Loading...
HomeMy WebLinkAboutSW8060101_APPROVED PLANS_20070629 (3)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 06 O I 0 l DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2007 0 6 201 YYYYMMDD f: A%55\.w%e 15% Imp = 3.1+95 Ae, I• A'Z - A55w•.e I S /o -r .p = 3.'75 At.. (19.805 K o.2� 4 i3.y95 X.95� \ . ,l III III(- �•\ `y \\ '\ \` `\�`\ � /��. J Ll-- -IliZSKCL +�375x.9$��O.3lZS MAX QUO ��� L+o A = 0.`t8.3 \Cjhr .. ®� .-. -..... .Y;,o — - , _ I• k5, - ��� IL — �I � Ur \� ?,.� �.� \�I I`�ECFIV --� JAN 0 3 2006 \`� 1'',',I1,("�l' •�i�� 111 u �41/ BY •• Y i �-¢=='. _ - - —��--� ; � `�\ �� lay °+, •\ � I � �' I 1 n I /_ :t,v r1 u Q� -A,� \' \ \ \� O' SCALE: 1 " = 200' \ \ ,A\ \ y •\\ u ---- \\ ell - LEGEND EXISTING TOPO CONTOURS PROPOSED GRADE 945.31 PROPOSED SPOT ELEVATION (TOP OF PAVEMENT) ........T......:�� 404 WETLANDS STORM DRAIN --@I-- CATCH BASIN/JUNCTION BOX [I.— POND OUTLET STRUCTURE —► DRAINAGE SWALE RIP —RAP OUTLET PROTECTION SILT FENCE CONSTRUCTION ENTRANCE uuwnnuuuuuuunnm m S.R. 1316 904 17 E� SHALLOP M BEACH ! o\\o, <e YRTLE 1" 6 SrR�e 17 OCEAN RIDGE r,. 00 Project s 41 Site 179 179 90 904 179 904 E g�_PON BEACH 0 pce VICINITY MAP Scale: 1 Inch = 1 Mile GRADING, STORMWATER AND EROSION CONTROL PLANS • 1 Meadow Ridge APPROVED /4� NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DIVISION OF WATER QUALITY Z?-14UG-Z? )0-- OCEAN ISLE BEACH, NORTH CAROLINA OCTOBER 2005 RECEIVED JUN 2 9 2007 REVISED JUNE 25) 2007 rROJ# 6w0(001rJ%RU0 Prepared by: HOUSTON AND ASSOCIATES, P.A. CONSULTING ENGINEERS 117 Pine Street P.O. Box 627 Shollotte, North Carolina 28459 (910) 754-6324 f a 0 W � � W I VI VO F Q � W mo o�9v N pia ci�o N V>_WI SN SNSN �! pmp8m8 mr CNN NN 1 Oa NN �nmm p N01S,,,,, ON//11111111111\1'\\``` y� Z o z w P4 It 0 U O O W W C ED U O � N ED a �LLJ LO �W OD OD N .o C) CD %/1 L V1 w �n � V 1 O ( � Z v � z ° L N ' x V ) o m �z o 0 a E-+ C) Cf) N C C) �1 LO U O O = ~ O Z N � T m O „ o m - Z N C s U U _ N O U N O Vl 0 0 U d 7 1, FUTURE TOTAL OUT TOTAL **EXISTING ALLOWABLE ALLOWABLE PARCEL AREA BUILT -UPON BUILT -UPON BUILT -UPON I.D. (AC.) AREA (AC.) AREA (AC.) AREA (AC.) 1 1.43 0.0585 1.1141 1.1726 (82%) 2 1.41 0.0765 1.0797 1.1562 (82%) 3 1.45 0.00 1.1745 1.1745 (81%) 4 5.88 4.99 0.0 4.99 5 13.59 5.26 0.9043 6.1643 6 3.45 0.00 1.9776 1.9776 7 2.79 0.135 1.6936 1.8286 R/W 1.27 0.98 0.0 0.98 TOTALS 31.27 11.5 7.9438 19.44 DEVELOPMENT TBD TBD TBD Access Storage II Access Storage II FLEX -SPACE FLEX -SPACE +* EXISTING BUILT -UPON AREA REFLECTS BUILT -UPON AREA SHOWN ON CURRENT PLAN AND APPROVED OR CURRENTLY PROPOSED UNDER SW8060101. m MWA Ewa - �. t.\ ✓ (INCLUDES FORCE MAIN) 32.2 ACRES --- -- ✓ \ �� / '� rF - - - -- I \ w u rc 0 ww zie gg H Ea zrc F� n�p9 a1 SN mm to \N �� �� ur 088 0 \N ¢ nm m`000nunnnm.... s P N0, '0rmunnnn nP`"�o�o�•• bb W O O U z w a b 0 y O a w U O 04 • n I L0 rl n T/1 O W Li o) In LLJ It 04 N OCD° �z t �w o Z �0 0 z Q- J N m Zz o O UQ V) O " L0 U O 0 = o z N K T m m U o m Z -0 OJ �' _ N U O 30 N p U 0 L N 0 C) U a- 1 I _ } MEADOW SUMMIT ©RIVE ;SCALE: HORIZONTAL 1'=50• 50 K vERncµrt„=� - _ .-J' - _ _p 0.809 _ -a.30% f s 4 s5% 1.32% �< �` _ ,. ..� ___ ,.. .,._ra., �_......., IF , 40 W I 5 11 . . mot o o :_ oo PM STA, 15+10 00 :.. o + a o+[ PM STA 11+55 00 , q PVT. STA 12+55.00 a PGI-E6EY; 48.30 :.. $ PFN f n + + a " PM 48.00 L'.1 0.0000 v _ y - + 4 �.- ¢, + PVI EL£/:-47.60 L. 190.0000 ,..-. + L: 100.0000 - N + rA ELEV -47.0 L 100.0000 e a .. a K: 6 886749 . - , ,� _- ti PM STA; 12+62.97 r+ '__ 35 I K: 32.178218 E: 0.388462 •.•. E: -02625W-. --- 6 ; , - ¢ K'S1.409819 E 0.243145 --. -, < - �^ CR Ev Q.188863 EST 15+01154782 _ ELM 45.85 @: 100.QD00-- a + m XS - m - "., .. SAiG. Tt+79.26, 47.80 CREST2 ,32+43.1 P,'98.05 , , _-...=54G 13+7183 4722' _.:: rA „. - 27.481012 SAO: 7+3633 46.18 i c 0 e O O. - 0: 1 1DI "s ol 0 cti 30 ._� 00, 3 _. MEADOW SUMMIT:.DRIVE. H RIZ NT EAL 660' ` 1 `-0.90% � �.. Y.-.. _---'_ __ ___._____�.- r___ .�___ _ 3 __"_ - a T 0.65X A -0.61R 3X ; -.. 1 Z - _ E i S i tp Q < - 8 PA SR 26+55.00, .: o v. °�-. .-�"'+._-, PALSi' 2 +60.00 .:. PA ELEV. 48.80 _.., } :.__ '.__.-_ vi .. ..._, q v1 _. = t 6 .. '.- PVI ELEY..,48Jp ., :;. o + '_ _, __ !__ _ o __ ... k 5'. ¢ h ST 30 55.00_� i . o L. 400.0000 , N N _..-. - _., ., .. � ._ n + .. 1 A STA. 24+2 .00. n + s ..._. o n L: 100.0000 r K:-79.087719 n N ! ., ._.in +. o - _.Q. + �i _, �_ `� PVI 4EK 445So , ` _ a _ 2 + K68.7592Y6 - E:-D.181794 _ , t .,. ,. N . ..} , PA El £V: 47.20 L.100.0000 .e N a--. . _..s o .;: E;-(1.158052 4 - ,.._. - ,.-m N _- PYL.STA:.29+0000 -'_. PVI:ELEY: 47.2q "' + __. u- ._i L; ioo. K: 51 00 0 P 845444 N CREST: 21.+68.49, 48.62 �^ • . ." . _;._ t a e K47962116.) ".. ..• '5 '.. ... ._-;._ ,+�_. N : CREST::26+56,58, 48.54 s .....: ,.._ .. .:. .. a'.' _ L'. 100.0000 _ m N E:...-0241101 - 3 .....,-'SAG: E: 0;156993 P4+23:07. 47.36 ;.,"- T `; _._., .,._.. ,� „ _... .. .. . _. _.._ :_..... y.. K'.. 60.808647 0.205563 a :.... _ CREST: 30+58.52, 48.56- rj 1 o 1 i-n ,. ) ...... - : cz > .. .E.. , :SA O: 28+87.23, 47.3Sf -...' - i - .�:3 - Lnz - ao, o`. . - -- X 4- 0 N Q) c- STORMWATER POND #1 SCALE: 1 "=30' STORMWATER POND #1 WEST FOREBAY EAST FOREBAY MAIN POND TOTAL ELEVATION SURFACE AREA SURFACE AREA SURFACE AREA SURFACE AREA (M.S.L.) (S.F.) (S.F.) (S.F.) (S.F.) 35.5 - - 4,019 4,019 36.0 687 692 4,546 5,925 40.0 2,428 2,466 9,042 13,936 41.0 3,066 3,097 12 771 18,934 42.0 3,587 3.645 16:057 23.289 43.0 4,106 4,183 17,700 25,989 43.4 4,322 4,407 18 356 27,085 44.0 4,655 4,750 19:342 28,747 EMERGENCY OVERFLOW OUTLET 20' WEIR 0 44.0 RIP -RAP Z_ WEST FOREBAY TOP FOREBAY ATM BERM 0 41 0 0 6:1 S TOP OF POND FROM 044.5 7� 40.0 STORMWATER POND #1 WEIR OUTLET STRUCTURE 10' WEIR 0 43.4 3" ORIFICE 0 42.01 _- RIP -RAP j TOP FOREBAY BERM 0 41.0 0 44.0 PORTABLE PUMP, CAPABLE OF PUMPING T0HETATOTAL POND VOLUME IN LESS THAN 24 HOURS, STORAGE POOL IS TO BE USED TO DRAIN PONDS IN AN EMERGENCY. 043.4 SECTION 1A-1'A STORMWATER POND #1 44 FLOOD POOL 0 44-0 44 STORAGE POOL 0 43.4 2 PERMANENT POOL 0 42.0 42 TOP FOREBAY BERM TOP FOREBAY BERM 0 41;0 041,0 �0 7 4 4C 1 EAST AW 8 0 P WEST .... . . ..... .. ......... . . . . .. . . . . . FOREBAY 3E FOR BAY � fn 36 3 BOTTOM ®36.0 BOTTOM ®36.0 SCALE; BOTTOM 0 35.5 HORIZONTAL ..=30- VERTICAL 1;'=3' 5 134 3A VEGETATIVE 0 6:1 S1 FROM 40.0 EMERGENCY OVERFLOW OUTLET 20' WEIR 0 44.84 STORMWATER POND #2 SCALE: 1 "=30' NOTE: A PORTABLE PUMP, CAPABLE OF PUMPING THE TOTAL POND VOLUME IN LESS THAN 24 HOURS, RP IS TO BE USED TO DRAIN PONDS IN AN EMERGENCY. 