Loading...
HomeMy WebLinkAboutSW8071026_HISTORICAL FILE_20080410STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 011021v DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2oog 0`110 YYYYMMDD \O�dF WAT f9 r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director Division of Water Quality April 10, 2008 Bruce Shell, New Hanover County Manager New Hanover County Fire Department 230 Government Center Drive, Suite 195 Wilmington, NC 28403 Subject: State Stormwater Permit No. SW8 071026 New Hanover County Murrayville Fire Station High Density Commercial Project New Hanover County Dear Mr. Shell: The Wilmington Regional Office received a complete Stormwater Management Permit Application for New Hanover County Murrayville Fire Station on April 8, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 071026 dated April 10, 2008, for the construction of the subject project. This permit shall be effective from the date of issuance until April 10, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Rhonda Hall, or me at (910) 796-7215. Sincerely, �i.u,oCa.Y1�i:QDao l� Edward Beck Regional Supervisor Surface Water Protection Section ENB/ rbh: S:\WQS\STORMWATER\PERMIT\071026.apr08 cc: Jody Bland, E.I., Norris, Kuske & Tunstall Consulting Engineers, Inc. New Hanover County Building Inspections City of Wilmington Development Services Rhonda Hall CWilmington-Regional-Office? CenntTal-Files NOCarolina AWtlrn!!y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Wilmington Regional Office Internet: www.ncwatcrauality org Fax (910) 350-2004 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10%Post Consumer Paper Customer Service 1-877-623-6748 State Stormwater Management Systems Permit No. SW8 071026 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Bruce Shell and New Hanover County Fire Department New Hanover County Murrayville Fire Station Murrayville Road, Wilmington, New Hanover County FOR THE construction, operation and maintenance of a wet detention pond(s) in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 10, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 51,141 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 071026 (-1 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, 9cres: Onsite, ft Offsite, ftz: b. Total Impervious Surfaces, ft2: C. Design Storm, inches: d. Average Pond Design Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMS�: g. Permanent Pool Surface Areq, ft h. Permitted Storage Volume, ft : i. Temporary Storage Elevation, FMSL: j. Controlling Orifice: k. Permitted Forebay Volume, ft3: I. Receiving Stream/River Basin: M. Stream Index Number: n. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 3.50 151,579 None 51,141 1 3.06 90% 35.0 8,121 5,129 35.6 1.25" 0 pipe 3,740 Smith Creek / Cape Fear 18-74-63 "C; Sw" The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowin.9 and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. Cl. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted Page 3 of 7 State Stormwater Management Systems Permit No. SW8 071026 facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change Form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 071026 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re - issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 11. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 10t' day of April, 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Caleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 NEW HANOVER COUNTY CONTRACP # 08-0156 NKT #07044 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM T his form may he photocopied for use as an original 1. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): New Hanover County Fire Department 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Bruce Shell New Hanover County Manager 3. Mailing Address for person listed in item 2 above: . 230 Government Center Drive, Suite 195 City: Wilmington State: NC Zip: 28403 Telephone Number: (910) 798-7184 4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): New Hanover County Murrayville Fire Station 5. Location of Project (street address): Road City: 6. Directions to project (from nearest major intersection): County: New Hanover located approximately 2,000 feet East of intersection of SR 1322 and US 117 7. Latitude: 340 17' 31 "N Longitude 770 52' 3"W 8. Contact person who can answer questions about the project: Name: J. Phillip Norris, P.E. / Jody Bland, E.I. Telephone Number: II. PERMIT INFORMATION 1. Specify whether project is (check one) X New Renewal of project (910)343-9653 S�o� Modification Form SWU-101 Version 3.99 Page 1 of 4 NEW HANOVER COUNTY CONTRACT # 08-0156 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the Existing permit number N/A And its issue date (if known) N/A 3. Specify the type of project (check one): Low Density x High Density Redevelop 4. Additional Project Requirements (check applicable blanks): CAMA Major X Sedimentation/Erosion Control General Permit Other 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater 2. Stormwater runoff from this project drains to the Cape Fear River Basin. 