Loading...
HomeMy WebLinkAboutSW8071207_CURRENT PERMIT_20220907STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 b 11 10- DOC TYPE LK] CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE �,b��% 81y 1 YYYYMMDD ROY COOPER Governor ELIZABETHS. BISER secretary BRIAN WRENN Director September 7, 2022 NORTH CAROLINA Environmental Quality Lowe's Home Centers, LLC Attn: Richard Goodman, ManagerNP Real Estate, Construction and Retail Facilities 1000 Lowe's Blvd Mooresville, NC 28117 Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 071207 Lowe's of Jacksonville Onslow County Dear Mr. Goodman: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on August 15, 2022. The Division is hereby notifying you that permit SW8071207 has been renewed, updated, and re -issued on September 7, 2022, as attached. Please be aware that the renewal and re - issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until December 31, 2029 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center; Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, 4 .37;, Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment C — permitting History copy of the Renewal Application Documents DES/ams: \\\Stormwater\Permits & Projects\2007\071207 14D\2022 09 permit 071207 cc: Wilmington Regional Office Stormwater File North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 071207 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Lowe's Home Centers, LLC Lowe's of Jacksonville Yopp Road, Jacksonville, Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2006-246 (hereafter referred to as the "stormwater rules and the NPDES Phase II Post Construction Requirements') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until December 31, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division fora permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. Page 1 of 7 Post -Construction Stormwater Management Permit No. SW8 071207 q 3. El This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 of this permit. The subdivision is permitted for one lot and eight outparcel lots, each allowed built -upon area (BUA) as follows: Lot / Out arceI No. Lot Area, ac Max BUA, s . ft. Lot #1 14.8 532,000 Outparcel #13 0.84 31,102 Outparcel #14 0.80 29,621 Outparcel #15 0.88 32,583 Outparcel #16 1.07 39,618 Outparcel #17 1.27 47,023 Outparcel #18 1.38 51,096 Out arcel #19 1.72 63,685 Out arcel#20 0.86 31,842 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The following design elements have been permitted for this wet detention pond, and must be provided in the system at all times. a. Drainage Area, acres: 23.7 Onsite: 1,031,916 Offsite: none b. Total Impervious Surfaces, ft2: 858,113 Lot #1 (Lowe's) 532,000 Buildings, ft2: 181.650 Roads/Parking, ft2: 314,985 Other, ft2: 34,908 Outparcel #13, ft2: 31,102 Outparcel #14, ft2: 29,621 Outparcel #15, ft2: 32,583 Outparcel #16, ft2: 39,618 Outparcel #17, ft2: 47,023 Outparcel #18, ft2: 51,096 Outparcel #19, ft2: 63,685 Outparcel #20, ft2: 31,842 Offsite, ft2: none C. Pond Depth, feet: 9 (5.2 average) d. TSS removal efficiency: 90% e. Design Storm: 1.5 f. Permanent Pool Elevation, FMSL: 15.00 g. Permitted Surface Area @PP, ft2: 60,208 h. Permitted Storage Volume, ft3: 114,735 i. Storage Elevation, FMSL: 16.70 j. Controlling Orifice: 4" O pipe k. Permanent Pool Volume, ft3: 313,693 I. Forebay Volume, ft3: 57,272 m. Maximum Fountain Horsepower: 1/2 n. Receiving Stream / River Basin: Brinson Creek / White Oak o. Stream Index Number: 19-12 p. Classification of Water Body: "Sc, NSW' Page 2 of 7 Post -Construction Stormwater Management Permit No. SW8 071207 II. SCHEDULE OF COMPLIANCE The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Energy, Mineral and Land Resources. Both the permittee and the lot owner are subject to enforcement action for failing to maintain compliance with the built -upon area limit. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve either the permittee or the lot owner of the responsibility to maintain compliance with the permitted BUA limit. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use, prior to the construction of any built -upon surface. 5. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. Page 3 of 7 Post -Construction Stormwater Management Permit No. SW8 071207 10. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 11. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 071207, as issued by the Division of Energy, Mineral and Land Resources under NCAC 2H.1000 and Session Law 2006- 246. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral and Land Resources. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Energy, Mineral and Land Resources. f. The maximum built -upon area per lot is as follows: Lot / Out arcel No. Lot Area, ac Max BUA, s . ft. Lot #1 14.8 532,000 Outparcel #13 0.84 31,102 Outparcel #14 0.80 29,621 Outparcel #15 0.88 32,583 Outparcel #16 1.07 39,618 Outparcel #17 1.27 47,023 Outparcel #18 1.38 51,096 Out arcel #19 1.72 63,685 Out arcel #20 0.86 31,842 This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. Built -upon area in excess of the permitted amount will require a permit modification. Each lot within the subdivision whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division of Energy, Mineral and Land Resources and receive a permit prior to any construction on the lot. 12. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, bear the signature of the Permittee, the deed book number and page and stamp/signature of the Register of Deeds. Page 4 of 7 Post -Construction Stormwater Management Permit No. SW8 071207 13. Decorative spray fountains are allowed in the pond, subject to the following criteria: a. The minimum permanent pool volume is 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. C. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The fountain may not be placed into the forebay. e. The falling water from the fountain must be centered in the main pond, away from the shoreline. f. The maximum horsepower for a fountain in this pond is 1/2 horsepower. 14. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 15. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. III. GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, V. The assignment of declarant rights to another individual or entity, Page 5 of 7 Post -Construction Stormwater Management Permit No. SW8 071207 vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 7th day of September 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Gggin-, 20 BrianW Wrenn, birector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 071207 Page 6 of 7 Post -Construction Stormwater Management Permit No. SW8 071207 Master Permit No. SW8 071207 Lot # from Master Permit Drains to Pond # Offsite Permit No. Date Issued Offsite Project Name Allocated BUA Proposed BUA 13 1 31,102 14 1 29,621 15 1 32,583 16 1 39,618 17 1 47,023 18 1 51,096 19 1 63,685 20 1 N/A Pond lot 31,842 Page 7 of 7 Attachment C - Permitting History Lowe's of Jacksonville Permit No. SW8 071207 Approval Date Permit Action BIMS Version Description of the Changes 1/28/2008 Original Approval 1.0 construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H A000 and Session Law 2006-246 1/20/2010 Correction - inclusion of an "Offsite Lot Table" to assist in tracking the outparcel development; The addition of a requirement to submit a renewal application 180 days before the permit expires; and A correction to the permit adjudication period from 60 days to 30 days 9/7/2016 Transfer 1.1 from Jemsite Development, LLC to Lowe's Home Centers, LLC 9/7/2022 Renewal 2.0 Expires December 31, 2029 • FeSr+�r 3 2014 Mr. Chris Baker NCDENR Wilmington Regional Office 127 Cardinal Drive Ext Wilmington, NC 28405 Re: Lot 18—Proposed Dialysis Center Freedom Village Shopping Center Jacksonville, NC Dear Mr. Baker, 5vomtrac �It� V-KNz 15 Tie Nam,,, Co/� ►c�c,� 33Ct,. C9�i3. Flo � � Pursuant your meeting with Chris Bailey on January 21, 2014, regarding development of Lot 19[Biotest] for Freedom Village Shopping Center, we are advising you that we are currently under contract with Bailey and Associates to purchase Lot 18, for the development of a medical facility. The contract agreement with Bailey and Associates requires that we share a common driveway. This is shown on the plans for Lot 19[Biotest]. In addition, we are in the process of completing plans for our project[Dialysis Center] on Lot I8,which we hope to be complete within the next 30-45 days of this letter. We understand that an Off -Site Storm water permit is required from the NCDENR for our project. At permitting, we fiuther understand that the total square footage for the shared drive between Lots 18 and 19 will be split between the two lots and this will be reflected in each lot's total square footage for each lot's project permit. Upon completion of our plans and specifications, our engineer will submit same to NCDENR. Should there be any questiops or concerns, please feel free to contact me. LLC Gray 11illl, Member Flondo STATE OF N9RiHEARANNA COUNTYOF SfyhlnUlit I certify that the following person personally appeared before me this day, acknowledging to me that to me that he voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: Mtmotr Date: 2 3 ZO MH M0AKER Signature of Notary Public: . 11WM Printed/Typed Name of Notary: I 1 My Commission Expires: o l 1 w i g