0 STORMWATER POND 2 OUTLET STRUCTURE BOTTOM WEIR 0 43.0 2.0" ORIFICE 0 41.75 ®36.0 STORAGE P OOL 24" INV. 39.88 rVEGETATIVE SHELF 0 0 ®6:1 SLOPE FROM 40.0 TO 42.0 PERMANENT POOL 1 75 FLOOD POOL 0 43.78 TOP FOREBAY BERM 0 41.0 77 TOP OF 04 SECTION 2A 2A r 46 ISTORMWATER POND #2 4 - 44 -FLOOD POOL, 0 43.78 STORAGE POOL 0 43.0 42 42 VEGETATIVE SHELF PERMANENT POOy 041.75 0 6:1 SLOPE TOP FOREBAY BERM FROM 40.0 TO 42t0 ®41.0 40 FOREBAY 38 - 1. &�' 3E 0 1 6 3E BOTTOM 0 36.0 BOTTOM 0 36.0 SCALE: HORIZONTAL 1"=30' VERTICAL 1' 34 34 STORMWATER POND #2 ELEVATION (M.S.L.) FOREBAY SURFACE AREA (S.F.) MAIN POND SURFACE AREA (S.F.) TOTAL SURFACE AREA (S.F.) SECTIOM 113-113 - STORMWATER POND #1 FLOOD POOL 0 44.0 41 STORAGE POOL 0 43.4 a a w w STORMWATER' POND 3 WEIR IRE: 7 36.0 40.0 41.0 42.0 43.0 44.0 1,170 3,769 4,609 5,343 6,075 6,835 2,782 6,175 9,036 11.776 13,190 14,634 3,952 9,944 13,645 17,119 19,269 21:469 POOL 0 42.0 STORMWATER POND #3 FOREBAY MAIN POND TOTAL ELEVATION SURFACE AREA SURFACE AREA SURFACE AREA (M.S.L.) (S.F.) (S.F.) (S.F.) 39.0 487 413 900 43.0 2,328 3.699 6,027 44.0 2,967 6,521 9,488 45.0 3,582 9,356 12,938 46.0 4,190 10,816 15,006 47.0 4,828 12,304 17,132 TOP STORMWATER POND #3 SCALE: 1 "=30' BOTTOM 0 39.0 VEGETATIVE SHELF 0 6:1 SLOPE FROM 43.0 TO 45.0 PERMANENT POOL 045.0 FLOOD POOL STORAGE POOL @ 46.5 0 46.0 0 M. ♦ TOP FOREBAY BERM 0 44.0 NOTE: A PORTABLE PUMP, CAPABLE OF PUMPING THE TOTAL POND VOLUME IN LESS THAN 24 HOURS, IS TO BE USED TO DRAIN PONDS IN AN EMERGENCY. SECTION 3A`3A FLOOD POOL ®46.5 STORMWATER POND #3 41E STORAGE POOL ®46.0. PERMANENT POOL 0 45.0 4 --- - ------ -_ JQP- FOREBAY-BERM EP ......... 44 ------ VEGCT;VIVE F 0 44.0 - 0 6:' SLOPB FROM 43.0 TO 45.0 �-2 FORE BAY, tyi 42 �0 . ..... . 4C SCALE: HORIZOOAL 1`30' VERTICAL I '_3' BOTTOM'® 39.0 BOTTOM ®39.0 138 31 SECTION 313-313 STCIRMWATER POND #3 48 4E FLOOD POOL 0 46.5 6 4E STORAGE POOL 0 46.0 ERmANENT POOL 0 45.0 441-1 44 VEGETATIVE SHELF 0 6:1 SLOPE; FROM 43.0 TO �5.0 2 4ti 40 ry 4C SCALE: HORIZONTAL l-1 "30' VERTICAL 1,z:i:3' BOTTOM 0 39.0 138 3 0 FROM CTION 213-213 STORMWATER POND #2 POOL BOTTOM 0 NOTE: Vegetative cover above permanent pool shall be bermudograss sod. Wetland species are to be planted on the 6:1 shelf. These species are: Pontederia Cordata (Pickerelweed) Juncus Effusus (Bog Rush) Ludwigla (Water timrose). ME MIN. TOP OF BANK �\ (SEE DE AIL) g, z CREST OF WEIR ELEV. (SEE DETAIL) sr a (STORAGE POOL) �i \ ORIFICE \ NORMALPOOL) 2 X 4 TREATED LUMBER STAINLESS STEEL WIRE MESH FLOW SPREADER ORIFICE PIPE \ SPIKE TO POST WITH WITH MIN. 3/16" STRANDS AND (SEED ETAIL) ,� \ (SEE DETAIL) 16d H.D.G. NAILS 1"SQUARE OPENS. (TYP.) PLAN VIEW RIP -RAP FROM NORMAL POOL POND B MESH SHALL BE CUT TO POINT DOWNSTREAM WHERE 1 - CHANNEL SLOPE IS LESS THAN 1 % i = SEAL WATER -TIGHT BETWEEN r_s_=- -- TO FIT IN SIDE TEE r - PIPE AND CATCH BASIN LONUITIM1NAL SECTION RIFICE PIPE SUPPORT J r________________ (SEE DETAIL) _ • _ r CH. 40 PVC ORIFICE PIPE 4 X 4 TREATED POST -RAP TO MINIMUM MIN. 4' IN GROUND , IPTOP OF BACK ELEVATION (TYP.) I d i 7L Jt A 3 RIFICE ELEV ��EE PLANS 3 (NORMAL POOL) A CAST IRON HOOD, FRAME AND GRATE =--------------- '- SEE PLANS FOR ORIFICE PIPE CROSS RECT_I_ON VULCAN MODEL: V-4065-1 - ,------------------------------ SIZE AND ELEVATIONS X 2 OR APPROVED EQUAL 6 CH. 40 PVC REDUCING TEE WMIRIJ_TE O T. _T ST$JJS'TL RE FO-I?�STORMWATF.R Pn00-ND PL`AN V1LW DRIFTC_F_PIPE SUPPORT DETAIL SECTION VIEW NTS SEE PLANS FOR PIPE SIZE NTS AND ELEVATIONS STORMWATER POND ORTFTC , PJPF, DF,TATT" ELEV OF TOP NTS OF CURB R/W R/W 6" PRECAST CONCRETE TOP WHEN REQ'D. 50' 6' 35' 6, AS REQD. 2.5' 15' 15' 2.5' MAX SLOPE SEE PLAN PRECAST CONCRETE B BOX SHOULDER SHOULDER 3.1 TIE TO 1" PER FOOT 1" PER FOOT FEXISTING ve PER FOOT ua" pER FoOr GRADE TOP OF BERM SEAL WATER -TIGHT BETWEEN MIN. SLOPE �—' --� 6:1 CULVERT SEE PIPE AND CATCH BASIN TIE TO 6a MIN. SLOPE EST OF WIE LAN FOR TYPE EXISTING � 3'1 SO' CURB & GUTTER 5:1 SLOPE GRADE ppCTED SUBGRADE TYPICAL CUT SECTION �., MAX. SLOPE _ SEE PLANS h __________________i i` IP-RAP FOR PIPEINVERT TYPICAL FILL SECTION 6" ABC OR 9' STBC ELEVATIONS h i ' " 1-2 BITUMINOUS CONCRETE -- - - _ a A MEADOW SUMMIT DRIVE ROADWAY SECTION LONGITUDINAL SECTION VIEW ......... CRUSHED STONE z 1 -..... . .:. :.: f. .. .. CRUSHED STONE if TOP OF ARM '-sC `i::7::7 li:: is i:::i: ' k E �U'� -------------- COMPACTED SUBGRADE 15' 31 REST OFW IER SEC:TION B_—B SECTION A -A SHOULDER 114" PER FOOT 114" PER FOOT SHOULDER RIP -RAP PRECAST CONCRETE r_____________ I` TIE TO MAX.SLOPE 1"PER FOOT .4 1' PER FOOT MAXSLOPE TIE TO EXISnNI 5:1 5:1 5:1 5:1 _- EUISTING TYTWAL_CUJ1B INLET CA CH B_ ASIN GRADE 6.1 ` 6 1 GRADE CROSS SECTION VIEW NTS SEE STORMWATER POND MIN. SLOPE MIN. SLOPE B ORIFICE PIPE DETAIL OMPACTED SUBGRADE /-'+�7��/vp �7� y+� 6" ABC OR 9" STBC EMERt?i_i� � �_! O ER,_LOWfJTL.FT SEE PLANS FOR PIPE SIZE PLAN VIEW 1 1/2' 1-2 BITUMINOUS CONCRETE NTS AND ELEVATIONS ROADWAY SECTION MANHOLE FRAME AND GRATE I—VARIERVARIE VARIES VARIES 4r, SEAL WATFA-TIGHT BETWEEN C TRASH GUARD � � PIPE AI.O CATCH BASIN WEIR ELEV. (STORAGE POOL ELEV.) COMPACTED SUBGRADE, 1 12" 1-2 BITUMINOUS CONCRETE "ABC OR 9' STBC COMPACTED R 1 /8" SEE STORMWATER POND MIN. PERIMETER =6. ORIFICE PIPE DETAIL - (95%STANDARD PROCTOR) tl MIN. AREA OPEN=3."------------ SECTION BETWEEN BUILDINGS R 1 3/4" ORIFICE ELEV _ r 1 (NORMALPOOL) R 1/8" 1 CONSTRUCTION TO BE IN ACCORDANCE WITH LATEST NCDOT SPECIFICATIONS AS REQUIRED : AS REQUIRED TYPIDAL -_ROADWAY SF TTONS_ _ 0 : _r.. PRECAST CONCRETE SUITABLE FOR O� I --__--NTS R3/4"'I CULVERPLAN R TYPE - .. 7"... -- - .- - ' 1 11 6 ABC OR SEE PLANS I 9" STBC PI -AN VIEW ...-,b.:..:. "- CAST TRON FRAME & GRATE SUITABLE FOR PIPE INVERT 1.1 .:}:::.- . . . . - - - - - :. ELEVATIONS - .. . . . . . .. - R TRAFFIC LOADING 3 MIN.-- `' FOR H2OT DING .'.'.'.'.'.'.'.'.'.'.':':'.'. 1 112 1 2 BITUMINOUS US PAVEMENT r:;i:a: .....:.;..1 Fi::.`:. ..........i �6PRECASTCDNGTETE TOP WHEN - TFN: OD. CRUSHED STONE 714" PER FOOL - 1 1-6V" REO'D. AS R IR) >^�����i3T :?-.-r3'�r.i,� nr� �a��7 ��^r�r•-4:r iy���r,^rrv-rr��ArTT�.,3���i� _ 3 rir,rv,�rvi� vvvvv�rvuv4v �rbvv�rbv+ $av�rvv$rbv vbOrOr�rbOa,bvvvvOa�r,rvv� ..b::::: =: --- CULVERT SEE 3 r r r r�vrv5va `r` v,r, v ,yr.................................:..:..:..:..:................._.. .. .. ..._ _ PLAN FOR TYPE �r+vrrE,r�rE r�r�,r45 r���s�+4�rrv�4vi�4,r,�r,4v�rr i�iarieni�r�rai�?ra5a5aS,Sa: ,v4ariva4�rraria�rv5ass5sin---"....................v-.:..:..:-.::_.:--:>a.--.........--�......-..•..•.......•-.• _ .NOTES. - COMPACTED SUBGRADE 6" ABC OR 9" STBC COMPACTED - ` _ , " - _ . • _ 1. CONCRETE SHALL BE 3,000 P-S.I. - (95°b STANDARD PROCTOR) 2. CONTRACTION JOINTS SHALL BE SPACED AT 10' INTERVALS. SECTION B J3 SECTION A -A -- _ _ (A 15' SPACING WILL BE ALLOWED WHEN A MACHINE IS USED.) 3. FINISH ALL CONCRETE WITH CURING COMPOUND. 5rrr rraaarrrr rrr4`rr``�ar rrrar SEE PLANS vara vivv,av,r,r,rvvr vvriv ,5 4 r - r Lva,r,r v,r,r,rv,r�wrr - ..._- "' FOR PIPE INVERT - ...._.� : .. - - ELEVATIONS COMPACTED SUB §ASS STORMWATER POND OJJTSLEZSTRILCTU1tE `;,,•.=::-;:-�::�::=::•:>::=::=::•s:�:-:�:::::;-:-:=:-'::-:-:�:::::�::-;:�-;:=:;-';:•;==:: — — y y, y, vavw,f,r,,y r,5`. 1 11 f: T� 1777 --.-e NTS t ;?rs;,t,.,;:r: :;:;;rs;c: css;:,.;�nr:;.`::;. L-6 MF'D_LANC�LT$�_c�S�ILT'I'E-R DF.TATT c::;; :: , {:::;:: _� 1 i.a_s-sv..r..r._e.e_r_rv..r_v..a.`rv.✓..r✓'r_c.<,¢,a. ::P ':.'::'{ CXiL5F/�STCNE .---1 ------------------- NTS COMPACTED SUBGRADE PAVEMENT DETAIL SEC B-B SECTION A -A NTS TYPICAL__GRATE INLET_CAT_CH BASIN NTS B 11 r-- -- R 1/211 I- A ° j B _ L c VEGETATIVE FILTER OF VIGOROUS ------------------------ .'