HomeMy WebLinkAboutNCC231748_ESC Approval Submitted (2)_20230607 � � UTILITY CONTACTS: LEGEND 4 DEMOLITION KEY: DEMOLITION NOTES: CITY OF WINSTON SALEM CONSTRUCTION SEQUENCE: r %�/� 0. r WATER 8 SEWER: _--_--_--_ I. PRIOR TO ANY DEMOLITION,GENERAL CONTRACTOR(6.C.)TO COORDINATE WITH OWNER FOR SCHEDULING OF DEMOLITION WORK. • OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT FROM THE CITY OF WINSTON-SALEM INSPECTIONS. 0 ` ,;� EXISTING PROPERTY LINES CONTACT EROSION CONTROL INSPECTOR DAVID EVEANS AT 336-399-9100 TO ESTABLISH A PRE-CONSTRUCTION CONFERENCE AND INSPECTIONMLI1 CITY OF WINSTON SALEM 2. REFER TO EXISTING CONDITIONS SURVEY FOR EXISTING GRADES,UTILITIES AND CONDITIONS ON SITE.UTILITIES BUSINESS OFFICE,P.O.BOX 2156 �, 3. GENERAL CONTRACTOR TO REPORT TO MLA DESIGN GROUP OR OWNER OF ANY DISCREPANCIES ENCOUNTERED UPON VISITING THE . SCHEDULE. WINSTON-SALEM,NG 21102 EXISTING TREES TO REMAIN ��� STE. SELF INSPECTION EFFECTIVE OCTOBER I,2010, PERSONS CONDUCTING LAND-DISTURBING ACTIVITIES,LARGER THAN ONE(I)ACRE,MUST INSPECT V PHONE:(336)121-8000 4. G.G.IS RESPONSIBLE FOR ALL FEES AND PAPERWORK REQUIRED FOR PERMITS AND APPROVALS FOR DEMOLITION. THEIR PROJECT AFTER EACH PHASE OF THE PROJECT,AND DOCUMENT THE INSPECTION IN WRITING ON APPROVED FORMS AVAILABLE FROM THE EXISTING CONTOURS(I FOOT INTERVAL) 822 5. G.G.TO COORDINATE AND NOTIFY ADJACENT PROPERTY OWNER OF DEMOLITION OF ITEMS,CLEARANCE OR GRADING ACTIVITIES CITY OF WINSTON-SALEM INSPECTIONS OFFICE. CIVIL ENGINEERS•SURVEYORS•LANDSCAPE ARCHITECTS NATURAL GAS: NEAR OR WITHIN ADJACENT PROPERTY THAT GOULD IMPACT TREES OR SHRUBS ADJACENT TO PROPERTY LINE,PRIOR TO ANY WORK. THE PHASES ARE AS FOLLOWS: PIEDMONT NATURAL GAS 6. PRIOR TO ANY BIDDING AND DEMOLITION,6.C.15 TO VISIT SITE AND FIELD VERIFY EXISTING CONDITIONS. THE G.C.15 TO BRING TO I. INSTALLATION OF EROSION CONTROL MEASURES SHOWN ON PHASE I EROSION CONTROL PLAN 120 Club Oaks Ct. Suite 100 4120 PIEDMONT ROW DRIVE PROPOSED TREES TO BE REMOVED THE ATTENTION(IN WRITING)OF THE OWNER ANY DISCREPANCIES. 2. CLEARING AND GRUBBING OF EXISTING GROUND COVER _� r "; CHARLOTTE,NG 28210 1. G.G.TO VERIFY OWNERSHIP OF ALL ITEMS TO BE DEMOLISHED,REMOVED OR RELOCATED PRIOR TO ANY WORK. 3.INSTALLATION OF REMAINDER OF THE EROSION CONTROL MEASURES AS SHOWN ON PHASE II EROSION CONTROL PLAN Winston-Salem,NC 27104 , . :M PHONE:(800)111-g8g8 8. DEMOLITION OF ITEMS SHOWN ON PLAN MAY NOT BE ALL INCLUSIVE. IN ADDITION TO THE DEMOLITION ITEMS SHOWN ON THIS PLAN, 4. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS 336.765.1923 PROPOSED LIMITS OF DISTURBANCE M I I I I-I M G.G.15 TO REVIEW ALL OTHER DRAWINGS FOR ADDITIONAL ITEMS TO BE DEMOLISHED,REMOVED OR RELOCATED. 5. INSTALLATION OF STORM DRAINAGE FACILITIES k 0'FOH1vI4•->r-` ELECTRICAL SERVICES: 9. G.G.15 RESPONSIBLE FOR ALL CLEARING AND GRUBBING NECESSARY FOR PROPOSED IMPROVEMENTS. b. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. WWW.MILLERLA.COM 'e fi DUKE ENERGY 10. G.G.TO CONTACT AND COORDINATE WITH ALL APPROPRIATE CITY,STATE AND PRIVATE UTILITY COMPANIES PRIOR TO ANY 1. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. DRAINAGE AREA DELINEATION TO SILT FENCES 9�� .. .. .. .. .. .. ..• • CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: TURNING LAND INTO LANDMARKS P.O.BOX logo DEMOLITION OR RELOCATION OF EXISTING UTILITIES. IT 15 THE G.G.'S RESPONSIBILITY TO ENSURE THAT ALL UTILITIES HAVE BEEN > CHARLOTTE,NC 2820I PROPERLY GAPPED OFF,DISCONNECTED OR RELOCATED.EXISTING UTILITIES SERVICING THE MAIN RESIDENCE AND ADJACENT a.TEMPORARY CONSTRUCTION ENTRANCE/EXIT NC CORPORATE LICENSE NC-1SO �I .,F 1 rY ,�. ,�. PHONE:(336)/25-9049,(600)111-9898 TEMPORARY CONCRETE WASH OUT PROPERTIES AND USES MUST REMAIN FULLY OPERATIONAL DURING DEMOLITION AND CONSTRUCTION S.TEMPORARY SILT FENCING �/1., II. G.G.TO COORDINATE WITH OWNER FOR ANY REFUSE OR STOCKPILING OF ITEMS TO BE REMOVED,RELOCATED OR DEMOLISHED PRIOR /.TEMPORARY STONE OUTLETS AT SILT FENCE •�L - TO ANY WORK. d.TEMPORARY CONCRETE WASH OUT� TEMPORARY TREE PROTECTION FENCE © 12. ALL HARD SURFACE DEMOLITION ITEMS WHICH ARE ABUTTING HARD SURFACES TO REMAIN(I.E.WALKS,CURB AND GUTTER,WALLS, e.TEMPORARY TREE PROTECTION FENCE T-T- ETC.)SHALL BE SAW CUT TO PREVENT DAMAGE TO ITEMS TO REMAIN. , ® • SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES(INCLUDING"GLEAN"WATER DIVERSION)UPON COMPLETION OF CONSTRUCTION. SEE - Si,T IS. G.G.TO ENSURE PROTECTION OF ALL EXISTING ITEMS TO REMAIN. GROUND STABILIZATION CRITERIA FOR MORE INFORMATION. �:sa F,u a 14. USE• OF EXPLOSIVES DO PYROTECHNICS IS NOT PERMITTED. • /F TTT��YSSS���""" TEMPORARY CONSTRUCTION ENTRANCE I5. UTILITIES SHOWN ON DEMOLITION PLAN ARE FOR REFERENCE ONLY AND MAY NOT INCLUDE ALL UTILITIES LOCATED ON SITE.G.G.TO •• BEGIN GLEARIN6,GRUBBING,AND STRIPPING OF SITE A5 REQUIRED. 0. 