Loading...
HomeMy WebLinkAboutSW8060309_HISTORICAL FILE_20140827STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Ovo30� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 � LA 08 21 YYYYMMDD AL74 � NC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary August 27, 2014 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28542 Subject: Stormwater Management Permit No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot High Density Commercial infiltration Basin Project Onslow County Dear Mr. Paul: The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot on August 27, 2014. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000, as applicable. We are forwarding Permit No. SW8 060309 dated August 27, 2014, for the construction, operation and maintenance of the BMP's and built -upon area associated with the subject project. This permit shall be effective from the date of issuance until August 27, 2022, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. The following modifications are included and covered by this permit: • The improvements previously approved for Drainage Area 3 were not constructed. Instead, with this modification the proposed gravel parking lot is to be located within the previously approved Drainage Area 3. The grading associated with proposed improvements will impact Drainage Area 1 and the calculations have been revised accordingly. • The infiltration basin associated with Drainage Area 2 is being increased to handle the proposed improvements. A forebay will be installed to promote sediment accumulation and act as additional storage volume. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson in the Wilmington Regional Office at (910) 796-7215. Al,,rel'y,c�C�ca,is, P.E., Director Division of Energy, Mineral and Land Resources GDS/can: \\\Stormwater\Permits & Projects\2006\060309 HD\2014 08 permit 060309 cc: Stephen Medvick, NAVFAC Wilmington Regional Office Stormwater File Division of Energy, Mineral, and Land Resources Land Quality Section - Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 State Stormwater Management Systems Permit No. SW8 060309 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Reserve Training Facility & Vehicle Maintenance Facility/P-1286 Gravel Parking Lot Intersection of Rifle Range Road and Rifle Range Road, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two (2) infiltration basins discharging to Class SA waters in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000, as applicable, (hereafter the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division and considered a part of this permit. This permit shall be effective from the date of issuance until August 27, 2022, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 of this permit. The stormwater controls labeled Drainage Area 1 and Drainage Area 2 have been designed to handle the runoff from 103,699 and 105,067 square feet of built -upon area, respectively. Per Section .1008 (h) of the stormwater rules, the alternative design provided in Infiltration Basin 2 provides equal or better protection because the basin is designed to store more than the regulated design storm volume and will infiltrate that volume within 5 days using an infiltration rate of one-half of the expected infiltration rate provided in the soils report. This Infiltration Basin 2 is partially designed in accordance with Option 3 of Section 16.3.9 of the BMP Manual; therefore, no offline bypass and no vegetated filter strip are required. Since this modification is to an existing permit, the multipliers identified in Section 1.7.d. of the permit varies depending on the policy in place at the time the proposed improvements were approved. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 060309 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 of this permit, and as shown on the approved plans. The built -upon area for the future development within Drainage Area 1 is limited to 2,378 square feet. There is no future allocation within Drainage Area 2. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. The project shall provide a 50' wide vegetated buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: Basin 1 Basin 2 a. Drainage Area, acres: 4.38 3.83 Onsite, subject to 1995 rules, ft2: 191.008 96,279 Onsite, subject to SL 2008-211, ft2: 0 70,437 Offsite, ft2: None None b. Total Impervious Surfaces, ft : 103,699 105.067 Onsite, subject to 1995 rules, ft2: 103,699 58,414 Onsite, subject to SL 2008-211, ft2: 0 46,653 Offsite, ft2: None None c. Design Storm, inches: 1995 rule, inches: 1.5 1.5 SL 2008-211, inches: n/a 3.68 d. Design Storm Multiplier to Waive Bypass and Vegetated Filter Strip: 1995 rule: n/a 3 SL 2008-211: n/a 2.5 e. Forebay: Bottom Elevation, FMSL: Na 51.55 Temporary Storage Elevation, FMSL: 53.75 Permitted Storage Volume, ft3: 7,484 f. Infiltration Basin Depth, feet: 1.89 2.75 g. Infiltration Bottom Elevation, FMSL: 52.50 51.00 h. Infiltration Bottom Surface Area, ft : 4,775 13,554 i. Infiltration Bypass Weir Elevation, FMSL: 54.39 53.75 . Total Permitted Storage Volume, ft : 12,956 51,538 k. Type of Soil: Ba meade Ba meade 1. Expected Infiltration Rate, in/hr: 1.5 1.5 m. Seasonal High Water Table, FMSL: 47.00 45.50 n. Time to Draw Down, days: 0.95 2.53 o. Receiving Stream/River Basin: Stones Creek / White Oak Stream Index Number: 19-30-3 Classification of Water Body: "SA,HQW" II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 060309 3. The permittee shall follow the approved Operation and Maintenance Agreement in its entirety, and shall provide and perform the listed operation and maintenance procedures at the specified intervals to assure the permitted stormwater system functions at optimum efficiency. 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. All stormwater collection and treatment systems must be located in public rights - of -way, common areas or easements. The final plats for the project will be recorded showing all such required rights -of -way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and" specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any designated future BUA on the application. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 060309 III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure; e. Dissolution of the partnership or corporate entity; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Approved plans, calculations, supplement forms, operation and maintenance agreements and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 4. Any individual or entity found to be in noncompliance with the terms and conditions of this permit or with the stormwater rules, is subject to enforcement action by the Division, in accordance with NCGS 143, Article 21. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 6. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 060309 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit modified and reissued this the 27th day of August 2014. CAROLINA ENQNMENTAL MANAGEMENT COMMISSION Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot Stormwater Permit No. SW8 060309 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 060309 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan: 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DEMLR Wilmington Regional Office Page 8 of 8 DWQ USE ONLY Date Received Fec Paid init Number `0 Ooo Gv Applicable Rules: Coastal SIN -1995 ❑ Coas) 1 SW - 2008 ❑ I'll 11 - Post Construction (select all that apply) ❑ Non -Coastal SW- HQIV/ORIV Vaters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM '11 is feria may he photocopied for use as an original 1. GENITAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Reserve Training Facile' & Vehicle Maintenance facility/1'-1286 Gravel Parking Lot 2. Location of Project (street address): Intersection of Rifle Ranee Road and Rifle Ranee Road City:Camp Lejeune Counly:Onslow 7ip:28542 3. Directions to project (from nearest major intersection): Front route 17S turn left onto NC 210, left onto connector Road into Camp Lejeune, straight into MARSOC complex left onto Rifle Ranee Road, road bends to the right, the site is at the first intersection after the bend. Project is in northwest corner of the intersection 4. Latihude:34° 35' 16" N Longitude:77* 26' 58" W of the main entrance to the project. If. PERMIT' INFORMATION: I. a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit nunrherSW8 060309 , its issue date (if known)5/01 /2006 , and the status of construction: ❑Not Started ®Partially Completed*, ❑ Completed* "provide a designer's certificalion 2. Specify the type of project (check one): ❑l.ow Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stonnwater management permit application, list the stormwater project number, if assigned, and the previous natue of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be . obtained by contacting the Customer Service Center at 1-877-623-67,18): ❑CAMA Major ®Sedimentation/Erosion Control: 2_23 ac of Disturbed Arca ❑NPDIS Industrial Stornnvater ❑404/401 Permit: Proposed Impacts b.lf any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit_ _ JUL 1 1 20% RV• Fonn SWU-101 Version 07.Iun2010 Page I of6 Ibl. CONTACT INFORMATION I. a. Print Applicant / Signing Official's name and title (specifically the developer, properly owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organiration:ConunandingOffjcer Marine Corps (lase Cane Lejeune Signing Official & Title:Neal Paul Deputy Public Works Officer b.Contact information for person listed in item la above: Street Address: lluilding 1005 Michael Road City:Canrp Lejeune Mailing Address (if City: Phone: (910 ) 451-2213 _ State:NC Lip:28542 Pax: (910 )_ 451-2927 c. Please check the appropriate box. The applicant listed above is: ® The properly owner (Skip to Contact Information, item 3a) ❑ Lessee" (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser" (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer" (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Properly Owner/1 Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if City:_ Phone: ( ) Pax: 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project - Other Contact Person/Organizatiowl'odd Carver OICC MCI East Signing Official & Title:Canip Lejeune Construction Manager b.Contact information for person listed in item 3a above: Mailing Address:lluilding 1005, Michael Road City:Camp Lejeune _ StatcNC Gip:28542 _ Phone: 910 451-2581 x5281 _ Fax: 13uiail:tocld.a.carverl iiavy.mil 4. Local jurisdiction for building pm-luits: Point of Form SWU-101 Version 07Jun2010 Page 2 of IV. PROJECT INFORMATION 1. In the spaceprovided below, hrigfly sununarize how the stormwater runoff will he treated. Runoff from the gravel parking lot will sheet Flow too detention basin on the north side of the lot. The detention basin will provide a slow release of the storm water and will lace as a forebay to the downstream infiltration basin. The existing infiltration basin for the Reserve Training & Vehicle Maintenance Facility will be. widened to accommodate the flow from the new travel lot. The infiltration basin will be designed for 2.5 times the design storm and a waiver is requested for the bypass flows and the grass filler strip. Drainage in excess of the basin capacity will flow over an emergency spillway with rip rap and flow to the nearby 2. a. If claiming vested rights, identify the supporting documents provided and the dale they were approved: ❑ Approval of a Site Specific Development flan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.lf claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 7.4 Existing plus 0.81 new =8.21 acres 5. 6, Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total ]'reject Area': 8.21 acres Total project area shall be calculated to exclude the followingg the nornal cool of irnF)ounded structures, the area behaecn tire banks of streams and rivers, the area belour the Nornml High `Nato (NMA1 line or Mean High Witter (MIIW) line, and coastal wetlands landward from the NI 1W (or MHIN) line. The resultant )rroject area is used to calculate overall percent built upon area (BUR). Norr-coastal toctlands lmrdward of the NHIN (or MI-Il(t) lure rnmy Ire included in fire total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 58.4 % 9. How many drainage areas does the project have? 2 (For high density, count I fir each proposed engineered storrnwater BMP. For lour density and other projects, rise I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Y FIVE JUL 18 20% i� BY: Form SNrU-101 Version 07Jun2010 Page 3 of 7 Basirt Information - Drainage Area 1 - Drainage Area 2 Draina e Area3- 'Draina a Area - Receiving Stream Name Stories Creek/ White Oak Stones Creek/ White Oak Basin 3 deleted TOTAL Stream Class * SA/HQW SA/HQW Stream Index Number * 19-30-3 19-30-3 Total Drainage Area (sf) 191,008 'J.1j 166,716 3,tO 357,724 On -site Drainage Area (so 191,008 166,716 Off -site Drainage Area (so 0 Pro osed Im ervious e rea' s 103,699 105,067 208,766 % Impervious Area" total 54.3 63.0 58.4 Impervious- Surface Area Drainage Area 1 Drainage Area 2 Drainage Area Drainage Area _ On -site Buildings/Lots (so 31,011 0 On -site Streets(SO 1757 5709 7,466 On -site Parking (sD 65,701 98,249 163,950 On -site Sidewalks (sf) 2,852 1,109 3,961 Other on -site s Future (so 7378 0 2378 Off -site (so 0 0 E)ristin BUA*** (so 0 0 Total so: 103,699 105,067 208,766 " Stream Class and Index Number can be determined at: Idtil. mortal.ncrletrr.orghucbAt)gli s/cstdclassificalions »» Impervious area is defined as the built upon.area including, but not limited to, buildings, roatis, parking areas, sidewalks, gravel areas, etc. ***Report only that amount ofexisting BUA that will rennin after developtnenI. Do not report any existing BUA that is to be removed and which will be replaced by tarn BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Prohects in Union County: Contact DB'Q CentralOJJice sigffta check ifrhe project is located a'ilhin a Threatener) & Endangered Species watershed that ttta , be subject to more stt•iragent startn)t•ater requirements as per A'CAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each 13MP specified for this project. The latest versions of the forms can be downloaded from hltp://I)ortil.ncdenr.org/web/%Vq/ws/su/bap-n)anual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from httr. portal.ncdenr.orl+/web/+vq/ws/su/state=s\v/fonns_dncs. Thecomplete application package should be submitted to the appropriate DWQ Office. (1'he appropriate office may be found by locating project on the interactive online map at httf3:/ /portalmcdenr.org/web/wq/\es/su/maw.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from httr. )ortaLncdenr.mF/\veb/wc /ws/su/statesw/forms does. Initials 1. Original and onecopyof the Slonnwater Management Permit Application Form. 54� 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants n/1ZA- Fornn. (if required as per Port Vll below) 3. Original of the applicable Supplement Form(s) (scaled, signed and dated) and O&M agreen)ent(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review;:n:laFi: _ littp://",Ww_eliyiiel1).Org/pages/oliestol2exizress.litniI for information on the Expr@ss progr and the associated fees. Contact the appropriate regional office Express Permit C64rdh� Ipr additional information and to schedule the required applicalion•meeting.) 2��4 Form SWU-101 Version 07Jun2010 Page 4 of 7 11 BY: _----a_ _ 5, A detailed narrative (one to two pages) describing the storunwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (scaled, signed, & dated), including: 5 /` 2 a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dales. It. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MI IW or Nl IW line of tidal waters, and any coastal wetlands landward of the MI-IW or NHW lines. ' • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MI-IW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all 13UA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stor nrwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SH14rT'elevations (Please identify �f elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration 13MPs, the repot should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to uerifij the SHIM'prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: _y 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC /J-— 44m Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of Stale, otherwise the application will be returned. littp://wwi%,.sccictai,y.state.iic.us/Col-I)ol.atioiI /CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed 13UA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded front lit ti1faxn lal.ncdenr.ury web wqf ws su/stalesw/forms, does. Download the latest versions for each submittal. In the instances where (lie applicant is different than the property owner, it is the responsibility of the properly owner to sign the deed restrictions and protective covenants form while tlne applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the websilq that the covenants will be binding on all patties and persons claiming under them, that they will run with the land, that the required covenants cat �Yrtlf #fIt -&Ie ed without concurrence from the NC DWQ, and that they will be recorded pri r to h a yet' JUL I Form SWU-101 Version 07Jun2010 Page 5 of V.III. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Stephen Medvick Consulting Mailing Address:9742 Maryland Ave City:Norfolk State:Va Zip:23511 Phone: (757 ) 322-4214 Pax: (757 ) 322-5280 _ Ennail:stephen.nnedvickOa navy.uiil IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, cmililete this section) 1, (print or type name of person listed in Contact Inforration, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type panne of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, itent la) to develop the project as currently proposed. A copy of the lease agreement or pending properly sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stonnwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels m defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Storrnwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediate]), and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a sto mwater treatment facility without a valid permit. I understand that the operation of a stonnwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. 1 I, __ _, a Notary Public for the State of County of do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission ECEIVE7 JUL 1 1 20% Form SWU-101 Versiou 07Jun2010 Page 6 of X. APPLICANT'S CERTIFICATION 1, (print or h/pe name of person listed in Contact Inforniation, item 7a) Neal Paul certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective c nants will be recorded, and that the proposed project complies with the requirements of the applicable sto - w ter rules under N AC 2H .1000, SL 2006-246 (Ph. 11- Post Construction) or SL 2008-211. Signature: DateT� 1 1 1�P,I�Uf1� I1YtA%A , a Notary Public for the State of County of do here certify that personally appeared before me this I/Jday of VU t A , and ac cn wl ,dQe the due xec ion oft ation for a stormwater permit. Witness my hand and official seal, UnU� ELLEY VANDECOEVERING NOTARY PUBLIC ONSLOW COUNTY eMq OF NORTH CAROLINA SEAL My commission expires 1WWA. �—1 'FCe,-V— JULy� sv Form SWU-101 Version 07Jun2010 Page 7 of 7 AATA STORMWATER MANAGEMENT NCDENR 401 CERTIFICATION l INFILTRATION BA: This form must be filled ou The Required Items Checklist (Part III) must be printed, filled Project Name Contact Person Phone Number Date Drainage Area Number Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Past 1-yr, 24-In peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5" runoff volume j>< ZtLA / u�L hI L• u.. Pre -development 1-yr, 24-hr runoff volume KI t e! Post -development 1-yr, 24-hr runoff volume ,may �_z Minimum required volume Volume provided 51!ai% Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area Form SW401-Infiltration Basin-Rev.5 11Apr2011 Reserve Traini Steve Medvick RMIT APPLICATION F01 'LICATION FORM (SUPPLEMENT ,inted and submitted. and submitted along with & Vehide Permit No. 514XL VW03Cq fro be Provided by DWQ) �t waTq as �� the required information. 1224214 I 1 3-14 i 1 # i in Drainage Area #2 1 I I 36,716.00 e' 70 yA-I %�:1z_ N vJ Al2Sa 15.067.00 Ift' `1(orCvSS r-c�fi rVE.r.I /���fl 63.02 I % (v IL2. 2 la i—b ry n.l E�q% 1.50 in 3.68 I in 0.15 1 inmr 0.15 1 fl'/sec 0.00 I ft'/sec -0.15 ft'Isec ft3 It3 5692.00 It -7 17 3 = I Z S C� 2,021.00 I ft3 l.i I ph 2 i X1 S" ; 13,963.00 I ff' i 6D, I Kr U 11942.00 (ft3 X 2.L//<I2_:51 61/ X q/1l/14 emc:\ CN eymeade 1.50 1 in/hr 45.50 ( imsl 2.53 days OK 3.00 I :1 OK 51.00 1 fmsl OK 53.75 1 fmsl 18,505.00 1 ft' 54.50 I fmsl � IE'i, 54.0 ft' AUG 2 1 00 2oi rt Parts I. 611, Design Summary, Page 1 or 2. Permit Additional Information Maximum runoff to each inlet to the basin? 2.00 ac in OK Length of vegetative filter for overllo.: afar It OR Distance to structure _ _ n!a If C)K Distance from surface writers_ _ 3.168.00 it ("It Distance from water supply wells) n!a_ It 71K Separation from impervious soil layer 3.O0 It Olr. Naturally occuring soil above shwa 3.00 ft 01( Bo?tom covered with 4-in of clean sand? y (Y or N) OK Proposed drainage casement provided? n!a (Y or N) Df( Capures all runoff al uliimate buildou,? Y—(Y or N) OK Bypass provided for larger storms? Y (Y or N) 09 Pretreatment devico provided _ Forebay fro he prnvid d ny DK'Q) Form SVJ401 dnh;lration Basin Ree.S 1 IAr201 I Parts I. F II. Design Somela,y, Page 2 012. MEMORY TRANSMISSION REPORT ' A TIME :08-28-2014 11:03 FAX NO.1 NAME FILE NO. 497 DATE 08.28 11:02 TO :n 917573225280 DOCUMENT PAGES 9 START TIME 08.28 11:02 END TIME 08.28 11:03 PAGES SENT 0 STATUS 0050 "'TX FAILURE NOTICE"' State of North Ca taa Dwpnrlmwnt nl Anvtropmeat aad Nvtvral Runnraa WtlminCtnn AeClonnl OMcu Par Mr(Yory, Gnveroor FAX COVISA, SFiF.AT JnFnRShvar/a lO. 9ewretgry W, PRHOS Caxct. aovgr): .� Tu. � �/ � � %f G �✓ r � r� Prom. 7^ r-,.nm cn: /r�.9 ✓�—.4-� Phunc: Goo v✓ i '� rrs� i G l2] CeMlnnl Oelvn P.xleoelm•, Wi\mington, NQ 2A401 C9lU) ]96-]213 An Squn\ Opputeun\ty ARf,mw�lve Aeebn llmployu State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Pat McCrory, Governor FAX COVER SHEET John E Skvarla III, Secretary Date: co: Fax: /%S 7— 3Z 2S Z �D Re: i n i n 9 No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910)350-2004 127 Cardinal Drive Extension, Wilmington, NC 28405 e (910) 796-7215 • An Equal Opportunity Affirmative Action Employer MEMORY,TRANSMISSION REPORT TIME :08-28-2014 11:05 FAX NO.1 NAME FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 498 08.28 11:02 919104512927 9 08.28 11:03 08.28 11:05 9 OK `SUCCESSFUL TX NOTICE- 6tata oT Norlh Carolina Oeparfmaof o(RnWronmm<aaJ IVatmai 8movrcor - wummatna ttaaimai omr., Pot M Cra y, C.waraar NAX COVER SHCET JoFa 6-SMatla /IlQBaarab ry Datc: 8 z ��% ' No- PaHw (exol- cover): �J Pax: C9101.310=2094 f a> c..ah.m nri..a isxwoaioa, wnmh.au.a. a.�c 2uaos . (v � o) �vr;--tz t3 . na mad onoorn...nr wm.ma... nouoa ampley.r State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Pat McCrory, Governor FAX COVER SHEET John ESkvarla III, Secretary Date: e/ No. Pages (excl. cover): C/ To: i1/�yG ®/ //L e5,f,, �SFrom: JoCasmer Co: lri g/�9Q G �T�"� —7 G� Phone: (910) 796-7336 Fax: ��� l / Fax: (910)350-2004 Re: 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer 'Nelson, Christine From: DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC [maryann.durant@navy.mil] Sent: Wednesday, August 27, 2014 12:42 PM To: Nelson, Christine Cc: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Subject: FW: request for additional info - P1286 Christine, You have our permission to make the changes by hand. Please give me a call if you have further questions at 757-322-8326. Thank you! Mary Ann -----Original Message ----- From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Tuesday, August 26, 2014 11:39 AM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC; DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC Subject: RE: request for additional info - P1286 Steve / MaryAnn, The narrative looks good. Thanks for the revisions. I printed out a copy. As for the provided storage volume, this item is a different animal than the rest of this section of the supplement. The other items are attempting to quantify the amount of runoff required to be treated. With the complex nature of this project and the various rules it applies under, there is a need to use the side to quantify the minimum amount of runoff. However, the provided volume, in a way, has nothing to do with the methods used to calculate minimum required volume. This line item is to solely show how much volume the BMP can hold. It is supposed to be a quick way to compare and demonstrate that volume provided in the BMP is equal to or greater than the minimum required volume. I would like to either see the supplement revised to list the provided storage or give me permission to make the change by hand. Thanks! Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick@navy.mil] Sent: Saturday, August 23, 2014 6:50 PM To: Nelson, Christine Cc: DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC Subject: FW: request for additional info - P1286 Christine I will be out of the office all next week and may not have access to emails. Please discuss this re -submittal with my supervisor (MaryAnn DuRant 757-322-8326) --hopefully we (I) can get it right this time. 1 To avoid any more confusion with slip -sheeting I ran an entire new updated report. I can send one sided or 2 sided copies whichever you prefer. I did not include the maintenance agreements. The application and supplements are included. I don't understand your comment about the combined drainage volume. It is shown like all of the others --the volume for the new area is shown and the total is noted in ink on the side -- see attached. I revised the drainage report references to match the drainage exhibit numbers. I also made sure the exhibit were current. All changes to the BOD are shown in red (attached) for ease of review. I removed the old exhibit 6 and replaced it with the pdf that explains the areas that qualify for "existing impervious". As noted above, I included all of the maps and exhibits. The combined report also includes the current calculations, existing and proposed routing calculations, geotechnical report and the submittals from the 2006 Reserve Facility Permit. I did not think I included any "maps" with the latest (8/20/14)submittal. I included copies of the 2 plan sheets that were revised (C-301 and C-701) and the drainage exhibit as requested. Please call or email MaryAnn and let her know if she needs to revise the supplement and if you want 1 or 2 sided copies. Thanks! Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick@navy.mil -----Original Message ----- From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Friday, August 22, 2014 2:56 PM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Subject: RE: request for additional info -. P1286 . Steve, The double sided copies make it very difficult to slip the revised sheets into the previously submitted narrative and calculations. The sides copied on the paper just don't match up. Now that I have that off my chest... - The supplement for drainage area 2 still lists a provided volume of 29,926 cf. Why does it not list the full amount? - Can you also please double check the exhibit references in the narrative? In both this recent version and the previous version, the references don't match up like .they did in the first submittal. The latest submittal included maps, but not sure how these get incorporated. Are they exhibits? z Thanks for helping me clear up these last few items. thristine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick@navy.mil] Sent: Wednesday, August 20, 2014 5:11 PM To: Nelson, Christine Subject: RE: request for additional info - P1286 No problem --I just put 2 copies of everything in the package. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick@navy.mil -----Original Message ----- From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Wednesday, August 20, 2014 3:10 PM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Subject: RE: request for additional info - P1286 Steve, I'm going through my a -mails and know you have sent another e-mail sent after this so my response may be a bit too late. We only need 1 copy of the calculations and supplement. The only thing we need multiple copies of is the plans and we ask for 2 sets of those. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick@navy.mil] Sent: Wednesday, August 20, 2014 12:46 PM To: Nelson, Christine Subject: RE: request for additional info - P1286 Christine I am putting the revised package in overnight today. I have 2 copies of each of the 3 revised plan sheets, and 2 copies of the revised supplement. Do you want 1 or 2 copies of the revised calculations? Steve 3 Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick@navy.mil -----Original Message ----- From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Monday, August 11, 2014 1:20 PM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC; Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN; Towler, David W CIV MARFORCOM, I&E/PWD DESIGN Cc: Weaver, Cameron Subject: request for additional info - P1286 Steve, There are just a few more hopefully minor items that need to be clarified for this project. Please see the attached request for additional information. I've also attached an e-mail chain to refresh your memory regarding item 4. Please let me know if you have any questions or concerns. Thanks! Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third.parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Nelson, Christine Sent: Friday, August 08, 2014 3:45 PM To: 'Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC' Subject: RE: P-1286 Gravel Lot re -submittal Steve, In looking through the narrative, I'm noticing subtle changes to the text and exhibit numbers. For instance, the second paragraph of Section 1.3 discussing the 2013 soil testing in the narrative is no longer there. The rainfall intensity originally listed in Section 2.2 was 3.68" (as is also reported in the supplements) is now listed as 3.60" in the revised Section 2.2 of the narrative. Might you have updated an old version of the narrative or has additional changes been made that need to be reflected through other parts of the package? I will keep chugging along in looking through the revised items. Thanks, Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, Sent: Friday, August 01, 2014 2:56 PM To: Nelson, Christine Cc: Labidi, Abdelkader H CIV NAVFAC MIDLANT, Subject: RE: P-1286 Gravel Lot re -submittal IPTNC [mailto:stephen.medvick@navy.mil] IPTNC 4 l I IO Tra n s m i t t 1 � V 7 Na al Facilities EnPinea n Command NIVFPC MIOAFI.AHTK Date: 20 August, 2014 To: Cameron Weaver NC-DENR Express Coordinator 127 Cardinal Drive Extension Wilmington, NC 28405 From: Naval Facilities Engineering Command — Mid -Atlantic Marine Corps North Carolina IPT 6506 Hampton Blvd., Bldg. CJV - Norfolk, VA 23508 POC: Steve Medvick, P.E. AU6 Z zoi� RE: Reserve Training Facility/P-1286 Gravel Parking Lot Stormwater Project SW8 060309 Storm Water Express Review Revised submittal Copies Date Description 2 B.O.D. 2 Design Calculations 2 Hydroflow Repoi1, Post -Conditions 2 Infiltration Basin 1 Supplement 2 Infiltration Basin 2 Supplement 2 Existing impervious exhibit 2 Full Size Plan Set Rev C-701 2 Full Size Plan Set Rev C-502 2 Copy of entailed responses 2 Full size Drainage exhibit Remarks: Revised plan sheets and calculations, as per your 8.1 1.14 comments. I'or review and approval. Please call if you have any questions, 757-322-4214. Respectfully, Steve Medv ck, .E. Distribution: NAVFAC Files Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Sent: Wednesday, August 20, 2014 14:17 To: 'Nelson, Christine' Cc: Labidi, Abdelkader H CIV NAVFAC MIDLANT, IPTNC; DuRant, MaryAnn V CIV NAVFAC Subject: FW:P-1286 - request for additional info Signed By: stephen.medvick@navy.mil Christine You will receive the revised package tomorrow. I included a copy of this email with my revised submittal package. The submittal includes a copy of all of the information that was included in the 8.4.14 package: Revised BOD, design calculations, Basin 2 supplement, Plan sheet C-502 and C- 701 and the drainage exhibit. The supplement 1, hydraflow report and impervious exhibit were not changed but are also included. As noted in my previous email, the calculations were correct and I needed to submit the correct supplement that matched the calculations. 1. a. The 2021 was correct --supplement was corrected. b. The 51, 468 is correct --supplement was corrected. c. The provided volume is 51,538--supplement was corrected. d. 53.75 is correct --supplement was corrected. e. 2.53 is correct --supplement was corrected. f. 18,505 is correct --supplement was corrected. 2. The rim elevation of 53.80 is correct--C-701 was revised. 3. The narrative was updated. The second paragraph for geotechnical was added. The rainfall intensity of 3.68 was corrected. 4. The drainage area was updated to 4.385 on C-502. 5. Thank you! 6. Noted --items rechecked. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick@navy.mil -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Sent: Thursday, August 14, 2014 2:47 PM To: 'Nelson, Christine' Subject: RE: request for additional info - P1286 1B Sorry about the continued confusion. 1 somehow managed to send an outdated supplement sheet. The corrected supplemental sheet (attached) matches the numbers in the calculations. I still need to add the notes in the side. 1. a. The 2021 was correct b. The 51, 468 is correct c. The provided volume is 51,538 d. 53.75 is correct e. 2.53 is correct f. 18,505 is correct. 2. 1 will confirm 3. 1 will fix 4. 1 will confirm Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick@navy.mil -----Original Message ----- From: Nelson, Christine[mailto:christine.nelson@ncdenr.gov] Sent: Monday, August 11, 2014 1:20 PM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC; Bradshaw, Thomas C CIV MARFORCOM, I&E - PWD - DESIGN; Towler, David W CIV MARFORCOM, I&E/PWD DESIGN Cc: Weaver, Cameron Subject: request for additional info - P1286 Steve, There are just a few more hopefully minor items that need to be clarified for this project. Please see the attached request for additional information. I've also attached an e-mail chain to refresh your memory regarding item 4. Please let me know if you have any questions or concerns. Thanks! Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Nelson, Christine Sent: Friday, August 08, 2014 3:45 PM To: 'Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC' Subject: RE: P-1286 Gravel Lot re -submittal E Steve, In looking through the narrative, I'm noticing subtle changes to the text and exhibit numbers. For instance, the second paragraph of Section 1.3 discussing the 2013 soil testing in the narrative is no longer there. The rainfall intensity originally listed in Section 2.2 was 3.68" (as is also reported in the supplements) is now listed as 3.60" in the revised Section 2.2 of the narrative. Might you have updated an old version of the narrative or has additional changes been made that need to be reflected through other parts of the package? I will keep chugging along in looking through the revised items. Thanks, Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick@navy.mil] Sent: Friday, August 01, 2014 2:56 PM To: Nelson, Christine Cc: Labidi, Abdelkader H CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 Gravel Lot re -submittal Christine The following responses are in reference to your 7/21/14 comments. 1. The supplemental sheet has been revised to note the bypass weirs. The 2 weirs are shown at elevation of 54.45 (old datum) and include 50' vegetative filters. 2a. The pre -developed impervious area has been reduced to 1062 s.f. as per our discussion. The attached exhibit shows the area outside of the permitted drainage areas that was included. 2b. The Rv is now shown and the volume was corrected. The volume was increased as a result of the revised existing impervious calculation discussed in 2a. 2c. The total required volume is shown as 51,468 at the end of the pre/post discussion. The 51,468 is also shown on the supplement form. 2d. The total required volume is shown as 51,468 at the end of the pre/post discussion. The 51,468 is also shown on the supplement form. 3. The required volume of 51,468 is shown on the supplement form. The provided,volume of 51,538 is also shown on the supplement form. The breakdown for the provided volumes is directly in front of the drawdown calculations. 4. Plan sheet C-502 was not revised. Two revised copies of plan sheets C-301 and C-701 will be sent. 5. Noted. 6. Noted. I didn't bother to attach the revised routing calculations as I presume you are willing to wait for the hard copy. Please let me know if everything looks acceptable. I sent C-301 and C-701 on the previous email. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Nelson, Christine From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [stephen.medvick@navy. mil] Sent: Thursday, August 14, 2014 2:47 PM To: Nelson, Christine Subject: RE: request for additional info - P1286 Attachments: 8.1.14 DA-2 Infiltration basin supplement rev.pdf Sorry about the continued confusion. I somehow managed to send an outdated supplement sheet. The corrected supplemental sheet (attached) matches the numbers in the calculations. I still need to add the notes in the side. 1. a. The 2021 was correct b. The 51, 468 is correct c. The provided volume is 51,538 d. 53.75 is correct e. 2.53 is correct f. 18,505 is correct. 2. I will confirm 3. I will fix 4. I will confirm Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick(@navy.mil -----Original Message ----- From: Nelson, Christine[mailto:christine.nelson(@ncdenr.gov] Sent: Monday, August 11, 2014 1:20 PM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC; Bradshaw, - DESIGN; Towler, David W CIV MARFORCOM, I&E/PWD DESIGN Cc: Weaver, Cameron Subject: request for additional info - P1286 Thomas C CIV MARFORCOM, I&E - PWD Steve, There are just a few more hopefully minor items that need to be clarified for this project. Please see the attached request for additional information. I've also attached an e-mail chain to refresh your memory regarding item 4. Please let me know if you have any questions or concerns. Thanks! Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message----- 1 From: Nelson, Christine Sent: Friday, August 08, 2014 3:45 PM To: 'Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC' Subject: RE: P-1286 Gravel Lot re -submittal Steve, In looking through the narrative, I'm noticing subtle changes to the text and exhibit numbers. For instance, the second paragraph of Section 1.3 discussing the 2013 soil testing in the narrative is no longer there. The rainfall intensity originally listed in Section 2.2 was 3.68" (as is also reported in the supplements) is now listed as 3.60" in the revised Section 2.2 of the narrative. Might you have updated an old version of the narrative or has additional changes been made that need to be reflected through other parts of the package? I will keep chugging along in looking through the revised items. Thanks, Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, Sent: Friday, August 01, 2014 2:56 PM To: Nelson, Christine Cc: Labidi, Abdelkader H CIV NAVFAC MIDLANT, Subject: RE: P-1286 Gravel Lot re -submittal Christine IPTNC[mailto:stephen.medvickOnavy.mil] IPTNC The following responses are in reference to your 7/21/14 comments. 