.'FI3' R3" R 1/8' I ° y I STAND OF BERMUDAGRASS - 1 PRECASTc REF I_—___—_ A A _� 1 1 /2" 1-2 1 0` -- - ........... fi ABC OR " ::; B 9" STBC PLAN vtEw 12" HOPE CUT IN HALF. MANHOLE PLAN - FRAMEB WVE `:.bRUSHED STONE;: :':.: _ ::: 1' 6 1 3 MIN... 6" r .. .. .. RCP UNDER ROADWAY AS D. AND HOPE FOR NOFTTRAFFIC LOAD {3 MN) EL_O�Y�SRREADDDR DETAIL NOTES. AREAS SECTION A A SECTION B-B 1. CONCRETE SHALL BE 3,000 P.S.I. NTS 2. CONTRACTION JOINTS SHALL BE SPACED AT IW INTERVALS. SEE PLANS (A 15' SPACING WILL BE ALLOWED WHEN A MACHINE 1S USED.) FOR PIPE INVERT 3. FINSH ALL CONCRETE WITH CURING COMPOUND. ELEVATIONS TYPICA7. METHO�OF FN TN = CTIRR AND �7TFR � NTS T-6" STANDARD_CURR 8_GTITTF.R D .___ETAffi CRDSEDSGNE /1 1 1 1 L1J This drawl Is the m of HOUSTON and ASSOCIATES, P.A.and NTS-----------' `-----------------------' is not be reproduced in Whole or in part without written permission Tram HOUSTON and ASSOCIATES, P.A. ©COPYH9bL 20ar SECTION 11-B SECTIONA-A AGT®SUBCgADE �1 ALL RIGHTS RESERVED STANDAT;SD JUNCTION BODY NTS v/ A. BURY THE TOP END OF THE JUTE STRIPS IN TRENCH 41NCHES OR MORE IN DEPTH. _:t;I; Sr??? TOP ELEVATION OF STORMWATER.5'- 1' B. TAMP THE TRENCH FULL OF SOIL. SECURE - �;.: WITH ROW OF STAPLES, 10 INCH SPACING, '�.'r.'.'.' ;:':'s ---------------- 41NCHESDOWNFROMTRENCH. ' i F y #S WASHED 1 MAX.m STONE 2 EROSION CONTROL ROL NARRATIVE V E a - E. OVERFALL. . W.>> C. OVERLAP - BURY UPPER END OF LOWER STRIP AS IN "A" AND "B". OVERLAP END CHANNELSLOP 1 RIP -RAP A. PROJECT DESCRIPTION OF TOP STRIP 4INCHES AND STAPLE. Meadow Ridge located , .......... OR WIDTH OF VARIES is in southern Brunswick g e nslvick Counts-, North (;arolina. Meadow Ridge is a 31.1'3 acre �.....�.'. '.' EZISf1NG`'i€ ABC PROPOSED STREET, ROADWAY:,':Es'i`Ei?.'.'.-.'.'.'.'.'.' WHICHEVER IS tract ofl land a d that will include five (5) future commercial developments and one (1) commercial storage { ' O .'\.'.': Y' \.. .:. GREATER SECTION VIEW facility, Access Storage II. The Access Storage B facility, the roadways, storm drainage, and utilities are being constructed now. All stormwater is treated in three 3 Stormwat r Ponds, g O e o nisi, the future EROSION STOP - FOLD OF JUTE BURIED IN . „ .,i-'.' - - � - -' EXISTING SLOPES stormwater runoff from the future commercial a CO ercial developments. The future commercial developments are P SLIT TRENCH AND TAMPED, v ti. :.'. :':'1 DOUBLE ROW OF STAPLE' '.T:'.'`I.-:.:.:. o allowed8 /oimpervious 5 coverage. Sediment storage is provided in the Stormwater Ponds. The Meadow g g P -�. • - - . - PLACE STAPLES 1.5 Ridge, construction project includes the con tntct.ion of a lift station on -site g P J ( ) and approximately mately 10.700 feet of 8-inch force PP � o - - - - - - - T06 FEET APART AS . .\. '. REQUIRED TO KEEP 10' MIN. main. NI project g Most of the force main is off of the Fitt ect site and is located in the NCDO'f right-of-way. > > .'.-y.'.'.' ��; .::'.:.:. .:.' THE JUTE FIRMLY i.. �. PRESSED INTO SOIL 15'-0" m Q -�v - HEIGHT & WIDTH DETERMINED BY TheMeadow endow• Ride project area drains to the Saw Pi Swamp t Sc a and ni to the h ll River- Both g P S a otte e of are - -:--- - :-:-' . PLAN VIEW EXISTING TOPOGRAPHY AND TOPOGRAPHY A .5' - 1' SEDIMENT STORAGE REQUIRED classified as "C. Swamp" according to the NCDEbf "Classification andWater Standards." .': TYPICAL STAPLES .'x.. - l.y' w Current land use of the project area is woodland. Kxglxuxa *� #6 GAUGE WIRE -'-- - -`- n EXISTING ROADWAY NEW CONSTRUCTION < #5 WASHED > STONE t' V a B. SOILS AND TERRAIN s^ MIN. 12" IN. The project area to be disturbed is slightly rolling with a consistent slope from the southern project boundary FRONT VIEW to the northern project boundary. The Soil Survey of Brunswick County classifies the soil types within the Q `� SECTION VIEW project boundaries as Mandarin Fine Sands and Grifton fine sandy loam. These series of soils are J a� F. AROUND STRUCTURES AND STAPLE SECURELY. considered to be poorly drained. =J! TE THATCHING_STABILi7.ATiON DETAIL ENTRANCE DETAIL TYPiC,AL CHECK DAM DETAIL, NTS _C-ONSTRU-CTION NTS NTS C. EROSION CONTROL MEASURES The primary land disturbing activities for this project are related to construction of the roadways, Storage INSTALLATiON OF -JUTE THATCHiNGSLLSWALES S (SEE WM#S.) Buildings (Access Storage II), parking lots, installation and construction of storm drainage system including STEEL OR WOOD POST :• sT.v stormwater pends, installation of under ground utilities, and the relocation of existing ditches. To prevent WHERE APPLICABLE seqaa wovEN wmE FE vanG As REURD. (SEE NOTE If sediment losses to off -site areas and erosion during construction, the followin measures shall be used: silt g g SILT FENCE FABRIC fencing, seasoned grassing, construction entrance, inlet protection, outlet protection, and Three (3) Jute thatching shall be used in swans where the slope exceeds 0.015 (1.5%) EXTRA STRENGTH (50 #/1 IN. MIN.) SYNTHETIC POROUS .stormwater Ponds will be used as sediment basins. The three (3) .stormwater Ponds are designed to the MIN 1212GA INTERMEDIATE FILL SLOPE FABRIC OF NYLON, POLYESTER, OR ETHYLENE YARNS. State's specifications for stormwater treatment, and provide more than enough sediment. storage capacity. P g SPECIFICATION GUIDE c z WIRE _ . - - - - - - - - - - - - - All accumulated sediment shall be removed from the Stormwater Ponds prior to their use as permanent a A. Preparing To low flows - �, I s{ormw'ater treatment BMP's- Sediment shall not be allowed to leave the site at any time during a channel and seeding: prevent meandering slope than rid-titcenter to confine tothe �' I I construction- Frequent inspections by the en 9 P engineer shall be done to ensure that all erosion. control measures F o channel where thatching will be. laid GRADE ' • I are functioning g property. W m . "-MIN. COMPACTED FILL OVER SKIRT IQ I U I Fertilization - Lime and fertilize as specified in "Seeding Schedule". Disk as needed but. do not cultipack. o ANCHOR SKIRT WITH MIN 4" LONG y�� WIRE STAPLES @ 12" O.C. A I A OO�OOOf�O ,.�.., .a. ....in ,� I I •G 3 I o000000o I O z 2. Vegetative Sprigging - Plant. grass sprigs or similar material before the thatching is put down. Spacings for FOR REPAIR OF SILT FENCE FAILURES, USE #57 WASHED STONE IN LIEU OF COMPACTED FILL. ���O�DDO I z x h O planting may vary. Suggested maximum is 10 x 20 inches. p g y gg I OOOOOOOO I zo zLL _ 3. Seedin s - Split the application. Sow half the seed before placing the thatching. Plant the remaining half after the g p g g' g F NT VIEW SIDE VIEW I TYP. UO I ¢o EROSION CONTROL GENERAL NOTES ci thatching is laid. I m� '' I ¢' I a Z 3 o-o H -' -' : t P 1. All. COIIStr'UC ton aCttVltleS Shall be performed m compliance with the Sedimentation Pollution Control c B. Laying the Thatching: The thatching shall be laid on loose soil after all rocks, clods and sticks have been picked up that would prevent contact with the soil surface. 1. Install silt fences as shown on drawing and at locations necessary to control Siltation of adjacent areas. 