Loading...
HomeMy WebLinkAboutSWA000206_Design Calculations_20230524 1w-.MMwK W [:) 1CA<w9C) N community infrastructure consultants Village of Waxhaw WKD # 20220782.00.CL CALCULATIONS FOR: Stormwater, Water Quality, & Detention DATE: 1/31/2023 e s Si' REV: 4/26/2023 s� is G. 1213 W. MOREHEAD STREET,SUITE 300, CHARLOTTE, NORTH CAROLINA 28208 TEL 704.334.5348 FAX 704.334.0078 www.WKDickson.com TABLE OF CONTENTS DESCRIPTION PAGE 1 Narrative 3 2 Pre/Post Development Curve Numbers 4 3 Impervious Calculations 6 4 Pre/Post Development Table 7 5 Wet Pond #1 8 6 Time of Concentrations 10 7 Rip Rap Apron Design 14 8 10-Year Spread Calculations (Non-sump Condition) 15 9 Wet Pond #1 Flotation Calculations 16 10 Wet Pond#1 Anti-Seep Collar Calculations 17 11 Wet Pond #1 Storm Pipe Analysis 18 12 HydroCAD Storm Pond Analysis 21 13 HY-8 Culvert Analysis 162 App. A USGS Topographic Maps 167 App. B NRCS Soils Report 169 App. C FEMA FIRM Map 189 App. D Pre/Post Drainage Area Plans 191 Village of Waxhaw FMkwl< PROJECT NO.: 20220782.00.CL BY: TDG ID I C KSO N DATE: 113112023 T.M.: WGB community Infrastructure consultants REVISED: 04/26/23 P.M.: WGB A Summary Village of Waxhaw is a 32-lot single family townhome development with a total of 7.44 aces,located in the Town of Waxhaw.The development will be constructed on existing vacant wooded land.The water and sanitary sewer for the subdivision will be provided by Union County Public Works.The Subdivision is being developed as an R-4 Cluster subdivision,per the approved Preliminary Plan. Proposed Improvements The project will collect stormwater with valley gutter and storm drainage inlets.The stormwater will be conveyed in concrete storm pipes. Per the Town of Waxhaw's stormwater detention requirements and NCDEQ Water Quality requirements,the stormwater will be conveyed from the storm drainage system to one wetpond facility.The stormwater,once treated for the first 1"of rainfall and detained per the Town's requirements will be discharged from the wetpond to a rip rap apron and vegetative filter strip. The site has two drainage points of interest. Point of interest#1 (POI#1)is located to the East of the center of the property where an existing non- jurisdictional swale runs through the site. POI#1 Tc was calculated at 24.4 MIN. Point of Interest#2(POI#2)is located at the Northeast corner of the site where a portion of the site drains into an existing wetland. POI#2 Tc was calculated at 18.3 MIN.The table below represents the pre-development and post development discharge.The wetpond provides stormwater quality for the first inch of rainfall(2-5 Day Drawdown)and detention for the peak stormwater runoff for the 2&10-year storm events to meet the pre-development rates.Also provided is a table that shows the available freeboard in the wetpond. 2 Yr-24hr PRE(CFS) POST(CFS) DELTA POI#1 7.11 6.33 -0.78 POI#2 0.53 0.73 0.2 10 Yr-24hr PRE(CFS) POST(CFS) DELTA POI#1 1.3.32 -0.13 POI#2 2.52 -0.02 50 Yr-24hr PRE(CFS) POST(CFS) DELTA POI#1 46.86 50.47 3.61 POI#2 5.74 5.07 -0.67 Free Board Check BMP-1 Peak Elv. Top of Berm Freeboard(ft) 2 YR 2.41 10 YR I 1 1 1.82 Village of Waxhaw W�WWI< PROJECT NO.: 20220782.00.cL BY: TDG IDICKSON DATE: 113112023 T.M.: WGB community Infrastructure consultants REVISED: P.M.: WGB PRE/POST DEVELOPMENT CURVE NUMBERS CURVE NUMBER: Predeveloped CN POI#1 Cover Type Area SF CN Wtd. CN Woods B 543022 0.67 55 36.60 Impervious 54658 0.07 98 6.56 Pasture(Poor, B) 9087 0.01 79 0.88 Grass B 209176 0.26 61 15.64 0.00 0.00 Total 1 815943 1.00 59.69 Composite CN 59.69j Use CN= 60 Predeveloped CN POI#2 Cover Type Area SF % CN Wtd. CN ''voods B 106262 1.00 55.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 106262 1.00 55.00 Com osite CN 55.00j =1 Use CN= Village of Waxhaw W�WWI< PROJECT NO.: 20220782.00.cL BY: TDG IDICKSON DATE: 113112023 T.M.: WGB community Infrastructure consultants REVISED: P.M.: WGB PRE/POST DEVELOPMENT CURVE NUMBERS Post developed CN BMP#1 Cover Type Area SF % CN Wtd. CN Sidewalk 15335 0.07 98 7.22 Lots buildin , walkway,patios) 38192 0.18 98 17.97 Driveways 14570 0.07 98 6.86 Roadway 42310 0.20 98 19.91 CBU Pads 44 0.00 1 98 0.02 Grass(B) 97775 0.47 1 61 28.64 Total 208226 0.53 80.63 Com osite CN 80.61=1 =1 Use CN= 8� Post developed CN BYPASS POI#1 Cover a SF % IF CN Wtd. CN Woods B 406538 0.63 55 34.91 Impervious B/d s, Driveways, Rds 53797 0.08 98 8.23 Pasture Poor, B 9087 0.01 79 1.12 Grass B 171038 0.27 61 16.29 0.00 0.00 0.00 0.00 Total 640461 1.00 60.55 Com osite CN 60.55j =1 Use CN= 61 Post developed CN BYPASS POI#2 Cover Type Area SF % CN Wtd. CN Woods B 42969 0.58 55 32.15 Greenway 3396 0.05 98 4.53 Grass B 27153 0.37 61 22.53 0.00 0.00 Total 73518 1.00 59.20 Com osite CN 59.201 =1 Use CN= 61 Post developed CN Culvert(Part of BYPASS POI#1) Cover Type Area SF % CN Wtd. CN Woods B 359379 0.60 32.84 Impervious 58277 0.10 9.49 Pasture Poor, B 9087 0.02 1.19 Grass(B) 175079 0.29 17.75 0.00 0.00 Total 1 601822 1 1.00 1 61.27 Com osite CN 61.2=1 =1 Use CN= 61 Village of Wax haw BY: TDG W.WWK PROJECT IDICI<SON DATE: 113112023 T.M.: WGB community intrastructuro consultants REVISED: P.M.: WGB IMPERVIOUS CALCULATIONS Impervious Calculations for Basins BMP 1 Drainage Area 4.78 acres Impervious Areas Sidewalk= 15335 sf Lots (building, walkway, patios)= 38192 sf Driveways= 14570 sf Roadway= 42310 sf CBU Pad = 44 sf Total Impervious= 110451 sf Percent Impervious= 53.04% Village of Waxhaw Fww1< PROJECT NO.: 20220782.00.cL BY: TDG - E:)1(-,1<SO N DATE: 113112023 T.M.: WGB community Infrastructure consultants REVISED: P.M.: WGB PRE/POST DEVELOPMENT TABLE STORM WATER PRE-DEVELOPMENT/POST-DEVELOPMENT TABLE 2 Yr-24hr 9111 PRE CFS POST CFS DELTA POI#1 7.11 6.33 -0.78 POI#2 0.53 0.73 0.2 10 Yr-24hr PRE CFS POST CFS DELTA POI#1 23.45 23.32 -0.13 POI#2 2.54 1 2.52 -0.02 50 Yr-24hr PRE CFS POST CFS DELTA POI#1 46.86 50.47 3.61 POI#2 5.74 5.07 -0.67 PRE-DEVELOPMENT AREA DRAINAGE BASIN AREA AC. Pre#1 18.73 Pre#2 2.44 Total 21.17 POST-DEVELOPMENT AREA DRAINAGE BASIN AREA AC. BMP#1 4.78 B Pass POI#1 14.70 B Pass POI#2 1.69 TOTAL 21.17 Village of Waxhaw �►WI< PROJECT NO.: 20220782.00.cL BY: TDG IC 1<SO N DATE: 1/31/2023 T.M.: WGB nary inf-st-fu--"Suet-ts REVISED: P.M.: WGB WATER QUALITYBASIN CALCULATIONS-WETPOND 1 WATER QUALITY REQUIREMENTS To meet the Water Quality requirements,the procedure outlined in the"Stormwater Best Management Practices"published by NCDENR will be used. This guide gives the required pond surface area and storage volume to meet an 85%pollutant removal efficiency. Also,the pond must detain the first 1"of rainfall and release this volume over a period of 2 to 5 days.Calculations for these requirements are as follows: PERMANENTPOOL DEPTH Surface area requirements Impervious 3 4 5 s Drainage area to pond(Da)= 4.78 Ac 10 0.51 0.43 0.37 0.3 0.27 0.25 Post-development impervious percentage= 53% 20 0.84 0.69 0.61 0.51 0.44 0.4 Average pool depth= 3.5 ft 30 1.17 0.94 0.84 0.72 0.61 0.56 Designed permanent pool elevation= 619 40 1.51 1.24 1.09 0.91 0.78 0.71 50 1.79 1.51 1.31 1.13 0.95 0.87 60 2.09 1.77 1.49 1.31 1.12 1.03 Interpolation to find required SA/DA ratio for non whole number 70 2.51 2.09 1.8 1.56 1.34 1.17 Storage 80 2.92 2.41 2.07 1.82 1.62 1.4 Depth volume 90 3.25 2.64 2.311 2.04 1.84 1.59 3 1.88 3.5 1.74 4 1.59 From table 1.1 in the BMP guidelines the required Surface Area to Drainage Area Ratio(SA/DA)for a permanent pool depth= 1.74 Required surface area=SAIDA/100 x Drainage area= 0.08 Ac 3613.187 Surface area of pond as designed at permanent pool elevation= 0.08759 Ac Average Depth Calculations Equation 2 Equation 3 1"rainfall requirements vpp 3.13 D v--v:neij 3.68 Using the runoff volume calculations in the"Simple Method": Dave- SA = avc aaovv of-lf SA 3816 Ab-m of shsir=3195 Rv=0.05+0.9(1) Vpp=11930 Vshsir= 186.75 Rv= 0.527394413 in/in Perimeter p-pool=249 Volume=(Design rainfall)(Rv)(Drainage Area) V hetf=0.5 -Depth..,over h,if*Perimeterperm P,*Width-bme,eed pare ofsheif Volume=1"rainfall x Rv in/in x 1/12 in/ft x Da= *Depth rounded down to nearest 0.5* or 0.21 ac-ft *USE EQUATION 3* This volume must be released over a period of 2-5 days 9151 ftA3 As designed pond areas: Permanent Pond Storage Volume Elevation Forebay Forebay FB Volume FB Volume Pond Pond Pond Volume Pond Volume Storage Volumes (mS0 (S f) lec) ou-ft) ao ffl lsf) 00 (-u-ft) 0-ft) Cumulative 614 0.0000 0.0000 1441 0.0331 Elevation Area(ac) Volume(ac-ft) s1s o.0000 0.0000 1776 0.040e lsoa o.o3se �� 619 0.113 0.00 616 3aa 0.0079 116 0.0000 2142 0.0492 3669 0.0817 �� 619.5 0.132 0.06 617 F 0.0104 2540 0.0583 6esa 0.1363 �� 620 0.143 0.13 618 F 0.0264 2968 0.0681 esa2 0.1984 �� 621 0.155 0.28 618.E 973 0.0223 1714 0.0367 3196 0.0733 10181 0.2337 �� 622 0.167 0.44 619 1122 0.0268 2237 0.0487 3816 0.0876 11930 0.2739 �� 623 0.180 0.61 619.5 0.0294 283s 0.0626 aaea 0.1 o2s 14000 0.3214 �� 624 0.194 0.80 620 0.0000 3049 0.0674 6208 0.1426 16669 0.3824 �� 625 0.207 1.00 621 0.0000 3049 0.0674 6742 0.1648 23126 0.6309 �� 622 0.0000 3049 0.0674 7291 0.1674 30133 0.6918 �� 623 0.0000 3049 0.0674 7866 0.1803 37696 0.8664 �� 624 0.0000 3049 0.0674 8434 0.1936 46831 1.0621 �� 625 0.0000 3049 0.0674 9029 0.2073 64663 1.2624 �� Forebay Volume(CF) 2237 00000000000 Main Pool Volume(CF) 11930 00000000000 Forebay%of Pond 18.75% 00000000000 00000000000 00000000000 00000000000 Interpolation to find elevation at which required storage volume is reached Storage Storage Storage Elev volume area(ac.) area(cf.) 619 0.00 0.11 4937.9 Elev 0.21 0.13 5798 625 1.00 0.21 9029.19 Elev= 620.26 Storage elevation= 1.26 feet above permanent pool elevation 620.19 Assume 2 day minimum Determination of Orifice size for 2-5 day drawdown a=2A x sgrt(h) 'Falling head equation Ct(sgrt(2g)) a=Area of orifice a sqft t=Time to drawdown 432000 sec (5 day drawdown) A=Average pond surface area 4807 sf g=Gravity constant 32.2 fUSA2 h=Change in head 1.26 ft C=Orifice constant 0.6 Minimum orifice area= 0.01 sqft Minimum orifice size= 1.0 inches Selected orifice size= 1.25 inches Village of Waxhaw §P-kWI< PROJECT NO.: 2o22o7s2.00.CL BY: TDG E I C:KSO N DATE: 113112023 T.M.: WGB community infrastructure consultants REVISED: P.M.: WGB TIME OF CONCENTRATION CALCULATIONS PREDEVELOPMENT POI#1 - TIME OF CONCENTRATION Pre-development Type: Sheet Flow Flow Phase One Length: !00 ft "N" Value: 0.4 from tables Slope: 0.023 ft/ft Computed 'T' 20.6 Minutes Pre-development I Type: Shallow Concentrated Flow Flow Phase Two Surface: u Length: 404 ft u=unpaved Slope: 0.059 ft/ft p=paved Velocity: 3.91 ft/sec Computed 'T'. 0.029 hr, or 1.7 Minutes Pre-development Type: Open Channel Flow Flow Phase Three Length: ft Velocity: ft/sec(assumed) Computed 'T'. 0.034 hr, or 2.0 Minutes Pre-development Time of Concentration Total Flow Total T c= 24.4 Minutes Summary Lag Time TLAG= 14.6 Minutes T LAC,=0.6 X T =ITLAG= 0.24 Hours Village of Waxhaw §P-kWI< PROJECT NO.: 20220782.00.CL BY: TDG E I C:KSO N DATE: 113112023 T.M.: WGB community infrastructure consultants REVISED: P.M.: WGB TIME OF CONCENTRATION CALCULATIONS PREDEVELOPMENT POI#2- TIME OF CONCENTRATION Pre-development Type: Sheet Flow Flow Phase One Length: !00 ft "N" Value: 0.4 from tables Slope: 0.053 ft/ft Computed 'T' 14.8 Minutes Pre-development I Type: Shallow Concentrated Flow Flow Phase Two Surface: u Length: 621 ft u=unpaved Slope: 0.088 ft/ft p=paved Velocity: 4.78 ft/sec Computed 'T'. 0.036 hr, or 2.2 Minutes Pre-development Type: Open Channel Flow Flow Phase Three Length: ft Velocity: ft/sec(assumed) Computed 'T'. 0.022 hr, or 1.3 Minutes Pre-development Time of Concentration Total Flow Total T c= 18.3 Minutes Summary Lag Time TLAG= 11.0 Minutes T LAC,=0.6 X T =ITLAG= 0.18 Hours Village of Waxhaw §P-kWI< PROJECT NO.: 2o22o7s2.00.CL BY: TDG E I C:KSO N DATE: 113112023 T.M.: WGB community infrastructure consultants REVISED: P.M.: WGB TIME OF CONCENTRATION CALCULATIONS POST-DEVELOPMENT POI#1 BYPASS- TIME OF CONCENTRATION Pre-development Type: Sheet Flow Flow Phase One Length: !00 ft "N" Value: 0.4 from tables Slope: 0.023 ft/ft Computed 'T' 20.6 Minutes Pre-development I Type: Shallow Concentrated Flow Flow Phase Two Surface: u Length: 404 ft u=unpaved Slope: 0.059 ft/ft p=paved Velocity: 3.91 ft/sec Computed 'T'. 0.029 hr, or 1.7 Minutes Pre-development Type: Open Channel Flow Flow Phase Three Length: ft Velocity: ft/sec(assumed) Computed 'T'. 0.034 hr, or 2.0 Minutes Pre-development Time of Concentration Total Flow Total T c= 24.4 Minutes Summary Lag Time TLAG= 14.6 Minutes T LAC,=0.6 X T =ITLAG= 0.24 Hours Village of Waxhaw wftWI< PROJECT NO.: 20220782.00.CL BY: TDG C>1�KSO N DATE: 113112023 T.M.: WGB community infrastructure consultants REVISED: P.M.: WGB TIME OF CONCENTRATION CALCULATIONS POST-DEVELOPMENT POI#2 BYPASS Post-development Type: Sheet Flow Flow Phase One Length: !00 ft "N" Value: 0.4 from tables Slope: 0.052 ft/ft Computed 'T' R 14.9 Minutes Post-development I Type: Shallow Concentrated Flow Flow Phase Two Surface: u Length: 370 ft u=unpaved Slope: 0.083 ft/ft p=paved Velocity: 4.66 ft/sec Computed 'T'. 0.022 hr, or 1.32 Minutes Post-development Type: Open Channel Flow Flow Phase Three Length: ft Velocity: ft/sec(assumed) Computed 'T'. 0.008 hr, or 0.5 Minutes Post-development Time of Concentration Total Flow Total T c= 16.7 Minutes Summary Lag Time T LAG- 10.0 Minutes T LAC,=0.6 X T =ITLAG= 0.17 Hours Village of Waxhaw §P-kWI< PROJECT NO.: 2o22o7s2.00.CL BY: TDG E I C:KSO N DATE: 113112023 T.M.: WGB community infrastructure consultants REVISED: P.M.: WGB TIME OF CONCENTRATION CALCULATIONS POST-DEVELOPMENT CULVERT- TIME OF CONCENTRATION Post-development Type: Sheet Flow Flow Phase One Length: !00 ft "N" Value: 0.4 from tables Slope: 0.023 ft/ft Computed 'T' R 20.6 Minutes Post-development I Type: Shallow Concentrated Flow Flow Phase Two Surface: u Length: 404 ft u=unpaved Slope: 0.059 ft/ft p=paved Velocity: 3.91 ft/sec Computed 'T'. 0.029 hr, or 1.74 Minutes Post-development Type: Open Channel Flow Flow Phase Three Length: ft Velocity: ft/sec(assumed) Computed 'T'. 0.023 hr, or 1.4 Minutes Post-development Time of Concentration Total Flow Total T c= 23.7 Minutes Summary Lag Time TLAG= 14.2 Minutes T LAC,=0.6 X T =ITLAG= 0.24 Hours Village of Waxhaw r p ITS©N PROJECT NO.: 20220782.00.cL BY: TDG DATE: 1/31/2023 T.M.: WGB community infrastructure consultants REVISED: 04/26/23 P.M.: WGB RIPRAP APRON DESIGN(NCDENR METHOD) •.III I I - Out!el k - Dp ; L4J P;pq dlen•sler��} iL _ �:�. ,il � lui�;r': ao _td ,.• SQ I: I I i I I q I' +- 7 y. . .. .0JI- _ o a I I j CL :: ;��• � :__ ,_ Imo.:.._ .I� °� •�I�,'r,� �, - :,� _ - - � f `2p: hn .i wtfk .;. ..I..I.I li'T a 10 W 50 too 290 .. Discharge(tt3paec) Design of outlet protection from a round pipe flowing full, minimum tailwater condition Tw<0.5 diameter FES# Do(Pipe o) Tw T,N<0.5e Q V d50 La Apron width Apron width Max Stone Apron (ft) (ft) (cfs) (ft/s) (ft) (ft) at pipe(ft) at outlet(ft) a(ft) Thickness(ft) HW-100 2.5 OKAY 12.94 5.34 0.5 7.5 19 0.75 1.13 BMP-1OUTFALL 2.5 OKAY 3.72 5 0.2 7.5 11 0.30 0.45 CULVERT 4.50 OKAY 28.30 5 0.5 13.5 35 0.75 1.13 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 7.5 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROR 0 0 0.00 0.00 ERROF 0 0 0.00 0.00 Village of Waxhaw D_WI< PROJECT NO.: 20220782.00.CL BY: TDG r->ICKS(Z>N DATE: 113112023 T.M.: WGB --unity inf-str-tu--nsult-ts REVISED: 04/26/23 P.M.: WGB SPREAD CALCULATIONS NON-SUMP CONDITION RAINFALL INTENS 4.00 IN/HR 10-YEAR DRAINAGE RUNOFF SURFACE"Q" SLOPE INLET BYPASS AREA COEFF. SUB. I TOTAL LONG. TRANS. "Q"CAP. SPREAD DEPTH Qb TO SUMP INLET# A (acres) C JOS(cfs)Q r WS)l S L (ft/ft) S r(ft/ft) I K IQ cAP(cfs) T(ft) D (It) (cfs) INLET# (') SAMPLE CALCULATION CB#1 1.00 1 4.00 4.00 0.0400 1 0.03125 1 28.5 1 2.30 7.1 0.22 1.70 CB#2 PROJECT CALCULATIO CI-101 J.0a 0.6 0.19 0.19 0.0100 0.0310 18 0.33 3.0 0.09 0.00 CI-103 0.07 0.6 0.17 0.17 0.0244 0.0310 23.5 0.30 2.4 0.07 0.00 CI-101 CI-104 0.07 0.6 0.17 0.17 0.0154 0.0310 18 0.27 2.6 0.08 0.00 CI-103 CI-105 0.25 0.6 0.60 0.60 0.0160 0.0310 18 0.68 4.5 0.14 0.00 CI-104 CI-106 0.09 0.6 0.22 0.22 0.0307 0.0310 26 0.37 2.5 0.08 0.00 CI-105 CI-107 0.02 0.6 0.05 0.05 0.0100 0.0310 18 0.14 1.8 0.05 0.00 CI-106 C1-108 0.04 0.6 0.10 0.10 0.0100 0.0310 18 0.22 2.3 0.07 0.00 CI-106 d CI-109 0.17 0.6 0.41 0.41 0.0300 0.0310 26 0.55 3.2 0.10 0.00 CI-106 CI-110 0.08 0.6 0.19 0.19 0.0300 0.0310 26 0.34 2.4 0.07 0.00 CI-109 CI-111 0.10 0.6 0.24 0.24 0.0300 0.0310 26 0.39 2.6 0.08 0.00 CI-110 m CI-112 0.22 0.6 0.53 0.53 0.0250 0.0310 23.5 0.62 3.6 0.11 0.00 CI-111 CI-113 0.48 0.6 1.15 1.15 0.0250 0.0310 23.5 1.01 4.9 0.15 0.15 CI-139 CI-114 0.31 0.6 0.74 0.74 0.0100 0.0310 18 0.78 4.9 0.15 0.00 CI-118 0.18 0.6 0.43 0.45 0.0244 0.0310 23.5 0.57 3.5 0.11 0.00 CI-102 CI-119 0.05 0.6 0.12 0.12 0.0344 0.0310 26 0.24 2.0 0.06 0.00 CI-102 CI-120 0.02 0.6 0.05 0.05 0.0344 0.0310 26 0.14 1.4 0.04 0.00 CI-119 71-123 0.27 0.6 0.65 0.65 0.0154 0.0310 18 0.63 4.3 0.13 0.02 CI-118 Village of Waxhaw ��WK PROJECT NO.: 20220782.00.CL BY: TDG / ED 1 C KSO N DATE: 113112023 T.M.: WGB community Infrastructure consultants REVISED: P.M.: WGB FLOTATION CALCULATIONS - WETPOND 1 CONSTRAINTS: Weight of Concrete Ibs/ft^3 Weight of Water 62.4 Ibs/ft^4 Safety Factor(S.F.) 1.2 Height of structure 5.75 ft Structure thickness 6 in Outlet box width (interior) 6 ft Weight of outlet structure(Ws) Ws = (width +thickness x 4)x thickness x height x weight of concrete = 11213 Ibs Weight of water displaced Ww= ((width +2 x thickness)^2)x Weight of water x height= 17581.2 Ibs Size Base Wb = (S.F. x Ww) - Ws = 9885 Ibs Footing size Required concrete = Wb/(Weight of concrete-weight of water) = 113 cuff *Assume base is 6"wider than exterior box width and minimum thickness is 8". Thickness of base = 2.01 ft Length = 8.00 ft Width = 8.00 ft Thickness= 2.00 ft Village of Waxhaw MWK PROJECT NO.: 2022078ZOO BY: TDG W DICKSON DATE: 21212023 T.M.: WGB community Infrastructure consultants REVISED: I P.M.: WGB PRELIMINARY CALCULATIONS ANTI-SEEP COLLARS BMP #1 Pipe Diameter 30 in Length of Covered Pipe 68 ft Number of Collars 2 Anti-Seep Collar Sizes Length: 8.30 ft Width: 8.30 ft Note: Anti-seep collars are centered on pipe Hydraflow Storm Sewers Extension for Autodesk@ Civil 3D0 Plan 37 36 32 33 3130 2 35 1 Outfall 34 3 2 4 28 29 26 5 25 1 2419 6 14 22 2387 15 16 17 9 10 13 11 1 Project File: Village of Waxhaw.strn Number of lines:37 Date:4/26/2023 Storm Sewers v2022.00 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) 00 (ft) 00 (ft) (ft) 00 I End 38.472 0.08 4.51 0.60 0.05 2.71 5.0 13.6 5.5 14.87 28.82 5.84 30 0.49 619.00 619.19 620.27 620.49 622.79 62674 Pipe-101 2 1 75.012 0.08 3.93 0.60 0.05 2.36 5.0 13.3 5.5 13.06 45.01 7.66 24 3.96 619.57 622.54 620.49 62184 626.74 628.21 Pipe-103 3 2 134.078 0.07 3.37 0.60 0.04 2.02 5.0 12.0 5.8 11.68 31.98 5.59 24 2.00 622.54 625.22 623.84 626.45 628.21 631.34 Pipe-104 4 3 118.920 0.21 3.03 0.60 0.13 1.82 5.0 11.5 5.9 10.68 15.93 5.43 24 0.50 625.23 625.82 626A5 627.01 631.34 632.54 Pipe-105 5 4 147.717 0.07 2.68 0.60 0.04 1.61 5.0 10.8 6.0 9.68 25.24 4.27 24 1.25 625.82 627.66 62771 628.77 632.54 636.36 Pipe-106 6 5 36.354 0.02 1.93 0.60 0.01 1.16 5.0 9.2 6.4 7.40 16.80 7.39 18 2.56 628.16 629.09 628.86 630.14 636.36 637.47 Pipe-107 7 6 20.004 0.04 1.69 0.60 0.02 1.01 5.0 6.9 7.0 7.09 14.85 5.41 18 2.00 629.09 629.49 630.14 630.52 637.47 637.47 Pipe-108 8 7 35.364 0.18 1.65 0.60 0.11 0.99 5.0 6.8 7.0 6.97 16.57 5.41 18 2.49 629.49 63037 630.52 631.39 637A7 638.55 Pipe-109 9 8 115.152 0.08 1.10 0.60 0.05 0.66 5.0 6.3 7.2 474 10.70 679 15 2.74 633.76 636.92 634.34 637.80 638.55 642.23 Pipe-110 10 9 71773 0.10 1.02 0.60 0.06 0.61 5.0 5.9 7.3 4.46 12.08 4.90 15 3.50 636.92 639A3 637.80 640.29 642.23 644.31 Pipe-111 11 10 115.718 0.22 0.70 0.60 0.13 0.42 5.0 5.2 7.5 3.17 11.31 3.95 15 3.07 639.43 642.98 640.29 64370 644.31 647.58 Pipe-112 12 11 21.002 0.48 0.48 0.60 0.29 0.29 5.0 5.0 7.6 2.19 8.45 3.43 15 1.71 642.98 643.34 643.70 643.93 647.58 647.59 Pipe-113 13 10 33.000 0.22 0.22 0.60 0.13 0.13 5.0 5.0 7.6 1.00 6A6 2.08 15 1.00 639.43 63976 640.29 640.15 644.31 644.30 Pipe-139 14 6 37.623 0.06 0.22 0.60 0.04 0.13 5.0 8.4 6.6 0.87 4.59 2.88 15 0.51 632.05 632.24 632A2 632.61 637A7 637.74 Pipe-134 15 14 32.020 0.03 0.16 0.60 0.02 0.10 5.0 7.5 6.8 0.66 10.14 1.96 15 2.47 632.24 633.03 632.80 633.35 637.74 637.72 Pipe-135 16 15 39.352 0.02 0.13 0.60 0.01 0.08 5.0 6.1 7.2 0.56 8.17 2.45 15 1.60 633.03 633.66 633.35 633.95 637.72 638.21 Pipe-136 17 16 27.039 0.11 0.11 0.60 0.07 0.07 5.0 5.0 7.6 0.50 14.43 2.40 15 4.99 633.66 635.01 633.95 635.29 638.21 640.50 Pipe-137 18 5 21.000 0.07 0.68 0.60 0.04 0.41 5.0 IM 6.1 2.47 7.60 3.72 18 0.52 628.16 628.27 62877 628.86 63636 636.36 Pipe-126 19 18 37176 0.03 0.61 0.60 0.02 0.37 5.0 10.2 6.2 2.25 7.51 3.53 18 0.51 628.26 628A5 628.86 629.02 63636 637.91 Pipe-127 20 19 20.004 0.05 0.36 0.60 0.03 0.22 5.0 6.5 7.1 1.54 14.44 4.86 15 5.00 628.70 629.70 629.02 630.19 637.91 637.90 Pipe-131 21 20 35.222 0.08 0.31 0.60 0.05 0.19 5.0 6.0 7.3 1.35 14.43 3.17 15 5.00 629.70 631.46 630.19 631.92 637.90 638.72 Pipe-132 22 21 51.212 0.23 0.23 0.60 0.14 0.14 5.0 5.0 7.6 1.05 14.44 2.82 15 5.00 631.46 634.02 631.92 634.42 63872 640.00 Pipe-133 Project File: Village of Waxhaw.strn Number of lines:37 Run Date: 4/26/2023 NOTES:Intensity=71.28/(Inlet time+11.90)1 0.79; Return period=Yrs. 10 c=cir e=ellip b=box Storm Sewers v2022.00 Storm Sewer Tabulation Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) 00 (ft) 00 (ft) (ft) 00 23 8 21.000 0.37 0.37 0.60 0.22 0.22 5.0 5.0 7.6 1.69 10.50 2.35 18 1.00 630.37 630.58 631.39 631.07 638.55 638.55 Pipe-138 24 19 35.517 0.03 0.22 0.60 0.02 0.13 5.0 9.5 6.3 0.83 4.60 2.85 15 0.51 628.70 628.88 629.06 62924 637.91 638.74 Pipe-128 25 24 37.099 0.03 0.19 0.60 0.02 0.11 5.0 8.5 6.5 0.75 6.45 2.41 15 1.00 628.88 629.25 629.30 629.59 638.74 639.82 Pipe-129 26 25 126.788 0.16 0.16 0.60 0.10 0.10 5.0 5.0 7.6 0.73 6A6 275 15 1.00 629.25 630.52 629.59 630.85 639.82 634.50 Pipe-130 27 3 21.000 0.27 0.27 0.60 0.16 0.16 5.0 5.0 7.6 1.23 6A6 3.64 15 1.00 627.01 627.22 627.38 627.66 631.34 631.34 Pipe-123 28 4 85.168 0.00 0.14 0.60 0.00 0.08 5.0 5.5 7.4 0.63 4.59 0.69 15 0.50 626.57 627.00 627.71 627.72 632.54 631.25 Pipe-124 29 28 14.894 0.14 0.14 0.60 0.08 0.08 5.0 5.0 7.6 0.64 9.16 1.77 15 2.01 627.00 627.30 627.73 627.61 631.25 633.50 Pipe-125 30 2 21.000 0.21 0.48 0.60 0.13 0.29 5.0 13.1 5.6 1.61 4.46 3.34 15 0.48 623.82 623.92 62434 624.44 628.21 628.21 Pipe-118 31 30 37.974 0.05 0.27 0.60 0.03 0.16 5.0 IM 5.7 0.92 6A6 2.11 15 1.00 623.92 624.30 624.64 624.68 628.21 628.84 Pipe-119 32 31 74328 0.02 0.22 0.60 0.01 0.13 5.0 10.9 6.0 0.79 6A4 2.69 15 1.00 624.30 625.04 624.68 625.39 628.84 631.40 Pipe-120 33 32 29.233 0.09 0.20 0.60 0.05 0.12 5.0 10.2 6.2 0.74 6.43 2.71 15 0.99 625.04 625.33 625.39 625.67 631.40 629.00 Pipe-121 34 33 127.965 0.11 0.11 0.60 0.07 0.07 5.0 5.0 7.6 0.50 6.46 2.20 15 1.00 625.33 626.61 625.67 626.89 629.00 630.50 Pipe-122 35 1 31.510 0.21 0.50 0.60 0.13 0.30 5.0 6.6 7.1 2.12 6.51 4.27 15 1.02 620.32 620.64 620.81 621.22 62674 626.76 Pipe-114 36 35 94.302 0.00 0.29 0.60 0.00 0.17 5.0 5.2 7.5 1.31 7.28 2.82 15 1.27 620.64 621.84 621.22 622.29 62676 626.28 Pipe-116 37 36 11.435 0.29 0.29 0.60 0.17 0.17 5.0 5.0 7.6 1.32 4.68 3.27 15 0.52 621.84 621.90 622.30 622.36 626.28 626.50 Pipe-117 1 1 1 1 Project File: Village of Waxhaw.strn Number of lines:37 Run Date: 4/26/2023 NOTES:Intensity=71.28/(Inlet time+11.90)1 0.79; Return period=Yrs. 10 c=cir e=ellip b=box Storm Sewers v2022.00 2S 1S POI#2 Predevelopment POI#1 Predevelopment DA#1 Post-Develo ment Pond 1 4S PO#2 Post-D elopment MP-1 BMP#1 ( et Pond) 12L1 POI#2 5S 3S 1L Culvert Post-Development Post-Development ByPass POI#1 POI#1 Subcat Reach on Link Routing Diagram for Villages at Waxhaw Prepared by WK Dickson, Printed 2/1/2023 EHyd,.CAD@ 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Villages at Waxhaw Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1" Storm Type II 24-hr Default 24.00 1 1.00 2 2 2 Year Type II 24-hr Default 24.00 1 3.55 2 3 10 Year Type II 24-hr Default 24.00 1 5.19 2 4 25-Year Type II 24-hr Default 24.00 1 6.21 2 5 50 Year Type II 24-hr Default 24.00 1 7.04 2 6 100 Year Type II 24-hr Default 24.00 1 7.90 2 Villages at Waxhaw Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 15.616 61 >75% Grass cover, Good, HSG B (1 S, 3S, 4S, 5S, DA#1) 0.001 98 CBU Pads (DA#1) 0.334 98 Driveways (DA#1) 0.078 98 Greenway (4S) 2.490 98 Impervious (Bldgs, Driveways, Rds) (1 S, 3S) 0.877 98 Lots (Building, walkway, patios) (DA#1) 0.626 79 Pasture/grassland/range, Poor, HSG B (1S, 3S, 5S) 1.338 98 Paved parking, HSG B (5S) 0.971 98 Roadway (DA#1) 0.352 98 Sidewalk (DA#1) 33.475 55 Woods, Good, HSG B (1 S, 2S, 3S, 4S, 5S) 56.158 62 TOTAL AREA Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 4 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: POI #1 Predevelopment Runoff Area=815,942 sf 6.70% Impervious Runoff Depth=0.00" Tc=24.4 min CN=60 Runoff=0.00 cfs 0.000 of Subcatchment2S: POI #2 Predevelopment Runoff Area=106,262 sf 0.00% Impervious Runoff Depth=0.00" Tc=18.3 min CN=55 Runoff=0.00 cfs 0.000 of Subcatchment3S: Post-Development Runoff Area=640,460 sf 8.40% Impervious Runoff Depth=0.00" Tc=24.4 min CN=61 Runoff=0.00 cfs 0.000 of Subcatchment4S: POI #2 Runoff Area=73,518 sf 4.62% Impervious Runoff Depth=0.00" Tc=16.7 min CN=59 Runoff=0.00 cfs 0.000 of Subcatchment5S: Culvert Runoff Area=601,822 sf 9.68% Impervious Runoff Depth=0.00" Tc=23.7 min CN=61 Runoff=0.00 cfs 0.000 of SubcatchmentDA#1: Post-Development Runoff Area=208,217 sf 53.03% Impervious Runoff Depth=0.10" Tc=5.0 min CN=81 Runoff=0.53 cfs 0.039 of Pond BMP-1: BMP#1 (Wet Pond) Peak Elev=619.22' Storage=1,117 cf Inflow=0.53 cfs 0.039 of Outflow=0.02 cfs 0.037 of Link 1L: POI #1 Inflow=0.02 cfs 0.037 of Primary=0.02 cfs 0.037 of Link 2L: POI #2 Inflow=0.00 cfs 0.000 of Primary=0.00 cfs 0.000 of Total Runoff Area = 56.158 ac Runoff Volume = 0.039 of Average Runoff Depth = 0.01" 88.53% Pervious = 49.717 ac 11.47% Impervious = 6.441 ac Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 1S: POI #1 Predevelopment [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Storm Rainfall=1.00" Area (so CN Description 543,022 55 Woods, Good, HSG B 54,658 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 209,175 61 >75% Grass cover, Good, HSG B 815,942 60 Weighted Average 761,284 93.30% Pervious Area 54,658 6.70% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 1S: POI #1 Predevelopment Hyd rog raph T—T—T—T—T— ————T— 1 ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ❑Runoff 1" Storm 'R'ainfaill;=1.00" RUh6ff At6a=815�942 isf R off Vro l�rM�='O b w Ru��n'off'DePth=0.00" ;T,c:�:24.4 Min, 0.00 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 6 Hydrograph for Subcatchment 1S: POI #1 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 1.00 0.00 0.00 1.00 0.01 0.00 0.00 53.00 1.00 0.00 0.00 2.00 0.02 0.00 0.00 54.00 1.00 0.00 0.00 3.00 0.03 0.00 0.00 55.00 1.00 0.00 0.00 4.00 0.05 0.00 0.00 56.00 1.00 0.00 0.00 5.00 0.06 0.00 0.00 57.00 1.00 0.00 0.00 6.00 0.08 0.00 0.00 58.00 1.00 0.00 0.00 7.00 0.10 0.00 0.00 59.00 1.00 0.00 0.00 8.00 0.12 0.00 0.00 60.00 1.00 0.00 0.00 9.00 0.15 0.00 0.00 61.00 1.00 0.00 0.00 10.00 0.18 0.00 0.00 62.00 1.00 0.00 0.00 11.00 0.24 0.00 0.00 63.00 1.00 0.00 0.00 12.00 0.66 0.00 0.00 64.00 1.00 0.00 0.00 13.00 0.77 0.00 0.00 65.00 1.00 0.00 0.00 14.00 0.82 0.00 0.00 66.00 1.00 0.00 0.00 15.00 0.85 0.00 0.00 67.00 1.00 0.00 0.00 16.00 0.88 0.00 0.00 68.00 1.00 0.00 0.00 17.00 0.90 0.00 0.00 69.00 1.00 0.00 0.00 18.00 0.92 0.00 0.00 70.00 1.00 0.00 0.00 19.00 0.94 0.00 0.00 71.00 1.00 0.00 0.00 20.00 0.95 0.00 0.00 72.00 1.00 0.00 0.00 21.00 0.96 0.00 0.00 22.00 0.98 0.00 0.00 23.00 0.99 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 2S: POI #2 Predevelopment [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Storm Rainfall=1.00" Area (so CN Description 106,262 55 Woods, Good, HSG B 106,262 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 Direct Entry, Subcatchment 2S: POI #2 Predevelopment Hyd rog raph - ---- - -,-T-T-T- - ------ -,-T-T-T- - ------ - ,-T-T-T - - - ---- - 1 ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ❑Runoff 1" Storm 'Rainfaill;=1.00" RUh6ff At6a=106�262 isf Fk off Vro l O b w Ru��n'off'DePth=0.00" T,ct:18.3 Min, 0.00 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 8 Hydrograph for Subcatchment 2S: POI #2 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 1.00 0.00 0.00 1.00 0.01 0.00 0.00 53.00 1.00 0.00 0.00 2.00 0.02 0.00 0.00 54.00 1.00 0.00 0.00 3.00 0.03 0.00 0.00 55.00 1.00 0.00 0.00 4.00 0.05 0.00 0.00 56.00 1.00 0.00 0.00 5.00 0.06 0.00 0.00 57.00 1.00 0.00 0.00 6.00 0.08 0.00 0.00 58.00 1.00 0.00 0.00 7.00 0.10 0.00 0.00 59.00 1.00 0.00 0.00 8.00 0.12 0.00 0.00 60.00 1.00 0.00 0.00 9.00 0.15 0.00 0.00 61.00 1.00 0.00 0.00 10.00 0.18 0.00 0.00 62.00 1.00 0.00 0.00 11.00 0.24 0.00 0.00 63.00 1.00 0.00 0.00 12.00 0.66 0.00 0.00 64.00 1.00 0.00 0.00 13.00 0.77 0.00 0.00 65.00 1.00 0.00 0.00 14.00 0.82 0.00 0.00 66.00 1.00 0.00 0.00 15.00 0.85 0.00 0.00 67.00 1.00 0.00 0.00 16.00 0.88 0.00 0.00 68.00 1.00 0.00 0.00 17.00 0.90 0.00 0.00 69.00 1.00 0.00 0.00 18.00 0.92 0.00 0.00 70.00 1.00 0.00 0.00 19.00 0.94 0.00 0.00 71.00 1.00 0.00 0.00 20.00 0.95 0.00 0.00 72.00 1.00 0.00 0.00 21.00 0.96 0.00 0.00 22.00 0.98 0.00 0.00 23.00 0.99 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 3S: Post-Development ByPass POI #1 [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Routed to Link 1 L : POI #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Storm Rainfall=1.00" Area (so CN Description 406,538 55 Woods, Good, HSG B 53,797 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 171,038 61 >75% Grass cover, Good, HSG B 640,460 61 Weighted Average 586,663 91.60% Pervious Area 53,797 8.40% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 3S: Post-Development ByPass POI #1 Hyd rog raph T—T—T -I——I— ,—T - 1 ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ❑Runoff (Type 111 24-hr 1" Stlorm 'IRlainfail1;=11.00" RUh6ff At6a=640�460 isf R off'I Vroll IO b w Ru�In'off'IaePth;0.00" ;T,c:�:24.4 Min�I 0.00 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 4850 5254 56 5860 62 6466 6870 72 Time (hours) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 10 Hydrograph for Subcatchment 3S: Post-Development ByPass POI #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 1.00 0.00 0.00 1.00 0.01 0.00 0.00 53.00 1.00 0.00 0.00 2.00 0.02 0.00 0.00 54.00 1.00 0.00 0.00 3.00 0.03 0.00 0.00 55.00 1.00 0.00 0.00 4.00 0.05 0.00 0.00 56.00 1.00 0.00 0.00 5.00 0.06 0.00 0.00 57.00 1.00 0.00 0.00 6.00 0.08 0.00 0.00 58.00 1.00 0.00 0.00 7.00 0.10 0.00 0.00 59.00 1.00 0.00 0.00 8.00 0.12 0.00 0.00 60.00 1.00 0.00 0.00 9.00 0.15 0.00 0.00 61.00 1.00 0.00 0.00 10.00 0.18 0.00 0.00 62.00 1.00 0.00 0.00 11.00 0.24 0.00 0.00 63.00 1.00 0.00 0.00 12.00 0.66 0.00 0.00 64.00 1.00 0.00 0.00 13.00 0.77 0.00 0.00 65.00 1.00 0.00 0.00 14.00 0.82 0.00 0.00 66.00 1.00 0.00 0.00 15.00 0.85 0.00 0.00 67.00 1.00 0.00 0.00 16.00 0.88 0.00 0.00 68.00 1.00 0.00 0.00 17.00 0.90 0.00 0.00 69.00 1.00 0.00 0.00 18.00 0.92 0.00 0.00 70.00 1.00 0.00 0.00 19.00 0.94 0.00 0.00 71.00 1.00 0.00 0.00 20.00 0.95 0.00 0.00 72.00 1.00 0.00 0.00 21.00 0.96 0.00 0.00 22.00 0.98 0.00 0.00 23.00 0.99 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 4S: POI #2 Post-Development [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Routed to Link 2L : POI #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Storm Rainfall=1.00" Area (so CN Description 42,969 55 Woods, Good, HSG B 3,396 98 Greenway 27,153 61 >75% Grass cover, Good, HSG B 73,518 59 Weighted Average 70,122 95.38% Pervious Area 3,396 4.