HomeMy WebLinkAboutNCC231733_Site Plan or Location Map_20230606 / \----3 / / 7 I `�/' N
�1 1vv , / - _ - ) v
21 s 11 ENGINEERS L� \ `___- / 4se 'Po.
\
"SITE $ PLANNERS .,--/
/ / HIS PROJECT IS INAHI /
4 0 8 SURVEYORS \ ) / --
.-/ WAT REGARDINGSER ZONE AND ALL ITIVE A E A S STONE -992 _
y aWO4 / WATERSHEDSS ULDB OLLOW �' REOUTOLET a deft \
ig g 73 MOORMAN,KIZER & RElTZEL,INC. ) INCLUDING AVST ILIZAT °'` S ENCE \
'� -- -----)
„.e��g. P 43 / / / CO TRU ION / WATTL ��>* \
WEST Or -- LIMI S ^ �7 g�>* /
END ° / / I J// i � vr/ , < -ll / /
/ V
SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY /Ii ) /CGS 113A-54.1'IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR / PHA$E 3 OMPLETED AS AN EXCEL SPREADSHEET. / J I QPEN$PAGE N ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED 'ROSION AND / / // %r/ ::.„.„TrE9T,R)c/79
•, ]4 /
SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A 5 / ATER ZONE AND RRE�QUIREMENT ��
73 21 NCAC 048.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY / / / REGARDING SENSITIVFREA
,QONSTRUCTION WATERSHEDS SHOULD BE FOLLOWED \ I
INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE / // -- � / LIMITS /� INCWDING]DAV STABILIZATION. �/
APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, ��
DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, / / / 9 / // // — CONSTRUCTION /3`" 4TB
PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION / ENTRANCE /
VICINITY MAP CONTROL PLAN.' ,./;--'
/ / / / / +
(NOT TO SCALE) / / / ,/-/,/
/ 59 \ / /
er/ ` / / / / CONSTRUCTION ///6D �:'j \ \ / / /
CONSTRUCTION SCHEDULE / 5 p .
I. Obtaln all necessary perm and plan approvals Erosion and Sediment Control f /
(E&3C)permit end a Certificate of Coverage(COC)must be obtained before any land disturbing activities \ \ \ / / / / / Lot Plan /1` 5 61 ' \
�j` \
occur.A copy of the E&SC p the COC and a hard copy of the plan must be kept on site,preferably in a „C„ ey/act" �� _=86�� \
permits /
b d accessible during inspection. i� dr
2 Install gravel construction f m aim fences,reinforced sin fence outlets and wages. ° +''+
3 Finish 1 g dgrubb g y necessary as on the lots as they are started. \ \ I a rr // 4, l /
4 Begin I getting d \j --._ ---
5 Begin with noose construction activities. ///{1/ // GelJ�. e/ '�
42
b. Finish all rough grading and horse construction. \ \ J '/ Q7 / /t I / /
]. Install driveways,walks and patios. \ \ J NSTRUCTION / / a.� --
8. Begin f a grading oflat areas LIMITS/ /WaY' / W / / /
9. Final grassing,mulching and stabilizing of lot.In most cases this will involve the installation of sod on the lot I /(,y. A y `- —� /
The silt fence will remain in place until the lot is sodded or grassing is stabilized and takes hold. \ 1 \ \ `o mmmr'I��I ,,�+r"`��/ / ,-
10. The contractor shall conduct self-inspections of the erosion and sedimentation control measures and complete 9t \ \ I //gtl`- / 46 / 6 //�Ry �i
the fallowing combined self-inspection f found on the DEMLR website ILL A. ills \ I I II\
https://files"nc.gov/vcdeo/Ener¢v%20Miveml%20avd%201and%20Res°races/Stormwater/NPDES%20 all& Lk A. AL I \ \ \ \ I / O Go / 4� /
General%20Permits/DEMLR-CSW-Monitoring-Forme-Rev-August-8-2019.pdf.Twelve months of complete \ _ �6.3 /
inspection forms shall be kept on site and available f inspection at all times.It is recommended a copy be J A. A. 9Le \ 1 1 / j / / 's ` /
kept in a permits box.(GS 113A-54.1(e),15A NCAC 04B.0131,NC001 Pan Ill Sections A and B) AL 911E \ \ \ \ \ `•
QJ /, Js �' /—\ �_ • - / //
11 Self-inspections for erosion and sedhmentamn control measures are to be h.An performed at leant once every seven >l� "` A \ \A.
