Loading...
HomeMy WebLinkAboutSW8970517_APPROVED PLANS_19970626 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 q1 0 5 1-1 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE I q 9� -1 O 1p 2 to YYYYMMDD e SEEDING SCHEDULE SPREAD 4" TOPSOIL OVER AREAS TO BE SEEDED AND ESTABLISH UNIFORM GRADE PRIOR TO SEEDING. APPLY LIME AND FERTILIZER AND WORK INTO SEED BED, DISTRIBUTE SEED UNIFORMLY AND COVER LIGHTLY. APPLY CLEAN STRAW MULCH OVER SEEDED AREA AND ANCHOR SECURELY NTH STRAIGHT BLADE DISC IN FLAT AREAS AND MATH ASPHALT TACK WHERE SLOPES EXCEED 4X MATERIAL APPLICATION RATE LIME 2 TONS/ACRE 20X SUPERPHOSPHATE 600 POUNDS/ACRE FERTIUZER(10-10-10) 1000 POUNDS/ACRE APRIL - JULY FESCUE, KY-31 50 POUNDS/ACRE BERMUDA (HULLED) 10 POUNDS/ACRE JANUARY - MARCH FESCUE, KY-31 50 POUNDS/ACRE BERMUDA (UNHULLED) 20 POUNDS/ACRE RYE (GRAIN) 25 POUNDS/ACRE SEPTEMBER - NOVEMBER FESCUE, KY-31 50 POUNDS/ACRE MULCH 2 TONS/ACRE ASPHALT TACK 300 GALLONS/ACRE NOTE: OWNER MAY VARY SEEDING TO CONFORM TO LANDSCAPING REQUIREMENTS SEEDBED PREPARATION NOTES: 1. SURFACE WATER CONTROL MEASURES TO BE INSTALLED ACCORDING TO PLAN. 2. AREAS TO BE SEEDED SHALL BE RIPPED AND SPREAD WITH AVAILABLE TOPSOIL 3" DEEP. TOTAL SEEDBED PREPARATION DEPTH SHALL BE 4'-6" DEEP. 3. LOOSE ROCKS, ROOTS AND OTHER OBSTRUCTIONS SHALL BE REMOVED FROM THE SURFACE SO THAT THEY WALL NOT INTERFERE WITH THE ESTABLISHMENT AND MAINTENANCE OF VEGETATION. SURFACE FOR FINAL SEEDBED PREPARATION, AT FINISH GRADES SHOWN, SHALL BE REASONABLY SMOOTH AND UNIFORM. 4. IF NO SOIL TEST IS TAKEN, FERTILIZER AND LIME TO BE ACCORDING TO SEEDING SPECIFICATIONS ABOVE. IN ADDITION, PROVIDE 15 LBS/1000 S.F. OF SUPER PHOSPHATE. 5. IF SOIL TEST IS TAKEN, PROVIDE LIME AND FERTILIZER ACCORDING TO SOIL TEST REPORT. 6. LIME AND FERTILIZER SHALL BE APPLIED UNIFORMLY AND MIXED WITH THE SOIL DURING SEEDBED PREPARATION. 3D `O° � o� I O I DRAINAGESTORM 61it•3!•Eii•�t•>[Y� A�����i-rs! L>i idll• E�•� tbYii iL�i7� �� �'� LL'� t•� Ei�'� tx YS.� �>r� � � l�ii��t•3��t•�'.Eitia[li���.•� Imo® • • • j• ����' I�iiL�•' • ' t•.�.�ilt'.•)FYlt'i�itL•� IIIIAIIIIIIIIIIIII 0 Wt.= m mg• momTAM =I[III=w �0 ff__L� ■ •k>, i!C! itY! i•1k: • is i t N 1! i 6iI� i►P1• 6Tt�iRl�7• • ,.r. !'r'S�iGii�iSa ���� • • tTl� o =L ' I 0=CIA C = 4.8 CARDINAL VILLAGE II 1 0.6 j� M.A. 8 P 71 Cl 2.88 ZONED R-7 BLK.O 00 DRIVE _ 6 _ I _ DITCH WV. \ I / I 1 A' / > ^I 1 ^I 46. 