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.7 Direct Entry, Subcatchment 4S: POI #2 Post-Development Hyd rog raph - ---- - -,-T-T-T- - ------ -,-T-T-T- - ------ - ,-T-T-T - - - ---- - 1 ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ❑Runoff 1" Storm 'R'ainfaill;=1.00" Ruhoff Aeec&13#518 isf Fk off Vro l O b w Ru��n'off'DePth=0.00" T,c:�:16.7 Min, 0.00 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 12 Hydrograph for Subcatchment 4S: POI #2 Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 1.00 0.00 0.00 1.00 0.01 0.00 0.00 53.00 1.00 0.00 0.00 2.00 0.02 0.00 0.00 54.00 1.00 0.00 0.00 3.00 0.03 0.00 0.00 55.00 1.00 0.00 0.00 4.00 0.05 0.00 0.00 56.00 1.00 0.00 0.00 5.00 0.06 0.00 0.00 57.00 1.00 0.00 0.00 6.00 0.08 0.00 0.00 58.00 1.00 0.00 0.00 7.00 0.10 0.00 0.00 59.00 1.00 0.00 0.00 8.00 0.12 0.00 0.00 60.00 1.00 0.00 0.00 9.00 0.15 0.00 0.00 61.00 1.00 0.00 0.00 10.00 0.18 0.00 0.00 62.00 1.00 0.00 0.00 11.00 0.24 0.00 0.00 63.00 1.00 0.00 0.00 12.00 0.66 0.00 0.00 64.00 1.00 0.00 0.00 13.00 0.77 0.00 0.00 65.00 1.00 0.00 0.00 14.00 0.82 0.00 0.00 66.00 1.00 0.00 0.00 15.00 0.85 0.00 0.00 67.00 1.00 0.00 0.00 16.00 0.88 0.00 0.00 68.00 1.00 0.00 0.00 17.00 0.90 0.00 0.00 69.00 1.00 0.00 0.00 18.00 0.92 0.00 0.00 70.00 1.00 0.00 0.00 19.00 0.94 0.00 0.00 71.00 1.00 0.00 0.00 20.00 0.95 0.00 0.00 72.00 1.00 0.00 0.00 21.00 0.96 0.00 0.00 22.00 0.98 0.00 0.00 23.00 0.99 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 5S: Culvert Post-Development [45] Hint: Runoff=Zero Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Storm Rainfall=1.00" Area (so CN Description 359,379 55 Woods, Good, HSG B 58,277 98 Paved parking, HSG B 9,087 79 Pasture/grassland/range, Poor, HSG B 175,079 61 >75% Grass cover, Good, HSG B 601,822 61 Weighted Average 543,545 90.32% Pervious Area 58,277 9.68% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.7 Direct Entry, Subcatchment 5S: Culvert Post-Development Hyd rog raph T—T—T—T—T— ————T— 1 ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ❑Runoff 1" Storm 'R'ainfaill;=1.00" RUh6ff At6a=601�8;22 isf R off Vro l O b w Ru��n'off'DePth=0.00" ;T,c:�:23.7 Min, 0.00 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 14 Hydrograph for Subcatchment 5S: Culvert Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 1.00 0.00 0.00 1.00 0.01 0.00 0.00 53.00 1.00 0.00 0.00 2.00 0.02 0.00 0.00 54.00 1.00 0.00 0.00 3.00 0.03 0.00 0.00 55.00 1.00 0.00 0.00 4.00 0.05 0.00 0.00 56.00 1.00 0.00 0.00 5.00 0.06 0.00 0.00 57.00 1.00 0.00 0.00 6.00 0.08 0.00 0.00 58.00 1.00 0.00 0.00 7.00 0.10 0.00 0.00 59.00 1.00 0.00 0.00 8.00 0.12 0.00 0.00 60.00 1.00 0.00 0.00 9.00 0.15 0.00 0.00 61.00 1.00 0.00 0.00 10.00 0.18 0.00 0.00 62.00 1.00 0.00 0.00 11.00 0.24 0.00 0.00 63.00 1.00 0.00 0.00 12.00 0.66 0.00 0.00 64.00 1.00 0.00 0.00 13.00 0.77 0.00 0.00 65.00 1.00 0.00 0.00 14.00 0.82 0.00 0.00 66.00 1.00 0.00 0.00 15.00 0.85 0.00 0.00 67.00 1.00 0.00 0.00 16.00 0.88 0.00 0.00 68.00 1.00 0.00 0.00 17.00 0.90 0.00 0.00 69.00 1.00 0.00 0.00 18.00 0.92 0.00 0.00 70.00 1.00 0.00 0.00 19.00 0.94 0.00 0.00 71.00 1.00 0.00 0.00 20.00 0.95 0.00 0.00 72.00 1.00 0.00 0.00 21.00 0.96 0.00 0.00 22.00 0.98 0.00 0.00 23.00 0.99 0.00 0.00 24.00 1.00 0.00 0.00 25.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 27.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 29.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 31.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 33.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 35.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 37.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 39.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 41.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 43.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 45.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 47.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 49.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 51.00 1.00 0.00 0.00 Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment DA #1: Post-Development Pond #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 0.53 cfs @ 12.00 hrs, Volume= 0.039 af, Depth= 0.10" Routed to Pond BMP-1 : BMP#1 (Wet Pond) Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Storm Rainfall=1.00" Area (so CN Description 15,333 98 Sidewalk 38,202 98 Lots (Building, walkway, patios) 14,549 98 Driveways 42,297 98 Roadway 44 98 CBU Pads 97,792 61 >75% Grass cover, Good, HSG B 208,217 81 Weighted Average 97,792 46.97% Pervious Area 110,425 53.03% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA #1: Post-Development Pond #1 Hydrograph ■Runoff i il--t-i--i-t-t-t-r-t-i--i-t-t-t-t-r-r-t-i--i-t-�-t-+-r-t-t-i--i-�-t-t-r-t-t- 0.55 0.53 cfs 0.5 --A", Storm-Rainfall :007 - 0.45 Mp I�iP.Q� -------- -- - - ---I--I----,--, --, -,----`- - I�1thbf� !08 247-0l-- 0.4 -- -t-r-r- - -rt-t-r-r- fOrloff'1010t1�=1091910-41-- 0.35 I I I I I I I I"(Nj -------- - -I-,- -I-L I-1-4-1-1 E .wyAa �pW©ePh ry „II 3 0.3 o a 0.25 02 -t-t-i-t- -t-r-t----t-t-t-t-r-r-t----t- -t-t-r-t-t---- -t-t-r-t-t- 0.15 0.1 0.05 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 16 Hydrograph for Subcatchment DA #1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 1.00 0.10 0.00 1.00 0.01 0.00 0.00 53.00 1.00 0.10 0.00 2.00 0.02 0.00 0.00 54.00 1.00 0.10 0.00 3.00 0.03 0.00 0.00 55.00 1.00 0.10 0.00 4.00 0.05 0.00 0.00 56.00 1.00 0.10 0.00 5.00 0.06 0.00 0.00 57.00 1.00 0.10 0.00 6.00 0.08 0.00 0.00 58.00 1.00 0.10 0.00 7.00 0.10 0.00 0.00 59.00 1.00 0.10 0.00 8.00 0.12 0.00 0.00 60.00 1.00 0.10 0.00 9.00 0.15 0.00 0.00 61.00 1.00 0.10 0.00 10.00 0.18 0.00 0.00 62.00 1.00 0.10 0.00 11.00 0.24 0.00 0.00 63.00 1.00 0.10 0.00 12.00 0.66 0.01 0.53 64.00 1.00 0.10 0.00 13.00 0.77 0.03 0.07 65.00 1.00 0.10 0.00 14.00 0.82 0.05 0.04 66.00 1.00 0.10 0.00 15.00 0.85 0.05 0.04 67.00 1.00 0.10 0.00 16.00 0.88 0.06 0.03 68.00 1.00 0.10 0.00 17.00 0.90 0.07 0.03 69.00 1.00 0.10 0.00 18.00 0.92 0.07 0.03 70.00 1.00 0.10 0.00 19.00 0.94 0.08 0.02 71.00 1.00 0.10 0.00 20.00 0.95 0.08 0.02 72.00 1.00 0.10 0.00 21.00 0.96 0.09 0.02 22.00 0.98 0.09 0.02 23.00 0.99 0.09 0.02 24.00 1.00 0.10 0.02 25.00 1.00 0.10 0.00 26.00 1.00 0.10 0.00 27.00 1.00 0.10 0.00 28.00 1.00 0.10 0.00 29.00 1.00 0.10 0.00 30.00 1.00 0.10 0.00 31.00 1.00 0.10 0.00 32.00 1.00 0.10 0.00 33.00 1.00 0.10 0.00 34.00 1.00 0.10 0.00 35.00 1.00 0.10 0.00 36.00 1.00 0.10 0.00 37.00 1.00 0.10 0.00 38.00 1.00 0.10 0.00 39.00 1.00 0.10 0.00 40.00 1.00 0.10 0.00 41.00 1.00 0.10 0.00 42.00 1.00 0.10 0.00 43.00 1.00 0.10 0.00 44.00 1.00 0.10 0.00 45.00 1.00 0.10 0.00 46.00 1.00 0.10 0.00 47.00 1.00 0.10 0.00 48.00 1.00 0.10 0.00 49.00 1.00 0.10 0.00 50.00 1.00 0.10 0.00 51.00 1.00 0.10 0.00 Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 17 Summary for Pond BMP-1: BMP #1 (Wet Pond) Inflow Area = 4.780 ac, 53.03% Impervious, Inflow Depth = 0.10" for 1" Storm event Inflow = 0.53 cfs @ 12.00 hrs, Volume= 0.039 of Outflow = 0.02 cfs @ 24.03 hrs, Volume= 0.037 af, Atten= 97%, Lag= 721.6 min Primary = 0.02 cfs @ 24.03 hrs, Volume= 0.037 of Routed to Link 1 L : POI #1 Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 619.22'@ 24.03 hrs Surf.Area= 5,298 sf Storage= 1,117 cf Plug-Flow detention time=965.0 min calculated for 0.037 of(95% of inflow) Center-of-Mass det. time= 938.5 min ( 1,876.4 - 938.0 ) Volume Invert Avail.Storage Storage Description #1 619.00' 43,609 cf Custom Stage Data (Prismatic)-isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 619.00 4,938 0 0 619.50 5,764 2,676 2,676 620.00 6,208 2,993 5,669 621.00 6,742 6,475 12,144 622.00 7,291 7,017 19,160 623.00 7,855 7,573 26,733 624.00 8,434 8,145 34,878 625.00 9,029 8,732 43,609 Device Routing Invert Outlet Devices #1 Primary 618.34' 30.0" Round Culvert L= 67.7' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 618.34'/618.00' S= 0.0050 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes& inlets, Flow Area= 4.91 sf #2 Device 1 619.00' 1.2"Vert. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 622.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.50 Width (feet) 2.00 2.00 #4 Device 1 624.00' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=0.02 cfs @ 24.03 hrs HW=619.22' (Free Discharge) L1=Culvert (Passes 0.02 cfs of 3.77 cfs potential flow) 2=WQ Orifice (Orifice Controls 0.02 cfs @ 1.97 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Orifice/Grate ( Controls 0.00 cfs) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 18 Pond BMP-1: BMP #1 (Wet Pond) Hyd rog raph I I I I I I I I - 11111 - r - �r rI- I- Irll Ir II- -I -II- - C Inflow 0.5 ❑Prima ry 0.55 -Y Aima 4,7,80Ac� / 0.5 ----+-+- --+-+-+------+-+-r--+-+-+-+ + F - I 0.45 -I-+- tpra�e=111,'�1171 �f1 0.4 - -L- -'- -L-L---'--'- -+- --J-L-+- ----J-L-+ -'--'- -+-L-'--'- - 0.35 ----L-L- -'-L-1-L-'--'--'-L-+-L-'-J-1-+-L----J-1-L-L-1--1-L-L-L-1--1-L- y I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I U I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 3 0.3 ----i-i- -- - - - ---- - - - -- - - ------ - - ---- - - ---I-i- p a 0.25 0.2 ,�i -�,--�-T- -- -T-r-�,-- - -T-r- -7-T-r-�,-- -7-T-+---- -T-+--�-�- 0.15 ------T- --T-T-T- ----T-+-r- -T-+-r---,- -7-r-T------r-T-�,--,--- 0.1 -r--+-+- -+-+-r-r----+-+-r-r+-+-+-r-r--+-+-r-r----+-r-r---I-+- 0.05 0.02 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Pond BMP-1: BMP #1 (Wet Pond) Stage-Discharge 625 ❑Primary Orifice/Grate ------------ -L----- 624 9 -- --+ T T I- 623 Custom Weir/Orifice w .0 622 I I I I I I w I I I I I I w - ---------- ----- ------ ---,- - ----- 621 620 WQ Orifice 619 0 5 10 15 20 25 30 35 40 45 50 Discharge (cfs) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 19 Pond BMP-1: BMP #1 (Wet Pond) Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-fi) 0 500 1,000 1,500 2,000 2,5003,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,0008,500 9,000 Surface ■Storage 625 - --'--- '-------' -- ------ --- ----- -------- - ---'--I- -I I --- ' 624 ------�-------+--+---+--+---��----- -I--�- -+-+-----I-+- +-+-I--- 623 w VI u I II I I I I I I I I I I I I I I I I I 0 622 > II I I I I I w I u I II I I I I I I I I I I I I I I I I I I I w 621 ------�- r- --Ir--+---I-------rr-----rt---r---I -t---r--y---+-t-I--- 620 Custom Stage Data 619 0 5,000 10,000 15,000 20,000 25,600 30,000 35,000 40,000 Storage(cubic-feet) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 20 Hydrograph for Pond BMP-1: BMP #1 (Wet Pond) Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 619.00 0.00 2.50 0.00 0 619.00 0.00 5.00 0.00 0 619.00 0.00 7.50 0.00 0 619.00 0.00 10.00 0.00 0 619.00 0.00 12.50 0.09 436 619.09 0.01 15.00 0.04 824 619.16 0.01 17.50 0.03 985 619.19 0.01 20.00 0.02 1,067 619.21 0.01 22.50 0.02 1,102 619.22 0.02 25.00 0.00 1,067 619.21 0.01 27.50 0.00 938 619.18 0.01 30.00 0.00 819 619.16 0.01 32.50 0.00 712 619.14 0.01 35.00 0.00 616 619.12 0.01 37.50 0.00 531 619.11 0.01 40.00 0.00 461 619.09 0.01 42.50 0.00 401 619.08 0.01 45.00 0.00 351 619.07 0.01 47.50 0.00 309 619.06 0.00 50.00 0.00 273 619.05 0.00 52.50 0.00 241 619.05 0.00 55.00 0.00 213 619.04 0.00 57.50 0.00 188 619.04 0.00 60.00 0.00 166 619.03 0.00 62.50 0.00 147 619.03 0.00 65.00 0.00 130 619.03 0.00 67.50 0.00 115 619.02 0.00 70.00 0.00 102 619.02 0.00 Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 21 Stage-Discharge for Pond BMP-1: BMP #1 (Wet Pond) Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 619.00 0.00 621.60 0.06 624.20 21.04 619.05 0.00 621.65 0.06 624.25 24.24 619.10 0.01 621.70 0.06 624.30 27.72 619.15 0.01 621.75 0.06 624.35 31.46 619.20 0.01 621.80 0.06 624.40 35.44 619.25 0.02 621.85 0.06 624.45 39.64 619.30 0.02 621.90 0.06 624.50 44.05 619.35 0.02 621.95 0.06 624.55 48.65 619.40 0.02 622.00 0.06 624.60 52.90 619.45 0.02 622.05 0.07 624.65 53.17 619.50 0.03 622.10 0.07 624.70 53.43 619.55 0.03 622.15 0.07 624.75 53.69 619.60 0.03 622.20 0.07 624.80 53.95 619.65 0.03 622.25 0.07 624.85 54.21 619.70 0.03 622.30 0.07 624.90 54.46 619.75 0.03 622.35 0.07 624.95 54.72 619.80 0.03 622.40 0.07 625.00 54.97 619.85 0.03 622.45 0.07 619.90 0.03 622.50 0.07 619.95 0.04 622.55 0.14 620.00 0.04 622.60 0.28 620.05 0.04 622.65 0.45 620.10 0.04 622.70 0.66 620.15 0.04 622.75 0.89 620.20 0.04 622.80 1.15 620.25 0.04 622.85 1.43 620.30 0.04 622.90 1.73 620.35 0.04 622.95 2.05 620.40 0.04 623.00 2.39 620.45 0.04 623.05 2.75 620.50 0.05 623.10 3.12 620.55 0.05 623.15 3.51 620.60 0.05 623.20 3.91 620.65 0.05 623.25 4.33 620.70 0.05 623.30 4.76 620.75 0.05 623.35 5.21 620.80 0.05 623.40 5.67 620.85 0.05 623.45 6.14 620.90 0.05 623.50 6.63 620.95 0.05 623.55 7.13 621.00 0.05 623.60 7.64 621.05 0.05 623.65 8.16 621.10 0.05 623.70 8.69 621.15 0.05 623.75 9.24 621.20 0.06 623.80 9.79 621.25 0.06 623.85 10.36 621.30 0.06 623.90 10.93 621.35 0.06 623.95 11.52 621.40 0.06 624.00 12.12 621.45 0.06 624.05 13.53 621.50 0.06 624.10 15.62 621.55 0.06 624.15 18.15 Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 22 Stage-Area-Storage for Pond BMP-1: BMP #1 (Wet Pond) Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 619.00 4,938 0 624.20 8,553 36,576 619.10 5,103 502 624.30 8,612 37,434 619.20 5,268 1,021 624.40 8,672 38,299 619.30 5,434 1,556 624.50 8,732 39,169 619.40 5,599 2,107 624.60 8,791 40,045 619.50 5,764 2,676 624.70 8,851 40,927 619.60 5,853 3,256 624.80 8,910 41,815 619.70 5,942 3,846 624.90 8,969 42,709 619.80 6,030 4,445 625.00 9,029 43,609 619.90 6,119 5,052 620.00 6,208 5,669 620.10 6,261 6,292 620.20 6,315 6,921 620.30 6,368 7,555 620.40 6,422 8,194 620.50 6,475 8,839 620.60 6,528 9,489 620.70 6,582 10,145 620.80 6,635 10,806 620.90 6,689 11,472 621.00 6,742 12,144 621.10 6,797 12,820 621.20 6,852 13,503 621.30 6,907 14,191 621.40 6,962 14,884 621.50 7,017 15,583 621.60 7,071 16,288 621.70 7,126 16,997 621.80 7,181 17,713 621.90 7,236 18,434 622.00 7,291 19,160 622.10 7,347 19,892 622.20 7,404 20,629 622.30 7,460 21,373 622.40 7,517 22,122 622.50 7,573 22,876 622.60 7,629 23,636 622.70 7,686 24,402 622.80 7,742 25,173 622.90 7,799 25,950 623.00 7,855 26,733 623.10 7,913 27,521 623.20 7,971 28,316 623.30 8,029 29,116 623.40 8,087 29,921 623.50 8,145 30,733 623.60 8,202 31,550 623.70 8,260 32,373 623.80 8,318 33,202 623.90 8,376 34,037 624.00 8,434 34,878 624.10 8,494 35,724 Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 23 Summary for Link 1 L: POI #1 Inflow Area = 19.483 ac, 19.35% Impervious, Inflow Depth > 0.02" for 1" Storm event Inflow = 0.02 cfs @ 24.03 hrs, Volume= 0.037 of Primary = 0.02 cfs @ 24.03 hrs, Volume= 0.037 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 1 L: POI #1 Hyd rog raph _ C Inflow 0.017 -Ii 0.02 cfsI❑Primary --I----I--r+--r+--r+--II-r-7+--r0.--02+c fs r—r—i----I--r1--T+--rr--III--�-I--7+--rr--r r--II----II--T+---rrr�-r 0.016 JI -rIrrr �n IIQW �r�l= �r--II,4--1"-+3--rr--II-c 0.015 0.014 0.013 — - I_1—L_L 0.012 w 0.01 I--I- -I- U ---I—T—T 1—T—T—Ir--1—T—Ir—II— ----T—T—Ir----7—T—Ir--1-7—T---- 0.009 �I -I-+-r-r-I--I-+-r-r-I-+-+-r-I--I- o 0.008 LL --r—+—L—I--I- 0.007 0.006 0.005 0.004 —I I I —I—r —r—r— —I -- —T—r r —--- —r r r—I —---r—r — — r r r r-- 0.003 �I -r-I-r -r-r-r-r-I-r-r-r-I--I-r—r-r----r-r-r-I--I- 0.002 0.001 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 24 Hydrograph for Link 1L: POI #1 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 53.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 54.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 55.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 56.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 57.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 59.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 61.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 62.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 63.00 0.00 0.00 0.00 12.00 0.00 0.00 0.00 64.00 0.00 0.00 0.00 13.00 0.01 0.00 0.01 65.00 0.00 0.00 0.00 14.00 0.01 0.00 0.01 66.00 0.00 0.00 0.00 15.00 0.01 0.00 0.01 67.00 0.00 0.00 0.00 16.00 0.01 0.00 0.01 68.00 0.00 0.00 0.00 17.00 0.01 0.00 0.01 69.00 0.00 0.00 0.00 18.00 0.01 0.00 0.01 70.00 0.00 0.00 0.00 19.00 0.01 0.00 0.01 71.00 0.00 0.00 0.00 20.00 0.01 0.00 0.01 72.00 0.00 0.00 0.00 21.00 0.02 0.00 0.02 22.00 0.02 0.00 0.02 23.00 0.02 0.00 0.02 24.00 0.02 0.00 0.02 25.00 0.01 0.00 0.01 26.00 0.01 0.00 0.01 27.00 0.01 0.00 0.01 28.00 0.01 0.00 0.01 29.00 0.01 0.00 0.01 30.00 0.01 0.00 0.01 31.00 0.01 0.00 0.01 32.00 0.01 0.00 0.01 33.00 0.01 0.00 0.01 34.00 0.01 0.00 0.01 35.00 0.01 0.00 0.01 36.00 0.01 0.00 0.01 37.00 0.01 0.00 0.01 38.00 0.01 0.00 0.01 39.00 0.01 0.00 0.01 40.00 0.01 0.00 0.01 41.00 0.01 0.00 0.01 42.00 0.01 0.00 0.01 43.00 0.01 0.00 0.01 44.00 0.01 0.00 0.01 45.00 0.01 0.00 0.01 46.00 0.00 0.00 0.00 47.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 49.00 0.00 0.00 0.00 50.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 25 Summary for Link 2L: POI #2 Inflow Area = 1.688 ac, 4.62% Impervious, Inflow Depth = 0.00" for 1" Storm event Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 2L: POI #2 Hyd rog raph —I--I—7—T-7-7—I--7-7—T-7---- —T-7-7—I--7-7—T-7---- —T-7-7—I----7—T— C Inflow 1 ❑Primary Inflow�Arlea=l �alc� y I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I U I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 3 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I p I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I LL 0.00 cfs 0.00 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 1" Storm Rainfall=1.00" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 26 Hydrograph for Link 2L: POI #2 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 53.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 54.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 55.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 56.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 57.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 59.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 61.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 62.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 63.00 0.00 0.00 0.00 12.00 0.00 0.00 0.00 64.00 0.00 0.00 0.00 13.00 0.00 0.00 0.00 65.00 0.00 0.00 0.00 14.00 0.00 0.00 0.00 66.00 0.00 0.00 0.00 15.00 0.00 0.00 0.00 67.00 0.00 0.00 0.00 16.00 0.00 0.00 0.00 68.00 0.00 0.00 0.00 17.00 0.00 0.00 0.00 69.00 0.00 0.00 0.00 18.00 0.00 0.00 0.00 70.00 0.00 0.00 0.00 19.00 0.00 0.00 0.00 71.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 21.00 0.00 0.00 0.00 22.00 0.00 0.00 0.00 23.00 0.00 0.00 0.00 24.00 0.00 0.00 0.00 25.00 0.00 0.00 0.00 26.00 0.00 0.00 0.00 27.00 0.00 0.00 0.00 28.00 0.00 0.00 0.00 29.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 31.00 0.00 0.00 0.00 32.00 0.00 0.00 0.00 33.00 0.00 0.00 0.00 34.00 0.00 0.00 0.00 35.00 0.00 0.00 0.00 36.00 0.00 0.00 0.00 37.00 0.00 0.00 0.00 38.00 0.00 0.00 0.00 39.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 42.00 0.00 0.00 0.00 43.00 0.00 0.00 0.00 44.00 0.00 0.00 0.00 45.00 0.00 0.00 0.00 46.00 0.00 0.00 0.00 47.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 49.00 0.00 0.00 0.00 50.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 27 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: POI #1 Predevelopment Runoff Area=815,942 sf 6.70% Impervious Runoff Depth=0.55" Tc=24.4 min CN=60 Runoff=7.11 cfs 0.863 of Subcatchment2S: POI #2 Predevelopment Runoff Area=106,262 sf 0.00% Impervious Runoff Depth=0.36" Tc=18.3 min CN=55 Runoff=0.53 cfs 0.074 of Subcatchment3S: Post-Development Runoff Area=640,460 sf 8.40% Impervious Runoff Depth=0.60" Tc=24.4 min CN=61 Runoff=6.27 cfs 0.729 of Subcatchment4S: POI #2 Runoff Area=73,518 sf 4.62% Impervious Runoff Depth=0.51" Tc=16.7 min CN=59 Runoff=0.73 cfs 0.072 of Subcatchment5S: Culvert Runoff Area=601,822 sf 9.68% Impervious Runoff Depth=0.60" Tc=23.7 min CN=61 Runoff=6.03 cfs 0.685 of SubcatchmentDA#1: Post-Development Runoff Area=208,217 sf 53.03% Impervious Runoff Depth=1.75" Tc=5.0 min CN=81 Runoff=15.04 cfs 0.697 of Pond BMP-1: BMP#1 (Wet Pond) Peak Elev=622.59' Storage=23,577 cf Inflow=15.04 cfs 0.697 of Outflow=0.26 cfs 0.411 of Link 1L: POI #1 Inflow=6.33 cfs 1.141 of Primary=6.33 cfs 1.141 of Link 2L: POI #2 Inflow=0.73 cfs 0.072 of Primary=0.73 cfs 0.072 of Total Runoff Area = 56.158 ac Runoff Volume = 3.121 of Average Runoff Depth = 0.67" 88.53% Pervious = 49.717 ac 11.47% Impervious = 6.441 ac Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 1S: POI #1 Predevelopment Runoff = 7.11 cfs @ 12.23 hrs, Volume= 0.863 af, Depth= 0.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Year Rainfall=3.55" Area (so CN Description 543,022 55 Woods, Good, HSG B 54,658 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 209,175 61 >75% Grass cover, Good, HSG B 815,942 60 Weighted Average 761,284 93.30% Pervious Area 54,658 6.70% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 1S: POI #1 Predevelopment Hydrograph II II II I I I II II II II II II II II II II II II II II II II II II II II II II II II II II II II II ■Runoff 7.11 cfs 7 Type I'II 24-hrr - -2 Year�Ralnf ll;=&W- 6 RUh6ff At6a=815�942 isf -�----J-J -1-1-L-L-�------J-�-1-1-L-L-�------J-�-1-1-1-L- 5 F'L;1jofif'1V�o11�#rM0='1O�86$ - - - - -+- - - - -'--'--'- - -+-+- - - -'i��Irrloff,Depft:* 5-s'�- IIII IIIIIIIIIIIIIIII 3 4 ITC"24.4 M i n LL —t—I--I—t— t—t—t—t—t—1--1--I—t—t—t—t—t—t—r—I--I--I—t—t—t—t—t—t—t---I--I—y- 3 -r-1--1-r- r-r-r-r-r-r-1--1-r-r-r-r-r-r-r-r-1--1-r-r-r-r-r-r-r-r-1--1-r- 2 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I —T 1 1—T —T—T—r r 1 T—T—T—T—T—r r T—T—T—T—T—r r T- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 29 Hydrograph for Subcatchment 1S: POI #1 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 3.55 0.55 0.00 1.00 0.04 0.00 0.00 53.00 3.55 0.55 0.00 2.00 0.08 0.00 0.00 54.00 3.55 0.55 0.00 3.00 0.12 0.00 0.00 55.00 3.55 0.55 0.00 4.00 0.17 0.00 0.00 56.00 3.55 0.55 0.00 5.00 0.22 0.00 0.00 57.00 3.55 0.55 0.00 6.00 0.28 0.00 0.00 58.00 3.55 0.55 0.00 7.00 0.35 0.00 0.00 59.00 3.55 0.55 0.00 8.00 0.43 0.00 0.00 60.00 3.55 0.55 0.00 9.00 0.52 0.00 0.00 61.00 3.55 0.55 0.00 10.00 0.64 0.00 0.00 62.00 3.55 0.55 0.00 11.00 0.83 0.00 0.00 63.00 3.55 0.55 0.00 12.00 2.35 0.14 1.55 64.00 3.55 0.55 0.00 13.00 2.74 0.25 1.78 65.00 3.55 0.55 0.00 14.00 2.91 0.30 1.01 66.00 3.55 0.55 0.00 15.00 3.03 0.34 0.78 67.00 3.55 0.55 0.00 16.00 3.12 0.38 0.64 68.00 3.55 0.55 0.00 17.00 3.20 0.41 0.55 69.00 3.55 0.55 0.00 18.00 3.27 0.44 0.50 70.00 3.55 0.55 0.00 19.00 3.33 0.46 0.45 71.00 3.55 0.55 0.00 20.00 3.38 0.48 0.39 72.00 3.55 0.55 0.00 21.00 3.42 0.50 0.36 22.00 3.47 0.52 0.35 23.00 3.51 0.54 0.34 24.00 3.55 0.55 0.33 25.00 3.55 0.55 0.00 26.00 3.55 0.55 0.00 27.00 3.55 0.55 0.00 28.00 3.55 0.55 0.00 29.00 3.55 0.55 0.00 30.00 3.55 0.55 0.00 31.00 3.55 0.55 0.00 32.00 3.55 0.55 0.00 33.00 3.55 0.55 0.00 34.00 3.55 0.55 0.00 35.00 3.55 0.55 0.00 36.00 3.55 0.55 0.00 37.00 3.55 0.55 0.00 38.00 3.55 0.55 0.00 39.00 3.55 0.55 0.00 40.00 3.55 0.55 0.00 41.00 3.55 0.55 0.00 42.00 3.55 0.55 0.00 43.00 3.55 0.55 0.00 44.00 3.55 0.55 0.00 45.00 3.55 0.55 0.00 46.00 3.55 0.55 0.00 47.00 3.55 0.55 0.00 48.00 3.55 0.55 0.00 49.00 3.55 0.55 0.00 50.00 3.55 0.55 0.00 51.00 3.55 0.55 0.00 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment 2S: POI #2 Predevelopment Runoff = 0.53 cfs @ 12.18 hrs, Volume= 0.074 af, Depth= 0.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Year Rainfall=3.55" Area (so CN Description 106,262 55 Woods, Good, HSG B 106,262 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 Direct Entry, Subcatchment 2S: POI #2 Predevelopment Hydrograph ' -'--'--'--'-I'-I' - '�-'�-'--'--'--'--'-I' -I' -'�-'�-'--'--'-I'-I'- '-- '�-'�-'--'--'--'-I'-I' - '�-'�-'--'-- ■Runoff 0.55 0.53cfs r /—I— r—r—r rr— T—r—r— r—T_T_ 0.5 -I-I-, -I-+-�-� _ -12 Year-Rainfall;=3-5-5" - 0.45 I I 7II�v I I I I I I I I I I I y1 .1 I I III I III -I-Rttltdff A1*46�1O'6'3V2-i§f- ----------------------- IIII IIIIIIIIIIIII � I � I 0.4 0.35 I I I I I I I I I I I I I I I I w 3 0.3 I rI -1 -I -1 I I l l I l I DI epth;�O 36" rI - I -I I I- I o - 0.25 0.2 T-I--r-I--I- r-r-r-I--I-r-T-T-T—r-r-r-I--I-T-T-T—r-r-r-r-I--I-T-T-r-r-r-r- 0.15 I I I 0.1 0.05 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 31 Hydrograph for Subcatchment 2S: POI #2 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 3.55 0.36 0.00 1.00 0.04 0.00 0.00 53.00 3.55 0.36 0.00 2.00 0.08 0.00 0.00 54.00 3.55 0.36 0.00 3.00 0.12 0.00 0.00 55.00 3.55 0.36 0.00 4.00 0.17 0.00 0.00 56.00 3.55 0.36 0.00 5.00 0.22 0.00 0.00 57.00 3.55 0.36 0.00 6.00 0.28 0.00 0.00 58.00 3.55 0.36 0.00 7.00 0.35 0.00 0.00 59.00 3.55 0.36 0.00 8.00 0.43 0.00 0.00 60.00 3.55 0.36 0.00 9.00 0.52 0.00 0.00 61.00 3.55 0.36 0.00 10.00 0.64 0.00 0.00 62.00 3.55 0.36 0.00 11.00 0.83 0.00 0.00 63.00 3.55 0.36 0.00 12.00 2.35 0.06 0.12 64.00 3.55 0.36 0.00 13.00 2.74 0.13 0.14 65.00 3.55 0.36 0.00 14.00 2.91 0.17 0.09 66.00 3.55 0.36 0.00 15.00 3.03 0.20 0.07 67.00 3.55 0.36 0.00 16.00 3.12 0.23 0.06 68.00 3.55 0.36 0.00 17.00 3.20 0.25 0.05 69.00 3.55 0.36 0.00 18.00 3.27 0.27 0.05 70.00 3.55 0.36 0.00 19.00 3.33 0.29 0.04 71.00 3.55 0.36 0.00 20.00 3.38 0.31 0.04 72.00 3.55 0.36 0.00 21.00 3.42 0.32 0.04 22.00 3.47 0.34 0.04 23.00 3.51 0.35 0.03 24.00 3.55 0.36 0.03 25.00 3.55 0.36 0.00 26.00 3.55 0.36 0.00 27.00 3.55 0.36 0.00 28.00 3.55 0.36 0.00 29.00 3.55 0.36 0.00 30.00 3.55 0.36 0.00 31.00 3.55 0.36 0.00 32.00 3.55 0.36 0.00 33.00 3.55 0.36 0.00 34.00 3.55 0.36 0.00 35.00 3.55 0.36 0.00 36.00 3.55 0.36 0.00 37.00 3.55 0.36 0.00 38.00 3.55 0.36 0.00 39.00 3.55 0.36 0.00 40.00 3.55 0.36 0.00 41.00 3.55 0.36 0.00 42.00 3.55 0.36 0.00 43.00 3.55 0.36 0.00 44.00 3.55 0.36 0.00 45.00 3.55 0.36 0.00 46.00 3.55 0.36 0.00 47.00 3.55 0.36 0.00 48.00 3.55 0.36 0.00 49.00 3.55 0.36 0.00 50.00 3.55 0.36 0.00 51.00 3.55 0.36 0.00 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment 3S: Post-Development ByPass POI #1 Runoff = 6.27 cfs @ 12.23 hrs, Volume= 0.729 af, Depth= 0.60" Routed to Link 1 L : POI #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Year Rainfall=3.55" Area (so CN Description 406,538 55 Woods, Good, HSG B 53,797 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 171,038 61 >75% Grass cover, Good, HSG B 640,460 61 Weighted Average 586,663 91.60% Pervious Area 53,797 8.40% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 3S: Post-Development ByPass POI #1 Hydrograph -r-i--i-r-r-r-t-r-r-r-r-i--i--i-r-r-r-t-r-r-r-i--i--i-r-r-r-t-r-r-r-r-i--i-r- 7 ❑Runoff 6.27 cfs Qi �J./� 2 Year �Rainfall;=3.55 -r-i--i-r-r -t-+-r-r-r-i--i--i-r-r-t-t-r-r-r-i--i--i-r-r-+-+-+-r-r-r-i--i-r- 5 RUh6ff At6a=640�460 isf MO w 4 k6noff bepth=0.i60"; - 111111111 -+ cr4. I11if� 0 a 3- 2- 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 5860 62 6466 6870 72 Time (hours) Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 33 Hydrograph for Subcatchment 3S: Post-Development ByPass POI #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 3.55 0.60 0.00 1.00 0.04 0.00 0.00 53.00 3.55 0.60 0.00 2.00 0.08 0.00 0.00 54.00 3.55 0.60 0.00 3.00 0.12 0.00 0.00 55.00 3.55 0.60 0.00 4.00 0.17 0.00 0.00 56.00 3.55 0.60 0.00 5.00 0.22 0.00 0.00 57.00 3.55 0.60 0.00 6.00 0.28 0.00 0.00 58.00 3.55 0.60 0.00 7.00 0.35 0.00 0.00 59.00 3.55 0.60 0.00 8.00 0.43 0.00 0.00 60.00 3.55 0.60 0.00 9.00 0.52 0.00 0.00 61.00 3.55 0.60 0.00 10.00 0.64 0.00 0.00 62.00 3.55 0.60 0.00 11.00 0.83 0.00 0.00 63.00 3.55 0.60 0.00 12.00 2.35 0.15 1.52 64.00 3.55 0.60 0.00 13.00 2.74 0.27 1.49 65.00 3.55 0.60 0.00 14.00 2.91 0.33 0.84 66.00 3.55 0.60 0.00 15.00 3.03 0.38 0.65 67.00 3.55 0.60 0.00 16.00 3.12 0.41 0.53 68.00 3.55 0.60 0.00 17.00 3.20 0.44 0.46 69.00 3.55 0.60 0.00 18.00 3.27 0.47 0.41 70.00 3.55 0.60 0.00 19.00 3.33 0.50 0.37 71.00 3.55 0.60 0.00 20.00 3.38 0.52 0.32 72.00 3.55 0.60 0.00 21.00 3.42 0.54 0.29 22.00 3.47 0.56 0.28 23.00 3.51 0.58 0.28 24.00 3.55 0.60 0.27 25.00 3.55 0.60 0.00 26.00 3.55 0.60 0.00 27.00 3.55 0.60 0.00 28.00 3.55 0.60 0.00 29.00 3.55 0.60 0.00 30.00 3.55 0.60 0.00 31.00 3.55 0.60 0.00 32.00 3.55 0.60 0.00 33.00 3.55 0.60 0.00 34.00 3.55 0.60 0.00 35.00 3.55 0.60 0.00 36.00 3.55 0.60 0.00 37.00 3.55 0.60 0.00 38.00 3.55 0.60 0.00 39.00 3.55 0.60 0.00 40.00 3.55 0.60 0.00 41.00 3.55 0.60 0.00 42.00 3.55 0.60 0.00 43.00 3.55 0.60 0.00 44.00 3.55 0.60 0.00 45.00 3.55 0.60 0.00 46.00 3.55 0.60 0.00 47.00 3.55 0.60 0.00 48.00 3.55 0.60 0.00 49.00 3.55 0.60 0.00 50.00 3.55 0.60 0.00 51.00 3.55 0.60 0.00 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 4S: POI #2 Post-Development Runoff = 0.73 cfs @ 12.13 hrs, Volume= 0.072 af, Depth= 0.51" Routed to Link 2L : POI #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Year Rainfall=3.55" Area (so CN Description 42,969 55 Woods, Good, HSG B 3,396 98 Greenway 27,153 61 >75% Grass cover, Good, HSG B 73,518 59 Weighted Average 70,122 95.38% Pervious Area 3,396 4.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.7 Direct Entry, Subcatchment 4S: POI #2 Post-Development Hydrograph 0.8 Runoff �i t-I-I-t-r-I--I-t-t-t-t-r-r-I--I--I-t- -t-+-r-r-I--I--I- 0.75 0.73 cfs -- 0.7 ---------------------------------------�y -ri- =ir - -----I--I- -T-T-r-I--I-7-7-7-T-r-r I -1 -1 �Tr.�F F-1r� 1--1 -1--7-qr-T fir-r 0.65 - - - ---- - - -+- - -----II- l�-I�GI-RQ�LLIA���V7�J�7„Ir- � I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0.6 IIIIII I I I I I I I I I I I I _II_f�tiO�ff�pCre�T3�5�F8-�- -------- -------------I-;-;------ IIII IIII III � I I I 0.55 _ 0.5 -----I--I- -t-t-r---I-t- -t-t-r-r-I--I Fujn1ofo�yr =0s0 - -- ------- - -L- 1-i-L- - - - 1 w 0.45 ' I pI � I `I -- _ -I--I- _ -I--I- Ffa �J111-IDlepthl-a51" 3 0 4 I I I I I I I I I I I I 1-------I-- -+-+-r---I-+-+-+-+-r-r------+-+-+-+ O -r-r-ITI'�I^/�T1 G`.I'�/}-ri1ln'I LL 0.35 -r-r-r---I-7- -7-T-r-r-r-I--I- - -T-r-r-r ---I--I- - 0.25 -----I-�- - - - ---- - - - - - ------ - - - - - ---- - - - - -�-�- 0.2 0.15 -----I--I- r-r-r----r-r-r-r-r-r------r-r-r-r-r-r-I--I---r-r-r-r-r-I-- 0.1 -----I--I- -L-1--1-J-J-1-1-L-L---I--I- -1-1-1-L-L---I--I- -1-L-L-L-L- 0.05 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 35 Hydrograph for Subcatchment 4S: POI #2 Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 3.55 0.51 0.00 1.00 0.04 0.00 0.00 53.00 3.55 0.51 0.00 2.00 0.08 0.00 0.00 54.00 3.55 0.51 0.00 3.00 0.12 0.00 0.00 55.00 3.55 0.51 0.00 4.00 0.17 0.00 0.00 56.00 3.55 0.51 0.00 5.00 0.22 0.00 0.00 57.00 3.55 0.51 0.00 6.00 0.28 0.00 0.00 58.00 3.55 0.51 0.00 7.00 0.35 0.00 0.00 59.00 3.55 0.51 0.00 8.00 0.43 0.00 0.00 60.00 3.55 0.51 0.00 9.00 0.52 0.00 0.00 61.00 3.55 0.51 0.00 10.00 0.64 0.00 0.00 62.00 3.55 0.51 0.00 11.00 0.83 0.00 0.00 63.00 3.55 0.51 0.00 12.00 2.35 0.12 0.32 64.00 3.55 0.51 0.00 13.00 2.74 0.22 0.13 65.00 3.55 0.51 0.00 14.00 2.91 0.27 0.08 66.00 3.55 0.51 0.00 15.00 3.03 0.31 0.07 67.00 3.55 0.51 0.00 16.00 3.12 0.35 0.05 68.00 3.55 0.51 0.00 17.00 3.20 0.37 0.05 69.00 3.55 0.51 0.00 18.00 3.27 0.40 0.04 70.00 3.55 0.51 0.00 19.00 3.33 0.42 0.04 71.00 3.55 0.51 0.00 20.00 3.38 0.44 0.03 72.00 3.55 0.51 0.00 21.00 3.42 0.46 0.03 22.00 3.47 0.48 0.03 23.00 3.51 0.50 0.03 24.00 3.55 0.51 0.03 25.00 3.55 0.51 0.00 26.00 3.55 0.51 0.00 27.00 3.55 0.51 0.00 28.00 3.55 0.51 0.00 29.00 3.55 0.51 0.00 30.00 3.55 0.51 0.00 31.00 3.55 0.51 0.00 32.00 3.55 0.51 0.00 33.00 3.55 0.51 0.00 34.00 3.55 0.51 0.00 35.00 3.55 0.51 0.00 36.00 3.55 0.51 0.00 37.00 3.55 0.51 0.00 38.00 3.55 0.51 0.00 39.00 3.55 0.51 0.00 40.00 3.55 0.51 0.00 41.00 3.55 0.51 0.00 42.00 3.55 0.51 0.00 43.00 3.55 0.51 0.00 44.00 3.55 0.51 0.00 45.00 3.55 0.51 0.00 46.00 3.55 0.51 0.00 47.00 3.55 0.51 0.00 48.00 3.55 0.51 0.00 49.00 3.55 0.51 0.00 50.00 3.55 0.51 0.00 51.00 3.55 0.51 0.00 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 5S: Culvert Post-Development Runoff = 6.03 cfs @ 12.22 hrs, Volume= 0.685 af, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Year Rainfall=3.55" Area (so CN Description 359,379 55 Woods, Good, HSG B 58,277 98 Paved parking, HSG B 9,087 79 Pasture/grassland/range, Poor, HSG B 175,079 61 >75% Grass cover, Good, HSG B 601,822 61 Weighted Average 543,545 90.32% Pervious Area 58,277 9.68% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.7 Direct Entry, Subcatchment 5S: Culvert Post-Development Hydrograph ■Runoff —+---i—+ 6.03 cfs +—+—+—+—+—++—+—+—+—+—+—+—+—+—+—i—+—+—+—+—+—+—+—+—+—i--i—+— 6 I ' Type ll 24-hr Z-r-t---I-t-t -t-t------t-t-Y-+-t-t-r V{a.l'F r 7Ra lnfall;:3.5 „'- 5 RUh6ff At6a=601�822 isf q Run off Depth=0.i60'1 LL 3 TC"'23.7 Min z t---I-t- +-t-t-t-t------t-t-t-t-t-t-t---I--I-t-t-t-t-t-t-t-----I-t- 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 37 Hydrograph for Subcatchment 5S: Culvert Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 3.55 0.60 0.00 1.00 0.04 0.00 0.00 53.00 3.55 0.60 0.00 2.00 0.08 0.00 0.00 54.00 3.55 0.60 0.00 3.00 0.12 0.00 0.00 55.00 3.55 0.60 0.00 4.00 0.17 0.00 0.00 56.00 3.55 0.60 0.00 5.00 0.22 0.00 0.00 57.00 3.55 0.60 0.00 6.00 0.28 0.00 0.00 58.00 3.55 0.60 0.00 7.00 0.35 0.00 0.00 59.00 3.55 0.60 0.00 8.00 0.43 0.00 0.00 60.00 3.55 0.60 0.00 9.00 0.52 0.00 0.00 61.00 3.55 0.60 0.00 10.00 0.64 0.00 0.00 62.00 3.55 0.60 0.00 11.00 0.83 0.00 0.00 63.00 3.55 0.60 0.00 12.00 2.35 0.15 1.56 64.00 3.55 0.60 0.00 13.00 2.74 0.27 1.38 65.00 3.55 0.60 0.00 14.00 2.91 0.33 0.79 66.00 3.55 0.60 0.00 15.00 3.03 0.38 0.61 67.00 3.55 0.60 0.00 16.00 3.12 0.41 0.50 68.00 3.55 0.60 0.00 17.00 3.20 0.44 0.43 69.00 3.55 0.60 0.00 18.00 3.27 0.47 0.39 70.00 3.55 0.60 0.00 19.00 3.33 0.50 0.34 71.00 3.55 0.60 0.00 20.00 3.38 0.52 0.30 72.00 3.55 0.60 0.00 21.00 3.42 0.54 0.27 22.00 3.47 0.56 0.27 23.00 3.51 0.58 0.26 24.00 3.55 0.60 0.25 25.00 3.55 0.60 0.00 26.00 3.55 0.60 0.00 27.00 3.55 0.60 0.00 28.00 3.55 0.60 0.00 29.00 3.55 0.60 0.00 30.00 3.55 0.60 0.00 31.00 3.55 0.60 0.00 32.00 3.55 0.60 0.00 33.00 3.55 0.60 0.00 34.00 3.55 0.60 0.00 35.00 3.55 0.60 0.00 36.00 3.55 0.60 0.00 37.00 3.55 0.60 0.00 38.00 3.55 0.60 0.00 39.00 3.55 0.60 0.00 40.00 3.55 0.60 0.00 41.00 3.55 0.60 0.00 42.00 3.55 0.60 0.00 43.00 3.55 0.60 0.00 44.00 3.55 0.60 0.00 45.00 3.55 0.60 0.00 46.00 3.55 0.60 0.00 47.00 3.55 0.60 0.00 48.00 3.55 0.60 0.00 49.00 3.55 0.60 0.00 50.00 3.55 0.60 0.00 51.00 3.55 0.60 0.00 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment DA #1: Post-Development Pond #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 15.04 cfs @ 11.96 hrs, Volume= 0.697 af, Depth= 1.75" Routed to Pond BMP-1 : BMP#1 (Wet Pond) Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Year Rainfall=3.55" Area (so CN Description 15,333 98 Sidewalk 38,202 98 Lots (Building, walkway, patios) 14,549 98 Driveways 42,297 98 Roadway 44 98 CBU Pads 97,792 61 >75% Grass cover, Good, HSG B 208,217 81 Weighted Average 97,792 46.97% Pervious Area 110,425 53.03% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA #1: Post-Development Pond #1 Hydrograph 1 -1--1--1--1-_1r�r�I-�1- 1I- 1I-1I-1--1--1--1--1-_1_�r�r�I -�1 -1I-1I-1--1--1--1--1__1r�I-�1- 1I- 1I-1I_1-- ■Runoff 16 —+-1--1— 15.04 cfs +—+—+—+—+-1--1--1--1--1--1—+—+—+—+—r—+—+-1--1--1—+—+—+—+—+—+—+—+— 15 ---1--1--1-- -----------1--1--1--1--1-------+- -1--1--1--1--1--1�� Y �� - -- i l 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 14 1 1 111111111111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -1 1111 1- 1 - 1 - 11 2YOar 11� gin1 alP=15W"1-- 13 -r-1--1--1- -+-+-+-r-r-r-r-r-1--1--1-rt-+-+-+`-.yr,�-�r-r-1y-�-y1,--1-+-y�-�y+prt-+A-*r�-r-r- 12 1 1_1_i_i_L_11__11__11__11__11__11 1_1-Ri�"ff�11�i1�^' 208V /M21/��F !