HomeMy WebLinkAboutNCC231727_Site Plan or Location Map_20230606 — 8� \ Ab RAIL ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY yS`'y5 CONSTRUCTION SCHEDULE NCGS 113A-54.1°IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 55-� - I. Obtain all necessary permits and plan approvals.Erosion and Sediment Control erd ® (MSC) d a Certificate of Covers COC be obtained before an land disturbing —\ -- ae \ COMPLETED TI AN EXCEL SPREADSHEET. ( C)permit m Coverage( )must y g activities n R/1�.,7 AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED cur.A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on site,preferably in a J�et•l 7��/-� EROSION AND permits box,and accessible during inspection. �_ � Nl. SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A 2. Install grovel construction entrances first,then Mt fences,reinforced silt fence outlets and wattles. �_ 1•ik'trT'1 NCAC 04B.0131 STATES THAT°...DOCUMENTATION SHALL BE ACCOMPLISHED BY . 3. Finish clearing and grabbing any necessary areas on the lots as they are stoned. —� \ � <l,j INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE �F o d. Begin lot grading and excavation«avities \ \ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING. y�'�o RANCH ROAD 5. Begin or continue with house construction activities. DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, 6. Finish all rough grading and house corewctivv. +iy'6` Z ,y4 PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION h+ ], install driveways,walks and patios. \ CONTROL PLAN.. \ A^1�' �^ / 8. Begin loe rading of lot areas � d 9. Etna'grassing,mulch ing and stabilizing of lot.a most cases this will involve the ivstallaavv of sod on the roc \ \ 1 pA °Z / The silt force will remain in place anal the lot is sodded or gmseivg is stabilized and lakes hold. \ (I\ ' qe� � � 10. The contractor shall conduct self-Ivepectims of the erosion and sedimmletoinn control measures end complete es me following morose p«aDn tin roans DEM R webaae SODDING Wk'YZ/Ap G + a ��• hope:I/files.ne.goo/ncdeq/Enerp%20Miveral%e20and%20Land%e20Reaources/S+om+watuMPDE3%e20 \ M. _► 'r,1R gaR'iR � General%20P .DEMLR-CSW M 't gF R A gas 82019.pdf.T Iva months of complete \ \ SITE inspection f b keptd availablef p recommended acopy be \ UT SOO IN A STAGGERED I keptNap b (CS 113A 54.1()ISA NCAC 04B.0131 NCGo1P III$ A dB) \ �� TORmlkp aoAD �` 1 11. Self-inspections I d sedimentation I beperformed 1 eryseven SR-I20J a,+ ,q g� calendar days Jwithin24 h f every of greater h 1 h.Any neededretry.fell be N�4 ■■ made immediately designed All ESC shall b J"specifiedin \ ������ ,�,s�aaeY AOB 3 m ae' the cons[ details h planA gauge b installed h protect fmonitoring. . N`5a" o < 3 ' 12. Inspeclio df 1 plan It Whenh project pl h pertained,fell DENIER to 314 sxos Axo Ta MM xs Pscas. 9, THOMAS DRIVE \ close out ERSC PI After DEMLR f rms n p nee of the protect close p port, /""V `� _ \ BUTT ry•Apiary... FLSDD+os o o ik I ^� the permlttee shall visit•'deg.nc.govaNCGOI"to submit an electmnd Noma f,criumanon(c-NOT).A 5100 Ill -- -- \ _� CAUSEDMII ill CI / 44111 , ''� annwlgmeralpmnit fee will be charged until the e-NOT has been filled out. nrexco CORRECTLY a4t9 9b '' RALFO�1i i•V � _\ — — — — p of Plan Lot Plan Y N H H: _____ .LIII pt0,1").1 \ \ Lot Plan / \ \ :,jìi �u)) III nG„ Leona \ Ilhwv'm) all. u IIVI g' ,‘,$°- 4 ______ _ �� we Acx DM Pk. ATT EEDED:WA °ELL AS 500..1-P1E300 IS Love MOWN/HEN-FRES.IS a �P wNw \ Lot Plan \ ��— — � 1 I wnx Txs saLCONiAAPPEARANCE OF GOOD SOD HIGH ''I-SETTIs mowed ) \401 VICINITY MAP ,9 35 / / �/ ��I����I^��I� V��IIII�I hell .m ,,MID MAD N.T.S. \ I o[Plan 36 \ nE.: — DATE: PAGE: \ I 4 / � f~_ F. d SILT FENCE + 43 I II l i 21 i 111111 / DATE: MaBTBeAT 2 ABaVETxE Q mew�xB T 22 T-, die La i STEEL FENCE,Br au Lane — — — HARDWARE CL N FRONT VIEW a \BURY �23 1 °I — )it -- -IIIIIIIII ...sr' 111 Ill 4 t = FILTER OF wABNEDBTD I FILTER FABRIC, ANDHALOTH RWAREN ( // Cot I 4 50 I I I I i .a. ql a „s 4 . »e.