Loading...
HomeMy WebLinkAboutSW4221202_O&M Agreement/Plan_20230404Operation & Maintenance Agreement Project Name: Dollar General Store #08606 Project Location: TBD Biesecker Road - Lexington, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be Kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & co Infiltration Basin Quantity: Infiltration Trench Quantity: Bloretention Cell Quantity: Wet Pond Quantity: Stormwater Wetiand Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present! User Defined SCM Present: Low Density Present: onding 0&M sheets will Location(s) Location(s): Location(s).- Location(s): Location(s).- Location(s): 1 Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): No Location(s): No Location(s): No Type: oe added automatically): 35.845431,-80.254620 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): /mail: Signature: Q4tvW" L- County of Joe Strickland Agent, Teramore Development, LLC 214 Klumac Road - Suite 101 Salisbury, NC 28144 704-224-7364 jstrickland@teramore.net A h L-nA 0 V,4 AJ personally appeared before me this acknowledge the due execution of the Witness my hand and official seal, DANIEL R. ALI NOTARY PU Rowan County, Nor My Commission Expires Carolina is 28,2027 Date: 1.1?' e -Po 41 a Notary Public for the State of & 0%T`u C4-oL-zN4 do hereby certify that U(' S; X tCC< L. 4AIIl day of A', c ig�,6 j--,A and and Maintenancy Agreement. Seal STORM-EZ Version 1.5 My commission expires U iv 6- 2 gr Z 0 17 O&M Agreement 121812022 Noe 1 of 3 Sand Filter Maintenance Requirements Important operation and maintenance procedures - Manage the drainage area to reduce the sediment load to the sand filter. - I lUdlf UUL UM JCU1111C11LdlIUl1 L;FJdJJIUU1 U1 IVICUdy W1lCIIUVCI bCUIIIICIIL Utlptfl UXLAG UUb - At least once a year, skim the sand media - Replace the sand filter media whenever it fails to function properly after maintenance After the sand filter is established, it shall be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County) . Records of operation and maintenance shall be kept in a known set location and shall be available upon request. ,action activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Entire sand filter Remove the trash/debris. Adjacent pavement Sediment is present (if applicable) on the pavement Sweep or vacuum the sediment as soon as possible. Areas of bare soil Regrade the soil if necessary to remove the gully, The perimeter of the and/or erosive gullies plant ground cover and water until it is established. sand filter have formed. Provide lime and a one-time fertilizer application. Vegetation is too short too long. Maintain vegetation at an appropriate height. The structure is Unclog the structure and dispose of sediment in a The flow diversion structure (if clogged. location where it will not cause impacts to streams or The structure is Make any necessary repairs or replace if the damage applicable) damaged. is too much for repair. The inlet pipe is Unclog the pipe and dispose of sediment in a location clogged (if where it will not cause impacts to streams or the SCM. cracked or otherwise damaged (if Repair or replace the pipe. The inlet device nnn1ir-nbIn1 Erosion is occurring in -- Regrade the swale if necessary and provide erosion the swale (if control devices such as reinforced turf matting or applicable). riprap to avoid future problems with erosion. clogged or covered in Remove sediment and clogged stone and replace sediment (if with clean stone. Sediment has Search for the source of the sediment and remedy the accumulated to a problem if possible. Remove the sediment and depth of greater than dispose of it in a location where it will not cause Sediment chamber six inches. impacts to streams or the SCM. Provide additional erosion protection such as (forebay) Erosion has occurred. reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Sand Filter Maintenance ReolliremPnfc (r-nntinifadl SCM element: Potential problem: How to remediate the problem: Sand chamber and Water is ponding on Check to see if the collector system is clogged and underdrain collection the surface for more flush if necessary. If water still ponds, remove the top system than 24 hours after a few inches of filter bed media and replace. If water storm. still ponds, then consult an appropriate professional. Clogging has 99 g Clean out the outlet device and dispose of sediment occurred. in a location where it will not cause impacts to The outlet device streams or the SCM. The outlet device is damaged. Repair or replace the outlet device. Erosion or other signs of damage have Repair the damage and improve the flow dissipation occurred at the outlet. structure. The receiving water Discharges from the sand filter are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water.