§.f- 11 ' 11 -11--11--11--11- - 11- 11- 11 - 11 -11 -11--11--11--11--11--11- 11- 11 -� Igoffl��OI 111=181�/1 7-1 `10 w -r-1--1--1- -r-r-r-r-r-r-r-r-1--1--1-r-r-r-+-r-r-r-1--1--1-r-r-r-r-r-r-r-r- g ' 1 RL n11Off 11Deptl17-1,75" - 0 8- 1 1 1 _ 1_ 1_ 1_ 1_ 1_ 1 _ 1_ 1__1__11� 0 f�1if1-- a 7 ----------- I11 - - 1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 1 J -r-1--1--1- -r-T-r-r-r-___-1--1--_--T-Y-Y-+-r-r-r-I__I__I-r-r-r- r- r- -� 11 6 -1+-11--11--11- -�-�-�-�-�-11--11--11--11--11--11-�-�-�-�-�-�-1+-11--11--11-�-�-�-�- -+- -�- s ' I 4 3 -+-+-1-+- -+-+-+-+-+-+-+-++-+-+-+-+-+-+-+-+-+-+-1-+-+-+-+-+-+-+-+-+- 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 3436 38 40 4244 46 48 50 52 54 56 58 60 6264 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 39 Hydrograph for Subcatchment DA #1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 3.55 1.75 0.00 1.00 0.04 0.00 0.00 53.00 3.55 1.75 0.00 2.00 0.08 0.00 0.00 54.00 3.55 1.75 0.00 3.00 0.12 0.00 0.00 55.00 3.55 1.75 0.00 4.00 0.17 0.00 0.00 56.00 3.55 1.75 0.00 5.00 0.22 0.00 0.00 57.00 3.55 1.75 0.00 6.00 0.28 0.00 0.00 58.00 3.55 1.75 0.00 7.00 0.35 0.00 0.00 59.00 3.55 1.75 0.00 8.00 0.43 0.00 0.00 60.00 3.55 1.75 0.00 9.00 0.52 0.00 0.02 61.00 3.55 1.75 0.00 10.00 0.64 0.01 0.08 62.00 3.55 1.75 0.00 11.00 0.83 0.05 0.28 63.00 3.55 1.75 0.00 12.00 2.35 0.84 13.21 64.00 3.55 1.75 0.00 13.00 2.74 1.12 0.82 65.00 3.55 1.75 0.00 14.00 2.91 1.25 0.50 66.00 3.55 1.75 0.00 15.00 3.03 1.34 0.40 67.00 3.55 1.75 0.00 16.00 3.12 1.41 0.31 68.00 3.55 1.75 0.00 17.00 3.20 1.47 0.28 69.00 3.55 1.75 0.00 18.00 3.27 1.52 0.25 70.00 3.55 1.75 0.00 19.00 3.33 1.57 0.21 71.00 3.55 1.75 0.00 20.00 3.38 1.61 0.18 72.00 3.55 1.75 0.00 21.00 3.42 1.65 0.17 22.00 3.47 1.68 0.17 23.00 3.51 1.72 0.16 24.00 3.55 1.75 0.15 25.00 3.55 1.75 0.00 26.00 3.55 1.75 0.00 27.00 3.55 1.75 0.00 28.00 3.55 1.75 0.00 29.00 3.55 1.75 0.00 30.00 3.55 1.75 0.00 31.00 3.55 1.75 0.00 32.00 3.55 1.75 0.00 33.00 3.55 1.75 0.00 34.00 3.55 1.75 0.00 35.00 3.55 1.75 0.00 36.00 3.55 1.75 0.00 37.00 3.55 1.75 0.00 38.00 3.55 1.75 0.00 39.00 3.55 1.75 0.00 40.00 3.55 1.75 0.00 41.00 3.55 1.75 0.00 42.00 3.55 1.75 0.00 43.00 3.55 1.75 0.00 44.00 3.55 1.75 0.00 45.00 3.55 1.75 0.00 46.00 3.55 1.75 0.00 47.00 3.55 1.75 0.00 48.00 3.55 1.75 0.00 49.00 3.55 1.75 0.00 50.00 3.55 1.75 0.00 51.00 3.55 1.75 0.00 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 40 Summary for Pond BMP-1: BMP #1 (Wet Pond) Inflow Area = 4.780 ac, 53.03% Impervious, Inflow Depth = 1.75" for 2 Year event Inflow = 15.04 cfs @ 11.96 hrs, Volume= 0.697 of Outflow = 0.26 cfs @ 17.63 hrs, Volume= 0.411 af, Atten= 98%, Lag= 340.1 min Primary = 0.26 cfs @ 17.63 hrs, Volume= 0.411 of Routed to Link 1 L : POI #1 Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 622.59'@ 17.63 hrs Surf.Area= 7,625 sf Storage= 23,577 cf Plug-Flow detention time= 1,427.9 min calculated for 0.411 of(59% of inflow) Center-of-Mass det. time= 1,310.8 min (2,141.2 - 830.3 ) Volume Invert Avail.Storage Storage Description #1 619.00' 43,609 cf Custom Stage Data (Prismatic)-isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 619.00 4,938 0 0 619.50 5,764 2,676 2,676 620.00 6,208 2,993 5,669 621.00 6,742 6,475 12,144 622.00 7,291 7,017 19,160 623.00 7,855 7,573 26,733 624.00 8,434 8,145 34,878 625.00 9,029 8,732 43,609 Device Routing Invert Outlet Devices #1 Primary 618.34' 30.0" Round Culvert L= 67.7' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 618.34'/618.00' S= 0.0050 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes& inlets, Flow Area= 4.91 sf #2 Device 1 619.00' 1.2"Vert. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 622.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.50 Width (feet) 2.00 2.00 #4 Device 1 624.00' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=0.25 cfs @ 17.63 hrs HW=622.59' (Free Discharge) L1=Culvert (Passes 0.25 cfs of 39.07 cfs potential flow) 2=WQ Orifice (Orifice Controls 0.07 cfs @ 9.06 fps) 3=Custom Weir/Orifice (Weir Controls 0.18 cfs @ 0.99 fps) 4=Orifice/Grate ( Controls 0.00 cfs) Villages at Waxhaw Type 1124-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 41 Pond BMP-1: BMP #1 (Wet Pond) Hyd rog raph -,--,- --I T----------?----------?-------,--,- - ----------?-------,--,- C Inflow -,---i--ri--i15-. ❑Primar y 16 /4— Q K =� � - 1-r- -1--1-J-1- 1�f]p -L-1�--I071--1'-�J-1-�L- - �15 r 1 14 -'--'- ---- - - -------- -I-------- 13 12 T 7 r r-i- I- - - 1 I ----r-r- r -r-r-rV- T r -----r- -r-r-r-I--I- 11 y10 U 9 � I 0 LL 7 -r--,-T- ------ _T-r- _r--T- _r-r-r-r--,-T-r------T-T-r-r-r-I--I- 6 5 —I--I— I— I— —I— — I —I —I--I--I— I I — 2 1 0.26 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Pond BMP-1: BMP #1 (Wet Pond) Stage-Discharge 625 ❑Primary Orifice/Grate ------------ -1----- 62454� -- --r T T ---- -� 623 Custom Weir/Orifice w .0 622 I I I I I I w I I I I I I w - ----r-----T-----7------ ---1 - ----- 621 620 WQ Orifice 619 0 5 10 15 20 25 30 35 40 45 50 Discharge (cfs) Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 42 Pond BMP-1: BMP #1 (Wet Pond) Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-fi) 0 500 1,000 1,500 2,000 2,5003,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,0008,500 9,000 Surface ■Storage 625 - --'--- '-------' -- ------ --- ----- -------- - ---'--I- -I I --- ' 624 ------�-------+--+---+--+---��----- -I--�- -+-+-----I-+- +-+-I--- 623 w VI u I II I I I I I I I I I I I I I I I I I 0 622 > II I I I I I w I u I II I I I I I I I I I I I I I I I I I I I w 621 ------�- r- --Ir--+---I-------rr-----rt---r---I -t---r--y---+-t-I--- 620 Custom Stage Data 619 0 5,000 10,000 15,000 20,000 25,600 30,000 35,000 40,000 Storage(cubic-feet) Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 43 Hydrograph for Pond BMP-1: BMP #1 (Wet Pond) Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 619.00 0.00 2.50 0.00 0 619.00 0.00 5.00 0.00 0 619.00 0.00 7.50 0.00 0 619.00 0.00 10.00 0.08 179 619.04 0.00 12.50 1.29 17,163 621.72 0.06 15.00 0.40 22,267 622.42 0.07 17.50 0.26 23,577 622.59 0.26 20.00 0.18 23,424 622.57 0.21 22.50 0.16 23,315 622.56 0.17 25.00 0.00 22,924 622.51 0.08 27.50 0.00 22,292 622.42 0.07 30.00 0.00 21,671 622.34 0.07 32.50 0.00 21,058 622.26 0.07 35.00 0.00 20,452 622.18 0.07 37.50 0.00 19,854 622.09 0.07 40.00 0.00 19,264 622.01 0.07 42.50 0.00 18,682 621.93 0.06 45.00 0.00 18,108 621.85 0.06 47.50 0.00 17,542 621.78 0.06 50.00 0.00 16,984 621.70 0.06 52.50 0.00 16,435 621.62 0.06 55.00 0.00 15,893 621.54 0.06 57.50 0.00 15,360 621.47 0.06 60.00 0.00 14,835 621.39 0.06 62.50 0.00 14,318 621.32 0.06 65.00 0.00 13,809 621.24 0.06 67.50 0.00 13,309 621.17 0.06 70.00 0.00 12,818 621.10 0.05 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 44 Stage-Discharge for Pond BMP-1: BMP #1 (Wet Pond) Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 619.00 0.00 621.60 0.06 624.20 21.04 619.05 0.00 621.65 0.06 624.25 24.24 619.10 0.01 621.70 0.06 624.30 27.72 619.15 0.01 621.75 0.06 624.35 31.46 619.20 0.01 621.80 0.06 624.40 35.44 619.25 0.02 621.85 0.06 624.45 39.64 619.30 0.02 621.90 0.06 624.50 44.05 619.35 0.02 621.95 0.06 624.55 48.65 619.40 0.02 622.00 0.06 624.60 52.90 619.45 0.02 622.05 0.07 624.65 53.17 619.50 0.03 622.10 0.07 624.70 53.43 619.55 0.03 622.15 0.07 624.75 53.69 619.60 0.03 622.20 0.07 624.80 53.95 619.65 0.03 622.25 0.07 624.85 54.21 619.70 0.03 622.30 0.07 624.90 54.46 619.75 0.03 622.35 0.07 624.95 54.72 619.80 0.03 622.40 0.07 625.00 54.97 619.85 0.03 622.45 0.07 619.90 0.03 622.50 0.07 619.95 0.04 622.55 0.14 620.00 0.04 622.60 0.28 620.05 0.04 622.65 0.45 620.10 0.04 622.70 0.66 620.15 0.04 622.75 0.89 620.20 0.04 622.80 1.15 620.25 0.04 622.85 1.43 620.30 0.04 622.90 1.73 620.35 0.04 622.95 2.05 620.40 0.04 623.00 2.39 620.45 0.04 623.05 2.75 620.50 0.05 623.10 3.12 620.55 0.05 623.15 3.51 620.60 0.05 623.20 3.91 620.65 0.05 623.25 4.33 620.70 0.05 623.30 4.76 620.75 0.05 623.35 5.21 620.80 0.05 623.40 5.67 620.85 0.05 623.45 6.14 620.90 0.05 623.50 6.63 620.95 0.05 623.55 7.13 621.00 0.05 623.60 7.64 621.05 0.05 623.65 8.16 621.10 0.05 623.70 8.69 621.15 0.05 623.75 9.24 621.20 0.06 623.80 9.79 621.25 0.06 623.85 10.36 621.30 0.06 623.90 10.93 621.35 0.06 623.95 11.52 621.40 0.06 624.00 12.12 621.45 0.06 624.05 13.53 621.50 0.06 624.10 15.62 621.55 0.06 624.15 18.15 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 45 Stage-Area-Storage for Pond BMP-1: BMP #1 (Wet Pond) Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 619.00 4,938 0 624.20 8,553 36,576 619.10 5,103 502 624.30 8,612 37,434 619.20 5,268 1,021 624.40 8,672 38,299 619.30 5,434 1,556 624.50 8,732 39,169 619.40 5,599 2,107 624.60 8,791 40,045 619.50 5,764 2,676 624.70 8,851 40,927 619.60 5,853 3,256 624.80 8,910 41,815 619.70 5,942 3,846 624.90 8,969 42,709 619.80 6,030 4,445 625.00 9,029 43,609 619.90 6,119 5,052 620.00 6,208 5,669 620.10 6,261 6,292 620.20 6,315 6,921 620.30 6,368 7,555 620.40 6,422 8,194 620.50 6,475 8,839 620.60 6,528 9,489 620.70 6,582 10,145 620.80 6,635 10,806 620.90 6,689 11,472 621.00 6,742 12,144 621.10 6,797 12,820 621.20 6,852 13,503 621.30 6,907 14,191 621.40 6,962 14,884 621.50 7,017 15,583 621.60 7,071 16,288 621.70 7,126 16,997 621.80 7,181 17,713 621.90 7,236 18,434 622.00 7,291 19,160 622.10 7,347 19,892 622.20 7,404 20,629 622.30 7,460 21,373 622.40 7,517 22,122 622.50 7,573 22,876 622.60 7,629 23,636 622.70 7,686 24,402 622.80 7,742 25,173 622.90 7,799 25,950 623.00 7,855 26,733 623.10 7,913 27,521 623.20 7,971 28,316 623.30 8,029 29,116 623.40 8,087 29,921 623.50 8,145 30,733 623.60 8,202 31,550 623.70 8,260 32,373 623.80 8,318 33,202 623.90 8,376 34,037 624.00 8,434 34,878 624.10 8,494 35,724 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 46 Summary for Link 1 L: POI #1 Inflow Area = 19.483 ac, 19.35% Impervious, Inflow Depth > 0.70" for 2 Year event Inflow = 6.33 cfs @ 12.23 hrs, Volume= 1.141 of Primary = 6.33 cfs @ 12.23 hrs, Volume= 1.141 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 1 L: POI #1 Hyd rog raph L-L-L-'--'-L-L-L-L-'--'-L-L-L-L-'--'-L-L-L-L - C Inflow 7 6.33 cfs ❑Primary -'--'- -----i--'- 'i-'i-'-6.33 cfs Iin l�7S Tw iAre1 =409-483 46 6 5- -4-I-I I-4-I-I- -1-+-1----1-+-L- ------1-+- w 4 -1--1-J-1-1-L-'--'-J-1-L-L-1--1-J-1-1-L----J-1-L-L-1--1--1-1-L- 0 a 3 ------ -T-i------ -r-i -T-i------ -r -T- 2 ---I-1- ---1-7-T-r----1-T-T-T----1-7-T-r----1-T-T-r------7-T- 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 47 Hydrograph for Link 1L: POI #1 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.06 0.00 0.06 1.00 0.00 0.00 0.00 53.00 0.06 0.00 0.06 2.00 0.00 0.00 0.00 54.00 0.06 0.00 0.06 3.00 0.00 0.00 0.00 55.00 0.06 0.00 0.06 4.00 0.00 0.00 0.00 56.00 0.06 0.00 0.06 5.00 0.00 0.00 0.00 57.00 0.06 0.00 0.06 6.00 0.00 0.00 0.00 58.00 0.06 0.00 0.06 7.00 0.00 0.00 0.00 59.00 0.06 0.00 0.06 8.00 0.00 0.00 0.00 60.00 0.06 0.00 0.06 9.00 0.00 0.00 0.00 61.00 0.06 0.00 0.06 10.00 0.00 0.00 0.00 62.00 0.06 0.00 0.06 11.00 0.01 0.00 0.01 63.00 0.06 0.00 0.06 12.00 1.57 0.00 1.57 64.00 0.06 0.00 0.06 13.00 1.55 0.00 1.55 65.00 0.06 0.00 0.06 14.00 0.91 0.00 0.91 66.00 0.06 0.00 0.06 15.00 0.72 0.00 0.72 67.00 0.06 0.00 0.06 16.00 0.68 0.00 0.68 68.00 0.05 0.00 0.05 17.00 0.71 0.00 0.71 69.00 0.05 0.00 0.05 18.00 0.67 0.00 0.67 70.00 0.05 0.00 0.05 19.00 0.60 0.00 0.60 71.00 0.05 0.00 0.05 20.00 0.52 0.00 0.52 72.00 0.05 0.00 0.05 21.00 0.48 0.00 0.48 22.00 0.46 0.00 0.46 23.00 0.44 0.00 0.44 24.00 0.43 0.00 0.43 25.00 0.08 0.00 0.08 26.00 0.07 0.00 0.07 27.00 0.07 0.00 0.07 28.00 0.07 0.00 0.07 29.00 0.07 0.00 0.07 30.00 0.07 0.00 0.07 31.00 0.07 0.00 0.07 32.00 0.07 0.00 0.07 33.00 0.07 0.00 0.07 34.00 0.07 0.00 0.07 35.00 0.07 0.00 0.07 36.00 0.07 0.00 0.07 37.00 0.07 0.00 0.07 38.00 0.07 0.00 0.07 39.00 0.07 0.00 0.07 40.00 0.07 0.00 0.07 41.00 0.06 0.00 0.06 42.00 0.06 0.00 0.06 43.00 0.06 0.00 0.06 44.00 0.06 0.00 0.06 45.00 0.06 0.00 0.06 46.00 0.06 0.00 0.06 47.00 0.06 0.00 0.06 48.00 0.06 0.00 0.06 49.00 0.06 0.00 0.06 50.00 0.06 0.00 0.06 51.00 0.06 0.00 0.06 Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 48 Summary for Link 2L: POI #2 Inflow Area = 1.688 ac, 4.62% Impervious, Inflow Depth = 0.51" for 2 Year event Inflow = 0.73 cfs @ 12.13 hrs, Volume= 0.072 of Primary = 0.73 cfs @ 12.13 hrs, Volume= 0.072 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 2L: POI #2 Hyd rog raph ❑Inflow -7- - - -i-7-7-r-r-r-i-7-r-r-rr-7-r-r-i--i-7-7-r-r-r-i-7-r-r-r-i-7- ❑Pnma 0.8 073 cfs r /��ii �i pi �+ ry 0.75 ---- 0.1. CTS -'- �n IT✓lrni /'11iGia= iOy -I--i-i- -i-li-li -----I--i-li------ 0.7 -i-li---i------ -------- -----I--i-i- ---i-1- 1-1-+-r------+-+-r--+-+-+-r----+-+-+-+----+-+-+---i-+- 0.6 -1--1-1- -'-1-1-L-1--1--1-1-L-L-'-J-1-L-L-'--1-J-1-1--L-1--1-1-L-L-1--1-1- 0.55 W 0.45 ---I-,- --7-7-r---1---7-T-r--7-7-T-r----7-7-r-r----7-r-r-1--1-7- U 3 0.4 LL 0.35 , i 0.25 -1--1-1- -1-1-1-L-1--1--'-1-L-L-'-J-1-L-L----J-1-L-L-1--1-1-L-L-1--1-1- 0.2 0.15 I T F T F F I T F I- ---I-1-0.1 ----1-T-r-II 1-7-T-r---- -7-T-Ir----I-T-Ir---II-I------------- 0.05 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 2 Year Rainfall=3.55" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 49 Hydrograph for Link 2L: POI #2 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 53.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 54.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 55.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 56.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 57.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 59.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 61.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 62.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 63.00 0.00 0.00 0.00 12.00 0.32 0.00 0.32 64.00 0.00 0.00 0.00 13.00 0.13 0.00 0.13 65.00 0.00 0.00 0.00 14.00 0.08 0.00 0.08 66.00 0.00 0.00 0.00 15.00 0.07 0.00 0.07 67.00 0.00 0.00 0.00 16.00 0.05 0.00 0.05 68.00 0.00 0.00 0.00 17.00 0.05 0.00 0.05 69.00 0.00 0.00 0.00 18.00 0.04 0.00 0.04 70.00 0.00 0.00 0.00 19.00 0.04 0.00 0.04 71.00 0.00 0.00 0.00 20.00 0.03 0.00 0.03 72.00 0.00 0.00 0.00 21.00 0.03 0.00 0.03 22.00 0.03 0.00 0.03 23.00 0.03 0.00 0.03 24.00 0.03 0.00 0.03 25.00 0.00 0.00 0.00 26.00 0.00 0.00 0.00 27.00 0.00 0.00 0.00 28.00 0.00 0.00 0.00 29.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 31.00 0.00 0.00 0.00 32.00 0.00 0.00 0.00 33.00 0.00 0.00 0.00 34.00 0.00 0.00 0.00 35.00 0.00 0.00 0.00 36.00 0.00 0.00 0.00 37.00 0.00 0.00 0.00 38.00 0.00 0.00 0.00 39.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 42.00 0.00 0.00 0.00 43.00 0.00 0.00 0.00 44.00 0.00 0.00 0.00 45.00 0.00 0.00 0.00 46.00 0.00 0.00 0.00 47.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 49.00 0.00 0.00 0.00 50.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 50 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: POI #1 Predevelopment Runoff Area=815,942 sf 6.70% Impervious Runoff Depth=1.41" Tc=24.4 min CN=60 Runoff=23.45 cfs 2.206 of Subcatchment2S: POI #2 Predevelopment Runoff Area=106,262 sf 0.00% Impervious Runoff Depth=1.08" Tc=18.3 min CN=55 Runoff=2.54 cfs 0.219 of Subcatchment3S: Post-Development Runoff Area=640,460 sf 8.40% Impervious Runoff Depth=1.48" Tc=24.4 min CN=61 Runoff=19.60 cfs 1.819 of Subcatchment4S: POI #2 Runoff Area=73,518 sf 4.62% Impervious Runoff Depth=1.34" Tc=16.7 min CN=59 Runoff=2.52 cfs 0.189 of Subcatchment5S: Culvert Runoff Area=601,822 sf 9.68% Impervious Runoff Depth=1.48" Tc=23.7 min CN=61 Runoff=18.75 cfs 1.709 of SubcatchmentDA#1: Post-Development Runoff Area=208,217 sf 53.03% Impervious Runoff Depth=3.15" Tc=5.0 min CN=81 Runoff=26.69 cfs 1.256 of Pond BMP-1: BMP#1 (Wet Pond) Peak Elev=623.18' Storage=28,122 cf Inflow=26.69 cfs 1.256 of Outflow=3.72 cfs 0.969 of Link 1L: POI #1 Inflow=23.32 cfs 2.788 of Primary=23.32 cfs 2.788 of Link 2L: POI #2 Inflow=2.52 cfs 0.189 of Primary=2.52 cfs 0.189 of Total Runoff Area = 56.158 ac Runoff Volume = 7.398 of Average Runoff Depth = 1.58" 88.53% Pervious = 49.717 ac 11.47% Impervious = 6.441 ac Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 51 Summary for Subcatchment 1S: POI #1 Predevelopment Runoff = 23.45 cfs @ 12.20 hrs, Volume= 2.206 af, Depth= 1.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Year Rainfall=5.19" Area (so CN Description 543,022 55 Woods, Good, HSG B 54,658 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 209,175 61 >75% Grass cover, Good, HSG B 815,942 60 Weighted Average 761,284 93.30% Pervious Area 54,658 6.70% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 1S: POI #1 Predevelopment Hydrograph 26 1i -1i-----11-�1- - - - - - -1r-1i-1i----J1- - - - - - -1i------J1-�1- - - - - -1r- Runoff 25 - —1--1--1— — — —+—+—+—+-1--I--I--1--1--1—+—+—+—+— — — —1--1--1—+— — —+—+—+—+— — 24 — —1——1— 23.45 cfs _ _r_r_r ®®I _ 23 -+-1--1--1-+ -+-+-+-+-+-1--1--1--1--1--1-+-+-+-+-+-+-+-1--1--1��---Y-[�- � ,I �-/ , 1 / —I——1——1——1——1 — — — — — —I——I——1——1——1——1— — — — — — —I——1——1——1— 1— —— —————————— 22 , I I I I I I I I I I I I I I I I I I I I I I �I/ I .y I I©�I,�I�I .y I I I ,I�-®I I 21 - -----I-� - - -+-+-r------------ - -+-^�� IrGI�RAi1111G1��5. 20 -1--1--1--1-J -I-I-I--I--I-1--1--1--1--1-J-I-I-I------------------------------ 19 - ---I--I- - - - - -r---------I--I- - =RU h-Off-A�6&815'91;4�tif-- 1 8 —I_—I——I——I—_I _ _ I_ I _ I _I _I__I__I__I__I__I_ I_ I I + �� �/ 17 -1r-1i--I--11-y -�-1-+-r-r-lr-lr-lr-li-711i-,-i_ 'J„Hif1rY�1� I- ,- �Z'2t%_Of- 16 -I -I_I_I_I- -1--1--1--1--I--I I w 15 -r-----I-r -r—r—r-r-r-r-r-r------r—r-r-t-rpr-r------r-r-r*�rt-r- IrA-r-r- u 14 � I _I__I__I__I_ _ I_ I_I_I_i_I__I__I__I__I__I_ I_ I _i_I_ IT►unii�17-1iD pLh=1'`F1,,-- 3 13 -r-r---I-r r—r-r-r-r-r-r--------r-r-r-r-r-r-r- r----r-r-r-r-r-r-r-r- ' I _-I__I__I _I _i L_L_L_L_L _I _I _I I frr6�F.4 111111 LL i I 11 -I I-I-r-r-r-r-r-r-I--I--I-I-r-r-r-r-r-r-r-I--I-r-1-7-7-r-r-r-r- 10 -L-1--1--1-L L-1-L-L-L-1--1--1--1--1--1-L-L-L-L-L-L-L-1--1--1-L- �I I I C 6— 9 -r-I--I--I-r r-r-r-r-r-r-r-I--I--I--I-r-r-r-r-r-r-r-I--I--I-r-r-r-r r- r- $ -L-1--1--I-L L-1-L-L-L-1--1--1--1--1--1-L-L-L-L-L-L-L-1--1--I-L-L-L-1-L-L-L-L- i l I I 7 -r-I--I--I-r r-r-r-r-r-r-r-I--I--I--I-r-r-r-r-r-r-r-I--I--I-r-r-r-r-r-r-r-r- 6 -L-1--1--I-J L-1-i-i-L-1--1--1--1--1--I-1-1-1-1-L-L-L-1--1--I-J-L-L-1-i-i-L-L- r-r-r I- r-r-r-r-r-r-i r r I- I-r-r-r-T-r-r-r-r-r I-r-r-r-r-r-r-r-r- 4 -L-1--1--1- L-L-L-L-L-1--1--1--1--1--1-L-a-L-L-L-L-L-1--1--1-�-L-L-L-L-L-L-L- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 2 -L-1--1--1- L-L-1--1--1--1--1--1-L-a-L-L-L-L-L-1--1--1- -L-L-L-L-L-L-L- 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 52 Hydrograph for Subcatchment 1S: POI #1 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 5.19 1.41 0.00 1.00 0.05 0.00 0.00 53.00 5.19 1.41 0.00 2.00 0.11 0.00 0.00 54.00 5.19 1.41 0.00 3.00 0.18 0.00 0.00 55.00 5.19 1.41 0.00 4.00 0.25 0.00 0.00 56.00 5.19 1.41 0.00 5.00 0.33 0.00 0.00 57.00 5.19 1.41 0.00 6.00 0.42 0.00 0.00 58.00 5.19 1.41 0.00 7.00 0.51 0.00 0.00 59.00 5.19 1.41 0.00 8.00 0.62 0.00 0.00 60.00 5.19 1.41 0.00 9.00 0.76 0.00 0.00 61.00 5.19 1.41 0.00 10.00 0.94 0.00 0.00 62.00 5.19 1.41 0.00 11.00 1.22 0.00 0.00 63.00 5.19 1.41 0.00 12.00 3.44 0.51 9.62 64.00 5.19 1.41 0.00 13.00 4.01 0.77 4.17 65.00 5.19 1.41 0.00 14.00 4.26 0.89 2.23 66.00 5.19 1.41 0.00 15.00 4.43 0.98 1.69 67.00 5.19 1.41 0.00 16.00 4.57 1.06 1.36 68.00 5.19 1.41 0.00 17.00 4.68 1.12 1.16 69.00 5.19 1.41 0.00 18.00 4.78 1.17 1.04 70.00 5.19 1.41 0.00 19.00 4.87 1.22 0.92 71.00 5.19 1.41 0.00 20.00 4.94 1.27 0.79 72.00 5.19 1.41 0.00 21.00 5.01 1.31 0.72 22.00 5.07 1.34 0.70 23.00 5.13 1.38 0.68 24.00 5.19 1.41 0.65 25.00 5.19 1.41 0.01 26.00 5.19 1.41 0.00 27.00 5.19 1.41 0.00 28.00 5.19 1.41 0.00 29.00 5.19 1.41 0.00 30.00 5.19 1.41 0.00 31.00 5.19 1.41 0.00 32.00 5.19 1.41 0.00 33.00 5.19 1.41 0.00 34.00 5.19 1.41 0.00 35.00 5.19 1.41 0.00 36.00 5.19 1.41 0.00 37.00 5.19 1.41 0.00 38.00 5.19 1.41 0.00 39.00 5.19 1.41 0.00 40.00 5.19 1.41 0.00 41.00 5.19 1.41 0.00 42.00 5.19 1.41 0.00 43.00 5.19 1.41 0.00 44.00 5.19 1.41 0.00 45.00 5.19 1.41 0.00 46.00 5.19 1.41 0.00 47.00 5.19 1.41 0.00 48.00 5.19 1.41 0.00 49.00 5.19 1.41 0.00 50.00 5.19 1.41 0.00 51.00 5.19 1.41 0.00 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 53 Summary for Subcatchment 2S: POI #2 Predevelopment Runoff = 2.54 cfs @ 12.14 hrs, Volume= 0.219 af, Depth= 1.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Year Rainfall=5.19" Area (so CN Description 106,262 55 Woods, Good, HSG B 106,262 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 Direct Entry, Subcatchment 2S: POI #2 Predevelopment Hydrograph II II II I I I II II II II II II II II II II II II II II II II II II II II II II II II II II II II II ❑Runoff 2.54 cfs ,Type IIIII 10 Year IIIIIRainfall;=5.1119" —L---I—L-- —+—L—L—L—L------J— —1—+—L—L—L—I--I--I—J—L—+—+—L—L—L---I--I—L- 2 RUh6ff At6a=106�262 isf PWOOO,VrOIO MO=0�2',10 Of N I I I I I I I I I I I I I I I I I I I I I I I R6nlloff IlDlepth=1.08" 3 11111111 111111111, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, I ITC"18.3 Miry LL 5 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 54 Hydrograph for Subcatchment 2S: POI #2 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 5.19 1.08 0.00 1.00 0.05 0.00 0.00 53.00 5.19 1.08 0.00 2.00 0.11 0.00 0.00 54.00 5.19 1.08 0.00 3.00 0.18 0.00 0.00 55.00 5.19 1.08 0.00 4.00 0.25 0.00 0.00 56.00 5.19 1.08 0.00 5.00 0.33 0.00 0.00 57.00 5.19 1.08 0.00 6.00 0.42 0.00 0.00 58.00 5.19 1.08 0.00 7.00 0.51 0.00 0.00 59.00 5.19 1.08 0.00 8.00 0.62 0.00 0.00 60.00 5.19 1.08 0.00 9.00 0.76 0.00 0.00 61.00 5.19 1.08 0.00 10.00 0.94 0.00 0.00 62.00 5.19 1.08 0.00 11.00 1.22 0.00 0.00 63.00 5.19 1.08 0.00 12.00 3.44 0.33 1.31 64.00 5.19 1.08 0.00 13.00 4.01 0.53 0.38 65.00 5.19 1.08 0.00 14.00 4.26 0.64 0.23 66.00 5.19 1.08 0.00 15.00 4.43 0.71 0.18 67.00 5.19 1.08 0.00 16.00 4.57 0.77 0.14 68.00 5.19 1.08 0.00 17.00 4.68 0.83 0.13 69.00 5.19 1.08 0.00 18.00 4.78 0.87 0.11 70.00 5.19 1.08 0.00 19.00 4.87 0.91 0.10 71.00 5.19 1.08 0.00 20.00 4.94 0.95 0.09 72.00 5.19 1.08 0.00 21.00 5.01 0.98 0.08 22.00 5.07 1.02 0.08 23.00 5.13 1.05 0.08 24.00 5.19 1.08 0.07 25.00 5.19 1.08 0.00 26.00 5.19 1.08 0.00 27.00 5.19 1.08 0.00 28.00 5.19 1.08 0.00 29.00 5.19 1.08 0.00 30.00 5.19 1.08 0.00 31.00 5.19 1.08 0.00 32.00 5.19 1.08 0.00 33.00 5.19 1.08 0.00 34.00 5.19 1.08 0.00 35.00 5.19 1.08 0.00 36.00 5.19 1.08 0.00 37.00 5.19 1.08 0.00 38.00 5.19 1.08 0.00 39.00 5.19 1.08 0.00 40.00 5.19 1.08 0.00 41.00 5.19 1.08 0.00 42.00 5.19 1.08 0.00 43.00 5.19 1.08 0.00 44.00 5.19 1.08 0.00 45.00 5.19 1.08 0.00 46.00 5.19 1.08 0.00 47.00 5.19 1.08 0.00 48.00 5.19 1.08 0.00 49.00 5.19 1.08 0.00 50.00 5.19 1.08 0.00 51.00 5.19 1.08 0.00 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment 3S: Post-Development ByPass POI #1 Runoff = 19.60 cfs @ 12.20 hrs, Volume= 1.819 af, Depth= 1.48" Routed to Link 1 L : POI #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Year Rainfall=5.19" Area (so CN Description 406,538 55 Woods, Good, HSG B 53,797 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 171,038 61 >75% Grass cover, Good, HSG B 640,460 61 Weighted Average 586,663 91.60% Pervious Area 53,797 8.40% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 3S: Post-Development ByPass POI #1 Hydrograph - - 21 - -------- - - - - - - - -------- - + - + - + - - - ---------- - - - II- Runoff �I 19.60 cfs 20 -T-T_r-r-, -T--T-+-T-r-r-r-I--I--Type-ki-�� � 19 - 18 --------- - - - - - -----------I_ I 17 -r-----'-J - -1-i-L-L---I--I __Ii__Ii_s_1_T_1 _ �lr li[SC1.InLA1ItL�9r��- /N►16 -+-+- -+ -+-+—+—+—+-+-+-++-+-+-+—+—fthoff Aeea=84044GQ , I Jgf 15 -r-----I-r -r-r-r-r-r-r-r-r------r-r-r-+-r-r-r------r-r-r- 14 -------,--, - - ---------------,--,- - -F0gofflll-�ali110=11840 - , � 13 -------'--' --'--'-----------------'--'--' ---------------------- II I----- ^ I I I I I I I I I I I I I I I I I I I I I I I I I 12 - - - - - - - - - ---------I--I-�-�-+-+- R.anof�IlDrepthr=148�� ,.. � I I I I I I I I I I I I I I I I I I I I I I 3 11 -+-+---I-+ +-+-+-+-+-+-+-+------+-+-+-+-r-r-+-+----++-+-n+�-w+-w+-+.,-�p+-+- .° 10 9 ------------------------------------------------- ,I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 8 - ---'--'- 1-1-1-L-L-----------1-1-1-+-+-r-r- ------J-J-1- 1L- 7 —+-----I—+ +—+—+—+—+—+----------+—+—+—+—+—+—+------+—+—+—+—+—+—+—+— , I 6 -Ir-----Ii- -T-r-r-r-Ii-Ii--------T-T-T-T-r-r-Ir-----Ii- - - - -r-r-r-Ir- 5 --------- - - - - ------------ - - - - - ------------ - - - -II--- 4 -r-'--'--'- I-1-i-L-L-1--1--1--1--1--1-s-1-+-+-r-�-r-'--'--'-J-J-�-1-i-L-L-L- , I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 3 -+-+-I-+- -+-+-+-+------------+-+-+-+-+-+-+-+----+-+-+-+-+-+-+-+- , I 2 -Ir-----II— —r—r------------7—T—T—T—r—T—Ir------r—T—T-7—r—r—r—Ir- 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 56 Hydrograph for Subcatchment 3S: Post-Development ByPass POI #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 5.19 1.48 0.00 1.00 0.05 0.00 0.00 53.00 5.19 1.48 0.00 2.00 0.11 0.00 0.00 54.00 5.19 1.48 0.00 3.00 0.18 0.00 0.00 55.00 5.19 1.48 0.00 4.00 0.25 0.00 0.00 56.00 5.19 1.48 0.00 5.00 0.33 0.00 0.00 57.00 5.19 1.48 0.00 6.00 0.42 0.00 0.00 58.00 5.19 1.48 0.00 7.00 0.51 0.00 0.00 59.00 5.19 1.48 0.00 8.00 0.62 0.00 0.00 60.00 5.19 1.48 0.00 9.00 0.76 0.00 0.00 61.00 5.19 1.48 0.00 10.00 0.94 0.00 0.00 62.00 5.19 1.48 0.00 11.00 1.22 0.00 0.00 63.00 5.19 1.48 0.00 12.00 3.44 0.55 8.33 64.00 5.19 1.48 0.00 13.00 4.01 0.82 3.41 65.00 5.19 1.48 0.00 14.00 4.26 0.95 1.81 66.00 5.19 1.48 0.00 15.00 4.43 1.04 1.37 67.00 5.19 1.48 0.00 16.00 4.57 1.12 1.10 68.00 5.19 1.48 0.00 17.00 4.68 1.18 0.94 69.00 5.19 1.48 0.00 18.00 4.78 1.24 0.84 70.00 5.19 1.48 0.00 19.00 4.87 1.29 0.74 71.00 5.19 1.48 0.00 20.00 4.94 1.33 0.64 72.00 5.19 1.48 0.00 21.00 5.01 1.37 0.58 22.00 5.07 1.41 0.57 23.00 5.13 1.45 0.55 24.00 5.19 1.48 0.53 25.00 5.19 1.48 0.00 26.00 5.19 1.48 0.00 27.00 5.19 1.48 0.00 28.00 5.19 1.48 0.00 29.00 5.19 1.48 0.00 30.00 5.19 1.48 0.00 31.00 5.19 1.48 0.00 32.00 5.19 1.48 0.00 33.00 5.19 1.48 0.00 34.00 5.19 1.48 0.00 35.00 5.19 1.48 0.00 36.00 5.19 1.48 0.00 37.00 5.19 1.48 0.00 38.00 5.19 1.48 0.00 39.00 5.19 1.48 0.00 40.00 5.19 1.48 0.00 41.00 5.19 1.48 0.00 42.00 5.19 1.48 0.00 43.00 5.19 1.48 0.00 44.00 5.19 1.48 0.00 45.00 5.19 1.48 0.00 46.00 5.19 1.48 0.00 47.00 5.19 1.48 0.00 48.00 5.19 1.48 0.00 49.00 5.19 1.48 0.00 50.00 5.19 1.48 0.00 51.00 5.19 1.48 0.00 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 57 Summary for Subcatchment 4S: POI #2 Post-Development Runoff = 2.52 cfs @ 12.11 hrs, Volume= 0.189 af, Depth= 1.34" Routed to Link 2L : POI #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Year Rainfall=5.19" Area (so CN Description 42,969 55 Woods, Good, HSG B 3,396 98 Greenway 27,153 61 >75% Grass cover, Good, HSG B 73,518 59 Weighted Average 70,122 95.38% Pervious Area 3,396 4.