�I GI I TT.T ° LJ LJ �I `� IS .ardware cloth and gravel should eachoerlay.lonaenc aelemnwana 24 1 " u RO JV —RO AV e a least 12 inches. o e ..1 se on field I "CoI-- ♦ AREA — — Lma°red Naea: .....::s:o....r....:•i i \ 308 T —j i / \ �'/ / / /— CUdB INLET 1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland ...°.. ....- based M1 _ rwMNTENANCE: I.Per NCGr01,Inspect cutlet at once a week so.after each l inch \� 7 --- \ - / boundary and/or around protected trees,providing a radius of atleaat 1.25 feet for each BURY WIRE FENCE AND HARDw CLOTH ..V'of UPPER EDGE or=srenraeved''nolcleerry =e' CO Ni.\ i LBa[ND neh of ironktlametar. FILTER FABRIC IN TRENCH Frsnen emnewreneearreaawmu 'nchea. �O -- - --- 55 \ 2lnsall 'It Fence on the low sieve[on stles of each lot Install Slt Fence outlets shown on s xeep meeh,raBaaehnm pmnae as erect I� I25 C,IRIAIWSGEE. � — _ schematic/diagram and adjusted,fneceesa forplacementat low points if lots are 4 Remove aearrentwrenhaHaemreo A s Replace nine as needeembadge.e ^ � � FLowDRecT ON p gram anry, 9' CZ -\/ / �- / / sLT FENCE coot guous antl have dBerent)antl owners or builders,each lot should haventl'vdual 511 sEtmoxv VIEW / / // Fences ® 3.Install required Sllt Fence within 10 feet of property Ilne to ensure there Is no conflict with ..\NC-Envir enlal.Jpeg / / / CONSTRUCTION ENTRANCE septic System.It is the responsibility of the builder to ensure the Installation of sediment L m SILT FENCE OUTLET 28 / _ / CURB INLET °ntrolmeasuresacesnaimpaathesepticsystemandrepairarea(s). / • 5�� / /— 4.At leas[one Construction s dedicatExil is to be Installed per lot. \I\ \ 5.Waste bins and other areas dedicated for managing building material waste shall be at / 1 least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that / /45 4, 1, J / / / no other alternative exists.If this separation cannot be achieved,these areas must be 27YY contained behind Silt Fence. 1 \ / \ \ / 6lnle downstream of disturbances should be protected;streets should swept when \ L°t1 P " I / sediment from the construction activity is present. 1 �(lY / / ..\NC-Environmen U.peg Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are I 1 44 / ��'P_ / / e provided on addRional sheets.Erosion and sediment control details are not drawn to stele. /2020 TYPICAL LOT LAYOUT WITH CURB AND GUTTERei — DATE: PAGE: \ Slit sock/Wattle \/� / / f� DATE: SItS Sock/ I/ ROw1. 7 1l a �I re our - meybeesuearmwfn e \ \ \/ i_: - IL ,_ m Prom ea \ 1 \ /l If ""l TollIL \//J,.'p'6 / /i/ \ \ / Stakes 12 'I St,. 3. (length ae urn dO d parallel ' Lot Plan / // \ \/ I / SECTION SECTIONgra beyond aoD GROUND STABILIZATION I •tr 0a O J J e SITE AREA STABILIZATION � I / / \ O ..� () ) M EXCEPTIONS / o Q' ' ra m ow "to e,Ma.. silt 11 n9 he DESCRIPTION TIME FRAME g \ e / so, T. PERIMETER DIKES, 7 DAYS NONE cm Rai in..2 inch cross semen shouki be driven SWALES,DITCHES / (\/ \ Q • • "/ow, T n 4 Yani MM &SLOPES / \ \ \ /'• i 1 1 1 1 1 1•1 1 1 1 maximum interval of 4 feet or a maximum interval HIGH DUALITY 7DAYS NONE J ���������.����tte• Wood Mulch or y.ocunan4 M of 8 feet Me silt sock/wage is placed in a 4 h WATER ZONES I I / \ \ •:_: .. •1111y,�y,�Iy11 uNTRENCNED INSTALLATIONbomlog at n. a fsocksAv.les are used on l heaw (HOW) 4: \ \ \ \ \ t` T�''r_.._. � •�'•�'•'�����-�' .- n,.,..m.•niv,.n....n..,m..,wea„aaa,mw SLOPES STEEPER 7 DAYS IF SLOPES ARE I �, awn f��Y� ���10 i" saMETRcVIEW MAINTENANCE THAN 3:1 10'OR LESS IN SS \ / "�'"�p ,+ LENGTH AND AREIIMPOS S«K NTa PLOW RATES a. NOT STEEPERI \Mulch or Compost THAN 21, 14m,uno-enmea socksarearoae Prom poo:�a. �2mi (eaa nix(isogym)(m�m> (�mxz. anlamaNbe,apla�d nuoeaea e, DAYS ARE sheernow sk ALLOWED I all e n,room,and otherogeaoiabm m�m wetter each l ncho greater,alnmlr woN �sia soak/xL�eu(zzi i rmi ivarI (°s°�1 (seen1 ( •m) a a SLOPES 3:1 OR 14 DAYS 7DAYS FOR 0Q e nw, make any w This may require pegiodic topdress,v.2 in.stone Wa00e - FLATTER SLOPES GREATER more ape a sand� roo�re nor v S.a 9we 'era Oe 7sin ;/n +min rein 'tin a' THAN 50'IN I ovea sen.a o,l�ckea onw poet I \ 1 \ m rya Iv era ohledanable malarial Spilled. v. (s. (1 °(lee ( B(i]' LENGTH / mundelse n outlet a roadways a rnun) ,,,,m> unto) ,nun) I,n,n) has been permanently stabilized r h mKePa9e h9 mimes suitable ..