Loading...
HomeMy WebLinkAboutSW8100701_HISTORICAL FILE_20150225STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 16 b� 1 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS 50 HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 201; 07- 1h YYYYMMDD { NC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor February 25, 2015 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 100701 Birch Street Physical Fitness Center, P-1160 High Density Commercial Wet Detention Pond Project Onslow County Construction Contract No. N40085-09-R-3220 Dear Mr. Paul: Donald van der Vaart Secretary The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for the Birch Street Physical Fitness Center, P-1160 on December 19, 2014. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 100701 dated February 25, 2015, for the construction of the subject project. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any stormwater permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension. Accordingly, this permit shall now be effective from the date of issuance until December 31, 2021, which includes all available extensions. The project shall remain subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. The following modifications are included and covered by this permit: 1. The removal of the low density trail area previously covered under this permit. This low density area has been incorporated into the adjacent North Wallace Creek Roads and Jogging Trail permit, SW8120612. This adjustment was done to avoid overlap between these two permits and to simplify the permit boundaries. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and . binding. Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 - (910) 796-7215 / Fax: (910) 350-2004 Permit No. SW8 100701 If you have any questions, or need additional information concerning this matter, please contact Christine Nelson in the Wilmington Regional Office, at (910) 796-7215. Sincerely, Tracy Da is, P.E., Director Division of Energy, Mineral and Land Resources GDS/ can: \\\Stormwater\Permits & Prcjects\2010\100701 HD\2015 02 permit 100701 CC' Matthew Haley, Cape Fear Engineering, Inc. Wilmington Regional Office Page 2 of 9 State Stormwater Management Systems Permit No. SW8 100701 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO US MCB Camp Lejeune Birch Street Physical Fitness Center, P-1160 Birch Street, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two (2) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division and considered a part of this permit. This permit shall be effective from the date of issuance until December 31, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.9 of this permit. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control systems. The stormwater controls, Pond 1 and Pond 2, have been designed to handle the runoff from 119,420 and 202,745 square feet of impervious area, respectively. 3. The maximum amount of built -upon area allowed for the entire project is 322,165 square feet. 4. The additional bioretention cells and permeable pavement shown on the plans do not meet State Stormwater BMP design requirements and therefore are not considered a part of the approved state stormwater treatment system. These additional measures are incorporated only by reference and are not enforceable parts of the permit. 5. The drainage areas will be limited to the amounts of built -upon area indicated in Sections 1.2 and 1.9 of this permit, and per approved plans. This permit does not provide any allocation of built -upon area for future development. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 100701 6. A vegetated filter strip is not required for this pond as it has been designed for a 90% total suspended solids removal efficiency. The project shall maintain a 50' wide vegetated buffer adjacent all surface waters, measured horizontally from the normal pool of impounded structures, the bank of each side of rivers and streams and the mean high water line of tidal waters. The wet detention pond(s) may not be located within the buffer and no built -upon area is allowed within the buffer. All runoff being directed into wetlands shall flow into and through those wetlands at a non -erosive velocity of 2 fps or less. 9. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: -Pond 1 Pond 2 a. Drainage Area, acres:. Total, ftZ: Onste, ft2: ' Offsite; ft2: 5.07 220,986 220,986 0 8.53 371,715 367,130 4,585 b. Total Impervious Surfaces, ft2: Onsite,.ft2: Offs te, _ft2: 119,420 119,420 0 202,745 198,160 4,585 c. Design Storm, inches: 1.5 1.5 d. Average Pond Design Depth, ft: 3.0 3.5 e. TSS removal efficiency: 90% 90% f. Permanent Pool Elevation, FMSL: 6.50 9.50 g. 