'E°p•^e ® VERIFY LOCATION AND PROTECT ALL EXISTING UTILITIES TO REMAIN PRIOR TO DEMOLITION. EARTHEN-MATERIAL STOCKPILES ON-SITE FOR LATER DISTRIBUTION AND/OR REMOVAL,AREAS DEDICATED FOR MANAGEMENT OF LAND GLEARIN6 Ib. REFER TO SHEET C-1.2 FOR DEMOLITION 4 C-I.5 FOR EROSION CONTROL PLAN FOR INSTALLATION OF EROSION CONTROL MEASURES. AND DEMOLITION DEBRIS,CONSTRUCTION AND DOMESTIC WASTE,AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY a V IGINITY MAP TEMPORARY SILT FENCE © - -•.- ALL INITIAL EROSION CONTROL MEASURES MUST BE INSTALLED AND INSPECTED BY THE EROSION CONTROL INSPECTOR FROM STORM DRAIN INLETS AND SURFACE WATERS(UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE),AND t43 t (NOT TO SCALE) ® BEFORE LAND DISTURBING ACTIVITY RELATED TO DEMOLITION WORK CAN BEGIN. WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES. O• o •• G.G.TO PROCEED WITH REMOVAL/DEMOLITION OF THE REMAINDER OF THE ITEMS SHOWN TO BE REMOVED WITHIN THE SUBJECT AREA. <• TEMPORARY GRAVEL OUTLET®SILT FENCE ® gi,vo • G.G.TO PROCEED WITH ROUGH GRADING OF REMAINDER OF THE SITE AS REQUIRED FOR CONSTRUCTION (STAKING 8 GRADING PLAN FOR THE ®g� fl NW p`b SUBJECT AREA). ea..44,e0 • ONCE THE SITE HAS BEEN BROUGHT TO ROUGH GRADE G.G.TO STAKE FOR APPROVAL. 5/25/25 • BEGIN SITE GRADING.MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH THE MAINTENANCE PLAN. INSTALL ADDITIONAL EROSION i POSSIBLE CONTROL MEASURES AS REQUIRED. •°•��•��CA tote,„/ a � - JUNCTION BQX2 • C-2.I - kk....-.._ O • '28INSTALL STORM DRAINAGE SYSTEM AS SHOWN ON SHEET 4 G 2.2 GRADING PLANS AND UTILITIES(REFER TO ARCHITECTURAL PLANS). �.• -(,,. q6 �/4 e2 I, l 0 • STORM UNDERDRAIN PIPING AND NEW LATERALS SHALL BE INSTALLED FROM LOW POINT IN FIELD,SOUTH TO NORTH. COMPLETION OF PIPING WILL £�O��SCPQE AR�•'iT 1fy? I, .�.���-• �Y S"RCP ONLY BE ALLOWED ONCE THE SITE HAS BEEN DEEMED STABLE BY THE EROSION CONTROL INSPECTOR. Gam'/�s' Fn.,�s r,r,'M �. • INSTALL PROTECTION AROUND ALL INLETS AS SHOWN ON SHEETS C-21.,C-2.2 AND G-5 AS STORM DRAIN SYSTEM IS INSTALLED. ALL NEW PAVED _ .y appt ' �` n� AREAS(WITHIN PHASE THE SUBJECT AREA)SHOULD BE STABILIZED WITH STONE IMMEDIATELY AFTER GRADING. ly C-100 KIU O ♦ 110�I •� 8 .�. O "- (` • INSTALL PEA GRAVEL AND ROOT ZONE MIX TO NEW FINISH GRADE ELEVATION.INSTALL NEW IRRIGATION SYSTEMS. yf � -PI O 8, o y,.t c o • PROVIDE TEMPORARY OR PERMANENT GROUND COVER AS REQUIRED AND COVER WITH STRAW AND TACK WITH ASPHALT EMULSION PER 'S9�`+�dyajJQ�ae' \\ J , TEMPORARY SEEDING SCHEDULE DETAIL.TEMPORARY VEGETATIVE COVER SHALL BE PROVIDED OVER DISTURBED AREAS WHICH MAY NOT BE AT '4,�F ,•-•+'"0 ,. \ \8Zq t ) a25 C"NW � �-� o� ' L J • FINAL GRADE BUT WHICH WILL BE LEFT UNDISTURBED FOR AT LEAST 15 DAYS. '�S?