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.7 Direct Entry, Subcatchment 4S: POI #2 Post-Development Hydrograph II II II I I I II II II II II II II II II II II II II II II II II II II II II II II II II II II II II ❑Runoff 2.52 cfs Type ll'll 24-hrr 10 Year IRIainfall;=5.l19" —I——1— — —+—+—+— — —1——I——I- 2- Runoff Aeec&�7113#518 isf P'L;n1Of1fYO)LJMq=OA00 Of I I Ru11n11off bepth=1.34" 3 11111111 1111111111111111111111111111111111111111 1 LL T1c"16.7 Miry —r—I--I-7— —+—t—r—r—r—I--I--I-7-7—Y—+—r—r—r—I--I--I-7-7—Y—+—t—r— ---I--- 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 4850 5254 56 5860 62 6466 6870 72 Time (hours) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 58 Hydrograph for Subcatchment 4S: POI #2 Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 5.19 1.34 0.00 1.00 0.05 0.00 0.00 53.00 5.19 1.34 0.00 2.00 0.11 0.00 0.00 54.00 5.19 1.34 0.00 3.00 0.18 0.00 0.00 55.00 5.19 1.34 0.00 4.00 0.25 0.00 0.00 56.00 5.19 1.34 0.00 5.00 0.33 0.00 0.00 57.00 5.19 1.34 0.00 6.00 0.42 0.00 0.00 58.00 5.19 1.34 0.00 7.00 0.51 0.00 0.00 59.00 5.19 1.34 0.00 8.00 0.62 0.00 0.00 60.00 5.19 1.34 0.00 9.00 0.76 0.00 0.00 61.00 5.19 1.34 0.00 10.00 0.94 0.00 0.00 62.00 5.19 1.34 0.00 11.00 1.22 0.00 0.00 63.00 5.19 1.34 0.00 12.00 3.44 0.47 1.63 64.00 5.19 1.34 0.00 13.00 4.01 0.72 0.31 65.00 5.19 1.34 0.00 14.00 4.26 0.84 0.18 66.00 5.19 1.34 0.00 15.00 4.43 0.93 0.14 67.00 5.19 1.34 0.00 16.00 4.57 1.00 0.12 68.00 5.19 1.34 0.00 17.00 4.68 1.06 0.10 69.00 5.19 1.34 0.00 18.00 4.78 1.11 0.09 70.00 5.19 1.34 0.00 19.00 4.87 1.16 0.08 71.00 5.19 1.34 0.00 20.00 4.94 1.20 0.07 72.00 5.19 1.34 0.00 21.00 5.01 1.24 0.06 22.00 5.07 1.27 0.06 23.00 5.13 1.31 0.06 24.00 5.19 1.34 0.06 25.00 5.19 1.34 0.00 26.00 5.19 1.34 0.00 27.00 5.19 1.34 0.00 28.00 5.19 1.34 0.00 29.00 5.19 1.34 0.00 30.00 5.19 1.34 0.00 31.00 5.19 1.34 0.00 32.00 5.19 1.34 0.00 33.00 5.19 1.34 0.00 34.00 5.19 1.34 0.00 35.00 5.19 1.34 0.00 36.00 5.19 1.34 0.00 37.00 5.19 1.34 0.00 38.00 5.19 1.34 0.00 39.00 5.19 1.34 0.00 40.00 5.19 1.34 0.00 41.00 5.19 1.34 0.00 42.00 5.19 1.34 0.00 43.00 5.19 1.34 0.00 44.00 5.19 1.34 0.00 45.00 5.19 1.34 0.00 46.00 5.19 1.34 0.00 47.00 5.19 1.34 0.00 48.00 5.19 1.34 0.00 49.00 5.19 1.34 0.00 50.00 5.19 1.34 0.00 51.00 5.19 1.34 0.00 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 59 Summary for Subcatchment 5S: Culvert Post-Development Runoff = 18.75 cfs @ 12.19 hrs, Volume= 1.709 af, Depth= 1.48" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Year Rainfall=5.19" Area (so CN Description 359,379 55 Woods, Good, HSG B 58,277 98 Paved parking, HSG B 9,087 79 Pasture/grassland/range, Poor, HSG B 175,079 61 >75% Grass cover, Good, HSG B 601,822 61 Weighted Average 543,545 90.32% Pervious Area 58,277 9.68% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.7 Direct Entry, Subcatchment 5S: Culvert Post-Development Hydrograph ,I - -r_-_-_-_- - -i-T_-_-_- - - ■Runoff 20 - - - - - - - ------------ - - - - -L- ------ --- - - - - -I-- 19 A -18+.7I 5 cfs Ai11Ii I------- p - r�46r 18 / rr r 17 - 16 —7-17—7—r—r—r—r 15 j- 4-4-r-r- 4 -T-7- Rb"f -ytt&:6VA7&22 ir 14 I -I -----_- 13 ------- - -- — - -- - - -'-'---------I--I- - -F�r�off��01 0=1�7-10- -- W 12 -L-----I—L —L-1-1—L—L-1--1--1--1—J--1-1-1-1-1—L—L—L-----1—J—J—L-1-1—L—L—L— w RL nIIOff IIDepth7-1-48" - U /► w�I)-�ryI f 10 0 -+-----I-+ +-+-+-+-+------------+-+-+-+-+-+-+-----I�Ci�6J I111111 LL 9 -r-r-I--I-1 7-7-r-r-14-I--r-I--I--I-7-7-T-T-r-r-r-r-I--I-7-�-7-7-r-r-r-r- ' 8 --II-J il-il- I, - I, -I, -I,-I,-II--Ii--Ii--Ii-i-i-i-i-I_-I_ I I I I I I I ,I I - 7 J 6 -------I--I - - - - ---------I--I- - - - - - ---------I--I- - - - - -I-- , I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 5 -L-I--I-—I-L L-1-L-L-L-1--1--1--1--1--1-L-L-L-L-L-L- -1--1--1-J-J-L-1-L-L-L- - , I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 4 -+---I--I- +-+-+-+-+------------+-+-+-+-+-+-+------+-+-+-+-+-+-+-+- , I 3 -+---I--I- -+-+-+-+------------+-+-+-+-+-+-+------+-+-+-+-+-+-+-+- 2 L 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 60 Hydrograph for Subcatchment 5S: Culvert Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 5.19 1.48 0.00 1.00 0.05 0.00 0.00 53.00 5.19 1.48 0.00 2.00 0.11 0.00 0.00 54.00 5.19 1.48 0.00 3.00 0.18 0.00 0.00 55.00 5.19 1.48 0.00 4.00 0.25 0.00 0.00 56.00 5.19 1.48 0.00 5.00 0.33 0.00 0.00 57.00 5.19 1.48 0.00 6.00 0.42 0.00 0.00 58.00 5.19 1.48 0.00 7.00 0.51 0.00 0.00 59.00 5.19 1.48 0.00 8.00 0.62 0.00 0.00 60.00 5.19 1.48 0.00 9.00 0.76 0.00 0.00 61.00 5.19 1.48 0.00 10.00 0.94 0.00 0.00 62.00 5.19 1.48 0.00 11.00 1.22 0.00 0.00 63.00 5.19 1.48 0.00 12.00 3.44 0.55 8.32 64.00 5.19 1.48 0.00 13.00 4.01 0.82 3.14 65.00 5.19 1.48 0.00 14.00 4.26 0.95 1.70 66.00 5.19 1.48 0.00 15.00 4.43 1.04 1.28 67.00 5.19 1.48 0.00 16.00 4.57 1.12 1.03 68.00 5.19 1.48 0.00 17.00 4.68 1.18 0.88 69.00 5.19 1.48 0.00 18.00 4.78 1.24 0.79 70.00 5.19 1.48 0.00 19.00 4.87 1.29 0.70 71.00 5.19 1.48 0.00 20.00 4.94 1.33 0.60 72.00 5.19 1.48 0.00 21.00 5.01 1.37 0.55 22.00 5.07 1.41 0.53 23.00 5.13 1.45 0.51 24.00 5.19 1.48 0.50 25.00 5.19 1.48 0.00 26.00 5.19 1.48 0.00 27.00 5.19 1.48 0.00 28.00 5.19 1.48 0.00 29.00 5.19 1.48 0.00 30.00 5.19 1.48 0.00 31.00 5.19 1.48 0.00 32.00 5.19 1.48 0.00 33.00 5.19 1.48 0.00 34.00 5.19 1.48 0.00 35.00 5.19 1.48 0.00 36.00 5.19 1.48 0.00 37.00 5.19 1.48 0.00 38.00 5.19 1.48 0.00 39.00 5.19 1.48 0.00 40.00 5.19 1.48 0.00 41.00 5.19 1.48 0.00 42.00 5.19 1.48 0.00 43.00 5.19 1.48 0.00 44.00 5.19 1.48 0.00 45.00 5.19 1.48 0.00 46.00 5.19 1.48 0.00 47.00 5.19 1.48 0.00 48.00 5.19 1.48 0.00 49.00 5.19 1.48 0.00 50.00 5.19 1.48 0.00 51.00 5.19 1.48 0.00 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 61 Summary for Subcatchment DA #1: Post-Development Pond #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 26.69 cfs @ 11.96 hrs, Volume= 1.256 af, Depth= 3.15" Routed to Pond BMP-1 : BMP#1 (Wet Pond) Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10 Year Rainfall=5.19" Area (so CN Description 15,333 98 Sidewalk 38,202 98 Lots (Building, walkway, patios) 14,549 98 Driveways 42,297 98 Roadway 44 98 CBU Pads 97,792 61 >75% Grass cover, Good, HSG B 208,217 81 Weighted Average 97,792 46.97% Pervious Area 110,425 53.03% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA #1: Post-Development Pond #1 Hydrograph -L-'--'--'-L-�-�-1-1-1-L-1--1--1--1--1--1-L-L-L-1-L-�-L-'--'--'-L-L-�-1-1-1-L-L- ■Runoff 28 26.s9 -� - cfs 7-7-T-T-7 -7-7-T-T-7- 26 -------'--' - - -'-'-'---------'--'- - - - ' -'-'-----'-- 24 1_O Yjaa_r Ra1nnfar<W 1-9�, -+-+-i-+- -+-+-+-+-+-+-+------ -+-+ -+- 22 -------- - - ------------------ -+-fZ"ff-Ae-6&:2-0812-17 isf-- 20 18 ^ —7---I--I— — —7—T—T-7—I—I--------7-7—T—T-7-7—F_IO --I-7— —7-7—T-7-7-7— u 16 R.un _QeDth=3.1 -----'--'- -------------------'--i_ ,off 5" 0 14 LL —+------ —+—+—+—+—+—+----------+—+—+—+—+—+—+------+ 12 -------- -i- - -r 1ft�1 10 — L—I——I——I—- — -1-1—L—L-1--1--1------1—L—L—L-1—L—L—L------L—L—L-1-1—L—L—L- 8 - r-i--i--i -- -r-r-r-r-r-r-r-r-i--i--i-r-r-r-t-r-r-r-i--i--i-r-r-r-r-r-r-r-r- 6 4 �i 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 62 Hydrograph for Subcatchment DA #1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 5.19 3.15 0.00 1.00 0.05 0.00 0.00 53.00 5.19 3.15 0.00 2.00 0.11 0.00 0.00 54.00 5.19 3.15 0.00 3.00 0.18 0.00 0.00 55.00 5.19 3.15 0.00 4.00 0.25 0.00 0.00 56.00 5.19 3.15 0.00 5.00 0.33 0.00 0.00 57.00 5.19 3.15 0.00 6.00 0.42 0.00 0.00 58.00 5.19 3.15 0.00 7.00 0.51 0.00 0.02 59.00 5.19 3.15 0.00 8.00 0.62 0.01 0.06 60.00 5.19 3.15 0.00 9.00 0.76 0.03 0.16 61.00 5.19 3.15 0.00 10.00 0.94 0.08 0.29 62.00 5.19 3.15 0.00 11.00 1.22 0.18 0.72 63.00 5.19 3.15 0.00 12.00 3.44 1.66 23.02 64.00 5.19 3.15 0.00 13.00 4.01 2.13 1.37 65.00 5.19 3.15 0.00 14.00 4.26 2.34 0.82 66.00 5.19 3.15 0.00 15.00 4.43 2.49 0.66 67.00 5.19 3.15 0.00 16.00 4.57 2.61 0.51 68.00 5.19 3.15 0.00 17.00 4.68 2.70 0.45 69.00 5.19 3.15 0.00 18.00 4.78 2.79 0.40 70.00 5.19 3.15 0.00 19.00 4.87 2.87 0.34 71.00 5.19 3.15 0.00 20.00 4.94 2.93 0.29 72.00 5.19 3.15 0.00 21.00 5.01 2.99 0.28 22.00 5.07 3.05 0.27 23.00 5.13 3.10 0.26 24.00 5.19 3.15 0.25 25.00 5.19 3.15 0.00 26.00 5.19 3.15 0.00 27.00 5.19 3.15 0.00 28.00 5.19 3.15 0.00 29.00 5.19 3.15 0.00 30.00 5.19 3.15 0.00 31.00 5.19 3.15 0.00 32.00 5.19 3.15 0.00 33.00 5.19 3.15 0.00 34.00 5.19 3.15 0.00 35.00 5.19 3.15 0.00 36.00 5.19 3.15 0.00 37.00 5.19 3.15 0.00 38.00 5.19 3.15 0.00 39.00 5.19 3.15 0.00 40.00 5.19 3.15 0.00 41.00 5.19 3.15 0.00 42.00 5.19 3.15 0.00 43.00 5.19 3.15 0.00 44.00 5.19 3.15 0.00 45.00 5.19 3.15 0.00 46.00 5.19 3.15 0.00 47.00 5.19 3.15 0.00 48.00 5.19 3.15 0.00 49.00 5.19 3.15 0.00 50.00 5.19 3.15 0.00 51.00 5.19 3.15 0.00 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 63 Summary for Pond BMP-1: BMP #1 (Wet Pond) Inflow Area = 4.780 ac, 53.03% Impervious, Inflow Depth = 3.15" for 10 Year event Inflow = 26.69 cfs @ 11.96 hrs, Volume= 1.256 of Outflow = 3.72 cfs @ 12.20 hrs, Volume= 0.969 af, Atten= 86%, Lag= 14.6 min Primary = 3.72 cfs @ 12.20 hrs, Volume= 0.969 of Routed to Link 1 L : POI #1 Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 623.18'@ 12.20 hrs Surf.Area= 7,957 sf Storage= 28,122 cf Plug-Flow detention time=681.3 min calculated for 0.969 of(77% of inflow) Center-of-Mass det. time= 594.6 min ( 1,408.0 - 813.5 ) Volume Invert Avail.Storage Storage Description #1 619.00' 43,609 cf Custom Stage Data (Prismatic)-isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 619.00 4,938 0 0 619.50 5,764 2,676 2,676 620.00 6,208 2,993 5,669 621.00 6,742 6,475 12,144 622.00 7,291 7,017 19,160 623.00 7,855 7,573 26,733 624.00 8,434 8,145 34,878 625.00 9,029 8,732 43,609 Device Routing Invert Outlet Devices #1 Primary 618.34' 30.0" Round Culvert L= 67.7' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 618.34'/618.00' S= 0.0050 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes& inlets, Flow Area= 4.91 sf #2 Device 1 619.00' 1.2"Vert. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 622.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.50 Width (feet) 2.00 2.00 #4 Device 1 624.00' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=3.71 cfs @ 12.20 hrs HW=623.18' (Free Discharge) L1=Culvert (Passes 3.71 cfs of 44.18 cfs potential flow) 2=WQ Orifice (Orifice Controls 0.08 cfs @ 9.78 fps) 3=Custom Weir/Orifice (Weir Controls 3.64 cfs @ 2.69 fps) 4=Orifice/Grate ( Controls 0.00 cfs) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 64 Pond BMP-1: BMP #1 (Wet Pond) Hyd rog raph -++-+-+-+-+-++-+-+-+-+-+-++-+-+-+-+-+-++-+-+-+-+--+-+-+-+-+-+--+- Cinflow ,1 ❑ 26.69 cfs i i i i i i i i i i i i i i i i i i i i i i i i i i i i i Primary + _ _ _ __________________________________________ 28 +-1-0101 W' Ares 447+8p��- 26 'i 24 - - - �f e 1 �091.1-0 22 rg-+--+—+— —++—+—+—+—+—+—++—+—+—+—+—+—+ 1—+—+—+---I--I—+—+—+—+—+—I— I- 20 ---I,--I,--I,- ---I,--I,--I,--I,- -----I,--IlStOce,2l,831221_d- _ �II--II-�-�-�-II--II--� � 18 'i u 16 3 ----+-+- -I--I--I-+-+-+-+-I--I-+-+-+-+-I--I--I-+-+-+-I--I--I-+-+-+-+-+-I--I- LL 12 -+--+-+- -+-I--I-+-+-+-+-i--I-+-+-+-r-i--+-i-+-+-r-+-I--i-+-+-+-+-+-,-+- IIIIILL g 6 ----+—+- ------+—+—+—+----+—+—+—+------+—+—+------+—+—+—+—+—I--I— �� —I_ 3.72 cfs q 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Pond BMP-1: BMP #1 (Wet Pond) Stage-Discharge 625 ❑Primary Orifice/Grate ------------ -1----- 624 9 —— ——+ T 7 623 Custom Weir/Orifice w 0 622 w ----------- -----7------ ---,- -+----- 621 620 WQ Orifice 619 0 5 10 15 20 25 30 35 40 45 50 Discharge (cfs) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 65 Pond BMP-1: BMP #1 (Wet Pond) Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-fi) 0 500 1,000 1,500 2,000 2,5003,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,0008,500 9,000 Surface ■Storage 625 - --'--- II-------' -- ------ --- ----- -------- - ---'--I- -I I --- I 624 ------�-------+--+---+--+---��----- -I--�- -+-+-----I-+- +-+-I--- 623 w VI u I II I I I I I I I I I I I I I I I I I 0 622 > II I I I I I ---I---�'---I----IL--i -J--1---LL--1---1-1--L---1-i-1 -I--I- i-i-I--- w I u I II I I I I I I I I I I I I I I I I I I I w 621 ------�- r- --Ir--+---I-------rr-----rt---r---I -t---r--y---+-t-I--- 620 Custom Stage Data 619 0 5,000 10,000 15,000 20,000 25,600 30,000 35,000 40,000 Storage(cubic-feet) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 66 Hydrograph for Pond BMP-1: BMP #1 (Wet Pond) Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 619.00 0.00 2.50 0.00 0 619.00 0.00 5.00 0.00 0 619.00 0.00 7.50 0.04 56 619.01 0.00 10.00 0.29 1,217 619.24 0.02 12.50 2.17 27,474 623.09 3.08 15.00 0.66 24,538 622.72 0.74 17.50 0.42 24,023 622.65 0.46 20.00 0.29 23,733 622.61 0.32 22.50 0.26 23,611 622.60 0.27 25.00 0.00 23,047 622.52 0.10 27.50 0.00 22,389 622.44 0.07 30.00 0.00 21,766 622.35 0.07 32.50 0.00 21,151 622.27 0.07 35.00 0.00 20,545 622.19 0.07 37.50 0.00 19,946 622.11 0.07 40.00 0.00 19,354 622.03 0.07 42.50 0.00 18,771 621.95 0.06 45.00 0.00 18,196 621.87 0.06 47.50 0.00 17,629 621.79 0.06 50.00 0.00 17,070 621.71 0.06 52.50 0.00 16,519 621.63 0.06 55.00 0.00 15,976 621.56 0.06 57.50 0.00 15,441 621.48 0.06 60.00 0.00 14,915 621.40 0.06 62.50 0.00 14,397 621.33 0.06 65.00 0.00 13,887 621.26 0.06 67.50 0.00 13,386 621.18 0.06 70.00 0.00 12,893 621.11 0.05 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 67 Stage-Discharge for Pond BMP-1: BMP #1 (Wet Pond) Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 619.00 0.00 621.60 0.06 624.20 21.04 619.05 0.00 621.65 0.06 624.25 24.24 619.10 0.01 621.70 0.06 624.30 27.72 619.15 0.01 621.75 0.06 624.35 31.46 619.20 0.01 621.80 0.06 624.40 35.44 619.25 0.02 621.85 0.06 624.45 39.64 619.30 0.02 621.90 0.06 624.50 44.05 619.35 0.02 621.95 0.06 624.55 48.65 619.40 0.02 622.00 0.06 624.60 52.90 619.45 0.02 622.05 0.07 624.65 53.17 619.50 0.03 622.10 0.07 624.70 53.43 619.55 0.03 622.15 0.07 624.75 53.69 619.60 0.03 622.20 0.07 624.80 53.95 619.65 0.03 622.25 0.07 624.85 54.21 619.70 0.03 622.30 0.07 624.90 54.46 619.75 0.03 622.35 0.07 624.95 54.72 619.80 0.03 622.40 0.07 625.00 54.97 619.85 0.03 622.45 0.07 619.90 0.03 622.50 0.07 619.95 0.04 622.55 0.14 620.00 0.04 622.60 0.28 620.05 0.04 622.65 0.45 620.10 0.04 622.70 0.66 620.15 0.04 622.75 0.89 620.20 0.04 622.80 1.15 620.25 0.04 622.85 1.43 620.30 0.04 622.90 1.73 620.35 0.04 622.95 2.05 620.40 0.04 623.00 2.39 620.45 0.04 623.05 2.75 620.50 0.05 623.10 3.12 620.55 0.05 623.15 3.51 620.60 0.05 623.20 3.91 620.65 0.05 623.25 4.33 620.70 0.05 623.30 4.76 620.75 0.05 623.35 5.21 620.80 0.05 623.40 5.67 620.85 0.05 623.45 6.14 620.90 0.05 623.50 6.63 620.95 0.05 623.55 7.13 621.00 0.05 623.60 7.64 621.05 0.05 623.65 8.16 621.10 0.05 623.70 8.69 621.15 0.05 623.75 9.24 621.20 0.06 623.80 9.79 621.25 0.06 623.85 10.36 621.30 0.06 623.90 10.93 621.35 0.06 623.95 11.52 621.40 0.06 624.00 12.12 621.45 0.06 624.05 13.53 621.50 0.06 624.10 15.62 621.55 0.06 624.15 18.15 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 68 Stage-Area-Storage for Pond BMP-1: BMP #1 (Wet Pond) Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 619.00 4,938 0 624.20 8,553 36,576 619.10 5,103 502 624.30 8,612 37,434 619.20 5,268 1,021 624.40 8,672 38,299 619.30 5,434 1,556 624.50 8,732 39,169 619.40 5,599 2,107 624.60 8,791 40,045 619.50 5,764 2,676 624.70 8,851 40,927 619.60 5,853 3,256 624.80 8,910 41,815 619.70 5,942 3,846 624.90 8,969 42,709 619.80 6,030 4,445 625.00 9,029 43,609 619.90 6,119 5,052 620.00 6,208 5,669 620.10 6,261 6,292 620.20 6,315 6,921 620.30 6,368 7,555 620.40 6,422 8,194 620.50 6,475 8,839 620.60 6,528 9,489 620.70 6,582 10,145 620.80 6,635 10,806 620.90 6,689 11,472 621.00 6,742 12,144 621.10 6,797 12,820 621.20 6,852 13,503 621.30 6,907 14,191 621.40 6,962 14,884 621.50 7,017 15,583 621.60 7,071 16,288 621.70 7,126 16,997 621.80 7,181 17,713 621.90 7,236 18,434 622.00 7,291 19,160 622.10 7,347 19,892 622.20 7,404 20,629 622.30 7,460 21,373 622.40 7,517 22,122 622.50 7,573 22,876 622.60 7,629 23,636 622.70 7,686 24,402 622.80 7,742 25,173 622.90 7,799 25,950 623.00 7,855 26,733 623.10 7,913 27,521 623.20 7,971 28,316 623.30 8,029 29,116 623.40 8,087 29,921 623.50 8,145 30,733 623.60 8,202 31,550 623.70 8,260 32,373 623.80 8,318 33,202 623.90 8,376 34,037 624.00 8,434 34,878 624.10 8,494 35,724 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 69 Summary for Link 1 L: POI #1 Inflow Area = 19.483 ac, 19.35% Impervious, Inflow Depth > 1.72" for 10 Year event Inflow = 23.32 cfs @ 12.20 hrs, Volume= 2.788 of Primary = 23.32 cfs @ 12.20 hrs, Volume= 2.788 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 1 L: POI #1 Hyd rog raph —r-1—+—+—+—r—r-1--1—+—+-r—r-1--1—+—+—r—r—r-1--1—+—+—r—r-1--1—+—+—r—r—r-1--I— I I I I I I C Inflow 26 I I I I ,1 —1--1—r— 1— 1 — —1--1--1—r—r—r—r—r—l—r—r—r—r—r—r—l—r—r—r—r—r—l—r—r—r—r—r-1—�— [Ima Primary 1 1 23.32 cfs I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 ry 24 —1--1— 23.32 cfs —i_1__1_T_7—T—T-1--1—T—T—T 1 ;=/�i�J;f�{�,I-(/y��]T 11 1— - 1111111 11111111111111111111111111111 ------ ------------------------------------------------- ----- 20 18 --1--1-J-L-L- -1--1-J-L-L-L-1--1--1- -L-L-1--1--1-J-L-L-L-L-1--1- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 y I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I u 14 —r-1—+— —r-1--1—+—+—r—r-1--1—+—+—+—r—r-1--1—+—+—r—r-1--1—+—+—+—r—r-1--1— � 1 0 12 —11--1—,— —r-1--1—�-7—T—r—r-1-7-7—r—r—r—r-1—,-7—r 7—T—r—r-1—�— LL I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 10- 8- 6- 4- 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 70 Hydrograph for Link 1L: POI #1 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.06 0.00 0.06 1.00 0.00 0.00 0.00 53.00 0.06 0.00 0.06 2.00 0.00 0.00 0.00 54.00 0.06 0.00 0.06 3.00 0.00 0.00 0.00 55.00 0.06 0.00 0.06 4.00 0.00 0.00 0.00 56.00 0.06 0.00 0.06 5.00 0.00 0.00 0.00 57.00 0.06 0.00 0.06 6.00 0.00 0.00 0.00 58.00 0.06 0.00 0.06 7.00 0.00 0.00 0.00 59.00 0.06 0.00 0.06 8.00 0.00 0.00 0.00 60.00 0.06 0.00 0.06 9.00 0.01 0.00 0.01 61.00 0.06 0.00 0.06 10.00 0.02 0.00 0.02 62.00 0.06 0.00 0.06 11.00 0.03 0.00 0.03 63.00 0.06 0.00 0.06 12.00 8.62 0.00 8.62 64.00 0.06 0.00 0.06 13.00 5.30 0.00 5.30 65.00 0.06 0.00 0.06 14.00 2.84 0.00 2.84 66.00 0.06 0.00 0.06 15.00 2.11 0.00 2.11 67.00 0.06 0.00 0.06 16.00 1.69 0.00 1.69 68.00 0.06 0.00 0.06 17.00 1.43 0.00 1.43 69.00 0.05 0.00 0.05 18.00 1.28 0.00 1.28 70.00 0.05 0.00 0.05 19.00 1.12 0.00 1.12 71.00 0.05 0.00 0.05 20.00 0.96 0.00 0.96 72.00 0.05 0.00 0.05 21.00 0.87 0.00 0.87 22.00 0.84 0.00 0.84 23.00 0.81 0.00 0.81 24.00 0.78 0.00 0.78 25.00 0.10 0.00 0.10 26.00 0.07 0.00 0.07 27.00 0.07 0.00 0.07 28.00 0.07 0.00 0.07 29.00 0.07 0.00 0.07 30.00 0.07 0.00 0.07 31.00 0.07 0.00 0.07 32.00 0.07 0.00 0.07 33.00 0.07 0.00 0.07 34.00 0.07 0.00 0.07 35.00 0.07 0.00 0.07 36.00 0.07 0.00 0.07 37.00 0.07 0.00 0.07 38.00 0.07 0.00 0.07 39.00 0.07 0.00 0.07 40.00 0.07 0.00 0.07 41.00 0.06 0.00 0.06 42.00 0.06 0.00 0.06 43.00 0.06 0.00 0.06 44.00 0.06 0.00 0.06 45.00 0.06 0.00 0.06 46.00 0.06 0.00 0.06 47.00 0.06 0.00 0.06 48.00 0.06 0.00 0.06 49.00 0.06 0.00 0.06 50.00 0.06 0.00 0.06 51.00 0.06 0.00 0.06 Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 71 Summary for Link 2L: POI #2 Inflow Area = 1.688 ac, 4.62% Impervious, Inflow Depth = 1.34" for 10 Year event Inflow = 2.52 cfs @ 12.11 hrs, Volume= 0.189 of Primary = 2.52 cfs @ 12.11 hrs, Volume= 0.189 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 2L: POI #2 Hyd rog raph C Inflow 2.52 cfs ❑Primary 2.52 cfs Infilow�Arlea=l .:6818 �alc� 2 y I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I U I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 3 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I O LL i —I--I—T— —II_T—T—T_T—I__I_T—T_T_T_I__I_T_7_T_r_I__I_1_T_T_r—I--I--I—T—T— 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 10 Year Rainfall=5.19" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 72 Hydrograph for Link 2L: POI #2 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 53.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 54.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 55.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 56.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 57.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 59.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 61.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 62.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 63.00 0.00 0.00 0.00 12.00 1.63 0.00 1.63 64.00 0.00 0.00 0.00 13.00 0.31 0.00 0.31 65.00 0.00 0.00 0.00 14.00 0.18 0.00 0.18 66.00 0.00 0.00 0.00 15.00 0.14 0.00 0.14 67.00 0.00 0.00 0.00 16.00 0.12 0.00 0.12 68.00 0.00 0.00 0.00 17.00 0.10 0.00 0.10 69.00 0.00 0.00 0.00 18.00 0.09 0.00 0.09 70.00 0.00 0.00 0.00 19.00 0.08 0.00 0.08 71.00 0.00 0.00 0.00 20.00 0.07 0.00 0.07 72.00 0.00 0.00 0.00 21.00 0.06 0.00 0.06 22.00 0.06 0.00 0.06 23.00 0.06 0.00 0.06 24.00 0.06 0.00 0.06 25.00 0.00 0.00 0.00 26.00 0.00 0.00 0.00 27.00 0.00 0.00 0.00 28.00 0.00 0.00 0.00 29.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 31.00 0.00 0.00 0.00 32.00 0.00 0.00 0.00 33.00 0.00 0.00 0.00 34.00 0.00 0.00 0.00 35.00 0.00 0.00 0.00 36.00 0.00 0.00 0.00 37.00 0.00 0.00 0.00 38.00 0.00 0.00 0.00 39.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 42.00 0.00 0.00 0.00 43.00 0.00 0.00 0.00 44.00 0.00 0.00 0.00 45.00 0.00 0.00 0.00 46.00 0.00 0.00 0.00 47.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 49.00 0.00 0.00 0.00 50.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 73 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: POI #1 Predevelopment Runoff Area=815,942 sf 6.70% Impervious Runoff Depth=2.06" Tc=24.4 min CN=60 Runoff=35.90 cfs 3.216 of Subcatchment2S: POI #2 Predevelopment Runoff Area=106,262 sf 0.00% Impervious Runoff Depth=1.64" Tc=18.3 min CN=55 Runoff=4.21 cfs 0.333 of Subcatchment3S: Post-Development Runoff Area=640,460 sf 8.40% Impervious Runoff Depth=2.15" Tc=24.4 min CN=61 Runoff=29.61 cfs 2.631 of Subcatchment4S: POI #2 Runoff Area=73,518 sf 4.62% Impervious Runoff Depth=1.97" Tc=16.7 min CN=59 Runoff=3.88 cfs 0.278 of Subcatchment5S: Culvert Runoff Area=601,822 sf 9.68% Impervious Runoff Depth=2.15" Tc=23.7 min CN=61 Runoff=28.30 cfs 2.472 of SubcatchmentDA#1: Post-Development Runoff Area=208,217 sf 53.03% Impervious Runoff Depth=4.08" Tc=5.0 min CN=81 Runoff=34.10 cfs 1.623 of Pond BMP-1: BMP#1 (Wet Pond) Peak Elev=623.87' Storage=33,804 cf Inflow=34.10 cfs 1.623 of Outflow=10.61 cfs 1.336 of Link 1L: POI #1 Inflow=38.67 cfs 3.967 of Primary=38.67 cfs 3.967 of Link 2L: POI #2 Inflow=3.88 cfs 0.278 of Primary=3.88 cfs 0.278 of Total Runoff Area = 56.158 ac Runoff Volume = 10.554 of Average Runoff Depth = 2.26" 88.53% Pervious = 49.717 ac 11.47% Impervious = 6.441 ac Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 74 Summary for Subcatchment 1S: POI #1 Predevelopment Runoff = 35.90 cfs @ 12.20 hrs, Volume= 3.216 af, Depth= 2.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.21" Area (so CN Description 543,022 55 Woods, Good, HSG B 54,658 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 209,175 61 >75% Grass cover, Good, HSG B 815,942 60 Weighted Average 761,284 93.30% Pervious Area 54,658 6.70% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 1S: POI #1 Predevelopment Hydrograph 40 -1r-1--1--1-+-+-+-+—+—+—r-I--I--I--I--I---+-+-+-+-r-r-r-1--1--1-+-+-+-+-+-+-r-r- Runoff 38 1 —r—r—r 35.90cfs r-r-r-r-r-r-1--r-1--1- _ _Y—r-t_r_r-r-I--I--I—r—r—r—T—r—r—r—r- 36 -Ir-1I--1r-1-T -T-T-r-r-r-lr-lr-lr-li--1i--1i- -T-T-T-r-r-lr-lr-lr-I�7pe 1'I� f ����I 34 1 I I I I I I I I I I I I r I— I—1 7 7 r—r—r r I— 1 1 1 7 7 T T—r—r—r—I——I— 1—1 1—T—'7`—T r—r—T- 32 ' 1 -1--1--1--1--11 - 1- 1- 1T- 1T-1T-1--1--1--1--1- 1 -T-25 Yai 1f�1airlEfa►11r� 1'I - 30 h-bff-4jtA*8- 115�91;42-�f-- 28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 26 ' 1 -1--1--1--1--1 - - - - -1--1--1--1--1--1- - -I 14��nno f1- a11�mm1-pp-1=3'".2, 4y�1- 24 -L-1--1--1-L -L-1-L-L-L-1--1--11--11--11--11-1-1-+ 1!L-L-L-1--1--!�!7--I T -L" L- ^ � 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 u22 -L-1--1--1-L -L-1-L-L-L-1--1--I--I--1--1-L-L-+-+-Lfl►�.#„1O11 1D1ep1 t1 =Z Nv,�- ,.. � 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 20 - -1--1--1-1 7-7-1-1—L-1--1--1--1--1--1-1-1-1-1—L—L— -1--1--1— -1—n�7�—�w7—wwI—pry,—�prp�—,,��1�1 — 0 LL 18 - -1--1--1- - -L-r-r-1--1--1--1--1--1- - -+-+-r-r- -1--1--1- 16 T— -----I—+ +—+—+—+—+------------+—+—+—+—+—+— ------+—+—+— +— 14 -1+-1+-1i--1i- -+-+-+-+-+-+-++-+-+-+-+-+-+-+-+-+-+-1-+-+-+-+-+- -+- -+- 12 -1r-1--1--1-+ +-+-+-+-r-r-r-r-1--1--1-+-+-+-+-r-r-r-1--1--1-+-+-+-+-+-+-r-r- ' 1 10 -r-1--1--1- -r-r-r-r-r-r-r-1--1--1-r-r-r-t-r-r-r-1--1--1-r- - -r-r-r-r-r- � I 8 —r-1--1--1— r—T—r—r—r—____I--I—____T—Y—Y_+-r-r-r------r-r-r-r-r-r-r-r- � I 6 —r---I--I— 7-7—T—r—r—I—I—1--1--1--1-7—T—T—T—r—r—r------1-1-7-7—T—r—r—r— i 4 IF I I I I I I —I--I— I— r—r—I— — — — -7-7—T—T—r—r—r—I--I— I-1-1-7-7—T—r—r—r- 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 75 Hydrograph for Subcatchment 1S: POI #1 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 6.21 2.06 0.00 1.00 0.07 0.00 0.00 53.00 6.21 2.06 0.00 2.00 0.14 0.00 0.00 54.00 6.21 2.06 0.00 3.00 0.21 0.00 0.00 55.00 6.21 2.06 0.00 4.00 0.30 0.00 0.00 56.00 6.21 2.06 0.00 5.00 0.39 0.00 0.00 57.00 6.21 2.06 0.00 6.00 0.50 0.00 0.00 58.00 6.21 2.06 0.00 7.00 0.61 0.00 0.00 59.00 6.21 2.06 0.00 8.00 0.75 0.00 0.00 60.00 6.21 2.06 0.00 9.00 0.91 0.00 0.00 61.00 6.21 2.06 0.00 10.00 1.12 0.00 0.00 62.00 6.21 2.06 0.00 11.00 1.46 0.00 0.03 63.00 6.21 2.06 0.00 12.00 4.12 0.82 16.65 64.00 6.21 2.06 0.00 13.00 4.79 1.18 5.84 65.00 6.21 2.06 0.00 14.00 5.09 1.36 3.06 66.00 6.21 2.06 0.00 15.00 5.30 1.48 2.30 67.00 6.21 2.06 0.00 16.00 5.46 1.58 1.85 68.00 6.21 2.06 0.00 17.00 5.60 1.66 1.57 69.00 6.21 2.06 0.00 18.00 5.72 1.74 1.41 70.00 6.21 2.06 0.00 19.00 5.82 1.81 1.24 71.00 6.21 2.06 0.00 20.00 5.91 1.86 1.06 72.00 6.21 2.06 0.00 21.00 5.99 1.92 0.97 22.00 6.07 1.97 0.94 23.00 6.14 2.01 0.91 24.00 6.21 2.06 0.87 25.00 6.21 2.06 0.01 26.00 6.21 2.06 0.00 27.00 6.21 2.06 0.00 28.00 6.21 2.06 0.00 29.00 6.21 2.06 0.00 30.00 6.21 2.06 0.00 31.00 6.21 2.06 0.00 32.00 6.21 2.06 0.00 33.00 6.21 2.06 0.00 34.00 6.21 2.06 0.00 35.00 6.21 2.06 0.00 36.00 6.21 2.06 0.00 37.00 6.21 2.06 0.00 38.00 6.21 2.06 0.00 39.00 6.21 2.06 0.00 40.00 6.21 2.06 0.00 41.00 6.21 2.06 0.00 42.00 6.21 2.06 0.00 43.00 6.21 2.06 0.00 44.00 6.21 2.06 0.00 45.00 6.21 2.06 0.00 46.00 6.21 2.06 0.00 47.00 6.21 2.06 0.00 48.00 6.21 2.06 0.00 49.00 6.21 2.06 0.00 50.00 6.21 2.06 0.00 51.00 6.21 2.06 0.00 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 76 Summary for Subcatchment 2S: POI #2 Predevelopment Runoff = 4.21 cfs @ 12.13 hrs, Volume= 0.333 af, Depth= 1.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.21" Area (so CN Description 106,262 55 Woods, Good, HSG B 106,262 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 Direct Entry, Subcatchment 2S: POI #2 Predevelopment Hydrograph II II II I I I II II II II II II II II II II II II II II II II II II II II II II II II II II II II II ■Runoff 4.21 cfs ----I-- -+-r TY , 11) —I —I— — — —r— —— 4 25-Year IIIRIainfaill;=6.21'�I RUhdff At6a=106111,262 isf -r-I--I-r- -t-r-r-r-r-I--I--I-r-r-r-t-r-r-r-I--I--I-r-r-r-t-r-r- 3 F'L;rlofiflllVollO IO=10�3 N I I I I I I I I I I I I I I I I I I I I I I I Runoff Ilbepth=1.64" 0 a 2 �I I I I I I I I I I -I__I__I__I_ i-- r-- r _I__I__I__I__I__iI--I--I - I-- I--I--I--I--I--I--I--I--I - I-- I--I--I--I--I--I--I- 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 2830 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 77 Hydrograph for Subcatchment 2S: POI #2 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 6.21 1.64 0.00 1.00 0.07 0.00 0.00 53.00 6.21 1.64 0.00 2.00 0.14 0.00 0.00 54.00 6.21 1.64 0.00 3.00 0.21 0.00 0.00 55.00 6.21 1.64 0.00 4.00 0.30 0.00 0.00 56.00 6.21 1.64 0.00 5.00 0.39 0.00 0.00 57.00 6.21 1.64 0.00 6.00 0.50 0.00 0.00 58.00 6.21 1.64 0.00 7.00 0.61 0.00 0.00 59.00 6.21 1.64 0.00 8.00 0.75 0.00 0.00 60.00 6.21 1.64 0.00 9.00 0.91 0.00 0.00 61.00 6.21 1.64 0.00 10.00 1.12 0.00 0.00 62.00 6.21 1.64 0.00 11.00 1.46 0.00 0.00 63.00 6.21 1.64 0.00 12.00 4.12 0.58 2.50 64.00 6.21 1.64 0.00 13.00 4.79 0.88 0.55 65.00 6.21 1.64 0.00 14.00 5.09 1.03 0.33 66.00 6.21 1.64 0.00 15.00 5.30 1.13 0.25 67.00 6.21 1.64 0.00 16.00 5.46 1.22 0.20 68.00 6.21 1.64 0.00 17.00 5.60 1.29 0.18 69.00 6.21 1.64 0.00 18.00 5.72 1.36 0.16 70.00 6.21 1.64 0.00 19.00 5.82 1.42 0.14 71.00 6.21 1.64 0.00 20.00 5.91 1.47 0.12 72.00 6.21 1.64 0.00 21.00 5.99 1.51 0.11 22.00 6.07 1.56 0.11 23.00 6.14 1.60 0.10 24.00 6.21 1.64 0.10 25.00 6.21 1.64 0.00 26.00 6.21 1.64 0.00 27.00 6.21 1.64 0.00 28.00 6.21 1.64 0.00 29.00 6.21 1.64 0.00 30.00 6.21 1.64 0.00 31.00 6.21 1.64 0.00 32.00 6.21 1.64 0.00 33.00 6.21 1.64 0.00 34.00 6.21 1.64 0.00 35.00 6.21 1.64 0.00 36.00 6.21 1.64 0.00 37.00 6.21 1.64 0.00 38.00 6.21 1.64 0.00 39.00 6.21 1.64 0.00 40.00 6.21 1.64 0.00 41.00 6.21 1.64 0.00 42.00 6.21 1.64 0.00 43.00 6.21 1.64 0.00 44.00 6.21 1.64 0.00 45.00 6.21 1.64 0.00 46.00 6.21 1.64 0.00 47.00 6.21 1.64 0.00 48.00 6.21 1.64 0.00 49.00 6.21 1.64 0.00 50.00 6.21 1.64 0.00 51.00 6.21 1.64 0.00 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 78 Summary for Subcatchment 3S: Post-Development ByPass POI #1 Runoff = 29.61 cfs @ 12.19 hrs, Volume= 2.631 af, Depth= 2.15" Routed to Link 1 L : POI #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.21" Area (so CN Description 406,538 55 Woods, Good, HSG B 53,797 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 171,038 61 >75% Grass cover, Good, HSG B 640,460 61 Weighted Average 586,663 91.60% Pervious Area 53,797 8.40% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 3S: Post-Development ByPass POI #1 Hydrograph 32 ■Runoff 29.61 cfs 30 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 7-7-T-r-r------------7-7-T-T-r-r-r----J_ ■ el-�Ow- 26 25-Yeair IIRIainlfa►I1;=6.217 p`.y,�� ;� y� y, ��►�� w�e� j 24 -Ir-Ir---Ii- - -rt-r-r-r-Ir-Ir-Ir------rt-rt- Ribff-� �Ia=@�10 � r- 22 - ------ - -'- - - ------------'- -�-��-n - �y -i -p- '' y�- 20 11�"Toll••I, Vai1LJMQ=l I6iv 1r`1'i --------- - ----------------------------------------- --------------- -- IIIIIIIIIIIIIIIIIIIIIIIIIIIII U 18 FRkA-i�li0-ki—li i/f�i- r-2-15" — .... —r—r—I--I—r —7-7—r—r—r—r—r—I--I--I--I-7-7—T—T—r 0 16 - ------ L-1-L-L-L-1--1--1--1--1--1-L-L-L-L-r- - ------ 14 1'c,"24.-4-r` ih-- --------- -------------------------------------------------------- 1211 � I -r-----I-r r- r-r-r-r-r-r-r------r-r-r-t-r-r-r---I--I-r-r-r -r- -r- -r- 10 -IL---'--'- L-1-L-L-L-1--1--1--1--1--1-L-L-L-1-L- - -1--1--1-J-J-L-1-1-L-L- - 8 -------- i-i- I-- I--I-------------i-i-i-T-I--I------------I-i-i- I-- I--i---- 6 -r-I--I--I- +- ' I 4- - L-I--I--I- 1-L-L-L-1--1--1--1--1--1-L-L-L-1-L-r-L------L-L-L-1-L-L-L-L- 2 1 1 1 1 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 79 Hydrograph for Subcatchment 3S: Post-Development ByPass POI #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 6.21 2.15 0.00 1.00 0.07 0.00 0.00 53.00 6.21 2.15 0.00 2.00 0.14 0.00 0.00 54.00 6.21 2.15 0.00 3.00 0.21 0.00 0.00 55.00 6.21 2.15 0.00 4.00 0.30 0.00 0.00 56.00 6.21 2.15 0.00 5.00 0.39 0.00 0.00 57.00 6.21 2.15 0.00 6.00 0.50 0.00 0.00 58.00 6.21 2.15 0.00 7.00 0.61 0.00 0.00 59.00 6.21 2.15 0.00 8.00 0.75 0.00 0.00 60.00 6.21 2.15 0.00 9.00 0.91 0.00 0.00 61.00 6.21 2.15 0.00 10.00 1.12 0.00 0.00 62.00 6.21 2.15 0.00 11.00 1.46 0.00 0.08 63.00 6.21 2.15 0.00 12.00 4.12 0.87 14.02 64.00 6.21 2.15 0.00 13.00 4.79 1.25 4.73 65.00 6.21 2.15 0.00 14.00 5.09 1.42 2.47 66.00 6.21 2.15 0.00 15.00 5.30 1.55 1.86 67.00 6.21 2.15 0.00 16.00 5.46 1.66 1.49 68.00 6.21 2.15 0.00 17.00 5.60 1.74 1.26 69.00 6.21 2.15 0.00 18.00 5.72 1.82 1.13 70.00 6.21 2.15 0.00 19.00 5.82 1.89 0.99 71.00 6.21 2.15 0.00 20.00 5.91 1.95 0.85 72.00 6.21 2.15 0.00 21.00 5.99 2.00 0.78 22.00 6.07 2.05 0.75 23.00 6.14 2.10 0.73 24.00 6.21 2.15 0.70 25.00 6.21 2.15 0.01 26.00 6.21 2.15 0.00 27.00 6.21 2.15 0.00 28.00 6.21 2.15 0.00 29.00 6.21 2.15 0.00 30.00 6.21 2.15 0.00 31.00 6.21 2.15 0.00 32.00 6.21 2.15 0.00 33.00 6.21 2.15 0.00 34.00 6.21 2.15 0.00 35.00 6.21 2.15 0.00 36.00 6.21 2.15 0.00 37.00 6.21 2.15 0.00 38.00 6.21 2.15 0.00 39.00 6.21 2.15 0.00 40.00 6.21 2.15 0.00 41.00 6.21 2.15 0.00 42.00 6.21 2.15 0.00 43.00 6.21 2.15 0.00 44.00 6.21 2.15 0.00 45.00 6.21 2.15 0.00 46.00 6.21 2.15 0.00 47.00 6.21 2.15 0.00 48.00 6.21 2.15 0.00 49.00 6.21 2.15 0.00 50.00 6.21 2.15 0.00 51.00 6.21 2.15 0.00 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 80 Summary for Subcatchment 4S: POI #2 Post-Development Runoff = 3.88 cfs @ 12.10 hrs, Volume= 0.278 af, Depth= 1.97" Routed to Link 2L : POI #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.21" Area (so CN Description 42,969 55 Woods, Good, HSG B 3,396 98 Greenway 27,153 61 >75% Grass cover, Good, HSG B 73,518 59 Weighted Average 70,122 95.38% Pervious Area 3,396 4.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.7 Direct Entry, Subcatchment 4S: POI #2 Post-Development Hydrograph I I I ■Runoff —r-1--1—r—r—r—r—r—r—r—r—r-1--1—r—r—r—r—r—r—r—r-1--1—r—r—r—r—r—r—r—r-1--1—r- 4 1 3.88 cfs 1 Typo 11111 24_hrr 25-Year 111R1ainfaill;=6.21" -T-1--1-T- -T-T-T_T_T T-T-T-r-Rdhoff AeeA=7;T3 51-8-i5 3 OOofifllVollL;MQ�1��27 ; N I I I I I I I I I I I I I I I I I I I I I I I Ru11n11off11Dep h=1.97'1 -r I--I-T-- -T-T-T-r r -1-----T-T-T-T-T-T-T------T-T-T-T- -r-I-I--1-T- 0 2 Tc""16.7 Min LL I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 ri 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 81 Hydrograph for Subcatchment 4S: POI #2 Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 6.21 1.97 0.00 1.00 0.07 0.00 0.00 53.00 6.21 1.97 0.00 2.00 0.14 0.00 0.00 54.00 6.21 1.97 0.00 3.00 0.21 0.00 0.00 55.00 6.21 1.97 0.00 4.00 0.30 0.00 0.00 56.00 6.21 1.97 0.00 5.00 0.39 0.00 0.00 57.00 6.21 1.97 0.00 6.00 0.50 0.00 0.00 58.00 6.21 1.97 0.00 7.00 0.61 0.00 0.00 59.00 6.21 1.97 0.00 8.00 0.75 0.00 0.00 60.00 6.21 1.97 0.00 9.00 0.91 0.00 0.00 61.00 6.21 1.97 0.00 10.00 1.12 0.00 0.00 62.00 6.21 1.97 0.00 11.00 1.46 0.00 0.00 63.00 6.21 1.97 0.00 12.00 4.12 0.77 2.69 64.00 6.21 1.97 0.00 13.00 4.79 1.12 0.43 65.00 6.21 1.97 0.00 14.00 5.09 1.29 0.25 66.00 6.21 1.97 0.00 15.00 5.30 1.41 0.20 67.00 6.21 1.97 0.00 16.00 5.46 1.51 0.16 68.00 6.21 1.97 0.00 17.00 5.60 1.59 0.14 69.00 6.21 1.97 0.00 18.00 5.72 1.66 0.12 70.00 6.21 1.97 0.00 19.00 5.82 1.73 0.11 71.00 6.21 1.97 0.00 20.00 5.91 1.78 0.09 72.00 6.21 1.97 0.00 21.00 5.99 1.83 0.08 22.00 6.07 1.88 0.08 23.00 6.14 1.93 0.08 24.00 6.21 1.97 0.08 25.00 6.21 1.97 0.00 26.00 6.21 1.97 0.00 27.00 6.21 1.97 0.00 28.00 6.21 1.97 0.00 29.00 6.21 1.97 0.00 30.00 6.21 1.97 0.00 31.00 6.21 1.97 0.00 32.00 6.21 1.97 0.00 33.00 6.21 1.97 0.00 34.00 6.21 1.97 0.00 35.00 6.21 1.97 0.00 36.00 6.21 1.97 0.00 37.00 6.21 1.97 0.00 38.00 6.21 1.97 0.00 39.00 6.21 1.97 0.00 40.00 6.21 1.97 0.00 41.00 6.21 1.97 0.00 42.00 6.21 1.97 0.00 43.00 6.21 1.97 0.00 44.00 6.21 1.97 0.00 45.00 6.21 1.97 0.00 46.00 6.21 1.97 0.00 47.00 6.21 1.97 0.00 48.00 6.21 1.97 0.00 49.00 6.21 1.97 0.00 50.00 6.21 1.97 0.00 51.00 6.21 1.97 0.00 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 82 Summary for Subcatchment 5S: Culvert Post-Development Runoff = 28.30 cfs @ 12.18 hrs, Volume= 2.472 af, Depth= 2.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.21" Area (so CN Description 359,379 55 Woods, Good, HSG B 58,277 98 Paved parking, HSG B 9,087 79 Pasture/grassland/range, Poor, HSG B 175,079 61 >75% Grass cover, Good, HSG B 601,822 61 Weighted Average 543,545 90.32% Pervious Area 58,277 9.68% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.7 Direct Entry, Subcatchment 5S: Culvert Post-Development Hydrograph -r------7-7-7-7-T-T-T------------7-T-T-T-r-r-r------7-7-7-7-T-7-7-r- ■Runoff 30 _Ii_ 28 -r-----I-287. --7_-1_1_L_L J 1_1_1_1_L_L_L_I__I__I_J_ _ 1_L_LLL - - - -rF _ - - - + - - I� ppp- 11- _- - -----I-L -L-71-TL-L-L-1--1--1- I -I -I 7I 7TTr -Y 26 _I- I- - - �RLL25-Y-ea-r Rainffl6.21"L 24 22 RU h 6ff Ae6a=60 1 X22_isf - zo -pod#fIIIY01 0=2 41ZO - w 18 -+-----1-+ -+-+-+-+-+------------+-+-+-+-+p 1, - f1� II�eptl IrL.I 1 J 3 16 °� 14 Tc�"_23.7 Min � 1 - r-I--I--I-y -r-I--I--I-rt-rt-t-t-r-r-r-I--I--I-y-y-�-rt-+-t-r-r- 12 I -L-I--I--I--I II-II- L - L -L I-- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 11 10 � 1 - r------r -T-r-r-r------------T-Y-Y-?