1. The supplemental sheet has been revised to note the bypass weirs. The 2 weirs are shown at elevation of 54.45 (old datum) and include 50' vegetative filters. 2a. The pre -developed impervious area has been reduced to 1062 s.f. as per our discussion. The attached exhibit shows the area outside of the permitted drainage areas that was included. 21b. The Rv is now shown and the volume was corrected. The volume was increased as a result of the revised existing impervious calculation discussed in 2a. 2c. The total required volume is shown as 51,468 at the end of the pre/post discussion. The 51,468 is also shown on the supplement form. 2d. The total required volume is shown as 51,468 at the end of the pre/post discussion. The 51,468 is also shown on the supplement form. 3. The required volume of 51,468 is shown on the supplement form. The provided volume of 51,538 is also shown on the supplement form. The breakdown for the provided volumes is directly in front of the drawdown calculations. 4. Plan sheet C-502 was not revised. Two revised copies of plan sheets C-301 and C-701 will be sent. 5. Noted. 6. Noted. I didn't bother to attach the revised routing calculations as I presume you are willing to wait for the hard copy. Please let me know if everything looks acceptable. I sent C-301 and C-701 on .the previous email. Steve C Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick(@navy.mil Pat McCrory Governor ARA. NCDENR North Carolina Department of Environment and Natural Resources John E. Skvarla, III Secretary August 11, 2014 n \ v,VON CommandingLeune O1fficerCB I c/o N as Paul, Deputy Public Works Officer 1005 Michael Road e-r^G X 2v-\C1O5v`ce . Camp Lejeune, INC 28542 Subject: Request for Additional Information Stormwater Project No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot Onslow County Dear Mr. Paul: The Wilmington Regional Office received a modified Express Stormwater Management Permit Application for the Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot on July 11, 2014 with additional information received on August 5, 2014. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please ensure the supplement provided for drainage area 2 is the most recent version. The following inconsistencies were noted between the provided supplement and the calculations: ,,a The revised calculations indicate that the pre -development volume for the 1-year, 24- hour storm event is 2,020.8 cf. However, the supplement indicates this volume is 4,424 cf. vb. The total minimum required volume written to the side of the supplement is listed as being 45,461 cf while the calculations indicate it is 51,468 cf. c. The provided volume is entered into the supplement as being 24,597 cf and appears to be written off to the side of the supplement as being 46,209 cf. However, the ,calculations indicate that the provided volume is 51,538 cf. vd. The storage elevation of the infiltration basin is listed on the supplement as being 53.53 ft while the calculations indicate it will be 53.75 ft. 1' The drawdown is listed in the supplement as being 2.27 days while the calculations .,indicate it will be 2.53 days. , 4. The storage surface area is listed in the supplement as being 18,092 sf while the calculations indicate it will be 18,505 sf. 2. The rim elevation for the forebay outlet structure is listed on sheet C-301 as 53.80 ft; however, sheet C-701 lists this elevation as 53.53 ft. Please confirm the elevation of the rim for the forebay outlet structure is presented consistently. 3. The revised narrative appears to have subtle changes to the text and the exhibit numbers from the originally submitted narrative. For instance, the second paragraph of Section 1.3 discussing the 2013 soil testing in the narrative is no longer there. The rainfall intensity originally listed in Section 2.2 of the narrative was 3.68" (as is also reported in the supplements) is now listed as 3,60" in the revised Section 2.2. Please confirm that the correct narrative was updated and if additional changes have been made, please reflect those throughout the other parts of the package. Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 1 Fax: (910) 350-2004 USMCB Camp Lejeune August 11, 2014 Stormwater Application No. SW8 060309 4. Please provide two copies of the revised plan sheet C-502 and the post development drainage area exhibit. Per the enclosed e-mail chain dated July 18, 2014, the original sheet C-502 listed drainage area 1 as 4.304 acres instead of the 4.385 acres listed in the application and other documents. Also, as indicated in the same e-mail, the post development drainage area exhibit was not included in the original submittal. 5. Due to the relatively minor nature of these comments, the express additional information review fee has been waived. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to August18, 2014, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7345 or email me at christine.nelson@ncdenr.gov. Sincerely, Cl , t 21� Christine Nelson Environmental Engineer GDS/can: G:\WQ\Shared\StormWater\Permits & Projects\2006\060309 HD\2014 08 addinfo 060309 cc: Stephen Medvick, NAVFAC Wilmington Regional Office Page 2 of 2 Nelson, Christine From: Nelson, Christine Sent: Monday, August 11, 2014 1:20 PM To: 'Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC'; thomas.bradshaw@usmc.mil, david.towler@usmc.mil Cc: Weaver, Cameron Subject: request for additional info - P1286 Attachments: 2014 08 addinfo 060309.pdf; RE: P-1286 submittal Steve, There are just a few more hopefully minor items that need to be clarified for this project. Please see the attached request for additional information. I've also attached an e-mail chain to refresh your memory regarding item 4. Please let me know if you have any questions or concerns. Thanks! Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----original Message ----- From: Nelson, Christine Sent: Friday, August 08, 2014 3:45 PM To: 'Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC' Subject: RE: P-1286 Gravel Lot re -submittal Steve, In looking through the narrative, I'm noticing subtle changes to the text and exhibit numbers. For instance, the second paragraph of Section 1.3 discussing the 2013 soil testing in the narrative is no longer there. The rainfall intensity originally listed in Section 2.2 was 3.68" (as is also reported in the supplements) is now listed as 3.60" in the revised Section 2.2 of the narrative. Might you have updated an old version of the narrative or has additional changes been made that need to be reflected through other parts of the package? I will keep chugging along in looking through the revised items. Thanks, Christine Email correspondence .to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, Sent: Friday, August 01, 2014 2:56 PM To: Nelson, Christine Cc: Labidi, Abdelkader H CIV NAVFAC MIDLANT, Subject: RE: P-1286 Gravel Lot re -submittal Christine IPTNC[mailto:stephen.medvick(@navy.mil] IPTNC The following responses are in reference to your 7/21/14 comments. 1 Nelson, Christine From: Nelson, Christine Sent: Friday, August 08, 2014 3:45 PM To: 'Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC' Subject: RE: P-1286 Gravel Lot re -submittal Steve, In looking through the narrative, I'm noticing subtle changes to the text and exhibit numbers. For instance, the second paragraph of Section 1.3 discussing the 2013 soil testing in the narrative is no longer there. The rainfall intensity originally listed in Section 2.2 was 3.68" (as is also reported in the supplements) is now listed as 3.60" in the revised Section 2.2 of the narrative. Might you. have updated an old version of the narrative or has additional changes been made that need to be reflected through other parts of the package? I will keep chugging along in looking through the revised items. Thanks, Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, Sent: Friday, August 01, 2014 2:56 PM To: Nelson, Christine Cc: Labidi, Abdelkader H CIV NAVFAC MIDLANT, Subject: RE: P-1286 Gravel Lot re -submittal Christine IPTNC[mailto:stephen.medvickOnavy.mil] IPTNC The following responses are in reference to your 7/21/14 comments. 1. The supplemental sheet has been revised to note the bypass weirs. The 2 weirs are shown elevation of 54.45 (old datum) and include 50' vegetative filters. 2a. The pre -developed impervious area has been reduced to 1062 s.f. as per our discussion. The attached exhibit shows the area outside of the permitted drainage areas that was included. 2b. The Rv is now shown and the volume was corrected. The volume was increased as a result the revised existing impervious calculation discussed in 2a. 2c. The total required volume is shown as 51,468 at the end of the pre/post discussion. The 51,468 is also shown on the supplement form. 2d. The total required volume is shown as 51,468 at the end of the pre/post discussion. The 51,468 is also shown on the supplement form. 3. The required volume of 51,468 is shown on the supplement form. The provided volume of 51,538 is also shown on the supplement form. The breakdown for the provided volumes is directly in front of the drawdown calculations. 4. Plan sheet C-502 was not revised. Two revised copies of plan sheets C-301 and C-701 will be sent. 5. Noted. 6. Noted. I didn't bother to attach the revised routing calculations as I presume you are willing to wait for the hard copy. Please let me know if everything looks acceptable. I sent C-301 and C-701 on the previous email. at of 1 t. Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Sent: Friday, August 01, 2014 14:56 To: 'Nelson, Christine' Cc: Labidi, Abdelkader H CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 Gravel Lot re -submittal Attachments: Existing gravel 3.pdf; 7.28.14 DA-1 Infiltration basin supplement.pdf; P-1286 DA-2 supplemental.pdf; 8 114 Rev Drainage calcualtions TO DENR.pdf Signed By: stephen.medvick@navy. miI Christine The following responses are in reference to your 7/21/14 comments 1. The supplemental sheet has been revised to note the bypass weirs. The 2 weirs are shown at elevation of 54.45 (old datum) and include 50' vegetative filters. 2a. The pre -developed impervious area has been reduced to 1062 s.f. as per our discussion. The attached exhibit shows the area outside of the permitted drainage areas that was included. 2b. The Rv is now shown and the volume was corrected. The volume was increased as a result of the revised existing impervious calculation discussed in 2a. 2c. The total required volume is shown as 51,468 at the end of the pre/post discussion. The 51,468 is also shown on the supplement form. 2d. The total required volume is shown as 51,468 at the end of the pre/post discussion. The 51,468 is also shown on the supplement form. 3. The required volume of 51,468 is shown on the supplement form. The provided volume of 51,538 is also shown on the supplement form. The breakdown for the provided volumes is directly in front of the drawdown calculations. 4. Plan sheet C-502 was not revised. Two revised copies of plan sheets C-301 and C-701 will be sent. 5. Noted. 6. Noted. I didn't bother to attach the revised routing calculations as I presume you are willing to wait for the hard copy. Please let me know if everything looks acceptable. I sent C-301 and C-701 on the previous email. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick@navy.mil EC17VIVE AUG 0 5 2014 Date: 4 August, 2014 To: Cameron Weaver NC-DENR 127 Cardinal Drive Extension Wilmington, NC 28405 From: Naval Facilities Engineering Command — Mid -Atlantic Marine Corps North Carolina IPT 6506 Hampton Blvd., Bldg. C Norfolk, VA 23508 POC: Steve Medvick, P.E. RE: Reserve Training Facility/P-1286 Gravel Parking Lot Storm Water Express Review Revised submittal i,qP V N! PaoifiSes EnglnoeringC Immend xnvvnc rmoannxnc Attu- 0 5 2014 BY: Copies Date Description 2 B.O.D. 2 Design Calculations 2 Flydroflow Report, Post -Conditions 2 Infiltration Basin I Supplement 2 Infiltration Basin 2 Supplement 2 Existing impervious exhibit 2 Full Size Plan Set Rev C-701 2 Full Size Plan Set Rev C-301 2 Copy of emailed responses Remarks: Revised plan sheets and calculations, as per -our discussion. For review and approval. Please call if you have any questions, 757-322-4214. Respectfully, Ste�Medk, .E. Distribution: NAVFAC Files NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvada, III Governor Secretary July 21, 20144Commanding MCB Camp LjeOfficer u c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road �1 Camp Lejeune, NC 28542 Subject: Request for Additional Information Stormwater Project No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot Onslow County Dear Mr. Paul The Wilmington Regional Office received a modified Express Stormwater Management Permit Application for the Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot on July 11, 2014. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: ✓ 1. The revised infiltration basin supplement for drainage area 1 indicates that the vegetated filter strip and offline bypass has not been provided. Permit Condition 1.2 indicates that this infiltration basin must be operated with a 50' vegetated filter. The plans approved in 2006 indicate that an overflow bypass was provided prior to the infiltration basin along with a 50' vegetated filter. Please confirm that the bypasses and vegetated filter areas have been installed for the infiltration basin associated with drainage area 1 in accordance with the previously approved plans. 2. Please consider the following when determining the minimum required storage volume for drainage area 2: r,L) a. In the pre/post volume calculations for drainage area 2, the pre -development conditions appear to indicate that there is some pre -development impervious area. Any pre - development impervious area should be demonstrated as being not subject to the stormwater rules either by documenting the impervious area existed prior to 1988 or it was built under conditions that did not require a stormwater permit. Please keep in mind that this is a permitted site and any changes from the plans and project area approved in 2006 should have been accounted for through a modification to the permit. Please explain the pre -developed impervious area and the reasoning as to why it is not considered part of the permitted impervious area. ✓b. The Rv value for the post -development condition for drainage area 2 doesn't appear to be showing in the calculations and the post -development volume is lower than expected given the drainage area conditions. Please provide the calculated Rv value for the post - developed condition avid confirm the associated volume calculation is correct. c. The calculations for drainage area 2 indicate that the required volume when considering the 1-year, 24-hour pre/post-development condition is 6,401 W but does not appear to include the previously approved storage volume for the 1.5" design storm as was done for the 1.5" design storm done earlier in the calculations. Please summarize the final minimum required storage volume from the pre/post-development calculations considering the entire drainage area. d. The minimum required storage volumes listed in the supplement for drainage area 2 appear to only consider the new drainage area and impervious area. Please consider the entire site, both previously permitted and new, in the minimum required storage volume in the supplement. Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 USMCB Camp Lejeune July 21, 2014 Stormwater Application No. SW8 060309 3. The supplement for drainage area 2 lists the volume provided in the infiltration basin as being 24,597 ft3, however the calculations appear to indicate that the storage provided at the storage elevation of 53.53 ft within the infiltration basin alone is 40,028 ft3. Please confirm the information is presented consistently and accurately. -- ->, 4. Please provide two copies of the revised plan sheet C-502 and the post development drainage area exhibit. ,,/5. Due to the relatively minor nature of these comments, the express additional information review fee has been waived. v6` Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to July 30, 2014, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7345 or email me at christine.nelson@ncdenr.gov. Sincerely, in �-- wi—dL 4 141 Christine Nelson Environmental Engineer GDS/can: G:\WQ\Shared\StormWater\Permits 8 Projects\2006\060309 HD\2014 07 addinfo 060309 cc: Stephen Medvick, NAVFAC Wilmington Regional Office Page 2 of 2 Nelson, Christine From: Nelson, Christine Sent: Monday, July 21, 2014 3:15 PM To: 'Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC'; 'thomas.bradshaw@usmc.mil'; 'david. towler@usmc. mil' Cc: Weaver, Cameron Subject: RE: P-1286 submittal Attachments: 2014 07 addinfo 060309.pdf Steve, The request for additional information for the P-1286 gravel parking lot is attached. Please let me know if you have questions. Thanks, Christine ** Please note the new direct phone number ** Christine Nelson Environmental Engineer State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext., Wilmington, NC 28405 Direct: 910-796-7345 / Main: 910-796-7215 / Fax: 910-350-2004 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick(@navy.mil] Sent: Friday, July 18, 2014 12:03 PM To: Nelson, Christine Subject:. RE: P-1286 submittal Christine Sounds good --thanks! The supplement sheet is attached. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvickpnavy.mil -----Original Message ----- From: Nelson, Christine [mailto:christine.nelson(dncdenr.eov] Sent: Friday, July 18, 2014 11:22 AM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC t y Nelson, Christine From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [stephen.medvick@navy. mil] Sent: Friday, July 18, 2014 12:03 PM To: Nelson, Christine Subject: RE: P-1286 submittal Attachments: 7.17.14 Rev. Infiltration basin supplement DA 1.pdf Christine Sounds good --thanks! The supplement sheet is attached. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick(dnavy.mil -----Original Message ----- From: Nelson, Christine [mailto:christine.nelsona)ncdenr.Rov] Sent: Friday, July 18, 2014 11:22 AM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 submittal Steve, Since you caught me at the beginning of my review, I will just swap out the corrected sheets in the application documents. We will likely need the plan sheets re -printed but that can wait to make sure there are no other comments. I didn't see the revised supplement attached, can you send that too? Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick(@navV.mil] Sent: Friday, July 18, 2014 10:48 AM To: Nelson, Christine Subject: RE: P-1286 submittal You are looking at the correct sheet --but there was supposed to be a drainage exhibit attached. The exhibit shows the bearings and distances for the 2 permitted drainage areas. I am pretty sure that I forgot to include the exhibit. I asked my Cadd tech to recheck my areas before I sent it to you. Drainage Area 2 (my project area) is correct. I of course, have the area for DA-1(off-site) incorrect. I could blame it on spell check if Cadd used spell check but it does not. I listed and checked (3 times) the area for DA-1 but it is wrong. The area was not closed on the layer that I was using -so it gives a false answer. Anyway --my tech did i •'it correctly and the area for DA-1 is slightly more than I used. The impervious area did not change so everything is still in accordance with the permit. The attached drainage exhibit shows the.correct areas. I revised the Basin DA-1 supplement and attached the calculation showing that DA-1 is still in accordance with the existing permit. The application has also been corrected to show the revised numbers for DA-1. I need to change 1 number on C-502 but I am not sure if you use the post developed drainage area sheet (showing all drainage areas) for anything. Sorry for the confusion --please let me know how you want me to handle the revisions. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick(dnavy.mil -----Original Message ----- From: Nelson, Christine [mailto:christine.nelson(dncdenr.Rov] Sent: Friday, July 18, 2014 8:45 AM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 submittal Steve, Sorry for the slight delay in my response. I just pulled this package out today for review. Which sheet should I be looking at? Sheet C-502 has the post -development drainage areas, but I don't see any bearings / distances. Could I be looking at the wrong thing and it is a separate exhibit? Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick(@navy.mil] Sent: Wednesday, July 16, 2014 2:08 PM To: Nelson, Christine Subject: P-1286 submittal Christine Please see if I included a copy of the drainage area exhibit in my submittal package. The exhibit has the bearings and distances for drainage areas 1 and 2 shown, as requested. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 2 Nelson, Christine From: Nelson, Christine Sent: Friday, July 18, 2014 11:22 AM To: 'Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC' Subject: RE: P-1286 submittal Steve, Since you caught me at the beginning of my review, I will just swap out the corrected sheets in the application documents. We will likely need the plan sheets re -printed but that can wait to make sure there are no other comments. I didn't see the revised supplement attached, can you send that too? Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick(@navy•mil] Sent: Friday, July 18, 2014 10:48 AM To: Nelson, Christine Subject: RE: P-1286 submittal You are looking at the correct sheet --but there was supposed to be a drainage exhibit attached. The exhibit shows the bearings and distances for the 2 permitted drainage areas. I am pretty sure that I forgot to include the exhibit. I asked my Cadd tech to recheck my areas before I sent it to you. Drainage Area 2 (my project area) is correct. I of course, have the area for DA-Koff-site) incorrect. I could blame it on spell check if Cadd used spell check but it does not. I listed and checked (3 times) the area for DA-1 but it is wrong. The area was not closed on the layer that I was using -so it gives a false answer. Anyway --my tech did it correctly and the area for DA-1 is slightly more than I used. The impervious area did not change so everything is still in accordance with the permit. The attached drainage exhibit shows the correct areas. I revised the Basin DA-1 supplement. and attached the calculation showing that DA-1 is still in accordance with the existing permit. The application has also been corrected to show the revised numbers for DA-1. I need to change 1 number on C-502 but I am not sure if you use the post developed drainage area sheet (showing all drainage areas) for anything. Sorry for the confusion --please let me know how you want me to handle the revisions. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick@navy.mil -----Original Message ----- From: Nelson, Christine [mailto:christine.nelson@ncdenr.aov] 1 1 Sent: Friday, July 18, 2014 8:45 AM To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 submittal Steve, Sorry for the slight delay in my response. I just pulled this package out today for review. Which sheet should I be looking at? Sheet C-502 has the post -development drainage areas, but I don't see any bearings / distances. Could I be looking at the wrong thing and it is a separate exhibit? Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC[mailto:stephen.medvick(@navy.mil] Sent: Wednesday, July 16, 2014 2:08 PM To: Nelson, Christine Subject: P-1286 submittal Christine Please see if I included a copy of the drainage area exhibit in my submittal package. The exhibit has the bearings and distances for drainage areas 1 and 2 shown, as requested. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick@navy.mil a PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 11.00 01 14 00 01 20 00.00 20 01 30 00 01 32 17.00 20 01 33 00 01 35 26 01 45 00.00 20 01 50 00 01 57 13.00 22 01 57 19.00 20 01 57 19.01 20 01 58 00 01 60 00.00 22 01 62 35 01 74 19 01 78 00 01 78 23 01 78 24.00 20 01 78 30.00 22 SUMMARY OF WORK WORK RESTRICTIONS PRICE AND PAYMENT PROCEDURES ADMINISTRATIVE REQUIREMENTS NETWORK ANALYSIS SCHEDULES (NAS) SUBMITTAL PROCEDURES GOVERNMENTAL SAFETY REQUIREMENTS QUALITY CONTROL TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS EROSION AND SEDIMENT CONTROL TEMPORARY ENVIRONMENTAL CONTROLS SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS PROJECT IDENTIFICATION REQUIREMENTS FOR PESTICIDE AND HERBICIDE COORDINATION RECYCLED / RECOVERED MATERIALS CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT CLOSEOUT SUBMITTALS OPERATION AND MAINTENANCE DATA FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI) DIGITAL DATA DELIVERABLES (GIS) DIVISION 31 - EARTHWORK 31 05 19 GEOTEXTILE 31 11 00 CLEARING AND GRUBBING 31 23 00.00 20 EXCAVATION AND FILL DIVISION 32 - EXTERIOR IMPROVEMENTS 32 11 23 CRUSHED AGGREGATE BASE COURSE 32 92 23 SODDING DIVISION 33 - UTILITIES 33 40 00 STORM DRAINAGE UTILITIES -- End of Project Table of Contents -- ECEIVE JUL 1 1 20% BY: Page 1 :r fr Ifotal Workforce Management JWM) Page 1 of 1 CERTIFICATE OF TRAINING This is to certify that I have completed training for TRAFFICKING IN PERSONS GENERAL AWARENESS TRAINING STEVEN WELLS 4/28/2014 40085/OPQC21 Name: Date: Component/Office: Continuing Education Units: 1 By digitally signing and submitting your proof of training certificate, you certify that you have reviewed and understand the information in this training course. STEVEN WELLS Signature (Digitally Signed) https://twms.navy.mil/selfservicelonline_traininglcertificate.asp?id=482744 4/28/2014 BEQ PARKING LOT MCB CAMP LEJEUNE. NC PROJECT TABLE OF CONTENTS DIVISION O1 - GENERAL REQUIREMENTS O1 11 00 O1 14 00 O1 20 00.00 20 O1 30 00 O1 32 17.00 20 O1 33 00 O1 35 26 O1 45 00.00 20 Ol 50 00 O1 57 13.00 22 O1 57 19.00 20 O1 57 19.01 20 O1 58 00 O1 60 00.00 22 O1 62 35 O1 74 19 O1 78 00 O1 78 23 O1 78 24.00 20 O1 78 30.00 22 11P1286 EPROJECTS W.O.NO.: 796558 SUMMARY OF WORK WORK RESTRICTIONS PRICE AND PAYMENT PROCEDURES ADMINISTRATIVE REQUIREMENTS NETWORK ANALYSIS SCHEDULES (NAS) SUBMITTAL PROCEDURES GOVERNMENTAL SAFETY REQUIREMENTS QUALITY CONTROL TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS EROSION AND SEDIMENT CONTROL TEMPORARY ENVIRONMENTAL CONTROLS SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS PROJECT IDENTIFICATION REQUIREMENTS FOR PESTICIDE AND HERBICIDE COORDINATION RECYCLED / RECOVERED MATERIALS CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT CLOSEOUT SUBMITTALS OPERATION AND MAINTENANCE DATA FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI) DIGITAL DATA DELIVERABLES (GIS) DIVISION 31 - EARTHWORK 31 OS 19 GEOTEXTILE 31 11 00 CLEARING AND GRUBBING 31 23 00.00 20 EXCAVATION AND FILL DIVISION 32 - EXTERIOR IMPROVEMENTS 32 11 23 CRUSHED AGGREGATE BASE COURSE 32 92 23 SODDING DIVISION 33 - UTILITIES 33 40 00 STORM DRAINAGE UTILITIES -- End of Project Table of Contents -- PROJECT TABLE OF CONTENTS Page 1 l 0 f BEQ PARKING LOT MCB CAMP LEJEUNE, NO SECTION O1 57 13.00 22 11P1286 EPROJECTS W.O.NO.: 796558 EROSION AND SEDIMENT CONTROL 05/13 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM D3787 (2007; R 2011) Bursting Strength of Textiles - Constant -Rate -of -Traverse (CRT), Ball Burst Test ASTM D4533 (2011) Trapezoid Tearing Strength of Geotextiles ASTM D4632 (2008) Grab Breaking Load and Elongation of Geotextiles NORTH CAROLINA SEDIMENT CONTROL COMMISSION (NCSCC) NCSCC ESCM (2006; R 20C9) Erosion and Sediment Control Planning and Design Manual 1.2 DESCRIPTION OF WORK The work includes the provision of temporary and permanent erosion control measures to prevent the pollution of air, water, and land within the project limits and in areas outside the project limits where work is accomplished in conjunction with the project. 1.3 SUBMITTALS Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Construction Sequence Schedule; G SD-03 Product Data Sediment Fence Dust Suppressors Erosion Control Matting Filter Fabric SD-11 Closeout Submittals SECTION O1 57 13.00 22 Page 1 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 Photographs of in -place Erosion and Sediment Control measures; G 1.4 CONSTRUCTION SEQUENCE SCHEDULE Submit a Contractor furnished construction work sequence schedule, a minimum of 30 days prior to start of construction. The work schedule shall coordinate the timing of land disturbing activities with the provision of erosion control measures to reduce on site erosion and off site sedimentation. Installation of temporary erosion control features shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and pollution. 1.5 STATE APPROVED PLAN The erosion control plan indicated has been approved by the State. No additional State review and approval of the erosion control plan is required, unless the Contractor desires to modify the erosion control plan indicated. Should the Contractor desire to modify the State approved plan, a resubmittal to the State, including the State's approval is required prior to the start of construction. The contractor shall be responsible for any additional costs and time incurred as a result of the resubmittal of the previously approved erosion control plan. The contractor shall anticipate a minimum 45 day review period by the State. Provide and maintain erosion control measures in accordance with NCSCC ESCM, and as specified herein. 1.5.1 Photographs of in -place Erosion and Sediment Control measures PART 2 PRODUCTS 2.1 SEDIMENT FENCE 2.1.1 State Standard Sediment Fence NCSCC ESCM Standard 6.62, sediment fence (maximum height of 18 inches). 2.2 SILT FENCE DROP INLET PROTECTION 2.2.1 State Standard Drop Inlet Protection NCSCC ESCM Standard 6.51, using silt fencing. 2.3 CONSTRUCTION ENTRANCE 2.3.1 State Standard Construction Entrance 2.3.1.1 Aggregate NCSCC ESCM, Standard 6.06. 2.3.1.2 Filter Fabric A woven or nonwoven polypropylene, nylon, or polyester containing stabilizers and/or inhibitors to make the fabric resistant to deterioration from ultraviolet, and with the following properties: a. Minimum grab tensile strength (TF 25 #1/ASTM D4632) 180 pounds b. Minimum Puncture (TF 25 #4/ASTM D3787) 75 psi in the weakest direction SECTION O1 57 13.00 22 Page 2 BEQ PARKING LOT 11P1286 MCB CAMP LEJEUNE, NC EPROJECTS W.O.NO.: 796558 C. Apparent Opening Size 40-80 (U.S. Sieve Size) d. Minimum Trapezoidal tear strength (TF 25 #2/ASTM D4533) 50 pounds 2.4 DUST SUPPRESSORS Calcium chloride, or other standard manufacturer's spray on adhesives designed for dust suppression. 2.5 TEMPORARY SEEDING 2.5.1 State Standard Temporary Seeding Provide seed, lime, and fertilizer in accordance with NCSCC ESCM, Standard 6.10. Provide hay or straw mulch. 2.6 EROSION CONTROL MATTING Jute, excelsior, or paper matting that has not been bleached or dyed. Provide matting inminimum4feet widths. Staples for anchoring the matting shall be minimum 11 gage wire, formed into a "U" shape with a minimum throat width of one inch and minimum length of 6 inches after forming. 2.6.1 Jute Matting A uniform open plain weave of single jute yarn providing an average weight of 0.9 pounds per square yard of matting. Yarn shall be of a loosely twisted construction and shall not vary in thickness by more than one-half its normal diameter. Matting shall have openings between strands length wise of 0.45 to 0.75 inch, and between strands crosswise of 0.67 to 1.13 inch. 2.6.2 Excelsior Matting A machine produced mat of wood excelsior with a minimum of 80 percent of wood fibers 6 inches in length or longer. The matting shall have an average weight of 0.75 to 0.85 pounds per square yard with an even fiber distribution producing a consistent mat thickness, and shall have on one side a woven fabric. The woven fabric shall be twisted paper cord, cotton cord, or an extruded plastic mesh with a minimum mesh size of one by one inch and a maximum mesh size of 1 1/2 by 3 inch. 2.6.3 Paper Matting Shall be a knitted polypropylene yarn with uniform openings with biodegradable paper strips continuously interwoven. The matting shall weigh a minimum of 0.09 pounds per square yard with maximum openings of 3/4 inch and minimum openings of 1/2 inch. 2.6.4 Straw Matting A machine produced straw mat with a minimum thickness of 1/2 inch +/- 1/8 inch. The straw shall be evenly distributed throughout the mat to provide a minimum average dry weight of .70 pounds per square yard. The topside of the mat shall be covered with a 3/8 inch biodegradable plastic mesh, with the mesh attached to the straw by a knitting process using biodegradable thread. SECTION O1 57 13.00 22 Page 3 BEQ PARKING LOT lIP1286 MCB CAMP LEJEUNE, NC EPROJECTS W.O.NO.: 796558 PART 3 EXECUTION 3.1 CONSTRUCTION SEQUENCE SCHEDULE Stabilize areas for construction access immediately with gravel. Install principal sediment basins and traps before any major'site grading takes place. Provide additional sediment traps, and sediment fences as grading progresses. Provide drop inlet protection around existing drainage structures, and inlet and outlet protection at the ends of new drainage systems. Stabilize graded and disturbed areas immediately after grading. Permanent stabilization shall be provided immediately on areas that have been final graded. Temporary seeding and mulching shall be provided on disturbed areas as specified in the paragraph entitled "Temporary Seeding." Installation of temporary erosion control features shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and sediment deposition. Remove temporary erosion control measures at the end of construction and provide permanent seeding. 3.2 SEDIMENT FENCES Install posts at the spacing indicated, and at an angle between 2 degrees and 20 degrees towards the potential silt load area. Sediment fence height shall be approximately 18 inches. Do not attach filter fabric to existing trees. Secure filter fabric to the post and wire fabric using staples, tie wire, or hog rings. Imbed the filter fabric into the ground as indicated. Splice filter fabric at support pole using a 6 inch overlap.and securely seal. 3.3 DROP INLET PROTECTION Provide stakes evenly spaced around the perimeter of the drop inlet , a maximum of 3 feet apart. Stakes shall be driven immediately adjacent to the drainage structure, a minimum of 18 inches into the ground. The fabric shall be securely fastened to the outside of the stakes, with the bottom of the fabric placed into a trench and backfilled. 3.4 CURB INLET PROTECTION Provide wire mesh over the curb inlet opening so at least 12 inches of wire mesh extends across the inlet cover and at least 12 inches of wire mesh extends across the gutter from the inlet opening, as indicated. Place stone on wire mesh against curb inlet. 3.5 CONSTRUCTION ENTRANCE Provide as indicated, a minimum of 6 inches thick, at points of vehicular ingress and egress on the construction site. Construction entrances shall be cleared and grubbed, and then excavated a minimum of 3 inches prior to placement of the filter fabric and aggregate. The aggregate shall be placed in a manner that will prevent damage and movement of the fabric. Place fabric in one piece, where possible. Overlap fabric joints a minimum of 12 inches. 3.6 DUST SUPPRESSORS Immediately dampen the surface before calcium chloride application. Apply dust suppressors on unsurfaced base, subbase and other unsurfaced travel SECTION O1 57 13.00 22 Page 4 BEQ PARKING LOT MCB CAMP LEJEUNE. NC 11P1286 EPROJECTS W.O.NO.: 796558 ways. Apply calcium chloride at the rate of 1.0 to 1.25 pounds per square yard of surface for pellets for the initial application. For subsequent applications of calcium chloride, application rates may be approximately 75 percent of initial application rates. Do not apply when raining or the moisture conditions exceed that required for proper application. Apply other dust suppressors in accordance with manufacturers instructions. Protect treated surfaces from traffic for a minimum of 2 hours after treatment. Repeat application of dust suppressors as required to control dust emissions. 3.7 TEMPORARY SEEDING 3.7.1 Time Restrictions Within 48 hours after attaining the grading increment specified herein, provide seed, fertilizer, mulch and water on graded areas when any of the following conditions occur: a. Grading operations stop for an anticipated duration of 30 days or more. b. When it is impossible or impractical to bring an area to finish grade so that permanent seeding operations can be performed without serious disturbance from additional grading. C. Grading operations for a specific area are completed and the seeding seasons specified for permanent seeding in Section 32 92 23 SODDING is more than 30 days away. d. When an immediate cover is required to minimize erosion, or when erosion has occurred. e. Provide on erosion control devices constructed using soil materials. 3.7.2 Seeding Requirements 3.7.2.1 State Standard Seeding Requirements Provide seed, lime, and fertilizer in accordance with NCSCC ESCM, Standard 6.10. Provide hay or straw mulch in an air dried condition, and secure mulch in place. 3.7.2.2 Permanent Seeding Temporary seeding shall be removed, and permanent seeding shall be provided during the specified planting season as specified in Section 32 92 23 SODDING. 3.8 EROSION CONTROL MATTING Place matting in the direction of the flow of water. The up channel mat ting end shall be toed in a narrow trench a minimum of 5 inches deep. Where. one roll of matting ends and a second roll begins, the end of the upper roll shall be brought over the buried end of the second roll, to provide a 6 inch overlap. Where matting widths are laid side by side, the overlap between matting shall be 4 inches. Provide check slots every 50 feet longitudinally in the matting. Construct check slots by providing a narrow trench 5 inches deep and folding the matting down in to the trench, across the bottom of the trench, and then back up the trench to the existing ground Backfill and compact the trench using the excavated SECTION O1 57 13.00 22 Page 5 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 material from the trench. Staple matting ends, junctions, and check slots at 10 inches on center. Staple matting outer edges and overlaps and the center of each matting strip at 3 feet on center. Install excelsior matting with the woven fabric on top. 3.9 MAINTENANCE AND INSPECTION Inspect erosion control devices after each rainfall and daily during pro longed rainfall. Remove sediment deposits aftereach rainfall or when sediment reaches approximately one-half the barrier height. Immediately repair damaged erosion control devices and damaged areas around and underneath the devices. Maintain erosion control devices to assure continued performance of their intended function. Modify the erosion control plan as required to control problem areas noticed after each inspection. Modifications shall be approved by the Contracting Officer. 