2 I 44.02 1 I �g 61' 35' 48, ' CUT OITCN TD 0.2X GRADE I \ 2 / P w ce 6 / / ` ^1 I �LK.N a2230g �- ♦�I I l4 0 i•460AI� .4�8 4( EA WV._43A L1 46 84 0 5,_43.1_ 15, sae �' :6.3 4 r54 a 1 & URu /DRAWACE 7i G 61. 14' 3 I I DITCH IN 1 < 4774 DETENTION POND A" r ' STORMWATER a EASEMENT E REr40'eED) EASOTENT 5C� A 4 W,3/94{��_ I 41.0 E)OST. M.H. °9,'2 , 4 PS0.00 TOP - 47.92 ' O DOST. M.N. 455.t: LS - - L6 IrV. - 42.87 FlNNEY S LOT 11 TOP - 49.03 `y t a .$ 4s . �_ . a r yyy WV. - 41.56 I 42.8 ,-� ` _.. �-r �- 0. 94 AC. . -T� 50 \ _ _ - 1 .. 2, 1 LOT 12 ; \ E76sT DITCH (110 0. 95 AC. <`,. $ LOT 13 �� I � 46.229 4>� 4_.t 4. a :71� = I� yI1. 20 AC. �� \7�WV.-42.90 a�2 4, rr ,4- LOT 14 4- 4 N I DETENTION CB4D4 SDI /0' R �TOPZRB _ _ 0. 94 AP. POND B TEMPORARY GRAVEL WV.-46.5 -- 33' M.B.L •a9.5 1 I � i c6 as GENERAL NnTFC_ .. TURN MOUND 1SO.00' NORTHWEST DRIVE -- I y�2 5 wAEASEM�T[R a7ea;451 a-6 a ---- 148.50' ,80• R/W ((PUB _ J I �, : 64 1. ALL RIGHT-OF-WAY INTERSECTIONS HAVE A 20' RADIUS. m•^ _ 190.00 uC, - �f �-�PTR5OPw 2. SIGHT DISTANCES ARE 10' x 70' AT INTERSECTIONS. E h1 PROP. .5 as E 4 CS 3. LOT DIMENSIONS SHOWN HEREON ARE SCALED DISTANCES. PROP. e - W '�54 Wv.=Zo 7 ys 4. DEVELOPERS TO FURNISH STREET SIGNS ACCORDING TO CITY STANDARDS. - 35, - TW 4a7 -- 15C.0 • 46 5 47 5, LOTS WALL BE SOLD & DEVELOPED INDIVIDUALY (LEFT WOODED). ti� w'S.L =' 181.88 _' 6. SOIL DISPOSAL & DEBRIS WALL BE HAULED IF REWIRED. 4 1 a3 yyy , 7. ALL FLARED END SECTIONS TO BE LINED WITH CLASS (1) RIP RAP. o' TEMPORARY �•R I - 8. DETENTION PONDS TO BE MAINTAINED BY BUSINESS PARK OWNERS ASSOCIATION. ^ �/ AR(X#ro _ g� 9. DETENTION PONDS ARE COMMON AREA. �S°4plr I I a �r� - - I PROP. a TOP-bs 10. THERE ARE NO WELL OR SEPTIC TANKS LOCATED IN THE GENERAL AREA OF TNEI PROJECT. g 3 I I } 1 r i TOP-47.0 207.99 ' Wv.-43.1_ - 11. RESTRICTIVE COVENANTS LIMIT BUILT UPON AREA TO 85X a� LOT 10 o I h-0 I �v._437a - --� I I 4' , �N/F 12. THE SITE HAS NO AREAS OF ENVIRONMENTAL CONCERNS. "� � L ��" I 4�' '� / 2. 04 AC. I o s ,, I T 35' M.B.L 1 I ONSL OW INVESTORS LLC 13. THIS SITE IS NOT IN A 100 YEAR FLOOD ZONE AS PER F.E.M.A. MAP j370178-00028, I > > LOT 8 M.B. 23 P. 132 EFFECTIVE DATE FEB. 15, 1985 AND IS NOT IN AN AREA OF ENVIRONMENTAL CONCERNS. o N LOT 9 0 I - I •, p n' - I a, e d - , 'DINED C.U. B-1 1. 