3. Total Project Area: 3.5 AC 4. Project Built Upon Area: 37+/- % 5. How many drainage areas does the project have? 1 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Smith Creek Receiving Stream Class $-1 y — (03 C- S� p Drainage Area 151,579 SF / 3.50 AC Existing Impervious * Area 0 Proposed Impervious* Area 51,141 SF / 1.17 AC % Impervious* Area (total) 37% Impervious* Surface Area Drainage Area I Drainage Area 2 On -site Buildings 13,530 SF / 0.31 AC On -site Streets (combined) 35,878 SF / 0.82 AC On -site Parkin (combined) On -site Sidewalks 1,733 SF / 0.04 AC Other on -site (future) Off -site N/A Total: 51,141 SF / 1.17 AC Total: * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 NEW HANOVER COUNTY CONPRACP # 08-0156 7. How was the off -site impervious area listed above derived? N/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number us issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runo/ffrom outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Form SWU-t03 Form SWU-104 Form SWU-105 Form SWU-106 Form SWU-107 Form SWU-108 Form SWU-109 Wet Detention Basin Supplement Infiltration Basin Supplement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Underground Infiltration Trench Supplement Neuse River Basin Supplement Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 NEW HANOVER COUNTY cONTRACP N 08-0156 V1. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Original and one copy of the Stormwater Management Permit Application Form One copy of the applicable supplement form(s) for each BMP Permit application processing fee of $420 (payable to NCDENR) Detailed narrative description of stormwater treatment / management Two copies of plans and specifications, including: - Development / Project name Engineer and firm Legend North arrow Scale - Revision number & date Mean high water line - Dimensioned property / project boundary Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished Floor elevations Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. J. Phillip Norris, P.E. Designated agent (individual or firm): Norris, Kuske & Tunstall Consulting Engineers, Inc. Mailing Address: Qn9 Market Strppt City: Wilmington State: NC Zip: 28401 Phone: (910) 343-9653 VIIL APPLICANT'S CERTIFICATION Fax: (910) 343-9604 Bruce Shell, New Hanover County 1, (print or type name of person listed in General Information, item 2) Manager Certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of l 5A NCAC 2H.1000. —::7� . Signature: Date: 7 la - 6 ? Form SWU-101 Version 3.99 Page 4 of 4 J. Phillip Norris, P.E NORRIS, KUSKE & TUNSTALL John S. Tunstall, P.E. John A. Kuske, III, P.E. James T. Pyrtle, P.E. Kent P. Harrell, P.E. CONSULTING ENGINEERS, INC. James L. Lewis, Jr., P.E. J.A. Kuske, P.E. 902 Market Street • Wilmington, NC 28401-4733 • Phone (910) 343-9653 • Fax (910) 343-9604 E-Mail: office@nkteng.com LETTER OF TRANSMITTAL To: Ms. Rhonda Hall Date: April 7, 2008 Job No. 07044 NC DENR / Division Water Quality subied: Murrayville Fire Station 127 Cardinal Drive Extension New Hanover County Wilmington, NC 28405-3845 WE ARE SENDING YOU VIA MAIL ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ❑ PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-287-5900 if you have any difficulty receiving this message. COPIES DATE NO. DESCRIPTION 1 Page 4 of State Stormwater application 1 Page 1 of Wet Detension Supplement 1 Page 2 of Wet Detension Supplement 2 Sheet 2.0 2 Sheet 2.4 BY: ® AS REQUESTED ❑ FOR YOUR USE ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL ❑ FOR BIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: CC: SIGNED Joseph K. Bland, El / neh CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. ANORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, INC. January 17, 2008 Ms. Rhonda Hall, Environmental Engineer NC DENR Division of Water Quality Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Murrayville Fire Station New Hanover County NKT Project No. 07044 Dear Ms. Hall: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S. Tunstall, P.E. J.A. Kuske, P.E. of Counsel In response to your emailed comments on December 20, 2007, the following is offered: 1. The plans, calculations, and page 2 of the state permit application form have been updated. 2. Pond elevations have been corrected. Please contact us if you have any further questions or comments. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. Joseph K. Bland, E.I. JKB/neh 07044 01-17-08 s-sw-response-Itr RF=1 1V ED RYt JAN 2 2 2008 902 Market Street • Wilmington, NC 28401-4733 0 Phone: 910.343.9653 • Fax: 910.343.9604 Date Design 902 Market Street Sheet �'' NORRIS, KUSKE&TUNSTALL Wiimin fOn, NC 28401-4733 ll�.l I1/d AM CONSULTING ENGINEERS, INC. g Ot Check Job For Job No. �7�fi,i/f�co Sim/�'vw�L fi�'�G+Ifi1�OnS NORRIS, KUSKE TUNSTALL 1/1712008 CONSULTING ENGINEERS, INC. State Stornawater Calculations Proiect: NHC Fire Station Murraysville Drainage Basin: Drainage Area, DA = Impervious Area = Pervious Area = % Impervious, I = Storage Volume Required (Simple Method): Design Depth, D = Normal Pool Elevation = State Storage Pool Elevation = Bottom Pool Elevation = Runoff Volume, Rv = Required Storage Volume = Provided Storage Volume = Required Surface Area: Average Depth, Davg = % Imp Low 30.00 High 40.00 Low 30.00 High 40.00 Required Surface Area = Provided Surface Area = Drawdown Orifice: Avg. Head = Drawdown Time = Internal Diameter = Internal Diameter = Drawdown Time = Internal Diameter = Intemal Diameter= Avg Internal Diameter = Design Orifice Diameter = NKT No: 151,579i sf 51;141sf 100,438 sf 33.74 % 1 l) in 35 SA = 8 121., sf "'''`" ` 35; SA= 8974'sf .. . 