Loading...
HomeMy WebLinkAboutNCC231200_Site Plan or Location Map_20230426 CONSTRUCTION SCHEDULE / P I. Obtain all necessary pe rmits and tan vale.Erosion and Sediment Control m occur. permit and a&SC p permit, t,Coverage d a ha most be the obtained before any land disturbing activities ASELF—INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY .A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on site,preferably N a NCGS 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR GROUND STABILIZATION permits box,and accessible during inspection. COMPLETED AS AN EXCEL SPREADSHEET JTAULZATON 2. Install gravel construction enrcancesf Sthen silt fences,reinforced silt fence outlets and wattles. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED A 3 Finish clearing and grubbing y necessary areas on the lots as they are started. EROSION AND SITE AREA STABILIZATION 4 Begin lot grading and excavationSEDIMENTATION CONTROL PLAN THAT IS REPT ON THE PROJECT SITE.RULE 15A EXCEPTIONS i�',•'I. / \ s Begin or continue with houseactivities. on e DESCRIPTION TIME FRAME 6 Finish all roll adtn and NCAC 04B.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY CITY OFOM 8h, Ban s INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE ^ ��` '/ Install driveways,walks and patios. ctiv tie VASS �. 8 Begin five gmdivg of lot areasAPPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES 9 Final g gee mulching andstabilizing of lot.In most cases this will Involve the installation of sod on the lot. DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, &SLOPES P gewesgrs eta irz PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION '1 The silt fencewill remainin I I Ne llot is sodded or bl ed and takes hold. HIGH QUALITY7 DAYS NONE 1 CONTROL PLAN."0 The contractor shall conduc If' s of the erosion and odrmentation control measures and win late WA R Nthe following combined seer-inspection torn roans m the DEMLR website THIS PROJECT IS INA TEHOW) ES „ 9 ,$p' '/ hops/afiles.nc.goo eodse Dnergy%2OMineml%2oarid%20Land%2oeesouresASo mwateeZNPDEs%2o General Erosion Control Notes HIGH-QUALITY WATER ZONE Gmeml/2oPermils/DEMLB-CSW-Monitoeoe-Fosse-Rev-Aagost-8-2o19.pdf.Tweloemonmsotmmplere SLOPES STEEPER 7 DAYS IF SLOPES ARE < 5 4 F inspectm tonne sbau be kept on site aria avaaable For inspection el au times.uis recommeededa copy be Pursuant to G.S.113A(3),provisions for permonent ground c sufficient to 1. Only the areas shown Shall be disturbed, AND ALL REQUIREMENTS THAN 3:1 10'OR LESS IN ' kept inapermas box.(OS 134-sa.1(e),lsw xcwc 048.0131,NCG01 PartmsectionsAand B) restrain Bros must be accomplished for all disturbed areas within14 REGARDING SENSITIVE AREA LENGTH AND ARE ,:°w^ II. Self-inspectionsperformed atleastoncee� workingdo erosion BO calendar do (whichever is shorter followingcompletion 2.Temporary ground stabilization is required within 7 days on all p shall sevenrdays days(w ) co p WATERSHEDS SHOULD NOT STEEPER calendar days and within 24 hours ofevery min event of greater thanl inch.Any needed repairs sbau be f construction. areas. BE FOLLOWED THAN 2:1, 14 5N made immediately to maintain measures as designed.All ESC measures shall be maintained as specified in DAYS ARE the Cana...details on this plan.A rain gauge shall be installed at the project site for monitoring. 