-r-r-r-I--I-- -r-r- -T-r-r-r-r- -L-I--I--I- L-1-L-L-L-1--1--1--1--1--1-L-L-L-L-L-L-L-1--1--1-J-J-L-1-L-L-L-L- 6 -r I 7-7-T-T-T 1 7-7-T-T-r-r-r 7-7-7-7-T-T-T-r- 4 - ---I--i- -r-T-T-r------------r-r-r-T-r-r- ---i--I- -r-r-r-T-T-r- - 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 83 Hydrograph for Subcatchment 5S: Culvert Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 6.21 2.15 0.00 1.00 0.07 0.00 0.00 53.00 6.21 2.15 0.00 2.00 0.14 0.00 0.00 54.00 6.21 2.15 0.00 3.00 0.21 0.00 0.00 55.00 6.21 2.15 0.00 4.00 0.30 0.00 0.00 56.00 6.21 2.15 0.00 5.00 0.39 0.00 0.00 57.00 6.21 2.15 0.00 6.00 0.50 0.00 0.00 58.00 6.21 2.15 0.00 7.00 0.61 0.00 0.00 59.00 6.21 2.15 0.00 8.00 0.75 0.00 0.00 60.00 6.21 2.15 0.00 9.00 0.91 0.00 0.00 61.00 6.21 2.15 0.00 10.00 1.12 0.00 0.00 62.00 6.21 2.15 0.00 11.00 1.46 0.00 0.08 63.00 6.21 2.15 0.00 12.00 4.12 0.87 13.94 64.00 6.21 2.15 0.00 13.00 4.79 1.25 4.36 65.00 6.21 2.15 0.00 14.00 5.09 1.42 2.31 66.00 6.21 2.15 0.00 15.00 5.30 1.55 1.74 67.00 6.21 2.15 0.00 16.00 5.46 1.66 1.40 68.00 6.21 2.15 0.00 17.00 5.60 1.74 1.19 69.00 6.21 2.15 0.00 18.00 5.72 1.82 1.06 70.00 6.21 2.15 0.00 19.00 5.82 1.89 0.93 71.00 6.21 2.15 0.00 20.00 5.91 1.95 0.80 72.00 6.21 2.15 0.00 21.00 5.99 2.00 0.73 22.00 6.07 2.05 0.71 23.00 6.14 2.10 0.68 24.00 6.21 2.15 0.66 25.00 6.21 2.15 0.00 26.00 6.21 2.15 0.00 27.00 6.21 2.15 0.00 28.00 6.21 2.15 0.00 29.00 6.21 2.15 0.00 30.00 6.21 2.15 0.00 31.00 6.21 2.15 0.00 32.00 6.21 2.15 0.00 33.00 6.21 2.15 0.00 34.00 6.21 2.15 0.00 35.00 6.21 2.15 0.00 36.00 6.21 2.15 0.00 37.00 6.21 2.15 0.00 38.00 6.21 2.15 0.00 39.00 6.21 2.15 0.00 40.00 6.21 2.15 0.00 41.00 6.21 2.15 0.00 42.00 6.21 2.15 0.00 43.00 6.21 2.15 0.00 44.00 6.21 2.15 0.00 45.00 6.21 2.15 0.00 46.00 6.21 2.15 0.00 47.00 6.21 2.15 0.00 48.00 6.21 2.15 0.00 49.00 6.21 2.15 0.00 50.00 6.21 2.15 0.00 51.00 6.21 2.15 0.00 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 84 Summary for Subcatchment DA #1: Post-Development Pond #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 34.10 cfs @ 11.95 hrs, Volume= 1.623 af, Depth= 4.08" Routed to Pond BMP-1 : BMP#1 (Wet Pond) Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.21" Area (so CN Description 15,333 98 Sidewalk 38,202 98 Lots (Building, walkway, patios) 14,549 98 Driveways 42,297 98 Roadway 44 98 CBU Pads 97,792 61 >75% Grass cover, Good, HSG B 208,217 81 Weighted Average 97,792 46.97% Pervious Area 110,425 53.03% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA #1: Post-Development Pond #1 Hydrograph 38 -1+------ - - - -+-+- -1�-------- - -+-+-+- - -1+------ - - - -+-+- -1+- Runoff 36 —+-1--1— 34.10cfs +—+—+—+—+—r-1--1--1--_+_+_+_+_+—+_+_+-1--1--1—+_+_+_+_+—+—+_+_ 34 -+-1--1--1-+ -+-+-+-+-+- -1--1--1i--1i- - -+-+-+- - -1+-1i--1i--1 + 'IT �— I- =�i-r�- 32 -+—+-1—+— —+—+—+—+—+—I--I--I--I--1--1—+—+—+—+—+—+—+—I--I--1—+—+—+—+—+—+—+—+— 30 ' 1 -1 -11 - - _ _ _ _ _1111111111111- _ _ _� -Ya�r_'IR'a�r�f�►llrG. 1'� - + 28 - -1--1--1- - - -+-+-+-1--1--1--1--1-- 1-1—fth6ff A-t6a=208'24T,5f= � 1 26 -L-1--1--1- -1-1-1-L-L-1--1--1--1--1--1-1-1-+-+-LPL-L�-'1J--1--1-J-pJ-1A- 24 _1 _1i__1i__1i_ _ _s_i_L_L_1L 1i__1i__1i__1i__1i_s_1_P-POIC fILV OWIMI �`if' w 22 -L-1--1--1- -1-1-1-1-L-1--1--1--1--1--1-1-1-1-1-L-L-L-1--1--1-1- -1-1-1-L-L-L- w 1 F��n11�ff_11 D�eipthr4.A$'L U .... 20 -L-1--1--1- -1-1-1-1-L-1--1--1--1--1- 1-1-1-1-+-L- �I 0 18 -1--1--1--1- --1--1- 1--- 1---1--1--1--1--1--1--1--1--1 --1 - 1---1--1--1--1--1--1--1T� J - �n1-- LL 16 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 14 -1--1--1--1- -1-1-1-1-1-1--1--1--1--1--1- -+-+-+-'-'-1--1--1--1--1--1-'- = a1-- ,1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 12 -1--1--1--1- - - -+-+-+-1--1--1--1--1--1- -+-+-+- - -1--1--1--1-J--1- - -+-+-+-1-- 10 �1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 8 -1-- ,1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 6 — 4 —I——1——1——1— — — 1— 1 — 1 —1 11111111111— 1— 1 — 1 — 1 —1 —1 —I——1——1——1——I——I— — — — —I—— 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -- 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 85 Hydrograph for Subcatchment DA #1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 6.21 4.08 0.00 1.00 0.07 0.00 0.00 53.00 6.21 4.08 0.00 2.00 0.14 0.00 0.00 54.00 6.21 4.08 0.00 3.00 0.21 0.00 0.00 55.00 6.21 4.08 0.00 4.00 0.30 0.00 0.00 56.00 6.21 4.08 0.00 5.00 0.39 0.00 0.00 57.00 6.21 4.08 0.00 6.00 0.50 0.00 0.01 58.00 6.21 4.08 0.00 7.00 0.61 0.01 0.06 59.00 6.21 4.08 0.00 8.00 0.75 0.03 0.13 60.00 6.21 4.08 0.00 9.00 0.91 0.07 0.27 61.00 6.21 4.08 0.00 10.00 1.12 0.14 0.44 62.00 6.21 4.08 0.00 11.00 1.46 0.29 1.02 63.00 6.21 4.08 0.00 12.00 4.12 2.22 29.22 64.00 6.21 4.08 0.00 13.00 4.79 2.80 1.70 65.00 6.21 4.08 0.00 14.00 5.09 3.07 1.02 66.00 6.21 4.08 0.00 15.00 5.30 3.25 0.82 67.00 6.21 4.08 0.00 16.00 5.46 3.40 0.63 68.00 6.21 4.08 0.00 17.00 5.60 3.52 0.56 69.00 6.21 4.08 0.00 18.00 5.72 3.63 0.49 70.00 6.21 4.08 0.00 19.00 5.82 3.72 0.43 71.00 6.21 4.08 0.00 20.00 5.91 3.80 0.36 72.00 6.21 4.08 0.00 21.00 5.99 3.88 0.34 22.00 6.07 3.95 0.33 23.00 6.14 4.01 0.32 24.00 6.21 4.08 0.30 25.00 6.21 4.08 0.00 26.00 6.21 4.08 0.00 27.00 6.21 4.08 0.00 28.00 6.21 4.08 0.00 29.00 6.21 4.08 0.00 30.00 6.21 4.08 0.00 31.00 6.21 4.08 0.00 32.00 6.21 4.08 0.00 33.00 6.21 4.08 0.00 34.00 6.21 4.08 0.00 35.00 6.21 4.08 0.00 36.00 6.21 4.08 0.00 37.00 6.21 4.08 0.00 38.00 6.21 4.08 0.00 39.00 6.21 4.08 0.00 40.00 6.21 4.08 0.00 41.00 6.21 4.08 0.00 42.00 6.21 4.08 0.00 43.00 6.21 4.08 0.00 44.00 6.21 4.08 0.00 45.00 6.21 4.08 0.00 46.00 6.21 4.08 0.00 47.00 6.21 4.08 0.00 48.00 6.21 4.08 0.00 49.00 6.21 4.08 0.00 50.00 6.21 4.08 0.00 51.00 6.21 4.08 0.00 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 86 Summary for Pond BMP-1: BMP #1 (Wet Pond) Inflow Area = 4.780 ac, 53.03% Impervious, Inflow Depth = 4.08" for 25-Year event Inflow = 34.10 cfs @ 11.95 hrs, Volume= 1.623 of Outflow = 10.61 cfs @ 12.09 hrs, Volume= 1.336 af, Atten= 69%, Lag= 8.0 min Primary = 10.61 cfs @ 12.09 hrs, Volume= 1.336 of Routed to Link 1 L : POI #1 Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 623.87'@ 12.09 hrs Surf.Area= 8,360 sf Storage= 33,804 cf Plug-Flow detention time=517.1 min calculated for 1.336 of(82% of inflow) Center-of-Mass det. time=441.0 min ( 1,247.2 - 806.2 ) Volume Invert Avail.Storage Storage Description #1 619.00' 43,609 cf Custom Stage Data (Prismatic)-isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 619.00 4,938 0 0 619.50 5,764 2,676 2,676 620.00 6,208 2,993 5,669 621.00 6,742 6,475 12,144 622.00 7,291 7,017 19,160 623.00 7,855 7,573 26,733 624.00 8,434 8,145 34,878 625.00 9,029 8,732 43,609 Device Routing Invert Outlet Devices #1 Primary 618.34' 30.0" Round Culvert L= 67.7' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 618.34'/618.00' S= 0.0050 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes& inlets, Flow Area= 4.91 sf #2 Device 1 619.00' 1.2"Vert. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 622.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.50 Width (feet) 2.00 2.00 #4 Device 1 624.00' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=10.50 cfs @ 12.09 hrs HW=623.86' (Free Discharge) L1=Culvert (Passes 10.50 cfs of 48.85 cfs potential flow) 2=WQ Orifice (Orifice Controls 0.08 cfs @ 10.56 fps) 3=Custom Weir/Orifice (Weir Controls 10.42 cfs @ 3.82 fps) 4=Orifice/Grate ( Controls 0.00 cfs) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 87 Pond BMP-1: BMP #1 (Wet Pond) Hyd rog raph -I--I-r-r-T-r-I--I--I-r-I-r-Ir-I--I-r-r-r-r-I--I--I-r-T-r-I--I--I-r-I-r-r-Ir---II- C Inflow 38 ---I-�- 1111Cfs ------ -7-r-r-r--7- -r-r-r-r-- -7-r-r-r-- -7-r-r-r-I-�- ❑Primary 36 ----;-T- -r----T-T-r-r----T-T-r-�11 'iQg11 �C1'�rd' F 801 6— 34 r-I1---II- -T-r-1 1-T-1 I 1-T-T-1-1---II- 32 30-: 'I `� -Y -I- 28 }}yamira 3I I 26 I I I I I I I I I I I I I I I I I I^w ------ I- ------------------------------------------------------ 24 --- ----- ------------------------------------------------------ w 22 -�v 20 0 18 I- I i i II I I- I i II II I I- I i II II I I- I i i II II I I- I i II II II I- I a 16 -�-�- -1--1--1-J-L-L-L-I--1-J-L-L-L-I--I--I-�-L-L-I--I--I-J-L-L-L-L-I--I- 14 --I- -L- -1--1--1-J-L-L- -1--1-J-L-L-L---I--I- -+-L------J-L-L- - -I--I- 12 10.61 cfs —J—L—L—L-1--1—J—L—L—L------ —L—L------J—L—L—L—L—I--I- 10 --I- - ---I--I- - - - -I--I- - - - ---I--I- - - ---I--I- - - - - -I--I- 8 - - ---I--I- - - - -I--I- - - - ---I--I- -+- ---I--I- - - - - -I--I- 6 ----1- -III--I--I-1-4-+- -I--I- -1-+- -----I-1-+- -I-----1-4-+-I-I- ---I- 4 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Pond BMP-1: BMP #1 (Wet Pond) Stage-Discharge 625 I I ❑Primary Orifice/Grate --------I---- -L----- 624 -- --r + - ---- -� 623 Custom Weir/Orifice w .0 622 I I I I I I w I I I I I I w - ----------+----- ------ ---I- -+----- 621 620 WQ Orifice 619 0 5 10 15 20 25 30 35 40 45 50 Discharge (cfs) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 88 Pond BMP-1: BMP #1 (Wet Pond) Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-fi) 0 500 1,000 1,500 2,000 2,5003,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,0008,500 9,000 Surface ■Storage 625 - --'--- II-------' -- ------ --- ----- -------- - ---'--I- -I I --- I 624 ------�-------+--+---+--+---��----- -I--�- -+-+-----I-+- +-+-I--- 623 w VI u I II I I I I I I I I I I I I I I I I I 0 622 > II I I I I I ---I---�'---I----IL--i -J--1---LL--1---1-1--L---1-i-1 -I--I- i-i-I--- w I u I II I I I I I I I I I I I I I I I I I I I w 621 ------�- r- --Ir--+---I-------rr-----rt---r---I -t---r--y---+-t-I--- 620 Custom Stage Data 619 0 5,000 10,000 15,000 20,000 25,600 30,000 35,000 40,000 Storage(cubic-feet) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 89 Hydrograph for Pond BMP-1: BMP #1 (Wet Pond) Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 619.00 0.00 2.50 0.00 0 619.00 0.00 5.00 0.00 0 619.00 0.00 7.50 0.09 264 619.05 0.00 10.00 0.44 2,229 619.42 0.02 12.50 2.71 29,198 623.31 4.86 15.00 0.82 24,810 622.75 0.91 17.50 0.53 24,220 622.68 0.56 20.00 0.36 23,895 622.63 0.40 22.50 0.32 23,749 622.61 0.33 25.00 0.00 23,100 622.53 0.11 27.50 0.00 22,424 622.44 0.07 30.00 0.00 21,801 622.36 0.07 32.50 0.00 21,186 622.27 0.07 35.00 0.00 20,579 622.19 0.07 37.50 0.00 19,979 622.11 0.07 40.00 0.00 19,387 622.03 0.07 42.50 0.00 18,804 621.95 0.06 45.00 0.00 18,228 621.87 0.06 47.50 0.00 17,660 621.79 0.06 50.00 0.00 17,101 621.71 0.06 52.50 0.00 16,549 621.64 0.06 55.00 0.00 16,006 621.56 0.06 57.50 0.00 15,471 621.48 0.06 60.00 0.00 14,944 621.41 0.06 62.50 0.00 14,426 621.33 0.06 65.00 0.00 13,915 621.26 0.06 67.50 0.00 13,414 621.19 0.06 70.00 0.00 12,920 621.11 0.05 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 90 Stage-Discharge for Pond BMP-1: BMP #1 (Wet Pond) Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 619.00 0.00 621.60 0.06 624.20 21.04 619.05 0.00 621.65 0.06 624.25 24.24 619.10 0.01 621.70 0.06 624.30 27.72 619.15 0.01 621.75 0.06 624.35 31.46 619.20 0.01 621.80 0.06 624.40 35.44 619.25 0.02 621.85 0.06 624.45 39.64 619.30 0.02 621.90 0.06 624.50 44.05 619.35 0.02 621.95 0.06 624.55 48.65 619.40 0.02 622.00 0.06 624.60 52.90 619.45 0.02 622.05 0.07 624.65 53.17 619.50 0.03 622.10 0.07 624.70 53.43 619.55 0.03 622.15 0.07 624.75 53.69 619.60 0.03 622.20 0.07 624.80 53.95 619.65 0.03 622.25 0.07 624.85 54.21 619.70 0.03 622.30 0.07 624.90 54.46 619.75 0.03 622.35 0.07 624.95 54.72 619.80 0.03 622.40 0.07 625.00 54.97 619.85 0.03 622.45 0.07 619.90 0.03 622.50 0.07 619.95 0.04 622.55 0.14 620.00 0.04 622.60 0.28 620.05 0.04 622.65 0.45 620.10 0.04 622.70 0.66 620.15 0.04 622.75 0.89 620.20 0.04 622.80 1.15 620.25 0.04 622.85 1.43 620.30 0.04 622.90 1.73 620.35 0.04 622.95 2.05 620.40 0.04 623.00 2.39 620.45 0.04 623.05 2.75 620.50 0.05 623.10 3.12 620.55 0.05 623.15 3.51 620.60 0.05 623.20 3.91 620.65 0.05 623.25 4.33 620.70 0.05 623.30 4.76 620.75 0.05 623.35 5.21 620.80 0.05 623.40 5.67 620.85 0.05 623.45 6.14 620.90 0.05 623.50 6.63 620.95 0.05 623.55 7.13 621.00 0.05 623.60 7.64 621.05 0.05 623.65 8.16 621.10 0.05 623.70 8.69 621.15 0.05 623.75 9.24 621.20 0.06 623.80 9.79 621.25 0.06 623.85 10.36 621.30 0.06 623.90 10.93 621.35 0.06 623.95 11.52 621.40 0.06 624.00 12.12 621.45 0.06 624.05 13.53 621.50 0.06 624.10 15.62 621.55 0.06 624.15 18.15 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 91 Stage-Area-Storage for Pond BMP-1: BMP #1 (Wet Pond) Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 619.00 4,938 0 624.20 8,553 36,576 619.10 5,103 502 624.30 8,612 37,434 619.20 5,268 1,021 624.40 8,672 38,299 619.30 5,434 1,556 624.50 8,732 39,169 619.40 5,599 2,107 624.60 8,791 40,045 619.50 5,764 2,676 624.70 8,851 40,927 619.60 5,853 3,256 624.80 8,910 41,815 619.70 5,942 3,846 624.90 8,969 42,709 619.80 6,030 4,445 625.00 9,029 43,609 619.90 6,119 5,052 620.00 6,208 5,669 620.10 6,261 6,292 620.20 6,315 6,921 620.30 6,368 7,555 620.40 6,422 8,194 620.50 6,475 8,839 620.60 6,528 9,489 620.70 6,582 10,145 620.80 6,635 10,806 620.90 6,689 11,472 621.00 6,742 12,144 621.10 6,797 12,820 621.20 6,852 13,503 621.30 6,907 14,191 621.40 6,962 14,884 621.50 7,017 15,583 621.60 7,071 16,288 621.70 7,126 16,997 621.80 7,181 17,713 621.90 7,236 18,434 622.00 7,291 19,160 622.10 7,347 19,892 622.20 7,404 20,629 622.30 7,460 21,373 622.40 7,517 22,122 622.50 7,573 22,876 622.60 7,629 23,636 622.70 7,686 24,402 622.80 7,742 25,173 622.90 7,799 25,950 623.00 7,855 26,733 623.10 7,913 27,521 623.20 7,971 28,316 623.30 8,029 29,116 623.40 8,087 29,921 623.50 8,145 30,733 623.60 8,202 31,550 623.70 8,260 32,373 623.80 8,318 33,202 623.90 8,376 34,037 624.00 8,434 34,878 624.10 8,494 35,724 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 92 Summary for Link 1 L: POI #1 Inflow Area = 19.483 ac, 19.35% Impervious, Inflow Depth > 2.44" for 25-Year event Inflow = 38.67 cfs @ 12.17 hrs, Volume= 3.967 of Primary = 38.67 cfs @ 12.17 hrs, Volume= 3.967 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 1 L: POI #1 Hyd rog raph -r-1-r-r-+-r-r-1--1-r-r-r-r-1--1-r-r-r-r-r-1--1-r-r-r-r-1--1-r-+-r-r-r-1--1- ---------- -------- - -------- - - ------ - - -------- - -------- CInflow 42 ______ 38.67 cfs —I——I——I——I— —I—1——1——1——1— — 1 —L—I——1——1— — —I—1——I——I——I— —I—1——1——1——1— ❑Primary 40 38.67 cfs }�y) R 38 ---- - ------ - - - ---- - - -1011O 1-ArYa�II II.7T 1 131 1\iI 1 T 11 T r I 1 + r 1 1 r r r 36 34 -1--1- - -1--1--1-L_L_I-L_1--1-I_L_L-L_1__1__1_L_L-L-1--I--I LLL-L-L-1--I- 32 -1--1-+- -1--1--1-+-+-+-+-1--1-+-+-+-r-1--1--1-+-+-r-1--1--1-+-+-+-r-+-1--1- 30 —1——1—1— — —1——1——1—1—1—1—1——1——1—1—1—r —1——1——1—1— + —r —1—I——1——1—1—I—I —1—I——I— 28 26 -1--1- - -1--1--1- -+- - -1--1- - - - -1--1--1- -+- -1--1--1- -+- - - -1--1- w 24 1 - - -r-1--1- -+-r-r-r-1-r- -r-r-r-r-1- -+-r-r-1--1- -+-r-r-r-1--1- 0 20 -1-_1- - -1__1__1_ -+-L_L_1__1_I_L_L_L_1__1__1_ -I_1__1__1_ -+-I_L-L_1 LL 18 -1-_1 -+- -1--1--1-+-+-+-+-1--1-+-+-+-r-1--1--1-+-+-r-1--1--1-+-+-+-r-+-1--1- 16 -1--1-1- -i-1--1--1-1-r-1-1--1--1-1-r-1-1--1--1-1-+-r-1-1--1--1-1-r-1-1-1--1- 14 12 -1 _1- - __1__1_ -+-L-L_1__1_ L_1__1__1_ -+-L_1__1__1_ -+-L_L_L_1 10 -r-1-+- r-1--1-+-+-r-r-1--1-+-+-+-r-r-1--1-+-+-r-r-1--1-+-+-+-r-r-1--1- 8 —1——1— — ————1—_I— + — —F—I——I——I— I— I — —1——1——1— —+— — —1——1——1—+— — — —1——1— 6 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 93 Hydrograph for Link 1L: POI #1 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.06 0.00 0.06 1.00 0.00 0.00 0.00 53.00 0.06 0.00 0.06 2.00 0.00 0.00 0.00 54.00 0.06 0.00 0.06 3.00 0.00 0.00 0.00 55.00 0.06 0.00 0.06 4.00 0.00 0.00 0.00 56.00 0.06 0.00 0.06 5.00 0.00 0.00 0.00 57.00 0.06 0.00 0.06 6.00 0.00 0.00 0.00 58.00 0.06 0.00 0.06 7.00 0.00 0.00 0.00 59.00 0.06 0.00 0.06 8.00 0.01 0.00 0.01 60.00 0.06 0.00 0.06 9.00 0.02 0.00 0.02 61.00 0.06 0.00 0.06 10.00 0.02 0.00 0.02 62.00 0.06 0.00 0.06 11.00 0.11 0.00 0.11 63.00 0.06 0.00 0.06 12.00 21.03 0.00 21.03 64.00 0.06 0.00 0.06 13.00 7.19 0.00 7.19 65.00 0.06 0.00 0.06 14.00 3.74 0.00 3.74 66.00 0.06 0.00 0.06 15.00 2.77 0.00 2.77 67.00 0.06 0.00 0.06 16.00 2.21 0.00 2.21 68.00 0.06 0.00 0.06 17.00 1.86 0.00 1.86 69.00 0.05 0.00 0.05 18.00 1.66 0.00 1.66 70.00 0.05 0.00 0.05 19.00 1.46 0.00 1.46 71.00 0.05 0.00 0.05 20.00 1.25 0.00 1.25 72.00 0.05 0.00 0.05 21.00 1.14 0.00 1.14 22.00 1.09 0.00 1.09 23.00 1.05 0.00 1.05 24.00 1.01 0.00 1.01 25.00 0.12 0.00 0.12 26.00 0.07 0.00 0.07 27.00 0.07 0.00 0.07 28.00 0.07 0.00 0.07 29.00 0.07 0.00 0.07 30.00 0.07 0.00 0.07 31.00 0.07 0.00 0.07 32.00 0.07 0.00 0.07 33.00 0.07 0.00 0.07 34.00 0.07 0.00 0.07 35.00 0.07 0.00 0.07 36.00 0.07 0.00 0.07 37.00 0.07 0.00 0.07 38.00 0.07 0.00 0.07 39.00 0.07 0.00 0.07 40.00 0.07 0.00 0.07 41.00 0.06 0.00 0.06 42.00 0.06 0.00 0.06 43.00 0.06 0.00 0.06 44.00 0.06 0.00 0.06 45.00 0.06 0.00 0.06 46.00 0.06 0.00 0.06 47.00 0.06 0.00 0.06 48.00 0.06 0.00 0.06 49.00 0.06 0.00 0.06 50.00 0.06 0.00 0.06 51.00 0.06 0.00 0.06 Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 94 Summary for Link 2L: POI #2 Inflow Area = 1.688 ac, 4.62% Impervious, Inflow Depth = 1.97" for 25-Year event Inflow = 3.88 cfs @ 12.10 hrs, Volume= 0.278 of Primary = 3.88 cfs @ 12.10 hrs, Volume= 0.278 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 2L: POI #2 Hyd rog raph nflow -1— — — —�--1-7—T-1----1-7—T—T— --1-7—T-1----1-7—T—T— ----7—T— ❑P 3.88 cfs I I I I I I I I I I.} I Primary 4 3.88 cfs 11 IInflowA leiµO .IC 84Ii6 3 N 7—T_T—I__I_T—T_T_T_I__I_T_7_T_r_I__I_1_T_T_r—I--I--I-7—T- 0 2 LL I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 1124-hr 25-Year Rainfall=6.21" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 95 Hydrograph for Link 2L: POI #2 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 53.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 54.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 55.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 56.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 57.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 59.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 61.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 62.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 63.00 0.00 0.00 0.00 12.00 2.69 0.00 2.69 64.00 0.00 0.00 0.00 13.00 0.43 0.00 0.43 65.00 0.00 0.00 0.00 14.00 0.25 0.00 0.25 66.00 0.00 0.00 0.00 15.00 0.20 0.00 0.20 67.00 0.00 0.00 0.00 16.00 0.16 0.00 0.16 68.00 0.00 0.00 0.00 17.00 0.14 0.00 0.14 69.00 0.00 0.00 0.00 18.00 0.12 0.00 0.12 70.00 0.00 0.00 0.00 19.00 0.11 0.00 0.11 71.00 0.00 0.00 0.00 20.00 0.09 0.00 0.09 72.00 0.00 0.00 0.00 21.00 0.08 0.00 0.08 22.00 0.08 0.00 0.08 23.00 0.08 0.00 0.08 24.00 0.08 0.00 0.08 25.00 0.00 0.00 0.00 26.00 0.00 0.00 0.00 27.00 0.00 0.00 0.00 28.00 0.00 0.00 0.00 29.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 31.00 0.00 0.00 0.00 32.00 0.00 0.00 0.00 33.00 0.00 0.00 0.00 34.00 0.00 0.00 0.00 35.00 0.00 0.00 0.00 36.00 0.00 0.00 0.00 37.00 0.00 0.00 0.00 38.00 0.00 0.00 0.00 39.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 42.00 0.00 0.00 0.00 43.00 0.00 0.00 0.00 44.00 0.00 0.00 0.00 45.00 0.00 0.00 0.00 46.00 0.00 0.00 0.00 47.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 49.00 0.00 0.00 0.00 50.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 96 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: POI #1 Predevelopment Runoff Area=815,942 sf 6.70% Impervious Runoff Depth=2.63" Tc=24.4 min CN=60 Runoff=46.86 cfs 4.108 of Subcatchment2S: POI #2 Predevelopment Runoff Area=106,262 sf 0.00% Impervious Runoff Depth=2.15" Tc=18.3 min CN=55 Runoff=5.74 cfs 0.437 of Subcatchment3S: Post-Development Runoff Area=640,460 sf 8.40% Impervious Runoff Depth=2.73" Tc=24.4 min CN=61 Runoff=38.38 cfs 3.346 of Subcatchment4S: POI #2 Runoff Area=73,518 sf 4.62% Impervious Runoff Depth=2.53" Tc=16.7 min CN=59 Runoff=5.07 cfs 0.356 of Subcatchment5S: Culvert Runoff Area=601,822 sf 9.68% Impervious Runoff Depth=2.73" Tc=23.7 min CN=61 Runoff=36.68 cfs 3.144 of SubcatchmentDA#1: Post-Development Runoff Area=208,217 sf 53.03% Impervious Runoff Depth=4.84" Tc=5.0 min CN=81 Runoff=40.16 cfs 1.929 of Pond BMP-1: BMP#1 (Wet Pond) Peak Elev=624.25' Storage=36,990 cf Inflow=40.16 cfs 1.929 of Outflow=24.17 cfs 1.641 of Link 1L: POI #1 Inflow=50.47 cfs 4.987 of Primary=50.47 cfs 4.987 of Link 2L: POI #2 Inflow=5.07 cfs 0.356 of Primary=5.07 cfs 0.356 of Total Runoff Area = 56.158 ac Runoff Volume = 13.321 of Average Runoff Depth = 2.85" 88.53% Pervious = 49.717 ac 11.47% Impervious = 6.441 ac Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 97 Summary for Subcatchment 1S: POI #1 Predevelopment Runoff = 46.86 cfs @ 12.19 hrs, Volume= 4.108 af, Depth= 2.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Year Rainfall=7.04" Area (so CN Description 543,022 55 Woods, Good, HSG B 54,658 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 209,175 61 >75% Grass cover, Good, HSG B 815,942 60 Weighted Average 761,284 93.30% Pervious Area 54,658 6.70% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 1S: POI #1 Predevelopment Hydrograph -+-1--1--1-+-+-+-+-+-r-r-1--1--1--1--1--1-+-+-+-+-+-+-+-1--1--1-+-+-+-+-+-+-+-+- 52 1i -1r-----11-�1- - - - - - -----1i----J1- - - - - - -1r------J1-�1- - - - - -1r- Runoff 50 - -1--1--1- ,1 --r--I11----I11----11--�1 -- 1--+1---++r --11r-----I1i-----I11------111------111------111---+1---++1 ---++1 ---++1 --+r--+-------I1i------1i-----11i-- - -_+- 48 46.a cfs - - -r - - I +-+-r- _ 46 44 Type-H_464* 42 - -----I-� - - -r-r-r------------ - -+-50 YarRairtfar<flr �4. `�- 40 -1--1--1--1-J - - - r-- r--r -1--1--1--1--1-J- - --1 ------------------------04'I 38 - ---I--I- - - -r-r-r---------I--I- - = iff-A6&815'91;42:tf-- 36 -1--1--1--1--1 - - -'-'-'-1--1--1----1--I_ 34 -1r-1I----1i-y 32 J-I__I__I__I_ r7 7 l_771 �„ Hf w 4T1t $- - w3 30 ' 1 I1 I I1 r r l rIl -Il--Ili--I1i- I1i r r r r rrr rrrrr 28 Run, #D pth=2-r-3r" 26 r----------7-7-----r-r-r -r-r-r-r-r-r-r--rr - - 24� i I -__I__-_I C#24.4 1i1 _ LL22 r- -r-r-r r r-r-r-r-r-r-rr -I-r-r-r-r-r-r-r-r- 20 �I L--1----1--1-- 1-L-L 18 -r r -r-r-r--1---r1---1--1----1----I1--rL--rL--rL--r1--rL--rL--rL--1I--1I----I1I--rL-- --rL--r r- - 16 �i Il --LL_--I1_--_--I1_-_-I1--- _r_--rrI _--rrI _ LLI _--1LI _--LLI _--LLI _--LLI -I1I--I1I--I11I-LrrI-rrLI-rrLI-rrLI-rrI _-rLI _-rrI _--Lr 14 r-r-r-r r-I I--I -Ir-r-r-r-r-r-r- - r-r-rr 12 L-I-- L-L-L J i-r-LLI - _- - - - r-rr-rr-1--1--1--1--1--1-rL-rL-rL-rL-rL-rL-rL--r1---r1--I1-- --L-L-L-rr--rL--rr--r $ 1 I I I 4 L-1-- - 2 L- 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 h Time (hours) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 98 Hydrograph for Subcatchment 1S: POI #1 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.04 2.63 0.00 1.00 0.07 0.00 0.00 53.00 7.04 2.63 0.00 2.00 0.15 0.00 0.00 54.00 7.04 2.63 0.00 3.00 0.24 0.00 0.00 55.00 7.04 2.63 0.00 4.00 0.34 0.00 0.00 56.00 7.04 2.63 0.00 5.00 0.44 0.00 0.00 57.00 7.04 2.63 0.00 6.00 0.56 0.00 0.00 58.00 7.04 2.63 0.00 7.00 0.70 0.00 0.00 59.00 7.04 2.63 0.00 8.00 0.84 0.00 0.00 60.00 7.04 2.63 0.00 9.00 1.03 0.00 0.00 61.00 7.04 2.63 0.00 10.00 1.27 0.00 0.00 62.00 7.04 2.63 0.00 11.00 1.65 0.01 0.36 63.00 7.04 2.63 0.00 12.00 4.67 1.11 23.00 64.00 7.04 2.63 0.00 13.00 5.43 1.56 7.26 65.00 7.04 2.63 0.00 14.00 5.77 1.77 3.77 66.00 7.04 2.63 0.00 15.00 6.01 1.93 2.82 67.00 7.04 2.63 0.00 16.00 6.20 2.05 2.26 68.00 7.04 2.63 0.00 17.00 6.35 2.15 1.91 69.00 7.04 2.63 0.00 18.00 6.48 2.24 1.71 70.00 7.04 2.63 0.00 19.00 6.60 2.33 1.50 71.00 7.04 2.63 0.00 20.00 6.70 2.39 1.28 72.00 7.04 2.63 0.00 21.00 6.79 2.46 1.17 22.00 6.88 2.52 1.14 23.00 6.96 2.58 1.09 24.00 7.04 2.63 1.05 25.00 7.04 2.63 0.01 26.00 7.04 2.63 0.00 27.00 7.04 2.63 0.00 28.00 7.04 2.63 0.00 29.00 7.04 2.63 0.00 30.00 7.04 2.63 0.00 31.00 7.04 2.63 0.00 32.00 7.04 2.63 0.00 33.00 7.04 2.63 0.00 34.00 7.04 2.63 0.00 35.00 7.04 2.63 0.00 36.00 7.04 2.63 0.00 37.00 7.04 2.63 0.00 38.00 7.04 2.63 0.00 39.00 7.04 2.63 0.00 40.00 7.04 2.63 0.00 41.00 7.04 2.63 0.00 42.00 7.04 2.63 0.00 43.00 7.04 2.63 0.00 44.00 7.04 2.63 0.00 45.00 7.04 2.63 0.00 46.00 7.04 2.63 0.00 47.00 7.04 2.63 0.00 48.00 7.04 2.63 0.00 49.00 7.04 2.63 0.00 50.00 7.04 2.63 0.00 51.00 7.04 2.63 0.00 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 99 Summary for Subcatchment 2S: POI #2 Predevelopment Runoff = 5.74 cfs @ 12.12 hrs, Volume= 0.437 af, Depth= 2.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Year Rainfall=7.04" Area (so CN Description 106,262 55 Woods, Good, HSG B 106,262 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 Direct Entry, Subcatchment 2S: POI #2 Predevelopment Hydrograph -I__I__I__I_-I-I_ I-- I-- I--I__I__I__I__I_-I-I_�_ I-- I--I__I__I__I__I_-I-I_�_ I-- I--I__I__I__I__I__I_ ■Runoff 6 1 5.74 cfs (Type IIIII ------II- - ---------------II- - -50Y"r�IIRaInf-a11#7.0-4" s IIII IIII IIIII IIIII RUh6ff Arella=106�262 isf 4 PL#jjo!ffIIlVOft;Mq=OA$j Of N I I I I I I I I I I I I I I I I I I I I I I I I I - w I Rullnlloff- ID�epft=2 1.5"III I I I I III I - -------------------------- 3 lTC"F-18.3Min -II--II--II--II- - ICI - lII-- lII--III--II--II--II--II--III-'ll-'ll - ICI - lII--III--II--II--II--II--III-'ll-'ll - ICI 2 1 IIII III IIIII IIIII IIIIIIIIIIIIIII 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 5860 62 6466 6870 72 Time (hours) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 100 Hydrograph for Subcatchment 2S: POI #2 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.04 2.15 0.00 1.00 0.07 0.00 0.00 53.00 7.04 2.15 0.00 2.00 0.15 0.00 0.00 54.00 7.04 2.15 0.00 3.00 0.24 0.00 0.00 55.00 7.04 2.15 0.00 4.00 0.34 0.00 0.00 56.00 7.04 2.15 0.00 5.00 0.44 0.00 0.00 57.00 7.04 2.15 0.00 6.00 0.56 0.00 0.00 58.00 7.04 2.15 0.00 7.00 0.70 0.00 0.00 59.00 7.04 2.15 0.00 8.00 0.84 0.00 0.00 60.00 7.04 2.15 0.00 9.00 1.03 0.00 0.00 61.00 7.04 2.15 0.00 10.00 1.27 0.00 0.00 62.00 7.04 2.15 0.00 11.00 1.65 0.00 0.00 63.00 7.04 2.15 0.00 12.00 4.67 0.82 3.60 64.00 7.04 2.15 0.00 13.00 5.43 1.20 0.70 65.00 7.04 2.15 0.00 14.00 5.77 1.39 0.41 66.00 7.04 2.15 0.00 15.00 6.01 1.52 0.32 67.00 7.04 2.15 0.00 16.00 6.20 1.63 0.25 68.00 7.04 2.15 0.00 17.00 6.35 1.72 0.22 69.00 7.04 2.15 0.00 18.00 6.48 1.80 0.20 70.00 7.04 2.15 0.00 19.00 6.60 1.88 0.17 71.00 7.04 2.15 0.00 20.00 6.70 1.94 0.15 72.00 7.04 2.15 0.00 21.00 6.79 1.99 0.14 22.00 6.88 2.05 0.13 23.00 6.96 2.10 0.13 24.00 7.04 2.15 0.12 25.00 7.04 2.15 0.00 26.00 7.04 2.15 0.00 27.00 7.04 2.15 0.00 28.00 7.04 2.15 0.00 29.00 7.04 2.15 0.00 30.00 7.04 2.15 0.00 31.00 7.04 2.15 0.00 32.00 7.04 2.15 0.00 33.00 7.04 2.15 0.00 34.00 7.04 2.15 0.00 35.00 7.04 2.15 0.00 36.00 7.04 2.15 0.00 37.00 7.04 2.15 0.00 38.00 7.04 2.15 0.00 39.00 7.04 2.15 0.00 40.00 7.04 2.15 0.00 41.00 7.04 2.15 0.00 42.00 7.04 2.15 0.00 43.00 7.04 2.15 0.00 44.00 7.04 2.15 0.00 45.00 7.04 2.15 0.00 46.00 7.04 2.15 0.00 47.00 7.04 2.15 0.00 48.00 7.04 2.15 0.00 49.00 7.04 2.15 0.00 50.00 7.04 2.15 0.00 51.00 7.04 2.15 0.00 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 101 Summary for Subcatchment 3S: Post-Development ByPass POI #1 Runoff = 38.38 cfs @ 12.19 hrs, Volume= 3.346 af, Depth= 2.73" Routed to Link 1 L : POI #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Year Rainfall=7.04" Area (so CN Description 406,538 55 Woods, Good, HSG B 53,797 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 171,038 61 >75% Grass cover, Good, HSG B 640,460 61 Weighted Average 586,663 91.60% Pervious Area 53,797 8.40% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 3S: Post-Development ByPass POI #1 Hydrograph 42 - -1--1----- - - - - - - - -1--1--1--1- - - - - - - -1--1--1--1--1- - - - -i-i- �RUnoff 40 j _L_1 _1_ 38.38 cfs 1-1_L_L_L_1__L_I__1__1__1_1_1_1_1_L_L_L_L_I__I_J_J_®®1_-1 L_L_L_L_ 38 -+-1--1--1-+ -+-+-+-+-+-1--1--1--1--1--1-+-+-+-+-+-+-+-1--1--I� MY 1'1� , 1 r , I 36 -r-r-1--1-r -r-r-r-r-r-r-r-1--1--1--1-r-r-r-r-r-r-r-r-1--1-r-{'fir-r-,r`-r-r-r-r- 34 -II-11------11 - - -T- -T- - -----II--II- - - -0- Year � alT fa[ .0�,�I - 32 _1__1_ ---------- I 30 1 I I I I I I I I I I I I I I I I b"ffA�6&64014'1 0-!0- -1----1--1--1 ---1_L_L_L �y 26ry -+-1--1--1-+ -+-+-+-+-+-1--1--1--1--1--1-+-+-+ w 24 1 -II-11--11--11-JI -�I- 1I- Ii- Ii -111I -I1I II1I _11I -_i111I -_T11I -_T11I 11I 1I- --Ru 1111I--11I 111II �J1c�1 1 =1r1.-4 L1 -.r11/ 71rf-��I1- - - - 22 -------- LL -1--1-_ -------- 200 --------- 18 - -1--1--1- - - - - -1--1--1--1--1--1- - - - - - - -1--1--1- - - - - - - - - � 1 A 16 ' 1 -+-1--1--1-+ +-+-+-+-+-1--1--1--1--1--1-+-+-+-+-r-r-+-1--1--1-+-+-+- - � l+- 14 -Ir-1--1--1- 7-7-r-r-r-1--1--1--1--1--1-7-7-1-T-r-r-Ir-1--1---1-1-7-7-r-r-r-Ir- 12L 11__1_ _I_ -I--I--1101--1--1- 111111 - - - - - -864 ----11-- - - -r-11--11--11--11--11--11-7-7-1-T-1-1-Ir-11--11--11-1-1-7-7-T-r-r-I r- 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 102 Hydrograph for Subcatchment 3S: Post-Development ByPass POI #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.04 2.73 0.00 1.00 0.07 0.00 0.00 53.00 7.04 2.73 0.00 2.00 0.15 0.00 0.00 54.00 7.04 2.73 0.00 3.00 0.24 0.00 0.00 55.00 7.04 2.73 0.00 4.00 0.34 0.00 0.00 56.00 7.04 2.73 0.00 5.00 0.44 0.00 0.00 57.00 7.04 2.73 0.00 6.00 0.56 0.00 0.00 58.00 7.04 2.73 0.00 7.00 0.70 0.00 0.00 59.00 7.04 2.73 0.00 8.00 0.84 0.00 0.00 60.00 7.04 2.73 0.00 9.00 1.03 0.00 0.00 61.00 7.04 2.73 0.00 10.00 1.27 0.00 0.00 62.00 7.04 2.73 0.00 11.00 1.65 0.02 0.38 63.00 7.04 2.73 0.00 12.00 4.67 1.17 19.13 64.00 7.04 2.73 0.00 13.00 5.43 1.64 5.86 65.00 7.04 2.73 0.00 14.00 5.77 1.86 3.03 66.00 7.04 2.73 0.00 15.00 6.01 2.01 2.26 67.00 7.04 2.73 0.00 16.00 6.20 2.14 1.81 68.00 7.04 2.73 0.00 17.00 6.35 2.24 1.54 69.00 7.04 2.73 0.00 18.00 6.48 2.34 1.37 70.00 7.04 2.73 0.00 19.00 6.60 2.42 1.20 71.00 7.04 2.73 0.00 20.00 6.70 2.49 1.03 72.00 7.04 2.73 0.00 21.00 6.79 2.55 0.94 22.00 6.88 2.61 0.91 23.00 6.96 2.67 0.88 24.00 7.04 2.73 0.84 25.00 7.04 2.73 0.01 26.00 7.04 2.73 0.00 27.00 7.04 2.73 0.00 28.00 7.04 2.73 0.00 29.00 7.04 2.73 0.00 30.00 7.04 2.73 0.00 31.00 7.04 2.73 0.00 32.00 7.04 2.73 0.00 33.00 7.04 2.73 0.00 34.00 7.04 2.73 0.00 35.00 7.04 2.73 0.00 36.00 7.04 2.73 0.00 37.00 7.04 2.73 0.00 38.00 7.04 2.73 0.00 39.00 7.04 2.73 0.00 40.00 7.04 2.73 0.00 41.00 7.04 2.73 0.00 42.00 7.04 2.73 0.00 43.00 7.04 2.73 0.00 44.00 7.04 2.73 0.00 45.00 7.04 2.73 0.00 46.00 7.04 2.73 0.00 47.00 7.04 2.73 0.00 48.00 7.04 2.73 0.00 49.00 7.04 2.73 0.00 50.00 7.04 2.73 0.00 51.00 7.04 2.73 0.00 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 103 Summary for Subcatchment 4S: POI #2 Post-Development Runoff = 5.07 cfs @ 12.10 hrs, Volume= 0.356 af, Depth= 2.53" Routed to Link 2L : POI #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Year Rainfall=7.04" Area (so CN Description 42,969 55 Woods, Good, HSG B 3,396 98 Greenway 27,153 61 >75% Grass cover, Good, HSG B 73,518 59 Weighted Average 70,122 95.38% Pervious Area 3,396 4.