3.10 CLEAN UP At the completion of the job, or when directed or approved by the Contracting Officer, temporary erosion control devices shall be removed. Erosion control devices and areas immediately adjacent to the device shall be filled (where applicable), shaped to drain and to blend into the surrounding contours, and provided with permanent seeding. Erosion control devices may remain in place after job completion when approved by the Contracting Officer. -- End of Section -- SECTION O1 57 13.00 22 Page 6 0 BEQ PARKING LOT MCB CAMP LEJEUNE, NC SECTION 31 05 19 GEOTEXTILE 08/08 19,130=f elnl�IDRIAI 1.1 REFERENCES 11P1286 EPROJECTS W.O.NO.: 796558 The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM D4873 (2002; R 2009) Identification, Storage, and Handling of Geosynthetic Rolls and Samples ASTM D4439 (2011) Geosynthetics AASHTO M 288 (2006; R 2011) Standard Specification for Geotextile Specification for Highway Applications NORTH CAROLINIA DEPARTMENT OF TRANSPORTATION (NCDOT) 1.2 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-07 Certificates Geotextile;G 1.3 DELIVERY, STORAGE, AND HANDLING Deliver, store, and handle geotextile in accordance with ASTM D4873. 1.3.1 Delivery Notify the Contracting Officer a minimum of 24 hours prior to delivery and unloading of geotextile rolls packaged in an opaque, waterproof, protective plastic wrapping.- The plastic wrapping'shall not be removed until deployment. If quality assurance samples are collected, immediately rewrap rolls with the plastic wrapping. Geotextile or plastic wrapping damaged during storage or handling shall be repaired or replaced, as directed. Label each roll with the manufacturer's name, geotextile type, roll number, roll dimensions (length, width, gross weight), and date manufactured. SECTION 31 05 19 Page 1 BEQ PARKING LOT MCB CAMP LEJEUNE, NO 1.3.2 Storage 11P1286 EPROJECTS W.O.NO.: 796558 Protect rolls of geotextile from construction equipment, chemicals, sparks and flames, temperatures in excess of 160 degrees F, or any other environmental condition that may damage the physical properties of the geotextile. To protect geotextile from becoming saturated, either elevate rolls off the ground or place them on a sacrificial sheet of plastic in an area where water will not accumulate. 1.3.3 Handling Handle and unload geotextile rolls with load carrying straps, a fork lift with a stinger bar, or an axial bar assembly. Rolls shall not be dragged along the ground, lifted by one end, or dropped to the ground. PART 2 PRODUCTS 2.1 RAW MATERIALS A minimum of 30 days prior to scheduled use, submit manufacturer's certificate of compliance stating that the geotextile meets the requirements of this section. For needle punched gectextiles, the manufacturer shall also certify that the geotextile has been continuously inspected using permanent on-line full -width metal detectors and does not contain any needles which could damage other geosynthetic layers. The certificate of compliance shall be attested to by a person having legal, authority to bind the geotextile manufacturer. 2.1.1 Geotextile Provide geotextile that is complies with NCDOT RS Section 1056-4.Define "machine direction" (MD) and "cross -machine direction" (CD) in accordance with ASTM D4439. PART 3 EXECUTION 3.1 INSTALLATION 3.1.1 Subgrade Preparation The surface underlying the geotextile shall be smooth and free of ruts or protrusions which could damage the geotextile. Subgrade materials and compaction requirements shall be in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL. 3.1.2 Placement Notify the Contracting Officer a minimum of 24 hours prior to installation of geotextile. Geotextile rolls which are damaged or contain imperfections shall be repaired or replaced as directed. The geotextile shall be laid flat and smooth so that it is in direct contact with the subgrade. The geotextile shall also be free of tensile stresses, folds, and wrinkles. On slopes steeper than 10 horizontal on 1 vertical, lay the geotextile with the machine direction of the fabric parallel to the slope direction. SECTION 31 05 19 Page 2 BEQ PARKING LOT MCB CAMP LEJEUNE. NC Ikjw�Ym21uk: 3.2.1 Sewn Seams 11P1286 EPROJECTS W.O.NO.: 796558 When required, sew geotextiles together in accordance with Article X1.1.4 of AASNTO M 288. Provide sewn seams with seam strengths meeting the required strengths for the geotextile type and class specified. 3.3 PROTECTION Protect the geotextile during installation from clogging, tears, and other damage. Damaged geotextile shall be repaired or replaced as directed. Use adequate ballast (e.g. sand bags) to prevent uplift by wind. The geotextile shall not be left uncovered for more than 2 days after installation. 3.4 REPAIRS Repair torn or damaged geotextile. Clogged areas of geotextile shall be removed. Perform repairs by placing a patch of the same type of geotextile over the damaged area. The patch shall extend a minimum of 12 inches beyond the edge of the damaged area. Patches shall be continuously fastened using approved methods. The machine direction of the patch shall be aligned with the machine direction of the geotextile being repaired. Remove and replace geotextile rolls which cannot be repaired. Repairs shall be performed at no additional cost to the Government 3.5 PENETRATIONS Construct engineered penetrations of the geotextile by methods recommended by the geotextile manufacturer. 3.6 COVERING Do not cover geotextile prior to inspection and approval by the Contracting Officer. Place cover soil in a manner that prevents soil from entering the geotextile overlap zone, prevents tensile stress from being mobilized in the geotextile, and prevents wrinkles from folding over onto themselves. On side slopes, soil backfill shall be placed from the bottom of the slope upward. Cover soil shall not be dropped onto the geotextile from a height greater than 3 feet. No equipment shall be operated directly on top of the geotextile without approval of the Contracting Officer. Use equipment with ground pressures less than 7 psi to place the first lift over the geotextile. A minimum of 12 inches of soil shall be maintained between full-scale construction equipment and the geotextile. Cover soil material type, compaction, and testing requirements are described in Section 31 23 00.00 20 EXCAVATION AND FILL. Equipment placing cover soil shall not stop abruptly, make sharp turns, spin their wheels, or travel at speeds exceeding 5 mph. -- End of Section -- SECTION 31 05 19 Page 3 BEQ PARKING LOT MCB CAMP LEJEUNE. NC SECTION 31 11 00 CLEARING AND GRUBBING 08/08 PART 1 GENERAL 1.1 'SUBMITTALS 11P1286 EPROJECTS W.O.NO.: 796558 Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-03 Product Data Nonsaleable Materials; G SD-04 Samples Tree wound paint Herbicide 1.2 DELIVERY, STORAGE, AND HANDLING Deliver materials to store at the site, and handle in a manner which will maintain the materials in their original manufactured or fabricated condition until ready for use. PART 2 PRODUCTS 2.1 TREE WOUND PAINT Submit samples in cans with manufacturer's label of bituminous based paint of standard manufacture specially formulated for tree wounds. 2.2 HERBICIDE Comply with Federal Insecticide; Fungicide, and Rodenticide Act (Title 7 U.S.C. Section 136) for requirements on Contractor's licensing, certification and record keeping. Contact the command Pest Control Coordinator prior to starting work. Submit samples in cans with manufacturer's label. PART 3 EXECUTION 3.1 PROTECTION 3.1.1 Roads and Walks Keep roads and walks free of dirt and debris at all times. 3.1.2 Trees, Shrubs, and Existing Facilities Provide protection in accordance with Section 01 57 19.00 20, TEMPORARY ENVIRONMENTAL CONTROLS. Protect trees and vegetation to be left standing from damage incident to clearing, grubbing, and construction operations by SECTION 31 11 00 Page 1 BEQ PARKING LOT MCB CAMP LEJEUNE. NC 11P1286 EPROJECTS W.O.NO.: 796556 the erection of barriers or by such other means as the circumstances require. 3.1.3 Utility Lines Protect existing utility lines that are indicated to remain from damage. Notify the Contracting Officer immediately of damage to or an encounter with an unknown existing utility line. The Contractor is responsible for the repairs of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations. When utility lines which are to be removed are encountered within the area of operations, notify the Contracting Officer in ample time to minimize interruption of the service. Refer to Section 01 30 00, ADMINISTRATIVE REQUIREMENTS and Section 01 57 19.00 20, TEMPORARY ENVIRONMENTAL CONTROLS for additional utility protection. 3.2 CLEARING Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Clearing shall also include the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface, except such trees and vegetation as may be indicated or directed to be left standing. Trees designated to be left standing within the cleared areas shall be trimmed of dead branches 1-1/2 inches or more in diameter and shall be trimmed of all branches the heights indicated or directed. Limbs and branches to be trimmed shall be neatly cut close to the bole of the tree or main branches. Cuts more than 1-1/2 inches in diameter shall be painted with an approved tree -wound paint. Apply herbicide in accordance with the manufacturer's label to the top surface of stumps designated not to be removed. 3.3 TREE REMOVAL Where indicated or directed, trees and stumps that are designated as trees shall be removed from areas outside those areas designated for clearing and grubbing. This work shall include the felling of such trees and the removal of their stumps and roots as specified in paragraph GRUBBING. Trees shall be disposed of as specified in paragraph DISPOSAL OF MATERIALS. 3.4 PRUNING Trim trees designated to be left standing within the cleared areas of dead branches 1-1/2 inches or more in diameter; and trim branches to heights and in a manner as indicated. Neatly cut limbs and branches to be trimmed close to the bole of the tree or main branches. Paint cuts more than 1-1/4 inches in diameter with an approved tree wound paint. 3.5 GRUBBING Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas. Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 18 inches below the original surface level of the ground in areas indicated to be grubbed and in areas indicated as construction areas under SECTION 31 11 00 Page 2 ,1 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 this contract, such as areas for buildings, and areas to be paved. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground. 3.6 DISPOSAL OF MATERIALS 3.6.1 Saleable Timber 1. All timber on the project site noted for clearing and grubbing shall become the property of the Contractor, and shall be removed from the project site and disposed of off stations. 3.6.2 Nonsaleable Materials Written permission to dispose of such products on private property shall be filed with the Contracting Officer. Logs, stumps, roots, brush, rotten wood, and other refuse from the clearing and grubbing operations, except for salable timber, shall be disposed of outside the limits of Government -controlled land at the Contractor's responsibility, except when otherwise directed in writing. Such directive will state the conditions covering the disposal of such products and will also state the areas in which they may be placed. -- End of Section -- SECTION 31 11 00 Page 3 �BEQ PARKING LOT MCB CAMP LEJEUNE, NC SECTION 31 23 00.00 20 EXCAVATION AND FILL 02/11 PART 1 GENERAL 1.1 REFERENCES lIP1286 EPROJECTS W.O.NO.: 796558 The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. AMERICAN WATER WORKS ASSOCIATION (AWWA) AWWA C600 (2010) Installation of Ductile -Iron Water Mains and Their Appurtenances AMERICAN WELDING SOCIETY (AWS) AWS D1.1/D1.1M (2010; Errata 2011) Structural Welding Code - Steel ASTM INTERNATIONAL (ASTM) ASTM A139/A139M (2004; R 2010) Standard Specification for Electric -Fusion (ARC) -Welded Steel Pipe (NPS 4 and over) ASTM A252 (2010) Standard Specification for Welded and Seamless Steel Pipe Piles ASTM C33/C33M (2013) Standard Specification for Concrete Aggregates ASTM D1140 (2000; R 2006) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve ASTM D1556 (2007) Density and Unit weight of Soil in Place by the Sand -Cone Method ASTM D1557 (2012) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3) ASTM D2321 (2011) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity -Flow Applications ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System) ASTM D4318 (2010) Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D6938 (2010) Standard Test Method for In -Place SECTION 31 23 00.00 20 Page 1 BEQ PARKING LOT lIP1286 MCB CAMP LEJEUNE, NC EPROJECTS W.O.NO.: 796558 Density and Water Content of Soil and Soil -Aggregate by Nuclear Methods (Shallow Depth) ASTM D698 (2012) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.)) U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) EPA SW-846.3-3 (1999, Third Edition, Update III -A) Test Methods for Evaluating Solid Waste: Physical/Chemical Methods U.S. GENERAL SERVICES ADMINISTRATION (GSA) NORTH CAROLINIA DEPARTMENT OF TRANSPORTATION (NCDOT) NCDOT RS (2012) Standard Specifications for Road and Structures 1.2 DEFINITIONS 1.2.1 Capillary water Barrier A layer of clean, poorly graded crushed rock, stone, or natural sand or gravel having a high porosity which is placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of pore water to the area immediately below a slab. 1.2.2 Degree of Compaction Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557, for general soil types, abbreviated as percent laboratory maximum density. 1.2.3 Hard Materials Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" but which usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal. Fwc�.YU:IuFYWY_�Ff.9 Government approval is required for submittals with a'"G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section O1 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Dewatering work plan Submit 15 days prior to starting work. SD-06 Test Reports SECTION 31 23 00.00 20 Page 2 BEQ PARKING LOT MCB CAMP LEJEUNE, NC Borrow Site Testing; G Fill and backfill test ;G Select material test ;G Density tests ;G Moisture Content Tests 11P1286 EPROJECTS W.O.NO.: 796558 Copies of all laboratory and field test reports within 24 hours of the completion of the test. 1.4 DELIVERY, STORAGE, AND HANDLING Perform in a manner to prevent contamination or segregation of materials. 1.5 CRITERIA FOR BIDDING Base bids on the following criteria: a. Surface elevations are as indicated. b. Pipes or other artificial obstructions, except those indicated, will not be encountered. C. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction. Seasonal perched water table conditions will be encountered. d. Material character is indicated by the boring logs. e. Hard materials will be encountered. f. Borrow material in the quantities required is not available on Government property. g. Blasting will not be permitted. Remove material in an approved manner. 1.6 REQUIREMENTS FOR OFF SITE SOIL Soils brought in from off site for use as backfill shall be tested for petroleum hydrocarbons, BTEX, PCBs and HW characteristics (including toxicity, ignitability, corrosivity, and reactivity). Backfill shall not contain concentrations of these analytes above the appropriate State and/or EPA criteria, and shall pass the tests for HW characteristics. Determine petroleum hydrocarbon concentrations by using appropriate State protocols. Determine BTEX concentrations by using EPA SW-846.3-3 Method 5035/82603. Perform complete TCLP in accordance with EPA SW-846.3-3 Method 1311. Perform HW characteristic tests for ignitability, corrosivity, and reactivity in accordance with accepted standard methods. Perform PCB testing in accordance with accepted standard methods for sampling and analysis of -bulk solid samples. Provide borrow site testing for petroleum hydrocarbons and BTEX from a grab sample of material from the area most likely to be contaminated at the borrow site (as indicated by visual or olfactory evidence), with at least one test from each borrow site. For each borrow site, provide borrow site testing for HW characteristics from a SECTION 31 23 00.00 20 Page 3 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 composite sample of material, collected in accordance with standard soil sampling techniques. Do not bring material onsite until tests results have been received and approved by the Contracting Officer. 1.7 QUALITY ASSURANCE 1.7.1 Dewatering Work Plan Submit procedures for accomplishing dewatering work. 1.7.2 Existing Utilities Movement of construction machinery and equipment over pipes and utilities during construction shall be at the Contractor's risk. Excavation made with power -driven equipment is not permitted within twofeet of known Government -owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing existing utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer. PART 2 PRODUCTS 2.1 SOIL MATERIALS 2.1.1 Satisfactory Materials Any materials classified by ASTM D2487 as GW, GP, GM, GP -GM, GW-GM, SW, SP, SM,SP-SM, with a maximum ASTM D 4318 liquid limit of 35, maximum ASTM D 4318 plasticity index of 9, and a maximum of 20 percent by weight passing ASTM D 1140, No. 200 sieves free of debris, roots, wood, scrap material,. vegetation', refuse, soft unsound particles, and deleterious, or objectionable materials. Unless specified otherwise, the maximum particle diameter shall be one-half the lift thickness at the intended location. 2.1.2 Unsatisfactory Materials Materials which do not comply with the requirements for satisfactory materials. Unsatisfactory materials also include man-made fills, trash, refuse, or backfills from previous construction. Unsatisfactory material also includes material classified as satisfactory which contains root and other organic matter, frozen material, and stones larger than 2 inches. The Contracting Officer shall be notified of any contaminated materials. 2.1.3 Expansive Soils Soils that have a plasticity index equal to or greater than 5 when tested in accordance with ASTM D4318. 2.1.4 Nonfrost Susceptible (NFS) Material A uniformly graded washed sand with less than 5 percent passing the No. 200 size sieve, and with not more than 3 percent by weight finer than 0.02 mm grain size. SECTION 31 23 00.00 20 Page 4 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 2.1.5 Common Fill lIP1286 EPROJECTS W.O.NO.: 796558 Approved, unclassified soil material with the characteristics required to compact to the soil density specified for the intended location. 2.1.6 Backfill and Fill Material ASTM D2487, classification GW, GP, GM, SW, SP, SM, with a maximum ASTM D4318 liquid limit of 35, maximum ASTM D4318 plasticity index of 9, and a maximum of 25 percent by weight passing ASTM D1140, No. 200 sieve. 2.1.7 Select Material Provide materials classified as GW, GP, SW, SP, or by ASTM D2487 where indicated. The liquid limit of such material shall not exceed 35 percent when tested in accordance with ASTM D4318. The plasticity index shall not be greater than 9 percent when tested in accordance with ASTM D4318, and not more than 35 percent by weight shall be finer than No. 200 sieve when tested in accordance with ASTM D1140. Gradation for aggregate surface courses: Sieve Size Percent Passing by Weight 1 inches 100 3/8 inches 100 No. 4 70-100 Nc. 10 55-100 No. 40 30-70 No. 200 8-15 2.1.8 Topsoil Provide as specified in Section 32 92 23 SODDING. 2.2 POROUS FILL FOR CAPILLARY WATER BARRIER ASTM C33/C33M fine aggregate grading with a maximum of 3 percent by weight passing ASTM D1140, No. 200 sieve, or 1-1/2 inches, and no more than 2 percent by weight passing the No. 4 size sieve or coarse aggregate Size 57, 67, or 77 and conforming to the general soil material requirements specified in paragraph entitled "Satisfactory Materials." 2.3 UTILITY BEDDING MATERIAL Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with AWWA C600, Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent SECTION 31 23 00.00 20 Page 5 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 of ASTM D698 maximum density. Plastic piping shall have bedding to spring line of pipe. Provide ASTM D2321 materials as follows: a. Class I: Angular, 0.25 to 1.5 inches, graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells. b. Class II: Coarse sands and gravels with maximum particle size of 1.5 inches, including various graded sands and gravels containing small percentages of fines, generally granular and noncohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class as specified in ASTM D2487. 2.4 BORROW Obtain borrow materials required in excess of those furnished from excavations from sources outside of Government property. 2.5 MATERIAL FOR PIPE CASING 2.5.1 Casing Pipe ASTM A139/A139M, Grade B, or ASTM A252, Grade 2, smooth wall pipe. Casing size shall be of the outside diameter and wall thickness as indicated. Protective coating is not required on casing pipe. 2.6 MATERIAL FOR RIP -RAP Rock for erosion control rip -rap shall conform to NCDOT RS Section 1042, class B.2.6. 2.7 BURIED WARNING AND IDENTIFICATION TAPE Polyethylene plastic and metallic core or metallic -faced, acid- and alkali -resistant, polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inch minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar wording. Color and printing shall be permanent, unaffected by moisture or soil. Warning Tape Color Codes Red: Electric Yellow: Gas, Oil; Dangerous Materials Orange: Telephone and Other Communications Blue: Potable Water Systems Green: Sewer Systems White: Steam Systems SECTION 31 23 00.00 20 Page 6 BEQ PARKING LOT MCB CAMP LEJEUNE, NC Warning Tape Color Codes Gray: Compressed Air Purple: Non Potable, Reclaimed Water, Irrigation and Slurry lines 11P1286 EPROJECTS W.O.NO.: 796558 2.7.1 Detectable Warning Tape for Non -Metallic Piping Polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of the tape shall be 0.004 inch. Tape shall have a minimum strength of 1500 psi lengthwise and 1250 psi crosswise. Tape shall be manufactured with integral wires, foil backing, or other means of enabling detection by a metal detector when tape is buried up to 3 feet deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection. 2.8 DETECTION WIRE FOR METALLIC AND NON-METALLIC PIPING Detection wire shall be insulated single strand, solid copper with a minimum of 12 AWG. PART 3 EXECUTION 3.1 PROTECTION 3.1.1 Drainage and Dewatering Provide for the collection and disposal of surface and subsurface water encountered during construction. 3.1.1.1 Drainage So that construction operations progress successfully, completely drain construction site during periods of construction to keep soil materials sufficiently dry. The Contractor shall establish/construct storm drainage features (ponds/basins) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and/or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils, prevent erosion and undermining of foundations. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed. Excavated slopes and backfill surfaces shall be protected to prevent erosion and sloughing. Excavation shall be performed so that the site, the area immediately surrounding the site, and the area affecting operations at the site shall be continually and effectively drained. 3.1.1.2 Dewatering Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. French drains, sumps, ditches or trenches will not be SECTION 31 23 00.00 20 Page 7 BEQ PARKING LOT MCB CAMP LEJEUNE, NC lIP1286 EPROJECTS W.O.NO.: 796558 permitted within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Control measures shall be taken by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, the water level shall be maintained continuously, at least 1.5 feet below the working level. Operate dewatering system continuously until construction work below existing water levels is complete. Submit performance records weekly. Measure and record performance of dewatering system at same time each day by use of observation wells or piezometers installed in conjunction with the dewatering system. Relieve hydrostatic head in previous zones below subgrade elevation in layered soils to prevent uplift. 3.1.2 Underground Utilities Location of the existing utilities indicated is approximate. The Contractor shall physically verify the location and elevation of the existing utilities indicated prior to starting construction. The Contractor shall scan the construction site with electromagnetic and sonic equipment and mark the surface of the ground where existing underground utilities are discovered. 3.1.3 Machinery and Equipment Movement of construction machinery and equipment over pipes during construction shall be at the Contractor's risk. Repair, or remove and provide new pipe for existing or newly installed pipe that has been displaced or damaged. Remove the existing utility pipe as shown on plan. 3.2 SURFACE PREPARATION 3.2.1 Clearing and Grubbing 1 Unless indicated otherwise, remove trees, stumps, logs, shrubs, brush and vegetation and other items that would interfere with construction operations within the . Remove stumps entirely. Grub out matted roots and roots over 2 inches in diameter to at least 18 inches below existing surface. 3.2.2 Stripping Strip soil from the site where excavation or grading is indicated and stockpile separately from other excavated material. Stripping shall be performed with track -mounted excavations and not with dobers or scrapers. Stripping shall be performed to a depth of at least 24 inches below the exiting ground surface. Stripping shall be performed to a horizontal (plan) distance of at least 5 feet beyond pavement areas. Material unsuitable for use as topsoil shall be stockpiled and used for common fill or backfilling. Locate topsoil so that the material can be used readily for the finished grading. Where sufficient existing topsoil conforming to the material requirements is not available on site, provide borrow materials suitable for use as topsoil. Protect topsoil and keep in segregated piles until needed. 3.2.3 Unsuitable Material Remove vegetation, debris, decayed vegetable matter, sod, mulch, and SECTION 31 23 00.00 20 Page 8 4 BEQ PARKING LOT 11P1286 MCB CAMP LEJEUNE, NC EPROJECTS W.O.NO.: 796558 rubbish underneath paved areas or concrete slabs. 3.3 EXCAVATION Excavate to contours, elevation, and dimensions indicated. Reuse excavated materials that meet the specified requirements for the material type required at the intended location. Keep excavations free from water. Excavate soil disturbed or weakened by Contractor's operations, soils softened or made unsuitable for subsequent construction due to exposure to weather. Excavations below indicated depths will not be permitted except to remove unsatisfactory material. Unsatisfactory material encountered below the grades shown shall be removed as directed. Refill with backfill and fill material and compact to 95 percent of ASTM D1557 maximum density. Unless specified otherwise, refill excavations cut below indicated depth with satisfactory material and compact to 95 percent of ASTM D1557 maximum density. Satisfactory material removed below the depths indicated, without specific direction of the Contracting Officer, shall be replaced with satisfactory materials to the indicated excavation grade; except as specified for spread footings. Determination of elevations and measurements of approved overdepth excavation of unsatisfactory material below grades indicated shall be done under the direction of the Contracting Officer. 3.3.1 Pipe Trenches Excavate to the dimension indicated. Grade bottom of trenches to provide uniform support for each section of pipe after pipe bedding placement. Tamp if necessary to provide a firm pipe bed. Recesses shall be excavated to accommodate bells and joints so that pipe will be uniformly supported for the entire length. Rock, where encountered, shall be excavated to a depth of at least 6 inches below the bottom of the pipe. 3.3.2 Hard Material Excavation Remove hard material to elevations indicated in a manner that will leave foundation material in an unshattered and solid condition. Roughen level surfaces and cut sloped surfaces into benches for bond with concrete. Protect shale from conditions causing decomposition along joints or cleavage planes and other types of erosion. Removal of hard material beyond lines and grades indicated will, not be grounds for a claim for additional payment unless previously authorized by the Contracting Officer. Excavation of the material claimed as rock shall not be performed until the material has been cross sectioned by the Contractor and approved by the Contracting Officer. Common excavation shall consist of all excavation not classified as rock excavation. 3.3.3 Excavated Materials Satisfactory excavated material required for fill or backfill shall be placed in the proper section of the permanent work required or shall be separately stockpiled if it cannot be readily placed. Satisfactory material in excess of that required for the permanent work and all unsatisfactory material shall be disposed of as specified in Paragraph "DISPOSITION OF SURPLUS MATERIAL." 3.3.4 Final Grade of Surfaces All surfaces shall be protected from erosion resulting from ponding or flow of water. SECTION 31 23 00.00 20 Page 9 0 BEQ PARKING LOT MCB CAMP LEJEUNE, NC Rw,l "101 ZMR-110 0 4a19\:7YMN1I1 11P1286 EPROJECTS W.O.NO.: 796558 Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer. Sloped surfaces steeper than 1 vertical to 4 horizontal shall be plowed, stepped, benched, or broken up so that the fill material will bond with the existing material. When subgrades are less than the specified density, the ground surface shall be broken up to a minimum depth of 6 inches, pulverized, and compacted to the specified density. When the subgrade is part fill and part excavation or natural ground, the excavated or natural ground portion shall be scarified to a depth of 12 inches and compacted as specified for the adjacent fill. Material shall not be placed on surfaces that are muddy, frozen, or contain frost. Compaction shall be accomplished by sheepsfoot rollers, pneumatic -tired rollers, steel -wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or aerated as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used. Minimum subgrade density shall be as specified herein. 3.4.1 Proof Rolling Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping and excavation to the planned subgrade elevations, proof roll the existing subgrade of the pavement areas with two passes of a loaded tandem axle truck or larger dump truck. Operate the truck in a systematic manner to ensure the number of passes over all areas, and at speeds between 2 1/2 to 3 1/2 miles per hour. Notify the Contracting Officer a minimum of 3 days prior to proof rolling. Proof rolling shall be performed in the presence of the Contracting Officer. Rutting or pumping material shall be undercut as directed by the Contracting Officerand replaced with fill and backfillselect material. 3.5 FILLING AND BACKFILLING Fill and backfill to contours, elevations, and dimensions indicated. Compact each lift before placing overlaying lift. 3.5.1 Common Fill Placement Provide for general site Place in 6 inch lifts. Compact areas not accessible to rollers or compactors with mechanical hand tampers. Aerate material excessively moistened by rain to a satisfactory moisture content. Finish to a smooth surface by blading, rolling with a smooth roller, or both. 3.5.2 Select Material Placement Provide under structures not pile supported. Place in 6 inch lifts. Do not place over wet or frozen areas. Backfill adjacent to structures shall be placed as structural elements are completed and accepted. Backfill against concrete only when approved. Place and compact material to avoid loading upon or against structure. SECTION 31 23 00.00 20 Page 10 BEQ PARKING LOT MCB CAMP LEJEUNE, NC lIP1286 EPROJECTS W.O.NO.: 796558 3.5.3 Backfill and Fill Material Placement Over Pipes Backfilling shall not begin until construction below finish grade has been approved, underground utilities systems have been inspected, tested and approved, forms removed, and the excavation cleaned of trash and debris. Backfill shall be brought to indicated finish grade. Where pipe is coated or wrapped for protection against corrosion, the backfill material up to an elevation 2 feet above sewer lines and 1 foot above other utility lines shall be free from stones larger than 1 inch in any dimension. Heavy equipment for spreading and compacting backfill shall not be operated closer to foundation or retaining walls than a distance equal to the height of backfill above the top of footing; the area remaining shall be compacted in layers not more than 4 inches in compacted thickness with power -driven hand tampers suitable for the material being compacted. Backfill shall be placed carefully around pipes or tanks to avoid damage to coatings, wrappings, or tanks. Backfill shall not be placed against foundation walls prior to 7 days after completion of the walls. As far as practicable, backfill shall be brought up evenly on each side of the wall and sloped to drain away from the wall. 3.5.4 Trench Backfilling Backfill as rapidly as construction, testing, and acceptance of work permits. Place and compact backfill under structures and paved areas in 6 inch lifts to top of trench and in 6 inch lifts to one foot over pipe outside structures and paved areas. 3.6 BORROW Where satisfactory materials are not available in sufficient quantity from required excavations, approved borrow materials shall be obtained as specified herein. 3.7 BURIED WARNING AND IDENTIFICATION TAPE Provide buried utility lines with utility identification tape. Bury tape 12 inches below finished grade; under pavements and slabs, bury tape 6 inches below top of subgrade. 3.8 BURIED DETECTION WIRE Bury detection wire directly above non-metallic piping at a distance not to exceed 12 inches above the top of pipe. The wire shall extend continuously and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 3 feet of wire, coiled, remaining accessible in each manhole. The wire shall remain insulated over it's entire length. The wire shall enter manholes between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, the wire shall terminate in the valve pit at the pump station end of the pipe. 3.9 COMPACTION Compaction requirements in accordance with corresponding tables in ASTM D4318. 3.9.1 General Site Compact underneath areas designated for vegetation and areas outside the 5 SECTION 31 23 00.00 20 Page 11 BEQ PARKING LOT MCB CAMP LEJEUNE. NC 11P1286 EPROJECTS W.O.NO.: 796558 foot line of the paved area or structure to 90 percent of ASTM D1557. 3.9.2 Adjacent Area Compact areas within 5 feet of structures to 90 percent of ASTM D1557. 3.10 PIPELINE CASING UNDER PAVEMENT Provide new smooth wall steel pipeline casing under new Provide each new pipeline casing, where indicated and to the lengths and dimensions shown, complete and suitable for use with the new piped utility as indicated. 3.10.1 Earthwork for Pipeline Casings Provide excavation, sheet piling, shoring, dewatering, and backfilling for pipeline casings under this section. 3.10.2 Steel Cased Pipelines Excavate and place bedding and backfill as indicated. Install pipeline casing by dry boring and jacking method as follows: 3.10.2.1 Hole for Pipeline Casing Mechanically bore holes and case through the soil with a cutting head on a continuous auger mounted inside the casing pipe. Weld lengths of pipe together in accordance with AWS D1.1/D1.1M. Do not use water or other fluids in connection with the boring operation. 3.10.2.2 Cleaning Clean inside of the pipeline casing of dirt, weld splatters, and other foreign matter which would interfere with insertion of the piped utilities by attaching a pipe cleaning plug to the boring rig and passing it through the pipe. 3.10.2.3 Piped Utilities Provide in casing using wood supports adjusted to obtained grades and elevations indicated. 3.10.2.4 End Seals After installation of piped utilities in pipeline casing, provide watertight end seals at each end of pipeline casing between pipeline casing and piping utilities. Provide watertight end seals as indicated. 3.11 RIP -RAP CONSTRUCTION Construct rip -rap in accordance with NCDOT RS State Standard, Section 876 RIPRAP in the areas indicated. 3.11.1 Stone Placement Place rock for rip -rap on prepared bedding material to produce a well graded mass with the minimum practicable percentage of voids in conformance with lines and grades indicated. Distribute larger rock fragments, with dimensions extending the full depth of the rip -rap throughout the entire mass and eliminate "pockets" of small rock fragments. Rearrange individual SECTION 31 23 00.00 20 Page 12 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 pieces by mechanical equipment or by hand as necessary to obtain the distribution of fragment sizes specified above. 3.12 FINISH OPERATIONS 3.12.1 Grading Finish grades as indicated within one -tenth of one foot. Grade areas to drain water away from structures. Maintain areas free of trash and debris. For existing grades that will remain but which were disturbed by Contractor's operations, grade as directed. 3.12.2 Topsoil and Seed Provide as specified in Section 32 92 23 SODDING. 3.12.3 Protection of Surfaces Protect newly backfilled, graded, and topsoiled areas from traffic, erosion, and settlements that may occur. Repair or reestablish damaged grades, elevations, or slopes. 3.13 DISPOSITION OF SURPLUS MATERIAL Waste in Government disposal area Remove from Government property and properly disposed surplus or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber. 3.14 FIELD QUALITY CONTROL 3.14.1 Sampling Take the number and size of samples required to perform the following tests. 3.14.2 Testing Perform one of each of the following tests for each material used. Provide additional tests for each source change. 3.14.2.1 Fill and Backfill Material Testing Test fill and backfill material in accordance with ASTM D 422 for conformance to ASTM D2487 gradation limits; ASTM D1140 for material finer than the No. 200 sieve; ASTM D4318 for liquid limit and for plastic limit; or ASTM D1557 for moisture density relations, as applicable. 3.14.2.2 Select Material Testing Test select material in accordance with ASTM D 422 for conformance to ASTM D2487 gradation limits; ASTM D1140 for material finer than the No. 200 sieve; ASTM D1557 for moisture density relations, as applicable. 