13 AC. J Y. a - N/F h J 4o,^/m 1.04 AC. v y 061 ro v I� LOT 7 �I LOT 6 V. ' agTOP T:ia37 HDX CORPORATION -1 / _ _ �� of aI o 1. 13 AC.. 0 1.00 AC. 'm 1 WV. - M.20 M.B. 27 P. 75 - i / /i� N r NI CONSTRU M.B. 27 P. 103 .eh- / 4 I N C� I 4� 5 E+ TEMPORARY sei79 a tC DR Civ ZONED C.U. B-1 /L 0' D.t U.E.AINAGE BREAK I I �7 r Z - DITCH I I I I p_ D.c - - r - 50.01 �I 204.56 DRAINAGE BREAK w a9 a DIST. ' 0&1\ 21m Pl TOP _ 2G',unu7Y E I m L�� / WV. - 4a / m INV. 44.se 0 ASEMENT I� 4 I LOT 4 LOT 5� O / I 1. 50 AC. 1. 13 AC. � 8,d7� LOT 1 I ^t . LOT 2 LOT 3 4 I c ^� 1 //�� i o / �•/ '` ° 2. 69 AC. I pj I 1. 55 AC. 1. 53 AC. 7 I ,a j' I oil � - �r 1 // / 'yry p I 49.0 EXIST. M.H. / -� i M I q Oo� I 1p OI - 16.e0 ,> 49 I % iV ,rj PROP. CIS I I I N �' - 49 2 ACCESS EASEMENT t UTN PR CB PROP. 1 TOP-460 T . Ce TOM44��..0 '49.6 WV._46.20 IO PROD. CO �� -_ EXIST e• >' • 48.90 WV 4e.3 WV.-46.10 D: TOPq+e.0 - - -� 9TJ6 w" � = r - �% - - _ - I - - - - 49 6 - - - - - - - - I I Wv.+46 07 yp_M B.L _- - - 6'?''_ - c'°n• 49 2 U1 00'M.B.L II I= L- �- _ ---_---J L- so' M.BA_ _ _-+ Ey1T. .490_ --- 49 8 9oN TO RESTERN FA - - - - - - - - a ' _ - - - - - ABLE TO DIET INVERT) 15' x25' SIGN E511T a8.8�- 15' rEXIST. CIL �♦ WV. TOP - 49.02 H�O a - _ a}.8043a 0.55� N.C.Sp DR. '^ 6• 9DEWALX .. 0 dY�3 Ewe r 3 78'2REG _ _ lyx �6+ i _ L. _ �pROP CUT IEjW'DITCN f.{-� .•.CONC"•W Ilizzic- 4 CONC• W R' �T NEW DITCH P.6®00 sa _�• - z. .. . 4' C011C• Ci PROP. STA 172+ _ _.__r ..._... I� P ____ - / \Zp�%ti�SU � 51 0 40.690 J 46.4 46.5 • a'v a 80 _ 51. .. � CUT NEW�TCH �.. 1 -- 0 _aF - PJ. 170+50 i9.' 20•UTUTY DANCE ( r�1 - -_ --- _ - - rr ENTRANCE (�91EE 9OF 10) •a INV."14.97 rr Y r _ ST� - _ _ _ - _ -- _ r ♦ r (�OSS'0� - 172+50, 01`T) rrrr (RIGHT -IN, RIGHT 4 - --- ,R - -- (C�b oss- - - - - - - - - - - - - - - ' - � - -- s �b gg�-RGFI -pU11� YJE RN �--�-- �_ N v =42.21 V _ T - - -T-- 1 TRACT DATA: TOTAL ACREAGE = 25.13 AC. HENRY HAYE & ERIC BUFFONG I I ACREAGE IN PARK OR OTHER LAND USEAGE = 0 ZONED R-7 AVERAGE LOT SIZE = 1.80 AC. TOTAL NUMBER OF LOTS = 14 LINEAR FEET OF STREET - 3,038 ZONING - C.U. B-1 CONSTRUCTION SEQUENCE OF EACH SECTION NOTE` 1. OBTAIN PLAN APPROVAL. THERE ARE NO WETLANDS ON THIS SITE. 2. INITIATE CLEARING & INSTALL CONSTRUCTION ENTRANCE, GRAVEL, & RIP -RAP FILTER BASINS, I EGEND• & INTERCEPTOR DIKES ADJACENT TO DITCH. D.E. = DRAINAGE EASEMENT 3. BEGIN STRIPPING SITE & EARTHWORK. INSTALL ROCK DAMS & SEDIMENT