'Permanent Pool Surface Area, ftZ" 17,025 23,374 h Permanent Pool Volume; ft : 52,342 78,792 ' i. Permitted Forebay Volume, ft3: 10,053 16,765 j. :Permitted Storage Volume, ft3: 87,843 109,600 k. Temporary Storage Elevation, FMSL: 10.00 13.00 I. Pre-dev. 1 yr-24`hr. discharge rate, cfs: 0.20 0.33 m: Controlling Orifice: 1.5" 0 pipe 2.0" 0 pipe n. Orifice Flowrate, cfs: 0.06 0.11 o. Fountain Horsepower, HP: 1/6 1 1/3 . Receiving Stream / River Basin Beaverdam Creek / White Oak q. Stream Index Number: 19-20-2 r. Classification of Water Body: SIB, NSW II. SCHEDULE OF COMPLIANCE No person or entity, including the permittee, shall alter any component of the approved stormwater system shown on the approved plans unless and until the Division has approved of the revised plan. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 100701 3. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 4. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in Ponds 1 and 2 are 1/6 and 1/3 horsepower, respectively. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements.. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 100701 11. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum. requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 111. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change Form signed by both parties, to the Division, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project nor the transfer of common area to a third party constitutes an approved transfer of the stormwater permit. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action,' including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re - issuance or termination does not stay any permit condition. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 100701 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit modified and re -issued this the 25th day of February 2015. CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 7 of 9 State Stormwater Management Systems Permit No. SW8 100701 Birch Street Physical Fitness Center, P-1160 Stormwater Permit No. SW8 100701 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No. SW8 100701 t Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DEMLR Regional Office Page 9 of 9 DEMLR USE ONLY Date Rec ived Fee Paid Permit Number Applicable Rules: 0 Coastal SW -1995 ❑ Coastal SW - 2008 EF h 11 - Post Construction (select all that apply) ❑Non-CoastalSW-HQW/ORWWaters ❑ Universal Stormwater Management Plan 0 Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopier! for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P1160 Camp Lejeune Birch Street Physical Fitness Center 2. Location of Project (street address): City:CampLejeune County:Onslow Zip:28542 3. Directions to project (from nearest major intersection): Drive Northwest on Brich Street from the intersection of Brich Street and Holcomb Boulevard. The project site will be located on the right side (north) of Birch Street in approximately one-half mile. 4. Latitude:34° 40' 37" N Longitude:77° 20' 33" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): , ❑New ®Modification ❑ Renewal w/ Modificationt tRenemats rnith modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8100701 , its issue date (if known)Sept 30, 2010 , and the status of construction: []Not Started []Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑Sedimentation/Erosion Control: _ ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts ac of Disturbed Area b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ❑No ❑Yes �= U 1�__ U \V/ U If yes, see S.L. 2012-200, Part V1: httt ://portal ncdenr.org/web/Ir/rules-and-regulations DEC 16 2014 Form SWU-101 Version Oct 31, 2013 Page I of III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organization:Commandine Officer Marine Corps Base Camp Leieune Signing Official & Title:Thomas Bradshaw Civt Engineer Public Works Department b. Contact information for person listed in item la above: Street Address:1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28457 Mailing Address (if applicable):1005 Michael Road City:MCB Camp Lejeune State:NC Zip28457 Phone: (910 ) 451-3238 ext 3285 Fax: (910 ) 451-2927 Email: thomas.bTadshaw-@usmc.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information,. item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2, a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): Phone: ( ) Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor, or other person who can answer questions about the project: Other Contact Person/ Signing Official & Title b. Contact information for person listed in item 3a above: Mailing Address: City: Stab Phone: �_ ) Fax: 4. Local jurisdiction for building permits: Point of Contact: Phone #: DEC 16 2014 Form S WU-t01 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, brieflv summarize how the stormwater runoff will be treated. Runoff will be treated in 2 previously permitted wet detention basins 2. a. If claiming vested rights, identify the supporting documents: provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the 4. Total Property Area: 9.02 acres River basin. 