3.14.2.3 Density Tests Test density in accordance with ASTM D1556, or ASTM D6938. When ASTM D6938 density tests are used, verify density test results by performing an ASTM D1556 density test at a location already ASTM D6938 tested as specified herein. Perform an ASTM D1556 density test at the start of the job,*and for every 10 ASTM D6938 density tests thereafter. Test each lift at randomly selected locations every 2000 square feet of existing grade in SECTION 31 23 00.00 20 Page 13 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 fills for structures and concrete slabs, and every 2500square feet for other fill areas and every 2000 square feet of subgrade in cut. Include density test results in daily report. Bedding and backfill in trenches: One test per 50 linear feet in each lift with a minimum of two tests per lift. -- End of Section -- SECTION 31 23 00.00 20 Page 14 BEQ PARKING LOT MCB CAMP LEJEUNE, NC SECTION 32 11 23 lIP1286 EPROJECTS W.O.NO.: 796558 CRUSHED AGGREGATE BASE COURSE O8/08 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) AASHTO T 180 (2010) Standard Method of Test for Moisture -Density Relations of Soils Using a 4.54-kg (10-1b) Rammer and a 457-mm (18-in.) Drop AASHTO T 224 (2010) Standard Method of Test for .Correction for Coarse Particles in the Soil Compaction Test ASTM INTERNATIONAL (ASTM) ASTM C117 (2013) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing ASTM C127 (2012) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate ASTM C128 (2012) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Fine Aggregate ASTM C131 (2006) Standard Test Method for Resistance to Degradation of Small -Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine ASTM C136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates ASTM C29/C29M (2009) Standard Test Method for Bulk Density ("Unit Weight") and Voids in Aggregate ASTM D1556 (2007) Density and Unit Weight of Soil in Place by the Sand -Cone Method i ASTM D1557 (2012) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 SECTION 32 11 23 Page 1 BEQ PARKING LOT 11P1286 MCB CAMP LEJEUNE, NC EPROJECTS W.O.NO.: 796558 ft-lbf/ft3) (2700 kN-m/m3) ASTM D2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System) ASTM D422 (1963; R 2007) Particle -Size Analysis of Soils ASTM D4318 (2010) Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D6938 (2010) Standard Test Method for In -Place Density and Water Content of Soil and Soil -Aggregate by Nuclear Methods (Shallow Depth) ASTM D75/D75M (2009) Standard Practice for Sampling Aggregates ASTM Ell (2013) Wire Cloth and Sieves for Testing Purposes NORTH CAROLINIA DEPARTMENT OF TRANSPORTATION (NCDOT) NCDOT RS (2012) Standard Specifications for Road and Structures 1.2 DEFINITIONS For the purposes of this specification, the following definitions apply. 1.2.1 Aggregate Base Course Aggregate base course (ABC) is well graded, durable aggregate uniformly moistened and mechanically stabilized by compaction. 1.2.2 Graded -Crushed Aggregate Base Course Graded -crushed aggregate (GCA) base course is well graded, crushed, durable aggregate uniformly moistened and mechanically stabilized by compaction. GCA is similar to ABC, but it has more stringent requirements and it produces a base course with higher strength and stability. 1.2.3 Degree of Compaction Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum laboratory dry density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum dry density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4 inch sieve, the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve are expressed as a percentage of the laboratory maximum dry density in accordance with AASHTO T 180 Method D and corrected with AASHTO T 224. SECTION 32 11 23 Page 2 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 1.3 SYSTEM DESCRIPTION lIP1286 EPROJECTS W.O.NO.: 796558 All plant, equipment, and tools used in the performance of the work will be subject to approval before the work is started and shall be maintained in satisfactory working condition at all times. Submit a list of proposed equipment, including descriptive data. Provide adequate equipment having the capability of producing the required compaction, meeting grade controls, thickness control, and smoothness requirements as set forth herein. 1.4 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-03 Product Data Plant, Equipment, and Tools SD-06 Test Reports Sampling and Testing Field Density Tests 1.5 QUALITY ASSURANCE Sampling and testing are the responsibility of the Contractor and performed by a testing laboratory approved in accordance with Section 01 45 00.00 20 QUALITY CONTROL. Work requiring testing will not be permitted until the testing laboratory has been inspected and approved. Test the materials to establish compliance with the specified requirements; perform testing at the specified frequency. The Contracting Officer may specify the time and location of the tests. Furnish copies of test results to the Contracting Officer within 24 hours of completion of the tests. 1.5.1 Sampling Take samples for laboratory testing in conformance with ASTM D75/D75M. When deemed necessary, the sampling will be observed by the Contracting Officer. 1.5.2 Tests Perform the following tests in conformance with the applicable standards listed. 1.5.2.1 Sieve Analysis Make sieve analysis in conformance with ASTM C117 and ASTM C136. Sieves shall conform to ASTM Ell. Particle -size analysis of the soils shall also be completed in conformance with ASTM D422. 1.5.2.2 Liquid Limit and Plasticity Index Determine liquid limit and plasticity index in accordance with ASTM D4318. SECTION 32 11 23 Page 3 BEQ PARKING LOT 11P1286 MCB CAMP LEJEUNE, NC EPROJECTS W.O.NO.: 796558 1.5.2.3 Moisture -Density Determinations Determine the laboratory maximum dry density and optimum moisture content in accordance with ASTM D1557. 1.5.2.4 Field Density Tests Measure field density in accordance with ASTM D1556, ASTM D2167 or ASTM D6938. For the method presented in ASTM D1556 use the base plate as shown in the drawing. For the method presented in ASTM D6938 check the calibration curves and adjust them, if necessary, using only the sand cone method as described in paragraph Calibration, of the ASTM publication. Tests 'performed in accordance with ASTM D6938 result in a wet unit weight of soil, and ASTM D6938 shall be used to determine the moisture content of the soil. The calibration curves furnished with the moisture gauges shall also be checked along with density calibration checks as described in ASTM D6938. The calibration checks of both the density and moisture gauges shall be made by the prepared containers of material method, as described in paragraph Calibration of ASTM D6938, on each different type of material being tested at the beginning of a job and at intervals as directed. a. Submit certified copies of test results for approval not less than 30 days before material is required for the work. b. Submit calibration curves and related test results prior to using the device or equipment being calibrated. C. Submit copies of field test results within 24 hours after the tests are performed. 1.5.2.5 Wear Test Perform wear tests on ABC course material in conformance with ASTM C131. 1.5.2.6 Weight of Slag Determine weight per cubic foot of slag in accordance with ASTM C29/C29M on the ABCcourse material. 1.5.3 Testing Frequency 1.5.3.1 Initial Tests Perform one of each of the following tests, on the proposed material prior to commencing construction, to demonstrate that the proposed material meets all specified requirements when furnished. If materials from more than one source are going to be utilized, this testing shall be completed for each source. a. Sieve Analysis . b. Liquid limit and plasticity index. C. Moisture -density relationship. d. Wear. e. Weight per cubic foot of Slag. SECTION 32 11 23 Page 4 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 1.5.3.2 In Place Tests 11P1286 EPROJECTS W.O.NO.: 796558 Perform each of the following tests on samples taken from the placed and compacted ABC. Samples shall be taken and tested at the rates indicated. Perform sampling and testing of recycled concrete aggregate at twice the specified frequency until the material uniformity is established. a. Perform density tests on every lift of material placed and at a frequency of one set of tests for every 250 square yards, or portion thereof, of completed area. b. Perform sieve analysis on every lift of material placed and at a frequency of one sieve analysis for every 500 square yards, or portion thereof, of material placed. C. Perform liquid limit and plasticity index tests at the same frequency as the sieve analysis. d. Measure the total thickness of the base course at intervals, in such a manner as to ensure one measurement for each 500 square yards of base course. Measurements shall be made in 3 inch diameter test holes penetrating the base course. 1.5.4 Approval of Material Select the source of the material 30 days prior to the time the material will be required in the work. Tentative approval of material will be based on initial test results. Final approval of the materials will be based on sieve analysis, liquid limit, and plasticity index tests performed on samples taken from the completed and fully compacted course(s). When the test results from such an additional sample is outside the gradation limits in Section 1010 of NCDOT RS and the nonuniformity cannot be corrected by road mixing, the aggregate base course represented by the sample will be rejected and replaced by the Contractor. 1.6 ENVIRONMENTAL REQUIREMENTS Perform construction when the atmospheric temperature is above 35 degrees F. When the temperature falls below 35 degrees F, protect all completed areas by approved methods against detrimental effects of freezing. Correct completed areas damaged by freezing, rainfall, or other weather conditions to meet specified requirements. PART 2 PRODUCTS 2.1 AGGREGATES Provide ABC consisting of clean, sound, crushed recycled concrete,ABC shall be free of lumps. of clay, organic matter, and other objectionable materials or coatings. The portion retained on the No. 4 sieve is known as coarse aggregate; that portion passing the No. 4 sieve is known as fine aggregate. 2.1.1 Coarse Aggregate Provide coarse aggregates with angular particles of uniform density. When the coarse aggregate is supplied from more than one source, aggregate from each source shall meet the specified requirements and shall be stockpiled separately. . SECTION 32 11 23 Page 5 P, , A BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 a. Crushed Recycled Concrete: Provide crushed recycled concrete consisting of previously hardened portland cement concrete or other concrete containing pozzolanic binder material. The recycled material shall be free of all reinforcing steel, bituminous concrete surfacing, and any other foreign material and shall be crushed and processed to meet the required gradations for coarse aggregate. Reject recycled concrete aggregate exceeding this value. Crushed recycled concrete shall meet all other applicable requirements specified below. 2.1.1.1 Aggregate Base Course ABC coarse aggregate shall be in accordance to NCDOT RS SECTION 1043. Crushed gravel shall be manufactured from gravel particles 50 percent of which, by weight, are retained on the maximum size sieve listed in TABLE 1. 2.1.2 Fine Aggregate Fine aggregates shall be angular particles of uniform density. When the fine aggregate is supplied from more than one source, aggregate from each source shall meet the specified requirements. 2.1.2.1 Aggregate Base Course ABC fine aggregate shall consist of screenings, angular sand, crushed recycled concrete fines, or other finely divided mineral matter processed or naturally combined with the coarse aggregate. 2.1.3 Gradation Requirements Apply the specified gradation requirements to the completed base course. The aggregates shall be continuously well graded within the limits specified in TABLE 1. Sieves shall conform to ASTM Ell. TABLE 1. GRADATION OF AGGREGATES Percentage by Weight Passing Square -Mesh Sieve Sieve Designation No. 1 No: 2 No. 3 2 inch 100 ---- ---- 1-1/2 inch 70-100 100 ---- 1 inch 45-80 60-100 100 1/2 inch 30-60 30-65 40-70 No. 4 20-50 20-50 20-50 No. 10 15-40 15-40 15-40 No. 40 5-25 5-25 5-25 No. 200 0-8 0-8 0-8 NOTE 1: Particles having diameters less than No. 635 shall not be in excess of 3 percent by weight of the total sample tested. NOTE 2: The values are based on aggregates of uniform specific gravity. If materials from different sources are used for the coarse and fine aggregates, they shall be tested in accordance with ASTM C127 and ASTM C128 to determine their specific gravities. If the specific gravities vary by more than 10 percent, the percentages passing the various sieves shall be corrected as directed by the Engineer.. SECTION 32 11 23. Page 6 r , BEQ PARKING LOT 11P1286 MCB CAMP LEJEUNE, NC EPROJECTS W.O.NO.: 796558 2.2 LIQUID LIMIT AND PLASTICITY INDEX Apply liquid limit and plasticity index requirements in accordance to ASTM D4318. PART 3 EXECUTION 3.1 GENERAL REQUIREMENTS When the ABC is constructed in more than one layer, clean the previously constructed layer of loose and foreign matter by sweeping with power sweepers or power brooms, except that hand brooms may be used in areas where power cleaning is not practicable. Provide adequate drainage during the entire period of construction to prevent water from collecting or standing on the working area. Provide line and grade stakes as necessary for control. Grade stakes shall be in lines parallel to the centerline of the area under construction and suitably spaced for string lining. 3.2 OPERATION OF AGGREGATE SOURCES Clearing, stripping, and excavating are the responsibility of the _ Contractor. Operate the aggregate sources to produce the quantity and quality of materials meeting the specified requirements in the specified time limit. Aggregate sources on private lands shall be conditioned in agreement with local laws or authorities. 3.3 STOCKPILING MATERIAL Clear and level storage sites prior to stockpiling of material. Stockpile all materials, including approved material available from excavation and grading, in the manner and at the locations designated. Aggregates shall be stockpiled on the cleared and leveled areas designated by the Contracting Officer to prevent segregation. Materials obtained from different sources shall be stockpiled separately. 3.4 PREPARATION OF UNDERLYING COURSE Prior to constructing the base course(s), the underlying course or subgrade shall be cleaned of all foreign substances. At.the time of construction of the base course(s), the underlying course shall contain no frozen material. The surface of the underlying course or subgrade shall meet specified compaction and surface tolerances. The underlying course shall conform to Section 31 23 00.00 20 EXCAVATION AND FILL. Ruts or soft yielding spots in the underlying courses, areas having inadequate compaction, and deviations of the surface from the requirements set forth herein shall be corrected by loosening and removing soft or unsatisfactory material and by adding approved material, reshaping to line and grade, and recompacting to specified density requirements. For cohesionless underlying courses containing sands or gravels, as defined in ASTM D2487, the surface shall be stabilized prior to placement of the base course(s). Stabilization shall be accomplished by mixing ABC into the underlying course and compacting by approved methods. The stabilized material shall be considered as part of the underlying course and shall meet all requirements of the underlying course. The finished underlying course shall not be disturbed by traffic or other operations and shall be maintained in a satisfactory condition until the base course is placed. SECTION 32 11 23 Page 7 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 3.5 INSTALLATION 3.5.1 Mixing the Materials 11P1286 EPROJECTS W.O.NO.: 796558 Mix the coarse and fine aggregates in a stationary plant, or in a traveling plant or bucket loader on an approved paved working area. Make adjustments in mixing procedures or in equipment, as directed, to obtain true grades, to minimize segregation or degradation, to obtain the required water . content, and to insure a satisfactory base course meeting all requirements of this specification. 3.5.2 Placing Place the mixed material on the prepared subgrade or subbase in layers of uniform thickness with an approved spreader. When a compacted layer 6 inches or less in thickness is required, place the material in a single layer. when a compacted layer in excess of 6 inches is required, place the material in layers of equal thickness. No layer shall be thicker than 6 inches or thinner than 3 inches when compacted. The layers shall be so placed that when compacted they will be true to the grades or levels required with the least possible surface disturbance. Where the base course is placed in more than one layer, the previously constructed layers shall be cleaned of loose and foreign matter by sweeping with power sweepers, power brooms, or hand brooms, as directed. Such adjustments in placing procedures or equipment shall be made as may be directed to obtain true grades, to minimize segregation and degradation, to adjust the water content, and to insure an acceptable base course. 3.5.3 Grade Control The finished and completed base course shall conform to the lines, grades, and cross sections shown on plan. Underlying material(s) shall be excavated and prepared at sufficient depth for the required base course thickness so that the finished base course and the subsequent surface course will meet the designated grades. 3.5.4 Edges of Base Course The base course(s) shall be placed so that the completed section will be a minimum of 2 feet wider, on all sides, than the next layer that will be placed above it. Additionally, place approved fill material along the outer edges of the base course in sufficient quantities to compact to the thickness of the course being constructed, or to the thickness of each layer in a multiple layer course, allowing in each operation at least a 2 foot width of this material to be rolled and compacted simultaneously with rolling and compacting of each layer of base course. If this base course material is to be placed adjacent to another pavement section, then the layers for both of these sections shall be placed and compacted along this edge at the same time. 3.5.5 Compaction Compact each layer of the base course, as specified, with approved compaction equipment. Maintain water content during the compaction procedure to within plus or minus 2 percent of the optimum water content determined from laboratory tests as specified in this Section. Begin rolling at the outside edge of the surface and proceed to the center, overlapping on successive trips at least one-half the width of the roller. Alternate trips of the roller shall be slightly different lengths. Speed SECTION 32 11 23 Page 8 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 of the roller shall be such that displacement of the aggregate does not occur. In all places not accessible to the rollers, the mixture shall be compacted with hand -operated power tampers. Continue compaction until each layer has a degree of compaction that is at least 100 percent of laboratory maximum density through the full depth of the layer. Make such adjustments in compacting or finishing procedures as may be directed to obtain true grades, to minimize segregation and degradation, to reduce or increase water content, and to ensure a satisfactory base course. Any materials that are found to be unsatisfactory shall be removed and replaced with satisfactory material or reworked, as directed, to meet the requirements of this specification. 3.5.6 Thickness Construct the compacted thickness of the base course as indicated. No individual layer shall be thicker than 6 inches nor be thinner than 3 inches in compacted thickness. The total compacted thickness of the base course(s) shall be within 1/2 inch of the thickness indicated. Where the measured thickness is more than 1/2 inch deficient, correct such areas by scarifying, adding new material of proper gradation, reblading, and recompacting as directed. Where the measured thickness is more than 1/2 inch thicker than indicated, the course shall be considered as conforming to the specified thickness requirements. Average job thickness shall be the average of all thickness measurements taken for the job, but shall be within 1/4 inch of the thickness indicated. The total thickness of the base course shall be measured at intervals in such a manner as to ensure one measurement for each 500 square yards of base course. Measurements shall be made in 3 inch diameter test holes penetrating the base course. 3.5.7 Proof Rolling L Proof rolling of the areas indicated shall be in addition to the compaction specified and shall consist of the application of two coverages with a heavy pneumatic -tired roller having four or more tires, each loaded to a minimum of 30,000 pounds and inflated to a minimum of 125 psi. In areas designated, apply proof rolling to the top of the underlying material on which the base course is laid and to each layer of base course . Maintain water content of the underlying material at optimum or at the percentage directed from start of compaction to completion of proof rolling of that layer. water content of each layer of the base course shall be maintained at the optimum percentage directed from start of compaction to completion of proof rolling. Any base course materials or any underlying materials that produce unsatisfactory results by proof rolling shall be removed and replaced with satisfactory materials, recompacted and proof rolled to meet these specifications. 3.5.8 Finishing The surface of the top layer of base course shall be finished after final compaction and proof rolling by cutting any overbuild to grade and rolling with a steel -wheeled roller. Thin layers of material shall not be added to the top layer of base course to meet grade. If the elevation of the top layer of base course is 1/2 inch or more below grade, then the top layer should be scarified to a depth of at least 3 inches and new material shall be blended in compacted and proof rolled to bring to grade. Adjustments to rolling and finishing procedures shall be made as directed to minimize segregation and degradation, obtain grades, maintain moisture content, and insure an acceptable base course. Should the surface become rough, corrugated, uneven in texture, or traffic marked prior to completion, the SECTION 32 11 23 Page 9 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 unsatisfactory portion shall be scarified, reworked and recompacted or it shall be replaced as directed. 3.5.9 Smoothness The surface of the top layer _shall show no deviations in excess of 3/8 inch when tested with a 12 foot straightedge. Take measurements in successive positions parallel to the centerline of the area to be paved. Measurements shall also be taken perpendicular to the centerline at 50 foot intervals. Deviations exceeding this amount shall be corrected by removing material and replacing with new material, or by reworking existing material and compacting it to meet these specifications. 3.6 TRAFFIC Do not allow traffic on the completed base course 3.7 MAINTENANCE Maintain the base course in a satisfactory condition until the full pavement section is completed and accepted. Maintenance shall include immediate repairs to any defects and shall be repeated as often as necessary to keep the area intact. Any base course that is not paved over prior to the onset of winter, shall be retested to verify that it still complies with the requirements of this specification. Any area of base course that is damaged shall be reworked or replaced as necessary to comply with this specification. 3.8 DISPOSAL OF UNSATISFACTORY MATERIALS Any unsuitable materials that must be removed shall be disposed of outside the limits of Government -controlled land. No additional payments will be made for materials that must be replaced. -- End of Section -- SECTION 32 11 23 Page 10 BEQ PARKING LOT MCB CAMP LEJEUNE. NC SECTION 32 92 23 SODDING 04/06 11P1286 EPROJECTS W.O.NO.: 796558 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM C602 (2013) Agricultural Liming Materials ASTM D4427 (2013) Peat Samples by Laboratory Testing ASTM D4972 (2001; R 2007) pH of Soils TURFGRASS PRODUCERS INTERNATIONAL (TPI) TPI GSS (1995) Guideline Specifications to Turfgrass Sodding U.S. DEPARTMENT OF AGRICULTURE (USDA) DOA SSIR 42 (1996) Soil Survey Investigation Report No. 42, Soil Survey Laboratory Methods Manual, Version 3.0 1.2 DEFINITIONS 1.2.1 Stand of Turf 100 percent ground cover of the established species. 1.3 RELATED REQUIREMENTS Section 31 23 00.00 20 EXCAVATION AND FILL applies to this section for pesticide use and plant. establishment requirements, with additions and modifications herein. 1.4 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section O1 33 00 SUBMITTAL PROCEDURES: SD-03 Product Data Fertilizer Include physical characteristics,. and recommendations. Sand Based Centipede Sod; G SECTION 32 92 23 Page 1 BEQ PARKING LOT MCB CAMP LEJEUNE, NC SD-06 Test Reports 11P1286 EPROJECTS W.O.NO.: 796558 Topsoil composition tests (reports and recommendations). SD-07 Certificates Nursery certification for sods accordance with TPI GSS. 1.5 DELIVERY, STORAGE, AND HANDLING 1.5.1 Delivery 1.5.1.1 Sod Protection Indicate type of sod in Protect from drying out and from contamination during delivery, on -site storage, and handling. 1.5.1.2 Fertilizer Gypsum, Sulfur, Iron and Lime Delivery Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer, gypsum, sulphur, iron, and lime may be furnished in bulk with certificate indicating the above information. 1.5.2 Storage 1.5.2.1 Sod Storage Lightly sprinkle with water, cover with moist burlap, straw, or other approved covering; and protect from exposure to wind and direct sunlight until planted. Provide covering that will allow air to circulate so that internal heat will not develop. Do not store sod longer than 24 hours. Do not store directly on concrete or bituminous surfaces. 1.5.2.2 Topsoil Prior to stockpiling topsoil, treat growing vegetation with application of appropriate specified non -selective herbicide. Clear and grub existing vegetation three to four weeks prior to stockpiling topsoil. 1.5.2.3 Handling Do not drop or dump materials from vehicles. 1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS 1.6.1 Restrictions Do not plant when the ground is snow covered, muddy, or when air temperature exceeds 90degrees Fahrenheit. 1.7 TIME LIMITATIONS 1.7.1 Sod Place sod a maximum of thirty six hours after initial harvesting, in SECTION 32 92 23 Page 2 BEQ PARKING LOT MCB CAMP LEJEUNE, NO accordance with TPI GSS as modified herein. PART 2 PRODUCTS 2.1 SODS 2.1.1 Classification 11P1286 EPROJECTS W.O.NO.: 796558 Nursery grown, certified as classified in the TPI GSS. Machine cut sod at a uniform thickness of 3/4 inch within a tolerance of 1/4 inch, excluding top growth and thatch. Each individual sod piece shall be strong enough to support its own weight when lifted by the ends. Broken pads, irregularly shaped pieces, and torn or uneven ends will be rejected. 2.1.2 Purity Sod species shall be genetically pure, free of weeds, pests, and disease. 2.1.3 Planting Dates Lay sod from 1 May to 1 August for warm season spring 2.1.4 Composition 2.1.4.1 Proportion Proportion grass species as follows. Botanical Name Common Name Percent Eremochloa ophiuroides Centipede 100 2.1.4.1.1 Sand Based Centipede Sod To be applied only in the BMP. Provide and install sand based centepede sod as shown on the plans or as directed. 2.2 TOPSOIL 2.2.1 On -Site Topsoil Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified fortopsoil in paragraph entitled "Composition." When available topsoil shall be existing surface soil stripped and stockpiled on -site in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL. 2.2.2 Off -Site Topsoil Conform to requirements specified in paragraph entitled "Composition." Additional topsoil shall be furnished by the Contractor. 2.2.3 Composition Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method SECTION 32 92 23 Page 3 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 described in DOA SSIR 42. Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH shall be tested in accordance with ASTM D4972. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials. Other components shall conform to the following limits: Silt 25-50 percent Clay 10-30 percent Sand 20-35 percent PH 5.5 to 7.0 Soluble Salts 600 ppm maximum 2.3 SOIL CONDITIONERS Add conditioners to topsoil as required to bring into compliance with "composition" standard for topsoil as specified herein. 2.3.1 Lime Commercial grade burnt limestone containing a calcium carbonate equivalent (C.C.E.) as specified in ASTM C602 of not less than 140 percent. 2.3.2 Aluminum Sulfate Commercial grade. 2.3.3 Sulfur 100 percent elemental 2.3.4 Iron 100 percent elemental 2.3.5 Peat Natural product of peat moss derived from a freshwater site and conforming to ASTM D4427. Shred and granulate peat to pass a 1/2 inch mesh screen and condition in storage pile for minimum 6 months after excavation. 2.3.6 Sand Clean and free of materials harmful to plants. 2.3.7 Perlite Horticultural grade. 2.3.8 Composted Derivatives Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties: SECTION 32 92 23 Page 4 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 2.3.8.1 Particle Size Minimum percent by weight passing: No. 4 mesh screen 95 No. 8 mesh screen 80 2.3.8.2 Nitrogen Content Minimum percent based on dry weight: Fir Sawdust 0.7 Fir or Pine Bark 1.0 2.3.9 Gypsum 11P1286 EPROJECTS W.O.NO.: 796558 Coarsely ground gypsum comprised of calcium sulfate dihydrate 91 percent, calcium 22 percent, sulfur 17 percent; minimum 96 percent passing through 20 mesh screen, 100 percent passing thru 16 mesh screen. 2.3.10 Calcined Clay Calcined clay shall be granular particles produced from montmorillonite clay calcined to a minimum temperature of 1200 degrees F. Gradation: A minimum 90 percent shall pass a No. 8 sieve; a minimum 99 percent shall be retained on a No. 60 sieve; and a maximum 2 percent shall pass a No. 100 sieve. Bulk density: A maximum 40 pounds per cubic foot. 2.4 FERTILIZER 2.4.1 Granular Fertilizer Organic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients: 20 percent available nitrogen 27 percent available phosphorus 5 percent available potassium 2.5 WATER Source of water shall be approved by Contracting Officer and of suitable quality for irrigation containing no element toxic to plant life. PART 3 EXECUTION 3.1 PREPARATION 3.1.1 Extent Of Work Provide soil preparation (including soil conditioners), fertilizing, and sodding of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations. 3.1.2 Soil Preparation Provide 4 inches of off -site topsoil or to meet indicated finish grade. After areas have been brought to indicated finish grade, incorporate SECTION 32 92 23 Page 5 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 fertilizer, pH adjusters, soil conditioners into soil a minimum depth of 4 inches by disking, harrowing, tilling or other method approved by the Contracting Officer. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic. 3.1.2.1 Soil Conditioner Application Rates Apply soil conditioners at rates as determined by laboratory soil analysis of the soils at the job site. 3.1.2.2 Fertilizer Application Rates Apply fertilizer at rates as determined by laboratory soil analysis of the soils at the job site. 3.2 SODDING 3.2.1 Finished Grade and Topsoil Prior to the commencement of the sodding operation, the Contractor shall verify that finished grades are as indicated on drawings; the placing of topsoil, smooth grading, and compaction requirements have been completed in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL. The prepared surface shall be a maximum 1 inch below the adjoining grade of any surfaced area. New surfaces shall be blended to existing areas. The prepared surface shall be completed with a light raking to remove from the surface debris and stones over a minimum 5/8 inch in any dimension. 3.2.2 Placing Place sod a maximum of 36 hours after initial harvesting, in accordance with TPI GSS as modified herein.- 3.2.3 Sodding Slopes and Ditches For slopes 2:1 and greater, lay sod with long edge perpendicular to the contour. For V-ditches and flat bottomed ditches, lay sod with long edge perpendicular to flow of water. Anchor each piece of sod with wood pegs or wire staples maximum 2 feet on center. On slope areas, start sodding at bottom of the slope. 1 3.2.4 Finishing After completing sodding, blend edges of sodded area smoothly into surrounding area. Air pockets shall be eliminated and a true and even surface shall be provided. Frayed edges shall be trimmed and holes and missing corners shall be patched with sod. 3.2.5 Rolling Immediately after sodding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width. 3.2.6 Watering Start watering areas sodded as required by daily temperature and wind SECTION 32 92 23 Page 6 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 conditions. Apply water at a rate sufficient to ensure thorough wetting of soil to minimum depth of 4 inches. Run-off, puddling, and wilting shall be prevented. Unless otherwise directed, watering trucks shall not be driven over turf areas. Watering of other adjacent areas or plant material shall be prevented. 3.3 PROTECTION OF TURF AREAS Immediately after turfing, protect area against traffic and other use. 3.4 RESTORATION Restore to original condition existing turf areas which have been damaged during turf installation operations. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean other paving when work in adjacent areas is complete. -- End of Section -- SECTION 32 92 23 Page 7 P ' - BEQ PARKING LOT MCB CAMP LEJEUNE, NC SECTION 33 40 00 STORM DRAINAGE UTILITIES 02/10 PART 1 GENERAL 1.1 REFERENCES 11P1286 EPROJECTS W.O.NO.: 796558 The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. AMERICAN RAILWAY ENGINEERING AND MAINTENANCE -OF -WAY ASSOCIATION (AREMA) AREMA Eng Man (2012) Manual for Railway Engineering ASTM INTERNATIONAL (ASTM) ASTM A123/A123M (2013) Standard Specification for Zinc (Hot -Dip Galvanized) Coatings on Iron and Steel Products ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings ASTM A536 (1984; R 2009) Standard Specification for Ductile Iron Castings ASTM A929/A929M (2001; R 2007) Standard Specification for Steel Sheet, Metallic -Coated by the Hot -Dip Process for Corrugated Steel Pipe ASTM B26/B26M (2012) Standard Specification for Aluminum -Alloy Sand Castings ASTM C139 (2011) Standard Specification for Concrete Masonry Units for Construction of Catch Basins and Manholes ASTM C1433 (2013) Standard Specification for Precast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers ASTM C231/C231M (2010) Standard Test Method for Air ' Content of Freshly Mixed Concrete by the Pressure Method ASTM C270 (2012a) Standard Specification for Mortar for Unit Masonry ASTM C32 (2013) Standard Specification for Sewer and Manhole Brick (Made from Clay or Shale) ASTM C425 (2004; R 2009) Standard Specification for Compression Joints for Vitrified Clay Pipe SECTION 33 40 00 Page 1 BEQ PARKING LOT 11P1286 MCB CAMP LEJEUNE, NC EPROJECTS W.O.NO.: 796558 and Fittings ASTM C443 (2011) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets ASTM C478 _ (2013) Standard Specification for Precast Reinforced Concrete Manhole Sections ASTM C55 (2011) Concrete Brick ASTM C62 (2013) Building Brick (Solid Masonry Units Made from Clay or Shale) ASTM C655 - (2012b) Reinforced Concrete D-Load Culvert, Storm Drain, and Sewer Pipe ASTM C76 (2013a) Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe ASTM C877 (2008) External Sealing Bands for Concrete Pipe, Manholes, and Precast Box Sections ASTM C923 (2008; R 2013) Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes and Laterals ASTM C990 (2009) Standard Specification for Joints - for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants ASTM D1056 (2007) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber ASTM D1171 (1999; R 2007) Rubber Deterioration - Surface Ozone Cracking Outdoors or Chamber (Triangular Specimens) ASTM D1557 (2012) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3) ASTM D1751 (2004; E 2013; R 2013) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types) ASTM D1752 (2004a; R 2008) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion ASTM D2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method SECTION 33 40 00 Page 2 F '' BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 ASTM DG938 (2010) Standard Test Method for In -Place Density and Water Content of Soil and Soil -Aggregate by Nuclear Methods (Shallow Depth) 1.2 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-03 Product Data Placing Pipe Submit printed copies of the manufacturer's recommendations for installation procedures of the material being placed, prior to installation. SD-04 Samples Pipe for Culverts and Storm Drains SD-07 Certificates Resin Certification Pipeline Testing Hydrostatic Test on Watertight Joints Determination of Density Frame and Cover for Gratings 1.3 DELIVERY, STORAGE, AND HANDLING 1.3.1 Delivery and Storage Materials delivered to site shall be inspected for damage, unloaded, and stored with a minimum of handling. Materials shall not be stored directly on the ground. The inside of pipes and fittings shall be kept free of dirt and debris. Before, during, and after installation, plastic pipe and fittings shall be protected from any environment that would result in damage or deterioration to the material. Keep a copy of the manufacturer's instructions available at the construction site at all times and follow these instructions unless directed otherwise by the Contracting Officer. Solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install plastic pipe shall be stored in accordance with the manufacturer's recommendations and shall be discarded if the storage period exceeds the recommended shelf life. .Solvents in use shall be discarded when the recommended pot life is exceeded. 1.3.2 Handling Materials shall be handled in a manner that ensures delivery to the trench in sound, undamaged condition. Pipe shall be carried to the trench, not dragged. SECTION 33 40 00 Page 3 BEQ PARKING LOT 11P1286 MCB CAMP LEJEUNE, NO EPROJECTS W.O.NO.: 796558 PART 2 PRODUCTS 2.1 PIPE FOR CULVERTS AND STORM DRAINS Pipe for culverts and storm drains shall be of the sizes indicated and shall conform to the requirements specified. 2.1.1 Concrete Pipe Manufactured in accordance with and conforming to ASTM C76, Class IV, or ASTM C655, D-Load. 2.2 DRAINAGE STRUCTURES 2.2.1 Flared End Sections Sections shall be of a standard design fabricated from zinc coated steel sheets meeting requirements of ASTM A929/A929M. 2.2.2 Precast Reinforced Concrete Box Manufactured in accordance with and conforming to ASTM C1433. 