0.354 intin Rv = 0.05 + 0.009*1 4,467 ft3 V = D/12 x Rv x DA 5,129 ft3 OKI 3.06 ft SA/DA Avg Depth Proj % Imp SA/DA 3 3.50 33.74 3.37 4 3.5 4.5 SA/DA = 0.30 It 2 days 0.11 It 1.34 in 5 days 0.07 ft 0.85 in 1.09 in 1.25 in 3.00 33.74 3.87 3.81 90% TSS removal, no filter strip 5,777 sf 8,121 sf OKI 172,800 s 432,000 s OKI 07044 H:\PROJECTS\2007\07044 Murrayville Fire Station\Calculations\07044 -6-23-07 w future imp: State Storrnwater Pond Spreadsheet (Avg. Depth) 1/17/2008 Main Pond Volume (Excluding Forebay) Pond Normal Pool Area Bottom of Veg Shelf Pool Area Bottom Pool Area Normal Pool Elevation Bottom of Veg Shelf Elevation Bottom Pool Elevation Normal Pool to Bottom Pond Volume Forebay Volume (Excluding Main Pond) Normal Forebay Pool Area Bottom Forebay Area Normal Pool Elevation Bottom Forebay Elevation Forebay Sizing 5,561 ` :!sf 2943 e sf 'sf 35 ft rjZ3 '`?ft 25 "ft 17,035 FT' 2;316 . sf 177 i sf 35 It Normal Pool to Bottom Forebay Volume 3,740 ft3 Percent Forebay Volume: 1 18.0% (18 - 22% Required) OKI H:\PROJECTS\2007\07044 Murrayville Fire Station\Calculations\07044-8-23-07 w future imp.- State Stormwater Pond Spreadsheet (Avg. Depth) Stormwater Pond Average Death Required Information Elevation Normal Pool (Enp) Elevation Bottom Vegetated Shelf (E,,) Elevation Bottom Pool (Ebp) Surface Area Normal Pool (A,,) Surface Area Bottom Vegetated Shelf (A,,) Surface Area Bottom Pool (Abp) Weighted Average Method 35:00 ft 34 33 i ft 25 M ft 5561:'M sf 2942.00 sf :�,98.001 sf Area 1 (A,) 2619.00 sf A,=A p kv Depth 1 ( DI) 0.34 ft Dj= (Eap-Ev,)/2 Area 2 (A2) 2844.00 sf A2=A,,,-Abp Depth 2 ( D2) 5.34 ft D2= [(ESP E�j+(E,p-Ebp)]/2 Area 3 (A3) 98.00 sf A3=Abp Depth 3 ( D3) 10.00 ft D3=E,PEbp Da y==[F (Dn x A,)] / Anp Davy 3.06 ft NORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, INC. October 4. 2007 Ms. Linda Lewis, Environmental Engineer NC DENR / Division of Water Quality Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: State Stormwater Permit Submittal Murrayville Fire Station New Hanover County, NC NKT Project No. 07044 Dear Ms. Lewis: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S. Tunstall, P.E. CA J.A. Kuske, P.E. of Counsel 8, Enclosed are two (2) sets of plans for the subject project, two (2) drainage area plans, one (1) set of calculations, one (1) copy of the stormwater narrative, the original Division of Water Quality Stormwater Management Permit application, the original SWU-102 supplement form and a $505.00 check for the permit review fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEER , INC. Phi I ANo, . E. JPN/neh 07044 10-04-07-s-sw-Itr Enclosures cc: Donnie Hall / New Hanover County Fire Chief Bruce Shell / New Hanover County Manager 902 Market Street • Wilmington, NC 28401-4733 • Phone: 910.343.9653 • Fax: 910.343.9604 FDate I Design I 9Market Street NORR15, KUSKE&TUNSTALL I�1e \„i1 CONSULTING sNcineeas. INC. Wilmington, NC 28401-4733 Of Check Job I For JoOlvo. JPH I MuMt0M V'u .E 50�51Dw, o4' a�.cC 0-7� 1 777 Pre -Development �SubcatR49chlon \L� LLL�j YJ 22, Post Develo ment ent Ip Stormwater Pond 07044 R1 Stormwater Pond Prepared by {enter your company name here} HvHrnr.AnA 7 10 %/n 000479 © 2005 HvdroCAD Sof Murrayville Fire Station Type // 24-hr 2 yr storm event Rainfall=4.50" Page 2 LLC Subcatchment 1S: Pre -Development Runoff = 2.02 cfs @ 12.80 hrs, Volume= 0.337 af, Depth> 1.16" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr storm event Rainfall=4.50" Area (ac) CN Description 3.501 65 Woods/grass comb., Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 100 0.0050 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 4.50" 1.7 65 0.0154 0.6 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 35.0 200 0.0154 0.1 Sheet Flow, Woods: Lioht underbrush n= 0.400 P2= 4.50" 68.2 365 Total Subcatchment 1S: Pre -Development O Runoff z Type II 24-hr 2 yr storm event Rainfall=4.50" Runoff Area=3.501 ac Runoff Volume=0.337 of Runoff Depth>116" Flow Length=365' LL Tc=68.2 min CN=65 9 10 11 12 13 14 15 16 17 18 Time (hours) 07044 R1 Stormwater Pond Prepared by {enter your company name HvdroCADO 7.10 sin 000479 © 2005 HydroC Murrayville Fire Station Type 11 24-hr 2 yr storm event Rainfall=4.50" Page 3 LLC Subcatchment 2S: Post Development Runoff = 5,91 cfs @ 12.27 hrs, Volume= 0.541 af, Depth> 1.86" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr storm event Rainfall=4.50" Area (ac) CN Description 1,150 98 Paved parking, sidewalks, & roofs 1.930 65 Woods/grass comb., Fair, HSG B 0.411 61 >75% Grass cover, Good HSG B 3.491 75 Weighted Average Tc Length Slope Velocity Capacity Description 31.5 250 0.0113 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 4.50" Subcatchment 2S: Post Development 6 Type II 24-hr 2 yr storm event Rainfall=4.50" 5 Runoff Area=3.491'. ac Runoff Volume=0.541 of Q Runoff Depth>1.86" Flow Length=250' a Tc=31.5 min 0 3 CN-75 2 1 5 6 7 8 9 10 11 12 13 Time (hours) 15 16 17 18 19 20 0 RunoH 07044 R1 Stormwater Pond Prepared by {enter your company name here} HAroCADO 7.10 s/n 000479 © 2005 HydroCAD Sof Murrayville Fire Station Type 1124-hr 2 yr storm event Rainfall=4.50" Page 4 Pond 3P: Stormwater Pond Inflow Area = 3.491 ac, Inflow Depth > 1.86" for 2 yr storm event event Inflow = 5.91 cfs @ 12.27 hrs, Volume= 