HomeMy WebLinkAboutSW6210905_Supplement-EZ Form_20230405SUPPLEMENT-EZ COVER PAGE
FORMS LOADED t
PROJECTINFORMATION 77777777
1 I Project Name f
Surface Water Area (ac)
Is this project High or Low Density?
Does this proiect use an off -site SCM?
Champion Court Rental_
6.72
0
High
No
COMPLIANCE WITH 02H .1003(4)
7 (Width of vegetated setbacks provided feet N/A
8 1 Will the vegetated setback remain ve etated? N/A _
9 If BUA is proposed in the setback does it meet NCAC 02H.1003(4)(c-d)? N/A
10 I Is streambank stabilization proposed on this proiect?
NUMBER AND TYPE OF SCMS:
11 Infiltration System
12 IBioretention Cell
t----
13 Met Pond
14 Stormwater Wetland
15 i Permeable Pavement
Level
Pond
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 ' Name and Title: Samuel R. Nye,_PE Principal Engineer
28 Organization: _ The Site Group, PLLC
29 Street address: 1111 Oberlin Rd.
30 City,State Zip: _ , -__ _ Raleigh, NC 27607
31 Phone numberfsl-
919-835-4787
Email:
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications,
operation and maintenance agreements and other supporting information are consistent with the information provided here.
uesryner
���\1111111///t
C A /QO/ //��.
4 EAL
3498
Seal � I W O *
'Zse�__A/
Sicyature of Designer
Date
L/ /Sf2v2.3
DRAINAGE AREAS
1
Is this a high densityproject? a
Yes _^
2
If so, number of drainage areas/SCMs
Does this project have low density areas? i
1
No
3
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule i
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 1
4
I ype OT OUVI vvetpurlu
JTotal drainage area (sq ft) 316899 193759
;Onsite drainage area (sq ft) 205413 183789
Offsite drainage area (sq ft) 111486 9970
Total BUA in project (sq ft) 166330 sf 151472 sf
5
6
7
8
9
New BUA on subdivided lots (subject to permitting)
(sq ft
10
.11
12
New BUA not on subdivided lots (subject to
permitting) (s
149948 sf
145819 sf
Offsite BUA (sq ft)
Breakdown of new BUA not on subdivided lots:
5653 sf
89468 sf
85339 sf
I - Parkin (sq ft
- Sidewalk (sq ft)
.v.a. _
_._�____._-�
- Roof (sq ft)
20160 sf
20160 sf
- Roadway (sq ft
- Future (sq ft)
40320 sf
40320 sf
- Other, please specify in the comment box
below sq ft)
13
New infiltrating permeable pavement on
subdivided lots (sq ft)
_
14
New infiltrating permeable pavement not on
subdivided lots (sq ft)
15permitting)
Existing BUA that will remain (not subject to
sq ft
16382 sf
16
Existing BUA that is already permitted sq ft
17
Existing BUA that will be removed (sq ft)
18
Percent BUA
52%
78%
19
Design storm (inches)
1.0 in
1.0 in
20 IDesign volume of SCM (cu ft)
21 Calculation method for design volume JSCS
12147 cf
Method
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 1drainage area(s):
Area for the entire site includes offsite drainage bypassing the wetpond and
Drainage Area C. To offset the new BUA that cannot be treated by the pond,
5,653 SF of the existing Buffalo Lake Road is treated.
WET POND
1 Drainage area number 1
c 21Minimum regwred treatment volume (cu ft) 12147 cf
aGENERAL MDC PROM 02H .1050
3 Is the SCM sized to treat the SW from all surfacesatbuild-out? Yes
4
Is the SCM located away from contaminated soils?
Yes_
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slo es?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump referred
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC 12 ?
Yes
161 Does the SCM follow the device specific MDC? Yes
17 Was the SCM designed by an NC licensed professional? Yes
POND MDC PRO .1053 1
18&Sizing method used SA/DA
19
Has aotage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
259.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
260.00
22
Elevation of the bottom of the vegetated shelf fmsl)
264.00
23
Elevation of the permanent pool fmsl
264.50
24
Elevation of the top of the vegetated shelf fmsl
265.00
25
Elevation of the temporary of fmsl)
266.00
26
Surface area of the main permanent pool(square feet
5653
27
Volume of the main permanent pool cubic feet
15887 cf
28
Average depth of the main pool feet
3.00 it
29
Average depth euation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
346.8 ft
31
If using equation 3, width of submerged veg, shelf feet
3.0 it
32
Volume of the forebay (cubic feet)
2778 cf
33
Is this 15-20% of the volume in the mainpool?
Yes
34
Clean -out depth for forebay inches
54 in
35
Design volume of SCM (cu ft)
12147 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
2 in
—
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.8
41
Are the inlet(s) and outlet located in a manner that avoids short-
clrcuitin ?
Yes
42
Are berms or baffles provided to improve the flow ?
Yes
43
Depth of forebay at entrance inches
66 in
44
Depth of forebay at exit (inches)
54 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 it
47
Slope of vegetated shelf H:
6:1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
50
Are fountains proposed? (if Y, please provide documentation that
MDC(9) is met.)
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
—531 Species of turf that will be used on the dam and embankment
54 1 Has a lantin Ian been provided for the vegetated shelf?
ADDITIONAL INFORMATION
55' Please use this space to provide any additional information about the
wet pond(s):
Actual Orifice Diameter. 1.5 inches
Centipede grass
Yes
+
Wet Pond 1 10:11 AM 4/5/2023