2.3 MISCELLANEOUS MATERIALS 2.3.1 Concrete Unless otherwise specified, concrete and reinforced concrete shall conform to the requirements for 3,000 psi concrete. The concrete mixture shall have air content by volume of concrete, based on measurements made immediately after discharge from the mixer, of 5 to 7 percent when maximum size of coarse aggregate exceeds 1-1/2 inches. Air content shall be determined in accordance with ASTM C231/C231M. The concrete covering over steel reinforcing shall not be less than 1 inch thick for covers and not less than 1-1/2 inches thick for walls and flooring. Concrete covering deposited directly against the ground shall have a thickness of at least 3 inches between steel and ground. Expansion -joint filler material shall conform to ASTM D1751, or ASTM D1752, or shall be resin -impregnated fiberboard conforming to the physical requirements of ASTM D1752. 2.3.2 Mortar Mortar for pipe joints, connections to other drainage structures, and brick or block construction shall conform to ASTM C270, Type M, except that the maximum placement time shall be 1 hour. The quantity of water in the mixture shall be sufficient to produce a stiff workable mortar but . water shall be clean and free of harmful acids, alkalis, and organic impurities. The mortar shall be used within 30 minutes after the ingredients are mixed with water. The inside of the joint shall be wiped clean and finished smooth. The mortar head on the outside shall be protected from air and sun with a proper covering until satisfactorily cured. 2.3.3 Precast Concrete Segmental Blocks Precast concrete segmental block shall conform to ASTM C139, not more than 8 inches thick, not less than 8 inches long, and of such shape that joints can be sealed effectively and bonded with cement mortar. SECTION 33 40 00 Page 4 06 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 2.3.4 Brick 11P1286 EPROJECTS W.O.NO.: 796558 Brick shall conform to ASTM C62, Grade SW; ASTM C55, Grade S-I or S-II; or ASTM C32, Grade MS. Mortar for jointing and plastering shall consist of one part portland cement and two parts fine sand. Lime may be added to the mortar in a quantity not more than 25 percent of the volume of cement. The joints shall be filled completely and shall be smooth and free from surplus mortar on the inside of the structure. Brick structures shall be plastered with 1/2 inch of mortar over the entire outside surface of the walls. For square or rectangular structures, brick shall be laid in stretcher courses with a header course every sixth course. For round structures, brick shall be laid radially with every sixth course a stretcher course. 2.3.5 Precast Reinforced Concrete Manholes Conform to ASTM C478. Joints between precast concrete risers and tops shall be made with flexible watertight, rubber -type gaskets meeting the requirements of paragraph JOINTS. 2.3.6 Frame and Cover for Gratings Submit certification on the ability of frame and cover or gratings to carry the imposed live load. Frame and cover for gratings shall be cast gray iron, ASTM A48/A48M, Class 35B; cast ductile iron, ASTM A536,, Grade 65-45-12; or cast aluminum, ASTM B26/B26M, Alloy 356.OT6. Weight, shape, size, and waterway openings for grates and curb inlets shall be as indicated on the plans. The word "Storm Sewer" shall be stamped or cast into covers so that it is plainly visible. 2.3.7 Joints 2.3.7.1 Flexible Watertight Joints a. Materials: Flexible watertight joints shall be made with plastic or rubber -type gaskets for concrete pipe and with factory -fabricated resilient materials for clay pipe. The design of joints and the physical requirements for preformed flexible joint sealants shall conform to ASTM C990, and rubber -type gaskets shall conform to ASTM C443. Factory -fabricated resilient joint materials shall conform to ASTM C425. Gaskets shall have not more than one factory -fabricated splice, except that two factory -fabricated splices of the rubber -type gasket are permitted if the nominal diameter of the pipe being gasketed exceeds 54 inches. b. Test Requirements: Watertight joints shall be tested and shall meet test requirements of paragraph HYDROSTATIC TEST ON WATERTIGHT JOINTS. Rubber gaskets shall comply with the oil resistant gasket requirements of ASTM C443. Certified copies of test results shall be delivered to the Contracting Officer before gaskets or jointing materials are installed. Alternate types of watertight joint may be furnished, if specifically approved. 2.3.7.2 External Sealing Bands Requirements for external sealing bands shall conform to ASTM C877. 2.3.7.3 Flexible Watertight, Gasketed Joints a. Gaskets: When infiltration or exfiltration is a concern for pipe SECTION 33 40 00 Page 5 BEQ PARKING LOT MCB CAMP LEJEUNE. NC 11P1286 EPROJECTS W.O.NO.: 796558 lines, the couplings may be required to have gaskets. The closed -cell expanded rubber gaskets shall be a continuous band approximately 7 inches wide and approximately 3/8 inch thick, meeting the requirements of ASTM D1056, Type 2 Al, and shall have a quality retention rating of not less than 70 percent when tested for weather resistance by ozone chamber exposure, Method B of ASTM D1171. Rubber O-ring gaskets shall be 13/16 inch in diameter for pipe diameters of 36 inches or smaller and 7/8 inch in diameter for larger pipe having 1/2 inch deep end corrugation. Rubber O-ring gaskets shall be 1-3/8 inches in diameter for pipe having 1 inch deep end corrugations. O-rings shall meet the requirements of'ASTM C990 or ASTM C443. Preformed flexible joint sealants shall conform to ASTM C990, Type B. b. Connecting Bands: Connecting bands shall be of the type, size and sheet thickness of band, and the size of angles, bolts, rods and lugs as indicated or where not indicated as specified in the applicable standards or specifications for the pipe. Exterior rivet heads in the longitudinal seam under the connecting band shall be countersunk or the rivets shall be omitted and the seam welded. Watertight joints shall be tested and shall meet the test requirements of paragraph HYDROSTATIC TEST ON WATERTIGHT JOINTS. 2.4 STEEL LADDER Steel ladder shall be provided where the depth of the storm drainage structure exceeds 12 feet. These ladders shall be not less than 16 inches in width, with 3/4 inch diameter rungs spaced 12 inches apart. The two stringers shall be a minimum 3/8 inch thick and 2-1/2 inches wide. Ladders and inserts shall be galvanized after fabrication in conformance with ASTM A123/A123M. 2.5 RESILIENT CONNECTORS Flexible, watertight connectors used for connecting pipe to manholes and inlets shall conform to ASTM C923. 2.6 HYDROSTATIC TEST ON WATERTIGHT JOINTS 2.6.1 ConcretePipe A hydrostatic test shall be made on the watertight joint types as proposed. Only one sample joint of each type needs testing; however, if the sample joint fails because of faulty design or workmanship, an additional sample joint may be tested. During the test period, gaskets or other jointing material shall be protected from extreme temperatures which might adversely affect the performance of such materials. Performance requirements for joints in reinforced concrete pipe shall conform to ASTM C990 or ASTM C443. 2.7 EROSION CONTROL RIPRAP Provide nonerodible rock not exceeding 15 inches in its greatest dimension and choked with sufficient small rocks to provide a dense mass with a minimum thickness of 8 inchesor as indicated. SECTION 33 40 00 Page 6 BEQ PARKING LOT MCB CAMP LEJEUNE, NC PART 3 EXECUTION lIP1286 EPROJECTS W.O.NO.: 796558 3.1 EXCAVATION FOR STORM DRAINS AND DRAINAGE STRUCTURES Excavation of trenches, and for appurtenances and backfilling for storm drains, shall be in accordance with the applicable portions of Section 31 23 00.00 20 EXCAVATION AND FILL and the requirements specified below. 3.1.1 Trenching The width of trenches at any point below the top of the pipe shall be not greater than the outside diameter of the pipe plus 4 inches to permit satisfactory jointing and thorough tamping of the bedding material under and around the pipe. Sheeting and bracing, where required, shall be placed within the trench width as specified, without any overexcavation. Where trench widths are exceeded, redesign with a resultant increase in cost of stronger pipe or special installation procedures will be necessary. Cost of this redesign and increased cost of pipe or installation shall be borne by the Contractor without additional cost to the Government. 3.1.2 Removal of Rock Rock in either ledge or boulder formation shall be replaced with suitable materials to provide a compacted earth cushion having a thickness between unremoved rock and the pipe of at least 8 inches or 1/2 inch for each foot of fill over the top of the pipe, whichever is greater, but not more than three -fourths the nominal diameter of the pipe. Where bell -and -spigot pipe is used, the cushion shall be maintained under the bell as well as under the straight portion of the pipe. Rock excavation shall be as specified and defined in Section 31 23 00'.00 20 EXCAVATION AND FILL. 3.1.3 Removal of Unstable Material Where wet or otherwise unstable soil incapable of properly supporting the pipe, as determined by the Contracting Officer, is unexpectedly encountered in the bottom of a trench, such material shall be removed to the depth required and replaced to the proper grade with select granular material, compacted as provided in paragraph BACKFILLING. When removal of unstable material is due' to the fault or neglect of the Contractor while performing shoring and sheeting, water removal, or other specified requirements, such removal and replacement shall be performed at no additional cost to the Government. 3.2 BEDDING The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe. 3.2.1 Concrete Pipe Requirements When no bedding class is specified or detailed on the drawings, concrete pipe shall be bedded in granular material minimum 4 inch in depth in trenches with soil foundation. Depth of granular bedding in trenches with rock foundation shall be 1/2 inch in depth per foot of depth of fill, minimum depth of bedding shall be 8 inch up to maximum depth of 24 inches. The middle third of the granular bedding shall be loosely placed. Bell holes and depressions for joints shall be removed and formed so entire barrel of pipe is uniformly supported. The bell hole and depressions for the joints shall be not more than the length, depth, and width required for SECTION 33 40 00 Page 7 -_ A BEQ PARKING LOT 11P1286 MCB CAMP LEJEUNE, NC EPROJECTS W.O.NO.: 796558 properly making the particular type of joint. 3.3 PLACING PIPE Each pipe shall be thoroughly examined before being laid; defective or damaged pipe shall not be used. Pipelines shall be laid to the grades and alignment indicated. Proper facilities shall be provided for lowering sections of pipe into trenches. Lifting lugs in vertically elongated metal pipe shall be placed in the same vertical plane as the major axis of the pipe. Pipe shall not be laid in water, and pipe shall not be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided,as necessary. Deflection of installed flexible pipe shall not exceed the following limits: Note post installation requirements of paragraph DEFLECTION TESTING in PART 3 of this specification for all pipe products including deflection testing requirements for flexible pipe. 3.3.1 Concrete Pipe Laying shall proceed upgrade with spigot ends of bell -and -spigot pipe and .tongue ends of tongue -and -groove pipe pointing in the direction of the flow. 3.3.2 Jacking Pipe Through Fills Methods of operation and installation for jacking pipe through fills shall conform to requirements specified in Volume 1, Chapter 1, Part 4 of AREMA Eng Man. 3.4 JOINTING 3.4.1 Concrete Pipe 3.4.1.1 Cement -Mortar Bell -and -Spigot Joint The first pipe shall be bedded to the established grade line, with the bell end placed upstream. The interior surface of the bell shall be thoroughly cleaned with a wet brush and the lower portion of the bell filled with mortar as required to bring inner surfaces of abutting pipes flush and even. The spigot end of each subsequent pipe shall be cleaned with a wet brush and uniformly matched into a bell so that sections are closely fitted. After each section is laid, the remainder of the joint shall be filled with mortar, and a bead shall be formed around the outside of the joint with sufficient additional mortar. If mortar is not sufficiently stiff to prevent appreciable slump before setting, the outside of the joint shall be wrapped or bandaged with cheesecloth to hold mortar in place. 3.4.1.2 Cement -Mortar Oakum Joint for Bell -and -Spigot Pipe A closely twisted gasket shall be made of jute or oakum of the diameter required to support the spigot end of the pipe at the proper grade and to make the joint concentric. Joint packing shall be in one piece of sufficient length to pass around the pipe and lap at top. This gasket shall be thoroughly saturated with neat cement grout. The bell of the pipe shall be thoroughly cleaned with a wet brush, and the gasket shall be laid in the bell for the lower third of the circumference and covered with mortar. The spigot of the pipe shall be thoroughly cleaned with a wet brush, inserted in the bell, and carefully driven home. A small amount of mortar shall be inserted in the annular space for the upper two-thirds of SECTION 33 40 00 Page 8 t• BEQ PARKING LOT MCB CAMP LEJEUNE, NC 11P1286 EPROJECTS W.O.NO.: 796558 the circumference. The gasket shall be lapped at the top of the pipe and driven home in the annular space with a caulking tool. The remainder of the annular space shall be filled completely with mortar and beveled at an angle of approximately 45 degrees with the outside of the bell. If,mortar is not sufficiently stiff to prevent appreciable slump before setting, the outside of the joint thus made shall be wrapped with cheesecloth. Placing of this type of joint shall be kept at least five joints behind laying operations. 3.4.1.3 Cement -Mortar Diaper Joint for Bell -and -Spigot Pipe The pipe shall be centered so that the annular space is uniform. The annular space shall be caulked with jute or oakum. Before caulking, the inside of the bell and the outside of the spigot shall be cleaned. a. Diaper Bands: Diaper bands shall consist of heavy.cloth fabric to hold grout in place at joints and shall be cut in lengths that extend one -eighth of the circumference of pipe above the spring line on one side of the pipe and up to the spring line on the other side of the pipe. Longitudinal edges of fabric bands shall be rolled and stitched around two pieces of wire. Width of fabric bands shall be such that after fabric has been securely stitched around both edges on wires, the wires will be uniformly spaced not less than 8 inches apart. Wires shall be cut into lengths to pass around pipe with sufficient extra length for the ends to be twisted at top of pipe to hold the band securely in place; bands shall be accurately centered around lower portion of joint. b. Grout: Grout shall be poured between band and pipe from the high side of band only, until grout rises to the top of band at the spring line of pipe, or as nearly so as possible, on the opposite side of pipe, to ensure a thorough sealing of joint around the portion of pipe covered by the band. Silt, slush, water, or polluted mortar grout forced up on the lower side shall be forced out by pouring, and removed. C. Remainder of Joint: The remaining unfilled upper portion of the joint shall be filled with mortar and a bead formed around the outside of this upper portion of the joint with a sufficient amount of additional mortar. The diaper shall be left in place. Placing of this type of joint shall be kept at least five joints behind actual laying of pipe. No backfilling around joints shall be done until joints have been fully inspected and approved. 3.4.1.4 Cement -Mortar Tongue -and -Groove Joint The first pipe shall be bedded carefully to the established grade line with the groove upstream. A shallow excavation shall be made underneath the pipe at the joint and filled with mortar to provide a bed for the pipe. The grooved end of the first pipe shall be thoroughly cleaned with a wet brush, and a layer of soft mortar applied to the lower half of the groove. The tongue of the second pipe shall be cleaned with a wet brush; while in horizontal position, a layer of soft mortar shall be applied to the upper. half of the tongue. The tongue end of the second pipe shall be inserted in the grooved end of the first pipe until mortar is squeezed out on interior and exterior surfaces. Sufficient mortar shall be used to fill the joint completely and to form a bead on the outside. SECTION 33 40 00 Page 9 BEQ PARKING LOT lIP1286 MCB CAMP LEJEUNE, NC EPROJECTS W.O.NO.: 796558 3.4.1.5 Cement -Mortar Diaper Joint for Tongue -and -Groove Pipe The joint shall be of the type described for cement -mortar tongue -and -groove joint in this paragraph, except that the shallow excavation directly beneath the joint shall not be filled with mortar until after a gauze or cheesecloth band dipped in cement mortar has been wrapped around the outside of the joint. The cement -mortar bead at the joint shall be at least 1/2 inch, thick and the width of the diaper band shall be at least 8 inches. The diaper shall be left in place. Placing of this type of joint shall be kept at least five joints behind the actual laying of the pipe. Backfilling around the joints shall not be done until the joints have been fully inspected and approved. 3.4.1.6 Plastic Sealing Compound Joints for Tongue -and -Grooved Pipe Sealing compounds shall follow the recommendation of the particular manufacturer in regard to special installation requirements. Surfaces to receive lubricants, primers, or adhesives shall be dry and clean. Sealing compounds shall be affixed to the pipe not more than 3 hours prior to installation of the pipe, and shall be protected from the sun, blowing dust, and other deleterious agents at all times. Sealing compounds shall be inspected before installation of the pipe, and any loose or improperly affixed sealing compound shall be removed and replaced. The pipe shall be aligned with the previously installed pipe, and the joint pulled together. If, while making the joint with mastic -type sealant, a slight protrusion of the material is not visible along the entire inner and outer circumference of the joint when the joint is pulled up, the pipe shall be removed and the joint remade. After the joint is made, all inner protrusions shall be cut off flush with the inner surface of the pipe. If non -mastic -type sealant material is used, the "Squeeze -Out" requirement above will be waived. 3.4.1.7 Flexible Watertight Joints Gaskets and jointing materials shall be as recommended by the particular manufacturer in regard to use of lubricants, cements, adhesives, and other special installation requirements. Surfaces to receive lubricants, cements, or adhesives shall be clean and dry. Gaskets and jointing materials shall be affixed to the pipe not more than 24 hours prior to the installation of the pipe, and shall be protected from the sun, blowing dust, and other deleterious agents at all times. Gaskets and jointing materials shall be inspected before installing the pipe; any loose or improperly affixed gaskets and jointing materials shall be removed and replaced. The pipe shall be aligned with the previously installed pipe, and the joint pushed home. If, while the joint is being made the gasket becomes visibly dislocated the pipe shall be removed and the joint remade. 3.5 DRAINAGE STRUCTURES 3.5.1 Manholes and Inlets Construction shall be of reinforced concrete, plain concrete, brick, precast reinforced concrete, precast concrete segmental blocks, prefabricated corrugated metal, or bituminous coated corrugated metal; complete with frames and covers or gratings; and with fixed galvanized steel ladders where indicated. Pipe studs and junction chambers of prefabricated corrugated metal manholes shall be fully bituminous -coated and paved when the connecting branch lines are so treated. Pipe connections to concrete manholes and inlets shall be made with flexible, watertight connectors. SECTION 33 40 00 Page 10 J BEQ PARKING LOT MCB CAMP LEJEUNE, NC 3.5.2 Walls and Headwalls Construction shall be as indicated. 3.6 STEEL LADDER INSTALLATION 11P1286 EPROJECTS W.O.NO.: 796558 Ladder shall be adequately anchored to the wall by means of steel inserts spaced not more than 6 feet vertically, and shall be installed to provide at least 6 inches of space between the wall and the rungs. The wall along the line of the ladder shall be vertical for its entire length. 3.7 BACKFILLING 3.7.1 Backfilling Pipe in Trenches After the pipe has been properly bedded, selected material from excavation or borrow, at a moisture content that will facilitate compaction, shall be placed along both sides of pipe in layers not exceeding 6 inches i❑ compacted depth. The backfill shall be brought up evenly on both sides of pipe for the full length of pipe. The fill shall be thoroughly compacted under the haunches of the pipe. Each layer shall be thoroughly compacted with mechanical tampers or rammers. This method of filling and compacting shall continue until the fill has reached an elevation equal to the midpoint (spring line) of RCP or has reached an elevation of at least 12 inches above the top of the pipe for flexible pipe. The remainder of the trench shall be backfilled and compacted by spreading and rolling or compacted by mechanical rammers or tampers in layers not exceeding 6 inches. Tests for density shall be made as necessary to ensure conformance to the compaction requirements specified below. Where it is necessary, in the opinion of the Contracting Officer,.that sheeting or portions of bracing used be left in place, the contract will be adjusted accordingly. Untreated sheeting shall not be left in place beneath structures or pavements. 3.7.2 Backfilling Pipe in Fill Sections For pipe placed in fill sections, backfill material and the placement and compaction procedures shall be as specified below. The fill material shall be uniformly spread in layers longitudinally on both sides of the pipe, not exceeding 6 inches in compacted depth, and shall be compacted by rolling parallel with pipe or by mechanical tamping or ramming. Prior to commencing normal filling operations, the crown width of the fill at a height of 12 inches above the top of the pipe shall extend a distance of not less than twice the outside pipe diameter on each side of the pipe or 12 feet, whichever is less. After the backfill has reached at least 12 inches above the top of the pipe, the remainder of the fill shall be placed and thoroughly compacted in layers not exceeding 6 inches. Use select granular material for this entire region of backfill for flexible pipe installations. 3.7.3 Movement of Construction Machinery when compacting by rolling or operating heavy equipment parallel with the pipe, displacement of or injury to the pipe shall be avoided. Movement of construction machinery over a culvert or storm drain at any stage of construction shall be at the Contractor's risk. Any damaged pipe shall be repaired or replaced. SECTION 33 40 00 Page 11 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 3.7.4 Compaction 3.7.4.1 General Requirements lIP1286 EPROJECTS W.O.NO.: 796558 Cohesionless materials include gravels, gravel -sand mixtures, sands, and gravelly sands. Cohesive materials include clayey and silty gravels, gravel -silt mixtures, clayey and silty sands, sand -clay mixtures, clays, silts, and very fine sands. When results of compaction tests for moisture -density relations are recorded on.graphs, cohesionless soils will show straight lines or reverse -shaped moisture -density curves, and cohesive soils will show normal moisture -density curves. 3.7.4.2 Minimum Density Backfill over and around the pipe and backfill around and adjacent to drainage structures shall be compacted at the approved moisture content to the following applicable minimum density, which will be determined as specified below. a. Under paved roads, streets, parking areas, and similar -use pavements including adjacent shoulder areas, the density shall be not less than 90 percent of maximum density for cohesive material and 95 percent of maximum density for cohesionless material, up to the elevation where requirements for pavement subgrade materials and compaction shall control. b. Under unpaved or turfed traffic areas, density shall not be less than 90 percent of maximum density for cohesive material and 95 percent of maximum density for cohesionless material. c. Under nontraffic areas, density shall be not less than that of the surrounding material. 3.7.5 Determination of Density Testing is the responsibility of the Contractor and performed at no additional cost to the Government. Testing shall be performed by an approved commercial testing laboratory or by the Contractor subject to approval. Tests shall be performed in sufficient number to ensure that specified density is being obtained. Laboratory tests for moisture -density relations shall be made in accordance with ASTM D1557 except that mechanical tampers may be used provided the results are correlated with those obtained with the specified hand tamper. Field density tests shall be determined in,accordance with ASTM D2167 or ASTM D6938. When ASTM D6938 is used, the calibration curves shall be checked and adjusted, if necessary, using the sand cone method as described in paragraph Calibration of the referenced publications. ASTM D6938 results in a wet unit weight of soil and ASTM D6938 shall be used to determine the moisture content of the soil. The calibration curves furnished with the moisture gauges shall be checked along with density calibration checks as described in ASTM D6938. Test results shall be furnished the Contracting Officer. The calibration checks of both the density and moisture gauges shall be made at the beginning of a job on each different type of material encountered and at intervals as directed. SECTION 33 40 00 Page 12 BEQ PARKING LOT MCB CAMP LEJEUNE, NC 3.8 PIPELINE TESTING 3.8.1 Leakage Tests 3.8.2 Post -Installation Inspection 11P1286 EPROJECTS W.O.NO.: 796558 One hundred percent of all reinforced concrete pipe installations shall be checked for joint separations, soil migration through the joint, cracks greater than 0.01 inches, settlement and alignment. One hundred percent of all flexible pipes (HDPE, PVC, CMP, PP) shall be checked for rips, tears, joint separations, soil migration through the joint, cracks, localized bucking, bulges, settlement and alignment. a. Replace pipes having cracks greater than 0.1 inches in width or deflection greater than 5 percent deflection. An engineer shall evaluate all pipes with cracks greater than 0.01 inches but less than 0.10 inches to determine if any remediation or repair is required. RCP with crack width less than 0.10 inches and located in a non -corrosive environment (pH 5.5) are generally acceptable. Repair or replace any pipe with crack exhibiting displacement across the crack, exhibiting bulges, creases, tears, spalls, or delamination. b. Reports: The deflection results and finial post installation inspection report shall include: a copy of all video taken, pipe location identification, equipment used for inspection, inspector name, deviation from design, grade, deviation from line, deflection and deformation of flexible pipe systems, inspector notes, condition of joints, condition of pipe wall (e.g. distress, cracking, wall damage dents, bulges, creases, tears, holes, etc.). -- End of Section -- SECTION 33 40 00 Page 13 RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA RESERVE TRAINING FACILITY & VEHICLE MAINTENANCE (FACILITY/P-I286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE JACKSONVILLE, NC FYI I MCON PROJECT P-1286 Stormwater Management NCOENR Permit July 8, 2014 NAVFAC MID -A] LANI IC ECEIVE JUL 112M BY:_ 0 RESERVE TRAINING FACILITY/I'-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA P-1286 GRAVELKING LOT TABLE OF CONTENTS -See on- A Applileation -AppRc-aUen- I nfikratiorrBasin-1-Supplement Inf' up nt Section B: Project Narrative/Basis of Design Section C: Maps USGS MAP Vicinity and Location Maps Section D: Exhibits Permitted drainage area map Drainage Area 3 Revisions Pre -developed drainage Drainage Area 2 Revisions Post -developed Drainage Section E: Storm Drainage Calculations Existing Permit Water quality Volumes for DA-2 Contributing Drainage area NAVFAC 10-year storm Water quality volume for modified DA-1 Pond Routing Drainage Area 2 pre -developed 1-year post -developed 10-year post -developed 100-year post -developed Section F: North Carolina P. E. Exemption Letter Section G: Project Construction Plans Section H: Project Construction Specifications Section I: Erosion and Sediment Control Practices Section J: Geotechnical Report Section K: Reserve Training Facility Storm Water calculations Soils scientist Report SECTION B: PROJECT NARRATIVE Reserve Training Facility/P-1286 Gravel Parking Lot MCAS Cherry Point, North Carolina Civil Basis of Design Final Submittal —Revised August 25, 2014 ECEIV AUG 2 5 2014 CIVIL BASIS OF DESIGN 1.0 PROJECT INFORMATION 1.1 PROJECT DESCRIPTION AND LOCATION The project consists of the construction of a temporary gravel parking lot to supplement the P- 1286 project The project site is located south of the Reserve Training Center & Vehicle maintenance Facility. The site is in the northwest corner of the Range Road and Range Road intersection, in MARSOC, Camp Lejeune, North Carolina. Vehicle access to the parking lot will be limited to the service drive along the north side of the site. The parking lot is intended for use by POV only. 1.2 EXISTING CONDITIONS The parking lot site is approximately 1.6 acres. The site is bounded by Rifle Range Road on the south and east sides, and the service drive to the Reserve Training Facility on the north side. The site has gentle slopes and no significant drainage features. There are slight swales along the south and east side of the site. The east side of the site contains two trailers and a gravel service area. The west half of the site contains small trees and dense underbrush. A survey of the site was completed by the Spectra Group in October of 2010. There are no tidal or non -tidal wetlands identified on the site. The survey of the adjoining sites was provided by several recent MILCON projects. 1.3 GEOTECHNICAL The geotechnical findings including soil borings, in -situ and laboratory testing were taken from the report included in the approved Reserve Training Facility & Vehicle Maintenance Facility (SW8 060309). The results of the study recommend an infiltration rate of 1.5 to 2 inches per hour. The estimated seasonal high water table was confirmed by DENR on March 7, 2006 to be 5.5 feet below the ground surface. Additional testing was done in March of 2013 to confirm the original 2006 findings. The attached report shows that the infiltration rates in the expanded basin are approximately 4 to 5 inches per/hour. The infiltration rates in the forebay are approximately 3.5 inches/hour. All drainage calculations use the 2006 conservative infiltration rate of 2"/hour. The ESHWT was confirmed to be approximately 5.5' below the surface at both locations. 1.4 DEMOLITION The low vegetation and remaining trees within the construction limits will be cleared and grubbed as needed. An existing sewer force main crossing the site will be protected. The two trailers will be removed by the base prior to start of construction. 6:,,... EQVr= h' i AUG 2 S 2014 iy. 1.5 NEW SITE WORK The project scope includes the construction of a temporary 42,000 s.f., gravel parking lot with associated storm drainage and stormwater management. The project does not include any buildings or other above ground facilities. A total of 132 parking spaces are proposed for the site. The POV spaces are designed to be 9-ft wide by 18.5-ft long with a 26-ft wide drive aisle. Parking spaces are not intended to be delineated on the gravel. The parking lot is not convenient to the nearby buildings and will not include ADA required accessible spaces, or spaces for Fuel Efficient vehicles. Trash and recycle bins are not required for this project. Construction access shall be via the service road along the north side. The infiltration basin, that was installed to serve the Reserve Training Center, will be enlarged to handle the additional flow from the gravel lot. 1.6 AT FP The project does not include any buildings or above ground facilities. The parking lot will be set a minimum of 82' from the existing buildingjust west of the site. 1.7 SUSTAINABLE DESIGN The gravel parking lot is temporary and is not seeking to attain LEED certification. 1.8 WATER SUPPLY & FIRE The gravel lot does not require water or fire services. The existing water line that cuts across the site will be protected. The water service to the existing trailer will be abandoned. 1.9 SANITARY SEWER The gravel lot does not require sewer service. The existing sewer force main that cuts across the site will be protected. The sewer service to the existing trailer will be abandoned. 1.10 PROPANE GAS Gas is not intended to be used for this facility. 1.11 EROSION & SEDIMENT CONTROL Erosion and sediment control measures include silt fencing, tree protection, inlet protection, diversion ditches, check damns, skimmer basins and a two temporary construction entrances in accordance with the North Carolina Erosion and Sediment Control Planning and Design Manual. The BMP that will be constructed on this site will serve as a forebay for expansion of the existing infiltration basin. The forebay will be used as a sediment basin during construction of the gravel lot. 1.12 ENVIRONMENTAL PERMITTING Stormwater Management and Sediment & Erosion Control permits will be required. The existing Stormwater permit for the infiltration basin for the Reserve Training Center will be modified to accommodate the gravel lot. E C E 0 Vr= AUG 2 5 2014 BY:.____----- No jurisdictional tidal or non -tidal wetlands are present within the site boundaries. 2.0 STORM DRAINAGE / STORMWATER MANAGEMENT 2.01 SITE RUNOFF Soil types were taken from the USDA Soil Survey of Onslow County. Sheet flow will be used through the site. The gravel lot will flow to a detention basin that will act as a forebay to the existing infiltration basin and will help extend flow times and decrease run off. The grassed banks of the gravel lot will flow to the existing perimeter swales. The swale along the east side of the site will be re -graded to promote positive flow. Site run-off will be controlled to existing levels. The project is within a drainage basin which flows to the White Oak River. The receiving stream is Stone Creek (SA, H WQ). The seasonal high water elevation for the infiltration basin that currently serves DA-2 was determined to be 5.5 below the surface. The site visit was conducted on March 7, 2006. The infiltration rate was determined to be 2 inches/hour. 2.1 EXI;STING PERMIT The stormwater permit for the Reserve Training Facility (SW8 060309) was issued on May I, 2006. The permit included approval for 3 infiltration basins. The drainage areas for the 3 basins are shown in Exhibit #1. Not all of the improvements shown in the exhibit were installed. The base stone for the parking lot in drainage area 2 was constructed but the asphalt surface was not installed. The infiltration basin that serves the parking lot (basin 2) was installed. The drive aisle and the infiltration basin for drainage area 3 were not installed (Sec Exhibit 2). The entrance for the parking lot in area 2 was relocated directly below infiltration basin 2. Exhibit 3 shows the as - built conditions of the installed improvements. Exhibit 3 also shows the revised drainage areas flowing to BMP 2. The proposed gravel lot falls in the southeast corner of the area that is shown in the Reserve Training Facility permit. The gravel lot will encompass the area that was shown as drainage area 3 in the approved permit. Drainage area 3 (as permitted) is not intended for installation at this time. Exhibit 3 also shows the limits of the proposed gravel lot and how they mesh with drainage areas 1 and 2. The majority of the gravel lot site currently flows to swales in the adjoining streets and is not treated by a BMP. The existing permit will be modified to reflect the revised areas for drainage area I and 2. The permit will also be modified to enlarge basin 2 to accept the flows from the temporary gravel lot. Exhibit 4 shows the detention basin for the gravel lot that will act as a forebay. The exhibit notes the flow from the forebay to cross the street to the expanded area of the existing infiltration basin. Exhibit 5 shows the post -developed drainage areas. AUG 2 5 2014 BY:______ 2.2 STORM DRAINAGE All new impervious areas are intended to flow to the existing BMP. Curbing will not be used and minimal storm sewer piping will be used to promote surface flows. Flow rates for the existing BMP will be maintained by enlarging the basin to handle the 10-year storm. The proposed forebay will also help extend the detention times and maintain lower flows. Rainfall intensity values are taken from Regional IDF Curves (Wilmington) as follows: Time of Concentration = 5 min. (conservative) Rainfall Intensity = 3.68"/hour 1-year 24-hour storm Rational Runoff Coefficients, "C," are taken from the North Carolina Department of Environmental Resources as follows: Roofs, Inclined 1.00 Asphalt 0.95 Concrete 0.95 I -awns, sandy soil 0.15 Wooded 0.15 Rational Runoff Coefficient, "C," for gravel was taken from H.R. Malcom 2003 Gravel 0.82 (maximum value) Existing conditions Site = 1.59 acres The current site is partially developed with two trailers and a small gravel parking area. The existing lot does not have any drainage features and is not served by a BMP. The site sheet flows to slight swales on all four sides 2.3 STORMWATER MANAGEMENT WATER QUALITY ANALYSIS The existing infiltration basin will be enlarged to provide the required water quality controls in accordance with NCDENR standards. The BMP for the Reserve Training Facility was designed (and permitted) to retain 3 times the water quality volume (4.5 inches of rainfall) to avoid bypass and overflow structures. The existing BMP will be enlarged to treat the 4.5" rain for the Reserve Training Facility site and 2.5 times (3.75 inches) the WQV for the gravel parking lot. The basin will be designed for 90% TSS removal. Basin I was permitted for 4.75 acres and for 2.38 acres of impervious area. Exhibit 3 shows that drainage area 1 was reduced to 4.52 acres. The service road between drainage areas 1 and 2 was designed with cross slope to drain to the south and into DA-l. This road was built with normal crown and the top half of this road now drains to BMP-2. The redirected roadway reduces the impervious area for DA-1 by 0.05 acres. The impervious area for BMP-1 was therefore reduced from 2.38 acres to 2.33 acres. The calculations and the supplement show that 0.5 acres of 13UA was added so that the impervious area ol'2.38 would match the permitted impervious. `ECEBVE AUG 2 5 20% ey: We are required to capture the additional run off generated by the 95% storm event to satisfy NAVFAC LID requirements. The 95% storm event for this area is 2.34 inches per hour. For SA waters we are, however, required by DENR to treat the pre to post difference in the I -year 24 hour storm. The I -year 24-hour storm for this area is 3.68". We are also storing 2.5 times the 3.68" rain to waive the bypass and filter strip requirements. The proposed enlarged infiltration basin will therefore infiltrate approximately 4 times the required pre to post difference in the 95% storm event. The existing site has a I0-year release rate of approximatly 1.7 cfs. The infiltration basins is shown to reduce the 10-year release rate for the developed site to approximately 1.3 cfs for the new gravel lot and existing parking lot combined. The infiltration basin is being modified to safely pass the 100-year storm. The emergency spillway will allow all flows in excess of the 10-year event to flow eastward to the existing swale along Rifle Range Road IECEi iY E 'i AVG 2 5 Zola RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA SECTION C:MAPS r� t RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA L`J RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA L._ RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA SECTION D: EXHIBITS RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA �Ilg l a ❑ u rxru[ur z c6 a .cp i L R REVMEDDRNE OELEW-D DRryE M. nvt.Te-r�- EXHIBIT 2 9 RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA I loi lj,hl dill jv t - J 7- 1 III1 _`-= 1 , . 