0.541 of Outflow = 1.96 cfs @ 12.78 hrs, Volume= 0.406 af, Atten= 67%, Lag= 30.5 min Primary = 1.96 cfs @ 12.78 hrs, Volume= 0,406 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 36.16' @ 12,78 hrs Surf.Area= 9,789 sf Storage= 10,353 cf Plug -Flow detention time= 119.5 min calculated for 0.405 of (75% of inflow) Center -of -Mass det. time= 58.9 min ( 871.3 - 812.4 ) Volume Invert Avail Storage Storage Description #1 35.00' 44,346 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.00 8,121 0 0 35.60 8,974 5,129 5,129 36.00 9,555 3,706 8,834 37.00 11,045 10,300 19,134 38.00 12,592 11,819 30,953 39.00 14,195 13,394 44,346 Device Routing Invert Outlet Devices #1 Primary 35.00' 24.0" x 40.0' long Culvert Ke= 0.500 Outlet Invert= 34.90' S= 0.0025 7' Cc= 0.900 n= 0.012 Concrete pipe, finished #2 Device 1 35,00' 1.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 35.60' 2.10' W x 0.30' H Vert. Orifice/Grate C= 0.600 #4 Device 1 36.50' 1.20' W x 0.35' H Vert. Orifice/Grate C= 0.600 #5 Device 1 37.50' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 Primary OutFlow Max=1.96 cfs @ 12.78 hrs HW=36.16' (Free Discharge) t- =Culvert (Passes 1.96 cfs of 4.64 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.04 cfs @ 5.1 fps) 3=Orifice/Grate (Orifice Controls 1.92 cfs @ 3.1 fps) =Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) Murrayville Fire Station 07044 R1 Stormwater Pond Type /I 24-hr 2 yr storm event Rainfall=4.50" Prepared by {enter your company name here} Page 5 HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 7/23/2007 Pond 3P: Stormwater Pond W 591 y_ Inflow Area=3.491 ac Peak Elev=36.16' 3; Storage__=_10,353 .cf 1�0.. 11 '12 13 14 15 16 17 15 19 20 Time (hours) Pond 3P: Stormwater Pond Stage -Discharge Discharge (cfs) io of ow D Primary D Primary Murrayville Fire Station 07044 R1 Stormwater Pond Type /I 24-hr 2 yr storm event Rainfall=4.50" Prepared by {enter your company name here} Page 6 HydroCADC 7 10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 7/23/2007 Pond 3P: Stormwater Pond Stage -Area -Storage -5 Surface 10 Storage Storage (cubic -feet) Murrayville Fire Station 07044 R1 Stormwater Pond Type // 24-hr 10 yr storm event Rainfall=6.72" Prepared by {enter your company name here} Page 7 HydroCAD®7 10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 7/23/2007 Subcatchment 1S: Pre -Development Runoff = 4.76 cfs @ 12.77 hrs, Volume= 0.750 at, Depth> 2.57" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr storm event Rainfall=6.72" Area (ac) CN Description 3.501 65 Woods/grass comb., Fair, HSG B Tc Length Slope Velocity Capacity Description 31.5 100 0.0050 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 4.50" 1.7 65 0,0154 0.6 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 35.0 200 0.0154 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 4.5_0" 68.2 365 Total Subcatchment 1 S: Pre -Development Hydrograph - - - - I ❑ Runaff Type II 24-hr 10 yr storm event Rainfall=6..72" ; 4 Runoff Area=3.501 ac' Runoff Volume=0.750 of Runoff Depth>2.57" 3- Flow Length=365' Tc=68.2 min CN=65 --- - —_ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Time (hours) 07044 R1 Stormwater Pond Prepared by {enter your company name HvdroCAD® 7.10 s/n 000479 © 2005 HydroC. Murrayville Fire Station Type/1 24-hr 10 yr storm event Rainfall=6.72" Page 8 7nznnrrr Subcatchment 2S: Post Development Runoff = 11.42 cfs @ 12.26 hrs, Volume= 1.043 af, Depth> 3.59" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr storm event Rainfall=6.72" Area (ac) CN Description 1,150 98 Paved parking, sidewalks, & roofs 1.930 65 Woods/grass comb., Fair, HSG B 0.411 61 >75% Grass cover, Good, HSG B 3.491 75 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 250 0,0113 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 4.50" Subcatchment 2S: Post Development Hydrograph _ . '- " _ .. .. _ _ _ _ _ - ❑ Runoff 12- naz tle Type II 24-hr 10 yr storm event Rainfall=6.72" 0 s Runoff-Area=3.491 ac 9 Runoff Volume=1.043..af. e Runoff Depth>3.59" Flow Length=250' Tc=31.5 min o s LL CN=75 s Murrayville Fire Station 07044 R1 Stormwater Pond Type 1124-hr 10 yr storm event Rainfall=6.72" Prepared by {enter your company name here) Page 9 HydroCAD®7 10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 7/23/2007 Pond 3P: Stormwater Pond Inflow Area = 3.491 ac, Inflow Depth > 3.59" for 10 yr storm event event Inflow = 11.42 cfs @ 12.26 hrs, Volume= 1.043 of Outflow = 4.55 cfs @ 12.68 hrs, Volume= 0.900 af, Atten= 60%, Lag= 25.1 min Primary = 4.55 cfs @ 12.68 hrs, Volume= 0.900 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 36.99' @ 12.68 hrs Surf.Area= 11,031 sf Storage= 19,029 cf Plug -Flow detention time= 95.6 min calculated for 0.897 of (86% of inflow) Center -of -Mass det. time= 54.9 min ( 853.6 - 798.7 ) Volume Invert Avail Storage Storage Description #1 35.00' 44,346 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surl Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.00 8,121 0 0 35.60 8,974 5,129 5,129 36.00 9,555 3,706 8,834 37.00 11,045 10,300 19,134 38.00 12,592 11,819 30,953 39.00 14,195 13,394 44,346 Device Routing Invert Outlet Devices #1 Primary 35.00' 24.0" x 40.0' long Culvert Ke= 0.500 Outlet Invert= 34.90' S= 0.00257 Cc= 0.900 n= 0.012 Concrete pipe, finished #2 Device 1 35.00' 1.