12. Inspection and final acceptevea letters.When the projmt is complete,the permitreea shall contantD 0 ropo m ALLOWED t ctose out the slags Plan.wilco DEMLR inr sthe lserminee otthe projmtctose out,via inspeaim repod, SLOPES 3:1 OR 14 DAYS 7 DAYS FOR the permiott shell visit"deq.ne.govMC001"tosubmit an eleetronio Notioe oftermination(e-NOT).A$100 ok FLATTER SLOPES GREATER annual I fee will be charged until the nNOT has been filled we \ \ THLENGTH IN VICINITY MAPgeneral permit it , ) OPEN SPACE \ (NOT TO SCALE) / ",�y'� �� / \\ AREA#$ I I) 1 \ $ y+, ALL OTHER AREAS 14 DAYS NONE(EXCEPT / �� /' \\ I I \\ N\\ ` FLATTER TH STHAN S4:1 FR PERIMETERS ANOD HOW ZONES) / I ir % I m\ \ :ioit' \ r/ /// ` \I 1I 1 THIS PROJECT IS IN — �'''ii I I (DRAINAGE ACCESS HIGH-QUALITY WA ZONE DATE: PAGE: 4 ( I \ \� & ( t \ CARDING S AND ALL ENSITIVE UIREM gTS \ ,� \ �\ \ MAINTENANCE CONSTRUCTION ' \ WATERSHEDS SHOULD ��e \ I (� 0. ///"` EASEMENT\ LIMITS IiO BE FOLLOWED �nM1 -1. p G r r 7 ` , ,,a,� 55 ( 1 \ 7D to1111i, SODDING 4 Y J Y a �`°� �'rds 6 .n L• AOVJ•1 �J. LJ J Li nuRDVvnx ��t ` RU �� `RDVJ� z ORAINAG8114CCESS4to \ .\\ \ I •yeuosauo mumnv>eces.TM..V,RIE STRIPS ,HU 1a Y 11U AV —HU AY HU NAY —HO WAV HU AV // MAINTENANCE \ \ \` "rVO�Owm Notes: / EASEMENT \ \ \ �` ,k // miCURB INLET 1 If needed Tree Protection fencng should be nstalled along the buffer zone wetland \ \ \ 1 ',r / cc Mil ST aboundary and/or around protected trees prow dng a radius of at least 1 25feet for each o,qI \ \ \ 1 , �Uso RMLEGEND rich of tmnk d'a \ \ C Cl / 2 Install Silt Fence on the low elevation sides of each lot Install Silt Fence outlets shown on ro q ;g1 \414S \ 1Lo n —U: /FLOW DIRECTION schematitld agram and field adjusted f necessary,for placement at low po nts If lots are iS' w1 F QZj� contiguous and have different land owners or builders each lot should have individual Silt '�2 rc`' 1 \ 1 Fences. 2 SILT FENCE SILT FENCE OUTLET ® 3Install required Silt Fence within 10 feet of property line to ensure there's no conflict Wth 1 \ ! ENTRANCECONSTRUCTION septic system.It s the responsibility f thebuilder t theinstallation of sediment I \ � 7 CURB INLET = Canmeasures does not' p theseptic system tl p ree(s). W.Atleast oneConstructonEntrance/Exit' binstalledp lot. I I 1 �App ( 1 7 fl✓I, II s Waste bins and other areas dedicated rmanaging building material waste shall be at l A I m\ , Sp C/1/ least 50 feat away from eta d 'Its drainage ditches less t can be shown that / 107 r'r• \ qR qC�c / ——— L °no other alternative erists If this separation cannot be acheved these areas must be r1. FQ w.„rile soL r^`r .s soon`�sr„e goo s` THE MOWER contained behind Silt Fence. \ • \ e�, / '�`4 / e IAIu. O nett a aT. • R.Inlets downstream of disturbances should be protected,streets should be swept when , APPEARANCE OF GOOD SOD sediment from the construction activity is present. l, \ 59 \ ..\NC—Environmental.peg 7.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are ` 46' I ` I // \ I II provided on additional sheets.Erosion and sediment control details are not drawn to scale. 1 ----------------- TYPICAL LOT LAYOUT WITH CURB AND GUTTER t `\ \ 60 \ \ umrwxea,". ra _ \ il��II���OII�I���I�li \ THIS PROJECT IS INA HIGH-Qt�4LITY / r ooao \ WATER ZONE AND ALL REQUIREMENTS I I _ \ ae=a..o,a.x,c„. oa...aw.,o..a REGARDING SENSITIVE ARE n 44 S10 /�� \ s"oraoae-ao,r.VOCree,a,.aas \ \ \ \ WATERSHEDS SHOULD BE FOLLO)^JED I I„ \ / \ \ �� - csa.ss"are. °ENw"O°`w`T — \ li,„ �dr DATE: Filler Fabric PAGE: ` \\ \ OPEN 2 ' \ \ \ AREk#1 / 1 /BwIP \ ) / I \ / 15Y _--- if Hem Standard BackfllrlrencM1 \ \ / / \ / / \ \ VM Strength tit wire fence Wire Fence Wfe , ' a Compact Steel Post thoroughly / / ,so`o/ I / MAINTENANCE OF RI,.CONSTRUCTION u�°p" ) ` Y / // CONSTRUCTION I O yI CP / // InnnontaNly remove all obnecrionable materials spille,washed.or tracked on.public P. 1 1 te-za• �-— DRAINAGE ACCESS \ LIMITS G�QS \ , ^f I / Wre ties / I 1�% /' 8 \> ( \ 7 HIS PRO ECT IS IN pI HIGH-0U LITV / /�' decomposed q eep ° / MAINTENANCE ( R AIL '� {yI` — 1 aownaa reward / I /' / / EASEMENT O� \ W�4TER ZOfiE AND ALL REQUIREME '3� (e the ' I ' / ( REGAFI?ING SENSITIVE AR' ( / // 1 / \ , 1$\�`,,, 'TERSHEFS SHOULD BE Fe ..WED I /. Sodding-Me sod should be properly mainmined lo insure Mat Me grass take holds in.areas being secured,T.sod should.watered as necessary LF to Fabric ( �/ // // \ '� 1 \.rem)rsa 'e I 1 / ...CP...