TRENCHES IMMEDIATELY T.C. = TOP OF CURB UPON OPENING OF ENTRANCE, ALSO INSTALL CONSTRUCTION ENTRANCE. J.B. = JUNCTION BOX 4. INSTALL CULVERT, MAINTAINING FLOW IN EXISTING CHANNEL. UPON COMPLETION, INSTALL U.S. & F.H. = FIRE HYDRANT D.S. RIP -RAP & BEGIN PLACING FILL OVER PIPE. ELIMINATE INTERCEPTOR DIKES. M.H. - MAN HOLE 5. MAINTAIN STRUCTURES DURING CONSTRUCTION. C.B. = CATCH BASIN 6. STABILIZE SLOPES & DITCHES AS THEY ARE BROUGHT TO GRADE. L.P. = LIGHT POLE 7. REMOVE TEMPORARY MEASURES. P.P. = POWER POLE G.V. - GATE VALVE B.O. = BLOW -OFF M.B. - MAP BOOK D.B. - DEED BOOK THIS IS TO CERTIFY THAT THIS MAP WAS PREPARED FROM PG. =PAGE AN ACTUAL SURVEY BY ME OR UNDER MY DIRECT SUPERVISION, MINIMUM BUILDING LINE AND THAT THE ERROR OF CLOSURE AS CALCULATED BY LATS. & M.B.L. = DEPS. IS 1:jig*006r-I' "A„ ®= LINE BEARING DISTANCE EXISTING ASPHALT PAVING CURVE DELTA RADIUS ARC CHORD TANGENT CHORD BRG WITNESS MY HAND & SEAL THI$`' f.7'�+ '�'�^�"• Li N 62' 06' 43" W 74.93 Cl 16' 25' 31" 5629.58 1613.87 1608.35 812.51 N 7113' 24" W L2 N 62' 04' 03" W 74.83 C2 19' 19' 28" 300.00 101.18 100.70 51.08 N 31' 41' 41" E =ROCK CHECK DAM L3 N 61' 21' 18" W 75.09 C3 12' 57' 13" 300.00 87.82 87.68 34.06 S 34' 52' 48" W - L4 N 61' 31' 15" W 96.97 C4 11' 52' 59" 530.00 109.92 109.72 55.16 N 22' 27' 43" E JOHN L PIER , R.L.S. L-Z596z L5 N 62' 44' 00' W 80.90 C5 16' 18' 46" 300.00 85.41 85.13 43.00 N 69' 45' 11" W -o = WATER SERVICE 2 r9/-�- L6 N 61' 48' 13" W 20.86 C6 85' 54' 34" 45.51 68.24 62.02 42.37 S 34' 57' 17' E -o =SEWER SERVICE REF: PORTION OF M.B. 23 P. 132 y� D = 16 r •_l 3/8 APPROVED NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DIVISION OF WATER QUALITY Dm2(o J)N 1 Al2, swmwl16E pow Nm-NW 0S 1 STORMWATER D E C E I V E JUN 0 91997 D PROD #&�7051 SEDIMENTATION & EROSION CONTROL GENERAL GRADING & DRAINAGE PLAN SHOWING NORTHWEST BUSINESS PARK JACKSONVILLE TOWNSHIP, ONSLOW COUNTY, NC PREPARED FOR DEBRA R. RAY, TRUSTEE FOR RICHARD L. RAY IRREVOCABLE TRUST DATED 1 /28/94 PREPARED BY JOHN L. PIERCE - SURVEYING 409 JOHNSON BLVD. JACKSONVILLE, NC 28540 PHONE: 910-346-9800 DATE: MAY 7, 1997 SCALE: 1" = 100' F.B. 301, PG. 18 - F.B. 322, PG. 52 JOB #972824 FILE NAME: NWBPGP 100 50 0 100 200 300 SCALE IN FEET SHEET 1 OF 10 REVISED: 05/06/97 REVISED: 05/27/97 REVISED: 06/03/97 -r"T W- 1 V2 R� rl/2 R t s ` r 'r t r t ' � 24 I CURB BI GUTTER