2, Where wood posts are used, they shall be a minimum d 3" in diameter and 6 in length- Posts shall be creosote or pentacnloroperrol treated southem pine. I ------------- W Z O F N - Act Of 197�. O ` m where steel posts are used. they shall be 5 m tench and be of the sell fastener angle type. 3' Woven wire fencing, where required (see Note # 6), shall conform m ASTM A116 forGass 3 galvanizing- Fabric shah 4' be 32' have a minimum a 6 Fine 12" The top X TREATED 2 X 4 POST &FRAME In 2. All land disturbing activity is to be planned and conducted to limit exposure to the Shortest feasible W 1. Start laying the thatching from the top of the channel and unroll down grade so that one edge of the strip coincides a minimum of wide and wires with stay spacing. and bottom was shall with the channel center. Lay a second strip parallel to the first on the other side of the channel and allow a 2 inch be 10 gauge, and intermediate wires shall be 12-12 gauge Wee caloric shall be fastered to wood pasts with rot less than #9 staples 1 107 long. {jnte overlap. If one roll of thatching does not extend the length of the channel, continue downhill with additional rolls. Finer taboo Shall be of nylon, polyester, propylene or m ethylene yam with minimustrength of 30lb.Ain, in, and a 5. minimum 85%filtemg efficiency. Fabric shall contain ultraviolet inhibitors and stabilizers It fitter fabric is used with a strength of 50lb.Ain. inor greater, and the post spacing (S) does not emeed 9, woven 6. wire ferxvrg is Otherwise. woven as wire leasing is required, and spacing 8'. Pi AN II W SECTION AA 3. All construction sites and severely eroded areas shall be stabilized by the establishment of a Securing the Thatching - Bury the top end of the jute strip in a trench 4 inches or more deep. Tamp the trench full rwt required. post shall not eweed permanent ground cover. 2. of soil. Reinforce with a row of staples driven through the jute about 10 inches apart. Then staple the overlap in the channel center. These staples should be 3 to 4 feet apart. The outside edges may be stapled similarly at any 4. As soon as all areas are permanently stabilized, all permanent measures have been installed; and time after the center has been stapled. Closer stapling along the sides is required where concentrated water may TYPIC.,A_T _CATC A. TN PROTECTILON - filial approval is received by the Erosion Control Engineer, erosion control temporary measures may be flow into the channel. STANDARD TF,MPORARY SILT FENCE NTS removed Where one roll of thatching ends and another roll begins, the end of the top strip overlaps the trench where the Make least 4 inches NT'� 5. Over the life of the project, the Owner shall make inspections the upper end of the lower strip is buried. the overlap at and staple securely. evaluate success io controlling erosion of soils to off -site areas. If areas are found where erosion is taking place, the Owner re found O Erosion Stops - At any point. the thatching may be folded for burying in slit trenches and secured as were the upper shall take the necessary measures to remedy the situation. 3. ends. This checks water flow and erosion that may begin under the matting. It also gives improved tie -down. The La procedure is recommended on steeper slopes and gentler slopes of sandy soil or areas subject to seepage. Spacings of stops very from 25 to 100 feet. • Diversions -Where diversion terraces outlet into the waterway, the outlet should be protected with thatching used • Nch 4. in the same manner as in the main channel. The thatching for the outlet is laid first so thatthatching in the main CONSTRUCTION SEQUENCE r0 channel will overlap the outlet strip. 1�1 to n n ThatchingSoil Contact - Get, contact between thatching and soil b y rolling at right angle after law stapling and - g y g glaying, P g NOTES: � O 5. seeding is complete. Perfect contact is vital to keep water flow over not under the thatching. 1. Vigorous stand of permanent grass cover shall be established as soon as possible along the center line and 1. Obtain approval Of Erosion Control Plan from NCDENR- Land Quality Section_ of channel. Where banks cannot be adequately stabilized with vegetation, an artificial linter such as o abanks rip -rap shall be used to protect the banks. RIP -RAP DISSIPATION PAD r^ Staples - Hairpin -shaped wire staples, number 8 gauge; 8 and 10 inches long have been used. The longer staples 2. Where slope of channel bottom exceeds 7.5%, jute thatching, orother effective channel lining material, as well 2. Install construction entrances. 6. are used in loose or wet sod- Wire staples are better than wooden pegs because the staples can be driven flush with as bermudagrass sod shall be used to protect channel center fine to a point f on each side of center. (see "Installation of Jute Thatching in saples") RIOFOSM FLARE f Or Fin the matting. Wooden pegs extend above the thatching and may catch trash that diverts water flow out of the EMsecnoH 3. Install temporary silt fencing. W thatch protected channel. wooden pegs may also set. up a damaging turbulence. N W Inspection: After job completion, make sure the thatching is in cnntArt with the soli at all places and the critics] ,,,.col• - 4. Clear sites at Stormw-ater Pond locations and begin construction of Stormwater Ponds. to ZIZ C. areas are secrueLvled down. ,.., 6. Rough o ..,,, grade roadways and parking lots and install storm drainage system and begin ditch relocation. O U 1 MAX .,.:,, sya+as-'"'v PLAN VIEW Z Tn s 5 i .,,,, ,: r- - 7. install water, sewer, and other utilities. Vr^1 �J f o V1 Z SCHERULEmr�_ - MEDIUM STONE DIA. d50 MAX STONE DIA. dmax 8. Within thirty days following final grading activities, seed and mulch disturbed areas which will not be �R ai SEEDING built upon. V o SLOPE Ro .. 1. All disturbed areas due to construction and any severely eroded areas shall be stabilized by the TYPT ETATU LLF, SAT. VFC= "'' .. .. .. .. .............. ........ �' :.: _: _ _ _ _ ....... .. ......._ -� 9. Maintain ten nary erosion n s - po control measures until permanent ground corer is estabhshed. A establishment of a permanent grass covet The seeds yes shall be selected based on the type soil resent, P g 1� •P P NTS PRON THICKNESS WITHFILE STONE APRON. WITH FILTER CLOTH �J J seasonal conditions and other considerations. As an alternative, the contractor map use the methods and SECTION 10. Obtain certificate of compliance through and on -site inspection by NCDENR Erosion Control Engineer. t` schedules shown below; however, it is recommended that a specialist be consulted with attention given to site VIEW Contact person is Mr. Dan Sams. 910-395-3900. specific conditions. OUTLET PROTF.CTIIL ON DETA 11_ Remove temporary Z o erosion control measures and stabilize these areas immediately. Permanent erosion LD a. Cultivate area to a depth of 5 inches NTS control measures shall remain. All sediment is to be removed from Stormwater Ponds and they are to O b. Apply agriculturall lime at the rate of 4000 lbs. per acre be returned to their design specifications before being used as permanent BMP's. r , c. Apply 10-20-20 commercial fertilizer at. the rate of 5001bs. per acre [-� Outlet Pipe d50 La 3Do W dmax Apron d. Sow grass seeds at the following rates: Size Do ( ) Thickness (in) (ft) (ft) tD (ft) (ft) (ft) (ft) V1 Bind Rate Per Acre Intentionally left blank CA All Rip -Rap at Pipe Outlets 24 0.5 16 6 18 0.75 1.13 Common Bermuda Grass unhulled 25 lbs. 36 0.6 18 9 21 0.9 1.35 48 0.8 22 12 26 12 1.80 Intentionally left blank 0) C O hulled 12 s Pensacola. Bahiagrass 50 lbs. Stcu nwater Pond Structures 10' Weir 0.8 18 10 16 12 1.8 a r Korean Lespedeza 25 lbs. Emergency Spillways 20' Weir 0.8 18 20 30 1.2 18 '- Tall Fescue 30 lbs- e. Mulch with straw at the rate of 3250 to 4350 lbs. per acre. Intentionally left blank £ Anchor straw with asphalt emulsion tack coat applied at the rate of 300 gallons per acre. 2. Where it is not possible to establish a permanent grass cover in a reasonably short period of time due to seasonal considerations; a temporary grass cover shall be established- The temporary cover shall include the planting of annual grasses or small grains such as rye grass. Temporary covers shall not eliminate the requirement for permanent grass cover. Where the season or other conditions are not suitable for grooving a temporary erosion resistant cover, mulch may he applied; however, mulch used alone shall be for the shortest time practical A temporary or permanent vegetative cover shall be established as soon as conditions are favorable. 3. Topsoil shall be used over unfavorable soil conditions for successful establishment of vegetative cover. 4. Irrigate as necessary to optimize plant growth- (0ED o � v lai Z LO m (fl = 0 Q Z, > E *'� Q m -0 Z This drawing is the property of HOUSTON and ASSOCIATES, P.A.and m = Y U is not be reproduced in whole or in pan without Written permission from L a HOl)STON and ASSOCIATES, P.A. n Copyright 2005 V! a) 0 0 0 a AL RIGHTS RESERVED WEIR OUTLET STRUCTURE 10' WEIR O 46.0 _ 1.5" ORIFICE O 45.0 i kIP=RAP :../ OVERFLOW OUTLET 0 30 60 120 240 EMERGENCY ; ...i'': 20' WEIR O 46.3 .: % INV 42.7 .. .. \\ //C70CP BON_ \\1 SCALE: 1 -60 INV 3s.o RIP RAP / i/ _ ..... ..... ' .•--.+rat .... ,. •, ..... ........ ... ..... a6 ...__� .. '........... ..:: -_ __'--- `48. ... . . 1 INV 435 4bJ N CATCH MIN � �[ .i o-� � P 5 1 1 ag INV 44.5 �v. r 4Y S RMWATER 48.9 78, POND #2 �, 48. HOPS s 4; \\ a' ^ IP-RAP 48.9 S 05a c• \ EMERGENCY - L/ 0 ® / / _ - _ f STORMWATER OVERFLOW OUTLET . - LL _ 'T Pb 1 L \ '0 47.5 20' WEIR O 4484 t / _ - POND #3 _ _ _ {i j INY 41.0 \ 48.9 O' POND OUTLET / 4y , l .,,\ E 300 E F.F.E. 4c/0 ae 4891 sb STRUCTURE Q' WEIR O 43.0 / ,;T x57s : y,ti. \*O 44` :.' :::: ::. ) O e Pn qq .......::: ........: ';. .0" ORIFICE O 41.75 ,yQ / 1'{ _ 24" INV. O 39.88 ..2T.T ,-J-�, - b� \.::."::.:::::::: " ./ .::: ..:: .:?\ CTH�7ASIN CTTOC BOIN 48.9 ..... q CATCH 1 NV 44.0 50' - 24" HDPE R t �,: r x �' �.�..°- .: \ -:.' I ® 2p ...-\ TOP 44.6 I JUNCTION::`\ .' �'� .,p 8 48. CAT an 46.5 01 4 . I s 8 TOP 48.1 NV 39.8 jJ - 5 4b. INV 45.0 J< H GTCH BASIN "fir f a..r i. 2 1 / S 7 . Oo '..: .::.::.:� ::: - a - / \.w 0 2 8 F. TOP 46.5 I ......' / ,...; ' - .�...: \ P 'ems_. / 9 N 47.4 ...: .: ` ` ,/ / F e i 48 t P 9 48.9 6 -: JUNCTION BOX :.::.. _ :.� O _ JUNCTION BOX i PE 47.2-r"' *].4 - 4 N TOP 36.6 /::::.:. .... .: A $, / 6 TOP 9.0 i AB % � f•" 5 ... .. .. ::: \ \ a s^ ';, e a' '= INV 38.5 :: .: :.... ::.:. .........:.. " ' ..::::. ..... .:::..:.' :: f:' \ 48.9 A i INV 39.0 ..... :' � ... ,. 1 N t za - m :'.... . CH BASIN 4B ... ........... ... ... ... ... '.., :: ....:::: s R \ \ t ..... '::..: / N 45.0 "'�� i.5 4 8.9 \ 3 0 :a \ \ 46.9 .. .. ........... ... �..-'.. � ,..../ \ .,.,. _.. ...,. ., .,. _ \ o�.�/ _ o .. :� CA _ .9 ..<:.: ...... ..:. ,\' /O- TOP 47. P- ..... .. �. / ATCN S N .4 c `' .. ..% .-.�.. 7 .: .. .\.• INV 43-ta TOP%6.0 ..,. �. _. INV .O ._.. \ .. .. ... ... f., N:, • �. � � ��'�'', 7.2 � � GTCH BASIN O JU CTION BO% m ,n \ 48, O CATCH .. .. .. i 4. .+f.'.-> ... ..... .. .. .. .. ...' .. TOP 47.0 BASIN ' TOP 46.0 .. ... .:.... �: •":' '� ��:'.:.':. '..:.' N 20_ Y -74 -\ t, v. 7 T24. a ♦.. 489 \ i INV 37.6 7.2 o O 6 8 '6 \ �'+k"x'm a 't. INN,47.6 7.4 N c ..� CATCH BASIN F.F.E. 49.t1"" •� : l i . \g 1 @ TOP 47.0 a. 6'b g GTCH BASIN ) \ 'r'O ¢ d INY d0.3 48.9 m 'v .:' TOP 46.8 N 50 c'`' - O ` .. tom. ! INV 41.0 'a o ,-... Op GTCHEWSIN 47.4 7: p `T.. : I 1 I iz.. �P 48.9 le RIP -RAP •'\ J, s iNV a�8 r'st s a _ F.F-E- 49-0 "1 GTCH BASIN :1 ! o! 51• - 15" RCP 4 E SD66 45.. R 4 - .'S 00 i ti 47. 'i'rt OP c - {NV 430 .1 NG 48.9 }} f 59 24" RCP � 4dQ + . 7 � N x S046 48.7 - Jt,NCTO BO. ! f 07 \\'. X �y Z2 CATCH BASIN TOP 46.0 , ,,, ,t ,:_. /' :: / p TOP 66A x� -ti, INV 39,5 a x. .,n .,_ , \ + 4H.9 g m 5 s. "�_-.-'..�„w«_:_..00 -� 48.9 :' : \ •,. '$� .� F.F.E. 49 �\ flP YT. -. a E'SOA .w' / .-+-' p51GTCP BASIN _ n ' 1 14 �2 0o k : t 5 F.F ro aa, 4 < CA H BA SO" N q_.°�+" / 4. HOP 47.9 v TOP 47,5 \ � p INV 45.0 JUT P 47.0 \ u4 R INVf427 241 V - 15 a z °•O- •^ \ - _ ` 5 GTCH SIN s a7.9 A, 5 TCH aBASSIN s H F 4 �� SOSjR 4: "xs a\\ 56' - 12" RCP B. a 1 1 5 \�} INV 42l7 ,\ _; Ir`t' '/ +7s _. PZ GTOP a68=�. \'� \\ _ _i i / / / sD68 a INY 38.41 - - �.-aCATCHN '` \ INV.A4'�"+ ../ `` --; s� �` 305 47.7 (j'�� 's T{ OP 47. 48 0 48. .18 7.4 U _ 47.9 N s ,.».'. 479 1r 1 18 T' l'/ "� GTCH BASR.i J,; 0 6- }a.s-• d7.9. ,l h ' �ii I(T PBASSINTOP a7.1 s F.F,E, 48 0 2 iCi�`9AS1 V 44.D *� • v'`�/' INV 410 '<, .^4:4,9 s ... ,'49 SV-0 TOP 47.0 '9F n 46.41 ,..A' µGP.' 48.4 a� , r ..GTCH BASIN RIP -RAP °47.3E- ;• CATCH BASIN �9[0 .. y 13 P INV 4 o TOP 46.1 A� 5D "G h0 �• WEIR OUTLET 47.88 a INY 43.0 a '. \ -"/ i p ,�;^ F. .48.0 CATCH BASIN 47 Y ON TpN OF DITCH �� ���• STRUCTURE 7 $ \� 47'', INV 4TOP 2 Z ,n .>, RAP LNG ON 45 47 PROPOSED RFa' ` 10' WEIR O 43.4 •,.4 a'!.6 •a R�- 3" ORIFICE O 42.0 ' CATCH BASIN �. *.. ''; .:_ o � ^ ' AllT aBA2IN ._s s7.9 w 47.6 RIP -RAP c- E- \. TOP 46.0 4•. CURB INLET -•'r W �- �\ INV 39.29 A'OP TP O CL 46.18 47.58 / \�\ 8A N` TCP o- ] E�- F O TP O BA�IN585.87 46.41 \skOD I '� 1 IRV ate, o r 10 0 9 7q s P 5o\p3 l48 B7 n� CATCH BA r NV 44.5 45 ,4'\0 n FE r TOP 47./ .xa tIf °'0 5 /Jy ! 4 s g 12' - 36" POPE �, 206 B RIP -RAP \ 7 119' - 24" HDPE 5015 \Og' ' /� t 47.9 - "$ 47 S0,08 EMERGENCY \.- 1 1 / CATCH BASIN CURB INLET i - - V� 479 .. ,}y OVERFLOW OUTLET \. TOP 46.0 TP O CL 46.18 F,F,E. 4B.S - UNCTION 20' WEIR O 44.0 INV 40.10 TP O BASIN 4587 4 JUNCTION BOX Z ^ 79 TOP 48.� MWATER \., INV 4-0.90 00 oe a TOP 1.11 aa.a) ass LJ INV aa.3 P #1 \ ,^x pOQ 48. g'�A 48.W / t ._.r'- "\ a _ INVTO 41.11 L * 9 47 . TO a7.1 � 69' 36' HOPE JUNCT 7�8CX r 47.9 GT BASIN RIP- > e rye qg.0 2 4&2 4 s 40 4 1 48.2,`..`44,,\ < '"tea l4r a3.s r ALL ROOF DRAINAGE IS TO BE DIRECTED \ Pn 479 ' A 2 1 TO THE STORMWATER DRAINAGE SYSTEM. Pry. `4 GTCHBASIN ? ab 4, »,. °- a7.5 JUNCTION 48.20% !