©N G �•+ �a78 ( - L / • ALL SLOPES 5:1 OR GREATER TO BE SEEDED,FERTILIZED AND INSTALLED WITH EROSION CONTROL MATT. �•�°` 4101111. �L, REFER TO NCDENR STABILIZATION TIMELINE CHART ON THIS SHEET GM 4 G-1.3 FOR ALL APPLICABLE GROUNDCOVER STABILIZATION TIMELINE. -(, 'lam 11411! • 826Ar • RE-SEED/STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. a O n O O • INSPECT ALL EROSION AND SEDIMENT CONTROL DEVICES ON A REGULAR BASIS AND IN ALL INSTANCES INSPECT IMMEDIATELY FOLLOWING ANY di SIGNIFICANT RAINFALL.PERFORM ALL NECESSARY MAINTENANCE ON EROSION AND SEDIMENT CONTROL DEVICES IMMEDIATELY. REPAIR OR e2 O , REPLACE ALL DETERIORATED MATERIALS PROMPTLY. • PROVIDE FOR GROUND STABILIZATION AFTER COMPLETION OF ANY PHASE OF GRADING IN ACCORDANCE WITH THE NPDES TIMEFRAMES TABLE. az ' PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES ARE RESPONSIBLE FOR PHASED INSPECTIONS TO ENSURE THE APPROVED EROSION AND s i SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED.ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND .411111r/ o AFTER EACH STORM EVENT OF 1.0 INCHES OR MORE IN A 24-HOUR PERIOD. / O ,'� 0 • REMOVE ANY TEMPORARY DRIVEWAY PIPE AND TEMPORARY CONSTRUCTION ENTRANCE IMMEDIATELY PRIOR TO CONSTRUCTING PERMANENT p // DRIVEWAY. O - a • PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE SITE(AT APPROXIMATELY 45 DAYS PRIOR TO DEMOBILIZATION),THE FINANCIALLY 8zq _ •LIMITS OF DISTURBANCE /GRADING RESPONSIBLE PARTY(OR THEIR DESIGNEE)WILL NOTIFY THE DESIGNATED EROSION CONTROL INSPECTOR OF THEIR ANTICIPATED DATE TO LEAVE ` = ` THE SITE. AN ON-SITE INSPECTION WILL BE CONDUCTED PRIOR TO THE LEAVE DATE BY THE DESIGNATED EROSION CONTROL INSPECTOR TO MAKE ilitit4l • ens O _ r CERTAIN ALL ACTION ITEMS HAVE BEEN ADDRESSED BY THE CONTRACTOR. . ■ `\ -\ ` / • CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS AND SITE W / HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR. O illipO ` TEMPORARY TREE \�, qy p PROTECTION FENCE Uw. 1 IPA \ EROSION CONTROL MAINTENANCE NOTES: • z e\ m 1 1 1 l`1 I ���L -..