SCALE:I/8-- C-0 MIN t 2„Min. I 1 �. �Kv rJo I U_ E �I 1 VALLEY GUTTER SCALE : 3/4- I-0 w 4-0 E' 10 7 Traverse Joint m j-0 Min, 1 • \ \ O Utility Strip tL 0 v m \ r _ 4'- 0" I Utility Strip Tamped Earth �1 \\\2500 1 b. Con SIDEWALK DETAIL SCALE : I/2 = I'—0' Must I i i RIP -RAP STILLING BASIN NC. 67 STONE o-o� '\' ("X) cPc° I o�'O c L3'YIN. e j' 00. I RIP -RAP i 4' YIN. MIN. ROCK CHECK DAM ✓V, t, I'jlti. G% UC _.�/ '„fi• n. crete fir, 1V4 L 1/,[,r; „ Cat=) I� 50'-0" i n I 1 4 � `r ( 1-2 !?IaniMiz) Slope.„'4 2 Asphalts ROWN 3 13' "Cam Sto9ase SICEWALK p ne 2-_O.. 10 I SCALE 5 J TYPICAL STREET SECTION 2 3- i S: G NATURAL GROUND 3 MIN — 9� a+ D" BASE PIPE I.D. _ Z Q CHANNEL DETAIL -W-TQ_SCALE MAIN DRAINAGE ON EASEMENTS TO BE CONSTRUCTED AS SHOWN }} f,��r•�= �3kc 2 0'-0" SWALE DETAIL_ NOT TO SCALE SIDELINE DRAINAGE TO BE CONSTRUCTED AS REQUIRED DIVERSION TRAPA-WILIAL CRCI tS-SSCTXON PARAAOL7C CROSS-sscrZom construction Specifications 1. All true, brush, stumps, obstructions, and other objectionable material shall be / removed and disposed of ao me not to interfere with the proper functioning of the diversion. 1. The diversion shall be excavated or shaped to line, grade, and cross section as required to matt the criteria specified herein, and be free of irregularities which will loped& normal flow. 3. Fills shall be compacted as needed to prevent unequal settlement that would cause damage in the con oted diversion. 4. All earth removed and not needed in construction shall be spread or disposed of no that Sit will not interim"* with the functioning of the diversion. tabilizat3. vegetative Pm shall be done according to tht appropriate Standard and Specifications for vegetative Trachea. A. For design velocities Of less than 3.5 ft. par see-, sending and mulching may be wad for the establishment of the vegetation. It is recommend*d that, when conditions Permit. temporary divtraioma or other mean* be used to prevent water from entering the diversion during the establishment of the vegetation. A. For design velocities of more then 3.3 ft. per sec., the diversion shall be stabllfsvd with sod, with *ending protected by jute or excelsior matting or with Needing and mulching Including temporary diversion of water until the vegetation Is eatxhllNhed. NOTE: May be used to divert water away from the site, prevent excess runoff from concentrating over large areas of the site, prevent surface water runoff over steep slopes, or divert stormwater to sediment basins or slope drains. 