\NC-Envir mental.ecu ALL OTHER AREAS 14 DAYS NONE(EXCEPT r� SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION WITH SLOPES FOR PERIMETERS N • •i� \II Ne—Envirmenml.pegwFLATTER THAN 4:1 AND HQW ZONES) 4S° � FYI J �" CONSTRUCTION ENTRANCEI EXIT DATE: PAGE: Ysets Post Wire Fence Filter Fabric / 1 \Bnckfll trench ////Si Max E rgm enewim mmnce Wre Fence Wae d Compact8'Ma.Standard strength fabric with wire m iii1and Co pGeneral Erosion Control Notest k Steel Poat 1.Only the ores shown shall be disturbed / PAGE 1 Of 2 2 AII d'sturbedareasshallbe grassed and UpS"" mDlaned as soon as possible and mG�taned - - _ TOTAL DISTURBED ACREAGE: 0.91 ACRES t t+az4• by f ant pemanent cover s establ shed n \/Wiretieef / / LOT EROSION CONTROL PLAN / k —Z LOTS 12, 13, 17, 18, 23, 27, 29 & 35 E e.d a4.m mmamrerwr�� — GATES FARM Filter Febrle aRaBaaEanaNwEw MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION eceseII..C°wee ahwr .oar�.a�°.°.ww.M, FOR nl.,.wna°eaa..,,a...Y..w r..,..m. n.re.a,tlreh«°'°"" General-AII measures will be inspected and corrections made after runoff producing rainfalls or at least once per week minimum,The builder will insure that the construction activities on an articular lot do not adverse) affect an of the installed erosion control measures.If lot construction dictates measures will be P P 9 P any y y BENJAMIN STOUT REAL ESTATE SERVICES INC. .,.manr.anramne,n.npNn.,ne nr,n.Mn. whe°,pl.ra<„pe.Nala..ea °•°°' °a•°K°^P°��oi°�r^° relocated on the lot to insure that thepotential for sedimentation runoff is eliminated as much aspossible.Silt fences andgravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seedingand mulching will be maintained to insure properground stabilizingcover. I 99 9 P P .ore l.n.a .. 0.,..a.,,n.... ,,S°Supports baanw,.w °.a.round, ^° Gravel Construction Entrance-The ravel ad should remain)n a condition to prevent mud or sediment from leaving the construction site,This may require periodic to dress)" with 2-inch stone.After each rainfall inspect an structure used to trap sediment and clean)t out as necessary. Immediate) remove all w . .. Mz.ra„mans i washed, P 9 v q ° top dressing P v v ry' v RAEFORD TOWNSHIP HOKE COUNTY p rmce.s.ni r.n.nw.nm•I.en°e,anl,w P.+, objectionable materials spilled, ashed,or tracked onto public roadways. lacanfta,w°c°,dawsn d.n...a.n..a°°n Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.An repairs should be made immediate). Damaged or decomposed fabric should be replacedpromptly.An sediment deposits that build u against the fence should be removed and disposed ofproperlyto insure urn°ss nn°rtn° a,d°nil°p°rm..°o.n°c I,.nnx.d. a ° P YY 9 P P Y P P 9 P SCALE: 1"=100' APR IL 2023 ,xN...—....Tnee.tomperiten°rm,a..Mrl.amal..ar.,,.oa°werkee °'°°"e that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. IS.D5,NNarnmx,Mon<.,saeehee,. Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growthNu GRAPHIC SCALE and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. 0 50 100 200 4D0 Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be M MI 11 repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) ANC-Envirscrnen tol.jpeg SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. t inch = 100 ft. JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:5/9/2023 9:58 AM LAST PLOTTED:6/I/2023 2:49 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\BENJAMIN STOUT REAL ESTATE SERVICES INC\23-2510-16 CATES FARM-EC\PLANS\GATES FARM EC-LOTS 12.13,17.1B.23.27.29 h 35 DWG