5. Total Coastal. Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. - Total Property Area (4) - Total Coastal,Wetlands Area (5) - Total Surface Water Area (6) = Total Project Arew:9.02 acres Total project area shall be calculated to exclude the following file normal pool of hit ounded structures, the area between the batiks of streams and rivers, tire area below the Normal High Water (NI-piW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHYV) line. The resultant project area is used to calculate overall percent built upon area (BUA). Nort-constal wetlands landward of t/te NHW (or MHW) line tray be included in the total project area. 8. Project percent of impervious area: (Total. Impervious Area / Total Project Area) X 100 = 54.36 % 9. How many drainage areas does the project have?18 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in tine same format as below. Basin Information , Drainage Area 1, Drainage Area 2 Drainage Area _ 'Drainage Area Receiving Stream Name Beaverdam Beaverdam Stream Class * SB, NSW SB,NSW Stream Index Number * 19-20-2 19-20-2 Total Drainage Area (sf) 220,986 371,715 On -site Drainage Area (so 220,986 367,130 Off -site Drainage Area (so 0 4,585 Proposed Im ervious Area** (so 119,420 202,745 % Impervious Area** total 54.04% 54.54% Impervious- Surface Area Drains a Area 1 Drains e Area 2 Drainage Area_ Drainage Area _ On -site Buildings/Lots (so 64,385 18,357 On -site Streets (so 12,878 69,193 On -site Parking (so 0 69,193 On -site Sidewalks (so 5,734 13,510 Other on -site (sf) 36,423 7,572 Future (so 0 0 Off -site (sf) 0 4,585 Existing BUA*** (so - 0 0 Total (so: 119,420 202,745 ( �� Strewn Class and Index Number can be determined at: htt ortal.ucdetir.or veb o su classi ications f p g. g� DEW� 14 bnpervions area is defined as the built a ou area including, but not limited to, buildings, n s, sil ewalks, gravel areas, etc. I \CtIVI, ""' f,u.ut IOINn.....� e.,ow% nun lr+lri LUlll renluul Idler ueueluprnrnl. UU nu+ repUrlWay ed+Sling, Dun lure is to be removed and which will be replacer( by new BUA. qv:------ Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from httr)://r)ortal.ncdenr.orQ/web/wa/ws/su/bmt)-nianual. VI. SUB MITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hn://portal.ncdenr.org/web/wq/ws/su/statesw/forms dots. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at hn://portal,ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hqR://portil.ncdenr.org/web/wq/ws/su/statesNv/forms dots. Initials 1. Original and me copy of the Stormwater Management Permit Application Form. WrV _ 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants N (-A Form. (if required as per Part V11 below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M u(A agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to 1� hn://www.envhelp.org/pages/"onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor MTYA the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the N(A receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). �I�A 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: V a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impouncRd�� p� 8 �1rr structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. DEC ' 6 zu�i j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. gY; in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Fomr S WU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify %(4 elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verifij the SHWI' prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: W A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC —�A(A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. h!W://ww%v,secretary.state.nc.us/CorRorations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://Vortal.ncdenr.orghvebar/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Matthew Haley, PE Consulting Firm: Cape Fear Engineering, Inc. Mailing Address:151 Poole Road Suite 100 City:Belville State:NC Zip:28451 Phone: (910 ) 383-1044 Fax: (910 1 383-1045 Email:matt.haley©capefearen ineering.mm IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or type name of person listed in Contact information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item In) with (print or type name of organization listed in Contact hmfornmntimn, item 7a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stonnwater system. F_ E��� DEC 16 20% Fonn SWU-101 Version Oct.31, 2013 Page 5 of As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that before me this _ day of County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION . 1, (print or hype name of person listed in Contact Information, item Ia) Thomas Bradshaw certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rule under 15A NCAC 2H . and any other applicable state stormwater requirements. Signyatture: i� Date: 1211 A 1, 1 i m �- . s4ri- 1�1 c a Notary Public for the State of DN o' 6) I nG , County of ir15�11FtJ do hereby certify that personally personally appeared before me this E day of D t!Q,I R Qy. and ack owledgc the due execution of the application for a stormwater permit. Witness my hand and official seal, A S a Nat0ry Public Onsiow County =My Commission Exp 05/26/2019 C SEAL My commission expires i t ;i all lh 1 6 1 i1 Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 CAPE FEAR ENGINEERING December 19, 2014 Christine Nelson Environmental Engineer 127 Cardinal Drive Ext. Wilmington, NC 28405 RE: Stormwater Permit Modification to Birch Street Fitness Center Stormwater Project No. SW8 100701 MCB Camp Lejeune Onslow County Dear Christine, In response to your emailed Request for Additional Information dated December 16, 2014 for the North Wallace Creek Roads and Jogging Trails permit (SW8 120612); Cape Fear Engineering is submitting additional information for the modification for the Birch Street Fitness Center (SW8 100701). This additional information is provided to correct an issue in the graphical presentation of the proposed permit boundary between the Birch Street Fitness Center (SW8 100701) and the North Wallace Creek Roads and Jogging Trail (SW8 120612) permits. Enclosed you will find the revised Wallace Creek Master plan showing the corrected overall Birch Street Fitness Center boundary. This change does not affect any of the other previously provided information for this permit modification. Please let us know if you have any questions or need any additional information. Sincerely,.�;y�pp- Matthew Haley, P.E. Cape Fear Engineering, nc. Cc: File 558-108 "36" EcEO E DEC 19 2014 BY:pr --- DEC 19 2014 151 Poole Road, Suite 100 • Belville, NC 28451 • TEL: (910)383-1044 • FAX (910)383-1045 www.copefearengineering.com CAPE FEAR ENG1NE.ER1,4 151 Poole Road, Suite 100 Belville, NC 28451 TEL (910) 383-1044 FAX (910) 383-1045 v .capefearengineering.com To: JNCDENR Water Quality Section - Stormwater 127 Cardinal Dr. Ext Wilmington, NC 28405 Attn: Christine Nelson Transmittal r 19. 2014 I File: 1 558-108 "36" 1 P1160 Camp Lejeune Birch Street Physical Fitness Center (SW8 100701) Stormwater Permit Modification ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 1 Original Cover Letter 2 Copy Revised Wallace Creek Low Density Master Plan 2 Copy Revised Wallace Creek Master Plan w MAC'. DEC 19 2 REMARKS Please let me know if you have any questions or need any additional information. Thanks. CC: File 558-108 "36" Cape Fear Engineering, Inc. Signed: Matthew Haley, P Received By: P955m1 -t 08 NWC Engineering WdminlStormwateMtOD tofintess oenten2014-12-19 Trans_ NCDENR_Stormwaterdoo Casmer-, Jo Fro7n: Casmer, Jo Sent: Thursday, December 18, 2014 3:50 PM To: 'thomas.bradshaw@usmc.mil'; 'matt.haley@capefearengineedng.com' Subject: P1160 Camp Lejeune Birch Street Physical Fitness Center, Stormwater Permit SW8 100701 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) received the Stormwater Permit Application and $505.00 fee on December 16, 2014. Your project will be assigned to a staff member and you will be notified if additional information is needed. Please be advised that the construction of built —upon area may not commence until the Stormwater Permit is issued. ,/o Casmer Administrative Assistant for DEMLR/Stormwater Section NC Department of Environment & Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 Phone:(910) 796-7336 Fax: (910) 350-2004 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and maybe disdosed to third parties Project Name: Received Date: Z CQ D Project Location: Accepted Date: Rule(s) of Permit: Paperwork . Coastal 6 11995 Coastal or.......:.-.LU-- r-l:ype:.._..wi.nn OQ Stream Class: ®Phase II (WiRO ) ®Universal El 1988 Coastal Existing Permit # (Mod or PR): (p O -]0) PE Cert on File? :..__Residential -=-.(=. Map W Ma Emailed Engineer on: Supplement(s) (1 original per BMP) BMP Type(s): ®O&M with correct/original signatures (1 original per BMP except LS/VFS and swales) �ication with correct/original signatures ®Deed to to SW8 e� Corp or LLC: Sig Auth per SoS or letter ®Email Address: 505 (within 6mo) E?Kail Address: Design Engineer Owner 6', A.