Loading...
HomeMy WebLinkAboutNCC230934_ESC Approval Submitted_20230404 DocuSign Envelope ID B1AD3E-3L-3e3F-4DAD-BDB3-CFQ9000FE393 , *' A ROY COOPER dovernor - a ELIZABETH S.BISER `• Secretary' ._.... DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Qualify December 28, 2022 LETTER OF APPROVAL WITH MODIFICATIONS County of Stanly Attention: Andy Lucas, County Manager 1000 N 1 St Street - Albemarle,North Carolina 28001 RE: Project Name: Stanly County Livestock Arena Project ID: STANL-2023-011 Acres Approved: 6.92 County: Stanly City: Albemarle Location: Newt Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Chambers Engineering,PA Date Received by LQS:November 28,2022 Plan Type: New Dear Mr. Lucas: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The • Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3)years following the date of approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. " As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the$100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.A;ov/NCG01. Direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. North Carolinas Department of Environmental Quality I Division of Enemy,Mineral and Land Resources E Mooresville itenienai Office 1610 East Center Avenue,Suite 301 I Mooresville.North Carolina 28115 mathav,� 70dv663:1699 DocuSign Envelope ID:B1AD3E3E-983F-4DAD-BDB3-CF09000FE393 Letter of Approval with Modifications County of Stanly December 28,2022 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition,local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, f—DocuSigned by: t —8B37DAC4AI 0E49A._. Kenny S. Llywelyn Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet • c: Chambers Engineering, PA Attn: Heather Reynolds 129 North First Street Albemarle, NC 28001 North Caroli Depart of Environmental Qlity I Division of Energy,Mineral and Resources D E crj� Mooresville Reginalna Omfficeent I 610 East Centerua Avenue,Suite 301 I Mooresville,North Carolina 28115 fit„rancr r.,,-. 704.663.1699 neaar om ai E�rG,�nna^�,U,iw.�i� /"d DocuSign Envelope ID: B1AD3E3E-983F-4DAD-BDB3-CF09000FE393 Letter of Approval with Modifications County of Stanly December 28,2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Stanly County Livestock Arena Project ID: STANL-2023-011 County: .Stanly • Reviewed by: Kenny S. Llywelyn 1. Vicinity Map is unclear where the location of the proposed site. Vicinity map should show the area where the project is located and have road names to be able to reference and locate on a map. 2. On the plans include road names when they are available. On this project Newt Road is adjacent to the project. 3. Provide a legend showing all line types, hatching, and symbols being used on the plans. 4. Clearly show property lines in relation to the proposed project.In the case for this project the property lines go in and out of the sheets,make sure these lines are marked clearly. 5. Show proposed graded contours for basin SB-2. Proposed contour lines are shown for SB-1. The same needs to be applied to SB-2. • • b. A proposed permanent channel (PD 1) is shown outside the limits of disturbance(LOD). Revise plan to include this channel within LOD and update acreage. Ensure PDI has a liner installed with the.rip rap. FRO may need to be updated and additional fees if revised area is.greater than original permitted area. 7. It is recommended that the channels have straw wattles instead of rip rap. This will allow for ease of maintenance for the facility. 8. It is recommended that the diversions DD1, DD2, and DD3 can combine into 1 single slope drain if desired for the site. �,� Q'3 North Carolina Department of Environmental Quality I Division of Energy,Mineral and Resources Mooresville Regina]Office I 6l0 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 704.663.[699 Ilenl 6n MIGl�1 anly