` 4 47.6 TOP 47.6 {� ^.':., �� _ '47.6 ` INV 44 , • INV 42.05 r' ,i \ Z 48 A 48.a GTCH BASIN / dam. -.a7.9 TOP 47.2 47.4 32' - 3I0 HDPE GTCH BASIN 12 2F.F4$.5 0, :, 0o TOP 47.6 \ INV 43� P O((GN INV 44.0 SD708 ,•x It 41.24 47.9 ,�477 PA m CATCH BASIY S 4 !'� •I CATCH BASIN GTCH &SIN TOP 47.6 A :� L/ I INY 2754 ''F L� OSEO R TOP 47.0 INV 42.8 !b INV 37.0 74 INV 43.4 .4 \ \\ _ 4g.4 / 47 4e 4. a4 F , Q A6 7.4 1 1 46.4 284' - 10 PJO�E ' � 4�.4 TP 47. E SD702 �� 8' a � .� 48. r ; GTCH BASIN- .LNOF� 50 - '-' IMPERVIOUS AREA TOP 47.3 `T 47.7 E.=' 48 ^^ 101 INV 43.3 Ng8' 4 ." 44 BASIN BASIN AREA BUILDINGS PAVEMENT 47. 'F i 484 47, �� AC A A GrcH BASIN q�, � IMPERVIOUS AREA ( ) ( C) (AC) 8 48.4 45.4 .., . GTCH m .,g TOP 4. i. - BASIN BASIN AR'_A BUILDINGS PAVEMENT 300 1.3000 0.2361 TOP 38.0 . 48.0 INV 43.5 301 0 .0999 0. 0499 I 38.0 '� (AC) (AC) (AC) � a7. 4g,a A7 � 302 0. 2020 -- 0. 1037 RIP -RAP t yp\ 398 1 1 3 4ao s/ :,/ 2011 0.1864 0.0312 0.0826 304 0.1342 0 0 304 0. 1342 0.0649 '..i INV 43.5 305 0.4896 0.1102 0,2249 4&.a �"� 202 0.1232 0.0239 0.0803 a7.5 48.2 306 0.2812 0.0695 0.1354 479 48. \06 204 0.1512 0,0605 0.0703 97 307 0-2670 0.1643 0.1027 m - 0 204 0.1512 0.0258 0.0778 CURB INLET a� 19 - - 1 " H S i -1 • 4B. OP 205 0. 1162 0.0258 0.0778 309 0.1795 0 0.0412 0.1383 17 407 TP O BAC N446,25 a48.0 0 ,5. N - 4T 5 07HDPE 3100 0. 27604 0. 1701 0. 1063 CATCH BASIN INV 40.7 = 49.4 \ 855 311 0.2652 0. 1180 0.1472 v o \o 207 0.2207 0,1261 0.0946 TOR 45.0 2s• - is., RCP 206 0. 4473 0.2533 0. 1603 48.a JUNCTION BOX 209 0. 4208 197 0. 23 �877 0.1941 514 INV 38.6 S08 m o CATCH BASIN 563 GTCH BASIN ffiC. �'2 T312 0.2704 0.1207 0.1496 ^o TOP 47.0 F.F. 48.5 TOP 47.0 yg,2 TOP 48.0 21 10 0.2411 0.0206 0.1309 t 0 INV 42.3 INV 43.5 36" INV IN 43.11 (D707) / 36" INV OUT 43.11 5(SD105) IMPERVIOUS AREA 7.35 '(' o 4 36" INV OUT 43.1, (SD,04) 213 0. 2746 0, 2790 0. 1753 �l1 - a8.a - 213 0.4366 0.2805 0,1561 a7.6�- aa.a 1 INV aa.o BASIN BASIN AREA BUILDINGS PAVEMENT 214 0.3784 0.2805 0. 2261 47 yte dUTO 4 BOx (AC) (AC) (AC) 216 0.3366 0.0964 0. D�FP TOP ae.o ---------------------- 216 0.3366 0.0964 0.1929 36" INV IN 43.5 (SO106)) 170' - 36" HOPE SD3 - 36" INV IN 42,14 (SD105) 100 0.8618 217 0.4626 0.2388 0.2238 / N FE 36" INV OUT 42A (SD1022) 101 1 .6773 218 0.3202 0.0918 0.2284 /--/ 0 102 0.1019 0.0550 219 0.3057 0.0749 0-2063 103 0,1036 -- 0.0550 220 0.2158 0.0741 0.1417 104 0.0971 0.05820.0576 w CURB INLET 105 0.0969 0.0582 221 0. 1765 0. 1417 y G H BASIN TP O CL 46.5 CURB INLET 223 0.5308 -- 0. 1728 o OP 45.0 TP O BASIN 46.25 106 0. 2208 -- 0.1545 = INV 38.8 INV 39.7 CURB INLET TP O CL 47.22 107 0. 1489 --- 0.0987 224 0.0912 0. 3056 0, 0315 TP o CL 47.22' TP O BASIN as.9, 224 0.0972 -- 0.0315 m TP O BASIN as.a3 INV 41.76 108 0. 1722 0. 1295 225 0.0757 0. 0260 'O INV 41.5 109 0.1845 0.1372 / �n W 11l 0,2757 0,0654 0.11650/-- g RCP 113 0.4641 0.1949 0. 2600 > ,+, SD7 114 0.4088 --- /- / / - A 116 0.7950 --- a 118 0.4941 -- 0.4353 y - 119 0.2273 --- 0.1648 120 0.1141 0.0243 0.0736 $ ` 126 122 0.2643 0.1907 0.0739_/-'- 123 0,1797 0,0634 0, 1163 124 125 e 124 1.3249 2797 125 1.2797 1 � 126 1.4996 it 127 0.6094 + I - APPROVED II I CURB INLET TP O CL 47.80 44' - "RCP /"'/ / / / / / /-'/ TP O BASIN 47-35 S CURB INLET / NORTH CAROLINA ENVIRONMENTAL I I MANAGEMENT COMMISSION I I INV 42.5 n0 TP O CL 0.80 v TP O BASIN 47.35 - -'- _i' NY 43.0 DIVISION OF WATER QUALITY I I 14U6-Z007 I I 7 --- - I -- -------------- RECEIVED I SEASIDE ROAD - N.C. HIGHWAY 904 _- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----------------------------- -- _ JUN 29 2007 I I - - - - - - - - - - - - - - - - -------------------------------------- - - - - - - nWg I ---------------------- PROJ#sLA2 - owl Myol I I Ib royo v G BASIN OP 45.0 INV 38.8 h I a 124 SCALE: 1 "=60' RIP -RAP 100 46 101 26' - 18" RCP SOB , ..CATCH BASIN \...:::::..... TOP 48.b INV 5 CATCH BASIN '�'.; •.. ... ...•. TOP 48.0 1 1 48 INV 44.5 f !♦ 128, `` • 48.HOP E 48.9 y 48 ` ' 48.9 9b 3 1 2 48.5 48.9 `F`F.E. 410 Aa r s' Pb 489� ICATCH 47 481 -�- 3,10 CATCH OP INV ,.. .._ - CATCH BASIN t '1 ey TOP 46.8 ..'•. 1:;..1 ,, CATCH BASIN .`..,;.'.:':;; 8.9 @ ;i M' INJ 41.0 o GTCH1' IN - •:` GTCH BASIN TOP 46.8 .. :..; ..: d 11" 4 f TOP .8 TOP 47 .' F G7 BASIN 1 .. \ o ... ' : I Y of SD66 OP 45.0 \ INV 4'8 a INV 40.3 "' "7.6_ TCH BASIN .� 51' - 15" RCP 4 48. L� 39.0 .i .. 47. E'-�� 3. .;. 48.9 ,� INV 4 . \.. .�,. 4 4 59 - 2a RCP. $ ..... .. ., .. :.'f'�: ��:1 ..1 47.a 7 W;. .•. 419 � \.. .. .. a Rxa SO48 _ . .., ., .,:. ;�.'�1 ryi48.7{ 77 73 ,� pt ..r. €-'..�::f: I f 0.48,9 f :. JSS \•; .'., 46.6 ,s> p3 06.>.E.��...aw.r.,..a=. ._,.�•...-... 24+00 l �:\;:; ::; :. 'f :; .1 % \s CATCH BASIN\ _"'•'i-m.... �•`:'...;..' i g aa.a \: \�\\\ 0 '• _.: \ TOP 46.0 r \ IFS HBASIN \ ;')t ^`r. ¢4•'7.`4 fl, INv 3. `. , t .,v"'- - /• 5g••.>.. RCP \'.''' 1 OJ 45.3 is .'.. A .::� EA .. may.. i''x.., SO CATCH BASIN \ 114 4 R I , \. ...:.\ - , 7.2OQ '. C 4 505� i sg >.` ,.;. -d TOP 48.1 '....1 4 GTCN BA8 SO 1 - / u OPE 47.9 >g. ,_ ...,. '- \.'.:..J F.F. INV 4 .0 .. \ W.. ��'� \ TOP 46.5 \39. � _•e` -' 4 � 58'$N � 75 r tin. S '4. � �: f/jf/1 / r IV. _ /� W J >. ...'.. INV 42.J 21 ,5 1 [ ' SDS ���. � ' F , 47.4 c+ • \ � f 7.2 1 15 GTCH ASIN 47-9 i r 1 48. TOP .1 +d' a- 4 56' - 12" RCP e INV 42.7 u 2- - O LLry: 4�:. \ ; i SD68 a INV 37.0 I IP_ �� `. 47.4 } ffz_uM /47.9 .. y 47 9.� a` GTCH BASIN�A i H GTCH N _ 305 gg� _ na TOP 47.1e. TOP 46.8 O 0 [] Iw "O INV�i:O";. '476 \ INV 42.1 �x�,9 48A-i 47,7 46 @ hl ' cai K a INV 39.7 U tt 118a a ' + 'TP O CL'45 36 I ,IBA IN; 5.05 GTE TOP �m� 117 R 125 CATCH BASI� TOP 46.0 INV 42.0 116 B 22 ti 35 - 30" RCP + �' SD7 I � � a CATCH BASIN 70P 45.0 INV 40.8 47.8 CATCH BASIN 4 TOP 47.6 INV 41.67 GTCH BASIN TOP 47.0 INV 43.4 11 �E 5U\c rye.i GTCH BASIN TOP 47.0 F.F. . 48.5 INV 42.3 126 47 1 48.0* 48.4 CATCH BASIN TOP a7.o INV 43.5 46.4 �IW44`J 1 S gOP a8.+ t5� / 2 2F.F. 48.5 GTCH BAS TOP 47.6 INV 42.8 yr, 284 36" SD102 1 .4 CATCH B, TOP 47 INV 43. - - - r - - - - - - SEASIDE ROAD= N.C. HIGHWAY 904 3INV3366N 47.9 -� W 496 _ 47.9• `7r' 7� [. » CATCH BASIN 48 f v F. 48.0 /'� p r r •� i' ASIN TOP 47.0 N 47.9 / ( 1 wF.�� - <.. •�„D _ TOP 47.0 INV 44.0 �-V L VV .i GTCH BASIN r._ v' < INV 43.7 _ =B7�yS INV 42.9 j0����• E 4S.O CATCH 429IN n a" RIP -RAP rl 45 47 PROPOSED RE OGTION OFF 1 47.99 47.9 CATCH BASIN INV 44.5 45 48 TOP 47 I4 i INY 41 8 v£ 12' - 16" HOPE 47- 47.7 SD108 47.6 UNCTION BOX 47.9 TOP , .2 .9 _. INV 44.3 J 75 � 47,91 s GT6H BASIN RIP- 69' - I0 HOPE 47.9 IN 3.6 •�,`' SD708 INVa43 6 - NOTE' ALL ROOF DRAINAGE IS TO BE DIRECTED 47.9 ""` 2 1 8 47.9 TO THE STORMWATER DRAINAGE SYSTEM. aJ •�"" / JUNCTION BOX $ 6 47.9 L TOP 48.2 46 L/ NV aa.1 ,A CATCH BASIN - 7.9 TOP 4. 479 32' - HOPE \ a INV 43.6 0\{CV` INV 44.0 SD1O108 - m 47.9 4473 I_ CATCH BASIN �,:. G/ TOP 47 _ INV 42.4 48.4 47 t2 \36 RIP -RAP INV 43.5 47' -36" HOPE SD107 JUNCTION BOX TOP 48.0 INV IN 432'SDI 07 BASIN BA`. 