Loading...
HomeMy WebLinkAboutSW8960329_HISTORICAL FILE_20220914STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 ' I�D0329 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 'L022.0c11°} YYYYMMDD Burd, Tina J From: Burd, Tina J Sent: Monday, August 15, 2022 9:46 AM To: Barraco CIV Talia M Subject: SW8 960329 - Camp Lejeune Naval Hospital, Parking Lot Addition and Medical Clinic The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 �E Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Based on the current guidance to minimize the spread of COVID-ig, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are worhing remotely m are on staggered shifts. 'I'a accommodate these staffing changes, all llEQoffice locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we maybe able to handle yen,- requests by phone at email. We appreciate your patience as we continue to serve the public during this challenging time. i Non -Transfer Application Completeness Review Checklist Project Name: �', �, NAVAL #0017AL /TAZk1J,1Gf N674 CA �Mcj� Cu A Project County/Location: D/tISLOt., Permit Action: New New Permit #2: Not located in the ETJ of the following delegated L Date Delivered to WIRO: 8/0 ZpZZ C BIMS Received/Accepted Date: A hO Z Z Date Given to Admin: O -,P-. 8I MS Acknowledged Date': � 15-'a a and functioning programs: NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mod / Renewal l— 11 Existing Permit N:)$0,3 2S' ❑Applicant & Permittee are the same?3 Expiration Date°: Permit Type: HD / LD Overall / HD &LD Combo General Permit /Offsite/ Exempt+ Redevelopment F-1Offsite to SW8: Development Type: Commercial / Residential / Other Ds Offsite Lot approved in Master Permit?s Subdivided?: Subdivision or Single Lot Rule(s): �2017 Coastal 2008 Coastal Il� �t1995 Coastal Phase 11 Universal 1988 Coastal Permitte Type & Documents Needed: Property Owner(s) Purchaser Lessee =HOA ODeveloper Viable? =Viable? =Viable? =Viable? =Viable? =Deed =Purchase Agmt =Lease =Election Minutes Paperwork fApplication ree: F_1$505 (within 6mo) Checklt(s): (,�IQ DNo Fee F-1Su pp lement' (1 new form or for older forms: 1 original per SCM) F]O&M 2 Soils Report (Infil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided' Project Narrative F-TSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N Plans (2 Sets) NOTES: IEnter RIMS Acknowledged Date on this Sheet 'For New Projects -Enter New Permit H on Supplements & Deed Restriction Templates. 31f permittee is different, STOP. Needs to be transferred first. "If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. slf Lot not approved in master permit, STOP. Master permit needs mod. EMAILED ENGINEER DATE: REVIEWER NAME: As4LE ♦r Comments: G:WQ\\\Reference Library\Procedures\Checklists\Completeness Review Checklist 20210908