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 35.60' 2.10' W x 0.30' H Vert. Orifice/Grate C= 0.600 #4 Device 1 36.50' 1.20' W x 0.35' H Vert. Orifice/Grate C= 0.600 #5 Device 1 37.50' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 Primary OutFlow Max=4.55 cfs @ 12.68 hrs HW=36.99' (Free Discharge) L1=Culvert (Passes 4.55 cfs of 11.52 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.05 cfs @ 6.7 fps) 3=Orifice/Grate (Orifice Controls 3.38 cfs @ 5.4 fps) =Orifice/Grate (Orifice Controls 1.12 cfs @ 2.7 fps) =Orifice/Grate ( Controls 0.00 cfs) Murrayville Fire Station 07044 R1 Stormwater Pond Type ll 24-hr 10 yr storm event Rainfall=6.72" Prepared by tenter your company name here} Page 10 HydroCAD®7 10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 7/23/2007 Pond 3P: Stormwater Pond Hydrograph . _.. _.. _ .. a Inflow n sa ds ❑ Primary 12 Inflow Area=3.491 ac " Peak Elev=36.9,9' 10 - _ . - Storage=! 9,029-cf - g y LL 5 155 cb 4 3 W Time (hours) Pond 3P: Stormwater Pond Staae-Discharge Discharge (cfs) D Primary Murrayville Fire Station 07044 R1 Stormwater Pond Type // 24-hr 10 yr storm event Rainfall=6.72" Prepared by {enter your company name here} Page 11 HydroCAD®7 10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 7/23/2007 Pond 3P: Stormwater Pond Stage -Area -Storage 0 Surface 0 Storage Storage (cubic -feet) 07044 R1 Stormwater Pond Prepared by {enter your company name. here} HvHrncAnR 7 10 s/n 000479 (9 2005 HvdroCAD Sof Murrayville Fire Station Type 1124-hr 25 yr storm event Rainfall=& 01 " Page 12 Subcatchment 1S: Pre -Development Runoff = 6.54 cfs @ 12.75 hrs, Volume= 1.021 af, Depth> 3.50" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr storm event Rainfall=8.01" Area (ac) CN Description 3.501 65 Woods/grass comb., Fair, HSG B Tc Length Slope Velocity Ca min) (feet) (ft/ft) (ft/sec) Description 31.5 100 0.0050 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 4,50" 1.7 65 0.0154 0.6 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 35.0 200 0.0154 0.1 Sheet Flow, Woods: Lioht underbrush n= 0.400 P2= 4.50" 68.2 365 Total Subcatchment 1S: Pre -Development Hydrograph ❑ Runoff 6.YI Ci6 Type II 24-hr 25 yr storm event s Rainfall=8.01" 3, Runoff Area=3.501 ac `> 5 Runoff Volume=1.021 of Runoff Depth>3.50" 4 Flow Length=365' Tc=68.2 min 3 CN=65 2 1 o.. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Murrayville Fire Station 07044 R1 Stormwater Pond Type Il24-hr25 yrstorm event Rainfall=& 01 " Prepared by {enter your company name here} Page 13 HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 7/23/2007 Subcatchment 2S: Post Development Runoff = 14.77 cfs @ 12.26 hrs, Volume= 1.356 af, Depth> 4.66" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr storm event Rainfall=8.01" Area (ac) CN Description 1.150 98 Paved parking, sidewalks, & roofs 1.930 65 Woods/grass comb., Fair, HSG B 0.411 61 >75% Grass cover, Good, HSG B 3.491 75 Weighted Average Tc Length Slope min) (feet) (f /ft) 31.5 250 0.0113 Capacity Description 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 4.50" Subcatchment 2S: Post Development Hydrograph 147 de 15 Type II 24-hr25 yrstorm event 0 Rainfall=8.01" 13- `y�` t2 Runoff Volume 3.491 ac Runoff Area- _. ,1.356 of 11_ 10. f.. Runoff Depth>4.66" Flow Len6th=250' a'< Tc=31.5 min LL 7 CN=75 6 r 4 3 2. 1 0. . . 6 6 7 6 9 10 11 12 13 14 15 i6 17 18 19 20 Time (hours) ❑ Runoff Murrayville Fire Station 07044 R1 Stormwater Pond Type 1124-hr 25 yr storm event Rainfall=& 01 " Prepared by {enter your company name here} Page 14 HydroCADS 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 7/23/2007 Pond 3P: Stormwater Pond Inflow Area = 3.491 ac, Inflow Depth > 4.66" for 25 yr storm event event Inflow = 14.77 cfs @ 12.26 hrs, Volume= 1.356 of Outflow = 5.82 cfs @ 12.68 hrs, Volume= 1.208 af, Atten= 61 %, Lag= 25.1 min Primary = 5.82 cfs @ 12.68 hrs, Volume= 1.208 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 37.46' @ 12.68 hrs Surf.Area= 11,763 sf Storage= 24,424 cf Plug -Flow detention time= 90.5 min calculated for 1.208 of (89% of inflow) Center -of -Mass det. time= 55.8 min ( 848.8 - 793.0 ) Volume Invert Avail Storage Storage Description #1 35.00' 44,346 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.00 8,121 0 0 35.60 8,974 5,129 5,129 36.00 9,555 3,706 8,834 37.00 11,045 10,300 19,134 38.00 12,592 11,819 30,953 39.00 14,195 13,394 44,346 Device Routing Invert Outlet Devices #1 Primary 35.00' 24.0" x 40.0' long Culvert Ke= 0.500 Outlet Invert= 34,90' S= 0.0025'/' Cc= 0,900 n= 0.012 Concrete pipe, finished #2 Device 1 35.00' 1.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 35.60' 2.10' W x 0.30' H Vert. Orifice/Grate C= 0.600 #4 Device 1 36.50' 1.20' W x 0.35' H Vert. Orifice/Grate C= 0.600 #5 Device 1 37.50' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0,600 Primary OutFlow Max=5.82 cfs @ 12.68 hrs HW=37.46' (Free Discharge) t- =Culvert (Passes 5.82 cfs of 15.16 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.06 cfs @ 7.5 fps) 3=Orifice/Grate (Orifice Controls 3.97 cfs @ 6.3 fps) =Orifice/Grate (Orifice Controls 1.79 cfs @ 4.3 fps) =Orifice/Grate ( Controls 0.00 cfs) Murrayville Fire Station 07044 R1 Stormwater Pond Type lI 24-hr 25 yr storm event Rainfall=& 01 " Prepared by {enter your company name here} Page 15 HydroCAD®7 10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 7/23/2007 Pond 3P: Stormwater