HomeMy WebLinkAboutSW8100502_HISTORICAL FILE_20220906STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 Woo 02
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
® HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
20220CI Olo
YYYYMMDD
Burd, Tina J
From:
Burd, Tina 1
Sent:
Thursday, August 18, 2022 3:38 PM
To:
Barraco CIV Talia M
Subject:
SW8 100502 - P-1357 Child Development Center Courthouse Bay
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 10, 2022. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Based on the current guidance to minimize the spread of COVID-w, the Department of [nvironmemal Quality has adjusted operations to
protect the health and safety of the staff and public. Many employees are working, vouvely or n at ostaggered shifts. To accommodate these
staffing changes, all DFQoffice locations are limiting public access to appointments only. Please check with the appropriate staff before
visiting our offices, as we may be. able to handle your requests by phone or entail. We. appreciate your patience as we continue to serve the
public during this challenging time.
Non -Transfer Application Completeness Review Checklist
Project Name: t„ AII.-O
cl�4Nrsp_
Project County/Location:
0 P sLot.1
�GoJC.T.IpJSE
�A'�
Permit Action: New New Permit tt':
❑Not located in the ETJ of the following delegated
and functioning programs:
Date Delivered to WIRO:
BIMS Received/Accepted Date:
Date Given to Admin:
BIMS Acknowledged Date':
NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach
Bruns: Leland / Navassa (?) / Oak Island
Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City
Major Mod / Minor Mod enewal Existing Permit k:
Applicant & Permittee are the same?3
Permit Type: HD LD / LD Overall / HD &LD Combo
General Permit / Offsite / Exempt + Redevelopment
Development Type: Commercial / Residential
er
Subdivided?: Subdivision or InY a eIToT�
Rule(s): u201.7 Coastal �2008 Coastal u1995 Coastal
Phase 11 Universal 01988 Coastal
Expiration Date°:
7.4( Zozz-
dt,JP> 100602.
2 31 Zo2L
M
E_10ffsite to SWB:
FIIs Offsite Lot approved in Master Permit?5
Permittee Type & Documents Needed:
n Property 0wner(s) Elurchaser Lessee QHOA ODeveloper
Viable? =Viable? Viable? =Viable? =Viable?
=Deed =Purchase Agmt =Lease =Election Minutes
Paperwork
®Application
Mee: =$505 (within 6mo) Checkk(sJ: W 1 �E =No Fee
Supplement' (1 new farm or for older farms: I original per SCM)
ElO&M 2
Soils Report (Infil or PP)
Calculations (signed/sealed)
Deed Restrictions, if subdivided'
Project Narrative
USES Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N
Plans (2 Sets)
NOTES:
'Enter BIMS Acknowledged Date on this Sheet
2For New Projects -Enter New Permit H on Supplements & Deed Restriction Templates.
If permittee is different, STOP. Needs to be transferred first.
°If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first.
slf Lot not approved in master permit, STOP. Master permit needs mod.
EMAI LED ENGINEER DATE:
REVIEWER NAME:
Comments:
G: W D\\\Reference Libra ry\Procedures\Checklists\Corn pleteness Review Checklist_2021 09 08