- Grassing .,"mna.rn. n.nn.a="a p rP a=r"".= >pe a dea,n,aendar"",wine" r Fco CROSS SECTION VIEW I / \ <0,\ I col I I // atstep erly.Any bare «xrw preno". m..=.zal.=h... n.p a „ ®.re.rlrep.reareare..dwi r ( \ 21 f o I ' , permit the ned as nealed to insure pll " g ,themaffig temporary grassing uldhe".edumilth`e m ,a,,.,«„« «an m, . \ mII g pmrernthem p 8 \ 22 �' rainfall.insure Mat Mey are operating as designed and Mat theiN placed hi locations.will not interfere with home constructon activities. m,m,.r,e„oo„r ow mdmoroh««,. m o„.o«,mwa««a '«ra«nhPo°'....,,, \ General on Control Notes /l I I �. 1 I I / lune been no breaches in Me bemn.Berms shall not exceedweekly marker runoff producing ed lot area ,m.,mamaem el...sav ,� reeeeeoa«. '"a«.w.m.«a m • !round 2.Temporary stabiliwn shall be zation �e n1‘ #s I �re ucp.nr..®. rcerernrro wren. .«.vem.ae,...a..r•.n«a... \ areas. / CO TRUCTION I I 1s I I I 6 sr(nil ntrriedris so =p:„om=..ma,.iwv tra.a= Derv.. o ga«"oas cum ds000ua nn°mceer.gm. a.a .,,e....m„a m,nrae«s,°ena uxngne `"'"•`� `r" r. „e..ins.a..e..p.a.ca.w,w.•e..mrrwm.,,ew+,wrrm„m.drMr. a ••m 6°" T / - L ITS/ w ,Penr,mw«° a.a.cedne neren. _ ` I activities wou«omme nne.m«oend compact Thorough sarnMo.dale e,a® / / THIB PROJEC'I81NA GI 1 \ particularany JJ - :orat east once per week minimum,The builder will insure gist the ro tie .m,o -,«ell,m®nre.u,wao,,,«, J HIGH-QUALITY DIR ERZONE aa,� / I I \ I ro mmnnm r.N=me.m,n - / AND ALL RE UIREMENTS / \ \ tie uwron w"o-o with sonar =sea m a,"e. �� entrancesmaintainedo eases N. / REGARDING SENSITIVE AREA I / t 1 rew : / WpIERSHEDS SHOULD / / / ) \ I Iheight. I / BE FOLLOWED 0/ / / i \ I reaun=,a.w damp \NC—En�ronmen lal tpeq ' �, \\ / 1 / sil A / I I �/ / wrumRmsrxe." renors=aomrer m= rrmrurea SILT FENCEitiVop / s sin wi the fe Hreplace,wne w ne="m.retaaa / /�/ I tisane= a .r s I \ \ / CONSTRUCTION / 30 / \ \ / LIMITS CONSTRUCTION uMJ / 1 1 / / / DATE: PAGE: / I 29 I // / / opts _I orroc , J/ // PAGE 1 of 2 + • III II II (III II II "l /� f // �/ �� LOT EROSION CONTROL PLAN / // / S�toe TOTAL DISTURBED ACREAGE: 0.26 ACRES ifWASHED •TOP OF SILT FENCE., I OPEN SPACE �E��/ j / S�� / OE TOE STEEL FENCE ! eg., I AREA#2 Ao,,� / / So L 0 T 62 WIREHARDWARE0L` FRONT VIEW e �° /o / / ,°�' WINDER STATION / / / THIS PROJECT IS IN A FILTER OFWASHED STo o al CLOTH IN TRENCH AND HARDWARE / HIGH-QUALITY WATER ZONE Ge�lfe /FILTER FABRIC, / /// / / AND ALL REQUIREMENTS 1. / / REGARDING SENSITIVE AREA V FILTER FABRIC GROUND ON `s' `s/ / WATERSHEDS SHOULD F O R �Os ash GROUND a°=ennhemn"Ra,anR°. vIaoC"I"vaanRar"aa"rainlenneamrlay Ole silt fence al least 12 inches. / / / /' BE FOLLOWED aaRYWIREFEN°EANnHARnW eLnTH '� E p.out owq 2.Slone outlets should be letatlN°nceaweekandaftereach,in. // 1.General Erosioneel ;Nita DREAM FINDERS HOMES, LLC FILTER FABRIC IN TRENCH9.Kew mesh We F ae°°oull exquired ceeds .immediately. / /' / reds. IN THE CIT' OF VASS 6.Remove sMiment Weill.or covered. / S Repacestone ae needed toMcil"01PWB'er' / // McNEILL TOWNSHIP MOORE COUNTY, N.C. / ..\NC—E00ronrnenfal.jpeq BED DNaIEW ( SCALE: 1"= 100' MARCH 2O23 FR-F— ,Tr„, SILT FENCE OUTLET GRAPHIC SCALE IN FEET ENGINEERS NE D —too o 100 200 300 aoo PLANNERS l SURVEYORS MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C. MOORM AN,KIZER 8C REITZEL,IN C. PHONE (910) 484-5191 FAX(910) 484-0388 License #: F-0106 .I SAVLn3/22/2023,,.mac AN LA PLa G,3/22/2023 1,32 PH - -__ _- __.rI -•_S_ENT., a H,.ONS ,.STa 136,05 WINDER BATON ECAPw„3LwNDER STA E3 LOT 62.DWR