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.7 Direct Entry, Subcatchment 4S: POI #2 Post-Development Hydrograph II II II I I I II II II II II II II II II II II II II II II II II II II II II II II II II II II II II ■Runoff 5.07 cfs _1_1_L 5 Type ll 24-hrr 50 Year IIIIIRainfall;=7.04" -L-I--I-J- -1-1-L-L-L-I--I--I-J-�-1-L-L-L-L-I--I--I-J-�-1-L-�-L-L-I--I--I-J- 4 Rdhoff ,Aee,a=713#5';18 isf R000�fIIlVrollL#n, OO O1 350 f 3 Ru11nl1off IIDlepth=2.153�, 3 II II II II II II II II II II II II II II II II II II II II II II II II I LL TIC"'16.7 Miry 2 —r—I——I—r-- T—T—r—r—r------r—r—T—T—r—r—r—I——I——I—r—r—T—T—T—r—r—I--I——I—r- 1 11 11 11 11 111 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 104 Hydrograph for Subcatchment 4S: POI #2 Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.04 2.53 0.00 1.00 0.07 0.00 0.00 53.00 7.04 2.53 0.00 2.00 0.15 0.00 0.00 54.00 7.04 2.53 0.00 3.00 0.24 0.00 0.00 55.00 7.04 2.53 0.00 4.00 0.34 0.00 0.00 56.00 7.04 2.53 0.00 5.00 0.44 0.00 0.00 57.00 7.04 2.53 0.00 6.00 0.56 0.00 0.00 58.00 7.04 2.53 0.00 7.00 0.70 0.00 0.00 59.00 7.04 2.53 0.00 8.00 0.84 0.00 0.00 60.00 7.04 2.53 0.00 9.00 1.03 0.00 0.00 61.00 7.04 2.53 0.00 10.00 1.27 0.00 0.00 62.00 7.04 2.53 0.00 11.00 1.65 0.01 0.03 63.00 7.04 2.53 0.00 12.00 4.67 1.05 3.64 64.00 7.04 2.53 0.00 13.00 5.43 1.49 0.53 65.00 7.04 2.53 0.00 14.00 5.77 1.70 0.31 66.00 7.04 2.53 0.00 15.00 6.01 1.84 0.24 67.00 7.04 2.53 0.00 16.00 6.20 1.96 0.19 68.00 7.04 2.53 0.00 17.00 6.35 2.06 0.17 69.00 7.04 2.53 0.00 18.00 6.48 2.15 0.15 70.00 7.04 2.53 0.00 19.00 6.60 2.23 0.13 71.00 7.04 2.53 0.00 20.00 6.70 2.30 0.11 72.00 7.04 2.53 0.00 21.00 6.79 2.36 0.10 22.00 6.88 2.42 0.10 23.00 6.96 2.48 0.10 24.00 7.04 2.53 0.09 25.00 7.04 2.53 0.00 26.00 7.04 2.53 0.00 27.00 7.04 2.53 0.00 28.00 7.04 2.53 0.00 29.00 7.04 2.53 0.00 30.00 7.04 2.53 0.00 31.00 7.04 2.53 0.00 32.00 7.04 2.53 0.00 33.00 7.04 2.53 0.00 34.00 7.04 2.53 0.00 35.00 7.04 2.53 0.00 36.00 7.04 2.53 0.00 37.00 7.04 2.53 0.00 38.00 7.04 2.53 0.00 39.00 7.04 2.53 0.00 40.00 7.04 2.53 0.00 41.00 7.04 2.53 0.00 42.00 7.04 2.53 0.00 43.00 7.04 2.53 0.00 44.00 7.04 2.53 0.00 45.00 7.04 2.53 0.00 46.00 7.04 2.53 0.00 47.00 7.04 2.53 0.00 48.00 7.04 2.53 0.00 49.00 7.04 2.53 0.00 50.00 7.04 2.53 0.00 51.00 7.04 2.53 0.00 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 105 Summary for Subcatchment 5S: Culvert Post-Development Runoff = 36.68 cfs @ 12.18 hrs, Volume= 3.144 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Year Rainfall=7.04" Area (so CN Description 359,379 55 Woods, Good, HSG B 58,277 98 Paved parking, HSG B 9,087 79 Pasture/grassland/range, Poor, HSG B 175,079 61 >75% Grass cover, Good, HSG B 601,822 61 Weighted Average 543,545 90.32% Pervious Area 58,277 9.68% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.7 Direct Entry, Subcatchment 5S: Culvert Post-Development Hydrograph — T------T—T—T—T—T—T—T—I—I--------T—T—T—T—r—T—T------T—T—T—T—T—T—T—T- 40 1 Runoff 1-T-r-r-r-i_i r r 1- 1-T-T-T-T-r-r-T-r-r 1-T-T-T-T-r-r-r-T- 38 1 — —I——I— 36.68 cfs 36 , 1 -I I I I I I 1 1 1 - ----1--- - - - - - -------I--I- ---i-iI I I IT M1 34 -L-1--1--1-J - -1-1-L-L-1--1--1--1--1--1-1-1-i-1-L-L-L-1--1--1-J- - - -i-i-L-+- 32 -1�-----11-J - - -1-L-L---11 11 11 11 11.1._L 50 Year_IIFainfaW--7 04"L- , IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIII 30 -I I——I--I-� - - - - -I I 1--1--1--1-- -�-RbilbffA-te1 &01'8 2-iSf IIIIII IIIIIIIIIIIII 1 28 -+-1--1--1-+ -+-+-+-+-+-1--1--1--1--1--1-+-+-+-+-+-+-+-1--1--1-+-I-+q- 26 -1r-1i--1--1i-y - -rt-+-r-r-lr-lr-lr-li--1i--1-rt-t- a#ftl =3t1�44 24 1 1 ' -T-f Y F"I N —T—I--I--I—T —T—T—T—T—T—I—I—I--I--I— I_7_7_T_T_rppr_r_III_^T_T_T*_7_Tn_rn_r_r_ 22 -T-1--1--1-T -T-T-T-T-T- r-1--1--1-T-T-T-T-,Run4�f 1Q@pth;=2.,7-3", 020 1 -1_-11--11--11--1 _— — — 1_- 1_-1_-1_-1_-11--1--1 11- 1— I — I — I -11 -11 -11 —I--I--I a 18 1 -1--1--1--1--1 - ------ _1--1--1--1--1--1-i_ 16 _1__1__1 _1__1__1__1__1 _1_ _L-I--1 14 -L-1--1--1-J 1-1-i-i-L-1--1--1--1--1--1-1-1-1-1-L-L-L-1--1--1-J-J-1-1- -i- -L- , 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 12 - -1--1--1- - - -r-r-1--1--1--1--1--1- - - - -r-r-L-1--1--1- - - - - -r-r-L- 10 - -1--1--1- - - -r-r-1--1--1--1--1--1- - - - -r-r- -1--1--1- - - - - -r-r- - � 1 8 -r-1--1--1- �-t-+-t-r-r-r-r-1--1--1-t-t-+-+-r-r-r-1--1--1-t-t-�-t-+-t-r-r- ' 1 6 —t------ —t—t—t—t---I--1--1-----t—t—Y—t—Y—t—t------t—t— —t—t—t—t—t— � I 4 1 1 1 1 1 1 1 1 1 1 1 T-1--1- 1- r-r-r_i_i r 1- 1- 1-T-T-T-T-r-r-T-1--1- 1-T-T-T-T-r-r-r-T- 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 106 Hydrograph for Subcatchment 5S: Culvert Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.04 2.73 0.00 1.00 0.07 0.00 0.00 53.00 7.04 2.73 0.00 2.00 0.15 0.00 0.00 54.00 7.04 2.73 0.00 3.00 0.24 0.00 0.00 55.00 7.04 2.73 0.00 4.00 0.34 0.00 0.00 56.00 7.04 2.73 0.00 5.00 0.44 0.00 0.00 57.00 7.04 2.73 0.00 6.00 0.56 0.00 0.00 58.00 7.04 2.73 0.00 7.00 0.70 0.00 0.00 59.00 7.04 2.73 0.00 8.00 0.84 0.00 0.00 60.00 7.04 2.73 0.00 9.00 1.03 0.00 0.00 61.00 7.04 2.73 0.00 10.00 1.27 0.00 0.00 62.00 7.04 2.73 0.00 11.00 1.65 0.02 0.37 63.00 7.04 2.73 0.00 12.00 4.67 1.17 18.97 64.00 7.04 2.73 0.00 13.00 5.43 1.64 5.39 65.00 7.04 2.73 0.00 14.00 5.77 1.86 2.83 66.00 7.04 2.73 0.00 15.00 6.01 2.01 2.12 67.00 7.04 2.73 0.00 16.00 6.20 2.14 1.70 68.00 7.04 2.73 0.00 17.00 6.35 2.24 1.44 69.00 7.04 2.73 0.00 18.00 6.48 2.34 1.29 70.00 7.04 2.73 0.00 19.00 6.60 2.42 1.13 71.00 7.04 2.73 0.00 20.00 6.70 2.49 0.96 72.00 7.04 2.73 0.00 21.00 6.79 2.55 0.88 22.00 6.88 2.61 0.85 23.00 6.96 2.67 0.82 24.00 7.04 2.73 0.79 25.00 7.04 2.73 0.01 26.00 7.04 2.73 0.00 27.00 7.04 2.73 0.00 28.00 7.04 2.73 0.00 29.00 7.04 2.73 0.00 30.00 7.04 2.73 0.00 31.00 7.04 2.73 0.00 32.00 7.04 2.73 0.00 33.00 7.04 2.73 0.00 34.00 7.04 2.73 0.00 35.00 7.04 2.73 0.00 36.00 7.04 2.73 0.00 37.00 7.04 2.73 0.00 38.00 7.04 2.73 0.00 39.00 7.04 2.73 0.00 40.00 7.04 2.73 0.00 41.00 7.04 2.73 0.00 42.00 7.04 2.73 0.00 43.00 7.04 2.73 0.00 44.00 7.04 2.73 0.00 45.00 7.04 2.73 0.00 46.00 7.04 2.73 0.00 47.00 7.04 2.73 0.00 48.00 7.04 2.73 0.00 49.00 7.04 2.73 0.00 50.00 7.04 2.73 0.00 51.00 7.04 2.73 0.00 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 107 Summary for Subcatchment DA #1: Post-Development Pond #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 40.16 cfs @ 11.95 hrs, Volume= 1.929 af, Depth= 4.84" Routed to Pond BMP-1 : BMP#1 (Wet Pond) Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 50 Year Rainfall=7.04" Area (so CN Description 15,333 98 Sidewalk 38,202 98 Lots (Building, walkway, patios) 14,549 98 Driveways 42,297 98 Roadway 44 98 CBU Pads 97,792 61 >75% Grass cover, Good, HSG B 208,217 81 Weighted Average 97,792 46.97% Pervious Area 110,425 53.03% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA #1: Post-Development Pond #1 Hydrograph 44 Runoff 42 - ———— 40.16 cfs 40 -Ir-----I—r — —7—r—r—r------------r—T—r—r—r—r—r---I--I 38 I iI I I I I I I i i I Ii i—II--II--IITYI PIY I—AI—ZI AI I r 36 - 1- -i- - - — I I I -50 Y-ea-rRA1nftl1r--.7.04"II — 34 -r-I--I--I- -+-+—+—+—r-r-r-r------_t t--+`-.yr,-�r-r-II-�-I--I-+-y-� -I-+-+�-r- /` j 32 -Ir-----Ii- - - -r-r-r-Ii-Ii-------Ii- -7- RUffl7ff- tt&:208v 2 A f* i5f- 30 -----I--I- - - ----- -----------I--I--I - ------I- -----I-J- ----- - - w 26 -r---I--I- -r-r-r-r-r-r-r-r------r-r-r-r-r-r-r---I--I r\J/-�r�-r[��rt��-r-r-r-r- u 24 ' I I I I I I I I - I I I I I I I I I I I I I th 4.847 _- , I I I I I I I I I I I I I I I I I I I 1 -,-Run, ep -+---I--I- -1-1-i-i-L-1--1--1--1--1--1-1-1-i-1-L-L-L-1--1--1-J-J-1-1-i-L-L-+- 20 _' ---I--I- - -1-1- - -I I I I I I-1-1-1-1- - -' -'I 'I II-,TJcT5.O-eniin-- LL 18 -r-r-I--I- -r-r-r-r-r-r-r-I--I--I--I-r-r-r-r-r-r-r-r-I--I-r-r-r- r- r- 16 ,I I 14 -L---I--I- - -1-i-L-L-1--1--1--1--1--1-s-1-1-L-L- -L------J-J- -1-i-L-L-L- ,I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 12 -+---I--I- -+-+-+-+-+------------+-+-+-+-r-r-+------+-+-+-+-+-+-+-+- ' I 10 -I,-----II- - - - - -I -I,-I,-------- - - - - -I,-I,---------- - - - -I -I,- 8 , 6 -L---I--I- -1-1-i-i-L-1--1--1--1--1--1-1-1-1-1-L- - -1--1--1-J-J-1-1-i-i-L- - 4 -r---I--I- -+-+-+-r-r-r-r------+-+-+-+-r-r-r------+-+-+-+-+-+-r-r- 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 61870 72 Time (hours) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 108 Hydrograph for Subcatchment DA #1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.04 4.84 0.00 1.00 0.07 0.00 0.00 53.00 7.04 4.84 0.00 2.00 0.15 0.00 0.00 54.00 7.04 4.84 0.00 3.00 0.24 0.00 0.00 55.00 7.04 4.84 0.00 4.00 0.34 0.00 0.00 56.00 7.04 4.84 0.00 5.00 0.44 0.00 0.00 57.00 7.04 4.84 0.00 6.00 0.56 0.00 0.04 58.00 7.04 4.84 0.00 7.00 0.70 0.02 0.11 59.00 7.04 4.84 0.00 8.00 0.84 0.05 0.19 60.00 7.04 4.84 0.00 9.00 1.03 0.11 0.36 61.00 7.04 4.84 0.00 10.00 1.27 0.21 0.58 62.00 7.04 4.84 0.00 11.00 1.65 0.40 1.28 63.00 7.04 4.84 0.00 12.00 4.67 2.69 34.27 64.00 7.04 4.84 0.00 13.00 5.43 3.37 1.98 65.00 7.04 4.84 0.00 14.00 5.77 3.68 1.18 66.00 7.04 4.84 0.00 15.00 6.01 3.89 0.94 67.00 7.04 4.84 0.00 16.00 6.20 4.06 0.73 68.00 7.04 4.84 0.00 17.00 6.35 4.20 0.64 69.00 7.04 4.84 0.00 18.00 6.48 4.33 0.57 70.00 7.04 4.84 0.00 19.00 6.60 4.44 0.49 71.00 7.04 4.84 0.00 20.00 6.70 4.53 0.41 72.00 7.04 4.84 0.00 21.00 6.79 4.61 0.39 22.00 6.88 4.69 0.38 23.00 6.96 4.77 0.36 24.00 7.04 4.84 0.35 25.00 7.04 4.84 0.00 26.00 7.04 4.84 0.00 27.00 7.04 4.84 0.00 28.00 7.04 4.84 0.00 29.00 7.04 4.84 0.00 30.00 7.04 4.84 0.00 31.00 7.04 4.84 0.00 32.00 7.04 4.84 0.00 33.00 7.04 4.84 0.00 34.00 7.04 4.84 0.00 35.00 7.04 4.84 0.00 36.00 7.04 4.84 0.00 37.00 7.04 4.84 0.00 38.00 7.04 4.84 0.00 39.00 7.04 4.84 0.00 40.00 7.04 4.84 0.00 41.00 7.04 4.84 0.00 42.00 7.04 4.84 0.00 43.00 7.04 4.84 0.00 44.00 7.04 4.84 0.00 45.00 7.04 4.84 0.00 46.00 7.04 4.84 0.00 47.00 7.04 4.84 0.00 48.00 7.04 4.84 0.00 49.00 7.04 4.84 0.00 50.00 7.04 4.84 0.00 51.00 7.04 4.84 0.00 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 109 Summary for Pond BMP-1: BMP #1 (Wet Pond) Inflow Area = 4.780 ac, 53.03% Impervious, Inflow Depth = 4.84" for 50 Year event Inflow = 40.16 cfs @ 11.95 hrs, Volume= 1.929 of Outflow = 24.17 cfs @ 12.05 hrs, Volume= 1.641 af, Atten= 40%, Lag= 5.7 min Primary = 24.17 cfs @ 12.05 hrs, Volume= 1.641 of Routed to Link 1 L : POI #1 Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 624.25'@ 12.05 hrs Surf.Area= 8,582 sf Storage= 36,990 cf Plug-Flow detention time=431.3 min calculated for 1.640 of(85% of inflow) Center-of-Mass det. time= 365.3 min ( 1,166.6 - 801.3 ) Volume Invert Avail.Storage Storage Description #1 619.00' 43,609 cf Custom Stage Data (Prismatic)-isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 619.00 4,938 0 0 619.50 5,764 2,676 2,676 620.00 6,208 2,993 5,669 621.00 6,742 6,475 12,144 622.00 7,291 7,017 19,160 623.00 7,855 7,573 26,733 624.00 8,434 8,145 34,878 625.00 9,029 8,732 43,609 Device Routing Invert Outlet Devices #1 Primary 618.34' 30.0" Round Culvert L= 67.7' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 618.34'/618.00' S= 0.0050 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes& inlets, Flow Area= 4.91 sf #2 Device 1 619.00' 1.2"Vert. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 622.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.50 Width (feet) 2.00 2.00 #4 Device 1 624.00' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=23.93 cfs @ 12.05 hrs HW=624.25' (Free Discharge) L1=Culvert (Passes 23.93 cfs of 51.00 cfs potential flow) 2=WQ Orifice (Orifice Controls 0.09 cfs @ 10.97 fps) 3=Custom Weir/Orifice (Orifice Controls 14.31 cfs @ 4.77 fps) 4=Orifice/Grate (Weir Controls 9.53 cfs @ 1.62 fps) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 110 Pond BMP-1: BMP #1 (Wet Pond) Hyd rog raph -'--'- - -1-L-1--1--1-J-L-L-L-1--1-J-L-L-L---'--'- -L-L------J-L-L-L-L-'--'- ■Inflow 44 --- — Primary_r_i__i_r� i _7_ i r_r_r_i__i_ ry 11 7180,4 1-- 40 38 -i--i-�-�- -r-i--i-�-r-r-r-r-i-r-�-r-r-i- i �-rr�r 1r � ri- 34 ---- - - ------ - -+- ---- - -+- ------ -+- ------ ��++ -+- - ---- 32 ---- - - - ----T-T-r------ - -r-r---I �� �7 30 - 28 ---- - - ------ - -+- ---- - -+- ------ -+- ------ - -+- - ---- W 26 —i--,— 24.17 cfs —i---- —r—r—r---- —r—r—r—----- —r—r—i---- —r—r—r—r—i--i- 24 ------ ------------------------------------------------------ 3 22 ---- - ------ - -+- ---- - -+- ------ -+- ------ - -+- - ---- E20 —I--I—r— —I----I—r—T—r—r---I—r—r—r—r—I----I—r—r—r—I-----r—T—r—r—r---I- 18 16 -i--,- - ---i--i- - -+- -i--i- - -+- ---i--i- -+- ---i--i- - -+- - -,--i- 14 -, i- - -r-r -r-r - - -r -r-r-r 12 10- 8 -i--i- - -i----T-T-T-T----T-T-T-T------T-T-T-i-i--i- -T-T-T-T-i--,- 6 -L- --1--1-J-1-L-L-1--1-J-L-L-L-'-----L-L-L------J-L-L-L-L-'--'- 4 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Pond BMP-1: BMP #1 (Wet Pond) Stage-Discharge 625 ❑Primary Orifice/Grate ------------ -L----- 624 -- --r r + - ---- -+ 623 Custom Weir/Orifice w 0 622 w - ----r----- ----- ------ ---,- - ----- 621 620 WQ Orifice 619 0 5 10 15 20 25 30 35 40 45 50 Discharge (cfs) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 111 Pond BMP-1: BMP #1 (Wet Pond) Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-fi) 0 500 1,000 1,500 2,000 2,5003,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,0008,500 9,000 Surface ■Storage 625 - --'--- II-------' -- ------ --- ----- -------- - ---'--I- -I I --- I 624 ------�-------+--+---+--+---��----- -I--�- -+-+-----I-+- +-+-I--- 623 w VI u I II I I I I I I I I I I I I I I I I I 0 622 > II I I I I I ---I---�'---I----IL--i -J--1---LL--1---1-1--L---1-i-1 -I--I- i-i-I--- w I u I II I I I I I I I I I I I I I I I I I I I w 621 ------�- r- --Ir--+---I-------rr-----rt---r---I -t---r--y---+-t-I--- 620 Custom Stage Data 619 0 5,000 10,000 15,000 20,000 25,600 30,000 35,000 40,000 Storage(cubic-feet) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 112 Hydrograph for Pond BMP-1: BMP #1 (Wet Pond) Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 619.00 0.00 2.50 0.00 0 619.00 0.00 5.00 0.00 0 619.00 0.00 7.50 0.15 529 619.11 0.01 10.00 0.58 3,224 619.59 0.03 12.50 3.15 29,891 623.40 5.64 15.00 0.94 25,018 622.78 1.04 17.50 0.61 24,375 622.70 0.65 20.00 0.41 24,022 622.65 0.46 22.50 0.37 23,858 622.63 0.38 25.00 0.00 23,134 622.53 0.12 27.50 0.00 22,445 622.44 0.07 30.00 0.00 21,822 622.36 0.07 32.50 0.00 21,207 622.28 0.07 35.00 0.00 20,599 622.20 0.07 37.50 0.00 19,999 622.11 0.07 40.00 0.00 19,407 622.03 0.07 42.50 0.00 18,823 621.95 0.06 45.00 0.00 18,248 621.87 0.06 47.50 0.00 17,680 621.80 0.06 50.00 0.00 17,120 621.72 0.06 52.50 0.00 16,568 621.64 0.06 55.00 0.00 16,024 621.56 0.06 57.50 0.00 15,489 621.49 0.06 60.00 0.00 14,962 621.41 0.06 62.50 0.00 14,443 621.34 0.06 65.00 0.00 13,933 621.26 0.06 67.50 0.00 13,431 621.19 0.06 70.00 0.00 12,937 621.12 0.05 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 113 Stage-Discharge for Pond BMP-1: BMP #1 (Wet Pond) Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 619.00 0.00 621.60 0.06 624.20 21.04 619.05 0.00 621.65 0.06 624.25 24.24 619.10 0.01 621.70 0.06 624.30 27.72 619.15 0.01 621.75 0.06 624.35 31.46 619.20 0.01 621.80 0.06 624.40 35.44 619.25 0.02 621.85 0.06 624.45 39.64 619.30 0.02 621.90 0.06 624.50 44.05 619.35 0.02 621.95 0.06 624.55 48.65 619.40 0.02 622.00 0.06 624.60 52.90 619.45 0.02 622.05 0.07 624.65 53.17 619.50 0.03 622.10 0.07 624.70 53.43 619.55 0.03 622.15 0.07 624.75 53.69 619.60 0.03 622.20 0.07 624.80 53.95 619.65 0.03 622.25 0.07 624.85 54.21 619.70 0.03 622.30 0.07 624.90 54.46 619.75 0.03 622.35 0.07 624.95 54.72 619.80 0.03 622.40 0.07 625.00 54.97 619.85 0.03 622.45 0.07 619.90 0.03 622.50 0.07 619.95 0.04 622.55 0.14 620.00 0.04 622.60 0.28 620.05 0.04 622.65 0.45 620.10 0.04 622.70 0.66 620.15 0.04 622.75 0.89 620.20 0.04 622.80 1.15 620.25 0.04 622.85 1.43 620.30 0.04 622.90 1.73 620.35 0.04 622.95 2.05 620.40 0.04 623.00 2.39 620.45 0.04 623.05 2.75 620.50 0.05 623.10 3.12 620.55 0.05 623.15 3.51 620.60 0.05 623.20 3.91 620.65 0.05 623.25 4.33 620.70 0.05 623.30 4.76 620.75 0.05 623.35 5.21 620.80 0.05 623.40 5.67 620.85 0.05 623.45 6.14 620.90 0.05 623.50 6.63 620.95 0.05 623.55 7.13 621.00 0.05 623.60 7.64 621.05 0.05 623.65 8.16 621.10 0.05 623.70 8.69 621.15 0.05 623.75 9.24 621.20 0.06 623.80 9.79 621.25 0.06 623.85 10.36 621.30 0.06 623.90 10.93 621.35 0.06 623.95 11.52 621.40 0.06 624.00 12.12 621.45 0.06 624.05 13.53 621.50 0.06 624.10 15.62 621.55 0.06 624.15 18.15 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 114 Stage-Area-Storage for Pond BMP-1: BMP #1 (Wet Pond) Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 619.00 4,938 0 624.20 8,553 36,576 619.10 5,103 502 624.30 8,612 37,434 619.20 5,268 1,021 624.40 8,672 38,299 619.30 5,434 1,556 624.50 8,732 39,169 619.40 5,599 2,107 624.60 8,791 40,045 619.50 5,764 2,676 624.70 8,851 40,927 619.60 5,853 3,256 624.80 8,910 41,815 619.70 5,942 3,846 624.90 8,969 42,709 619.80 6,030 4,445 625.00 9,029 43,609 619.90 6,119 5,052 620.00 6,208 5,669 620.10 6,261 6,292 620.20 6,315 6,921 620.30 6,368 7,555 620.40 6,422 8,194 620.50 6,475 8,839 620.60 6,528 9,489 620.70 6,582 10,145 620.80 6,635 10,806 620.90 6,689 11,472 621.00 6,742 12,144 621.10 6,797 12,820 621.20 6,852 13,503 621.30 6,907 14,191 621.40 6,962 14,884 621.50 7,017 15,583 621.60 7,071 16,288 621.70 7,126 16,997 621.80 7,181 17,713 621.90 7,236 18,434 622.00 7,291 19,160 622.10 7,347 19,892 622.20 7,404 20,629 622.30 7,460 21,373 622.40 7,517 22,122 622.50 7,573 22,876 622.60 7,629 23,636 622.70 7,686 24,402 622.80 7,742 25,173 622.90 7,799 25,950 623.00 7,855 26,733 623.10 7,913 27,521 623.20 7,971 28,316 623.30 8,029 29,116 623.40 8,087 29,921 623.50 8,145 30,733 623.60 8,202 31,550 623.70 8,260 32,373 623.80 8,318 33,202 623.90 8,376 34,037 624.00 8,434 34,878 624.10 8,494 35,724 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 115 Summary for Link 1 L: POI #1 Inflow Area = 19.483 ac, 19.35% Impervious, Inflow Depth > 3.07" for 50 Year event Inflow = 50.47 cfs @ 12.05 hrs, Volume= 4.987 of Primary = 50.47 cfs @ 12.05 hrs, Volume= 4.987 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 1 L: POI #1 Hyd rog raph -I--I-T-T-T-T-I--I--I-T-T-r-T-I--I-T-T-T-T-I--I--I-T-T-T-I--I--I-T-T-r-T-T-I--I- �1 C Inflow 55 -1--1-+- 50.47 cfs -I--I--I-+-+-+-+-1--1-+-+-+-rl--- I +-+-r------+/�-��+-,I+-+-+-I--I- ❑Primary 11 11 50.47 cfs 11 11 11 11 11 1 1 1 1 11 11 11 Inflow �I -Irea=1111119A81113111�Ic111 50 45 1 1 r-r-r-11-r-r-r-r-1--r 1-r-r-r-i-1- 1-r-r-r-r-r-1--1- 40 -1--1- - -1--1--1- -+-+- -1--1-+- -+-+-1--1--1- -+-+-1--1--1- -+-+- - -1--1- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 35 -1--1- - -1--1--1-J-L-L-L-1--1-J-L-L-L-1--1--1- -L-L-1--1--1-J-L-L-L-L-1--1- y I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I u 30 1 -1--1-i- -1--1--1- -1--1--1- 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 �—°° 25 ---I-,- -I--I--I-T-T-r-T-I--I-T-T-r-T---I--I-T-T-T---I--I-T-T-r-T-T-I--I- , 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 20 -1--1-+- -1--1--1-+-+-+-+-1--1-+-+-+-+-1--1--1-+-+-+-1--1--1-+-+-+-+-+-1--1- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 -1--1- 1- -1--1--1--11- -L-1--1--1--1- - -L-1--1--1- 1- -L-1--1--1--11- - -Ii-1--1--1- 10 -1--1-r- --1--1-r-r-r-Ir-1--1-r-r-r-r-1--1--1-r-T-r-1 -1--1-r-r-r-Ir-Ir-1--11- 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 116 Hydrograph for Link 1L: POI #1 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.06 0.00 0.06 1.00 0.00 0.00 0.00 53.00 0.06 0.00 0.06 2.00 0.00 0.00 0.00 54.00 0.06 0.00 0.06 3.00 0.00 0.00 0.00 55.00 0.06 0.00 0.06 4.00 0.00 0.00 0.00 56.00 0.06 0.00 0.06 5.00 0.00 0.00 0.00 57.00 0.06 0.00 0.06 6.00 0.00 0.00 0.00 58.00 0.06 0.00 0.06 7.00 0.00 0.00 0.00 59.00 0.06 0.00 0.06 8.00 0.01 0.00 0.01 60.00 0.06 0.00 0.06 9.00 0.02 0.00 0.02 61.00 0.06 0.00 0.06 10.00 0.03 0.00 0.03 62.00 0.06 0.00 0.06 11.00 0.42 0.00 0.42 63.00 0.06 0.00 0.06 12.00 36.05 0.00 36.05 64.00 0.06 0.00 0.06 13.00 8.67 0.00 8.67 65.00 0.06 0.00 0.06 14.00 4.48 0.00 4.48 66.00 0.06 0.00 0.06 15.00 3.31 0.00 3.31 67.00 0.06 0.00 0.06 16.00 2.64 0.00 2.64 68.00 0.06 0.00 0.06 17.00 2.22 0.00 2.22 69.00 0.05 0.00 0.05 18.00 1.98 0.00 1.98 70.00 0.05 0.00 0.05 19.00 1.73 0.00 1.73 71.00 0.05 0.00 0.05 20.00 1.48 0.00 1.48 72.00 0.05 0.00 0.05 21.00 1.35 0.00 1.35 22.00 1.30 0.00 1.30 23.00 1.25 0.00 1.25 24.00 1.20 0.00 1.20 25.00 0.12 0.00 0.12 26.00 0.07 0.00 0.07 27.00 0.07 0.00 0.07 28.00 0.07 0.00 0.07 29.00 0.07 0.00 0.07 30.00 0.07 0.00 0.07 31.00 0.07 0.00 0.07 32.00 0.07 0.00 0.07 33.00 0.07 0.00 0.07 34.00 0.07 0.00 0.07 35.00 0.07 0.00 0.07 36.00 0.07 0.00 0.07 37.00 0.07 0.00 0.07 38.00 0.07 0.00 0.07 39.00 0.07 0.00 0.07 40.00 0.07 0.00 0.07 41.00 0.06 0.00 0.06 42.00 0.06 0.00 0.06 43.00 0.06 0.00 0.06 44.00 0.06 0.00 0.06 45.00 0.06 0.00 0.06 46.00 0.06 0.00 0.06 47.00 0.06 0.00 0.06 48.00 0.06 0.00 0.06 49.00 0.06 0.00 0.06 50.00 0.06 0.00 0.06 51.00 0.06 0.00 0.06 Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 117 Summary for Link 2L: POI #2 Inflow Area = 1.688 ac, 4.62% Impervious, Inflow Depth = 2.53" for 50 Year event Inflow = 5.07 cfs @ 12.10 hrs, Volume= 0.356 of Primary = 5.07 cfs @ 12.10 hrs, Volume= 0.356 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 2L: POI #2 Hyd rog raph C Inflow ---I_-1_ 5.07cfs -1--1-J--1 - ----J-1-r-r---1-J-1-r-L----J-1-r- -----1-1-1- [I Primary 5.07 cfs Inflow IIAreaO .08 Illal6 5 -I--I-r- -r-I-r-r-r-r-I--I-r-r-r-r-r-I-r-r-r-r-I--I-r-r-r-r-r-I --I-r-r- 4 ---I-J- -1--1-J-1-r-L----J-1-L-r-1--1-J-1-r-L----J-1-L-L-----1-1-L- y I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I V 3 3 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 a -r-I-y- -r--y-rt-r-r-r--y-rt-r-r-r--y-rt-r-r-r--y-rt-r-r-r----rt-r- 2 -I__I_-I-i_r _r _I__I__I_i_ r -r -I__I_-I-i_r _I__I__I__I_ 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type 11 24-hr 50 Year Rainfall=7.04" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 118 Hydrograph for Link 2L: POI #2 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 53.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 54.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 55.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 56.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 57.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 59.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 61.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 62.00 0.00 0.00 0.00 11.00 0.03 0.00 0.03 63.00 0.00 0.00 0.00 12.00 3.64 0.00 3.64 64.00 0.00 0.00 0.00 13.00 0.53 0.00 0.53 65.00 0.00 0.00 0.00 14.00 0.31 0.00 0.31 66.00 0.00 0.00 0.00 15.00 0.24 0.00 0.24 67.00 0.00 0.00 0.00 16.00 0.19 0.00 0.19 68.00 0.00 0.00 0.00 17.00 0.17 0.00 0.17 69.00 0.00 0.00 0.00 18.00 0.15 0.00 0.15 70.00 0.00 0.00 0.00 19.00 0.13 0.00 0.13 71.00 0.00 0.00 0.00 20.00 0.11 0.00 0.11 72.00 0.00 0.00 0.00 21.00 0.10 0.00 0.10 22.00 0.10 0.00 0.10 23.00 0.10 0.00 0.10 24.00 0.09 0.00 0.09 25.00 0.00 0.00 0.00 26.00 0.00 0.00 0.00 27.00 0.00 0.00 0.00 28.00 0.00 0.00 0.00 29.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 31.00 0.00 0.00 0.00 32.00 0.00 0.00 0.00 33.00 0.00 0.00 0.00 34.00 0.00 0.00 0.00 35.00 0.00 0.00 0.00 36.00 0.00 0.00 0.00 37.00 0.00 0.00 0.00 38.00 0.00 0.00 0.00 39.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 42.00 0.00 0.00 0.00 43.00 0.00 0.00 0.00 44.00 0.00 0.00 0.00 45.00 0.00 0.00 0.00 46.00 0.00 0.00 0.00 47.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 49.00 0.00 0.00 0.00 50.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 119 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: POI #1 Predevelopment Runoff Area=815,942 sf 6.70% Impervious Runoff Depth=3.26" Tc=24.4 min CN=60 Runoff=58.82 cfs 5.086 of Subcatchment2S: POI #2 Predevelopment Runoff Area=106,262 sf 0.00% Impervious Runoff Depth=2.72" Tc=18.3 min CN=55 Runoff=7.41 cfs 0.552 of Subcatchment3S: Post-Development Runoff Area=640,460 sf 8.40% Impervious Runoff Depth=3.37" Tc=24.4 min CN=61 Runoff=47.92 cfs 4.127 of Subcatchment4S: POI #2 Runoff Area=73,518 sf 4.62% Impervious Runoff Depth=3.15" Tc=16.7 min CN=59 Runoff=6.38 cfs 0.443 of Subcatchment5S: Culvert Runoff Area=601,822 sf 9.68% Impervious Runoff Depth=3.37" Tc=23.7 min CN=61 Runoff=45.79 cfs 3.878 of SubcatchmentDA#1: Post-Development Runoff Area=208,217 sf 53.03% Impervious Runoff Depth=5.65" Tc=5.0 min CN=81 Runoff=46.43 cfs 2.250 of Pond BMP-1: BMP#1 (Wet Pond) Peak Elev=624.46' Storage=38,783 cf Inflow=46.43 cfs 2.250 of Outflow=39.77 cfs 1.961 of Link 1L: POI #1 Inflow=64.97 cfs 6.089 of Primary=64.97 cfs 6.089 of Link 2L: POI #2 Inflow=6.38 cfs 0.443 of Primary=6.38 cfs 0.443 of Total Runoff Area = 56.158 ac Runoff Volume = 16.337 of Average Runoff Depth = 3.49" 88.53% Pervious = 49.717 ac 11.47% Impervious = 6.441 ac Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 120 Summary for Subcatchment 1S: POI #1 Predevelopment Runoff = 58.82 cfs @ 12.19 hrs, Volume= 5.086 af, Depth= 3.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100 Year Rainfall=7.90" Area (so CN Description 543,022 55 Woods, Good, HSG B 54,658 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 209,175 61 >75% Grass cover, Good, HSG B 815,942 60 Weighted Average 761,284 93.30% Pervious Area 54,658 6.70% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 1S: POI #1 Predevelopment Hydrograph -L---'--'- - -L-1-L-L-L-1--1--1--1--1--1-L-L-L-L-L-L-L-1--1--1-J-J-L-1-L-L-L-L- 65 Runoff 60-: 58.82 cfs y }p �� - ------ - - -+-+-+-------------- -+-+-r-r- ----- 55 I I I I I I I 1 -�- - -� - - -+-+-+- 7-4-4100YVai1rRainfa►fIr7.90`- 50 -�- �- -� -+—+—+—+—+— +—+—R—UhOffAee'& ■5�9�42-�f- 45 - - - ------------ - - 40 Iu11offlVa'lurpe=5�0�� Runoff 35 Depth=3.26" ,° 30 TCT24.4 Min -r---I-T +-+-+-+-r-r-r-r------+-+-+-+-r-r-r-+----+-+-+-+-+-+-r-r- 25 � (� -7------7 7-7-r-r-r-I I -I--I--I---7-7-+-+-r-r-7-I--I--I-7-7-r--p4 Y07- 20 —7------ -7—T—r—r—I—I--------7-7—T—T—r-7-7------7— — -7—T—r—r-7- 15 7-7-r-r-r-i-r r i- i- i-7-7-+_T-r-r-7- -1--1 -1-7 T T -T- r 107 1 1 1 i 1 5 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 6264 66 6870 72 Time (hours) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 121 Hydrograph for Subcatchment 1S: POI #1 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.90 3.26 0.00 1.00 0.08 0.00 0.00 53.00 7.90 3.26 0.00 2.00 0.17 0.00 0.00 54.00 7.90 3.26 0.00 3.00 0.27 0.00 0.00 55.00 7.90 3.26 0.00 4.00 0.38 0.00 0.00 56.00 7.90 3.26 0.00 5.00 0.50 0.00 0.00 57.00 7.90 3.26 0.00 6.00 0.63 0.00 0.00 58.00 7.90 3.26 0.00 7.00 0.78 0.00 0.00 59.00 7.90 3.26 0.00 8.00 0.95 0.00 0.00 60.00 7.90 3.26 0.00 9.00 1.16 0.00 0.00 61.00 7.90 3.26 0.00 10.00 1.43 0.00 0.02 62.00 7.90 3.26 0.00 11.00 1.86 0.04 0.82 63.00 7.90 3.26 0.00 12.00 5.24 1.44 30.05 64.00 7.90 3.26 0.00 13.00 6.10 1.99 8.76 65.00 7.90 3.26 0.00 14.00 6.48 2.24 4.51 66.00 7.90 3.26 0.00 15.00 6.74 2.42 3.36 67.00 7.90 3.26 0.00 16.00 6.95 2.57 2.69 68.00 7.90 3.26 0.00 17.00 7.12 2.69 2.27 69.00 7.90 3.26 0.00 18.00 7.28 2.80 2.03 70.00 7.90 3.26 0.00 19.00 7.41 2.90 1.78 71.00 7.90 3.26 0.00 20.00 7.52 2.98 1.52 72.00 7.90 3.26 0.00 21.00 7.62 3.05 1.39 22.00 7.72 3.12 1.34 23.00 7.81 3.19 1.29 24.00 7.90 3.26 1.24 25.00 7.90 3.26 0.01 26.00 7.90 3.26 0.00 27.00 7.90 3.26 0.00 28.00 7.90 3.26 0.00 29.00 7.90 3.26 0.00 30.00 7.90 3.26 0.00 31.00 7.90 3.26 0.00 32.00 7.90 3.26 0.00 33.00 7.90 3.26 0.00 34.00 7.90 3.26 0.00 35.00 7.90 3.26 0.00 36.00 7.90 3.26 0.00 37.00 7.90 3.26 0.00 38.00 7.90 3.26 0.00 39.00 7.90 3.26 0.00 40.00 7.90 3.26 0.00 41.00 7.90 3.26 0.00 42.00 7.90 3.26 0.00 43.00 7.90 3.26 0.00 44.00 7.90 3.26 0.00 45.00 7.90 3.26 0.00 46.00 7.90 3.26 0.00 47.00 7.90 3.26 0.00 48.00 7.90 3.26 0.00 49.00 7.90 3.26 0.00 50.00 7.90 3.26 0.00 51.00 7.90 3.26 0.00 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 122 Summary for Subcatchment 2S: POI #2 Predevelopment Runoff = 7.41 cfs @ 12.12 hrs, Volume= 0.552 af, Depth= 2.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100 Year Rainfall=7.90" Area (so CN Description 106,262 55 Woods, Good, HSG B 106,262 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 Direct Entry, Subcatchment 2S: POI #2 Predevelopment Hydrograph 8 ■Runoff 7.41 cfs -+--+-+- -+-+-+-+-+-I--I--I- +-+ +-+-+------+-+-+Ty"11 7 100 Year IRainfaill�p.00" 6 RUhOff A e';a=10!6�2;62 isf 5 - - -J- - - - - -I- - -;1 L-1off'1 -Iro-I 1=`OII-I-f N I I I I I I +---I-+ _+ +-+-+-+---I--I- - -+-+-+-+-+-Rulnioff+Qepth:2.727 0 4 LL Tc"18.3 Min -------- -+ _ 3 —L———'—L— —1—+—L—L—L———I——I—J—J—1—L—L—L—L——————J—J—+—+—L—L—L - 2 -+---I-+- +-+-+-+-+-++-+-+-+-+-+-+-+-+-+--+-+-+-+-+-+-+-+-----I-+- 1 II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 123 Hydrograph for Subcatchment 2S: POI #2 Predevelopment Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.90 2.72 0.00 1.00 0.08 0.00 0.00 53.00 7.90 2.72 0.00 2.00 0.17 0.00 0.00 54.00 7.90 2.72 0.00 3.00 0.27 0.00 0.00 55.00 7.90 2.72 0.00 4.00 0.38 0.00 0.00 56.00 7.90 2.72 0.00 5.00 0.50 0.00 0.00 57.00 7.90 2.72 0.00 6.00 0.63 0.00 0.00 58.00 7.90 2.72 0.00 7.00 0.78 0.00 0.00 59.00 7.90 2.72 0.00 8.00 0.95 0.00 0.00 60.00 7.90 2.72 0.00 9.00 1.16 0.00 0.00 61.00 7.90 2.72 0.00 10.00 1.43 0.00 0.00 62.00 7.90 2.72 0.00 11.00 1.86 0.01 0.02 63.00 7.90 2.72 0.00 12.00 5.24 1.10 4.83 64.00 7.90 2.72 0.00 13.00 6.10 1.57 0.85 65.00 7.90 2.72 0.00 14.00 6.48 1.80 0.50 66.00 7.90 2.72 0.00 15.00 6.74 1.96 0.38 67.00 7.90 2.72 0.00 16.00 6.95 2.09 0.31 68.00 7.90 2.72 0.00 17.00 7.12 2.20 0.26 69.00 7.90 2.72 0.00 18.00 7.28 2.30 0.24 70.00 7.90 2.72 0.00 19.00 7.41 2.39 0.21 71.00 7.90 2.72 0.00 20.00 7.52 2.46 0.18 72.00 7.90 2.72 0.00 21.00 7.62 2.53 0.16 22.00 7.72 2.59 0.16 23.00 7.81 2.66 0.15 24.00 7.90 2.72 0.15 25.00 7.90 2.72 0.00 26.00 7.90 2.72 0.00 27.00 7.90 2.72 0.00 28.00 7.90 2.72 0.00 29.00 7.90 2.72 0.00 30.00 7.90 2.72 0.00 31.00 7.90 2.72 0.00 32.00 7.90 2.72 0.00 33.00 7.90 2.72 0.00 34.00 7.90 2.72 0.00 35.00 7.90 2.72 0.00 36.00 7.90 2.72 0.00 37.00 7.90 2.72 0.00 38.00 7.90 2.72 0.00 39.00 7.90 2.72 0.00 40.00 7.90 2.72 0.00 41.00 7.90 2.72 0.00 42.00 7.90 2.72 0.00 43.00 7.90 2.72 0.00 44.00 7.90 2.72 0.00 45.00 7.90 2.72 0.00 46.00 7.90 2.72 0.00 47.00 7.90 2.72 0.00 48.00 7.90 2.72 0.00 49.00 7.90 2.72 0.00 50.00 7.90 2.72 0.00 51.00 7.90 2.72 0.00 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 124 Summary for Subcatchment 3S: Post-Development ByPass POI #1 Runoff = 47.92 cfs @ 12.19 hrs, Volume= 4.127 af, Depth= 3.37" Routed to Link 1 L : POI #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100 Year Rainfall=7.90" Area (so CN Description 406,538 55 Woods, Good, HSG B 53,797 98 Impervious (Bldgs, Driveways, Rds) 9,087 79 Pasture/grassland/range, Poor, HSG B 171,038 61 >75% Grass cover, Good, HSG B 640,460 61 Weighted Average 586,663 91.60% Pervious Area 53,797 8.40% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.4 Direct Entry, Subcatchment 3S: Post-Development ByPass POI #1 Hydrograph ' -'--'--'--'--'-I'-I'-I'- '-- '--'--'--'--'--'--'--'-I'-I' -I' - '--'--'--'--'--'--'--'--'-I'-I'- '-- '--'--'-- ❑Runoff 50 47.92 cfs J + + + + + + + + + + + + + + Type-1 ye a 1� T q-rP- 45 �++��ff �i - - - - - - - - 4M Year'RAftf [1;=7.M" - 40 - b"ffA6&640�4'II 0-!10f-- 35 -t-T-T------------4-T-1�"gOffY0 1 r- w 30 I 1 �� Runoff Qelp6=137-'-- 25 Tc�"_24.4 Min 20 -T------T -7-T-T-T------------7-T-T-T-T-T-T------T-T-T-r-+-T-+-Ir- -----'--'- - - - - ---------'--'- - - - -r - ---------'--'- - - - - -'-- 10 -+-I--I--I- +-+-+-+-+------------+-+-+-+-+-+-+------+-+-+-+-+-+-+-+- 5 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 125 Hydrograph for Subcatchment 3S: Post-Development ByPass POI #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.90 3.37 0.00 1.00 0.08 0.00 0.00 53.00 7.90 3.37 0.00 2.00 0.17 0.00 0.00 54.00 7.90 3.37 0.00 3.00 0.27 0.00 0.00 55.00 7.90 3.37 0.00 4.00 0.38 0.00 0.00 56.00 7.90 3.37 0.00 5.00 0.50 0.00 0.00 57.00 7.90 3.37 0.00 6.00 0.63 0.00 0.00 58.00 7.90 3.37 0.00 7.00 0.78 0.00 0.00 59.00 7.90 3.37 0.00 8.00 0.95 0.00 0.00 60.00 7.90 3.37 0.00 9.00 1.16 0.00 0.00 61.00 7.90 3.37 0.00 10.00 1.43 0.00 0.06 62.00 7.90 3.37 0.00 11.00 1.86 0.05 0.76 63.00 7.90 3.37 0.00 12.00 5.24 1.51 24.79 64.00 7.90 3.37 0.00 13.00 6.10 2.07 7.05 65.00 7.90 3.37 0.00 14.00 6.48 2.33 3.62 66.00 7.90 3.37 0.00 15.00 6.74 2.52 2.69 67.00 7.90 3.37 0.00 16.00 6.95 2.67 2.15 68.00 7.90 3.37 0.00 17.00 7.12 2.79 1.82 69.00 7.90 3.37 0.00 18.00 7.28 2.90 1.62 70.00 7.90 3.37 0.00 19.00 7.41 3.00 1.42 71.00 7.90 3.37 0.00 20.00 7.52 3.08 1.21 72.00 7.90 3.37 0.00 21.00 7.62 3.16 1.11 22.00 7.72 3.23 1.07 23.00 7.81 3.30 1.03 24.00 7.90 3.37 0.99 25.00 7.90 3.37 0.01 26.00 7.90 3.37 0.00 27.00 7.90 3.37 0.00 28.00 7.90 3.37 0.00 29.00 7.90 3.37 0.00 30.00 7.90 3.37 0.00 31.00 7.90 3.37 0.00 32.00 7.90 3.37 0.00 33.00 7.90 3.37 0.00 34.00 7.90 3.37 0.00 35.00 7.90 3.37 0.00 36.00 7.90 3.37 0.00 37.00 7.90 3.37 0.00 38.00 7.90 3.37 0.00 39.00 7.90 3.37 0.00 40.00 7.90 3.37 0.00 41.00 7.90 3.37 0.00 42.00 7.90 3.37 0.00 43.00 7.90 3.37 0.00 44.00 7.90 3.37 0.00 45.00 7.90 3.37 0.00 46.00 7.90 3.37 0.00 47.00 7.90 3.37 0.00 48.00 7.90 3.37 0.00 49.00 7.90 3.37 0.00 50.00 7.90 3.37 0.00 51.00 7.90 3.37 0.00 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 126 Summary for Subcatchment 4S: POI #2 Post-Development Runoff = 6.38 cfs @ 12.10 hrs, Volume= 0.443 af, Depth= 3.15" Routed to Link 2L : POI #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100 Year Rainfall=7.90" Area (so CN Description 42,969 55 Woods, Good, HSG B 3,396 98 Greenway 27,153 61 >75% Grass cover, Good, HSG B 73,518 59 Weighted Average 70,122 95.38% Pervious Area 3,396 4.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.7 Direct Entry, Subcatchment 4S: POI #2 Post-Development Hydrograph 7 ■Runoff 6.38 cfs -Ty 6 100 Year IRainfaill;=p.00" 5 Ruhoff Aee&=713#5';18 isf -'r-I--I- - -!-!-!-'r-'r------,-,-7-!-!1 0offlV010 rM =040 Of- 4 Runoff Dlepth=3.115" 3 _o -------- -------- ----------'TZ,-l6.7t`n1d --------------------- a 3 I�I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I `.