/ / '<'r��//., /�004. -seB __
di
calendar days and within 24 hours of every re f grater than I inch Any needed repairs shall be
made immediately to maintain measures as designed.All ESC measures shall be maintained as specified in \
the construction details on this plan A rain gauge shall b installed at the project site P monitoring -^ \ \ \/ \ \ / 64_� �� / /
12. Inspection and final acceptance letters.When N project complain,the permittees shall contact DEMLR m _ / \ \ \ \ T PROJECT IS IN A HIG UALITv\ I 'G / \ /
close out the E&SC Plan.Afler DEMLR informs the permitter of the project close out,via inspection report, A. 911E i \ \ WATER NE AND ALL REQUIR ENTS / 50 / alr / +yam �0R
the permitter shall visit"deq"nc.gov/NCGOI"to submit an elawnic Notice of termination(e-NOT).A$100 REGARDIR65 NSITIVE ARE �4
emirs general penult fee will be charged analthe.-NOT has been tilled out �m � / ^ \ \ \WATERSHEDS SHOUL EFOLLO 0 \ / eA / g -65-- -� 10 \ / /
0e / \ \ \ \ ' `INCLUDING]DAV STA RATION. I • / ��e /-- / \ / /
5 5 � 1 �// _ate
-. III / a-u. n 111,s t s / toted rnr T.1Z ilk. 1 i/ ` / \ \ \ N\ I I I I// 5y .. O �a"_66 Sc, // / /
SECTION 6 SECTION `sink« ()and a minimum of 10 feet bbe ow 11 ,111E \rev..snot sac ha Ogs de nOt mn.
grad.slope.Silt sock/Wallie(s)located below 4 ,...___..' ( • ,dl,; ( I I I ' / / // °�
/
Ro F k,wici wanlel.i no a be om;a:Nnwus%to
1YC A. A.,h��,/ \ \ l 'ILL 9\� \\ 1 I I �/:flat areas should be located at the edge of the / Z----- i-,,, Cg, ,,
// "_ •� � \
A Me* sMm- prevent 4. silt ur a around e endswI a 1� 9u1 911E I I / 7
`� \ \ iluLiik \ I I I /,¢�`� s \ \\ \\ \Inch x 2 Inch cross sect.should be vertIcally plumb,through metaem e woa n'le AIL 4 'JIL \ TK \ 14 ( III �/ I \ / \
sock/wattle.Stakes should Trenchin a sin soruwattle is placed in a 4 inch \ (/ 1 \ \ \ I I I I ("53
.t<`. / �4 \ \� \
maximum interval of 4 feet or a Wood 2 <r Com ground 4 Min. maximum
a,Men9� (I - `
°t/2 height s. v 4 4 '� \ 1 \ 1 /P / THIS PROJ TIS IN AHIGH-UALITY
UNTRENCHED INSTALLATION „..w�unuan r,srl-m,-,_..ur�wnw.,Gar.n socks/wanles are us.on ment)heaw interval
\ \` \ 1 \� I N� ` /'', 54 / WATER ZONEA DALE R�QUI ENTS \
hold, p during runoff events. \ I 911i: \ \ \V/ REGARDING�ENSITBSN9LEA�
ISOMETRIC VIEW h. Inspect silt k '.\ 911E 911E gg,."\ y+QT J \ehind the silt
I �� \ I , \ \ \ / \ WATERSHEDS SHOULD BOLLOWED
T '\ INCLUDING $TABILVA IZON. \
•
tar uMulch or no-.ren.a soot , ogee ,z i�en�eOtomnre each 1 inch or greater rain.Remove
accumulated sediment and any debris za tam as twattle at least weekly and ate, �, �� ED .� \ �'<• / — —
') Toe.P' :%;�°nlem.r°��Pm�T.pro rot)t.aa rim)(ana rim) �'m) 3 Wame man,e<rePlarea ea<„ed or "I ALL ,J4 r 9LL f'� .4.
�\11 & _ 55/ 4
sot sock a�uthm(asJ` l,°eJFmi(zzeFmi :� 'ia0° tFaso reo a� a 911E 9LL
Sheet F coo kresa l� :user//M` ( m) (>aa m) mph m) 6 Reinstall II c.a.,.or imaalie a pee Caged.tr_ e r '1LL 914 ALE.I' \ \ �G - � �/ I 56
x� k n T.aR Tip
tin/N ow
a'n6Riltsockslwablesshallinspectedundl /II. Jk. JILL 4 Lk 4 4 \ N \// .. /
v land
min) /mr/) vlmim) v,„„,) vmim) measure has been permanentlystabillized. fl' \ \ 1 \ \ ��� \
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION
DATE: PAGE: DATE: PAGE:
DATE: PAGE:
yry F n Filter Fabric
T'Y _ /I
S.M.,Standard�^ M fence Wire BBeckrlltrench q p G e e
Steel Pon 6 Max. strength wire fen Wire Fence d Compact 1f T 4 ll " Alla
A Steel Past thoroughly T y ,% % g, D ✓e r( � �Yl�'!,
— n . u �9. . co- �.� tip.
tie tie J p p — — AY — Ron — °�\`G } .