200 201 202 203 204 205 206 207 08 210 IMPERVIOUS AREA IN AREA BUILDINGS P, (AC) -- (AC) - .8024 .1864 0.0312 I .1232 0.0429 I .0942 0.0239 I .1512 0.0605 I .1162 0.0258 I .4473 0.2533 I .2207 0.1261 I .1623 0.0514 I .2331 0.0584 I .2495 0.0206 I IVEMENT (AC) 0826 0803 0703 0907 0778 1603 0946 0855 0866 1054 IMPERVIOUS AREA BASIN BASIN BUILDINGS PAVEMENT CjREA 300 1,3000 0.2361 301 0.0999 --- 0.0499 302 0.2020 --- 0.1037 303 0.0894 0.0398 304 0,1342 0.0649 305 0.4896 0.1102 0.2249 306 0.2812 0.0695 0.1354 307 0.2670 0.1643 0.1027 308 0.1795 0.0412 0.1383 309 0.3590 0.1517 0,1407 310 0.2764 0.1701 0.1063 311 0.2652 0.1180 0.1472 312 0.2704 0.1207 0.1496 563 INv OUT 42.8 (SDIO� IMPERVIOUS AREA 211 0. 4494 0. 1234 0.1705 . 1705 INV OUT a2.5 (SD104) '--------__-- 212 0.2746 0.0993 0. 1753 ='h' 213 0.4366 0.2805 0.1561 J'�j BASIN BASIN AREA BUILDINGS PAVEMENT 214 0.4366 0.2805 0.1561 (AC) (AC) (AC) 215 0.1509 0.0521 216 0.3366 0.0964 0.1929 100 0.8618---------- 217 0.4626 0.2388 0.2238 -� 101 1.6773, -- 218 0.3202 0.0918 0.2284--�- 102 0.1019' -- 0.05501i 219 0.3057 0.0749 0.2061 103 0.1036' _= 0.0550 220 0.2158 0.0741 0.1417 J 104 0.0971 _- 0.0582 i 105 0.0969 0.0582 221 0.2451 0.- 0.1717 -i- 106 0,22011 0.1508 223 0.322 0.1174 223 0.3225 0.1174 -� 107� 0.1489 -- 0.0987 i" 108, 0.1722 -- 0.1295 109 0.1845 -- 0.1372 (110 0.1923. 0. 0652�0460 �../ 111 0.2730 0.0662 0. 1650 113 0.4633' 0.2097., 0.16541 14. 0.4088 �' 116 0. 7950 -- --- 1 �i (.3 U ac {'\ 1i-'i- .17 0.6927 -- -- 'euST e 49<< 19 10.2230.07361648 70.0265 121 0.1802 0.0737 0.0961 vyl .22 0.2643 0.1907 0.0735 123 0.1797 0.0634 0.1163 124 1.3249) -- -- I �'-125 1.2797 4 .126 1.4996 .. -7477 //,, i �1 I JAN 7006 .�r�8r0 I IAItATI r (a��Tt BY. I I d_ x rc z 0 o rc -oz o My�Q 11 >W0 U E—G Q COZW VI � W O Qp N0 LLU \ WWW Nm woo \ W W y! 000 KK R `f 00 0 0000 � rx. o unnlpr..... W �nrrurnnn um"mooc"• W � b y V C F a � Nas O w w 'b w o co Q� w LO U O I LO r 7) 0 W/Nn � VW/ rn L LJ <t N �z T C CDO O` U z w z �C z Q— � N v� x 0 m �z o o O o L � N O LO V Q O Z ~ O Z N � \ T m O o m Z -a C Y V o o o U1n O t L c) o U d REC�T�rPD JAN [uuo BY ouOIp1 SCALE: 1 " = 200' '- LEGEND EXISTING TOPO CONTOURS PROPOSED GRADE ® 45.31 PROPOSED SPOT ELEVATION (TOP OF PAVEMENT) �. -......T........� 404 WETLANDS muuuwuuuumnwuu mumnnnuuuunuuuu muuutnnnuuummun STORM DRAIN CATCH BASIN/JUNCTION BOX POND OUTLET STRUCTURE DRAINAGE SWALE RIP —RAP OUTLET PROTECTION SILT FENCE CONSTRUCTION ENTRANCE \. A. i\ \ \ •y 0 m 0 S.R. 1316 9C? 17 SHAL�0 �_ PAYRTLE e BEACH 1 " ( � � Sr�\\Je� 17 ti - OCEAN RIDGE / I R 1 �6� 00 Project s41. Site 179 179 90 904 179 90 g�PON BEACH OCEAN \S�� Apoe°\� VICINITY MAP Scale: 1 Inch = 1 Mile LEADING, STORMWATER AND EROSION CONTROL PLANS FOR Meadow Ridge 6 OCEAN ISLE BEACH, NORTH CAROLINA OCTOBER 2005 REVISED DECEMBER 2005 Prepared by: HOUSTON AND ASSOCIATES, P.A. CONSULTING ENGINEERS 117 Pine Street P.O. Box 627 Shallotte, North Carolina 28459 (910) 754-6324 JAN 0 3 Z006 a OU WW WN ON rcrc NN 00 00 N Nn NO �N C O • INO V'S�H' "I'll'1111111Will UPr b0 Z� o U z o r� o Cd E2 w o 0 n • M 1� (D LO LO r C f) 0 W C/-) rr Li LO It �j L_LJ I00 t N �z T \ C O(-D U �z r w � ° Z QU z ° o� Q— ^ � N X O m �z o O O a UV U� V) O " LO to 0 ==°lommz �1 V V _ N O O N O U O cn ino L a v o o o Z _ N � m O n II Z o m -O V N O « p N p n 0 0 0 2 I STORMWATER POND #1 SCALE: 1 "=30' -00 I.W.1141 STORMWATER POND #1 WEST FOREBAY EAST FOREBAY MAIN POND TOTAL ELEVATION SURFACE AREA SURFACE AREA SURFACE AREA SURFACE AREA (M.S.L.) (S.F.) (S.F.) (S.F.) 35.5 _(S.F.) -- -- 4,019 4,019 36.0 687 692 4,546 5,925 40.0 2,428 2,466 9,042 13,936 41.0 3,066 3,097 12,771 18,934 42.0 3,587 3,645 16,057 23,289 43.0 4,106 4,183 17,70C 25,989 43.4 4 322 4,407 18,356 27,085 44.0 :655 4,750 19,342 28,747 EMERGENCY OVERFLOW OUTLET Cn 20' WEIR 0 44.0 RIP -RAP WEST FOREBAY STORMWATER POND 11 WEIR OUTLET STRUCTURE 10' WEIR @ 43.4 3" ORIFICE 0 42 0 RIP -RAP PERMANENT POOL --I-- 420 TOP FORE13AY ATIVE SHELF BERM 0 41.0 0 6:1 SLOPE STORAGE POOL TOP OF POND FROM 40.0 TO 42.0 043.4 044.5 Wwiac) N P CAPABLE OF PUMPING IN LESS THAN 24 HOURS, PONDS IN AN EMERGENCY. SECTION 1A-iA STORMWATER POND #1 44 FLOOD POOL 44 STORAGE POOL 0 43.4 i 4-? PERMANENT POOL 0 42.0 42 TOP FOREB1,0AY BERM i TOP FOREBAY BERM 0 4 0 41,10 40 . . . .. . . . . . . . . . . . . . . . . . . . . . . 4C . . . . . . . . .. . . ... . . . ... .. ... .. . . . . . . . 76 EAST 38 1P WES ----- - FOREBAY ........ 10 46 3E FOR&Y 11 6 BOTTOV 36.0 BOTTOM 0 36.0 SCALE 14 BOTTOM 0 35.5 HORIZONTAL )"=30- VERTICAL SECTION; 113- 1 B STORMWATER POND #1 4-4- FLOOD POOL ®44.0 t 44 STOR GE PQQ' AIA 2 PERMANENT POOL 0 42.0 42 VEGETATIVE SHELF 0 6:1 SLOPE FROM 40.0 TO 42';0 40 4C 38 3E . .......... 3-E ------ SCALO BOTTOM 0 35.5 HORIZONTAL 1"=30' VERTICAL 1,`=3' 134 3 STORMWATER POND #1 DATA SUMMARY Total Built -Upon Area (Ac.) ............................... 9.8 Total SW Drainage Area (Ac.) ............................ 12.32 % Impervious Area .............................................. 79.4 Computed Runoff from 1" Rainfall (CF) ............ 34,203 Provided Storage (CF) ........................................ 35,262 Required Surface Area (SF) .............................. 21,273 Surface Area of Pond @ Normal Pool (SF) ........ 23,289 Surface Area of Pond @ Storage Pool (SF) ....... Z7,085 SW Storage Depth (Feet) .................................. 1.4 Number of Orifices .............................................. I Diameter of Orifice (inch) .................................. 3 Elevation of Orifice Bottom (MSQ ..................... 42.00 Approx. Time for Drawdown (Days) .................. 2.10 Overflow Weir Elev. (MSQ ........................ 43.40 1 O-Year Routed Flowrate (CFS) ......................... 56 Flood Pool Elevation @ Q1 0 ............................... 44.0 STORMWATER POND #3 FOREBAY MAIN POND TOTAL ELEVATION SURFACE AREA SURFACE AREA SURFACE AREA (M.S.L.) (S.F.) (S.F.) (S.F.)__ 39.0 487 413 900 43.0 2.328 3,699 6,027 44.0 2,967 6,521 9,488 45.0 3,582 9,356 12,938 46.0 4,190 10.816 15,006 47.0 4,828 12,304 17.132 BO M TOP OF POND 0 3 .0 EMERGENCY OVERFLOW O44.0 STORMWATER POND #2 20�RWEIR 0 . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SCALE: 1 "=30' NOTE: A PORTABLE PUMP, CAPABLE OF PUMPING THE TOTAL POND VOLUME IN LESS THAN 24 HOURS, IS TO BE USED TO DRAIN PONDS IN AN EMERGENCY. -R[P'-RAAP V ,0 5-6-j STORMWATER POND 12 OUTLET STRUCTURE BOTTOM WEIR 0 43.0 0 36.0 2.0" ORIFICE 0 42.0 STORAGE 24" INV. 39.0 J VEGETATIVE SHELF Q 43.0 0 6:1 SLOPE FROM 40.0 TO 42.0 PERMANENT POOL 042.0 FLOOD POOL TOP FOREBAY 0 43.78 BERM 0 41.0 I % bP TOP OF POND 0 44.5 BOTTOM n, 036.0 SECTION 2A 2 A 46 STORMWATER PO Arc 4 44 STORAGE POOL 0 43.0 42 VEGETATIVE PERMANENT POOL ®42.0 SHELF 0 6:1 SLOPE TOP FOREBAY OERM FROM 40.0 TO 4210 041.0 i �0 4C FOREBAY Ilu 38 a, 3E -J 36 BOqTOM @ 36.0 i BOTTOM 0 36.0 -31E SCALE$ HORIZONTAL I "=30' VERTICAL 1,,"=3' 34 VEGETATIVE SHELF 0 6:1 SLOPE FROM 43.0 TO 45.0 PERMANENT POOL (W W i440 045.0 STORMWATER POND #3 FLOOD POOL STORAGE POOL 0 46.5 0 46.0 NOTE: A PORTABLE PUMPCAPABLE OF PUMPING SCALE: 1 "=30' THE TOTAL POND VOLUME, IN LESS THAN 24 HOURS, IS TO BE USED TO DRAIN PONDS IN AN EMERGENCY. SECTION 3A 13A STORMWATER POND #3 FLOOD POOL 0 46.5 46 4E STORAGE POOL 0 46.0; PERMANENT POOL 0 45.0 4 TQR­FQREjBAY­8ERM­ 44 VEGETArVE SHP-F SLOP 0 44.0 0 61 FROM 6.0 TO 45.0 42 42 0 -0 -0 4C ..... ..... .... SCALE: H0RIZ)NTAL 1 `-30' VERXAL 1 3' BOTTOM V 39.0 BOTTOM 0 39.0 38 STORMWATER POND #2 FOREBAY MAIN POND TOTAL ELEVATION SURFACE AREA SURFACE AREA SURFACE AREA (M.S.L.) (S.F.) (S.F.) (S.F.) 35.0 1,170 2,782 3,952 40.0 3,769 6,175 9.944 41.0 4,609 9,036 13,645 42.0 5 343 11,776 17,119 43.0 6:075 13,190 19.265 44.0 6,835 14,634 21,469 STORMWATER POND #2 DATA SUMMARY Total Built -Upon Area (Ac.) ............................... 