- �i • I. INSPECT ALL SEDIMENTATION AND EROSION CONTROL DEVICES FOR STABILITY AND FUNCTION EACH WEEK AND FOLLOWING 1111 LIMITS OF DISTURBANCE >, EACH RAINFALL EVENT. T, /GRADING '1\ _ � ♦ 2. REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED 50%GAPAGITY. Q z ,� azo ` 3. REMOVE ACCUMULATED SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH EXCEEDS APPROXIMATELY 5 TEMPORARY (,0 \ SILT FENCE 0.5'. REPAIR AND REPLACE SILT FENCE A. A 1 O 818 �� IF4. CONTRACTOR SHALL APPOINT AN ON-SITE INSPECTOR AND MAINTAIN RECORDS OF INSPECTIONS IN ACCORDANCE WITH THE u VJ �� ;J \ PROVISIONS OF THE GENERAL NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES. II I� r 815 O 5. G.G.15 RESPONSIBLE FOR ALL EROSION CONTROL PRACTICES REQUIRED TO MINIMIZE EFFECTS ON ADJACENT PROPERTIES. ( ^ i/� 0 5 L \ \,�, S. THE OWNER 15 RESPONSIBLE FOR THE LONG TERM MAINTENANCE OF THE GROUND COVER ON THE PROPERTY.GROUND v ' V) L \ COVER MUST BE MAINTAINED TO A DEGREE THAT PREVENTS SOIL EROSION AND SEDIMENTATION AT ALL TIMES. \ r ACCEPTANCE AND APPROVAL OF THIS PLAN IS CONDITIONED UPON THE PROPERTY OWNER(5)COMPLIANCE WITH FEDERAL LLJ O nn • - AND STATE WATER QUALITY LAWS,REGULATIONS,AND RULES.IN ADDITION,LOCAL TOWN OR COUNTY ORDINANCES OR L V 1 .90. alq 1 , \\ �. ` TEMPORARY RULES MAY ALSO APPLY TO THIS LAND-DISTURBING ACTIVITY.THIS APPROVAL DOES NOT SUPERSEDE ANY OTHER PERMITCe 0 �' _ 1 a6 i1rIIIIIuII567 GRAVEL OUTLE OR APPROVAL. /� "111 ¢ t O a SILT FENCE 1. ALL EXPOSED SLOPES MUST BE SEEDED AND MULCHED FOLLOWING COMPLETION OF ANY PHASE OF GRADING.REFER TO Br 5 p 0 .:.r.;r 815 THIS SHEET FOR GROUNDCOVER STABLIZATION CHART FOR STABLIZATION TIMEFRAME. ` 0 \ �" 10 ♦ -e/A, 8. SEEDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND I5 MAINTAINED. AREAS SHOULD BE / - o OLIMITS OF DISTURBANCE •� J �5 r`M� � �� FERTILIZED AND RESEEDED AS NEEDED. • • ���//�����,,������ J ` \ /GRADING //���" TEMPORARY _ 0... •LLJ t{/SILT FENCE C '♦ ti:/ . IMPORTANT NOTE: L/0)-) --) - _s��`"?/� O w OFF-SITE WASTE OR BORROW AREAS MUST HAVE AN EXISTING APPROVED EROSION /1 / Illlllllr� LL / ery ,` �.` �' - '� REMOVE EXISTING TREE 8 ,Y y \ CONTROL PLAN AND/OR GRADING/EROSION CONTROL PERMIT. GENERAL -� TEMPORARY TREE © ,� VEGETATION AS NECESSARY , CONTRACTOR/GRADING CONTRACTOR TO PROVIDE DOCUMENTATION OF THE I-I 2 PROTECTION FENCE APPROVAL FOR THE OFF-SITE WASTE OR BORROW AREA TO THE EROSION CONTROL TEMPORARY TREE E a a a►� TO INSTALL INITIAL EROSION 5 PROTECTION FENCE ��.0 ---CONTROL MEASURES TEMPORARY INSPECTOR PRIOR TO BEGINNING OF ANY WORK. e+o TEMPORARY ]�' O �,.