1 N 1 , EXHIBIT 1 RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA EXHIBIT 4 RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA T'2. 1,`mnr�. eM..�Zfili�.% •• _ 71 C � I� tl pp � ♦ � �" s JA d . 'J' tH 1.� H ��. _ _,=� _l., � _ gl. •��Siy'ili ._ _ y. � 1 . �a'iE�• t. i 4�0. .. "+.N Ifs � � � '�. /> ♦.. w, II 1yyt� � S - �� / •! i til S� I zi i\!; �� -sue.'- � .. •.. ,� 4 --<,� I`� III/ J >•I� aA� �_i �I — J> .��•��,..41 iiy, lr`{•� 4 , EXHIBIT 3 E rn- .:{ ._. '' i t +: �� '� .._. - •_�z ,.�— .--� \ � n � ��! „ ; I��a D tfW tj r; r • -•� N.vf.� y. rta i?.� �( I �`3 rf ',\ �..." ___. .., hy_y • ii �.� n� � i li 1F__yTo, 2.487 AC 4.30 IMP 4 AC 9. A:`' .' • 'y+l.J J = 1.404 .3D,. -, . ` ` IMP = 2-381 •.••, a �i: i / C —'" - a'n I \ a • -St� t do • '��^'^ '-7 i -•a__� ,w" ',.� S. ROAD (OiF511E)', 4 - . • - 0.120 AC zs • 1 .....» 3 . GRAVEL LOT SITE BOUNDARY • .,• _ IMP = 0.068 AC _ \ `T4:. - „IMP 0 1 : • ...,,... sf C - 02 , .� f s s'5ts -.. 1 a t L �' • 4 u�'� FB-.s.""Y,*e ro �^��%s a, � �,•' "j `i ' ,.x.-,�./ �9 � !z T. 56 4,11,lff OR LOT J _ ; .,`_" ✓ • a AC 12IMP = 0.940 AC i ?'x i • ,� ' 1" r ;1£, .... 20 Iy.7I+ 1 ° .^z se�V — C - 0.7 IN o:_ r_ DA-5 A A`J� TO RIFlE PINGE ROADWAY i 0.286 AC .� L— t NP = .012 AC _ — �M EXHIBIT 5 0 C B I IA o rs' m eo' Hydraflow Table of Contents Hydrallow Watershed Hydrograph Extension for AutoCADrS Civil 3D® 2010 by Autodesk, Inc. v9.25 7.28.14 pond routing.gpw ' Friday, Aug 1, 2014 Schematic..................................................................................... 1 PeriodRecap...................................................................1..... 2 1 -Year SummaryReport....................................................................................................................... 3 HydrographReports.................................................................................................................. 4 Hydrograph No. 1, SCS�R\\unoff, Existing DA#2.................................................................. 4 Hydrograph No. 2, SCS iZ off, FOREBAY ..........................7z............................................ 5 Hydrograph No. 3, Reservoi ,Forebay Routing...................�................................................ 6 PondReport Forebay....................................................................................I............... 7 Hydrograph No. 4, Combine, Coined routing to existing ..................................................... 8 Hydrograph No. 5, Reservoir, Combined into BMP'2............................................................... 9 Pond Report - Pond 2 BMP 2...... \�............; �................................................................. 10 2 - Year SummaryReport ................................. ........\....Y.i............................................................. 11 Hydrograph Reports ........................... ................ ..................................................................... 12 Hydrograph No. 1, SCS Runoff, Existing DA#2.................................................................... 12 Hydrograph No. 2, SCS Runoff, FOREBAY.........\............................................................... 13 Hydrograph No. 3, Reservoir; Forebay Routing......��........................................................... 14 Hydrograph No. 4, Combine/,Combined routing to existing ................................................... 15 Hydrograph No. 5, Reservoir, Combined into BMP 2............................................................ 16 10 -Year SummaryReport....:[............................................................................................................. 17 HydrographReports�..................................................................�.......................................... 18 Hydrograph No. 1; SCS Runoff, Existing DA#2.................................................................. 18 Hydrograph,tVo�2, SCS Runoff, FOREBAY.......................................................................... 19 Hydrograph No. 3, Reservoir, Forebay Routing ................................. \.................................. 20 Hydrograph I o. 4, Combine, Combined routing to existing ................. ............................... 21 HydrograWNo. 5, Reservoir, Combined into BMP 2.................................I............................ 22 100 - Year / Summaii Report ....................................................................................................................... 23 HydroaphReports............................................................................................. ................. 24 H flrograph No. 1, SCS Runoff, Existing DA#2...................................................... .............. 24 ydrograph No. 2, SCS Runoff, FOREBAY........................................................................ 25 Hydrograph No. 3, Reservoir, Forebay Routing ............. ............................................�......... 26 Hydrograph No. 4, Combine, Combined routing to existing ............................................... 27 Hydrograph No. 5, Reservoir, Combined into BMP 2............................................................. 28 OFReport.......................................................................................................... \ 29 D mw 21 jjj' .45 3 .. 1 -4. .. ... DA I 4.1 $85 AC 17 - ... IMP 2.381 AC DA- 2 3.827.AC c IMP 2.412 AC W 21.MV S31m,- 13 Y I IM' � W Qjo� W5� QJN Wll N, sr21MV 51zn TO FULE 0.2 IMP 0.0 A I GO 2 3 5 LEGEND GRAPHIC SCALE I$] c RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA SECTION E: CALCULATIONS SEE ATTACHED calculations P-1286 Gravel DRAINAGE CALCULATIONS BMP sizing SGM 8.18.14 REVISED Modify permit--SW8 060309 for Reserve Training Facility As noted in the basis of design, the existing infiltration basin #2 that serves the Reserve Training Facility will be expanded to accept the flow from the proposed gravel lot. The following calculations analyze the existing BMP and the impact of enlarging the BMP to accept the proposed improvements. Verify volumes for existing BMP # 2 for Reserve Training Facility As per permit (permit approved in 2006--SW8 060309)) site 2.21 acres imp 58415 1.341 acres site % imp = 0.607 Required Storage Volume:(for water quality) imper. Simple Rv = 0.05 +0.9 (imp) 0.61 Rv= 0.596118 V1.5=3630*1.5*Rv*A A= 2.21 V1.5 = 7173.36 c.f. Permit calls for 4.5" rain (3 x WQV) to waive bypass and level spreader V4.5 = 21520.08 c.f. Okay -design volume--21,238 as per permit Volume provided (as per permit) 21612 Okay Existing storage volumes (as -built survey) (NOTE:the datum for the as -built survey is different than the datum used for the permit -the bottom of BMP 2 was permitted at 53.45 and was surveyed at approximately 51.0--overexcavated to approximately 50.7) AUG 2 120% R BY:__ For basin at surveyed elevation of 51.0 ELEV ELEV DIFFEREMAREA SF VOLUME Cl' 51 6570 0 52 1 8105 7337.5 53 1 9670 16225.0 0.2 53.2 10008 18192.8 0.333 53.533 10572 21619.4 21619 okay 0.467 (Vol as per permit-21612) 54 11362 26741.0 The top of bank is at approx. 54.0 0.47 of freeboard to t.o.b.--permit shows 0.03' okay Therefore the existing BMP provides the permitted water quality volume of 21,612 at elevation of 53.53 (approx) Try to keep storage height at (or below) 53.53 to match existing conditions Note: The driveway for the Reserve Faciltiy site was revised in 2007 construction Half of the existing driveway south of the BMP now flows to the BMP drive way = 3429 s.f. imp. = 2803 s.f. 0.079 ac. As per my discussion with Linda Lewis this driveway area needs to ber considered as new even though it is existing, since it is not covered under the existing permit. 1173.5 s.f. of this drive was permitted to flow to Basin # 1 ECEIVE AUG2r2014 0.064 Calculate the required modifcations to BMP 2 to accent the additional flows from the Proposed gravel parking lot Drainage Area 11-2 that was permitted in 2006 is covered by the regulations in place at that time. The dosing storm for DA-112 was the 1.5" rain. The 2006 permit allowed for the site to waive the requirement for a LS/VI'S by providing 3 x the volume for the design storm. The proposed improvements must meet the cmrenl guidelines for infiltration basins. For current regulations the design storm for the proposed area is considered the greater of the 1.5" rain or the difference in the I -year , 24-hour storm (pre vs post) 1.5" rain Storage volume for the permittted area from above is Determine new area Area flowing to expanded infiltration basin (permitted impervious) DA-2 = (additional impervious) DA-2 = (new lot) DA-4 = (offsite driveway) DA-6 = Total site flowing to expanded infiltration basin is permitted area flowing to basin is New Area = Storage volume required for new area is (for DA-4--new gravel lot) pie impervious 2.487 ac 1.340 ac ac 0.064 ac 1.220 ac 0.940 ac 0.120 ac + 0.068 ac 3.827 ac 2.412 ac 63.01% 7173.36 c.f. n p u _ I. - )a G�� Site In )ervious 3.827 ac 2.412 2.210 ac 1.341 1.617 ac 1.071 New imper. bldg 0.000 gravel 0.940 0.95 0.8925551 grass 0.281 0.2 0.0561019 1.220 0.948657 Impervious = 77.01% C = 0.78 acres (for DA-6--service road) bldg 0.000 (flow to new foreabay) paved 0.068 0.95 0.0643147 grass 0.053 0.2 0.0105556 0.120 0.0748703 Impervious = 56.19% C = 0.62 acres (for DA-8--service road) bldg 0.000 (flows to existing basin) paved 0.064 grass 0.014 0.079 Impervious = 81.74% acres expanded BMP area bldg 0 gravel 0 grass 0.198 0.198 Impervious = 0.00% Combined Area New Area using 2.5 x the WQV ' (flowing to expanded infiltration basin) Simple Rv = 0.05 +0.9 (imp) Rv = 0.646326 V 1.5= 3630* 1.5*Rv*A V1.5= 5691.58 c.f. acres imp bldg 0.000 0 gravel/paved 1.0716 1.072 grass 0.546 1.617 1.072 Impervious = 66.26% Imp = 0.66 A = 1.617 Total storage volume permitted new required for 1.5" rain is 7173 + �C692-IVC12865D AUG 2 120% BY: PRE VS POST (for new improvements only) Analyze only the new areas flowing to the expanded infiltration basin I-yr 24 storm is 3.68 inches = EXISTING Q Lc-dev.Llonedj acres "C" (for DA-4--new gravel lot) bldg 0.000 1 gravel 0.024 0.82 grass 1.196 0.2 (for DA-6--service road) (flow to new foreaba Note 2347 s.f. of the existing drive that will flow to 13MI'-2 was permiled to flow to BRIP-1 use 2347/2 for exist. for each segment (for DA-8--service road) (flows to existing basin) Note 2347 s.f. of the existing drive that will flow to BMP-2 was permiled to flow to BMP-1 use 2347/2 for exist. for each segment expanded LIMP area 2347/2 2347/2 1.220 C= Imp = bldg paved grass bldg paved grass 0.21 0.02 0 0.02694 0.094 0.120 C= Imp = acres 0.000 0.02694 0.052 0.079 C= Imp = 0.153 in/hour "CA" 0.000 0.020 0.239 0.259 "C" "CA" 1 0.000 0.95 0.026 0.2 0.019 0.044 0.37 0.22 1 0.95 0.2 0.46 0.34 acres bldg 0 1 gravel 0 0.82 grass 0.198 0.2 0.198 C = 0.20 Impervious = 0.00% "CA" 0.000 0.026 0.010 0.036 "CA" 0.000 0.000 0.040 0.040 0.040 Combined Area (flowing to expanded infiltration basin) acres "C" bldg 0.000 1 gravel 0.024 0.82 paved 0.054 0.95 grass 1.539 0.2 1.617 C = 0.23 impervious = 4.84% Predeveloned volume Simple Rv = 0.05 +0.9 (imp) Imp = 0.05 Rv = 0.093538 V3.68= 3630*3.68*Rv*A / V3.68 = 2020.8 c.f. ✓/ Predeveloned rate for NEW DEVELOPMENT area 1-yr 24 storm is Existing Q=CIA A= 1.617 3.68 inches = C = 0.23 I= 0.153 Q= 0.23 0.153 1.617 Q = 0.06 CFS Predeveloned rate for EXISTING 2.21 ACRE SITE I-yr 24 storm is 3.68 inches = Existing C = 0.20 Q=CIA I= 0.153 Q = 0.20 0.153 2.21 Q = 0.07 CFS "CA" 0.000 0.020 0.051 0.308 0.379 0.153 in/hour A= 1.617 0.153 in/hour A = 2.21 Existing 2.21 acre site Q = 0.07 cfs New 1.617 acres of development Q = 0.06 cfs Total Existing flow = 0.13 cfs The controlled release from the enlarged infiltration basin for the 1-year 24 hour storm through the BMP can not exceed existing flow of 0.13 ccaf; The routing calculation show that there is no release for the l and 2-year storms --OKAY AUG 212014 Compare 1.5" rain to 1 year1)resost (The design storm is the greater of the two) for DA-4--new Y.ravel lot) (note -use C=0.95 for gravel in case they pave in the future) (for DA-6--service road) (fl(w to new foreabav)_ (for DA-8--service road) (flows to existing basin) ezpaocled BMI' area (for new development only) acres "C" CA bldg 0 1 0.000 gravel 0.940 0.95 0.893 grass 0.281 0.2 0.056 1.220 0.949 C = 0.78 Imp = 0.77 acres "C" "CA" bldg 0.000 1 0.000 paved 0.068 0.95 0.064 grass 0.053 0.2 0.011 0.120 0.075 C= 0.62 Imp = 0.56 acres "C" "CA" bldg 0.000 1 0.000 paved 0.064 0.95 0.061 grass 0.014 0.2 0.003 0.079 0.064 C = 0.81 Imp = 0.82 acres "CA" bldg 0 1 0.000 gravel 0 0.82 0.000 grass 0.198 0.2 0.040 0.198 0.040 C = 0.20 Impervious = 0.00% Combined Area (new) (flowing to expanded infiltration basin) gravel/paved Proposed Q=CIA Q = 0.70 Q = 0.17 CFS Post -developed volume Simple Rv = 0.05 +0.9 (imp) / Rv = 0.65 V3.68= 3630*3.68*Rv*A V3.68 = 13963.3 c.f. bldg grass C= I= 0.153 1.617 Imp = M acres "C" CA 0.000 1 0.000 1.072 0.95 1.018 0.546 0.2 0.109 1.617 1.127 C = 0.70 Imp = 0.66 0.70 0.153 A= 1.617 0.66 1.617 For the new area post -developed volume is 13963.3 For the new area pre -developed volume is 2020.8 pre/post difference is 11942.5 cf. The 1-yr, 24 hour storm volume (pre vs post) is 11942.5 c.f. The volume for the 1.5" rain event is 5691.6 c.f. The 1-yr, 24 hour storm volume is therefore greater and is considered the design storm The required water quality volume is As noted above, 2.5 times the water quality volume is required to waive the requirement for LS/VFS 2.5 x the WQV is 2.5 x 11942.5 = 11942.5 29856.3 c.f. We need to allow for 29856.3 c.f. of storage for the new developed area We need to allow for 7 13 x 3 = 21612.0 c.f. of storage for the existing facility. We need to allow for v 51468.3 c.f. of total storage for the expanded BMP EGEIVE AUG 212014 M_--__._"-.—_. Expanded BMP storage volumes (in BMP#2) ELEV ELEV DIFFEREMAREA SF VOLUME CF 51 13554 0 1 52 1 15379 14466.5 53 17096 30704 0.75 53.75 18505 44,054.5 required WQV --0.1.1— —53:6h 1-8299—42;0303 - -036 54 18975 48,739.5 0.5 54.5 46974 65,226.8 look at WQV at 53.75 = 44054.5 c.f. FOREBAY VOLUMES look at WQV at 53.75 ELEV ELEV DIFFERENCE AREA SF VOLUME CF 51.55 0 0 0.45 52 1373 308.925 53 1 4793 3391.925 0.75 53.75 6119 7483.925 -0. Ff —53-64 5925 —68$1:531�{ —036- 54 6561 9068.925 The volume provided at 53.75 is 7483.925 Total volume provided at 53.75 expanded BMP forebay is 44054.5 plus 7483.9 = 51538.4 c.f. WQ vol Req. volume 51538.4 exceeds 51468.3 OKAY ✓ As noted, the water quality volume of 51538.4 c.f. exceeds the required volume of 51468.3 c.f. And the elevation of 53.75 approximates the existing stage of 53.53 freeboard to top of bank increased from 0.03' to 0.25 okay The WQ elevation remains the same. The existing basin did not have a spillway --water had to raise to elev of 54.0 to leave the basin - The basin revisions will provide a spillway that allows flows in excess of the WQV to leave the basin at 53.75 DRAWDOWN The drawdown for the water quality volume must be less than 5 days using 1/2 of the repotted infiltration rate Look at drawdown time in enlarged infiltration basin for WATER QUALITY VOLUME WQV = 51,538.4 C.F. From the existing permit the infiltration rate is shown as 1.5 in/hr = 3.472E-05 R/sec 1/2 of infiltration rate is 1.73611E-05 bottom surface area at elev of 51.0 = 13554 infiltration rate is 1.736E-05 x 13554 = drawdown is 51,538.4 divided by 0.2353125 = 219021.06 seconds = 2.53 days The enlarged infiltration basin will therefore draw down in 2.53 days is less than 5 days Compare to drawdown for EXISTING infiltration basin WQV = 21,612.0 C.F. From the existing permit the infiltration rate is shown as 1.5 in/hr = 3.472E-05 A/sec 1/2 of infiltration rate is 1.73611 E-05 bottom surface area at elev of 51.0 = OKAY 1.5 inch/hr 0.2353125 cfs 219021.06 seconds 2.53 days 1.5 inch/hr ffih1EC;F-1*je 6570 1 201a AUG 2 infilll.ation rate is 1.736E-05 x 6570 = 0.1140625 efs drawdown is 21,612.0 divided by 189475.07 seconds = 0.1140625 = 2.19 days 189475.07 seconds NOTE THE DRAWDOWN FOR FNLARGED BASIN is extended from 2.19 to 2.53 days by adding the gravel lot OKAY CONTRIBUTING DRAINAGE AREA The maximum allowable drainage area for an infiltration basin shall be less than 5 acres or 2.0 acre -inches of rainfall. The area flowing to the expanded infiltration basin is: Area acres impervious The modified drain. area for the infiltration basin is DA-2 2.487 1.404 56.5% The gravel lot addition is 4 1.220 0.940 The service drive is 7 0.120 0.068 total drainage area is 3.827 2.411 63.0% DA-2 includes the existing drainage area and the expanded area of the BMP. The area inside of the 13MP receives direct flow and does not flow to the existing inlet. Total DA-2 = 2.487 ac imper. = 1.404 56.5% BMP inside contour 54 0.436 ac imper. = 0.000 0.0% Flow to existing inlet 2.051 1.404 68.4% Maximum run off is to the existing inlet at DA-2 Simple Rv = 0.05 +0.9 (imp) Rv = 0.666045 Imp = V 1.5= 3630* 1.5*Rv*A A = V1.5 = 7438.73 c.f. 7438.73 es. = 2.0 ac-ft of run off for the 1.5" rain As noted in the first section, the permitted run off volume is for DA#2 ,r- 0.68 2.051 OKAY 7173.36 To avoid any concerns over the drainage areas and to minimize the potential for erosion at the inlet, a second inlet was added. The new inlet serves the gravel lot and uses a detention basin as a forebay to reduce flows, velocities and erosion. Flow to new forebay (for routing calculations) acres "C" CA (for DA-4--new gravel lot) bldg 0 1 0.000 (from above) gravel 0.940 0.95 0.893 grass 0.281 0.2 0.056 1.220 0 0.949 C = 0.78 Imp = 0.77 acres "C" "CA" (for DA-6--service road) bldg 0.000 1 0.000 (flow to new foreabav) paved 0.068 0.95 0.064 grass 0.053 0.2 0.011 0.120 0 0.075 C= 0.62 hnp = 0.56 Combined acres "C" CA bldg 0.000 1 0.000 gravel 1.007 0.95 0.957 grass 0.333 0.2 0.067 1.341 0 1.024 C = 0.76 Imp = 0.75 Direct Flow toBMP 2 (for routing calculations) Total flow from above 1` GF i vs E Area flowing to expanded infiltration basin impervious pUG 212014 (permitted impervious) DA-2 = 2.487 ac 1.340 ac (additional impervious) DA-2 = 0.000 ac 0.064 ac (new lot) DA-4 = 1.220 ac 0.940 ac (offsite driveway) DA-6 = 0.120 ac 0.068 ac 3.827 ac 2.412 ac 63.01% Area flowine to forebay from above Combined area = 1.341 hpp = 1.024 total area = 3.827 total imper= 2.412 area to forebay = 1.341 imper to forebay = 1.024 2.487 ac 1.388 Therefore the direct 17ow to 13MP # 2 is 2.487 acres and 1.388 acres of impervious NAVFAC 10-YEAR STORM (proposed 1.617 acre site only) NAVFAC also requires no net increase io the 10-year storm release for post developed conditions Look at pre -developed release for a 10-year storm Bldg 0.049 1 0.049 Pre -developed flows gravel 0.175 0.82 0.143 (for gravel lot) grass 1.368 0.2 0.274 1.592 0.466 C = 0.29 Existing C = 0.29 Q=CIA 1= 4.74 10-YR; 30 MINTc Q = 0.29 4.74 1.592 Q = 2.21 CFS The controlled site release for the gavel lot through the DMP CAN NOT EXCEED 2.21 cfs The release front the existing infiltration basin also must be at or below existing rates. The routing calculators show that the 10-yr release for the EXISTING 13MP (Infiltration basin 82) is approximately 1.7 cfs The controlled release front the enlarged infiltration basin can not exceed rDA.11 2 1.7 plus existing gravel lot 2.21 = 3.91 rr The routing calculations show that the combined release for the enlarged infiltration is approximately 1.3 cfs 1.3 c.f.s. is less than 3.91 c.f.s. OKAY VERIFY DRAINAGE AREA # 1 PERMITTED DRAINAGE AREA DA-1 4.75 ac site 4.75 acres imp 2.3806 site % imp = 0.501 Required Storage Volume:(for water quality) imper. Simple Rv = 0.05 +0.9 (imp) 0.501 Rv = 0.501 V 1.5= 3630* 1.5*Rv*A A = 4.750 V I.5 = 12959.3 c.f. Permit says V 1.5 = 12956.0 okay ---use 12956.0 c.f. REVISED site is 4.385 ac site 4.385 acres imp 2.326 site % imp = 0.530 Required Storage Volume:(for water quality) imper. Simple Rv = 0.05 +0.9 (imp) 0.530 Rv = 0.527 V 1.5= 3630* 1.5*Rv*A A = 4.385 V1.5= 12592.4c.f. Permitted V 1.5 = 12956 c.f. Revised V 1.5 = 12592 c.f. Storage volume reduced by 364 c.f. ADD future QUA to match permitted volume As noted by DENR the total impervious area can not exceed the impervious are in the existing permit Permitted impervious area is 2.381 Revised impervious area is 2.326 allowable addition is 0.055 ac. Therefore we are allowed to add 0.055 ac. or 2378.4 s.f. AUG 2120�4 site 4.385 acres imp = 2326 plus BUA 0.055 = 2 881 site % imp = Required Storage Volume:(for water quality) imper. Simple Rv = 0.05 +0.9 (imp) (0.543 Rv = 0.539 \ V 1.5= 3630* 1.5*Rv*A A = 4.385 V1.5= 12859.9 c.f. Iz Permitted V 1.5 = 12956 Revised V 1.5 = 12859.9 ✓ Storage volume reduced by 96 okay Add 2378 s.f of Future BUA Note: the additional 2378 of impervious area is controlled by the proposed WQV and is therefore acceptable Storage Elevation (from permit) elev. area cumulative volume 52.5 4775 0 53.2 6082 3800 53.8 7450 7859 5439 8313 12956 54.5 8912 13586 CONTRIBUTING DRAINAGE AREA (For DA-1) ,me maximum allowable drainage area for an infiltration basin shall be less than 5 acres or 2.0 acre -inches of rainfall. BMP I receives drainage through inlets on the south and cast sides Drainage area I impervious Area la = 3.615 1.956 54.1% Area I b = 0.77 0.4248 Total = 4.385 2.381 Volume of 1.5 " rain for area la = 2.9337 acre/inches Volume of 1.5" rain for area lb = 0.6372 acre/inches 0.543 Maximum run off is to Area la Simplc Rv = 0.05 +0.9 (imp) Imp = 0.54 Rv = 0.536929 V1.5=3630*1.5*Rv*A A= 3.615 V1.5 = 10568.57 c.f. 10568.57 c.f. = 2.9 ac-ft of run off for the 1.5" rain Please note that this drainage area was reduced from the permitted 4.75 ac to 4.385 ac. p�6 212014 I Watershed Model Schematic Hydragow Hydrographs Extension for AutoCAD®Civil 3D92010 by Autodesk, Inc. v9.25 1 y;2v ^� F# ,' tp; 4 r 5 r Project: 7.28.14 pond iouling.gpw Friday, Aug 1, 2014 Hydrograph Return Period Rep y ra ow Hydrographs Extension for AutoCAD® Civil 3D102010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type Inflow hyd(s) Peak Outflow lots) Hydrograph Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 6.603 8.596 ------- ------- 14.62 ------- ------- 26.16 Existing DA#2 2 SCS Runoff ------ 4.132 5.199 ------ ------- 8.387 ------- ------- 14.48 FOREBAY 3 Reservoir 2 0.950 1.042 ------- ------- 2,530 ------- ------- 7.164 Forebay Routing 4 Combine 1.3 7.371 9.481 ------- ------- 15.71 ------- ------- 32.71 Combined routing to existing 5 Reservoir 4 0.000 0.000 ------- ------- 1.388 ------- ------- 14.64 Combined into BMP 2 � C; p,�G 212014 Proj. file: 7.28.14 pond routing.gpw Friday, Aug 1, 2014 Hydrograph Summary Report Hydra9owHydrogfaphsExtension for AuIoCADOCivil 3DID2010byAutodesk,Inc. v9.25 Hyd. No. Hydrograph typo (origin) Peak flow (cfs) Time intomal (Mill) Time to Peak (min) Hyd. volumo (tuft) Inflow hyd(s) Maximum elevation (ft) Total slrge used (tuft) Hydrograph Description 1 SCS Runoff 6.603 2 724 19,870 ----- ------ ------ Existing DA #2 2 SCS Runoff 4.132 2 724 12,811 ------ ------ ------ FOREBAY 3 Reservoir 0.950 2 746 12,804 2 53.06 3,757 Forebay Routing 4 Combine 7.371 2 724 32,674 1,3 ------ ------ Combined routing to existing 5 Reservoir J 0.000 2 1872 0 4 52.53 23,096 Combined into BMP 2 /' 7.28.14 pond routing.gpw Return Period: 1 Year Friday, Aug 1, 2014 Cl Hydrograph Report Hydraflow Hydrographs Extension for AuIoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 1 Existing DA #2 Hydrograph type = SCS Runoff Peak discharge = 6.603 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 19,870 cuft Drainage area = 2.490 ac Curve number = 87' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.388 x 98) + (1.099 x 74)] 12.490 Q (Cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 - 0 2 4 Hyd No. 1 Existing DA #2 Hyd. No. 1 -- 1 Year 6 8 10 12 14 16 Q (Cfs) 7.00 M 5.00 4.00 we Ealft, E110111 t `—_ �- 0.00 18 20 22 24 26 ECEIVE Time(hrs) AUG 2 12014 BV: - 5 Hydrograph Report HydraOow Hydrographs Extension for AutoCAl7$ Civil 313V 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 2 FOREBAY Hydrograph type = SCS Runoff Peak discharge = 4.132 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 12,811 cuft Drainage area = 1.340 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = 1(0.940 x 98) + (0.280 x 74) + (0.070 x 98) + (0.050 x 74)J 11.340 Q (Cfs) 5.00 FROM 3.00 2.00 1.00 0.00 0 2 4 6 --. Hyd No, 2. n i FOREBAY Hyd. No. 2 -- 1 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 1 I I I---7---1- - _ 0.00 10 12 14 16 18 20 22 24 Time (hrs) IHydrograph Report 6 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 3 Forebay Routing Hydrograph type = Reservoir Peak discharge = 0.950 cfs Storm frequency = 1 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 12,804 cuft Inflow hyd. No. = 2 - FOREBAY Max. Elevation = 53.06 ft Reservoir name = Forebay Max. Storage = 3,757 cuft Storage Indication method used Forebay Routing Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 5.00 5.00 4.00 — -- -- - ---- --- 4.00 -- -- — 3.00 -- - --- - 3.00 2.00 2.00 - - - - - - 1.00 1.00 t . 0 2 4 6 8 10 — Hyd No. 3 — Hyd No. 2 12 14 16 18 20 22 2 Total storage used = 3,7V AGE AW 212014 BY:_-- 26 Time (hrs) Pond Report 7 Hydrallow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Pond No. 9 - Forebay Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 51.55 It Stage / Storage Table Stage (0) Elevation (ft) Contour area (sgfl) Incr. Storage (tuft) Total storage (tuft) 0.00 0.45 1.45 2.45 2.95 3.45 51.55 52.00 53.00 54.00 54.50 55.00 00 1,373 4,793 6,561 7,490 11,635 0 309 3,083 5,677 3,513 4,781 0 309 3.392 9,069 12,582 17,363 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrtRsr] [A] [B] [C] [D] Rise (in) = 15.00 6.00 0.00 0.00 Crest Len (ft) = 10.00 0.00 0.00 0.00 Span (in) = 15.00 6.00 0.00 0.00 Crest El. (ft) = 53.80 0.00 0.00 0.00 No. Barrels = 10 10 0 0 Weir Coeff. = 3.330.00 3.33 3.33 3.33 Invert El. (ft) = 51.55 51.55 0.00 0.00 Weir Typo = Rect --- --- --- Length(ft) = 87.00 0.00 0.00 0.00 Multi-Stago = Yes No No No Slope I%) = 0.29 0.00 0.00 n/a N-value = .013 .013 .013 Na Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(Inlhr) = 0 (by Contour) Multi-Stago = nla Yes No No TW Elov. (ft) = 0.00 Note. CulverVOMiee outilms are analgee under Inlet(ic) and pupal (ot) control. Welr risers checked for orifice wnd,tens(io) and eubmorgonce (s). Stage I Storage I Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrtRsr WrA WrB WrC WrD Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 51.55 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 0.45 309 52.00 0.38 oc 0.36 is --- --- 0.00 --- --- --- --- --- 0.360 1.45 3,392 53.00 0.92 oc 0.92 is --- --- 0.00 --- --- --- --- --- 0.923 2.45 9,069 54.00 3.88 oc 0.90 is --- --- 2.98 --- --- --- --- --- 3.879 2.95 12,582 54.50 7.29 oc 0.18 is --- --- 7.11 s --- --- --- --- --- 7.283 3.45 17,363 55.00 8.22 oc 0.09 is --- --- 8.11 s --- --- --- --- --- 8.204 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139) 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 4 Combined routing to existing Hydrograph type = Combine Peak discharge = 7.371 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 32,674 cuft Inflow hyds. = 1, 3 Contrib. drain. area = 2.490 ac Combined routing to existing Q (cfs) Hyd. No. 4 -- 1 Year Q (Cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 — Hyd No. 4 6 8 10 12 14 16 18 2022 Hyd No. 1 — Hyd No. '.ECEI E AUG 212014 24 26 Time (hrs) Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCAD$ Civil 3D9 2010 by Aulodesk, Inc, v9.25 Friday, Aug 1, 2014 Hyd. No. 5 Combined into BMP 2 Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 31.20 hrs Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 4 - Combined routing to existintoax. Elevation = 52.53 ft Reservoir name = Pond 2 BMP 2 Max. Storage = 23,096 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 8.00 M Exile] 2.00 0.00 0 6 12 18 24 — Hyd No..5 — Hyd No. 4 f . Combined into BMP 2 Hyd. No. 5 -- 1 Year 30 36 42 48 54 60 III ! I 1 1 Total storage used = 23,096 cuft Q (cfs) 8.00 .O 4.00 2.00 0.00 66 Time (hrs) Pond Report 10 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Pond No. 2 - Pond 2 BMP 2 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 51.00 it Stage I Storage Table Stage (it) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 51.00 13,554 0 0 1.00 52.00 15,379 14,467 14,467 2.00 53.00 17,096 16,238 30,704 3.00 54.00 18,975 18,036 48,740 3.50 54.50 46,974 16.487 65,227 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C1 [D] Rise (In) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 20.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 53.75 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 2,60.00 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length (it) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 Na Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfll.(Infhr) = 0.750.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: GAVaWonfice outgowa aree.lyieduMer inlet(ic) and wVet loot control. Weir riser. rheckedfor ongce conditions(k) and eubmergenw(e), Stage I Storage I Discharge Table Stage Storage Elevation ChrA ChrB clvC PARsr WrA WrB WrC It Exfil User Total ft cuft ft cfs cis cfs cfs cis cfs cis cfs cis cis cis 0.00 0 51.00 --- --- --- 0.00 --- -- --- 0.000 -- 0.000 1.00 14,467 52.00 --- --- --- 0.00 --- --- --- 0.267 --- 0.267 2.00 30,704 53.00 --- --- --- --- 0.00 --- --- --- 0.297 --- 0.297 3.00 48,740 54.00 --- -- --- --- 6.50 --- --- --- 0.329 --- 6.829 3.50 65,227 54.50 --- --- --- --- 33.77 -- --- --- 0.816 --- 34.59 Aug 2 � 2o�a 11 Hydrograph Summary Report HydrallowHydrographsExtension for AuloCAD® Civil 3DO2010byAulodesk,Inc. v9.25 Hyd. No. Hydrograph typo (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (ft) -total slrgo used (cuft) Hydrograph Description 1 SCS Runoff 8.596 2 724 26,102 ------ ------ ------ Existing DA#2 2 SCS Runoff 5.199 2 724 16,337 ------ ------ ------ FOREBAY 3 Reservoir 1.042 2 748 16,331 2 53.30 5,095 Forebay Routing 4 Combine 9.481 2 724 42,433 1,3 ------ ------ Combined routing to existing 5 Reservoir 0.000 2 712 0 4 53.03 31,300 Combined into BMP 2 i. 7.28.14 pond routing.glow Return Period: 2 Year Friday, Aug 1, 2014 12 Hydrograph Report HydraOow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. No. 1 Existing DA #2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.490 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.48 in Distribution Storm duration = 24 hrs Shape factor Composite (ArealCN) - 1(1.388 x 98) + (1.099 x 74)) 12.490 Q (cfs) 10.00 o W 4.00 2.00 Existing DA #2 Hyd. No. 1 -- 2 Year 2 4 6 8 10 12 14 Hyd No. 1 Friday, Aug 1, 2014 = 8.596 cfs = 12.07 hrs = 26,102 cuft = 87* = Oft = 5.00 min = Type III = 484 16 18 20 �1.- errs AUG Z 1201a 22 Q (cfs) 10.00 f:11I61 1411B1 4.00 0.00 24 Time (hrs) Hyda-ograph Report 13 Hydrallow Hydrographs Extension for AuloCA69'1 Civil 3139) 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 2 FOREBAY Hydrograph type = SCS Runoff Peak discharge = 5.199 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 16,337 cuft Drainage area = 1.340 ac Curve number = 92" Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.48 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ' Composite (ArealCN) _ 1(0.940 x 98) + (0.280 x 74) + (0.070 x 98) + (0.050 x 74)1/ 1.340 'FOREBAY Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 6.00 6.00 5.00 — 5.00 4.00 4.00 3.00 3.00 2.00 — 2.00 1.00 1.00 0.00 --- — "'_ 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 --- Hyd,No.2. . Time (hrs) Hydrograph Report 14 Hydraflow Hydrographs Extension for AuIoCAD® Civil 3DO2010 by Autodesk, Inc. vg.25 Friday, Aug 1, 2014 Hyd. No. 3 Forebay Routing Hydrograph type = Reservoir Peak discharge = 1.042 cfs Storm frequency = 2 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 16,331 cuft Inflow hyd. No. = 2 - FOREBAY Max. Elevation = 53.30 ft Reservoir name = Forebay Max. Storage = 5,095 cuft Storage Indication method used Forebay Routing Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 3.00 - 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 — Hyd No. 2 [I_I_I_CI_I 4 Total s�toragea s - ,095 cuff Time (hrs) AUG 212014 BY:------ 15 Hydrocgraph Report Hydraflow Hydrographs Extension for AutoCADE) Civil 3D$ 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 4 Combined routing to existing Hydrograph type = Combine Peak discharge = 9.481 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 42,433 cuft Inflow hyds. = 1, 3 Contrib. drain. area = 2.490 ac Combined routing to existing Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) ---- Hyd No. 4 -- Hyd No. 1 — Hyd No. 3 Hydrograph Report 16 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2010 by Autodesk, Inc, v9.25 Friday, Aug 1, 2014 Hyd. No. 5 Combined into BMP 2 Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 11.87 hrs Time interval = 2 min Hyd. volume = 0 cult Inflow hyd. No. = 4 - Combined routing to existinMax. Elevation = 53.03 ft Reservoir name = Pond 2 BMP 2 Max. Storage = 31,300 cuft Storage Indication method used. Extilhation extracted from Outflow Combined into BMP 2 Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 L11 7�1 . ...... ......................... 0.00 0.00 0 8 16 24 32 40 48 56 64 72 80 — Hyd No. 5 —Hyd No. 4 II_l_I_CLI_I Totals(g[age.u,Sgdt,=f,3I3p0 cuff Time (hrs) AUG 21 2014 17 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO2010 by Autodesk, Inc. v925 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation M Total slrgo used (tuft) Hydrograph Description 1 SCS Runoff 14.62 2 724 45.612 ------ ------ ------ Existing DA #2 2 SCS Runoff 8.387 2 724 27,161 ------ ------ ------ FOREBAY 3 Reservoir 2.530 2 742 27,154 2 53.92 8,615 Forebay Routing 4 Combine 15.71 2 724 72,766 1,3 ------ ------ Combined routing to existing 5 i Reservoir 1.388 2 862 14,388 4 53.83 45,729 Combined into BMP 2 7.28.14 pond routing.gpw i Return Period: 10 Year Friday, Aug 1, 2014 W. Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Aulodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 1 Existing DA #2 Hydrograph type = SCS Runoff Peak discharge = 14.62 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 45,612 cuft Drainage area = 2.490 ac Curve number = 87* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. - = 6.90 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = ((1.388 x 98) + (1.099 x 74)j 12.490 Q (cfs) 15.00 12.00 • MM .M 3.00 Existing DA #2 Hyd. No. 1 -- 10 Year 0.00 t 0 2 4 6 8 10 12 14 16 pj8 20 — Hyd No. 1 EG� Aug 2 � zoip 22 Q (cfs) 15.00 12.00 M M 3.00 � 0.00 24 Time (hrs) Hydrograph Report HydraBow Hydrographs Extension for AutoCAD& Civil 3DO 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 2 FOREBAY Hydrograph type = SCS Runoff Peak discharge = 8.387 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 27,161 cuft Drainage area = 1.340 ac Curve number = 92` Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.90 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) = [(0.940 x 98) + (0.280 x 74) + (0.070 x 98) + (0.050 x 74)111.340 Q (cfs) 10.00 M 146I111 4.00 2.00 FOREBAY Hyd. No. 2 -- 10 Year Q (cfs) 10.00 8.00 6.00 - 4.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 — — Hyd No. 2 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 3 Forebay Routing Hydrograph type = Reservoir Peak discharge = 2.530 cfs Storm frequency = 10 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 27,154 cuft Inflow hyd. No. = 2 - FOREBAY Max. Elevation = 53.92 ft Reservoir name = Forebay Max. Storage = 8,615 cuft Storage Indication method used. Forebay Routing Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 — Hyd No. 2 il_l wFotrtOtus = 8,615 tuft AUG 212014 Hydrograph Report 21 Hydrallow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 4 Combined routing to existing Hydrograph type = Combine Peak discharge = 15.71 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 72,766 tuft Inflow hyds. = 1, 3 Contrib: drain. area = 2.490 ac Combined routing to existing Q (cfs) Hyd. No. 4 -- 10 Year Cl (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 - 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) •---- Hyd No. 4Hyd No. 1 —Hyd No. 3 W Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Aulodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 5 Combined into BMP 2 Hydrograph type = Reservoir Peak discharge = 1.388 cfs Storm frequency = 10 yrs Time to peak = 14.37 hrs Time interval = 2 min Hyd. volume = 14,388 cuft Inflow hyd. No. = 4 - Combined routing to existinMax. Elevation = 53.83 ft Reservoir name = Pond 2 BMP 2 Max. Storage = 45,729 cuft Storage Indication method used. Exflltration extracted from Outflow. Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 — Hyd No. 5 — Hyd No. 4 (LIT TTotl tQr sed = 45,729 tuft AUG 2 12014 BY: Combined into BMP 2 Hyd. No. 5 -- 10 Year Q (cfs) 18.00 15.00 12.00 M . 11 3.00 0.00 22.0 Time (hrs) 23 Hydrograph Summary Report HydraOow Hydrographs Extension for AutoCADO Civil 3DO 2010 by Autodesk, Inc. v9.25 liyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (it) Total strge used (cuH) Hydrograph Description 1 SCS Runoff 26.16 2 724 84,580 ------ ------ ------ Existing DA #2 2 SCS Runoff 14.48 2 724 48.420 ------ ------ ------ FOREBAY 3 Reservoir 7.164 2 732 48,413 2 54.45 12,192 Forebay Routing 4 Combine 32.71 2 724 132.994 1,3 ------ ------ Combined routing to existing 5 Reservoir 14.64 2 740 71,234 4 54.18 54,649 Combined into BMP 2. 7.28.14 pond routing.gpw Return Period:,100 Year Friday, Aug 1, 2014 Hydrograph Report 24 Hydra9ow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 1 Existing DA #2 Hydrograph type = SCS Runoff Peak discharge = 26.16 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 84,580 cuft Drainage area = 2.490 ac Curve number = 87* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 11.