Pond 13 12 1, 10- `0 9 3 8 0 n 7 6- - W 567861'01'11213 Time (hours� 0 Inflow 0 Primary Inflow Area=3.491 ac Peak Elev=37.46' Storage24,4 =24 cf. 15 16 17 18 19 20 Pond 3P: Stormwater Pond Staqe-Discharge Discharge (cts) 0 Primary 07044 R1 Stormwater Pond Prepared by {enter your company name here} HvdroCAD® 7.10 s/n 000479 © 2005 HydroCAD Sof W Murrayville Fire Station Type 1124-hr 25 yr storm event Rainfall=8.01 " Page 16 Pond 3P: Stormwater Pond Stage -Area -Storage S:�rtacelRcrize:�_'�-!M`et:ed Storage (tunic -reed Surface ❑ Storage 07044 R1 Stormwater Pond Prepared by {enter your company name HvdrnCAD® 7.10 s/n 000479 © 2005 HydroC, Murrayville Fire Station Type It 24-hr 100 yr storm event Rainfall=10.00" Page 17 s LLC Subcatchment 1S: Pre -Development Runoff = 9.44 cfs @ 12.73 hrs, Volume= 1.467 af, Depth> 5.03" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type It 24-hr 100 yr storm event Rainfall=10.00" Area (ac) CN Description 3.501 65 Woods/grass comb., Fair, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (f /sec) (cfs) 31.5 100 0.0050 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 4.50" 1.7 65 0.0154 0.6 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 35.0 200 0.0154 0.1 Sheet Flow, Woods: Licht underbrush n= 0.400 P2= 4.50" 68.2 365 Total Subcatchment 1S: Pre -Development Hydrograph Type 1124-hr.100 yr storm event 9 Rainfall.=10.00 _: ..._ 8 Runoff Area=3.501 ac 7 RunoffV6lume=1.467 af- -- Runoff Depth>5.03" 6- Flow Length=365' u 5 Tc=68.2 min CN=65- . . Time (houm) Murrayville Fire Station 07044 R1 Stormwater Pond Type 11 24-hr 100 yr storm event Rainfall=10.00" Prepared by {enter your company name here} Page 18 HydroCAD®7 10 s/n 000479 @ 2005 HydroCAD Software Solutions LLC 7/23/2007 Subcatchment 2S: Post Development Runoff = 20.02 cfs @ 12.26 hrs, Volume= 1.854 af, Depth> 6.37" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 yr storm event Rainfall=10.00" Area (ac) CN Description 1.150 98 Paved parking, sidewalks, & roofs 1.930 65 Woods/grass comb., Fair, HSG B 0.411 61 >75% Grass cover, Good, HSG B 3.491 75 Weighted Average Tc Length Slope Velocity Capacity Description 31.5 250 0.0113 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 4.50" Subcatchment 2S: Post Development 21. L 20 .. . _... .. _ -.. .... . .. .. 19 18 - 17 . ..__ .. ..... ..._._ 6 -Type II 24-hr 100 yr storm event - _Rainfall=10.00" -Runoff-Area=3.491 ac Runoff Volume=1.854.af Runoff Depth>6.37" Flow Length=250' .. Tc 31.5 min CN=75 . Yi p /���✓'III//I/////////////////////// 567861,011121314151617181920 Time (houm) Murrayville Fire Station 07044 R1 Stormwater Pond Type/1 24-hr 100 yr storm event Rainfall=10.00" Prepared by {enter your company name here} Page 19 HydroCAD& 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 7/23/2007 Pond 3P: Stormwater Pond Inflow Area = 3.491 ac, Inflow Depth > 6.37" for 100 yr storm event event Inflow = 20.02 cfs @ 12.26 hrs, Volume= 1.854 of Outflow = 14.16 cfs @ 12.47 hrs, Volume= 1.701 af, Atten= 29%, Lag= 12.8 min Primary = 14.16 cfs @ 12.47 hrs, Volume= 1.701 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 37.78' @ 12.47 hrs Surf.Area= 12,248 sf Storage= 28,191 cf Plug -Flow detention time= 78.9 min calculated for 1.701 of (92% of inflow) Center -of -Mass det. time= 50.9 min ( 836.8 - 785.9 ) Volume Invert Avail Storage Storage Description #1 35.00' 44,346 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 35.00 8,121 0 0 35.60 8,974 5,129 5,129 36.00 9,555 3,706 8,834 37.00 11,045 10,300 19,134 38.00 12,592 11,819 30,953 39.00 14,195 13,394 44,346 Device Routing Invert Outlet Devices #1 Primary 35.00' 24.0" x 40.0' long Culvert Ke= 0.500 Outlet Invert= 34.90' S= 0.0025 T Cc= 0.900 n= 0.012 Concrete pipe, finished #2 Device 1 35.00' 1.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 35.60' 2.10' W x 0.30' H Vert. Orifice/Grate C= 0.600 #4 Device 1 36.50' 1.20' W x 0.35' H Vert. Orifice/Grate C= 0.600 #5 Device 1 37.50' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 Primary OutFlow Max=13.96 cfs @ 12.47 hrs HW=37.77' (Free Discharge) t1=Culvert (Passes 13.96 cfs of 16.98 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.06 cfs @ 7.9 fps) 3=Orifice/Grate (Orifice Controls 4.31 cfs @ 6.8 fps) =Orifice/Grate (Orifice Controls 2.12 cfs @ 5.0 fps) =Orifice/Grate (Weir Controls 7.47 cfs @ 1.7 fps) Murrayville Fire Station 07044 R1 Stormwater Pond Type // 24-hr 100 yrstorm event Rainfall= 10. 00" Prepared by {enter your company name here} Page 20 HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 7/23/2007 Pond 3P: Stormwater Pond 21 E •P///////�///`///I/I/Iii/iiii/iii/% Time (hours) Pond 3P: Stormwater Pond Stage -Discharge Discharge (cts) D Primary 07044 R1 Stormwater Pond Prepared by {enter your company name Murrayville Fire Station Type 11 24-hr 100 yrstorm event Rainfall= 10. 00" Page 21 LLC Pond 3P: Stormwater Pond Stage -Area -Storage =_vr�ceMarizon!