�' 1 _ SILT FENCE GRAVEL OUTLE TEMPORARY© O S SILT FENCE �� CT IVO _/ � p V - CO I SILT FENCE��� 809 I If O® ,'.../ a% / - r� I I! -00 l \80B '\ii� IT ' ' / / -_ - - - "'Irry - LIMITS OF DISTURBANCE \__�a07 - _� / _ ili /GRADING 8p _ _- TEMPORARY 5 �- 9 REMOVE EX ISTI NO TREE 8 , SILT FENCE �-55 �I c _ O M - B VEGETATION AS NECESSARY / I'I / -REMOVE EXISTING TREE 8 e� �-Oa TO INSTALL INITIAL EROSION O R CONTROL MEASURES TEMPORARY TREE 2 ` I.VEGETATION A5 NECESSARY ,9 8+ `' PROTECTION FENCE _TO INSTALL INITIAL EROSION - CONTROL MEASURES eil TEMPORARY LIMITS OF DISTURBANCE - ,',* lI�g1, GRAVEL OUTLE 1 a SILT FENCE i /GRADING \" _ I �, ,Z� Date: 8TH MARCH 2O23 4 _ �:\ o' g10 FOR CONSTRUCTION , \ • �,'' ��• _ LIMITS OF DISTURBANCE , \ /.O I `� / Revisions: • �i GRADING O �� 'tee 5/I5/23 PERMITTING COMMENTS ... F" TEMPORARY TREE 'I IIIIIIIEiI ;/ C s b/2/23 PERMITTING COMMENTS eo, ; �, w PROTECTION FENCE C p _ u LIMITS OF DISTURBANCE I lbw O (, , /GRADING REMOVE EXISTING TREE 8 800c , \VEGETATION AS NECESSARY i I _ TO INSTALL INITIAL EROSION TEMPORARY©�e \i J TEMPORARY 0 I /SILT FENCE►W ' . CONTROL MEASURES 1��. v • _--- -- • - ,�5//SILT FENCE \ -,' 1 - 5 TEMPORARY -�--- / 79, '� I - rc. -5 SILT FENCE I a. T 1 - ,` 4� 0 Drawn By ARM \ I - / QTEMPORARY I 6 7saI : �� / I �6RAVEL OUTLET - Anilre: Checked By GSM / -805 " ®SILT FENCE I o - 5 LIMITS OF DISTURBANCE �� I 806 Project is LA-22-00I /GRADING �N _ M1111111 0���• I �,\ " Wei S� / I-''-"O w S I '\ s. TEMPORARY © ` O o mV I Li) TEMPORARY ''='' I ItiggeXIMIIIIIIIitN 70 SILT FENCE G� SILT FENCE a�� o -, �\ TEMPORARY CONCRETE WASHOUT. /^♦' TEMPORARY 80A/ REFER TO SHEET G-1,NCGOI GROUND \ , SILT FENCE V 1111111111K \✓ STABILIZATION AND MATERIALS ♦\ J IIIIIIIIIIIIIIIIIIIL 1.0 w Nit. \ HANDLING SHEET FOR DETAIL ♦' filV eo�TTor•of,r,- 1► ,� �� LIMITS OF DISTURBANCE FJ.ev.wa-Ta �� �ill� • �- �V /GRADING -a03 •� , ``���.W.- [XI SILTTEMPORARYFENCE Agik \.�__ \�� \\ n \�\.�...\ }7 s Illirlik. - VEMOVE ALLNNIING TREE 4 SAR _eo2- SCALE: I"820' WV �� _lor = `` �� �� - -- LL .f CONTROL MEASURES V. 601 96. `� 9404, ' /_ _-_\� �` .\ , SE TPOERA a°°� WS/FC EROSION CONTR ICE "BEFORE YOU40 DIG" LINE ROBI ""OpD R°AD \1 �� `♦ \ = 7g9 r PLANS APPROVED FOR N UCTION \ _ 7 -800 632-4141 ORB -- - -- r \ -----\ \ 0 r�'\'1 io -41. ' - 95 \ i ,. ,` This plan complies with Ch er ,A • 4-Erosion Control of - 7sa Sheet Title • ♦ the Town of Lewisvill nifi evelot •nt Ordinance. A r _ ____ TEMPORARY NSTRU�ON© �'' printed set of the sta d/appr• • p . must be kept on the PHASE I- EROSION ENTRANCE ® I '_ +. _ construction site for r ence w in ling required erosion control measures. CONTROL ELAN TEMPORARY gig - _ 95 790 CONSTRUCTION+ _ TN '. 9,,,, ENTRANCE --_ - _ 798 704 ,01111 . ►� matthewo 06/02/2023 1:58:34 PM Sheet G-I