Loading...
HomeMy WebLinkAboutSWA000208_Supplement-EZ Form_20230525SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 lProiectName 4 (Surface Water Area THE PLANT GUYS 5 Ils this project High or Low Density? Both High and Low Density 6 1 Does this proiect use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 10 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 1 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 1 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Brian T. Upton, P.E. Project Engineer) 28 Organization: The Isaacs Group, P.C. 29 Street address: 8720 Red Oak Blvd, Suite 420 30 City, State, Zip: Charlotte, NC 28217 31 Phone numbers : 704 227-9406 32 Email: bupton@isaacsgrp.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Signature of Designer Seal Date DRAINAGE AREAS 1 Is this a hi h density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? Yes 4 If so number of low density drainage areas 3 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 LID 1 LID 2 LID 3 4 Type of SCM N/A Sand Filter N/A N/A N/A 5 Total drainage area (sq ft 360,239 104108 10,890 8,276 28,749 6 Onsite drainage area (sq ft 360,239 104108 10,890 8,276 28,749 7 Offsite drainage area (sq ft 0 0 0 0 0 8 Total BUA in project (sq ft 192791 sf 58370 sf sf 1670 sf 16011 sf 9 New BUA on subdivided lots (subject to ermitting) (sq ft 10 New BUA not on subdivided lots (subject to ermittin s 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft - Sidewalk (sq ft - Roof (sq ft - Roadway s ft - Future (sq ft - Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on Isubdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 54% 56% 0% 20% 56% 19 Design storm inches 4.8 in 20 IDesign volume of SCM cu ft 41643 cf 21 lCalculation method for design volume Rational ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 Is project below density thresholds set forth in the applicable stormwater rule? Yes 1 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 3:1 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 2.65 fUs 6 lAre curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (%) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? No 12 Ils stormwater released at the edge of the setback as dispersed flow? Yes 13 1 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 JAre variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 Please use this space to provide any additional information about this low density project: There are 3 areas that drain offsite without going through the Sand Filter basin. Those areas are grassed, to the highest extent possible, and/or they are *below* the elevation of the Sand Filter and cannot be treated by that basin. The areas are shown an labeled on the Drainage Area Maps Sheet C6.0 in the full-sized Ian set). SAND FILTER 18 SHWT elevation (fmsl) 700 19 Type of sand filter (open or closed) Open 20 If closed, will the filter will be pre -cast or pour -in -place? 21 If closed, top of grate elevation (fmsl) 22 Is this sand filter designed to attenuate peak flows? Yes Sediment Chamber 23 Volume that can be retained in the sediment chamber (cubic feet) 1,240 cu ft Will there be a permanent pool in the sediment chamber? No Bottom of the sediment chamber (fmsl) 712.00' Area of the sediment chamber (square feet) 930 sq ft 24 25 26 27 Physical depth of the sediment chamber (inches) 36 in 28 Ponding depth in the sediment chamber, above any permanent pool (inches) 24 in 291 Elevation of top of weir between chambers (fmsl) 714.00' I Sand Chamber 30 Volume that can be retained in the sand chamber (cubic feet) 10,000 cu ft 31 Bottom of the sand chamber (fmsl) 712.00' 32 Area of the sand chamber (square feet) 4,872 sq ft 33 Physical depth of the sand chamber (inches) 54 in 34 Ponding depth in the sand chamber, above the sand surface inches 25 in 351 Elevation of the bypass device (fmsl) 714.10' 36 Type of bypass device Weir 37 Mechanism for distributing flow over the sand surface Sheet Flow 38 Sand specification for sand chamber ASTM C33 39 Depth above underdrain pipe (inches) 30 in 40 Will the media be maintained to drain at least two inches per hour at the sand surface? Yes 41 Is at least one clean -out pipe provided at the low point of each underdrain line? Yes 42 Will clean -out pipes be capped? Yes INFORMATION I 431 Please use this space to provide any additional information about thel sand filter(s): Sand Filter 1 12:13 PM 1/26/2023