►�_�� -T---I-T- -T-T-T-T-T------T-T-T-T-T-T-T------T-T-T-T-T-T-T-----I-T- 2 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 2830 3234 36 3840 4244 46 4850 5254 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 127 Hydrograph for Subcatchment 4S: POI #2 Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.90 3.15 0.00 1.00 0.08 0.00 0.00 53.00 7.90 3.15 0.00 2.00 0.17 0.00 0.00 54.00 7.90 3.15 0.00 3.00 0.27 0.00 0.00 55.00 7.90 3.15 0.00 4.00 0.38 0.00 0.00 56.00 7.90 3.15 0.00 5.00 0.50 0.00 0.00 57.00 7.90 3.15 0.00 6.00 0.63 0.00 0.00 58.00 7.90 3.15 0.00 7.00 0.78 0.00 0.00 59.00 7.90 3.15 0.00 8.00 0.95 0.00 0.00 60.00 7.90 3.15 0.00 9.00 1.16 0.00 0.00 61.00 7.90 3.15 0.00 10.00 1.43 0.00 0.00 62.00 7.90 3.15 0.00 11.00 1.86 0.03 0.07 63.00 7.90 3.15 0.00 12.00 5.24 1.37 4.69 64.00 7.90 3.15 0.00 13.00 6.10 1.90 0.64 65.00 7.90 3.15 0.00 14.00 6.48 2.15 0.38 66.00 7.90 3.15 0.00 15.00 6.74 2.33 0.29 67.00 7.90 3.15 0.00 16.00 6.95 2.47 0.23 68.00 7.90 3.15 0.00 17.00 7.12 2.59 0.20 69.00 7.90 3.15 0.00 18.00 7.28 2.70 0.18 70.00 7.90 3.15 0.00 19.00 7.41 2.79 0.15 71.00 7.90 3.15 0.00 20.00 7.52 2.87 0.13 72.00 7.90 3.15 0.00 21.00 7.62 2.95 0.12 22.00 7.72 3.02 0.12 23.00 7.81 3.08 0.11 24.00 7.90 3.15 0.11 25.00 7.90 3.15 0.00 26.00 7.90 3.15 0.00 27.00 7.90 3.15 0.00 28.00 7.90 3.15 0.00 29.00 7.90 3.15 0.00 30.00 7.90 3.15 0.00 31.00 7.90 3.15 0.00 32.00 7.90 3.15 0.00 33.00 7.90 3.15 0.00 34.00 7.90 3.15 0.00 35.00 7.90 3.15 0.00 36.00 7.90 3.15 0.00 37.00 7.90 3.15 0.00 38.00 7.90 3.15 0.00 39.00 7.90 3.15 0.00 40.00 7.90 3.15 0.00 41.00 7.90 3.15 0.00 42.00 7.90 3.15 0.00 43.00 7.90 3.15 0.00 44.00 7.90 3.15 0.00 45.00 7.90 3.15 0.00 46.00 7.90 3.15 0.00 47.00 7.90 3.15 0.00 48.00 7.90 3.15 0.00 49.00 7.90 3.15 0.00 50.00 7.90 3.15 0.00 51.00 7.90 3.15 0.00 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 128 Summary for Subcatchment 5S: Culvert Post-Development Runoff = 45.79 cfs @ 12.18 hrs, Volume= 3.878 af, Depth= 3.37" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100 Year Rainfall=7.90" Area (so CN Description 359,379 55 Woods, Good, HSG B 58,277 98 Paved parking, HSG B 9,087 79 Pasture/grassland/range, Poor, HSG B 175,079 61 >75% Grass cover, Good, HSG B 601,822 61 Weighted Average 543,545 90.32% Pervious Area 58,277 9.68% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.7 Direct Entry, Subcatchment 5S: Culvert Post-Development Hydrograph — r------ —T—T—T—T—T—T—I—I--------T—T—T—T—r—r—r------T— —T—T—T—T—T—r- 50 L-1--1--'-1- - -1-1-L-L-1--1--1--1--1--1-1-1-+-1-L-L_1------1-1- -1-1-L-L-1- �RUnoff �I I 48 � -�-I--I- 4579cfs �-T-T-T-T-r I I I I I I I I I I I I -iI -II--II--II--II-TI- I -+I -TI I --I----I----'I- - - - --T- 46 -L-L-L T— —T—T — T—T— r— —I— I— IYhl T-6T-MMn 44 y �- -42 -L-1--1--1-1 -1-1-1—L-L-1--1--1--1--1--1-1-1-+-+-L_L-L-1--1--1-1-1-1-1-1-L-L-L- 40 - -----I-T -T-T-T-T-T------------T-T-TIOO Year IR'ainf�►[I�7.90".- / ———————I——I —I—I—I—I—I————————————I—I———————————————I II—————I—_——————— 38 I I I I I I I I I I I I I I I I I I p`.y,�� ;� I/� y, �►�y A j 36 r-----I-+ -+-+-r-r-r-r-r-r------+-+- R ibff-� �'a 601a 22-i� - 34 -'i-------'i - 1I- 1I- 'i- 'i-'i-'i-'i-------'i- 1I-I------ -------------------------- 32 -r-+---I-+ -+-+-+-+-r-r-r-r------+-+- a#fIVol 0=1810-0- -------�--� - -I-�-�-�------------I-I-------------------------------- ,... 30 I I I I I I I I I I I I I I I I I I I I I I u 28 � - I I I I I I I Ih=Ir 26 - _p 24 - , I , i 20 -+-----I-+ +-+-+-+-+------------+-+-+-+-r-+-+------+-+-+- +- +- 18 j,I I I I-i 1 1�--�- I I I I I I I I I I 167 1-+-+-L------------1-+-+-+- - - ------ - -1-1-+-+-+- - � i 14 -�--�--�--�- 12 - ---'--'- 1-1-+-1-L-1--1--1--1--1--1-1-1-+-+- - - ---'--'- - -1-1-+-1-L- - 10 _T__T_T_T_ 8 - ---'--'— — — —+— ------------4—+—+—+— — — ———'——'— — — — — —+— — — , i -I,-----I- - - - -I -I,-I,- ------- - - 6 - - -I,-I,---------- - - - -I -I,- 4 - ---'--'- -1-1-L-1--1--1--1--1--1-1-a- -+- - - ---'--'- - -1-1-1-1-L- - 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 129 Hydrograph for Subcatchment 5S: Culvert Post-Development Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.90 3.37 0.00 1.00 0.08 0.00 0.00 53.00 7.90 3.37 0.00 2.00 0.17 0.00 0.00 54.00 7.90 3.37 0.00 3.00 0.27 0.00 0.00 55.00 7.90 3.37 0.00 4.00 0.38 0.00 0.00 56.00 7.90 3.37 0.00 5.00 0.50 0.00 0.00 57.00 7.90 3.37 0.00 6.00 0.63 0.00 0.00 58.00 7.90 3.37 0.00 7.00 0.78 0.00 0.00 59.00 7.90 3.37 0.00 8.00 0.95 0.00 0.00 60.00 7.90 3.37 0.00 9.00 1.16 0.00 0.00 61.00 7.90 3.37 0.00 10.00 1.43 0.00 0.06 62.00 7.90 3.37 0.00 11.00 1.86 0.05 0.73 63.00 7.90 3.37 0.00 12.00 5.24 1.51 24.53 64.00 7.90 3.37 0.00 13.00 6.10 2.07 6.49 65.00 7.90 3.37 0.00 14.00 6.48 2.33 3.38 66.00 7.90 3.37 0.00 15.00 6.74 2.52 2.53 67.00 7.90 3.37 0.00 16.00 6.95 2.67 2.01 68.00 7.90 3.37 0.00 17.00 7.12 2.79 1.71 69.00 7.90 3.37 0.00 18.00 7.28 2.90 1.52 70.00 7.90 3.37 0.00 19.00 7.41 3.00 1.33 71.00 7.90 3.37 0.00 20.00 7.52 3.08 1.14 72.00 7.90 3.37 0.00 21.00 7.62 3.16 1.04 22.00 7.72 3.23 1.01 23.00 7.81 3.30 0.97 24.00 7.90 3.37 0.93 25.00 7.90 3.37 0.01 26.00 7.90 3.37 0.00 27.00 7.90 3.37 0.00 28.00 7.90 3.37 0.00 29.00 7.90 3.37 0.00 30.00 7.90 3.37 0.00 31.00 7.90 3.37 0.00 32.00 7.90 3.37 0.00 33.00 7.90 3.37 0.00 34.00 7.90 3.37 0.00 35.00 7.90 3.37 0.00 36.00 7.90 3.37 0.00 37.00 7.90 3.37 0.00 38.00 7.90 3.37 0.00 39.00 7.90 3.37 0.00 40.00 7.90 3.37 0.00 41.00 7.90 3.37 0.00 42.00 7.90 3.37 0.00 43.00 7.90 3.37 0.00 44.00 7.90 3.37 0.00 45.00 7.90 3.37 0.00 46.00 7.90 3.37 0.00 47.00 7.90 3.37 0.00 48.00 7.90 3.37 0.00 49.00 7.90 3.37 0.00 50.00 7.90 3.37 0.00 51.00 7.90 3.37 0.00 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 130 Summary for Subcatchment DA #1: Post-Development Pond #1 [49] Hint: Tc<2dt may require smaller dt Runoff = 46.43 cfs @ 11.95 hrs, Volume= 2.250 af, Depth= 5.65" Routed to Pond BMP-1 : BMP#1 (Wet Pond) Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100 Year Rainfall=7.90" Area (so CN Description 15,333 98 Sidewalk 38,202 98 Lots (Building, walkway, patios) 14,549 98 Driveways 42,297 98 Roadway 44 98 CBU Pads 97,792 61 >75% Grass cover, Good, HSG B 208,217 81 Weighted Average 97,792 46.97% Pervious Area 110,425 53.03% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA #1: Post-Development Pond #1 Hydrograph -r------ -,-7-7-T-T-7-I-I--------7-7-T-T-r-r-r------r- -7-7-T-r-T-r- 52 -L-'--'--'-L-L-L-1-L-L-L-1--1--1--1--1--1-1-1-1-1-L-L-L-1--1--1-J-J-L-1-L-L-L-L- I I I I I ■Runoff r-r-I- I-r-7-7-7-r-r-r-r-r r I- I- I-7-T-T-T-r-r-r-IF-IF I-r-r-7-7-r-r-r-r- 48 -L 46.43 cfs - 46 T-Ir-11--11--,--, - I- I- Ir- Ir-Ir -Ir-Ir-------- - - - - - - ---II--I pFI- I 44 -L-----'-L - -1-L-L-L-1--1--1--1--1--1-L-L-L-L-L-yrr-yiL�'-r--R-'Tyl I I-1I- /}}M�_ -L- 42 -Ir-----II- - -7-T-T-7-II-II--------7-7-TJIRf11-l�K{AJ-Ill>l l� It l��L©F�- 40 - ---'--'- -L-1-L-L-L-1--1--1--1--1--1-L-L-L � I I I I I I I I I I I I I I I I I I I I��I� I� I I II, I I �Iry Ip I I *IC I I 38 -L-'--'--'- -L-1-L-L-L-1--1--1--1--1--1-1-L- i�FFWf �11�i' 6V6 �f-tf - 36 34 -L-'--'--'- -L-L-L-L-L-'--'--'--'--'--'-L-L Ap'T f -I O 1-f','0= �2-5 r- - 32 1r- /��* -O�7yIr^ N 30 -r---I--I- - r-r-r-r-i- -I- @-r-r-------I--I- �-r�-;-y.;-;-r- _ -L---'--'- - off 28 i 1 I I 3 26 r-I--I--I- 7 7 T T r r r 7 7 T T r-r-r 1 7 7-7-T T-T-r 0 24 - - - -1-1-L-L-1--1--1--1--1--1-1-1-1-L-L-L- ------L� - - --------- - - - - - - -------- - - - - - - - -------- - 2O -L---'--'- -1-1-L-L-L-'--'--'-------1-1-1-1-L-L-L------L-L-L- L L- = � I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 16 - ---'--'- - -'-+-+-+-----------'-+- -+-+-+-+- -----'-+- - -'-+-+-+- - 14 -�r-----�I- - - -------�r-�r-------�I- - - - -----r-------I-i- - -------r- r-I--I- I- 7-7-r-r-r-r-r r I- I- I-7-T-T-T-r-r-r-I--I- I-r-r-7-7-r-r-r-r- 8 -L---'--'- -1-1-L-L-L-'--'--'--'--'--'-1-1-1-1-L-L-L-'--'--'-J-J-1-1-L-L-L-L- - -------- - - - - - - - - - - - - - - ----- I- I I I I I I I I I I I I I I I I I I 4 -+---'--'- -+-+-+-+-'--'--'--'--'--'-+-+-+-+-+-+-+-'--'--'-+-+-+-+-+-+-+-+- 2 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 131 Hydrograph for Subcatchment DA #1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 52.00 7.90 5.65 0.00 1.00 0.08 0.00 0.00 53.00 7.90 5.65 0.00 2.00 0.17 0.00 0.00 54.00 7.90 5.65 0.00 3.00 0.27 0.00 0.00 55.00 7.90 5.65 0.00 4.00 0.38 0.00 0.00 56.00 7.90 5.65 0.00 5.00 0.50 0.00 0.01 57.00 7.90 5.65 0.00 6.00 0.63 0.01 0.08 58.00 7.90 5.65 0.00 7.00 0.78 0.04 0.16 59.00 7.90 5.65 0.00 8.00 0.95 0.08 0.25 60.00 7.90 5.65 0.00 9.00 1.16 0.16 0.47 61.00 7.90 5.65 0.00 10.00 1.43 0.28 0.72 62.00 7.90 5.65 0.00 11.00 1.86 0.52 1.56 63.00 7.90 5.65 0.00 12.00 5.24 3.20 39.49 64.00 7.90 5.65 0.00 13.00 6.10 3.97 2.26 65.00 7.90 5.65 0.00 14.00 6.48 4.32 1.35 66.00 7.90 5.65 0.00 15.00 6.74 4.57 1.08 67.00 7.90 5.65 0.00 16.00 6.95 4.76 0.83 68.00 7.90 5.65 0.00 17.00 7.12 4.92 0.73 69.00 7.90 5.65 0.00 18.00 7.28 5.06 0.65 70.00 7.90 5.65 0.00 19.00 7.41 5.19 0.56 71.00 7.90 5.65 0.00 20.00 7.52 5.29 0.47 72.00 7.90 5.65 0.00 21.00 7.62 5.39 0.45 22.00 7.72 5.48 0.43 23.00 7.81 5.56 0.41 24.00 7.90 5.65 0.40 25.00 7.90 5.65 0.00 26.00 7.90 5.65 0.00 27.00 7.90 5.65 0.00 28.00 7.90 5.65 0.00 29.00 7.90 5.65 0.00 30.00 7.90 5.65 0.00 31.00 7.90 5.65 0.00 32.00 7.90 5.65 0.00 33.00 7.90 5.65 0.00 34.00 7.90 5.65 0.00 35.00 7.90 5.65 0.00 36.00 7.90 5.65 0.00 37.00 7.90 5.65 0.00 38.00 7.90 5.65 0.00 39.00 7.90 5.65 0.00 40.00 7.90 5.65 0.00 41.00 7.90 5.65 0.00 42.00 7.90 5.65 0.00 43.00 7.90 5.65 0.00 44.00 7.90 5.65 0.00 45.00 7.90 5.65 0.00 46.00 7.90 5.65 0.00 47.00 7.90 5.65 0.00 48.00 7.90 5.65 0.00 49.00 7.90 5.65 0.00 50.00 7.90 5.65 0.00 51.00 7.90 5.65 0.00 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 132 Summary for Pond BMP-1: BMP #1 (Wet Pond) Inflow Area = 4.780 ac, 53.03% Impervious, Inflow Depth = 5.65" for 100 Year event Inflow = 46.43 cfs @ 11.95 hrs, Volume= 2.250 of Outflow = 39.77 cfs @ 12.01 hrs, Volume= 1.961 af, Atten= 14%, Lag= 3.5 min Primary = 39.77 cfs @ 12.01 hrs, Volume= 1.961 of Routed to Link 1 L : POI #1 Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 624.46'@ 12.01 hrs Surf.Area= 8,705 sf Storage= 38,783 cf Plug-Flow detention time=372.3 min calculated for 1.961 of(87% of inflow) Center-of-Mass det. time= 311.1 min ( 1,108.0 - 796.9 ) Volume Invert Avail.Storage Storage Description #1 619.00' 43,609 cf Custom Stage Data (Prismatic)-isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 619.00 4,938 0 0 619.50 5,764 2,676 2,676 620.00 6,208 2,993 5,669 621.00 6,742 6,475 12,144 622.00 7,291 7,017 19,160 623.00 7,855 7,573 26,733 624.00 8,434 8,145 34,878 625.00 9,029 8,732 43,609 Device Routing Invert Outlet Devices #1 Primary 618.34' 30.0" Round Culvert L= 67.7' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 618.34'/618.00' S= 0.0050 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes& inlets, Flow Area= 4.91 sf #2 Device 1 619.00' 1.2"Vert. WQ Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 622.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.50 Width (feet) 2.00 2.00 #4 Device 1 624.00' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=37.00 cfs @ 12.01 hrs HW=624.42' (Free Discharge) L1=Culvert (Passes 37.00 cfs of 51.94 cfs potential flow) 2=WQ Orifice (Orifice Controls 0.09 cfs @ 11.16 fps) 3=Custom Weir/Orifice (Orifice Controls 15.64 cfs @ 5.21 fps) 4=Orifice/Grate (Weir Controls 21.28 cfs @ 2.12 fps) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 133 Pond BMP-1: BMP #1 (Wet Pond) Hyd rog raph - -1-1-L------J-1-L- -1--1-J-1-1-L-1--'--'- -1-L------J-1-L- - -'--'- ,'1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 ■Inflow 50 4643 cfs. ❑Primary - -�- - --I--I- -F-r- --- -T-1-1-flQ—'A-'- 4.7�80 ---'- , 1 45 ----1-1- -1--1--1-J-1-L-L-1--1-J-1-1-L-'--'--'-1JAA1-L-1--'--1-/�-J-1-/CL�--LL-L-'--'- 39.77 cfs '',RCcIK �IIIGIT r- li'0 III 40 -+-1-+- -+-1--1-+-+-r-r-1--1-+-+-+-r-r-1--1-+-+-r-r-1--1-+-+-+-r-r-1--1- StOr a =;3''8'' 783 Cf1 35 -- -------------------------- J w 30 -i--i- - ---i--1- - - - -i--1- - - - ---i--1- - - ---i--1- - - - - -i--i- �-- 3 25 ---- - -------- - -------- - - ------ - - -------- - -------- 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 LL i i 20- -1 1 L L -J -1 L L -1 L L -1 1 L L L 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 J� -1--1- +-r-r-r-1- -7-r-r-r-1- -7-r-r-r-1-�- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 10 ' I- - - -------- - -------- - - ------ - - -------- - -------- 5- 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Pond BMP-1: BMP #1 (Wet Pond) Stage-Discharge 625 ❑Primary Orifice/Grate ------------ -1----- 624 -- --+ T - ---- -� 623 Custom Weir/Orifice w .0 622 1 1 1 1 1 1 w 1 1 1 1 1 1 w - ----------T----- ------ ---- - ----- 621 620 WQ Orifice 619 0 5 10 15 20 25 30 35 40 45 50 Discharge (cfs) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 134 Pond BMP-1: BMP #1 (Wet Pond) Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-fi) 0 500 1,000 1,500 2,000 2,5003,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,0008,500 9,000 Surface ■Storage 625 - --'--- '-------' -- ------ --- ----- -------- - ---'--I- -I I --- ' 624 ------�-------+--+---+--+---��----- -I--�- -+-+-----I-+- +-+-I--- 623 w VI u I II I I I I I I I I I I I I I I I I I 0 622 > II I I I I I w I u I II I I I I I I I I I I I I I I I I I I I w 621 ------�- r- --Ir--+---I-------rr-----rt---r---I -t---r--y---+-t-I--- 620 Custom Stage Data 619 0 5,000 10,000 15,000 20,000 25,600 30,000 35,000 40,000 Storage(cubic-feet) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 135 Hydrograph for Pond BMP-1: BMP #1 (Wet Pond) Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 619.00 0.00 2.50 0.00 0 619.00 0.00 5.00 0.01 3 619.00 0.00 7.50 0.21 883 619.17 0.01 10.00 0.72 4,396 619.79 0.03 12.50 3.61 30,328 623.45 6.15 15.00 1.08 25,220 622.81 1.19 17.50 0.69 24,528 622.72 0.73 20.00 0.47 24,138 622.67 0.51 22.50 0.42 23,970 622.64 0.43 25.00 0.00 23,166 622.54 0.12 27.50 0.00 22,464 622.45 0.07 30.00 0.00 21,841 622.36 0.07 32.50 0.00 21,225 622.28 0.07 35.00 0.00 20,618 622.20 0.07 37.50 0.00 20,018 622.12 0.07 40.00 0.00 19,425 622.04 0.07 42.50 0.00 18,841 621.96 0.06 45.00 0.00 18,265 621.88 0.06 47.50 0.00 17,697 621.80 0.06 50.00 0.00 17,137 621.72 0.06 52.50 0.00 16,585 621.64 0.06 55.00 0.00 16,041 621.57 0.06 57.50 0.00 15,505 621.49 0.06 60.00 0.00 14,978 621.41 0.06 62.50 0.00 14,459 621.34 0.06 65.00 0.00 13,948 621.26 0.06 67.50 0.00 13,446 621.19 0.06 70.00 0.00 12,952 621.12 0.05 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 136 Stage-Discharge for Pond BMP-1: BMP #1 (Wet Pond) Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 619.00 0.00 621.60 0.06 624.20 21.04 619.05 0.00 621.65 0.06 624.25 24.24 619.10 0.01 621.70 0.06 624.30 27.72 619.15 0.01 621.75 0.06 624.35 31.46 619.20 0.01 621.80 0.06 624.40 35.44 619.25 0.02 621.85 0.06 624.45 39.64 619.30 0.02 621.90 0.06 624.50 44.05 619.35 0.02 621.95 0.06 624.55 48.65 619.40 0.02 622.00 0.06 624.60 52.90 619.45 0.02 622.05 0.07 624.65 53.17 619.50 0.03 622.10 0.07 624.70 53.43 619.55 0.03 622.15 0.07 624.75 53.69 619.60 0.03 622.20 0.07 624.80 53.95 619.65 0.03 622.25 0.07 624.85 54.21 619.70 0.03 622.30 0.07 624.90 54.46 619.75 0.03 622.35 0.07 624.95 54.72 619.80 0.03 622.40 0.07 625.00 54.97 619.85 0.03 622.45 0.07 619.90 0.03 622.50 0.07 619.95 0.04 622.55 0.14 620.00 0.04 622.60 0.28 620.05 0.04 622.65 0.45 620.10 0.04 622.70 0.66 620.15 0.04 622.75 0.89 620.20 0.04 622.80 1.15 620.25 0.04 622.85 1.43 620.30 0.04 622.90 1.73 620.35 0.04 622.95 2.05 620.40 0.04 623.00 2.39 620.45 0.04 623.05 2.75 620.50 0.05 623.10 3.12 620.55 0.05 623.15 3.51 620.60 0.05 623.20 3.91 620.65 0.05 623.25 4.33 620.70 0.05 623.30 4.76 620.75 0.05 623.35 5.21 620.80 0.05 623.40 5.67 620.85 0.05 623.45 6.14 620.90 0.05 623.50 6.63 620.95 0.05 623.55 7.13 621.00 0.05 623.60 7.64 621.05 0.05 623.65 8.16 621.10 0.05 623.70 8.69 621.15 0.05 623.75 9.24 621.20 0.06 623.80 9.79 621.25 0.06 623.85 10.36 621.30 0.06 623.90 10.93 621.35 0.06 623.95 11.52 621.40 0.06 624.00 12.12 621.45 0.06 624.05 13.53 621.50 0.06 624.10 15.62 621.55 0.06 624.15 18.15 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 137 Stage-Area-Storage for Pond BMP-1: BMP #1 (Wet Pond) Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 619.00 4,938 0 624.20 8,553 36,576 619.10 5,103 502 624.30 8,612 37,434 619.20 5,268 1,021 624.40 8,672 38,299 619.30 5,434 1,556 624.50 8,732 39,169 619.40 5,599 2,107 624.60 8,791 40,045 619.50 5,764 2,676 624.70 8,851 40,927 619.60 5,853 3,256 624.80 8,910 41,815 619.70 5,942 3,846 624.90 8,969 42,709 619.80 6,030 4,445 625.00 9,029 43,609 619.90 6,119 5,052 620.00 6,208 5,669 620.10 6,261 6,292 620.20 6,315 6,921 620.30 6,368 7,555 620.40 6,422 8,194 620.50 6,475 8,839 620.60 6,528 9,489 620.70 6,582 10,145 620.80 6,635 10,806 620.90 6,689 11,472 621.00 6,742 12,144 621.10 6,797 12,820 621.20 6,852 13,503 621.30 6,907 14,191 621.40 6,962 14,884 621.50 7,017 15,583 621.60 7,071 16,288 621.70 7,126 16,997 621.80 7,181 17,713 621.90 7,236 18,434 622.00 7,291 19,160 622.10 7,347 19,892 622.20 7,404 20,629 622.30 7,460 21,373 622.40 7,517 22,122 622.50 7,573 22,876 622.60 7,629 23,636 622.70 7,686 24,402 622.80 7,742 25,173 622.90 7,799 25,950 623.00 7,855 26,733 623.10 7,913 27,521 623.20 7,971 28,316 623.30 8,029 29,116 623.40 8,087 29,921 623.50 8,145 30,733 623.60 8,202 31,550 623.70 8,260 32,373 623.80 8,318 33,202 623.90 8,376 34,037 624.00 8,434 34,878 624.10 8,494 35,724 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 138 Summary for Link 1 L: POI #1 Inflow Area = 19.483 ac, 19.35% Impervious, Inflow Depth > 3.75" for 100 Year event Inflow = 64.97 cfs @ 12.03 hrs, Volume= 6.089 of Primary = 64.97 cfs @ 12.03 hrs, Volume= 6.089 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 1 L: POI #1 Hyd rog raph C Inflow 1 70 __III-_ - 64.97 cfs ------J-r1--rL- --I--I-rJ-r1--r1-�_II I I � +_r_i_I IIl � 7_r_� � I I- ❑Primar y 64.97 cfs 65 1 RflvwAFle' a—Ia 9 V ILalc I I 60 - 55 50 ---I-+- -I--I--I-+-+-+-+-I--I-+-+-+-+-I--I--I-+-+-+-I--I--I-+-+-+-+-+-I--I- 45 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I w 40 -I--I-�- -I--I--I-�-�-�-�-I--I-�-'-�-�-I--I--I-�-+-�-I--I--I-�-�-�-�-�-I--I- �-- 3 35 -I--I- -----1-i-r F---I--I- ---I--I- i-r F-----1-i-r F F-I--I- 0 ' I L_L_I__I__I_L_1_L_I__I__I_J_1_L_L_L 30 25 ---I-r- - ----r-r-r-r----r-r-r-r------r-+-r-r----r-r-r-r-r-I--I- 20 15 -r-I-y- r-I--I-y-rt-r-r-I--I-y-rt-+-r-r-I--I-y-+-r-r-I--I-y-rt-r-r-r-I--I- 10 5 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 139 Hydrograph for Link 1L: POI #1 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.06 0.00 0.06 1.00 0.00 0.00 0.00 53.00 0.06 0.00 0.06 2.00 0.00 0.00 0.00 54.00 0.06 0.00 0.06 3.00 0.00 0.00 0.00 55.00 0.06 0.00 0.06 4.00 0.00 0.00 0.00 56.00 0.06 0.00 0.06 5.00 0.00 0.00 0.00 57.00 0.06 0.00 0.06 6.00 0.00 0.00 0.00 58.00 0.06 0.00 0.06 7.00 0.01 0.00 0.01 59.00 0.06 0.00 0.06 8.00 0.02 0.00 0.02 60.00 0.06 0.00 0.06 9.00 0.02 0.00 0.02 61.00 0.06 0.00 0.06 10.00 0.10 0.00 0.10 62.00 0.06 0.00 0.06 11.00 0.81 0.00 0.81 63.00 0.06 0.00 0.06 12.00 63.74 0.00 63.74 64.00 0.06 0.00 0.06 13.00 10.18 0.00 10.18 65.00 0.06 0.00 0.06 14.00 5.25 0.00 5.25 66.00 0.06 0.00 0.06 15.00 3.88 0.00 3.88 67.00 0.06 0.00 0.06 16.00 3.09 0.00 3.09 68.00 0.06 0.00 0.06 17.00 2.60 0.00 2.60 69.00 0.05 0.00 0.05 18.00 2.31 0.00 2.31 70.00 0.05 0.00 0.05 19.00 2.02 0.00 2.02 71.00 0.05 0.00 0.05 20.00 1.73 0.00 1.73 72.00 0.05 0.00 0.05 21.00 1.57 0.00 1.57 22.00 1.51 0.00 1.51 23.00 1.46 0.00 1.46 24.00 1.40 0.00 1.40 25.00 0.13 0.00 0.13 26.00 0.07 0.00 0.07 27.00 0.07 0.00 0.07 28.00 0.07 0.00 0.07 29.00 0.07 0.00 0.07 30.00 0.07 0.00 0.07 31.00 0.07 0.00 0.07 32.00 0.07 0.00 0.07 33.00 0.07 0.00 0.07 34.00 0.07 0.00 0.07 35.00 0.07 0.00 0.07 36.00 0.07 0.00 0.07 37.00 0.07 0.00 0.07 38.00 0.07 0.00 0.07 39.00 0.07 0.00 0.07 40.00 0.07 0.00 0.07 41.00 0.06 0.00 0.06 42.00 0.06 0.00 0.06 43.00 0.06 0.00 0.06 44.00 0.06 0.00 0.06 45.00 0.06 0.00 0.06 46.00 0.06 0.00 0.06 47.00 0.06 0.00 0.06 48.00 0.06 0.00 0.06 49.00 0.06 0.00 0.06 50.00 0.06 0.00 0.06 51.00 0.06 0.00 0.06 Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 140 Summary for Link 2L: POI #2 Inflow Area = 1.688 ac, 4.62% Impervious, Inflow Depth = 3.15" for 100 Year event Inflow = 6.38 cfs @ 12.10 hrs, Volume= 0.443 of Primary = 6.38 cfs @ 12.10 hrs, Volume= 0.443 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Link 2L: POI #2 Hyd rog raph ❑Inflow 7 6.38 cfs ❑Primary —— 6.38 cfs —1 — I of IOW A r;"_1 :,,6 08-'a;c'i- 6 -rT1 -rT I-+-r-r--y-rt-r-r-r--y-rt-+-r-r--y-rt-r-r-r-I--i-I-+- 5 w 4 a 3 2 ---I-7— ----7-7—T-7----7-7-7-7----7-7—T-7----7-7-7-7------7—T— 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Villages at Waxhaw Type/1 24-hr 100 Year Rainfall=7.90" Prepared by WK Dickson Printed 2/1/2023 HydroCAD® 10.20-2f s/n 08484 ©2022 HydroCAD Software Solutions LLC Page 141 Hydrograph for Link 2L: POI #2 Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 52.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 53.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 54.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 55.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 56.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 57.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 59.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 61.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 62.00 0.00 0.00 0.00 11.00 0.07 0.00 0.07 63.00 0.00 0.00 0.00 12.00 4.69 0.00 4.69 64.00 0.00 0.00 0.00 13.00 0.64 0.00 0.64 65.00 0.00 0.00 0.00 14.00 0.38 0.00 0.38 66.00 0.00 0.00 0.00 15.00 0.29 0.00 0.29 67.00 0.00 0.00 0.00 16.00 0.23 0.00 0.23 68.00 0.00 0.00 0.00 17.00 0.20 0.00 0.20 69.00 0.00 0.00 0.00 18.00 0.18 0.00 0.18 70.00 0.00 0.00 0.00 19.00 0.15 0.00 0.15 71.00 0.00 0.00 0.00 20.00 0.13 0.00 0.13 72.00 0.00 0.00 0.00 21.00 0.12 0.00 0.12 22.00 0.12 0.00 0.12 23.00 0.11 0.00 0.11 24.00 0.11 0.00 0.11 25.00 0.00 0.00 0.00 26.00 0.00 0.00 0.00 27.00 0.00 0.00 0.00 28.00 0.00 0.00 0.00 29.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 31.00 0.00 0.00 0.00 32.00 0.00 0.00 0.00 33.00 0.00 0.00 0.00 34.00 0.00 0.00 0.00 35.00 0.00 0.00 0.00 36.00 0.00 0.00 0.00 37.00 0.00 0.00 0.00 38.00 0.00 0.00 0.00 39.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 42.00 0.00 0.00 0.00 43.00 0.00 0.00 0.00 44.00 0.00 0.00 0.00 45.00 0.00 0.00 0.00 46.00 0.00 0.00 0.00 47.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 49.00 0.00 0.00 0.00 50.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 HY-8 Culvert Analysis Report Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design,and Maximum Flow Minimum Flow: 28.30 cfs Design Flow: 37.05 cfs Maximum Flow: 45.79 cfs Table 1-Summary of Culvert Flows at Crossing: Crossing 1 Headwater Total Culvert 1 Roadway Iterations Elevation (ft) Discharge Discharge Discharge (cfs) (cfs) (cfs) 622.95 28.30 28.30 0.00 1 623.02 30.05 30.05 0.00 1 623.10 31.80 31.80 0.00 1 623.17 33.55 33.55 0.00 1 623.25 35.30 35.30 0.00 1 623.32 37.05 37.05 0.00 1 623.39 38.79 38.79 0.00 1 623.46 40.54 40.54 0.00 1 623.53 42.29 42.29 0.00 1 623.62 44.04 44.04 0.00 1 623.67 45.79 45.79 0.00 1 632.26 169.41 169.41 0.00 Overtopping Rating Curve Plot for Crossing: Crossing 1 Total Rating Curve Crossing:Crossing 1 632 631 630 629 a �628 w a� Co 627 CU m a) =626 625 624 623 40 60 80 100 120 i40 160 180 Total Discharge(cfs) Culvert Data: Culvert 1 Table 1-Culvert Summary Table: Culvert 1 Total Culvert Headwater Inlet Outlet Flow Normal Critical Outlet Tailwater Outlet Tailwater Discharge Discharge Elevation(ft) Control Control Type Depth Depth Depth Depth Velocity Velocity (cfs) (cfs) Depth(ft) Depth(ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) 28.30 cfs 28.30 cfs 622.95 1.89 1.957 3-M1t 1.19 1.14 2.36 2.36 2.82 1.70 30.05 cfs 30.05 cfs 623.02 1.97 2.033 3-M1t 1.23 1.19 2.41 2.41 2.93 1.72 31.80 cfs 31.80 cfs 623.10 2.04 2.109 3-M1t 1.28 1.23 2.46 2.46 3.04 1.75 33.55 cfs 33.55 cfs 623.17 2.11 2.184 3-M1t 1.32 1.27 2.51 2.51 3.15 1.77 35.30 cfs 35.30 cfs 623.25 2.18 2.258 3-M1t 1.36 1.31 2.56 2.56 3.26 1.79 37.05 cfs 37.05 cfs 623.32 2.25 2.331 3-M1t 1.40 1.35 2.61 2.61 3.37 1.82 38.79 cfs 38.79 cfs 623.39 2.32 2.403 3-M1t 1.44 1.39 2.65 2.65 3.48 1.84 40.54 cfs 40.54 cfs 623.46 2.39 2.474 3-M1t 1.47 1.43 2.70 2.70 3.59 1.86 42.29 cfs 42.29 cfs 623.53 2.46 2.544 3-M1t 1.51 1.47 2.74 2.74 3.69 1.88 44.04 cfs 44.04 cfs 623.62 2.52 2.632 3-M1t 1.55 1.51 2.78 2.78 3.80 1.90 45.79 cfs 45.79 cfs 623.67 2.59 2.681 3-M1t 1.59 1.55 2.82 2.82 3.91 1.91 Culvert Barrel Data Culvert Barrel Type Straight Culvert Inlet Elevation (invert): 620.99 ft, Outlet Elevation (invert): 618.92 ft Culvert Length: 88.39 ft, Culvert Slope: 0.0234 Culvert Performance Curve Plot: Culvert 1 Performance Curve Culvert:Culvert 1 0 0 Inlet Control Elev Outlet Control Elev 632 631 630 i a � m �4')628 w m 627 CU i� C z 626 ��- 625 624 623 4D 60 80 100 120 140 160 180 Total Discharge(cis) Water Surface Profile Plot for Culvert:Culvert 1 Crossing- Crossing 1,Design Discharge- 37.0 cfs Culvert-Culvert 1,Culvert Discharge-37.0 cfs 632 630 628 626 a 5 w 624 622 620 618 -20 0 20 40 60 80 100 Station(ft) Site Data - Culvert 1 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 619.99 ft Outlet Station: 8 8.3 7 ft Outlet Elevation: 617.92 ft Number of Barrels: 1 Culvert Data Summary - Culvert 1 Barrel Shape: Circular Barrel Diameter: 4.50 ft Barrel Material: Concrete Embedment: 12.00 in Barrel Manning's n: 0.0120 (top and sides) Manning's n: 0.0350 (bottom) Culvert Type: Straight Inlet Configuration: Grooved End in Headwall Inlet Depression: None Tailwater Data for Crossing: Crossing 1 Table 2- Downstream Channel Rating Curve(Crossing: Crossing 1) Flow(cfs) Water Velocity Depth (ft) Shear(psf) Froude Surface (ft/s) Number Elev (ft) 28.30 621.28 2.36 1.70 6.62 0.28 30.05 621.33 2.41 1.72 6.77 0.28 31.80 621.38 2.46 1.75 6.91 0.28 33.55 621.43 2.51 1.77 7.05 0.28 35.30 621.48 2.56 1.79 7.19 0.28 37.05 621.53 2.61 1.82 7.32 0.28 38.79 621.57 2.65 1.84 7.45 0.28 40.54 621.62 2.70 1.86 7.57 0.28 42.29 621.66 2.74 1.88 7.69 0.28 44.04 621.70 2.78 1.90 7.81 0.28 45.79 621.74 2.82 1.91 7.93 0.28 Tailwater Channel Data - Crossing 1 Tailwater Channel Option: Triangular Channel Side Slope (H:V): 3.00 (_:1) Channel Slope: 0.0450 Channel Manning's n: 0.2000 Channel Invert Elevation: 618.92 ft Roadway Data for Crossing: Crossing 1 Roadway Profile Shape: Constant Roadway Elevation Crest Length: 100.00 ft Crest Elevation: 632.26 ft Roadway Surface: Paved Roadway Top Width: 50.00 ft Z US �� U.S. DEPARTMENT OF THE INTERIOR The National Map CATAWBA NE QUADRANGLE U.S. GEOLOGICAL SURVEY tau I SOUTH CAROLINA - NORTH CAROLINA Ic science for a changing world VV Top 7.5-MINUTE SERIES -80.8750' -80.7500" 35.0000' 512000m E 13 14 15 16 17 18 19 20 21 22 35.0000" 73 3873000m N Hawk's N Fti D-III T�iT� KnolllAirport ors �� ova �J ion o nks Presbyterian e ry z �.,' e R �� Valley Gem 4 �f�f/r n -1 UNBRIDLE 6s c -� 2 Church `J �, N Z z ���� Cem ❑ ❑ Banks Chi V YCem / o Oy>vP Presby Brian NEWTOWN_RD �� so / O y J ��:(T Wqy MARViN-RD, 6s° �. A�'f i p0 urchA2� Ch 0 p5 o r s Cy 0� blip M o z� EW.TOWN o Planion 72 o 72 �a d o 0 0 0 o 0 0 v �Q Oa OO M0NT DR TOAEy v ^ �' ' OaG�Va b p Y, it p� /A/ SANDY Oho ��O\ ///OJT ° •� ����� �GEfp-D� RAVENWOOD,DR O rq� �0. o y,P� � � a '•�" ��aG o, W m v.JA � o o, F ho ,y x �O � m � so � G0 71 z 9m O � PP 71 � O PAN � STRIKE Go �) b� O O z EUNNY CI E DR WpODHALC\� q � gRGpUR, / MV�V O Ace/�v(i/ \ ONLN 1 �� 650� o Be�ndsl DRAY, �rbve TON LN O r� / \ < O \\ � �✓ � oo A O� , � Church h a 'p ( . �p ❑ so R H �600� 70 O � � o E CNU .TWIN RqK z o � � POSS 70 U. HOC wR0 60 R � BO �GREENgVE v��D �o 600 4 z o C,550� y w � Cj ry � 69 ORTHFI LD N o o o M D 69 ��o eo 600 CEDAREN �a A z b GRP� 0 y K A p01NT CARPENTER�RO� � 550 c9L� 4 / J 65p o� � OARING;EAGCE<�N 0 0, Co �� \ WHITEHAWKI,' JI �co t ' V IN oq yy01 68 68 O� m L I' U )A��� �� ( z a 67 � ° E��a5 Y RD �� �° v ��� of o 67 h D �yo O �� ��a.Pa � D O �'yARR15 D � rho A� �J��� Soo•• � �ON DR W o 66 a` oy15 o-veers o �oR O h � W V. \l RES Q CRE 550 �N�FISHER DR p� R Q bp0 Cj FALL'ONDgL-'E Rp �� �� ,% o •• a � � I pWP Six Mile Cem 65 ,o �- o �� ►��0� �� 65 500 Tj,,• \\ h l� �G' I o p _ SHENA>yDO 1 z� :• a � ool � � a �� � 600 w �F 64 SSp I �F. F<< z �' - A BALD v. .►�� .00 v aP < 0 01 I �N� o — - S\ 1 O CI ti pp ��Z 600 0 O _ 1 rP Es, W 63 00 6 �yo H/BF�y. 6 O O o � 650 0 62 62 s Ago CI � RCNE�- — I � 61 0 bpp o �) �.0 ���� 61 5po/' Heath Memorial s� ^V0 .,, l� Pre blyterian jChurchl C�elm �� Chu ch Cem sso o ���� �n_ ILL R C,PF�so / P� 6sd 60 5 ¢ 3860000mN �N\ �h° „` ., „` •?o� �� Sao `'�'o _ p,p � I O 5i0 34.8750" -80.8750° 12 13 14 15 16 17 18 19 20 21 522000mE -80.7500 34.8750" " Produced by the United States Geological Survey MN * SCALE 1:24 000 ROAD CLASSIFICATION North American Datum of 1983(NAD83) LO World Geodetic System of 1984(WGS84). Projection and 1 0.5 0 KILOMETERS 1 2 SOUTH Expressway Local Connector co LO 1 000-meter grid:Universal Transverse Mercator,Zone 175 N CAROLINA Secondary Hwy Local Road o N This map is not a legal document. Boundaries may be 7o49• 1000 500 0 METERS 1000 2000 139 MILS 1 05 0 1 Ramp 4WD generalized for this map scale. Private lands within government pos. . rn Y reservations may not be shown.Obtain permission before 2 MILS MILES •Interstate Route US Route O State Route entering private lands. 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 QUADRANGLE LOCATION N oX Imagery.....................................................NAIP, July 2017 - November 2018 FEET Roads......................................... U.S. Census Bureau, 2016 2017 UTM GRID AND 2019 MAGNETIC NORTH o Names............................................................................GNIS, 1980-2020 1 Fort Mill DECLINATION AT CENTER OF SHEET Hydrography...............................National Hydrography Dataset, 2003 2 3 2 Weddington Contours............................................National Elevation Dataset, 2008 - 2013 U.S.National Grid CONTOUR INTERVAL 10 FEET 3 Matthews � • Boundaries..............Multiple sources; see metadata file 2018 - 2019 100,000-m NORTH AMERICAN VERTICAL DATUM OF 1988 Square ID 4 5 4 Rock Hill East to O 5 Waxhaw Z Wetlands.................FWS National Wetlands Inventory 1989 This map was produced to conform with the LL NU National Geospatial Program US Topo Product Standard,2011. 6 Catawba W 7 Van A metadata file associated with this product is draft version 0.6.18 6 7 8 8 UnitWyck CATAW BA NE, SC, NC z a y N C9 Grid Zone Designation ADJOINING QUADRANGLES Z Z 17S 2020 Z US �� U.S. DEPARTMENT OF THE INTERIOR The National Map WAXHAW QUADRANGLE U.S. GEOLOGICAL SURVEY tau I NORTH CAROLINA - UNION COUNTY Ic science for a changing world VV Top 7.5-MINUTE SERIES -80.7500' -80.6250' 35.0000' 523000ME 24 25 26 27 28 29 30 31 32 33 34 35.0000' 73 3873000mN �EIP OR ��O 00 m 100 s � AeroiPla.nta"t-io LQ�ke Number One � y �� � � goo `'gsrLEs1°� o i °� � boo �j �-� � ��o��� MP�o to O p PAL"AAERS�N t'N °ooQ' '-A Rlafltdt1011 � V m �VP�� o � � •'RA ELAGHDR �- d � ��`>�'� Q'�F'� Airport Wesley 84 72 ChapelZ"m 6So 600 6 0 50 boo Ri GW ' Yd R 550 / a w/<oUGNe RD 0 �/ G TlF•� a 60 � < �1� ��e' e ��� bh a • � ( � � 0 6So ��e ♦ ) O W S•L-EY C�I3A�P�EL (r wN m\ O 0 R D z O o C' L •�' NEW TOWN R 71 ° iIriion o O g W F� o 0 0 � z n ,no ■ a� 0 m Oak Grove of 600 ` D a '" v tle Cr sANDTYN DR Church' Mount Zion m L GhurclTCem o 0 O • O so 0 � �1 e boo � o � e m, 70 O;T E Dq � Y 1 c � ABUNpgN � W �F � 70 rw�•d C —- h Q A> DZ �� l \D� 00 A ,per 6o O 650 Q NEW TOW •' N RDO ast_Fork u'�Ivemtl 0 � oSoo 0 I 69 e � ) 55o cY� 69 OP 0 0 0 0� 1Vlacliine O- GtiG 0P 660 bh0 �Qi O 'F'O JEANNE pR so ?, 68 OJ qUT �h MLLL PD o� a B�' time s 68 ��� �Do �' � �`' Bgtes B o •` � q�FRR 5Y•-' ' �`�v 9i,`o gip`' t- r � v o0 6So O ' 1 P � 75 RD 0/� / 02k� p a _ q�i RAYMOND AU571 jlj 600 0�,'• �\ O o P 656 50 6c � �h •. P v 0 6p0 PQ Q a �00° _ by0 6s 67 d 67 `�l` QO 600 b = o Q 650 O V G� m t6y0. Pa 55 ��O\ V�O SADLER-RD NµSS1 6po��R FNT GREEN LN 0 O �P 650 2 /I 0 E��P •o M NROE. �.... � yYP� 0 0 MCNEELYRD ZP `'9!`�° Mineral �"� v�P NPR �°' bqo •o �� bti F� Pa`N Springs °`0 0 HICH R e �� Min- ral Springs bh o United Methodist J �lff �A7 50 a % O Church CemJ - .�o� b DOSTER RD oREST o 0 o sApi U 66 �00 bo �aa � 66 WOOD DR O 0 �� Ei OOD O o 0 GRESTWOD_DR 6S�16 � r Q 0 n SNOW ITEFt� �• 61 b�J FPGP� 550 bho 75 byo p� EastSide F��� ) h0 � •� 65 p b N RICE sT HOlN1E M)NE. D Cerri� .•• - 'T. 65 O + C W SO ;LH"s �r 75 n o o `,00J e yo 1��jP� 6so . ,�,q�� by0 O• >c::, IL✓ 6So 0 �FS,<� NEWFLL DR -c'!y! 100 O � � r �• •1 a HILL OR y Yi O D �7 o \VI ����9. �� ob�� � ��" •?� 0� o / � CN1RKS MCCp z p 20 �9 rn GROVE lI � �� RD��.0 64 Waxhaw � moo P� MURp N°R City-Cem o Q �� 64 0 �? SNP .tN°pKp� PyF. i � 100 to �/`oo 50 �� L 0 yyAXNAW FARMS RD o o� - '� � P�� �O •��. O v ��� �n q q�s Aso 100 � L by0 �'h�� •.. LP 90 .p 600 O C) O m O byDDD �o 6 O 63 m Y � o � o •.��� 0 f n b 3Q \ ro O O MAW ,KNOLL DR REl ClR A � Piney Grove � o Church�Cem 2 � ' �.-sIMS o l� Wax haw N Church.Cem ^ "s LSo 0 Y / 0 0 0 .� My LpDYS WA o •.. � ^ O Po v Walker Cem �o �o j N 650 / O O 700 � � PARK OOD SCHOO�D 62 o zoo 62 bh Ebenezer Q / Q O O IK A Chi K-Cem bh •' 6so � � ``so Z a � �.. o .•Roughe .ge `• D � 60 � 6$O 2 �s / P = � NESBIT RD 0 0 /• o F A Z o 0 m 600 61 A ° 61 U 60o O b S� 0 • G 650 e .07 � Wy � -:�.