50-0 or 6o'-0" i I 2. - J' COARSE AGQR IE EXISTING ROAD R/W \ I I Gf R/* PROFILE EMM a (SEE NOTE) PLAN VIEW STABILIZED CONSTRUCTION ENTRANCE (D-5) NOT TO SCALE rl irt' K 64a cr IEI V,, iLr l-•,61' uJFsE AG6REbAfC ✓INLY /VLhTiC fJ Wa-� , F!P F,ti. //r✓.>. 4 0i I, 4-O a-s „ or I 9-5 2 I 3'-5" 12 1 9°f5 �'— I i :'2 j Slope vd I (Plant Mix) 2..Asphalt ,..OPE I e I/4:I / I/4' I' I Slop SIDEWALK a Ie Camp.StoneBase� (27�o R) u/I SIDEWALK , !� i 31 -0 SCALE.I'=6-0' TYPICAL RAISED STREET SECTION a -PE I D. + 2' 4" .# 4^- T 7-1/2 .. / / /4" ,I MF Oi}9D _ /aA45v5 ML'= a K � K I�� LL / NI O ? . q E • w-�� PIPE I C . I' 0" GROUT -. �..-------- --�r'8,. 4 , NOTE COVER TO BE 2500# CONC. FOOTING— PROVIDED WITH TWO (2) PIPE I + _ LIFTING HANDLES. f�----- TYPICAL JUNCTION BOX NOT TO SCALE FIVE I D . 2. 4„ I ' CFNE'' BROS. INC. 24'x36- pRCP 'INLET CH-9N -2 v aP,CK _ .�_.CNC.GRCU' F!LL n �V ?SCCaC�NC.FOpT!IvG a a 2'-0' a- 14' a'- 0 ETA i I ?ly!1 i✓ � L T Y ftCA1 r"F^c y _- /.—ULWLY HHUS. INC. CATCH BA 8' MAX, „ 5' MIN '2 7"I i Y w J m a B" 2'- 2" / 8"BRICK ir i E., + E, �I I 4'- 8' 250C # CONC TYPICAL CURB INLET NOT TO SCALE . EROSION CONTROL & ROAD AND DRAINAGE DETAILS FOR' NORTHWEST BUSINESS PARK PROPERTY OF: DEBRA R. RAY JOHN L. PIERCE R.L.S. JACKSONVILLE N.C. JACKSONVILLE TOWNSHIP ONSLOW COUNTY a I Y I NOTES: ( 1. La IS THE LENGHT OF THE RIPRAP APRON. 2. d- 1.5 TIMES THE MAX STONE DIAMETER BUT NOT LESS THAT 4'. 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6' ABOVE THE MAX. TAILWATER DEPTH OR TO THE TOP OF BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOUILD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. RIPRAP OUTLET PROTECTION DETAIL (D-10) FOR PIPES OR FLUMES/WELL DEFINED CHANNEL NO SCALE POND " A" PLAN SCALE: 1" =20' 'YENCY SPILLWAY = 47.0' RISER 44.0 DETAIL) kTIVE SHELF DE SLOPE DE) 5:1 SIDE SLOPES RAINFALL DESIGN ELEV. 1. = 45.7 (13.440 S.F.) FANT POND ELEV. - 44.0 00 S.F.) INV.- 45.2 PROP. CB TOP-48.8 INV.