PI.w 1 tan' } -� Q "`Odr er
�y
''` L-'-' a'�" � "°sae THIS PROJECT IS IN AHIGH-QUALITY
e aown84 rowan augur S. in H V a=cnw0 AY
1Q AV KU AV kU NAV Ro war Ro Av .� .� WATER ZONE AND ALL REQUIREMENTS
/ �eoOe Notes :41"/i 7 = ,.- REGARDING SENSITIVEAREA
ICU INLET 1,If needed,Tree Protection fencing should be installed along the buffer zone wetland - - Ala' '' WATERSHEDS SHOULD BE FOLLOWED
boundary and/or around protected trees providing a radius of at least125 feet for each R''``` ````JaK Y. INCLUDING 7 DAY STABILIZATOION.
1 1 LEGEND inch of trunk diameter. IF.
BMn
\--Filler FObr< < 2.Install Silt Fence on the low elevations des of each lot Install Silt Fence Outlets shown on ��- •• Tai , p
CROSS SECTION VIEW DIRECTION FLOW schematic/diagram and field adjusted,(necessary for placement at low polnis If lots are
°n
eAre ars.n.n°daleeM..amewrMa.npn=rrena=mar mpnu,e wain=:mwamrSILT FENCEcontiguous and have different land owners or builders,each tat should have individual Silt � Y cPp�
'.°=igleseAirnent barrier of standard stranot or ee eignerl.M,amm.wapeuwrv.n<,,..r.n.msaGn=annvra=un in. n, n , Fences s :._
.°u mourgeG., ® 3.Install required Silt Ferespathn10 feet f property line nsuret ensure there sno conflict with Mi&gl'� General Erosion Control Notes
..m. frertenn.ap=ivo==leamnann<.pen.con.or Hasne zioa..shade bee mivo=er.*ne.c.M°..tr totem. ENTRANCEseptic system.It is the responsibility of the builder to ensure the installation of sediment
CURB INLET ontrol m doesnot impact the septic system and repair area(s). 1.Only the show shall be disturbed.
tent.lensed stt5=m.am.maer..o= l maneuei.ad.an nv t etc a ma.Tix=Ur=mawN 4.At least oneConsWclion Entrance/Exit is to be installed per lot. all vesetaeon,roots,and other objectionable na after earn l tarn greater rainfall,
ppropergramake any required 2. All disturbed a shall be grassed and
Wa
ste astS bins and others areas o bdItln runless wastes sh be rs immediately
n n,ana.s�r,m ren<n in=mm,Mnzae m nainag 9 con r .alrone npe<mc grade and asmanninnn Shawn en the plans.and y mulched asas possible and maintained
leant other feet awe non storm is se parts o coma b elichev d,the it are be ust b mat il>.am.m.rmemwrge,.�r.g.anon nv M.n Y g unt'I pemanent cover Is established.o
a.Plass 12 inches of al,.along as Seams and side dale Sarah
rfi ough comas.n.m,repo.n Gra to.rnrma Min.,. paver a� otaidtehind en if th's separation cannot be achieved,these areas muctba , spilled,waanea.r,mckea°topub is
rmatenamaonu Tlvunsn mmpmwna n,coon is arou ex.Mmmm�m. nonta contained behind Sill Fence. subject ,eery the foundation in locations roadways.
m.Don.... n=ring M„' 6.Inlets downstream of disturbances should be protected"streets should be swept when seepageg .her Lade.
sediment from the construction activity is present.
..\NC-En vironmental.jpeg ].Details for Slit Fence,Silt Fence Outlets,Construction Entrances and other measures are ..\,ve-Frivol 0 0Itor Iey
provided on additional sheets.Erosion and sediment control details are not drawn to scale. CONSTRUCTION ENTRANCE/EXIT
u-3 :':Z202D TYPICAL LOT LAYOUT WITH CURB AND GUTTER '" •.