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.388 x 98) + (1.099 x 74)1/ 2.490 Existing DA #2 Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 28.00 24.00 - --- -- — -- 28.00 -- — -- -- ---- 24.00 20.00 --- ------- ----- 20.00 16.00 12.00 16.00 12.00 4.00 Don L 4.00 000 0 2 4 — Hyd No. 1 6 8 10 12 14 16 18 EIOEIVF- AUG 21201q BY:__----- 20 22 24 Time (hrs) 25 Hydr®graph Report Hydraflow Hydrographs Extension for AutoCAD9 Civil 3D9 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 2 FOREBAY Hydrograph type = SCS Runoff Peak discharge = 14.48 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 48,420 cuft Drainage area = 1.340 ac Curve number = 92` Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 11.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ' Composite (AreafCN) _ 1(0.940 x 98) + (0.280 x 74) + (0.070 x 98) 4 (0.050 x 74)) 11.340 FOREBAY Q (Cfs) Hyd. No. 2 -- 100 Year Q (cfs) 15.00 15.00 12.00 12.00 - 9.00 9.00 6.00 6.00 3.00 3.00 L 0.00 — — 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hrs) ---- Hyd No. 2 _ 26 Hydrograph Report Hydragow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 3 Forebay Routing Hydrograph type = Reservoir Peak discharge = 7.164 cfs Storm frequency = 100 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 48,413 cuft Inflow hyd. No. = 2 - FOREBAY Max. Elevation = 54.45 ft Reservoir name = Forebay Max. Storage = 12,192 cuft Storage Indication method used Q (cfs) 15.00 12.00 • m . m 3.00 Forebay Routing Hyd. No. 3 -- 100 Year Q (cfs) 15.00 12.00 •m � 3.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 3 —Hyd No. 2 ll_lEC IFT Bar �� used = 12,192 tuft Time (hrs) AM 212014 BY: ------- 27 Hydrogpaph Report Hydrallow Hydrographs Extension for AuloCAD® Civil 3D9 2010 by Aulodesk, Inc. v9.25 Friday. Aug 1, 2014 Hyd. No. 4 Combined routing to existing Hydrograph type = Combine Peak discharge = 32.71 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 132,994 cuft Inflow hyds. = 1, 3 Contrib. drain. area = 2.490 ac Combined routing to existing Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 --- Hyd No. 4 Hyd No. 1 ----- Hyd No. 3 Time (hrs) ,i Hydrograph Report 28 HydFaflowHydrographs Extension for AutoCAD& Civil 3DO 2010 by Autodesk, Inc. v9.25 Friday, Aug 1, 2014 Hyd. No. 5 Combined into BMP 2 Hydrograph type = Reservoir Peak discharge = 14.64 cfs Storm frequency = 100 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 71,234 cuft Inflow hyd. No. = 4 - Combined routing to existin§lax. Elevation = 54.18 ft Reservoir name = Pond 2 BMP 2 Max. Storage = 54,649 cuft Storage Indication method used. Exfiltration extracted from Outflow Combined into BMP 2 0 (cfs) Hyd. No. 5 100 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 1 -tv 7 54,649 cuft Time (hrs) Hyd No. 5 —Hyd No. 4 (IT A AUG 2 1 Hydraf6®w Rainfall Report HydraBmv Hydrographs Extension for AutoCAD® Civil 3135 2010 by Autedesk, Inc. v9.25 Return Period Intonsity-Duration-Froquoncy Equation Coefficients (FFIA) (Yrs) B D E (NIA) 1 74.6009 12.5000 0.8842 -------- 2 86.8470 12.7000 0.8752 -------- 3 0.0000 0.0000 0,0000 -------- 5 94.3798 13.1000 0.8433 -------- 10 92,0692 12.5000 0.8056 -------- 25 80.9203 11,0000 0.7402 -------- 50 74.1581 10,0000 0.6951 -------- 100 69.6550 9.2000 0.6567 ------- File name: SneadsFerry.IDF Intensity = B / (Tc + D)AE Friday, Aug 1, 2014 Return Period Intensity Values (Inlhr) (Yrs) 5 min 10 15 20 25 30 35 40 45 5o 55 Ell 1 5.94 4.76 3.98 3.44 3.03 2.71 2.46 2.25 2.07 1.93 1.80 1.69 2 7.02 5.65 4.75 4.10 3.62 3.25 2.95 2.70 2.50 2.32 2.17 2.04 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 8.21 6.68 5.67 4.93 4.38 3.95 3.60 3.31 3.07 2.86 2.69 2.53 10 9.18 7.49 6.38 5.57 4.97 4.49 4.11 3.79 3.52 3.29 3.09 2.92 25 10.39 8.50 7.26 6.37 5.70 5.18 4.76 4.41 4.11 3.86 3.64 3.45 50 11.29 9.24 7.92 6.97 6.27 5.71 5.26 4.89 4.56 4.31 4.07 3.87 100 12.20 10.00 8.59 7.60 6.85 6.26 5.79 5.39 5.06 4.78 4.53 4.31 Tc = time in minutes. Values may exceed 60. Precm file name: WNC IPT NUCLEUS\(Civil\HvdraflovAlDF\SneadsFerrv24horecindeolh.oco Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.68 4.48 0.00 5.79 6.90 8.56 9.98 11.60 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4lh 0.00 0.00 0.00. 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 -0.00 0.00 0.00 0.00 0.00 0.00 Hydraflow Table of Contents Hydranow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc, v9.25 7.28.14 pond routing.gpw Friday, Aug 1, 2014 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap ........................... :................................................. 2 1 -Year SummaryReport ......................................................................................................................... 3 HydrographReports......:............................................................................................................ 4 Hydrograph No. 1, SCS Runoff, Existing DA#2...................................................................... 4. Hydrograph No. 2, SCS Runoff, FOREBAY............................................................................. 5 Hydrograph No. 3, Reservoir, Forebay Routing....................................................................... 6 PondReport - Forebay........................................................................................................ 7 Hydrograph No. 4, Combine, Combined routing to existing ..................................................... 8 Hydrograph No. 5, Reservoir, Combined into BMP 2............................................................... 9 PondReport - Pond 2 BMP 2............................................................................................ 10 2 - Year SummaryReport ....................................................................................................................... 11 HydrographReports................................................................................................................. 12 Hydrograph No. 1, SCS Runoff, Existing DA#2.................................................................... 12 Hydrograph No. 2, SCS Runoff, FOREBAY........................................................................... 13 Hydrograph No. 3, Reservoir, Forebay Routing..................................................................... 14 Hydrograph No. 4, Combine, Combined routing to existing ................................................... 15 Hydrograph No. 5, Reservoir, Combined into BMP 2............................................................. 16 10 -Year SummaryReoort....................................................................................................................... 17 HydrographReports................................................................................................................. 18 Hydrograph No. 1, SCS Runoff, Existing DA#2.................................................................... 18 Hydrograph No. 2, SCS Runoff, FOREBAY........................................................................... 19 Hydrograph No. 3, Reservoir, Forebay Routing..................................................................... 20 Hydrograph No. 4, Combine, Combined routing to existing ................................................... 21 Hydrograph No. 5, Reservoir, Combined into BMP 2............................................................. 22 100 -Year SummarvRenort....................................................................................................................... 23 HydrographReports................................................................................................................. 24 Hydrograph No. 1, SCS Runoff, Existing DA#2.................................................................... 24 Hydrograph No. 2, SCS Runoff, FOREBAY............................................................................ 25 Hydrograph No. 3, Reservoir, Forebay Routing..................................................................... 26 Hydrograph No. 4, Combine, Combined routing to existing ................................................... 27 Hydrograph No. 5, Reservoir, Combined into BMP 2............................................................. 28 OFReport................................................................................. ;; 9V 29 AUG 2 1 2014 P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTII CAROLINA SECTION F: PE EXEMPTION Np "CAIaC IMTi KN1V OI IeaOdallAlgn 1110eeleWUl.M01FfeA YYl41V NR/itOal NeM•lO.IWJ YYetlw...m IYY ��Cir4rM K"" H..JemY C. bl.a, PB a....r•errr ByenhcerWOC Wy'-Adwk Mbbe a..er.Y..ru Nrva1 Rt011W Ca( rIe{Commrb A .. � tlaDOi•ev ems Mawa �, NORoIk VLlbh Lllt.a6YJ L emudrpd'b Iov.aMan Ygamal H..t011.1N0, [amamW IGY.W blYh.ly1. �PIYIi1N NMtI QlffiM1:111MOR�ajablYii ed! retnlwruNeJen rvQf.laC31 NIl� rymi0n 6Notiem aa•r ep,YwNmggr{unae. PaYP.IA /.Pa10ullaemga'Redbaby haarn oltr.mea fares Y ecplgonaftMµavnmrvoltr 11alHd {ub RhW aagladhM WMlw olea4ratE+{IXINQ anpi)NraMYfG prreremYt W fasrmmtmebxvM eb pah*r' TNb anreptbadWN mt battameela to e0»ralon+'ry uMceere bepwW W to lr Urpenreei otue Nar)6y iwe-ralvereAmHnn WOtaYaaa PorulutleNnrunee..aNmhPNine rrpuwrvmd nabb b rey.velaMHnr{e oleoyTn{beYbf YhbY Y rpw;e.ew . eMoehPraM1ro.alaR. t qui J4lnlorw[bv N r HYIY •an4s nM.�krh.tye.euh>.m unbomW Y,walwtha.Yrm.aa� sbovrly. (/ llFyTPnR oemuaa senmry �r tLlfblVter P-1286 GRAVEL PARKING LOT MARSOC CAMP LE,JEUNE, NORTH CAROLINA SECTION G: PROJECT CONSTRUCTION PLANS SEE ATTACHED for Construction Plans P-1286 GRAVEL PARKING 1,01' M A RSOC CAMP LEJEUNE, NORTFl CAROLINA SECTION H: PROJECT CONSTRUCTION SPECIFICATIONS SEE ATTACHED for Construction Specifications l P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA SECTION I: EROSION AND SEDIMENT CONTROL PRACTICES PLANNED EROSION AND SEDIMENT CONTROL PRACTICES 1. Temporary Gravel Construction Entrance/Exit: A temporary gravel construction entrance will be installed. 2. Land Grading: Grading will be required on approximately 2.2 acres. All cut and fill slopes will be 3:1 or flatter to avoid instability due to wetness. (NCSCC ESCM Std. 6.02) 3. Temporary Silt Fence: Provided around the site to prevent debris and sediment from migrating to downstream drainage courses (NCSCC ESCM Std. 6.62). 4. Rock Check Dams: Provided at entrances to pipe culverts in ditches and swales to reduce erosion by restricting velocity of flow (NCSCC ESCM Std. 6.83). 5. Sod: Provided in all new ditches and swales to maintain bank stability. Sod will also be used for permanent stabilization of all open space areas. Sand type Sod will be used in the base of the infiltration basins. 6. Erosion Control Matting: Provided in all new ditches and swales to maintain bank stability. 7. Temporary Seeding: See Specifications CONSTRUCTION SCHEDULE I . Obtain plan approval and other applicable permits. 2. Flag the limits of construction. 3. Install check dams in all existing ditches and swales as indicated. 4. Install temporary gravel construction entrance. 5. Install temporary silt fence around the site and around infiltration basins as indicated. 6. Clear trees and stump removal. 7. Rough grade site, stockpile topsoil, construct swales, culverts and storm drain system. 8. Finish slopes around parking lot upon completion of rough grading. Leave slightly rough and vegetate and mulch immediately. 9. Complete final grading for parking, drives and stabilize with gravel. 10. Complete final grading of the grounds, topsoil critical areas and permanently vegetate with sod, landscape and mulch. 11. After site is stabilized, remove all temporary measures. P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA MAINTENANCE PLAN I. All erosion and sediment control practices will be inspected weekly and within 24 hours of a 1/2-inch rainfall event and every 14 days. A rain gauge shall be installed to measure rain events. Needed repairs will be made immediately to maintain all practices as designed. 2. Sediment will be removed from behind the sediment fence when it becomes about 0.5 ft deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. 3. All disturbed areas will be sodded as permanent vegetation and temporary measures will be seeded, fertilized, reseeded as necessary, and mulched according to the Seeding Specifications. VEGETATIVE PLAN See specification Section 32 92 19 Seeding and 32 92 23 Sodding. .V� L� e' f HAND AUGER BORING RECORD Project: Rifle Range Road Parking Lot Boring Number: B-1(2) Location: Stone Bay Camp Lejeune, NC Date Drilled: 10-02-12 JON Number: Driller: J. Singer / Z. Pace Depth (ft.) t 8.5 Feet Elevation ft): = 55 Feet Depth ft.l') USCS To Bot. Material Description Class. Test Results / Comments 0 0.5 Dark Brown, Silty Fine SAND with traces of Surficial Organic Soil organics Dark Gray, Silty Fine SAND with trace clay SM 0.5 2,0 organics and roots, moist Light Gray, Silty Fine SAND with trace SM 2.0 2.5 medium sand, moist Dark Brown, Fine SAND with trace silt and SP-SM Estimated Field Ksat at 3.3 2.5 4.0 medium sand, moist to 4 ft. = 21.8 to 23.4 inlhr(3) Tan, Silty Fine SAND with trace mottling and SM 4.0 6.0 iron deposits, moist Tan, Fine SAND with trace to some silt and SM Phreatic surface 6.0 8.r)(4) clay nodules, moist to wet SM-SC encountered at 8.0 ft. Notes: (1) Depth referenced from current ground surface. (2) Boring Geographic Coordinates: 340 35.241 N; 770 26.989 W. (3) Unfactored test result. Multiple test runs completed due to quick water flow rate observed. (4) Boring terminated at 8.5 ft. due to caving soils and lack of sample recovery. NAVFAC Mid-Atlantic•9742 Maryland Avenue- Norfolk, VA 23611-3095 HAND AUGER BORING (RECORD Project: Rifle Range Road Parking Lot Location: _ Stone Bay, Camp Lejeune, NC JON Number: Depth (ft.) t 6 Feet 4 ,r� L • • •r Boring Number: B-2(2) Date Drilled: 10-02-12 Driller: J. Singer / Z. Pace Elevation (ft.): = 55.6 Feet Dept kf) USCS To Bot. Material Description Class. Test Results / Comments 0 0.33(3) Gray to Tan, Silty Fine SAND with traces of organics SM 0.33 2.0 Light Gray, Silty Fine SAND with traces of SM root and organic matter, moist 2.0 5.0 Light Gray, Silty Fine SAND with trace SM Organic staining and traces medium sand, moist of root. 5.0 6.0(4) Dark Brown, Fine SAND with trace silt and SP-SM medium sand, moist Notes: (1) Depth referenced from current ground surface. (2) Boring Geographic Coordinates: 34° 35.259 N; 77' 26.973 W. (3) No Surficial Organic Soil encountered at boring location. (4) Phreatic surface not encountered within the depth of boring. NAVFAC Mid-Atlantic•9742 Maryland Avenue- Norfolk, VA 23511-3096 HAND AUGER BORING RECORD Project: Rifle Range Road Parking Lot Location: Stone Bay Camp Lejeune, NC JON Number: Depth (ft.) i7 Feet Boring Number: Date Drilled: B-3(2) 10-02-12 Driller: J. Singer / Z. Pace Elevation ft): = 55.6 Feet Dept (ft.)(') USCS Top Bot. Material Description Class. Test Results / Comments 0 1r3r Light Gray, Silty Fine SAND with traces of SM POSSIBLE FILL organics Light Gray, Fine SAND with interbedded 1 layers of organically stained brown sand, SP POSSIBLE FILL F moist 5.0 7.0(4) Dark Brown, Silty Fine SAND with trace SM medium sand, moist to very moist Notes: (1) Depth referenced from current ground surface. (2) Boring Geographic Coordinates: 340 35.259 N; 77° 26.995 W. (3) Very little to no Surricial Organic Soil encountered at boring location. (4) Phreatic surface not encountered within the depth of boring. NAVFAC Mid-Atlantic•9742 Maryland Avenue- Norfolk, VA 23511-3095 BAND AUGER BORING RECORD Project: Rifle Range Road Parking Lot Location: Stone Bay, MCB Camp Leieune. North Carolina Boring Number: B-4 JON Number: Depth (ft.) 7.0 Date Drilled: Driller: Elevation ft): March 12, 2014 J. Singer / R. Bamberg =57 De th (ft.)(,) USCS Test Results / Top J Bot. Material Description Classification Comments 0.0 1.5 Light Gray to White, Fine SAND, SP No surficial organic soil moist encountered. Traces of hardpan Brown to Tan, Silty Fine SAND with materials encountered 1.5 5.0 traces of iron -oxide nodules, moist SM at 2.5 ft. Estimated field k,•t at 4 to 5 ft. is 3.9 in/hr.l't Tan, Fine to Medium SAND with 5.0 7.O(2) traces of silt and clay lenses, moist SP-SM Phreatic surface to wet encountered at 7.0 feet. Notes: (1) Depth referenced from current ground surface. (2) Boring terminated at 7 feet due to caving soils. (3) Unfactored test result. NAVFAC Mid-Atlantic•9742 Maryland Avenue- Norfolk, VA 23511-3095 ORNEWAY 'V AREA 1797 5 r i DRIVEWAY REMOVED FROM AREA 1 = 2347 LL S N i Ln Wo W Q m _., r. 1 1 1 1 1 P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA SECTION K: 2006 RESERVE TRAINING FACILITY REPORT SEE ATTACHED FOR Stormwater Calculations Soil Scientist Report Prepared by: Stephen Medvick, P.E. Civil Engineer MCNC IPT-NAVFAC 9742 Maryland Avenue Norfolk, VA 23511 PH (757) 322-4214 Fax(757) 322-5280 Rifle Range Road Parking Lot Marine Corps Base Camp Lejeune — Stone Bay Jacksonville, North Carolina March 11, 2014 Site Visit Photographs 113 .:,.q ev-.iMs _ rgY+osrYiU(7orm Photograph 7: View looking south across Reserve Training Facility (RTF) access drive and prop ed forebavarea. 8: View looking southwest across RTF access drive and proposed forebay area. Rifle Range Road Parking Lot Marine Corps Base Camp Lejeune — Stone Bay Jacksonville, North Carolina March 11, 2014 Site Visit Photographs Photograph 5: Photograph 6: View of 103 IMILE r Ib5 �rrenrbv of existing; utility marker along eastern edge of BMP. communications shed. Rifle Range Road Parking Lot Marine Corps Base Camp Lef eune - Stone Bay Jacksonville, North Carolina March 11, 2014 Site Visit Photographs Photograph 3: View of existing BMP western slope. Note local slope destabilization likely due to heavv foot traffic traversine the oond from the mini mart to oolnts east of Rifle Ranee Road. Photograph 4: View of the existing BMP eastern slope also destabilized due to heavy foot traffic. Rifle Range Road Parking Lot Marine Corps Base Camp Lejeune —Stone Bay Jacksonville, North Carolina March 11, 2014 Site Visit Photographs n nrJlrrs rgyroerYq CnrtrmrH Photograph 1: View of existing BMP42 looking north. I , Photograph 2: Expanded view of the bottom of existing BMPg2 looking southeast. Project: Location: Boring Number: B-5 JON Number: Depth (ft.) 8.5 Naval Facilities ngineer ng Command HAND AUGER BORING RECORD nne Road Parkina Lot Date Drilled: March 12, 2014 Driller: J. Singer / R. Bamberg Elevation (ft.): -56 Depth ft. t'f USCS Test Results / To Bot. Material Description Classification Comments Dark Gray, Silty Fine to Fine SAND, SM No surficial organic soil 0.0 2.0 moist encountered. Light Tan to White, Fine SAND with SP-SM 2.0 3.5 little silt, moist Dark Brown to Brown, Silty Fine to Traces of hardpan 3.5 4.0 Fine SAND with traces of iron -oxide SM materials encountered nodules, moist at 4 ft. Brown, Silty Fine SAND with traces SM Estimated field k"t at 4 4.0 5.5 of medium sand, moist to 5 ft. is 3.0 in/hr.f'l czl Dark Brown, Silty Fine SAND, moist SM Phreatic surface 5.5 8.5 to Wet encountered at 7.5 feet. Notes: (1) Depth referenced from current ground sunaae. (2) Boring terminated at 8.5 feet due to caving soils. (3) Unfactored test result. NAVFAC Mid-Atiantic•9742 Maryland Avenue- Norfolk, VA 23611-3095 P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA SECTION J: GEOTECHNICAL REPORT SEE ATTACHED for 2014 supp►emental report Ar_ JE o lot ;o i 0 max. ; � •,... •, � ,� �'� � . ,J d 1 -1 ;ell w NEW FUREBAY 7 M.p NEW GRA L LOT�I'i'" I i 0/ ' II .` ' IIILLL � .• L_ .rw � . , ..ram• , r � I r "" a� . ✓, , N � � Scale: ._._ Approved By: Jeffrey J. Singer, PE Date: March 31, 2014 Rifle Range Road Parking Lot pro1B01 Stone Bay, Marine Corps Base NAOFFAC Cam Le•eune, North Carolina Drawing TMi,; Field Exploration Location Plan D'awne 1 Number: SECTION B: PROJECT NARRATIVE Reserve Training Facility/P-1286 Gravel Parking Lot MCAS Cherry Point, North Carolina Civil Basis of Design Final Submittal —Revised August 18, 2014 !I III i11, RESERVE TRAINING FACILITY & VEHICLE MAINTENANCE FACILITY ONSLOW COUNTY, NC DESIGN AND STORMWATER NARRATIVE Prepared for: NAVFAC 1005 Micheal Read CAMP LEJEUNE, NC 28547 Prepared by: ---------- --------------- .ffRAM0-UNT] 127 Racine Drive, Suite 202 Wilmington, NC 28403 Project #06103.PE March 2006 0 M0 0 8 2006 — RESERVE TRAINING FACILITY & VEHICLE MAINTENANCE FACILITY ONSLOW COUNTY, NORTH CAROLINA Project 1106103.11E Table of Contents Design Narrative Proposed Improvements / Stormwater NC DBNR Infiltration Basin Calculations Soils Scientist Report USGS Quad Map Pagoi RESERVE TRAINING FACILITY & VEHICLE MAINTENANCE FACILITY ONSLOW COUNTY, NORTH CAROLINA DESIGN NARRATIVE NAVFAC is proposing the construction of a Training Facility (26,500 sf) and Vehicle Maintenance Facility (3050 sf). The property boundary will be determined by placing a fence at the desired locations. The impervious area will be approximately 3.9 acres with a disturbed area of 7.4 acres. The property currently is wooded and grassland. It is bordered by an existing parking lot to the north, Rifle Range Road to the east, and woods and grassland to the south and west. The site is located +/- 1 mile on the left side of Rifle Range Road inside Camp Lejeune,1.8 miles from the intersection of US Hwy 17 and NC 210. The project is within a drainage basin which drains to the White Oak River. The receiving stream is Stones Creek (SA, HQW, 1.5" runoff). The runoff will be conveyed through the use of 3 infiltration basins which are designed to remove 90% of the TSS. The seasonal high water elevation was determined to be 5.5 feet, this information is placed in the report supplied by Terracon (Consulting Engineers & Scientists) and confirmed by Vincent Lewis of NCDENR on March 7. The infiltration rate was determined to be 2 inches/hours. Both of these items are shown in the soils report Infiltration basin #1 will retain the first 1.5-inches of rainfall, dual bypass weirs at elevation 16.6 in (54.45 ft) will be placed at the inlet locations. A 50' vegetative buffer will be placed at the end of the bypass systems. Infiltration basin #2 and #3, will retain the first 4.5 inches of rainfall; this allows no bypass or overflow to be placed in the system. The flow into the systems will be directed through sheet flow into swales for basin #1 and curb cuts in basins #2 and #3. No wetlands are located on the site. PROPOSED IMPROVEMENTS / STORMWATER The stormwater will be treated through the use of 3 infiltration basins. They will be conveyed to the basins through sheet flow on the site. The design took into account the treatment of the 1.5 inch of runoff. The soil on the site is Baymeade, based on the Onslow County Soil Survey For treatment calculations the procedure in the NCDENR stormwater best management practices manual was used to determine the volume and drawdown needed for the basins. For basin #1, the required volume for the 1.5 inch rainfall was 12,956 cf, the provided volume at elevation 16.6 (54.45) is 13,586; therefore the 1.5-inch elevation is 54.39 ft. A pair of bypass weirs at elevation 16.6 (54.45) are placed to convey the rainfall above the 1.5-inch storm. A 50 Page 1 foot vegetative filter is placed for each of the bypass weirs. For basin N2, the basins top elevation is 17 m (55.7 ft), the required volume for the 4.5-inch rainfall is 21,238 cf, the provided volume is 21,612 cf; the 4.5-inch elevation is 55.67 ft. For basin U3, the basins top elevation is 16.6 m (54.5 ft), the required volume for the 4.5-inch rainfall is 2,997 ef, the provided volume is 3046 cf; the 4.5-inch elevation is 54.45 ft. For all the t1MP's, the drawdown was determined to be less than the 5 day state requirement. All supporting drainage calculations, drainage basin and infiltration basin information are provided within. the following pages of this report. MAINTENANCE Contractors shall be responsible for periodic inspection and maintenance of all indicated erosion control devices. In addition, inspection and any necessary maintenance will be required immediately following any significant storm event. Any erosion control measure that fails to function as intended shall be repaired immediately. Upon completion of construction and the establishment of stabilized ground cover, the property owner shall be responsible for any on going site maintenance. Page 2 NC DENR -CALCULATIONS-INFILTRATION BASINS Basin #1 Infiltration Pond Calculations Reserve Training Facility & Vehicle Maintenance Facility NC ve/ecnve: assign an Infiltration basin with the following characteristics. bottom of basin 2-toot above seasonal h4 level and drewdown less than 6 days; a volume that meets TSS removal requirements (values set by NC DENR) Step.1; Determine the surface area required for 90% TSS removal Post -Development Conditions Total Drainage Area 4.76 ACRE Impervious Drainage Area 2.38 ACRE Impervious Cover 60.1% Elevation of Bottom of infiltration Basin 62.5 FT Depth of Infiltration Basin 2.0 FT Elevation of 1.61nch elevation 64.6 FT Approximate Pond Length 160 FT Required 1.6" Runoff Volume (Volume of Temporary Pool) 12,958 CF Top Elevation of Basin Total Volume of Basin Bottom Surface Area Value from CAD Value from CAD Impervious Covert(tmpervlous Drainage Area)/(Total Drainage Area)'1009 Value selected by designer (Bottom Elevation) -(Permanent Pool Surface Elevation) -(Depth of Permanent Pool) Value from CAD 1.5"Runoff Volumo=1.6inch'Rv°1 tooiH2 Inch"(Total Drainage Area) 64.50 FT Value chosen by designer 13.585.09 FTs 4.776.00 FTZ Taken from Contours hem APR G 0 Z006 FAY:_._--• ---------- P:1ProjectelFreeland-Cllnkscales106103.PE-Camp LejeunelDocumentslDesign CelculationelHydro\Inflitratlon Beeln 1 Reserve Training Facility & Vehicle Maintenance Facility e Calculations fo the storage capacity and of the Infiltration Basin #1 -s of the proposed inf ll Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) 52.50 4,776 0 1 0 -.Permanent Pool 53.20 6,082 3,800 3,800 53.80 7,450 4,059 7,859 54.39 12,956 1.5" Elevation 54.5 8,912 5,727 13,586 basin P:\Projects\Freeland-Clinkscales\06103.PE-Camp Lejeune\Documents\Design Calculations\Hydro\Infiltration Basin 1 Basin #2 Infiltration Pond Calculations Reserve Training Facility & Vehicle Maintenance Facility NC -9NR Retention Requirements ObJecllve: design an Infiltration basin with the following characteristics: bottom of basin 2-feet above seasonal high water level and drawdown lose than 5 days; a volume that meets TSS removal requirements (values set by NO DENR) Step 1: 'Determine the surface area required for 00% TSS removal Poet -Development Conditions Total Drainage Area 2.21 ACRE Impervious Drainage Area 1.34 ACRE Impervious Cover Elevation of Bottom of Infiltratlon Basin Depth of Infiltration Basin Elevation of 1.5 Inch elevation Approximate Pond Lenath Required 1.5" Runoff Volume (Volume of Temporary PooQ 60.6% 53.4 FT 2.4 FT 55.7 FT 260 FT 21,005 CF Value from CAD Value from CAD Impervious Covemilinpelvious Drainage Area)//Total Drainage Area)'100% Value selected by designer (Bottom Elevation)=(Permanent Pool Surface Elevation) -(Depth of Permanent Pool) Value from CAD 4.5"RunoflVolume=4.51nch'Rv'1 fooN12 Inch'(Tofnl Drainage Area) Top Elevation of Basin 55.70 a,ve., uy owr acvennsr FT Value chosen by designer Total Volume of Basin � 21,611.70 F'I° Bottom Surface Area 700.00 FTZ Taken from cnnrnum fin... pia.. AIIR 2 fi )Illifl P:\Projects\Freeland-Cllnkscales1o0103.PE-Camp LejeunelDocumenleMeslgn CalculatlonaWydrolinflltratlon Beeln2 Reserve Training Facility & Vehicle Maintenance Facility Calculations for determine the storage capacity and Stage/Storage Above Permanent Infiltration Basin #2 ,s of the proposed Infiltration basin Infiltration basin per contour Contour Incremental Volume, S Contour Area (SF) Volume (CF) 53.45 7,600 0 1 0 ••-Permanent Pool 53.80 8,300 2,782 2,782 64.50 9,400 6,195 8,977 66.10 10,650 5,985 12,956 56.67 21,358 1.6" Elevation 55.7 11,657 12,634 21,612 P:\Projects\Freeland-Clinkscales\06103.PE-Camp Lejeune\Documents\Design Calculations\Hydro\lnfiltration Basing Basin #3 Infiltration Pond Calculations Reserve Training Facility & Vehicle Maintenance Facllity NC DENR Retention Requirements Db)ecllve: dosfgn an infiltration basin with the following characteristics: bottom of basin 2-1eef above seasonal high water level and drowdown less than 5 days, a volume that meets TSS removal requirements (values set by NC DENR) Step 1: Determine the surface area requirod for 90% TSS removal Poet-Devolopment Conditions Total Drainage Area 0.43 ACRE Impervious Drainage Area 0.18 ACRE Impervious Cover 41.8% Elevation of Bottom of Infiltration Basin 52.6 FT Depth of Infiltration Basin 2.0 FT Elevation of 1.6 Inch elevation 64.5 FT Approximate Pond Length 70 FT Approximate Pond Width 17 FT Value from CAD Value from CAD Impervious Coverm(lmpendous Drainage Aroa)/(Total Drainage Aroa)`100% Value selected by designer (Bottom Elevallon)a(Pemrenent Pool Surface Elevallon)-(Depth OfPemranent P000 Value from CAD Required 1.5" Runoff Volume (Volume of 2,987 Cl:4.6"RunoNVolumoa4.51m Temporary PooQ Inch`(Total Drainage Area) WY12 Top Elevation of Basin 54.50 FT Value chosen by designer Total Volume of Basin 3,040.07 F13 Bottom Surface Area 664.60 FT2 Taken from Contours thorn Plan Drawdown Time for 1.11-Inch Runoff 1.19 DAYS (Drowdown 77me)=(1.6dnch voluma7bo8ara 1aPK `b 6 'Nub P:IProjects\Freeland-Clinkscales108103.PE-Comp Leleunaftcumentelbeeign CalculatlonsWildrollnflftratlon Basln3 Reserve Training Facility & Vehicle Maintenance Facility storage i'TTTI � for Proposed Infiltration Basin #3 and characteristics of tho'proposod inliltm basin Per contour Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) 52.50 855 0 0 -Permanent Pool 53.15 1,275 692 692 63.80 1,727 976 1,668 64.46 2,997 1.5" Elevation 64.60 2,211 1,378 3,046. basin P:\Projects\Freeland-Clinkscales\06103.PE-Camp Lejeune0ocuments0esign Calculations\Hydro\Infiltration Basin3 SOILS SCIENTIST REPORT consuxing englnaem 6 6aientlem February 13, 2006 T9rrncon DOnsUllanle. Inc. 524D Greene Dairy Road Relelgh. North Corogns 27018 Phone 919,073.2211 Fax 910.03.0666 The Benham Companies, LLC wwW.lertacon,txsn 9400 N. Broadway, Suite 300 Oklahoma City, OK 73114-7401 Attention: Mr. Edward Kochick Subject: Stormwater Detention Considerations Marine Reserve Training Center MCB Camp LeJeune, North Carolina Terrawn Project No. 70055102 Dear Mr. Kochick: Terracon performed field and laboratory testing to evaluate the soil infiltration rate for use in designing a .stormwater detention pond at the proposed Marine Reserve Training Center (MRTC) to be located at MCB Camp LeJeune, North Carolina. We previously performed a subsurface exploration for the project and submitted the results in our geotechnlcat engineering report dated January 24, 2008. For the additional testing, we performed a field density test using the sand cone method and collected a sample of the on -site soil to return to our laboratory for remolded permeability. testing. Th®;sample was remolded In the laboratory to near the field density. The results of the permeability test Indicate a hydraulic conductivity value of 1.36x10`3 em/ese. Based on the results of the laboratory testing and our experience with similar materials, we recommend using an infiltration rate of 1.5 to 2 Inch/hour for design of the 8tormwater detention pond. The results of the field density test and permeability test are attached. Additionally, we estimate a seasonal high water level for the site on the order of 6.6 fett below the current ground surface. This estimate is based on the groundwater level observations in our borings during the geotechnical exploration as well as the moisture and color profile of the soil. palivsdng Success for clients and Employees Pines 1965 A More Than 70 Offices Nationwide Marine Reserve Training Center MCB Camp LeJeune, North Carallna Tor acon Project No. 70055102 Bebmary 13, 2006 We appreciate the opportunity to be of service to you on this project. If you have any questions conceming this letter, or if we may be of further service to you in any way, please do not hesitate to contact us: , Sincerely, P, ZT OO,; 1fi�riracon Matthew S. Balven, P.E. Barney�C.-Cials, P.E. Project Engineer 'M Principal North Carolina No. 030731 North Carolina No. 11285 Attachments Copies to: Addressee (3) U FEB. 13.2006 8:35AM TERRACON GREENVILLE NO.675 P. 2 PERMEABILITY TEST REPORT TEST DATA: . SAMPLE DATA: Specimen Height (am): 10.15 SaMP10 IdentifIcat ion: BORING 8-2 Specimen Diameter (001 7.03 HAND AUGER SAMPLE Dry Unit Weight (Pcr): 95:6 Visual Description: TAN BROWN SLIGHTLY Moisture Before Test (X): 11.0 SILTY FINE SAND Moisture After Test (X): 25.6 Remarks: ASTM D5064 Run Number: t 0 2 Cell Pressure (psi): 42.0 42.0 Moialmum Cry Density (pef): Test Presaure(pal): 40.5 40.5 Optimum Moisture Content (%): Sock Pressure(pal): 40.0 40.0 Oiff. Head (poi); 0.5 0.5• Percent Compaction: Flow Rate (aa/8e0:I.90.:0--+ 2.11 . la--t Pormoomater type: F.iaKible wall Porm. (cm/sec):, 1.56s 10•-3 t.ee.10•a Somple type: REMOLDED TIME - t (sec) 0 25 50 75 100 0 0 a 2 n y „ 1 4 J� O 6 O J LL 6 pr, 10 e 1 . 10•4 m — � e , 1aa E .V„ 6 . 10- 3 x y1 4S W-3 2 x 10-3 TT Q. 1 . 10--3 0 5 10 15 20 AVERAGE HYDRAULIC GRADIENT - dH/L (cm/cm) project: STONE BAY MARINE BASE Project No.: 70055102 Location: CAMP LEJEUNE, NORTH CAROLINA File No.: Dote: 2/13/2006 Lab No.: Tested by: MTS PERMEABILITY TEST REPORT Checked by: CFO QU TITAN ATLANTIC GROUP, INC. Test: CH - constant head USGS QUAD MAP 1 P77-12W O.OY'V� 1 P77-1 27- 0.0 77* 26'0, 09" VVI 1 P71'1 21' 77124'0.0 O-oq, INI I p q to ltk v If ZU U.UU -F-b7712 270.0 111897.(Colech, f,. T9'ansmOttaO Date: 8 July 8, 2014 To: Cameron Weaver NC-DENR 127 Cardinal Drive Extension Wilmington, NC 28405 From: Naval Facilities Engineering Command — Mid -Atlantic Marine Corps North Carolina IPT 6506 Hampton Blvd., Bldg. C Norfolk, VA 23508 POC: Steve Medvick, P.E. RE: Reserve Training Facility/P-1286 Gravel Parking Lot Storm Water Express Review Ery Navel FaUllties EnBineoAnB Command Na FAC Min.n.0 TIC CJUh 0 9 2014 BY• ACUL� %/l/19 Copies Date Description 2 Storm Water management Permit Application 2 Narrative/Design Calculations 2 H droflow Report, Pre -Conditions 2 H droflow Report, Post -Conditions 2 Infiltration Basin SLIppleinent 2 P.E. Exemption Letter I Application Fee: $2,000.00 Check 2 Full Size Plan Set 2 BMP Maintenance Agreement DA-I 2 BMP Maintenance Agreement DA-2 I Geolechnical Report I "Technical Specifications Remarks: For review and approval. Please call if you have any questions, 757-322-4214. Respectfully, Distribution: NAVFAC Files �SleveMed lck, P.E. For DENR Use ONLYXWA fteWewer North Carolina Department of Environment and Q�► suanit. Natural Resources 1 NCDENR Request for Express Permit Review 3' v� Confon: FILL-IN all the information below and CHECK the Permits) you are requesting for express review Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan i1PDF;i1e) and vicinity map (same items expected in the application packaae of the project location. Please include this form in the application package. • Asheville Region Alison Davidson 828-296-4698,'alison.davidson@Lcdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791-4203, david.leer@ncdenr oov • Mooresville& Winston Salem Region- Patrick Grogan 704-235-2107orpatrick.orooan(a?ncdenroov • Washington Region -Lyn Hardison 252-948-3842orlvn.hardison0madenr.aov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron. weaver0ncdenr oov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: P-1286 GRAVEL PARKING LOT County: ONSLOW Applicant: USMC Company: USMC Address: BLDG 1005 MICHAEL RD City: CAMP LEJEUNE, State: NC Zip: 28542 Phone: 910-451-2213, Fax: 910-051-2927, Email: CARLBAKER@USMC.MIL Ph sical LocatiomRIFLE RANGE ROAD AND RIFLE RANGE ROAD SW SW _ SW NPDES _ NPDES _ Wo WQ _ E&S _ E&S _ Other Y Project Drains into SA waters- Water classification HWQ (for classification see- http://portal.ncdenr.org/web/wq/ps/csu/classifications) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? /N, within % mile and draining to class SA waters Y. or within 1 mile and draining to class HQW waters? Y Engineer/Consultant: STEVE MEDVICK, PE Company: NAVFAC Address: 6506 HAMPTON BLVD City: NORFOLK, Slate: VA Zip: 23508-1278 Phone: 757-3224214, Fax: 757-322-8280, Email: STEPHEN.MEDVICK@NAVY.MIL W1 APR 0 4 2016 PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE $_ #_ PERMANENT JOBS #_ TEMPORARY JOBS SECTION ONE: REQUESTING A SCORING MEETING ONLY OScoping Meeting ONLY ❑ DWR(401, NPDES, Non -Discharge) ❑ DCM,gDEMLR (EIS, W), ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance El Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bl Rmp, ❑ Clear & Grub, ❑ Utility . ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] []High Density -Detention Pond _ #Treatment Systems ® High Density -Infiltration 2#Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _ #Treatment Systems /® MOD:[] Major ® Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#> ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Manna Development ❑ Urban Waterfront ' @ Land Quality ® Erosion and Sedimentation Control Plan with 2 acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No Received from US ACOE ❑ Yes ® No Buffer Impacts: ® No ❑ YES: _acre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit DENR use only_ Fees lit for multiplepermits: (Check#_______l Tota/FeeAmount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LQS $ Stream Deter— $ NCDENR EXPRESS November 2013 P-1286 Parking Lot Plan Modification 4.4.2016 SGM Re: Stormwater Management Permit No. SW8 060309 Reserve Training Facility & Vehicle Maintenance Facility / P-1286 Gravel Parking Lot High Density Commercial infiltration Basin Project Project Narrative The plan revisions to this permit were approved on 8.27.2014. The project is currently under construction and there is a communication ductbank in conflict with the proposed expansion of the infiltration basin. The plans are, therefore, being modified to expand the existing infiltration basin to the west in lieu of the east to avoid the existing ductbank. There is a gravel lot on the west side of the existing basin. The expansion to the west will require reducing the existing gravel lot by 27'. Reduction of the existing lot will reduce the drainage area and will reduce the impervious area flowing to the basin. The reduced impervious areas will, however, be added back in as Future BUA. The future BUA will be adjusted to provide the permitted WQV of 51,468 c.f. The surface area at elevation 51 will remain the same as permitted. The permitted WQV at elev. 53.75 is 51,538 and will remain the same. The 10-year release will remain at 1.38 and the 10-yr max stage of 53.83 is also unchanged. The 100-yr release rate increases from 14.5 to 15.3 cfs. No other modifications for the infiltration basin are required. S i J ff GRAVEL PARKING LOT P-1286 MARSOC, CAMP LEJEUNE, NC NAVAL FACILITIES ENGINEERING COMMAND - MID -ATLANTIC. MARINE CORPS NORTH CAROLINA IPT, NORFOLK, VA RD FINAL SUBMISSION - 07/08/2014 i 4 SHEET LIST TABLE SKET MM➢W SIE Ci TITLE WVPK a -m1 V 1 126JI a25 C-ml 1 �� NI�R69RiS6V SrS EalSil�i Ld01 i1011i YID YEIYlli16Y '267I426 126JI a2J C-Im C-2m OVCR/ SITE L/.T.T 126IF [-201 SITE PLNI 126J142S -301 C-WI Ci W ➢IMP-LYI WOSIN�l MD $iCBCTTidl PLY'- S 1 [NDSI 'ISM'➢ SED T C1 T1 PLW- SE 2 126)la ]t I26)1a31 126JIa32 C-S01 PRC-L_EVR�VIIWL pt611Wi PL.W 126JIa33 [-502 PDSi- VE M ➢RPIIUGC PI.W 126)la3a L-601 EPOSIBII iR-ESE EIII�JIi m111�NOTiS YI-6S�➢TRENT�MRt1 Cif11.