Loading...
HomeMy WebLinkAboutSW8880310_HISTORICAL FILE_19880427STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 s 8 O 3\ b DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2--1 YYYYMMDD DIVISION OF ENVIRONMENTAL MANAGEMENT tiiaku�- Z2 /9� e5 aewwy L _P•o. Box Imo &)964W, n/.e. 2g42 Subject: Project No.p3J(j Q�arJ�s 6U)i Li5AM2e- County Dear Sir: The Environmental Management Commission (EMC) recently adopted new stormwater regulations which became effective on 1 January 1988. The new rules will affect much of the development taking place in the 20 coastal counties. Any development project located in a coastal county that is required to submit a Sedimentation and Erosion Control Plan to a State, County or City review agency, must comply with the newly adopted Stormwater Regulations. The Division of Environmental Management has received a copy of your Sedimentation & Erosion Control Plan (or your Stormwater Management Plan) _-for..the: subject project. " At this' time --your submittal concerning Stormwater Management: Appears to be complete, and your project will be reviewed as soon as possible. 4 Is not complete. The following information is needed to complete your submittal. Please submit the following items within 30 days, or your project will be returned as incomplete. \ For projects using density limits approach. A site plan that clearly indicates all built -upon areas (i.e., streets, driveways, walkways, building footprints, etc.). Computations showing the percent built upon areas, both existing and planned. A copy of deed restriction(s) and restrictive covenants which include t e State as a beneficiary. The attached submittal fort should be completed for projects using the density limits approach. Other Q rWQA/ W/N P/c15- APoPOS� Rc�T,J )WI V u/r B& C0A15rX4.k-1_eD For projects involving an engineered Stormwater Management System. Plan and profile drawings .of the collection and/or disposal systems. Computations or other criteria used to support design of the system. Volume of runoff. Volume of containment/disposal system. Dewatering time of containment/disposal system. Length of vegetative filter strip needed. Other Supporting data concerning the hydrogeology of the site: Seasonal high water table. Infiltration capacity - saturated hydraulic conductivity. Other Drainage pattern(s).for design storm event, and drainage pattern(s) for runoff in excess of design storm event. A complete stormwater maintenance manual including responsible party, quantitative and qualitative criteria which would indicate when corrective maintenance is required, and a periodic maintenance _- table as needed. A proposed monitoring program for the system. Other Please be reminded that construction of the subject project may not commence prior to approval of the Stormwater Management Plan. We will make every attempt to assist you in any way we can. If \�(ou have any questions, lease call �/KE )'ftl-l�I AS at telephone number (919) 25 4161. $sincerely, A. Preston Howa d, Jr., P.E. Regional Engin!Ir APH:kc CC: WiRO, CF Bill Mills