�I/`Neeed Area (=a-fti .7 Surface 10 Storage Storage (cubic -feet) STORMWATER SYSTEM & EROSION CONTROL NARRATIVE NEW HANOVER COUNTY. NORTH CAROLINA For New Hanover County Murrayville Fire Station 230 Government Center Drive, Suite 130 Wilmington, NC 28403 (910)798-7420 October 2007 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07044 NARRATIVE DESCRIPTION: The project site is a 3.5 acre tract located in New Hanover County along Murrayville Road. The soils of the site consist of lightly vegetated - moderately wooded - sandy topsoil and grades ranging from 0% to 2%. Approximately 3.1 acres will be graded to allow construction of a Fire Station with paved parking and paved access. The runoff from the site is estimated using the rational method 10-year design storm and rainfall data for the area. Construction is scheduled to begin as soon as all permits and approvals are obtained. The project consists of a lightly wooded tract to be developed into a New Hanover County Fire Station. Approximately 3.1 acres will be disturbed and 1.18 acres (37%) will be covered by impervious surfaces. EROSION CONTROL MEASURES: The attached plans and specifications outline the requirements for erosion control measures. Silt fencing will be provided along each side of the entrance drive where stormwater would be expected to sheet flow from disturbed areas directly to adjacent property. Gravel check dams will not be provided unless the Contractor has to temporarily discharge into an open ditch instead of the proposed storm drain outfall. The detention pond will be used as a silt basin during construction and restored to its design contours prior to completion. A gravel construction entrance will be constructed at the eastern entrance. Maintenance will be provided by the grading contractor and developer. STORMWATER MANAGEMENT MEASURES: The project site is located in New Hanover County. Land disturbing on the site will exceed one acre, which requires the site to comply with both State and County Regulations. The stormwater runoff from the development will be directed to the stormwater detention pond. The stormwater detention pond was designed to accommodate this site at 37% impervious area lot coverage. CONSTRUCTION SEQUENCE: The Contractor will install the gravel construction entrance and silt fence prior to beginning any clearing and grading operations. Additional silt fence will be installed when and if conditions warrant during construction. The detention pond/silt basin will be constructed immediately after that portion of the site is cleared, and outlet structure with protection will be installed. Disturbed areas will be landscaped or seeded upon completion. EROSION CONTROL NOTES AND MAINTENANCE PLAN 1. Install erosion control measures before beginning construction or as soon thereafter as possible. All erosion and sediment control practices will be checked for stability and operation following every runoff -producing rainfall but in no case less than once every week. Any needed repairs will be made immediately to maintain all practices as designed. 2. Maintain the gravel construction entrances in a condition to prevent mud or sediment from leaving the construction site. The contractor shall inspect the construction entrances on a daily basis. This will require periodic top dressing with additional No. 4 stone. Any objectionable materials spilled, washed, or tracked onto public roadways shall be removed immediately. 3. Install erosion control measures around the drop inlets as shown on the plans to trap silt during construction. Inspect the erosion control around the inlets after each rain and make repairs immediately. Remove sediment when it becomes 8" deep to provide adequate storage volume for subsequent rains. Remove and replace the rock when it no longer drains properly. When the contributing drainage area has been adequately stabilized, remove all materials and any unstable soil and either salvage or dispose of it properly. Bring the disturbed area to proper grade and appropriately stabilize all bare areas around the drop inlets. 4. Sediment will be removed from behind the silt fence when it becomes 0.5 feet deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. Silt fence stakes shall be spaced 6 feet apart unless a wire backing is used with 8 foot stake spacing. 5. Inspect temporary sediment traps / check dams after each period of significant rainfall. Remove sediment and restore the trap to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage from erosion or piping. Periodically check the depth of the spillway to ensure it is a minimum of 1.5 ft below the low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any riprap displaced from the spillway must be replaced immediately. After all sediment - producing areas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly. 6. The stormwater pond will act as a sediment basin and will be cleaned out when the level of sediment reaches 2.0 ft below the top of the riser. Gravel will be cleaned or replaced when the sediment pool no longer drains properly. 7. The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion -control devices or structures. In any event, slopes left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. 8. All disturbed areas shall be seeded within 21 calendar days of disturbance. All seeded areas will be fertilized, reseeded as necessary and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. 9. More stringent measures shall be used to halt erosion if those shown on this plan are not effective. 10. All erosion shall be controlled including side slopes before the project is completed. 11. Remove temporary measures upon completion of project. All permanent measures will be well established before project closeout. SECTION 02920 SOIL EROSION AND SEDIMENTATION CONTROL 1. GENERAL 1.1 Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and Local regulations. 