$ ERTDV� Si➢TK'XT W(TRR 11[i�ILS 126)ta35 126714. 126J1131 C-6 C-6m C-6Ua CRTIDI Y , NEXT CONTRR LETRILS SIiT➢2i%.I S1TC ➢E)FI126)1a 126JIa3B 126J1 �39 a➢ C-701 C-)@ E-101 �Efi41 PL 126JIa a1 -201 ilu lilTOi=111-12671442 [CivIC6T➢E1267IN3 ../uTL 1" = 60" AT 11 X 17 RESERVE TRAINING FACILITY/P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE. NORTH CAROLINA 'C 1QIg6NVd 1311W0YR4 i � A t h J `!Et ! t ` t ti '.•y z._ j ,.��_ fi, r +� BASIN f tlfx+j �. � —" e L �•4.�.. a i 1 a E �. 3� , •p - �.� y i, RELOCATED BASINi!j y I y .IIi� � ito{ai.a I. I�, `+' ❑4! _ - E w n 1�4 dv"7r 4 y .. V � I I t3� y e 1 ��I/>«Kj �R!! � • ���.. r a� i � i�i IM �I Nil' >N tPfl�iPi Weaver, Cameron From: Bradshaw CIV Thomas C [thomas.bradshaw@usmc.mil] Sent: Wednesday, March 19, 2014 10:32 AM To: Weaver, Cameron Cc: Towler CIV David W Subject: RE: P-1286 Gravel Parking Lot-MARSOC(?) Cameron this project sits outside of the MARSOC boundary but is located at the Rifle Range. The MARSOC boundary is on the opposite side of the road of this project. Thanks, Thomas Bradshaw, EIT Public Works Design, Civil Branch Camp Lejeune, NC 910-451-3238 ext3285 -----Original Message ----- From: Weaver, Cameron [mailto:cameron.weaver@ncdenr.gov] Sent: Wednesday, March 19, 2014 10:24 To: Bradshaw CIV Thomas C Subject: P-1286 Gravel Parking Lot-MARSOC(?) Hi Thomas. I've got an Express Request in for this project and he indicates that it is within MARSOC; see attached. I am just asking for confirmation on that and how this impacts the sequencing that you had devised for projects there. Attached is the information provided thus far. He wants to do it sometime mid -April and I can schedule it for April 15 with Linda if that fits with the sequencing, but we wanted to check with you first. Just let me know. Cameron Cameron Weaver r Cameron.Weaver(dncdenr.gov <mailto:Cameron.Weaver(dncdenr.gov> Environmental Assistance Coordinator NCDENR / Division of Environmental Assistance and Customer Service (DEACS) 1 127 Cardinal Drive Wilmington, NC 28405 910-796-7303 (F) 910-350-2004 http://ncenvironmentalassistance.org/ E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. d�Q z r. Weaver, Cameron From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [stephen.medvick@navy.mill Sent: Wednesday, March 12, 2014 11:11 AM To: Weaver, Cameron Subject: RE: P-1286 Gravel Lot submittal Cameron Please let me know what additional or updated information you need for me to get on the express submittal schedule. Steve -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Sent: Friday, January 10, 2014 1:46 PM To: Weaver, Cameron Cc: Swaney, William A CIV NAVFAC MIDLANT, CI Subject: RE: P-1286 Gravel Lot Cameron I will be leaving around 2:30 today, so if you need anything later than that please send the request to Bill. Bill knows where to find me. Steve -----Original Message ----- From: Weaver, Cameron [mailto:cameron.weaver@ncdenr.gov] Sent: Friday, January 10, 2014 13:25 To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 Gravel Lot Perfect! I'll try to be in touch this afternoon, but will look to see Bill on Tuesday. Cameron Weaver Cameron.Weaver@ncdenr.gov Environmental Assistance Coordinator NCDENR / Division of Environmental Assistance and Customer Service (DEACS) 127 Cardinal Drive Wilmington, NC 28405 910-796-7303 (F) 910-350-2004 http://ncenvironmentalassistance.org/ E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, Sent: Friday, January 10, 2014 12:14 PM To: Weaver, Cameron Cc: Swaney, William A CIV NAVFAC MIDLANT, CI; Subject: RE: P-1286 Gravel Lot IPTNC [mailto:stephen.medvick@navy.mil] DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC 1 Cameron I have attached a copy of the current project narrative for your use. Please note that the calculations and exhibits have not been finalized. Is this acceptable for the express request? Steve -----Original Message ----- From: Weaver, Cameron [mailto:cameron.weaver@ncdenr.gov] Sent: Friday, January 10, 2014 10:05 To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 Gravel Lot Do you already have a narrative prepared about the project that you could send me? That was part of the information requested on the form. Cameron Weaver Cameron.Weaver@ncdenr.gov Environmental Assistance Coordinator NCDENR / Division of Environmental Assistance and Customer Service (DEACS) 127 Cardinal Drive Wilmington, NC 28405 910-796-7303 (F) 910-350-2004 http://ncenvironmentalassistance.org/ E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, Sent: Friday, January 10, 2014 9:31 AM To: Weaver, Cameron Cc: Nelson, Christine; Lewis,Linda Subject: RE: P-1286 Gravel Lot Cameron The request form is attached. Thanks for your help! Steve IPTNC [mailto:stephen.medvick@navy.mil] -----Original Message ----- From: Weaver, Cameron [mailto:cameron.weaver@ncdenr.gov] Sent: Thursday, January 09, 2014 16:50 To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Cc: Nelson, Christine; Lewis,Linda Subject: RE: P-1286 Gravel Lot Hi Steve. If you don't mind, please fill out this form and provide the requested information about your project and we will provide some time for Christine (or Linda) to discuss this project after the meeting that is already scheduled with Linda about P-1349. z Please let me know if there are other issues. Cameron Cameron Weaver Cameron.Weaver@ncdenr.gov Environmental Assistance Coordinator NCDENR / Division of Environmental Assistance 127 Cardinal Drive Wilmington, NC 28405 910-796-7303 (F) 910-350-2004 http://ncenvironmentalassistance.org/ and Customer Service (DEACS) E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Nelson, Christine Sent: Thursday, January 09, 2014 3:34 PM To: Weaver, Cameron Subject: FW: P-1286 Gravel Lot A meeting request. Should I send this to you? How should it be handled? Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick@navy.mil] Sent: Thursday, January 09, 2014 3:31 PM To: Nelson, Christine Cc: Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC; DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 Gravel Lot Thanks --I will double check Section 16.3.9. The oversized forebay helped keep the pond stage down and helped reduce the pond release rate. As you know, we have NAVFAC requirements for water quantity that go beyond DENR requirements. I just found out that Bill Swaney is meeting with Linda Lewis on Tuesday at 10:00 a.m. Can you find some time to discuss this gravel lot with him after his 10:00 meeting? Steve -----Original Message ----- From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Thursday, January 09, 2014 14:51 To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Cc: Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC; DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC; Lewis,Linda Subject: RE: P-1286 Gravel Lot Steve, The state has no rule or requirement to look at any storm event beyond the design storm or the 10 year storm event (if it is required to direct the excess runoff to a filter strip). 3 Unless there is another requirement out there from another group, you can choose to do what you want with the 100-year storm. Storing the entire water quality volume in a pre-treatment device is going above and beyond what we would generally see for a gravity type system. However, we have seen people propose it; especially if they have to pump the volume to an area capable of infiltrating or if the flow needs to be restricted when the infiltration area is not very large. The most common pre-treatment we probably see is the use of sumps in the collection system to collect the debris and solids. On the surface, what you have proposed sounds fine but if you are trying to waive the offline bypass and vegetated filter strip, please double check with Section 16.3.9 of the BMP manual to make sure you cover all of the requirements. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick@navy.mil] Sent: Thursday, January 09, 2014 2:18 PM To: Nelson, Christine Cc: Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC; DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC Subject: FW: P-1286 Gravel Lot Christine Thanks for the information! I am scared of the current interpretation of "pervious" gravel and I don't think that is the intent of this lot. We plan on using standard NCDOT ABC aggregate with full compaction, so I expect that it will not be pervious. I will consider it impervious for water quality and plan to use the largest "C" and "N" values that Malcolm assigns to gravel (C = 82, N = 91) for pond routing. There are a couple of things about the current design that concern me, and I don't know if they are allowable in 2014. The basin was designed to handle 4.5 times the WQV and that appears to be all that they looked at. There are no provisions for overflow for storms in excess of 4.5 inches, and there is only 0.03' of freeboard to the top of the bank for the 4.5" rain (see attached). I cannot significantly raise the bank as I do not want to cause water to back into the existing lot. I am adding an emergency spillway to direct any excessive flows. The design including the spillway will maintain 0.5' of freeboard for the 10-year storm. I cannot, however, contain the 100-year storm --is that acceptable? The 10 year release for the expanded infiltration basin will be held to match current conditions. I don't see any pretreatment for the flows from the existing parking lot. As noted, I intend to construct a forebay along my gravel lot and then pipe the discharge to the existing pond. The forebay will be designed as an detention basin with a 6" orifice to control the discharge rate. The forebay will detain approximately 100% of the WQV for the gravel lot. The drawdown for the 2-year storm is approximately 7 hours in the forebay. Is that acceptable? Steve -----Original Message----- 4 From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Thursday, January 09, 2014 11:21 To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC; Lewis,Linda Cc: Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 Gravel Lot Steve, Linda is out of the office today, but I'm going to take a stab at trying to help you out. I'm not sure if anyone is familiar with this project as the original reviewer no longer with DENR. But any of us should be able to help answer questions. A copy of the permit for 060309 is attached. When you say submittal package, are you looking for the approved plans or just the permit, application, supplement forms, and 0&Ms? You don't mention what type of gravel you are looking to use. If you are trying for pervious gravel, I will need to get clarification on how adding gravel areas to an existing permit works with the new BUA definition. But when adding impervious area (e.g. asphalt) to a project, it must be permitted under the current rule (assuming there is no future BUA allocated in the permit and other documents). SW8 060309 was permitted under the old rules where 1.5 inches was the requirement for projects within 1/2 mi and draining to of SA waters. Any new impervious area within 1/2 mi of and draining to SA waters would have to be designed at the greater of 1) the difference in the pre/post development volume for the 1-year, 24-hr storm or 2) the 1.5 in design storm volume. Also, the requirements for waiving the offline bypass and the vegetated filter strip have changed slightly since 2006 (please refer to Section 16.3.9 of the BMP manual). Back in 2006, to waive both the offline bypass and filter strip it was required to store 3 times the design volume (1.5 x 3 = 4.5 inches). The current requirement to waive both is to store 2.5 times the required design volume. So the additional volume from any new impervious areas would have to be treated at 2.5 times the required volume. DENR has no problems with expanding BMPs. The only catch is that the sections that are being expanded need to meet the current requirements. This is more of a logistical issue with wet ponds and trying to include the vegetated shelf on older ponds that either didn't have one or had ones under the older design. I know this probably doesn't answer all of your questions, but hopefully it will give you a good start on how we look at modifying older permits. Let us know if you have other questions! Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick@navy.mil] Sent: Wednesday, January 08, 2014 6:44 PM To: Lewis,Linda; Nelson, Christine Cc: Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC Subject: P-1286 Gravel Lot Linda/Christine 5 we are designing a temporary gravel lot for MARSOC in Camp Lejeune. We plan to expand the existing infiltration basin as our BMP. The existing basin was 1 of 3 infiltration basins that were approved for the Reserve Training & Vehicle Maintenance Facility. I was told that the permit # is SW8-060309. How can I get a copy of the approved permit and permit submittal package so that I may modify the permit? The attached pdf shows the limits of the drainage basins for the 3 approved BMP's. Please note that infiltration basin # 3 was not installed as Rifle Range Road was re -aligned in this area. The access drive below Drainage Area # 2 was continued straight to Rifle Range Road and the dog -legged drive was deleted. The second pdf shows how the proposed gravel parking lot fits into the southeast corner of the Reserve Training Facility drainage map. The expanded BMP is also labeled on this pdf. The stormwater narrative for the Reserve Training Facility states that BMP # 2 was designed to retain 4.5 inches of rainfall to avoid a bypass and overflow. I will design the expanded BMP to retain the 4.5 inch rainfall for the gravel lot in addition to the Reserve Training Facility site. Is this acceptable? I would like to know if DENR has any problems or specific concerns with the concept of expanding the approved infiltration basin. The project drains to the White Oak River. The receiving stream is Stones Creek (SA,HWQ,1.5" runoff). The infiltration rate and SHWT were confirmed by Vincent Lewis on March 7, 2006. I would like to discuss the project with one of your engineers, but I don't know if anyone is familiar with the Reserve Training Facility project. As always --I appreciate your help! Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick@navy.mil 6 For DENR Use ONLY Reviewer: C� A7jA North Carolina Department of Environment and Natural Resources Time:submllNC: ENR Request for Express Permit Review Confirm: FILL-IN all the information below and CHECK the Permits) you are requesting for express review. Calland Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application ap ckage of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296-4698;alison.davidson®ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919.791-4203; david.lee@ncdenr.gov • Mooresville & Winston Salem Region - Patrick Grogan 704-235-2107 or patrick.groganQncdenr.gov • Washington Region -Lyn Hardison 252-948-3842 or lyn.hardison@ncdenr.gov • Wilmington Region -Cameron Weaver 910.796-7303orcameron.weaver@ncdenr.gov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: P-1286 GRAVEL PARKING LOTCounty: ONSLOW Applicant: USMC Company: USMC Address: BLDG 1005 MICHAEL RDCity:CAMP LEJEUNE, State: NCZip: 28542-_ Phone: 910-451-2213, Fax: 910-451-2927, Email: Nealpaul@USMC.MIL Ph sical LocatiomRIFLE RANGE ROAD AND RIFLE RANGE ROAD SW SW SW_ NPDES NPDES _ Wo Wa_ E&S _ E&S _ Other Y Project Drains into SA waters — Water classification HWQ (for classification see-hap://portal.ncdenr.org/web/wq/ps/csu/classifications) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? /N, within 1/2 mile and draining to class SA watersY or within 1 mile and draining to class HOW waters? Y Engineer/Consultant: STEVE MEDVICK, PE Company: NAVFAC Address: 6506 HAMPTON BLVDCity: NORFOLK, State: VAZip: 23508-1278 Phone: 757-322-4214,Fax: 757-322-8280, Email: STEPHEN.MEDVICK@NAVY.MIL PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE $_ #_PERMANENTJOBS #_TEMPORARY JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑Scoping Meeting ONLY ❑ DWR(401, NPDES, Non -Discharge) ❑ DCM, ❑ DEMLR (FJS, SW), ❑ OTHER: _ SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑401 Unit ❑ Stream Origin Determination: _ If of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ If of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear It or acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ®State Stormwater ❑ General❑ SFR,❑ SFR< 1 ac. ❑Bkhd & Bt Rmp,❑Clear & Grub,❑ Utility❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit It)] ❑ High Density -Detention Pond _ a Treatment Systems ® High Density -Infiltration 2 #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems INMOD:® Major ❑ Minor ❑Plan Revision ❑ Redev. Exclusion SW (Provide permit #) ❑Coastal Management ❑Excavation & Fill ❑ Bridges & Culverts ❑Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 2 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ❑ Yes ® No Isolated wetland on Property ❑ Yes ® No US ALOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ALOE ❑ Yes ® No For DENR use only Rap Rnlit fnr multinla nermitsr (Check # 1 Total Fee Amount S SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance([] Mal; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LOS $ Stream Deter,_ $ 0(Do 30� NCDENR EXPRESS November 2013 P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA GRAVEL PARKING LOT MARSOC CAMP LEJEUNE HAVELOCK,NC FYI 1 MCON PROJECT P-1286 Stormwater Management NCDENR Permit March 2014 I NAND N�1F9CitmHS E�'iS�InCCr'in�CAmmar1d NAVFAC MID -ATLANTIC P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA P-1286 GRAVELKING LOT TABLE OF CONTENTS S e ct i o n M: M p p l i c a t i o n 0 Application0 Infiltration[iBasinUSupplementN I nfiltration[tbasinCinaintena nce0 S e ct i o n M: [P roj a ct[18 a s i s[tb f [Des i g n M SectionX:[PAapsO Vicinity®nd[location[M1a ps0 Site[layout0 Drainage[AreasM Pre-developed[Wrainage0 Post-developed®rainage0 Boring[locations0 I nfi It ration0estM SeasonalffiighWaterE Section[D:[Storm®rainage[Ealcu lations© Storm[SystemN WaterG4ua lityWolume0 Pond[EloutingE9 1-yea Ore-deve loped0 10-yeaare-developedN Section[F:GNorth[Ea roli nalP.[E.[Exemptionlletter0 Section[F:(ProjectXonstruction[gPI ansM Secti o n OG :[Proj ect[io nstru cti on[S pec ifi cat i o n sN P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA SECTION A: STORMWATER MANAGEMENT PERMIT APPLICATION P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA SECTION B: PROJECT NARRATIVE P-1286 Gravel parking Lot MCAS Cherry Point, North Carolina Civil Basis of Design Final Submittal March 2014 P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA CIVIL BASIS OF DESIGN 1.0 PROJECT INFORMATION 1.1 PROJECT DESCRIPTION AND LOCATION The project consists of the construction of a temporary gravel parking lot to supplement the P-1286 project The project site is located south of the Reserve Training Center & Vehicle maintenance Facility. The site is in the northwest corner of the Range Road and Range Road intersection, in MARSOC, Camp Lejeune, North Carolina. Vehicle access to the parking lot will be limited to the service drive along the north side of the site. The parking lot is intended for use by POV only. 1.2 EXISTING CONDITIONS The parking lot site is approximately 1.6 acres. The site is bounded by Rifle Range Road on the south and east sides, and the service drive to the Reserve Training Facility on the north side. The site has gentle slopes and no significant drainage features. There are slight swales along the south and east side of the site. The east side of the site contains two trailers and a gravel service area. The west half of the site contains small trees and dense underbrush. A survey of the site was completed by NAVFAC forces in January of 2012. There are no tidal or non -tidal wetlands identified on the site. The survey of the adjoining sites was provided by several recent MILCON projects. 1.3 GEOTECHNICAL The geotechnical findings including soil borings, in -situ and laboratory testing were taken from the report included in the approved Reserve Training Facility & Vehicle Maintenance Facility (SW8 060309). The results of the study recommend an infiltration rate of 1.5 to 2 inches per hour. The estimated seasonal high water table was confirmed by DEN on March 7, 2006 to be 5.5 feet below the ground surface. 1.4 DEMOLITION The low vegetation and remaining trees within the construction limits will be cleared and grubbed as needed. An existing sewer force main crossing the site will be protected. The two trailers will be removed by the base prior to start of construction. 1.5 NEW SITE WORK The project scope includes the construction of a temporary 42,000 s.f., gravel parking lot. with associated storm drainage and stormwater management. The project does not include any buildings or other above ground facilities. P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA A total of 132 parking spaces are proposed for the site. The POV spaces are designed to be 9-ft wide by 18.5-ft long with a 26-11 wide drive aisle. Parking spaces are not intended to be delineated on the gravel. The parking lot is not convenient to the nearby buildings and will not include ADA required accessible spaces, or spaces for Fuel Efficient vehicles. Trash and recycle bins are not required for this project. Construction access shall be via the service road along the north side. The infiltration basin, that was installed to serve the Reserve Training Center, will be enlarged to handle the additional flow from the gravel lot. 1.6 ATFP The project does not include any buildings or above ground facilities. The parking lot will be set a minimum of 82' from the existing buildingjust west of the site. 1.7 SUSTAINABLE DESIGN The gravel parking lot is temporary and is not seeking to attain LEED certification. 1.8 WATER SUPPLY & FIRE The gravel lot does not require water or fire services. The existing water line that cuts across the site will be protected. 1.9 SANITARY SEWER The gravel lot does not require sewer service. The existing sewer force main that cuts across the site will be protected. 1.10 PROPANE GAS Gas is not intended to be used for this facility. 1.11 EROSION & SEDIMENT CONTROL Erosion and sediment control measures include silt fencing, tree protection, inlet protection, diversion ditches, check damns, skimmer basins and a two temporary construction entrances in accordance with the North Carolina Erosion and Sediment Control Planning and Design Manual. The BMP that will be constructed on this site will serve as a forebay for expansion of the existing infiltration basin. The forebay will be used as a sediment basin during construction of the gravel lot. 1.12 ENVIRONMENTAL PERMITTING Stormwater Management and Sediment & Erosion Control permits will be required. The existing stormwater permit for the infiltration basin for the Reserve Training Center will be modified to accommodate the gravel lot. No jurisdictional tidal or non -tidal wetlands are present within the site boundaries P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA 2.0 STORM DRAINAGE / STORMWATER MANAGEMENT 2.1 SITE RUNOFF Soil types were taken from the USDA Soil Survey of Onslow County. Sheet flow will be used through the site. The gravel lot will flow to a detention basin that will act as a forebay to the existing infiltration basin and will help extend flow times and decrease run off. The grassed banks of the gravel lot will flow to the existing perimeter swales. The swale along the east side of the site will be re -graded to promote positive flow. Site run-off will be controlled to existing levels. The project is within a drainage basin which flows to the White Oak River. The receiving stream is Stone Creek (SA, HWQ). The seasonal high water elevation for the infiltration basin that currently serves DA-2 was determined to be 5.5 below the surface. The site visit was conducted on March 7, 2006. The infiltration rate was determined to be 2 inches/hour. 2.1 EXISTING PERMIT The stormwater permit for the Reserve Training Facility (SW8 060309) was issued on May 1, 2006. The permit included approval for 3 infiltration basins. The drainage areas for the 3 basins are shown in Exhibit #1. Not all of the improvements shown in the exhibit were installed. The base stone for the parking lot in drainage area 2 was constructed but the asphalt surface was not installed. The infiltration basin that serves the parking lot (basin 2) was installed. The drive aisle and the infiltration basin for drainage area 3 were not installed (Exhibit 2). The entrance for the parking lot in area 2 was relocated directly below infiltration basin 2. Exhibit 3 shows the as -built conditions of the installed improvements. Exhibit 2 also shows the revised drainage areas flowing to BMP 2. The proposed gravel lot falls in the southeast corner of the area that is shown in the Reserve Training Facility permit. The gravel lot will encompass the area that was shown as drainage area 3 in the approved permit. Drainage area 3 (as permitted) is not intended for installation at this time. Exhibit 3 also shows the limits of the proposed gravel lot and how they mesh with drainage areas I and 2. The majority of the gravel lot,site currently flows to swales in the adjoining streets and is not treated by a BMP. The existing permit will be modified to reflect the revised areas for drainage area I and 2. The permit will also be modified to enlarge basin 2 to accept the flows from the temporary gravel lot. Exhibit 4 shows the detention basin for the gravel lot that will act as a forebay. The exhibit notes the flow from the forebay to cross the street to the expanded area of the existing infiltration basin. P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA 2.2 STORM DRAINAGE All new impervious areas are intended to flow to the existing BMP. Curbing will not be used and minimal storm sewer piping will be used to promote surface flows. Flow rates for the existing BMP will be maintained by enlarging the basin to handle the 10-year storm. The proposed forebay will also help extend the detention times and maintain lower flows. Rainfall intensity values are taken from Regional IDF Curves (Wilmington) as follows: Time of Concentration = 5 min. (conservative) Rainfall Intensity = 3.60"/hour 1-year 24-hour storm Rational Runoff Coefficients, "C," are taken from the North Carolina Department of Environmental Resources as follows: Roofs, Inclined 1.00 Asphalt 0.95 Concrete0.95 Lawns, sandy soil 0.15 Wooded 0.15 Rational Runoff Coefficient, "C," for gravel was taken from H.R. Malcom 2003 Gravel 0.82 (maximum value) Existing conditions Site = 1.59 acres The current site is partially developed with two trailers and a small gravel parking area. The existing lot does not have any drainage features and is not served by a BMP. The site sheet flows to slight swales on all four sides 2.3 STORMWATER MANAGEMENT WATER QUALITY ANALYSIS The existing infiltration basin will be enlarged to provide the required water quality controls in accordance with NCDENR standards. The BMP for the Reserve Training Facility was designed (and permitted) to retain 3 times the water quality volume (4.5 inches of rainfall) to avoid bypass and overflow structures. The existing BMP will be enlarged to treat the 4.5" rain for the Reserve Training Facility site and 2.5 times (3.75 inches) the WQV for the gravel parking lot. The basin will be designed for 90%TSS removal Basin 1 was permitted for 4.75 acres and for 2.38 acres of impervious area. Exhibit 3 shows that drainage area 1 was reduced to 4.52 acres. The service road between drainage areas 1 and 2 was designed with cross slope to drain to the south and into DA-1. This road was built with normal crown and the top half of this road now drains to BMP-2. The P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA redirected roadway reduces the impervious area for DA-1 by 0.05 acres. The impervious area for BMP-I was therefore reduced from 2.38 acres to 2.33 acres We are required to capture the additional run off generated by the 95% storm event to satisfy NAVFAC LID requirements. The 95% storm event for this area is 2.34 inches per hour. For SA waters we are, however, required by DENR to treat the pre to post difference in the 1-year 24 hour storm. The 1-year 24-hour storm for this area is 3.68". We are also storing 2.5 times the 3.68" rain to waive the bypass and filter strip requirements. The proposed enlarged infiltration basin will therefore infiltrate approximately 4 times the required pre to post difference in the 95% storm event. The existing site has a 10-year release rate of approximate 2.2 cfs. The infiltration basins is shown to reduce the 10-year release rate for the developed site to approximately 1.0 cfs for the new gravel lot and existing parking lot combined. The infiltration basin is being modified to safely pass the 100-year storm. The emergency spillway will allow all flows in excess of the 10-year event to flow eastward to the existing swale along Rifle Range Road P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA EXHIBIT I P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA g I d J a EXHIM 2 E • a k L a REVISED DRIVE Dul'fl:'. 1) DRIVE w t r� e ail 111111( "V. v I� y Ill EXHIBIT 2 P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA EXHIBIT 3 P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA EXHIBIT 4 P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA PLANNED EROSION AND SEDIMENT CONTROL PRACTICES 1. Temporary Gravel Construction Entrance/Exit: A temporary gravel construction entrance will be installed. 2. Land Grading: Grading will be required on approximately 2 acres. All cut and fill slopes will be 3:1 or flatter to avoid instability due to wetness. (NCSCC ESCM Std. 6.02) 3. Temporary Silt Fence: Provided around the site to prevent debris and sediment from migrating to downstream drainage courses (NCSCC ESCM Std. 6.62). 4. Rock Check Dams: Provided at entrances to pipe culverts in ditches and swales to reduce erosion by restricting velocity of flow (NCSCC ESCM Std. 6.83). 5. Sod: Provided in all new ditches and swales to maintain bank stability. Sod will also be used for permanent stabilization of all open space areas. Sand type Sod will be used in the base of the infiltration basins. 6. Erosion Control Matting: Provided in all new ditches and swales to maintain bank stability. 7. Temporary Seeding: See Specifications CONSTRUCTION SCHEDULE 1. Obtain plan approval and other applicable permits. 2. Flag the limits of construction. 3. Install check dams in all existing ditches and swales as indicated. 4. Install temporary gravel construction entrance. 5. Install temporary silt fence around the site and around infiltration basins as indicated. 6. Clear trees and stump removal. 7. Rough grade site, stockpile topsoil, construct swales, culverts and storm drain system. 8. Finish slopes around parking lot upon completion of rough grading. Leave slightly rough and vegetate and mulch immediately. 9. Complete final grading for parking, drives and stabilize with gravel. 10. Complete final grading of the grounds, topsoil critical areas and permanently vegetate with sod, landscape and mulch. 11. After site is stabilized, remove all temporary measures. P-1286 GRAVEL PARKING LOT MARSOC CAMP LEJEUNE, NORTH CAROLINA MAINTENANCE PLAN I. All erosion and sediment control practices will be inspected weekly and within 24 hours of a 1/2-inch rainfall event and every 14 days. A rain gauge shall be installed to measure rain events. Needed repairs will be made immediately to maintain all practices as designed. 2. Sediment will be removed from behind the sediment fence when it becomes about 0.5 ft deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. 3. All disturbed areas will be sodded as permanent vegetation and temporary measures will be seeded, fertilized, reseeded as necessary, and mulched according to the Seeding Specifications. VEGETATIVE PLAN See specification Section 32 92 19 Seeding and 32 92 23 Sodding. Prepared by: Stephen Medvick, P.E. Civil Engineer MCNC IPT-NAVFAC 9742 Maryland Avenue Norfolk, VA 23511 PH (757) Civil Engineer MCNC IPT-NAVFAC 9742 Maryland Avenue Norfolk, VA 23511 PH (757) 2 4 NOTES rc - it v DA- 2 2.485 AC., IMP, 1.28 LEGEND BMP 2 �l I b A- S. ROAD (offsite 'Pll 24 AC I, -:q6g.. IMP GRAVEL 4- . — c - BOUNDARY FOREBAYN tTO DA 0 082E'ACI-.' IMP 0s•j E 4 % _ --DA`GR-LOT A-TO',_RIFLE.,RANGE 1185 A& .ROADWAY 25-XiC 0.69 IMP .012 AC GRAPHIC SCALE C = 0.22 0 11 C-502 I 3 4 5 L o _ � � J r 1i _ I S I 9. r l{ r •_ t. I E 128 TOTAL Fl AT RPAr GRAPHIC SCALE 5 M WaRli Ma Ns ;Ac ? IC Nelson, Christine From: Sent: To: Cc: Subject: My apologies correct. V/ r, Nick Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC [nicholas.r.youngl@navy.mil] Thursday, August 15, 2013 7:42 AM Nelson, Christine Young, Connor CIV NAVFAC MIDLANT, Cl; Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC RE: P-1286 WQV It is an existing infiltration basin not pond, thus the permit # should be -----Original Message ----- From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Wednesday, August 14, 2013 14:38 To: Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC Cc: Young, Connor CIV NAVFAC MIDLANT, CI; Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 WQV Nick, Here are the calcs (along with everything else that was included with it) for SW8 060309. Your e-mail says "existing pond", but these seem to be infiltration basins. Did you give the right permit #? Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC [mailto:nicholas.r.youngl@navy.mil] Sent: Wednesday, August 14, 2013 10:49 AM To: Nelson, Christine Cc: Young, Connor CIV NAVFAC MIDLANT, CI; Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 WQV Christine, After coordinating with Thomas Bradshaw/David Towler, we were able to get the plans of the existing pond; however, we do not have any of the calculations for the existing pond. The permit number provided to us is SW8 060309. Do you have any calculation information that we could use? Please let us know. Thanks. V/r, Nick Nicholas R. Young, EIT Civil Engineer NAVFAC MIDLANT, North Carolina IPT 6506 Hampton Blvd LRC - Bldg C 1 r Norfolk, VA 23508 Phone: (757) 322-4640 Email: nicholas.r.youngl@navy.mil -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Sent: Tuesday, August 13, 2013 14:30 To: Nelson, Christine Cc: Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC; Young, Connor CIV NAVFAC MIDLANT, CI Subject: RE: P-1286 WQV Thanks for the information! You are correct --I was thinking (obviously not thinking) that the "C" value impacted the water quality volume. Gravel -no matter what "C" value is assigned -is considered impervious. We are thinking of using infiltration and providing 2.5 times the required WQV, so the "C" value should not be a factor. I will let you know if we need further direction about "swapping" impervious areas. Steve -----Original Message ----- From: Nelson, Christine [mailto:christine.nelson@ncdenr.gov] Sent: Friday, August 09, 2013 13:39 To: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC Cc: Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC; Young, Connor CIV NAVFAC MIDLANT, CI; DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC Subject: RE: P-1286 WQV Steve, The C value is used for a discharge rate, but your subject indicates you looking at the volume (WQV). The water quality volume should be determined using the Simple Method (Section 3.3.1 of the BMP manual), which is based on the percent of impervious coverage. If you are trying to determine the peak flow, then a conservative C value should be used and it's up to the BPI of the designer to determine what that is. The rest of your questions get quite complicated to answer. There is a redevelopment exclusion option for the 10,000 BUA if can be demonstrated that it either existed prior to the stormwater rules or if it was constructed after 1988, that it did not trigger a permit. Triggers would be either receiving a sediment and erosion control plan.or CAMA major permit. Under the redevelopment exclusion, the BUA must be equal to or less than the existing BUA and must provide equal or better stormwater control. I have attached a document outlining the requirements of the redevelopment exclusion process. Assuming the 10,000 sq ft of existing BUA can meet both requirements, then it would be listed as a second drainage area to the permit. The additional proposed BUA must be treated as normal through high density or low density means depending on the percent of impervious area. With the high density option, if any of the redeveloped BUA is located within the drainage area of a proposed BMP, then it must be included in the BMP design at the current design storm. If the site cannot meet the redevelopment exclusion requirements, it would be difficult to justify allowing 10,000 square feet of BUA to bypass the BMP even if the full WQV was provided. Swapping the roadway for the untreated portion of the gravel lot sounds like it might be a good option but additional details would be needed (such as the areas for both the 2 roadway that would be treated and the untreated gravel area, the water classification and how far/close this site is to surface waters). But take a look at the re -development exclusion option first. Please let me know if I can be of further assistance. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Medvick, Stephen G CIV NAVFAC MIDLANT, IPTNC [mailto:stephen.medvick@navy.mil] Sent: Friday, August 09, 2013 12:11 PM To: Nelson, Christine Cc: Young, Nicholas R CIV NAVFAC MIDLANT, IPTNC; Young, Connor CIV NAVFAC MIDLANT, CI; DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC Subject: P-1286 WQV Christine Ref: P-1286 Rifle Range Road Parking, Stone Bay, Camp Lejeune We are designing 1 acre of gravel parking on a 1.7 acre site. What "C" value do you use for gravel? Your manual (Table 3-2) makes reference to "C" values derived by Malcom, 1999. Do you use the attached 2003 version of "C" values by Malcom, or do you have other specifics? The lot is considered temporary by the base, but we do not have any timeframe for removal. The proposed lot will include approximately 43,000 s.f. of gravel. The existing lot has approximately 10,000 s.f. of impervious surface (gravel and trailers). We are computing the WQV based on the 43,000 s.f. of impervious area. Is there any water quality credit for existing impervious area? Do we still need to treat 100% (or as close as possible) of the new 43,000 s.f.? If grading makes it difficult to get all of the new lot to the BMP can we let 10,000 s.f. go untreated -if we still provide the full WQV? We may need to direct half of the adjoining roadway to our BMP. Can we swap this pavement for untreated portions of the gravel lot? The attached pdf shows a preliminary layout with the roadway noted to drain to the BMP. The requested bypass area is also shown. Steve Steve Medvick, P.E. Civil Engineer NAVFAC MIDLANT Marine Corps North Carolina IPT Phone: 757.322.4214 Fax: 757.322.8280 Email: stephen.medvick@navy.mil 3