• 6 0/c O � 0 oRTFR,RD O � o r O N� � MASSEY RD I I AD K. cWho . Gem o SHY�OALN o� � 0 °�N (+ o b pr a •� 60 0 0 2O b0 MoCKIN z y p7HAN R 3860000mN ethl�m • ��( �� 200 �hurch�Qem °� 0 o D � a s Cr axha 10 6y0 � o 60 600 600 0 � � 0 34.8750" 23 24 25 26 27 28 29 30 31 32 33 534000"E 34.8750° 80.7500' -80.6250" 1-0) Produced by the United States Geological Survey SCALE 1:24 000 ROAD CLASSIFICATION n o North American Datum of 1983(NAD83) MN, , oo World Geodetic System of 1984(WGS84). Projection and 1 0.5 0 KILOMETERS 1 2 NORTH Expressway Local Connector I- 1 000-meter grid:Universal Transverse Mercator,Zone 175 T°48• 1000 500 0 METERS 1000 2000 N AROLINA Secondary Hwy Local Road 0) This map is not a legal document. Boundaries may be Ramp 4WD generalized for this map scale. Private lands within government 139 MILS 1 0.5 0 1 r Y 0°11" (1)'ITN reservations may not be shown.Obtain permission before 3 MILS MILES •Interstate Route US Route State Route co X entering private lands. 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 QUADRANGLE LOCATION O Imagery.....................................................NAIP, July 2020 - July 2020 FEET O CD Roads......................................... U.S. Census Bureau, 2016 UTM GRID AND 2019 MAGNETIC NORTH M U) Names............................................................................GNIS, 1980-2022 DECLINATION 20 CENTER MAGNETIC SHEET 1 Weddington H dro rah National H dro rah Dataset, 2003 - 2018 1 2 3 2 Matthews y g p y������������������������������� y g p y Contours............................................National Elevation Dataset, 2008 co U.S.National Grid NORTH CONTOUR INTERVAL 10 FEET AMERICAN VERTICAL DATUM OF 1988 Z 3 Bakers C) Boundaries..............Multiple sources; see metadata file 2019 2021 100,000-m Square ID 4 5 4 Catawba NE LL Wetlands.................FWS National Wetlands Inventory Not Available This map was produced to conform with the 6 Van Wyck NU National Geospatial Program US Topo Product Standard. Z Q 6 7 8 7 Unity y(D 8 Tradesville WAXHAW, NC Z Z Grid Zone Designation ADJOINING QUADRANGLES 17S 2022 USDA United States A product of the National Custom Soil Resource Department of Cooperative Soil Survey, Agriculture a joint effort of the United Report for N ��� States Department of Agriculture and other Union County, Federal agencies, State Natural agencies including the Resources Agricultural Experiment North Carolina Conservation Stations, and local Service participants ks P 0 ---------- 1 7000 000 I L November 29, 2022 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres.usda.gov/wps/ portal/nres/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https:Hoffices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nres142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or(202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 SoilMap.................................................................................................................. 8 SoilMap................................................................................................................9 Legend................................................................................................................10 MapUnit Legend................................................................................................ 11 MapUnit Descriptions.........................................................................................11 Union County, North Carolina......................................................................... 13 GfB2—Georgeville silty clay loam, 2 to 8 percent slopes, moderately eroded...................................................................................................13 TaB—Tarrus gravelly silt loam, 2 to 8 percent slopes..................................14 TbC2—Tarrus gravelly silty clay loam, 8 to 15 percent slopes, moderately eroded................................................................................15 TuB—Tarrus-Urban land complex, 2 to 8 percent slopes............................16 References............................................................................................................18 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and 6 Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 Custom Soil Resource Report Soil Map In In 522100 522200 522300 522400 522500 522000 522700 34°55'52"N I 34°55'52"N k 8 8 �y Soil MaN may not he valiel at this scale. 34°55'25"N I 34°55'25"N 522100 522200 522300 522400 522500 522000 522700 b v Map Scale:1:4,080 if printed on A portrait(8.5"x 11")sheet. in ` Meters $ $ N 0 50 100 200 300 Feet 0 150 300 E00 900 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 9 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(A01) Spoil Area The soil surveys that comprise your AOI were mapped at 0 Area of Interest(AOI) Stony Spot 1:24,000. Soils Very Stony Spot 0 Soil Map Unit Polygons Warning:Soil Map may not be valid at this scale. Wet Spot Soil Map Unit Lines Enlargement of maps beyond the scale of mapping can cause Other misunderstanding of the detail of mapping and accuracy of soil � Soil Map Unit Points 9 pp 9 Y �- Special Line Features line placement.The maps do not show the small areas of Special Point Features contrasting soils that could have been shown at a more detailed Iwo Blowout Water Features scale. Streams and Canals Borrow Pit Transportation Please rely on the bar scale on each map sheet for map Clay Spot � Rails measurements. Closed Depression ­0 Interstate Highways Source of Map: Natural Resources Conservation Service Gravel Pit US Routes Web Soil Survey URL: Gravelly Spot Coordinate System: Web Mercator(EPSG:3857) Major Roads Landfill Local Roads Maps from the Web Soil Survey are based on the Web Mercator A. Lava Flow Background projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the Marsh or swamp Aerial Photography Albers equal-area conic projection,should be used if more Mine or Quarry accurate calculations of distance or area are required. Miscellaneous Water This product is generated from the USDA-NRCS certified data as Perennial Water of the version date(s)listed below. Rock Outcrop Soil Survey Area: Union County, North Carolina Saline Spot Survey Area Data: Version 23, Sep 12,2022 Sandy spot Soil map units are labeled(as space allows)for map scales Severely Eroded Spot 1:50,000 or larger. Sinkhole Date(s)aerial images were photographed: Apr 15,2022—May Slide or Slip 10,2022 oa Sodic Spot The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 10 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI GfB2 Georgeville silty clay loam,2 to 34.4 42.1% 8 percent slopes, moderately eroded TaB Tarrus gravelly silt loam,2 to 8 19.3 23.6% percent slopes TbC2 Tarrus gravelly silty clay loam,8 27.4 33.5% to 15 percent slopes, moderately eroded TuB Tarrus-Urban land complex,2 to 0.7 0.9% 8 percent slopes Totals for Area of Interest 81.8 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. 11 Custom Soil Resource Report The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Union County, North Carolina W132—Georgeville silty clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol. 2mx7q Elevation: 270 to 950 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Georgeville, moderately eroded, and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Georgeville, Moderately Eroded Setting Landform: I me rfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap-0 to 7 inches: silty clay loam Bt- 7 to 60 inches: clay C- 60 to 80 inches: silty clay loam Properties and qualities Slope:2 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 9.6 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No 13 Custom Soil Resource Report TAB—Tarrus gravelly silt loam, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 2mx8j Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Tarrus and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Tarrus Setting Landform: Imerfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap-0 to 5 inches: gravelly silt loam Bt-5 to 32 inches: clay BC-32 to 40 inches: silty clay loam C-40 to 54 inches: silt loam Cr-54 to 80 inches: weathered bedrock Properties and qualities Slope:2 to 8 percent Depth to restrictive feature:40 to 60 inches to paralithic bedrock Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 6.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No 14 Custom Soil Resource Report TbC2—Tarrus gravelly silty clay loam, 8 to 15 percent slopes, moderately eroded Map Unit Setting National map unit symbol. 2mx8r Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Tarrus, moderately eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Tarrus, Moderately Eroded Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap-0 to 6 inches: gravelly silty clay loam Bt- 6 to 45 inches: silty clay Cr-45 to 80 inches: weathered bedrock Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature:40 to 60 inches to paralithic bedrock Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No 15 Custom Soil Resource Report TuB—Tarrus-Urban land complex, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 2mx8s Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Tarrus and similar soils: 60 percent Urban land:25 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Tarrus Setting Landform: Imerfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap-0 to 7 inches: gravelly silt loam Bt- 7 to 42 inches: silty clay loam Cr-42 to 80 inches: weathered bedrock Properties and qualities Slope:2 to 8 percent Depth to restrictive feature:40 to 60 inches to paralithic bedrock Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No 16 Custom Soil Resource Report Description of Urban Land Setting Landform: Imerfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Impervious layers over human transported material Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8 Hydric soil rating: No 17 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ n res/d eta i I/n ati o n a I/s o i Is/?cid=n res 142 p2_0 54262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nres.usda.gov/wps/portal/nres/detail/soils/ home/?cid=nres142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepastu re/?cid=stelprdb1043084 18 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ n res/d eta i I/so i Is/scie ntists/?cid=n res 142 p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid=n res 142 p2_05 3624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:H www.nrcs.usda.gov/lnternet/FSE—DOCUMENTS/nrcsl 42p2_052290.pdf 19 National Flood Hazard Layer FI RMette *FEMA Legend 8Oo45'45'W 34o56'2"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT w � M �� �f � Cc Without Base Flood Elevation(BFE) ilkr,p Zone A,V,A99 SPECIAL FLOOD With BFE or Depthzoneae,Ao,AH,ve,Aa * � F' r +• , # HAZARD AREAS Regulatory Floodway = -� , . 0.2%Annual Chance Flood Hazard,Areas f ,, N. of 1%annual chance flood with average 1 � �T_T depth less than one foot or with drainage '5T4 - areas of less than one square mile Zonex # *� { # i Future Conditions 1%Annual { I Chance Flood Hazard Zonex R I ', , " Area with Reduced Flood Risk due to qf •* 1' # �' OTHER AREAS OF Levee.See Notes.Zone FLOOD HAZARD Area with Flood Risk due to Leveezone D NO SCREEN Area of Minimal Flood Hazard Effective LOMRs }} OTHER AREAS Area of Undetermined Flood Hazard Ab ' AV GENERAL -—-- Channel,Culvert,or Storm Sewer 1%� STRUCTURES i i i i i i i Levee,Dike,or Floodwall . ' �■■ `. a zo.z Cross Sections with 1%Annual Chance 17,5 Water Surface Elevation IdkREA F � FLOOD HA AR7 D # * a- - - Coastal Transect + _sfa^•^^•• Base Flood Elevation Line(BFE) i I F k ` s Limit of Study P Jurisdiction Boundary Coastal Transect Baseline OTHER _ Profile Baseline a FEATURES Hydrographic Feature � 1 Digital Data Available N Of 0 f. 4- , No Digital Data Available J i MAP PANELS �A r Unmapped The pin displayed on the map is an approximate 14` ,: , point selected by the user and does not represent + •- *, . ry t• y +� dr M i an authoritative property location. # ��~ ` ., k � � #,4 j This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. IL The basemap shown complies with FEMA's basemap A accuracy standards '* The flood hazard information is derived directly from the • authoritative NFHL web services provided by FEMA.This map f + +F t was exported on 2/1/2023 at 7:07 PM and does not reflect changes or amendments subsequent to this date and + T INCLUDED) time.The NFHL and effective information may change or y become superseded by new data overtime. rs This map image is void if the one or more of the following map elements do not appear:basemap imagery,flood zone labels, legend,scale bar,map creation date,community identifiers, FIRM panel number,and FIRM effective date.Map images for Feet 1 6000 80045'7"W 34055'32"N unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 ' regulatory purposes. Basemap:USGS National Map:Orthoimagery:Data refreshed October,2020 0. ww w z00 00O OJU 'Ozw a ¢ DICKSON wwo community infrastructure consultants 0'.=U a0 1213 W. MOREHEAD STREET o Z_ I \\ V Ira SUITE 00 . o CHARLOTTE, 28 203zoZ oZ0 -334-5348° (t)704 0 (fl 704 334 0078 10 I I II . �. / \ WWW.WKDICKSON.COM ooQ _ 0374Z¢ NC LICENSE NO.F¢ ZZ k� I / I I I / O I ¢3:z ��■ ■ ■ ■ ■ ■ ■ ■ ■ ■ �j / \ I i I I / / / I/ / / o • °< --- - -- ---- -- - - - -- - — 1 ♦ I -� _ / - - `! -` —'/` rV Tom- ' 4zmz 0 ZZO 0 0 o I ■ SHEET FLOW - FZ ■ LENGTH=100 FT ` I • -- - - - - - ---- / --- _ � ooa I ■ Tc=20.6MINUTES Fm.o o -- --- - - - ■ - - -- - - - - ` - - - —�— - - - I / I I I I I \ I I / PROFESSIONAL SEAL 1 I I I I I 1 � I � � � ■ �/ I I _ m / � / � ■ it i I ,II� I I I � I I / SHALLOW • CONCENTRATED FLOW ` ■ I / \ 4 �" ■ LENGTH=404 FT ■ I / I I \ I I \ \ • Tc=1.7 MINUTES ■ \ I � -_ ■ - _ - - - - -- - - - - — SHEET FLOW -- - • / ` LENGTH=100 FT Tc=14.8MINUTES At / \ I OPEN CHANNEL FLOW ♦ ` .� IL-- _ i _ \\ \_ _ I LENGTH=611 FT `Tc-2.0 MINUTES ♦ ` •.. I / j - - - \ / �\ \\ i p z -�1 I I • . SHALLOW I / _ _ - ^ �\ \� i' _ O f - i O o_ / CONCENTRATED FLOW / / / �- - -- \ \ � ��� � / / \ r I I ♦ ` . LENGTH=621 FT I % % -� , - / _ - ��- U oc PRE-DEVELOPED DEVELOPED . Tc=2.2 MINUTES \ - - / - % - _ _ W C� I / / DRAINAGE AREA 1: 18.73 AC ♦ - - 1. Ir Cl) �' / Tc= 24.4 MIN O PROPERTY BOUNDARY ' . I I J / / / / --�_ �_ � � � � � � w � • LI OPEN CHANNEL FLOW • / / - - - - - ��� T ♦ LENGTH=399 FT / r �; ♦ Tc=1.3MINUTES Lj I PRE-DEVELOPED DEVELOPED/ . DRAINAGE AREA 2: 7.40 AC 1 Tc- 18.3MIN ■ � � 1 r LU J \ EX.WETLANDS \ / / J I ■ .. ' I I I I I I I I ° / U ■ POI #1 POI #2 \ z� CV) N N / / 6i N w I / / 1 I / I I 1 \ I / _j W I / I 11 \ 1 1 / ss Q Q JI-LU N Q a i ¢ Q —/ �/ I I I I \ \ \ \ \ I z0. dN — N r � 1. // // // // // / / II \ \ \ 11 �\ \ \\ \\ o `L Q _j ss� EX.WETLANDS W U LU O Z / (TYP.) °C J Z (aj U OJ w W LU LU Ir i U z a \ O IV U 00 0 Z LL' O a O w o LL 0 70 0 70 140 w U SCALE: 1" = 70' Li 6i w z p � Z ° Ir p 0 0 L E N N A ° Q PROJ. MGR.: WGB DESIGN BY: WGB DRAWN BY: RBB PROJ. DATE: JAN 2023 z DRAWING NUMBER: ON Wl<L—L U - � C4 .4 4% LLJ WKD PROJ. NO.: community infrastructure consultants 2022078200 a w w 0. w zaw 00O OJ 'zw OD woo DICKSON communityinfrastructure consultants U= O'. .a0 �-w I / ' � \ — — — — — — — — —I ` ` —\ — ;} — — — T 1 \ \ \ — _ — - 1213 W. MOREHEAD STREET 10Uo I I I I / I — � � / /I — — \ � \ - - � \ \ \ �� — '� - - - - - - // \ \ \ \ \ ) / SUITE300 LLOzw I I I I I I I I I I / / \ \� 1 \ \ '_� \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ - _ \ \ \ \ l / / w o Z I 1 \ I /\ \ \ \ \ \ _ \ \ \ I / / I CHARLOTTE, NC 28203 DZw — — _ — — — — — \ \ / / I I I I I I I I ( � _ - I _ - \ \ \ \ \ \ \ / 1 / (t)704-334-5348 Z,)o ` _ °o= I I I I 1 I 1 \ I I �� \ \ \ _ _ _ 11 1 // / \ \\ \\ _ \\ \ \ \\ \ \\ \ \\\\ \\\ \ _ - - - - - - - _ / \ \_ '-`�\ I I / / I-, ,-, ,- // � (f)7043340078 =UQ oY� I I I I I 1 I \ 1 / - - _ / \ \ \ \ \ \ \ \ \\ \� \ / I \ \ \- / / / �� �� \ \ \ \ I \ / / / WWW.WKDICKSON.COM III I \ ( \ _ \ / / \ I`- \ \ \ \ \ __ _ / / / ZQ I \ I \ F_ I I I 1 I I \ \ \ \ \ / / I \ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■�♦♦ \ \ \ \\ \ \ \ \ \ \ �\ \ _ � — ` �I I I 1 I I/ / I/ / I/ /_ ' / NC LICENSENO.F0374 0w \ I I I I \ \ \ \ I I 1 I I /O �' 1-1� � \ \ \ I I II I I I I \ �� / ♦ \ \ \ \ \ \ \ \ \ \ \\' \\ � I �/ / I/ / 1 / / /I / / / // / /�/ y / /` / \ I I I I I I I •�11 ■ ■ o�■ ■ ■ � � ■ / ♦♦ \I \ \ \ \\ \ \\\\ __ __ \ \\ I / / /' \ _ _ _ \ 1 /I / I / // / / / // / / / / I/ /L///// / / w s 0 \ \ \ '\ '\ '\ ' '\ \ '\ I 'I ' ' '1 I , - \ \\ ' I 1 / l \ \ \ \ ( J , / y / / / / z \ \ \ \ \ \ \ \ /I -_ *is \ (.6 / // / -_ — . ##, I \ \ — \ — / / / v / / / / / /_ m m-mm \ a- \ -\ rt \- \-T--�- I I -' I /_ I � \ \ I I I 1- \ - / �- / � - - - - �-fi— \ 11 I / /� - - - - - - - - - // / / / / Joa \ 1 L\ 1- }-1 I I -!- r �- - I-I— t \ \ I 7 I 0\ \ \ / // / / / - - - � - \� 1 \ \ \ \\ \\ \ \ \�\ \\ \ I � 1 / i - - - - - - - - L 1 - / // / / /// /jT -�- zm I I I I I I I I I I I / \ \ \ I I \ \ \ / / / ' / " \ ~\ \ \ \ \ \ �� \ 1 I I I I 1 / / , , - - - - - // / 1 / / / / / / / 1 I I I I I I / \ \ \ \ \ \ \ / / / / / I \ \ \ \ \ \ \ \ I I 1 / / / I / , / / / / / / �z0 / I I I I ) I I I I I I I 1 / 1 1 1 k \ \ \ ' / / �/ / \ \ \ \! # \ \ \ \ \ I I ( / / - _ ' I I 1 / l l l I / 1 I I I I I I 1 / \ \ I 1 1 / J■ \ \. /' / // /� , _ _\\\\\ \\ \ \ \ \ \ \ I I I I I I I I ( / / I I I / I / / / °�P I I I I I / / I I 1 1 I I / / I \ / / / ♦ \ \ \ \ \ \ I / \ - - � / I J I I I I / / 1 I I I I � \ I / / / / I ■� \\ \ SHEET FLOW - -�s � / / / / ///4 \ \ \\ \\ \\ \ \\ \ I I i I I ( _ _ _/,�— - -- r-*-T I {-I (1--�--1- /. °z / / / I I I I I I ) / / / / / / / / ■ \\ LENGTH=100FT c� /' / / / / -- �\ \\ \\ \\ \ •�� _\ \ \\ \ -1 -� I I I I-I 1- / `�_ -\ - - - - - / L / I 1 I ( ' 1 I 1 1 1 I l / / l I 1 I 1 I / / / / / / / �■ \\ Tc-20.6 MINUTES / / / / / / / ' / �\ \ \ \ - -♦ 'c \ \ \ �-1 I I � I I III I I / ,- - _ _ / / I \ \ \ I / �Z= I III 1 I / I / , I / I I 1 / / / / / / / — — — i —� \ \ \ —\— \ \ \ \ 1 I I II I , � _ — _ _ — _ — / I / I I 1 \ \ \I \ PROFESSIONAL SEAL ado I I I I I / I l / I / 1 1 1 -I - l - - -/ ■ \ � - - `' / /' / / / / / -\ \ \\\\ \\ \\ \\ \ ♦♦ \ \ \ \ \ ` 1 I I I I I I I I I I / / - _ L \ \ '/ / I 1 \ 1 \ \ \ \ I \ aoLL / I 1 \ \ / / / / / / ■ �l � _ / / / / ' / / \ \ \ \ \ \ \ \ I I 1 I \I 1 / / - / /I I I\ \ \I \ \ \ / I I � l � / / / I I / // I \ 1 1 // // / / / / / / I/ �-- \ --\ _ - � -A �/ / / // / / / - \ \ \ \\ \ \ \ \ \ \ � \ \ \ \ \ ; 1 I \ \\ \ 1 \ / I r _� _ , -_ I� /\ \\\\ \ \ \\ _ _ \ l - - - _' \ I \\\ m / � / / / / I I I I 1 I , 1 1 \ 1 / / / / / / / // - - - /, �' / // /' =' �I- \ \\\\ \ \\ \\ \\ \\ \\ \ ■ \ \ \\ \ \ \ ' ' \ 1 ' ' ' ' \ \ \ \1 \ 1 / �\ �I � // ( \\\ \ \ \\ / / / / / / / I I I 1 1 / / / / / / / / /■ / - - - - / / / / \ \ \ \ \ \ \ \ \ \ \ I I I \ \ \ \ \ \ ) \�/ / / / I I I 1 I 1 � \_ �/ / / / / / /■ / //� / �/ / / \ \\ \ \ \\ \\ \\ \\ \\ \ ■ / \ \ \ \ \ \ \ \\` 1 \ \ \ \ 1�\ \ \ 1 I /- - - - - - - �_ �\ \ \� ' / / / / / / 1 1 I 1 ' / / / / / / / / / / ' - - / / / / y / - � \ \ \ \ - \\ \ \ \ \ \ \ \ \ \ I 1 \ \ I 1 \ / / - < \ / 1 I / / - - - / / / \ \ \ / / / / / - \ \ \ \� ' /// /1 / 1 1 - 1- 1 I - \ \ r -/ i � L /-/ -t—/ / I/ - _ _ - - _- - - - - � / / / / / / /\ \ ' \\ \ \ \ \ \ \ \\ \\ I* - �� / I \ \ \ \ \ \ \ I I I I ( / / / /, �// /; - - \ \ \ I \ \ I / 1 \ \✓- / / l l / /l / / / / - - - _ - - - - - / V / / \ \ \ \ \ \ \ \ \ \ _ - _ / � I \ \ \ \ \ 1 I 1111 //'/ / , /' �\ \ \ \ \ \ \ \\ \ \ � // ( I 1 I \ \ \ \ \ // / / / // / / / / 1 - - - _ _ _ /'�'` / / / / /- \ \ \\\ \\\\ \\\\\ \\ \\ - _ _ - - / / I 1 I \�\ \ \ \ \ \\ '\ \ \ I I 1 1 1/� I I _ \\ \ \\ \ \ I \ I \ \\ 1 / / / / / - - '` / / \ \ \ - / / 1 I\ \ I I �tt' 11 1 I I ^\ I \ � \ \ I I \ 1 ( I I 1\ \ \ \\ \ \\ \� \ ,/ / / / / / / / // /� '- � _ _ - _ / / / // \\\ \ \\ \\ \ \ \ \` � , - - _ I \\ \ \ \ \ ' I 11 /' \ \\ \ \\ / / / / VI/// / / _ SHALLOW_ - - -' / � " , \ \ \ \ \ \ - / � / / I I \ \ \ \ I I 1 \ 1 \ \ � \ I II \ \ 1 \ \ \ \ \ \ \ // / / / / / / - / / ' \ \ - - - - - - / - / 1 \ 1 I III \ \ \ I �- -\ K \ \ \ \\ \ \ \ \ _"�' \ / / / / / — _ CONCENTRATED FLOW / / \ \ \ \ \ \ \ \ \ _ / / — \ \ \ \ \ \ \ \ \ \ � � � �/ / 1 / 1 / / / / / / — LENGTH=404FT - - �/ / / \ \\ \ \ \ \ \ \ \ ■ / ' � — _ _- - - - _ — — / � I \ \ \ I I I I I I I 1 1 \ \I \ \ \ \ \ \ � \ / ) \\ \ \\ \\ \ / / / // ( / / /_ - - - Tc-1.7MINUTEs '/ / /� \ \\ \ \\ \ \ / _ - _ _ _ � / ) I I I I I 1 1 I 1 I � I I I 111' I \ I I \ \ 1\ \ \ \ / / 1 1 11 I l _ - - - - / \ \ \\\\ \\ \\ \\\ / /' / '� / , I 1 I l I / /U I I l \ \ / 1\ \ \ \\ \ \ \ \ \ �\ \ + L � I 1 _ � — — — — /� �/ / \ \ \\ \ \ -_ SHEET FLOW -- / / / 1 / / \ \ \ � \ —�� �I \ \ _ —� -� \ T / 11 / F \ \ \ ` — — J \ \ \ \ \ \ \ \ \ / / , LENGTH=100FT � _ - - - / / / / / / / _�_ —�- IV �—\ /\ \ --\ \ / I \ I I _ _ - - / / / - � \ \ \ \ \ \ \ \ / - - - - / 1 / ,/ / / / - \ / \ \ \ \ \ / 1 I 1 \ \ \ \ — Tc=14.8 MINUTES' — — / \ \ — \-7— — \\ \\ \\ \\\ �\ \ \ - - - J / l l I l l/ 1 \ \\ \ \ \ \ \ / - — — _ — _ _ — / / / ��_ ' \ \\ \ \ \ \ \ \ \\\ ///' / - - - - � // // /�\ 11 / / / / � / \ \ \ \ l I \ \ \ \ / - - - - - - - - / / / \ \ \ \ \ \ / - - - - - - — _/I / / / / / / /- - \ \ \ \ \ _ J \ \ \ \ - - _ �, / / / * I \ \ \\ \\ \ \ \ \ � - - - _ _ - - - - _ _ / / \ \ \ \\ \ \ \ \ \ \\ / / / / / - - - - - -_- - - _ -I�/v / / /� /' ' / \ \ \ I- - �> \ \ \ \ \ \ / r — / \ / / _ _ _ / / / // / / / / / \ \ \ \\�\ \\\ \\\� \\ \\ \\ \\\\ \\\� _ // / / /// / is 1 \ \\\\\\ \\ DRAINAGEAREALOP400AC POST �' � / - - _ ' / // _A \\ \\\ \\ \ \\ \ \\ \ \ \ \ ■lit / / / / / / — - - - - - - // ' ' / // / // / / / / / \ \ \\ \� \�� � / \ / \ Tc= 24.4MIN / � � — _ _ � \ \ \ \ \ \ �\ \ /�/ / / _ — / / // / , � / / / V / // \ \ \ 1.1\- �\ \ / "' - - \ \ _ / / — — _ — / - - - / / / / / / / \ \ I / i � _ _\ \ \ _\ _ 1 � \ \ \ \ \ \ \ \ / / / \ \ \\ \ \ \ \_ / �/ / / / / / / / — / � / — 1-1 \ \ \ \ — — — — / \ \ \ SHALLOW — / / _ \ \ / / � - — — — 1 \ \ \\\\ \ \ \\ \ / / / / \ \\ \ \ \ \ \ \ \ / — i / \ OPEN CHANNEL FLOW / / / / / / fir/ / — / - / I \ __ \\ \_ _ / \ \ \ \ \ � , / // \ \ \ \ \ \ \ \ \ I I / — — — _ — / \ \ \ \ ' / / / / / / — -CONCENTRATED FLOW / /, / / / — / — _ — / —/I \_ — y\\ /i /� \ \ \ LENGTH=611 FT \ _ / - — — _ / \ -- \ \ \ \ \ \ \ \ I / / / — � — -�- / / 'LENGTH=370 FT � / / � � � — — �— � / - - - - \ \ \ \ \ \ \ \ �� / / / / \ \ \ \ \ I — - - - `Tc=2.0MINUTES \\ / / / / / / / / � — — / / \ / \\ \\ \ / i_ — Z \ \ \ 7 \ \ \ / \ / / / Tc=1.3MINUTES / / / / — - - - - / - — Q - - -\ \ \ \ \ \ \ \� �� / , * - / \ \ \ I \ I I I I I 1 I I / / , - \ \ \\ \� \ `� - - - -�- / / / / / / - - , ; /'�// _ - - -, �\ \ -_ � / � - - - Ir - _ - Ir \ \ \ \ \ \ \ \ \ \ \ \ / /, r , \ \ 1 I I 1 I I I I I I ( / / - - \ \, \ /� / / / / / //� � /i / / / - - �\ `\ --� �% \ \ \ \ \ \ \ \ / �/� / \ I I ) / ) I I 1 I I I I I / / /� - - \\,�\ \\ \\ \ \ �/ // / / / - / / _ / - _ _ _ _ - O \\ \ \\ \ \ \ \ \ \ \\\ \\\ \ / / / / / / / / / I I I I I I 1 I / �� \ \ \�\\ \\\�\ �� - - -�' / / / / ,'/ / / / / / ./�' /�//.// / \ / /� w — _ \ \ I \ \ \ \ \ \ \ \ \ \ / 1 1 ,� ) I / / / / l l l / l I \ I I /—r � \ \\ \ \\ \ \ \ — / / // / / / / / POST-DEVELOPED \ \ )/ _ _ _ / / Z o IN / , f / / / I \ \ \ ( / 1 \ \ \ \\ \ ' / / / / / / / DRAINAGE AREA 2: 1.63 AC \ __ —/ '/ O ----\ 4 -r- _�_� �_ - I I 1 \ � � \ \ \ / / , , / / / / / / / / / / I \ \\ \ \ \ \ \ \ ( \ \ \ \ ���� \\ \ -, Al / / // , � / // / � ,6.7 , � � \ \ � / � '/ > '-\ 1� \ \ I I 1 \ \ _ I / I' / / / / I I / ( \ \ � \ l \ \ \ \ \ � 1 / / / / / / '-� i /,� / /�/ / / /, / / / / \ _ I I\ _ _ / 1 f I \\ \\ \ \ / / o / / / / / \ \ \ \ \ \ \ \ \ \ \ /I' — \ \ \ \ \ \ \ \ / / / / / / / //� / u/ / / / ' Ir w \ // , / / / / I I I \ \ \ \\ \ \\ \ ��\ \\ \ \ \ \ / / / / / "- / / I / / / I� — \ \ \ \ I I 1 \ \ \ \ \ / �� / / / / / \ � \ \ \\ \ \ \\\ \ \\�\ ) / \ , \ \ \ -0 _/ / / / / -_ / / --I - // /��_ I I 1 1 I I I \ \ ` \ \ � \ \ \ /// �/ / / / I PROPERTY BOUNDARY ` \ \ \ \ \ \ \ • — / / / // / // �� / /(/ /I \ \ � \ \ \ it ( (TYP.)1 \ \ \ \ \ — \ / // 1-1 I I I I \ \ \ \ \\ \\\ \ \ \ \ �6 //i/ ; I / I I \ \ \ \ \' \\\ ` \\\ \\ \\\\\\ \ \ / �I( —\\\ \\\ \\\ \� \\\\ _ — / (// / / l II ////i "', _/ , / 11 / l / / / / /'� / / III 1 1\ \ \�\\ \\�\ __ \�\ \\�\ \\ \ ' II - - - I \- -� - � �\ \ \ \ \ \ \\ \ \ -_ ` \\ I / /` � / /\ \ \ '\ " - - �z / / I I I I I 1 1 \ ' \\ _\ \ �/� I \ \ \ \ \f\ 1 � \ \ \\\ \ \\ \ \ I . J/ / / - _ / ) I I I I — II , / I \ \ 71 ! 4 T OPEN CHANNEL FLOW _ _ _ — / `\\ \ \\\\\��=��� \\\ \ \ 1 /// / 1 I . \ I \ \ I I / / LENGTH=150FT — _ � — � \ = _ / �_ I 1 \ \\\\ \ �' -" __ — \ \\ \ \\ \\ \ \ �/ ��/ I I \ \ \ \\ /1 \ \ \ \ rZl 1 I. J / Tc=0.5MINUTES — — � �'�\\- - - ' - -' / / I\I . \ � � � �\_\ \ \ \\\ \ \ \\ \ \ I �' �lil '� l I \ 1 I mil\ \\ \ \\ I 1 \ \ \ \ \ \ \ \ \ \ �\ I \ I I� / l /'\ //%� /� - - \ \ \ \ \\ - -r- - - / �////�` \ \\ \mil -_ �\ , \ \ \ \ \ \ \ �l /, / l \ I ) I I I 1 \ 1 - - - - / / 1 \ \ \ I I \ \ \ \ \ \ 1 � / 1/l0 / I I I \ \ I \ \ 1 1 i / 11 I l 111 \ \\ \ I \ 1 \ 111 �� J O� �i/f _ � \ \\y\\ \ \� I _ - -�- / 11 /-/-/�- /- / ,/ / / I ) 1 ) /l %/�' ) 1\ ■ #0 / _ _ - -- 1 I I I III \/�- / / / /�J-/-/' �`\ \y \� __-(-_- - -_- _ _ - _ i / ' / / - / / 11 �l , / / / / I \ / 1 I I 1 -�___- - _�/ l I --___- __ - __ -___ - - - '� �' /�' �� 1-1// / // � / l , ,, , �l / 1-1 1-1 //' 1-1/- / I - - - J III, ,� = �J 1 I /// % -_- _- _-1� / / / / / / / / / // ) / / 1-1 — / / /�� _ / // \ — / / 1 — / / / // / �/ % — / // — / / / '/ / _ � I I — / / / / /. / ( / / / // // / / r/ / / // / ,/ �, _— - =_/// / / / — � _ \\ - - -�— w / 1 / / / /) I I 1 1 / il , � � - / / / / // /l k / / / / / - - - - _ EX.WETLANDS_ _ — / ' — - / // / / / / _/ I I I 1 / ��' � � - / / // / \ \ \ \ �,. (TYP.) � , - - �'/ / \ — / / I / / / /, . - I I I I 1 / , i � - - / / l l / I �� :)' I �✓ ,/ /'/ ' — / � � , - / / / I I I I I I I I ° / / / / 1 1 J / l 1 �l - I/ /'/' - - - �/ l '^ — 1 / / / i� l l l I ( / / _ � l l / / — � ' _- / / \ � l ./— -Z L��'�� ' / T/ f' —x�c—X�-' � // / / / X� / / _ , � / / / / / // / I I 1 ? ��� r / J I I I 1 \ \� \ �` •�• — � _ _� \ ' / __ / / / / �"x x x —x —x� v� / ./ / / � / ,/ / ./ � ./ / / / 111 l 1 I \ \ / I I \ \ \\ \\ \\\� ; ' �% / \ / / ,� / / 1-1 / / �/ / / / / i — X_ / / / / I L \ \ \ \ \ \ < I l \ \ \ \ \ \ \\ \�\\\\ \ \ �. �, ; '_ - - - �\ \ _\ / / , 1-1 / �/ — // / / / / i\ — — / POST-DEVELOPED / POI #1 \ \ PROPOSED BMP#1 WET-POND \ \ \ POI #2 • / \ _ \ / / / / / / / �� 1 / / / / / / - I \ \ \\ \ \ > \\ \ \ _ _ _ / / / I/ / / / // / 1-1/ i 1 i \'_ — J / / // — — / � / / / / / L —/ j — — _ / DRAINAGE AREA 1_14.00 AC 1 I I I I 1 \ \ \ \ \ \ DRAINAGE AREA: 4.73 AC \ \ \\ \ \\\\\\ ()( ^l \ �. •� — / r I— \ / / / /�` ' / / — — / / / / J Tc= 24.4 MIN I _\\ \ \ \ \ \ \\ "I PERCENT IMPERVIOUS = 53.70% \ \ \ \ \ \\ 1 \ �• , \ \ , ^1 \ — -� \ / ' / / ' / l /' // // l / . "'! / / / � / / - / / / i / - - - - / I I , I I I I \ \\ \ 11 1 \\ / \ \ / / / / / r / , / / / /� - - - / / // / / I / / / / / � - - - - - - / / ) ) III I I I I \ \ \ \ \ \ \, Tc= 5MIN \ \ 11 I I 1\\�\1�\ \�\ \- \ (\ / I� - - - - /\ �- / / / / / / / / / /4°� / / / / / / / / _ - ' / / / / / / - - - - - - / / ) , / ) j I I I 1 I I I \\\ \\ \ \ / / / I > > I I I I I I I III \ \ \ \ \ \ \ // - - - - / /� / / / / - - - - /� / / I I I I I I I I I / \ \ \\ \\ \\ / / �/ l / / 1 l � I I II I III \� \\ \� \ \\ \ \ 1\ / //\, - - \ / \ / / / \ \ \/ \ \ / / /, // l 1( (, 1/ // l�c� �' /'- ,' // // // ' ' �__ - - �/ / / / / / / ' ' / - - - - / � / / 1 I IIIII � I / \ \\\ \\ \ \ \\ � - / / / / / / / / / l/ 111 � I \ \ \ \\ \ \\ \ � \ \ \ � \ \ / / / I / / Q zC-) / / / / /,/ - - - � / / / / / / / / /' / / �/ I I I I \ \ \ \\ / / / / / I \ \ \ �` \ \ � \ / 1-1 / 1 1 cv / / - / / / / I I I / \\ \ \ \ / / / / / // I \ 1 \ \ \ \ \ \ ` \ I / � , / / / / / / � / / / / / / / - / / / I \ \ \\ / / / / 1 IIN \\�\\ \ \ \ \ 1 I \ \ I / 2P / / / / z > � \ / / / / // /' / � - - - '/ / / // '/ / / I I \\ \ \ \ � /// / / / / / / / \\ \ \ \ \ \ \ ` 1 \ \ \ /' / // / / / / / /' // // / / ' / (/ 1 I I \\ '_ - - / / I 1 j \ \ \ \ \ \ \ \I I \ \ / / / / / I \ \ \ \ \ \ / / / / / / � / / / / / / / / / / _ - - / / / / / / I / ( / / / 1 I I I \\ \ \ \\\ / / / / / / / / / \ I X \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \� II - - / / / / � o �/ / / / / / / / , _ _ _ - - - - / / / / / , / , I I 1 , / / / / / / / III I �\\\ \ \ / / / / / / I I I I I` \ \ \\ \ \ \ // / / / / / / / , / / / � - - - J ' / / \ / / / / / / \ \ \ \ \ \ \ \ �� / / / / `° p4/ _ �/ / / / / / / / / / - - - / / / / / ) I l l / 1 / l / / / / I I I I I \\ \\\\ \ � - / / / / / / / / / I 1 I I " \ \ \ \ \ \ \ \ \"=- - - F / / / �/ r � �� / / / / / / �- / / �/ / / 1 J 1 / l / / l / I I I 1 \\\ \ \ \� �' / / / / / I I \ \ �\ \ \ \ \\ \ \ \ I I \\ ;%; M / / / / / / / I-, / / / / / - / / / / / - / y\ \ \ 1 1 N / / / / / / /llli / �' �' /' / / / / / / ' _ - - - '' �' / /' l / / / , / , /// / l � l 1 ► I \\� \ ' / // / / 1 I ! \ \ \\�\ \ 1 \ 11,-� �� � ; O / / / / / / / / / / / / J / / 1 I / / \\\ \\ // / / / / / I I \ \\ \\\\ \\ \\ I\ \\ (' N w / / / / / / / / / / / / / / �� / / / / / / // / I \\\ \� / / / / / / / I \ \ \ \ \ \ \ 1 \ � / / / l l / / / / /� /// / / // / / // / / / // // __� �/ '/ // ,/ / / / / / / // / l 1 1 I I I ( - \ \\\\\\ - ��/�/ / / // / // / / / I I\K \ \ \\ \ \ \ \ 1 \ \ \ \ 1 \ \ �\ � r / / /A / / / / / / / / / / / / / / / \ x \ \ / / / / / / / / / � / / / / / �/ / / / / / / 1 / \ \ \ \\ \- -- - - / / / / / x ) / ) \ \ \ \ \ � z / / / / / / / / / / / / / / _ - � _ � / / / / / / / I I � \ \ \\\� _ / �/ / / / / - I \ \ � 1 1 ( I \ \ 1 \ N z / / / / / / / / 1 / / / / / / � / / / 11 � - - / / / ,- / / / / / / / / / / / / I - - - / / x / �/ / ` ) ) \ \ \ � / / / / / / / / / / / / / / / / / ( / / - - - ' �� � �' / / / �/ / / / / � /�/ / I I / \��\\\\__- -- - - Jam/ /,'//�// /; -/ / / /) // / I I I \ / / ) / \ \ I \ ` a_ /- -/ / - -/ / l / I / / / / / ( ( I I l / _ - - _ _ - - - - /' i //' /' / / / / // �/� - / I I , -\\\ \ \\ / // / /i' - - - - x / / /�/ ,� � I / /, ) / / I \ /� W N Q 7 / / / / 1 / / / I 1 _ - - - ' ' / ' / ' / / / / ' / / / / - - - - - / / ' ' - �- // , / , / / / / , 1 / / / / I 1 I I I I \ ( / - _ / / / / / // ' / / / / I - \���; - - - _ - _ / / / / / ; - x // _ / / / 1 \ / / / / / I I / / / / / \ /// > U � LU m / / / I l 1 / / / / / // / / / / l r \ / / / / — /i Q > J H N Q / /%� �' J W CO / l l / I I I I I l l 1 1 I I \ 1 \ / / / / // / / / - -' i / ! - _- - - - x / / / / / / / / / l \ //� '. o� I I, N LU _ // __ ' / // / / / Q / / / / � \ / / / / / / //ice _ - - - - - - - - / / — — _ I-x� / / / / / �ii / i /- - /���� / Q �� — / / / / / / / — - - - / / / - - - - — — o. / / / / / / 1 I I \ - / / / / / // // / / / - - - - - - - -� / / / � ; / // / /I 1 / I I \ \ \\ \\ ' I\ 1 1 / / / / / " // // / // _ _ - - - - - // / -,- _ / � ' ///� ' / ' /�',/ � z o U Q / / / / / 1 I \ 1 - - / / / - - _ � �-' / / / /; / �/ °COO of / / / / / / l I \ \ \ \ \ \ _ / / / / / / / i / / l _ i � i / /: � �\ �� x_ — /�_ //� / / / / O O Ir LU / / / / \ / / / / / / / / / / � — / / / /� Cln / / / / / \ \ — / � -' I _ — / / 5 U / I / / / / / / / / / / // —\\ — —/ i'/s \ EX.WETLANDS. LU W LLI W / / I 1 / / / / / / / / / / I I I \ I I / / / / / / / / / / / / / / / / / / // / / ,� _- - - _ / �i TYP. c� of J ( , / , , , 1 ) I I I / _ / / / / / / / , / / / //, / // / \� _ - - _ /%��/ (/ 7 ) -- o_ /1. I / / / / / / / / / / / / ) j l I I I r - l / / / / / / � / / /^ / / / ( / \ - _ _ - � /� _ / .h a of O 3 I l / 1 / / / / / l / l l / 1 I I I I I / - / / / / / 11 l l / / /I z /I / � / / / / / � \ l // / / / / / 1 \ / //�� sy - / \ Z ( > 1 / I I l I I , I I / / / // // / / // / / / � / / / / l I 1 I 1 / /_ - - / / / / / / / J / / / / / --- \ "I� l / / , \\ � f / / - - ,�, - / ) / / / > 1 1 I 1 / / / / / / / 1 1 / / /� / / / / l / l l l / - 1-1 / \ / // / / / 1 I / �� I 'i \ / ,/ /' _j U I 1 , I I / / / I / / / / / /' / i / / / / // ,/ // / l /l 1 / / / / �/'/ / // /// / / l / / // ,/ - - / / 1-1 ,/ / -� �v� �// / l / l - -�//l 1 1i ����- = - 1 �: :�' \�/�/ � ''/, z o 1 1 I I I / / / / / / / / / / / / / - / / / / / / I / \ ' / /;` - - / ' 0 Cl) / / / / / / / 1 ( / / / \ / / / I I I I I I I I I I I I ' /'' / ' ' / / /' / / / / // // / / / / /� 1 '/ / / // / / / I I I / / - �\ / / / / I I 1 4—.. / 10 / I 1 I I I / / / / / / / / / / / / / - - / / / / / / / I I I I / -/ / ( II � �_ - '' � \ ", . / / / ' - � a_ oo 1. / I I I I I I / / / / / / / / / / / / / / / / I 1 \ - - - 18 / ,/ I /I I I � I I , I I I � � I / / / "/ / / � / / / / / l ./ � /,/ / / , i ./ / / / l I I I I \ I _/ \ -%�� � \ / / U It U C _ �// z Rn I o IV U w Z U m Ir O w 0 0 70 0 70 140 w FI 2 J U� SCALE: 1" = 70' D Z o �__ o �__ z RM 0 z Q o 0 . L E N N A 1Z I PROJ. MGR.: WGB DESIGN BY: WGB li DRAWN BY: RBB oo 1. Q PROJ. DATE: JAN 2023 z DRAWING NUMBER: Ro Wl< U C4. 5 1 I- DICI<SON 2 J 6 LLJ WKD PROJ. NO.: Rn community infrastructure consultants M 2022078200 a w