..\n C-E n v i non m e n t a I,jp eg
SILT FENCE PAGE 1 of 2
SODDING THIS PROJECT IS IN AHIGH-QUALITY
WATER ZONE AND ALL REQUIREMENTS
DATE: PAGE: REGARDING SENSITIVEAREA LOT EROSION CONTROL PLAN FOR
IL FENCE WATERSHEDS SHOULD BE FOLLOWED
- - - T 1a - NAmTENANCRorRRastoN.,NDsco.MENTATfoncoNTBof.m5.srrRESPOBf.o,'consesocnoN POT OVERLAP.P SHARPENED INCLUDING7DAYSTABILIZATOION. ONSITE HOMES, LLC
III IIIII II IIIIII IIIIIIIIalislincshately remove all*atonable mel aterishould washed.als tracked anMpb,uw a in a condition m paw.mud or sediment die and 1° °rB"""°""� GROUND STABILIZATION
SITE AREA STABILIZATION TOTAL DISTURBED ACREAGE: 1.33 ACRES
- , , A< ,r,n<.nnr, , Mn,ae,n<r<n=< � "r`"`°`°""CiL°' DESCRIPTION TIME FRAME EXCEPTIONS LOTS n 6 & 57
SDI Pence-Sedimmt fences should he insinected at least once a week.d after each rainfall event.Any repairs Amid be made immediately. MAI .`,',T,Zt=4","
MUST at Vines.Take notana<rm undermine during operations. PERIMETER DIKES, 7 DAYS NONE `t V .J
THEonABOVE WASHED TOP OF SILT FENCE areas being a,newa SWALES,DIT°HES GRETCHEN PINES
STEEL FENCE ST aonowAREa Tn raonn VIEW Is,
GGrassing and Mulching-The arum receive grassing and mulching sh.ld he rareseeded.=e possible. the ram ===,an,=� lygroash and stabilisation orthe root bed.Ille sod should be Inn.and fertilized as per fto maintain adequate moisture in the r.t zone and prevent dormancy a thc sal.The sod=�ized and lime recommendations
temporary s see an preparation.as an initial step in soil hould not he mowed to close,sbice this could inhibit adequate &SLOPES
VV1RE FENG� \ HIGH QUALITY 7 DAYS NONE
FILTER FABRIC,
ent of a permanent grass,then a
AND HARDWARE
WATER ZONES
BURN'WIRE FENCE. On.the grassing hu been placed,.area should he maintained as needed to insure that all arus are germinating g (HOW)
wLTEROSTo FENCE TJi CLOTH IN TRENCH
ono" of ap`""'"`,gras`- ter Y I�IIIII' SLOPES STEEPER 7 DAYS IF SLOPES ARE PHASE 3
SETMAXDiversion Berms-Diversion bem.shall he inspected weekly or Mier each nmoR producing raMfall to insure operatingdesignedandMatthere 1l+/)lFg,ua "gel 111p)N THAN 3:1 10'OR LESS IN
MIN.DV 3"FILTER FABRIC GROUNDt. grakarea LENGTH AND ARE MINERAL SPRINGS TW,' MOORE CO., N.C.
ON GROUND m=e<ma won m<M�,narenG, WITH sea "" APTHEP.is EMOWER NOT STEEPER
1.Hardware clot and gravel should den) eley.vation namanrsltilt fence at neea 12 at compacted pa<t<aermc,<tyt°mna.<thatth<bernremamn place during xtnecourseofMecom,.n<nonaN,v,r<n. "" an THAN 2 1, 14 SCALE: 1'= 100' APRIL 2023
o°ah3'. 2.Stone outlets should be\\ nd
ass on coeamons. APPEARANCE OF GOOD SOD DAYS ARE
BURY WIRE FENCE AND stow CLOTH ` MAINTENANCE
y ,n in<each 1 inchrg< a ALLOWED
EH Per immediately.
- s SLOPES 3:1 OR 14 DAYS 7 DAYS FOR
FLTERFAeRaN rah a Removed
illll�� anaoi PLATER SLOPES EAER GRAPHIC SCALE IN FEET
THAN 50'IN -too 0 100 200 300 400
4.Remove s.lment when half of stone outlet Is covered. that impair the filtration capability of the wattle shall be removed when the udiment reaches one-third of the wattles s Replace stone as ne.aea to Meditate...Water 6 .sm<,n.alln w<w,,n p, m.r=n r tmc a=,mrm sa nn, t m<m., r ra nrwator. ago DE. LENGTH
SECTION VIEW _ W
reduce
`"a'°°'°'"'�`" ALL OTHER AREAS 14 DAYS NONE(EXCEPT I
..\NC-EnHr°nmentol.jpeg Take care to avoid the fence rare are arsine„cleanout.Remove a.replace stone as necessary crrisssoo5an+ WITH SLOPES FOR PERIMETERS
«..\NC Eno•,,,,,on=6 SILT FENCE OUTLET and aMn,b.<,t after the cmhmn s s< <a has properly stabilized. ' s ° "' FLATTER THAN 4:1 AND HQW ZONES) MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C.
PHONE (910) 484-5191 FAX(910) 484-0388 License #: F-0106
LAST SAVED:4/19/2023 10:43 AM LAST PLOTTED:4/19/2023 11:55 AM PLOTTED BO:Dennis Gilbert FILENAME:0:\CURRENT JOBS\ONSITE HOMES\20-2]24-02 GRETCHEN PINES-EC\PLANS\EC GRETCHEN PINES-LOTS 46&5T"OW°