1.2 The Contractor shall install all required silt fences, and construction entrances at the initiation of work, and have these measures reviewed and approved by the local permit authority prior to clearing and grading operations. 1.3 The Contractor shall, within 21 days of suspension or completion of land disturbing activities, provide permanent protective covering for disturbed areas. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and siltation control throughout the construction and post -construction period. Use the specified seed for both temporary and permanent seeding. 2. PRODUCTS 2.1 Asphalt for anchoring mulch shall be Type SS-1 Emulsion. 2.2 Fertilizer shall be 10-10-10 grade or equivalent. 2.3 Lime shall be dolomitic agricultural ground limestone containing not less than 10 percent magnesium oxide. 2.4 Mulch shall be small grain straw, hay, wood chips, asphalt emulsion, jute or other suitable material free of undesirable weed seed. 2.5 Phosphate shall be 20 percent superphosphate or equivalent. 2.6 Seed shall be 20% carpet grass, 24% Bermuda, 20% turf Fescue, 10% Creeping Red Fescue, and 24% Annual Rye grain. Bermuda seed shall be hulled for warm weather planting and unhulled for cool weather planting. Purity of seed shall be a minimum of 98 percent and germination shall be a minimum of 85 percent. 2.7 Silt fence shall consist of NCDOT Class A fabric supported by metal posts spaced not more than 6 feet on center. The bottom of the fabric shall be buried a minimum of 6 inches. 2.8 Gravel for check dams shall be #57 washed stone. 2.9 Aggregate for construction entrance shall be #4 washed stone. 2.10 Stone rip rap for check dams and erosion control shall be NCDOT Class A or B as shown. 3. EXECUTION 3.1 General: Take every practicable measure during construction or suspension to work to minimize erosion and siltation. Measures should include good construction practices, temporary physical barriers to sediment travel, settling basins for new ditches, and establishment of vegetative cover. 3.2 Construction Practices 3.2.1 Avoid dumping soil or sediment into any wetland or watercourse. 3.2.2 Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. 3.2.3 Avoid equipment crossings of streams, creeks, and ditches where practicable. 3.2.4 Grade all cut, fill and ditch slopes to minimum slope of 3:1, unless otherwise shown or directed. 3.3 Temporary Physical Barriers are required where sedimentation on off site property or excessive erosion is a problem. 3.3.1 Mulch shall be used for temporary stabilization of areas subject to excessive erosion and for protection of seedbeds after planting where required. 1. Apply grain straw and hay at a rate of 75 to 100 pounds per 1000 square feet and wood chips at a rate of 500 pounds per 1000 square feet. Jute and mesh should be installed as per manufacturer's instructions. 2. Asphalt emulsion for slope stabilization should be applied at a rate of 1,000 gallons per acre. Asphalt emulsion used for anchoring straw should be applied at a rate of 150 gallons per ton of straw. 3.3.2 Silt Fences shall be used at the base of slopes to restrict movement of sediment from the site. Clean silt fence of accumulated sediment after each rainfall event or when it exceeds a depth of 0.5 feet above natural grade. 3.3.3 Stone Check Dams, placed at the discharges of creeks, ditches, and swales, shall consist of Class A or Class B erosion control stone at minimum two feet high and three feet thick across the watercourse, with a one foot thick layer of gravel on upstream side. Remove sediment if accumulated to a depth of 1.0 feet at upstream face. 3.4 Vegetative Cover: Establish and maintain permanent vegetative cover on all unpaved areas disturbed by the work. 3.4.1 Preparation of Seedbed: Areas to be seeded shall be scarified to a depth of 4 inches and until a firm, well pulverized, uniform seedbed is prepared. Lime, phosphorous and fertilizer shall be applied during the scarification process in accordance with the following rates: Lime: 45 pounds per 1000 square feet Phosphorous: 20 pounds per 1000 square feet Fertilizer: 17 pounds per 1000 square feet 3.4.2 Seeding: Disturbed areas shall be seeded with 2 to 3 pounds per 1000 square feet of the specified seed mixture. Seed shall be worked into the bed to a depth of 1/4 inch. Regrade and seed eroded areas immediately 3.4.3 Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. Reapply as necessary to retain cover until grass is established. 3.5 Construction Entrance: Provide an aggregate drive, 20 feet wide by 50 feet long by 6 inches thick at each entrance to the site used by construction vehicles, until such time as the permanent roadway is constructed. Remove soil if accumulated to a depth greater than 0.5 inches. 3.6 Maintenance: The Owner and Contractor shall be responsible for maintaining all temporary and permanent erosion control measures. Temporary structures shall be maintained until such time as vegetation is firmly established in the area protected by the structure. Permanent streambank protection and grassed areas shall be maintained until completion of the project. Areas that fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. END OF SECTION