- Act I ®Soils Report with SHWT Note to Reviewer: 6 a ®Calculations (signed/sealed) ® No obvious errors ®Density includes common areas, etc / U° � �/Zc eC'' ®Deed Restrictions, if subdivided: Msiened & Notarized Plans Sets ®Grading ®Vicinity Map ®Legend ®Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Wetlands: Delineated or No Wetlands ®Layout (proposed BUA dimensions) ®DA Maps ®Project Boundaries Infiltration Wet Pond Offsite Soils Report Soils Report �PE Cert for Master Lot #: SHWT: ®Deed Rest for Master ®Lot # Matches Master Bottom: ®SHWT: PP: BUA Permitted (Master): sf Vicitari. BUA Proposed (Offsite): sf Additional Information: Dre. n.i• Pr000sed: BUA (sf) DA (sf) Permlttea rrupuaeu: �r�� r• PP (el) SHWT (el) Depth (ft) SA (sf) Nelson, Christine From: Nelson, Christine Sent: Monday, December 15, 2014 11:52 AM To: 'Matt Haley' Cc: Bradshaw CIV Thomas C; Scott, Georgette Subject: RE: Wallace Creek - SW8 120612 Matt, I do see that 3 packages were delivered. The 2 modification packages are sitting with the other incoming regular program projects waiting for a completeness review. I have the 3id package of the requested information for 120612 in front of me and will hopefully get started on it this afternoon. Thanks for the heads up on the signed forms being delivered tomorrow. I'll make sure they get paired up with the 2 modification packages. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Matt Haley [ma ilto: matt. haley@capefearengineering.com] Sent: Monday, December 15, 2014 10:57 AM To: Nelson, Christine CC: Bradshaw CIV Thomas C Subject: Re: Wallace Creek - SW8 120612 Christine, Hope you had a wonderful vacation. Just want to make sure that you received three packages to address the below comments. These were delivered on Friday. Also, FYI Thomas Bradshaw will be bringing the signed application documents when he is in town tomorrow. Thanks, Matthew Haley, P.E. Cape Fear Engineering, Inc. On Nov 26, 2014, at 3:29 PM, "Nelson, Christine" <christine.nelson@ncdenr.gov> wrote: Matt, I have had a chance to take a look at the resubmitted items for the modification to the North Wallace Creek Roads and Jogging Trail permit (SW8 120612). 1 do have a few comments: 1. The modifications to the bridges to add open slatted decking within the 50' buffer looks fine except for a small sliver of pavement that looks to be within the 50' buffer on the northern side of Bridge 1 (refer to C-201). Please double check this area to make sure the open slatted boardwalk is extended to beyond the buffer. 2. It appears that a stone check dam is proposed within the 50' buffer. Please note that the 50' buffer must be vegetated. Please confirm that the stone check dam will be removed after construction or relocate it such that it is located outside the 50' buffer. CAPEFEAR ENGINEERING- 151 Poole Road, Suite 100 Belville, NC 28451 TEL (910) 383-1044 FAX (910) 383-1045 w .capetearengineering.corn To: JNCDENR Water Quality Section - Stormwater 127 Cardinal Dr. Ext Wilmington, NC 28405 Attn: Christine Nelson Transmittal Date: December 12, 2014 File: 558-108 "26" P1160 Camp Lejeune Birch Street Physical Fitness Center (SW8 100701) Stormwater Permit Modification ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 1 Original Application Fee ($505) 1 Original Cover Letter 1 Copy Revised Permit Application and Drainage Area Breakdown 2 Copy Revised Wallace Creek Master Plan EC 12 2014 91 Uy Elul• REMARKS Please let me know if you have any questions or need any additional information. Thanks. CC: ��, 1 ;, tlCape Fear Engineers g, Inc. File 558-108 "36" RECEIVED Signed: 0- DEC 12 2014 Matthew Haley, PE Received By: P'.t55M555-108 NWC Engineering WdraintStorraweteAMOD to 0ntess centerV014-12-12 Trans_ NCDENR_Storrr ater.doc CAPE FEAR ENGINEERING December 11, 2014 Christine Nelson Environmental Engineer 127 Cardinal Drive Ext. Wilmington, NC 28405 RE: Stormwater Permit Modification to Birch Street Fitness Center Stormwater Project No. SW8 100701 MCB Camp Lejeune Onslow County Dear Christine, In response to your Request for Additional Information dated November 18, 2014 and additional comments emailed on November 26, 2014 for the North Wallace Creek Roads and Jogging Trails permit (SW8 120612); Cape Fear Engineering is submitting this permit modification for the Birch Street Fitness Center (SW8 100701). The purpose of this modification is to avoid overlap between the existing Birch Street Fitness Center permit boundary and the proposed permit boundary for the North Wallace Creek Roads and Jogging Trails permit. Enclosed you will find the revised Wallace Creek Master plan showing the new overall Birch Street Fitness Center boundary. You will also find a revised stormwater permit application and drainage area breakdown removing the previously permitted low density trail area. Please let us know if you have any questions or need any additional information. Sincerely, /1 v ' Matthew Haley, P.E. Cape Fear Engineering, nc. Cc: File 558-108 "36" CEI E DEC1YEC 1 2 2014 BY: 151 Poole Road, Suite 100 • Belrille, NC 28451 • TEL: (910)383-1044 • FAX (910)383-1045 www.copefearengineering.com