-45.5 POND A RATIONAL METHOD ~ Q=CIA (C-0.84) (1 = 7) (A 6.14 AC) Q 36.10 VELOCITY CALCULATIONS TRAPEZOIDAL VEGETATIVE FILTER 0.5% SLOPE 6' BASE 2:1 SLOPES MANNING' S EQUATION I V = 1.486 R 2/3 S 1 /2 V = 1.486 (0.9280) 2/3 (0.005) 1 /2 0.030 V = 3.33 (5.0 MAX VELOCITY FOR STIFF CLAY CONDITIONS W/ VE^vEiATION) POND A FOREBAY VOL. = 5584 = 30% > 20% TOTAL STORAGE 18613 POND B FOREBAY VOL. = 12964 = 24% > 20% TOTAL STORAGE 54020 NOTE: THERE ARE NO WETLANDS ON THIS SITE. 46 SS v 0 e / \ I / I / I /V V 4.I I / I I I II / - BOT'COM E(:EV..39 2 : I / J / / ..... .. ....... .. ....... ..:. r. .. r. . J / ..: ... I I II / FORBAY AREA / BOTTiTM )r{:EV:-'36 1 I / . .. :... - I m � II I z / ° 4 II \ \ --- - - - - - - - - - - - - - - - - - - - - - - - - - -43 - - - - - - -- 44 -- - - - - - - - i - - - - - I Q 45 I II 46 - 47 I II - 48 �` hk 216.30' 04 O INV.- 42.8 POND " B" PLAN I �� PROP. CS TOP-46.5 MTV.-43O EARTH BERM -" ELEV. - 14.0' FOREBAY AREA 2:1 SLOP - POND BOTTOM ELEV.-39.0 SCALE: 1 " =20' TRASH RACK WITH /4 REBP (4. O.C.E.W.) -ELEV, 40.7 Q YEAR FL n ELEV. 44.0 PERMANENT POND 6" PVC PIPE W/CP - 1.75- HOLE DRILLED IN CAPPED END b (W/HARDWARE EN) 1.5' SEPARATION CLOT NOTCH RISER AT ELEV- 46.7 RISER W/ ENCLOSED BOTTOM 3:1 - =117 24" C.M.P. ANT -FLOAT BLOCK (40 C1. FT. CONCRETE) POND " A" CROSS-SECTION DETENTION POND -A' PRINCIPAL SPILLWAY j NOT TO SCALE NOT TO SCALE EARTH BERM ELEV. 42.2' FOREBAY AREA 3:1 SLOPE 3 t 6 (VEG. SHELF _- 1 Pow sursiACE-42.2 - -' -I. 3 - -�1 -- --I - -. ELEV.-38.1 POND BOTTOM - 35.2 -, - .I POND " B' CROSS-SECTION NOT TO SCALE TRASH RAC( WITH #4 REBP (4- O.C.E.W.) 0 ri NOTCH RISER AT ELEV- 44.0 RISER W/ ENCLOSED BOTTOM - 3:1U(_l =L 42' C.M.P. 6" PVC PIP W/c P - 3- _/' -i -III I I I=T_ 71 HOLE DRILLED -I I In 1-! I 1=11 EEW_= I- 1= IN CAPPED END 'o �-i. - -11 (W/HARDWARE n 1.5' SEPARATION ANTI -FLOAT BLOC( CLOTH SCREEN) - III= ='' (40 W. FT. CONCRETE) ELEV 352I�- Ill Llil DETENTION POND "B" PRINCIPAL SPILLWAY NOT TO SCALE DITCH INV. = 41.0 INV. - 42.1 INTERFERENCE \\ MANHOLE DUST. M.H. TOP . 47.22 W. - 42.87 48" RISER\ INV.-42.2 (SEE DETAIL) \ \ EMERGENCY SPILLWAY ELEV. - 47.0' VEGETATIVE SHELF 6:1 SIDE SLOPE (6' WIDE) 3:1 SIDE SLOPES 1" RAINFALL DESIGN ELEV. ELEV. - 44.0 (33,124 S.F.) CONSTANT POND ELEV. = 42.2 (27,200 S.F.) I TO OUTFALL DITCH INV. ELEV.- 44.0' TO OUTFALL DITCH INV. ELEV.- 42.Z STORMWATER DETAILS FOR NORTHWEST BUSINESS PARK JACKSONVILLE TOWNSHIP, ONSLOW COUNTY, NC PREPARED BY JOHN L. PIERCE - SURVEYING 409 JOHNSON BLVD. JACKSONVILLE, NC 28540 PHONE: 910-346-9800 DATE: MAY 1, 1997 SCALE: AS NOTED JOB #972824 FILE NAME: NWBPOND SHEET 10 OF 10 REVISED: 6/03/97