5.1147 Total SW Drainage Area (Ac.) ........................... 6.8671 % Impervious Area .............................................. 74.5 Computed Runoff from 1" Rainfall (CF) ............ 17,956 Provided Storage (CF) ........................................ 18,192 Required Surface Area (SF) .............................. 12,608 Surface Area of Pond @ Normal Pool (SF) ........ 17,119 Surface Area of Pond @ Storage Pool (SF) ....... 19,265 SW Storage Depth (Feet) .................................. I Number of Orifices .............................................. I Diameter of Orifice (inch) ................................. 2 Elevation of Orifice Bottom (MSQ ..................... 42.00 Approx. Time for Drawdown (Days) .................. 2.92 Overflow Weir Elev. (MSL) ........................ 43.00 1 O-Year Routed Flowrate (CFS) ......................... 26 Flood Pool Elevation @ Q1 0 ............................... 43.78 SECTION 313-313 STORMWATER POND 48 4E FLOOD POOL 0 46.5 6 4E STORAGE POOL 0 46.0 PERMANENT POOL 0 45 44 44 VEGETATIVE SHELF 0 6:1 SLOPE; FROM 43.0 TO 45'0 2 42 0 40 4C SCALE: HORIZONTAL 1'�=301 VERTICAL 1=ic3' BOTTOM 0 390 138 3 ECTION 2'13-2B STORMWATER POND #2 kGE POOL 0 43.0i PERMANENT POOL 0 42.0 M-e WOIKKWJ STORMWATER POND #3 DATA SUMMARY Total Built -Upon Area (Ac.) ............................... 3.4895 Total SW Drainage Area (Ac.) ............................ 4.2138 % Impervious Area ............................................. 82.8 Computed Runoff from 1" Rainfall (CF) ............ 12,165 Provided Storage (CF) ........................................ 13,972 Required Surface Area (sr) .............................. 8,752 Surface Area of Pond @ Normal Pool (SF) ........ 12,938 Surface Area of Pond @ Storage Pool (SF) ....... 15,006 SW Storage Depth (Feet) .................................. I Number of Orifices .............................................. I Diameter of Orifice (Inch) ................................. 1.5 Elevation of Orifice Bottom (MSQ ..................... 45.00 Approx. Time for Drawdown (Days) .................. 3.48 Overflow Weir Elev. (MSQ ........................ 46.00 1 O-Year Routed Flowrate (CFS) ......................... 22 Flood Pool Elevation @ Q1 0 ............................... 46.5 NOTE: Vegetative cover above permanent pool shall be bermudograss sod. Wetland species are to be planted on the 6:1 shelf. These species are: Pontederia Cordato (Pickerelweed) Juncus Effusus Bog Rush) Ludwigio (WaterPrimrose). H ORIFICE PIPE a MIN. TOP OF BANK �\ SEE DETAIL () ";� � � £� �= � _ ' `' CREST OF WEIR ELEV. \ (STORAGE POOL) ORIFICE // / \ NORMALPOOL) 2 X 4 TREATED LUMBER STAINLESS STEEL WIRE MESH FLOW SPREADER /// \ ORIFICE PIPE (SEE DETAIL1 \rRIFICEPIPE SPIKE TO POST WITH WITH MIN. 3/16" STRANDS AND / 16d H.D.G. NAILS 1"SQUARE OPENS. (TYP.) PLAN VIEW RIP -RAP FROM NORMAL POOL B TO POINT DOWNSTREAM WHERE IJ- - _- MESH SHALL BE CUT TO FIT IN SIDE TEE CHANNEL SLOPE IS LESS THAN I% 1! SEAL WATER -TIGHT BETWEEN PIPE AND CATCH BASIN -' ' L9NGITTTI�INAT, Sr CTTON T 1 (SEEDETAIL) - ------' -, �________________ . L' ' � � CH. 40PYC ORIFICE PIPE 1 y 4 X 4 TREATED POST IP-RAP TO MINIMUM MIN. 4' IN GROUND , TOP OF BACK ELEVATION (TYP.) I d 1 J1 ' 3 3 RIFICE ELEV EE PLANS NORMALPOOL II A ( ) CAST IRON HOOD, FRAME AND GRATE---'________________- ._ SEE PLANS FOR ORIFICE PIPE CR(iSS`' SFCTION VULCAN MODEL V-4065-1 ----------------- ------------- SIZE AND ELEVATIONS X 2 OR APPROVED EQUAL B CH. 40 PVC REDUCING TEE WEIRS TT,ET STRUCTURE FOR�T�.?RMWATF.R POND PLAN YIM ORIFICE PIPE SU_PP0RT DETAIL SECTION VIEW NTS SEE PLANS FOR PIPE SIZE NTS AND ELEVATIONS STO CAWATF.R POND-ORIFIC/F, PTPF, TAIL ELEV. OF TOP NTS OF CURB W W WIN 6" PRECAST CONCRETE TOP WHEN REQD. 50' 6' 35' 6' AS REQ'D. 2.5 15' 15' 2.5' PRECAST CONCRETE g MAX. SLOPE SEE PLANS BOX SHOULDER SHOULDER 3.1 TIE TO T' PER FOOT 1" PER FOOT FEXISTING TOP OF BERM 1/4" PER FOOT 1/4' PER FOOT GRADE SEAL WATER -TIGHT BETWEEN MIN. SLOPE Ems_ -------- > 6:1 CULVERT SEE PIPE AND CATCH BASIN 6:1 - " ' " ' MIN. SLOPE RESTOF WI TIE TO LAN FOR TYPE EXISTING-y 3[7 30" CURB & GUTTER 51 SLOPE ('r- y---•-- 1-- y-- 1-- --{YI GRADE MAX. SLOPE COMPACTED SUBGRADE SEE PLANS TYPICAL CUT SECTION P RAP q __________________, I, �ELEVATIONSRT 6" ABC OR 9' STB TYPICAL FILL SECTION "1-2 BITUMINOUS CONCRETE i:-::':- Q� LONGITUDINAL SECTION VIEW = -=� r=-• r= :':_;: A A MEADOW SUMMIT DRIVE ROADWAY SECTION r.:::::=: cRusHEDSTONE `.:.,_;. t:::::-'-_�. cRusFlEDsroNE - -.- 4 ® i IT TOP OF BERM i.T::: COMPACTED SUBGRADE 15' 15' sTOFwIER SECTION B-B SlEACTTION A A PRECAST CONCRETE 4 IJ _L_____________ y TIE TO MAX. SLOPE SHOULDER 1/4"PER FOOT 114"PERFOOT SHOULDER RIP -RAP PIC I. IRB IN 1" PER FOOT F� ----� 1" PER FOOT MAX. SLOPE TIE TO r�T�7 C ,� T GRADE_ 5_ 5 1 - 5:1 5:.1 --*-EXISTING 1 A-�- ��L Tice! CII BA�IN 6:1 6.1 GRADE CROSS SECTION VIEW NTS SEE STORMWATER POND MIN. SLOPE �CpMppCTED SUBGRADE MIN. SLOPE ORIFICE PIPE DETAIL B 6"ABCOR9"STBC EMFRC><F.N�Y OV +.RFT.OW OUTL.F.T l 1/2" 1-2 BITUMINOUS CONCRETE NTS SEE AND ELEVATIONSPLANS FOR PIPE ROADWAY PL.AL�LYIEW ROADWAY SECTION MANHOLE FRAME AND GRATE VARIES VARIES ' VARIES VARIES _�Y1 $ SEAL WATER-TKM BUINEEN TRASH GUARD PIPE AND CATCH BASIN WEIR ELEV. - _ - _ - - (STORAGE POOL ELEV.) - - COMPACTED SUBGRADE 1 1M' 1-2 BITUMINOUS CONCRETE ABC OR 9' STBC COMPACTED R 118" SEE STORMWATER POND' .- - '. (95%STANDARD PROCTOR) MIN. PERIMETER =6.D SECTION BETWEEN BUILDINGS MIN. AREA OPEN=3.a i -----------' ORIFICE PIPE DETAIL R 1 3/4" 1_>_ ORIFICE ELEV (NORMAL POOL) CONSTRUCTION TO BE IN ACCORDANCE WITH LATEST NCDOT SPECIFICATIONS R 1I8 AS REQUIRED AS REQUIRED TYPTCAI, IIOAD�F.CTI_ONS ,2„ 1 2 NTS r R 3%4"' �FOR`SH-2oCTTRAFFFIc o oi------------' >_ CULVERTSEE _ ••" PLAN FOR TYPE 711, .. 6 ABC OR BJ 9" STBC SEE PLANS - PLAN VIEW . . . . .......... '' CAST TRON FRAME&GRATE SUITABLE r..:... .. .. .. .. .. :3 MIN. ..-..- -.:.. :-.:..:_ter.::.}- FOR H2O TRAFFIC LOADING FOR PIPE INVERT - .1 . ELEVATIONS .. .::'� :'.':::':'::':':':':':' 1 1/2 1-2 BITUMINOUS PAVEMENT TOP V* N REO . rE _ -1 1 II TOP WFEN REO'D. CRUSHED STONE :, 1/4" PER FOOT 1 -6 REO11. CULVERT SEE 3 ,rvvvvv,nlvvv,rvv„vvv,Jv\Fvvv} vY,rv,rbv\F\rvvv\4vvv,rvv,rvr�yvv,y�F,v .. .. .. .. .. - LfyJrr r,♦rr r1r rr r r! !J lr11r Jfl J!!! v� \n............... ...:-- \nr,r\r,1S�r y,n!\nf\lw,y,l,nl,y,J,n4t �,i.:,ltr '�y.,r-,ray,ral lOMPA nrar.\rarBGRA NOTE.rI. PLAN FOR TIDE COMPACTED SUBGRADE " 6" ABC OR 9" STBC COMPACTED 1. CONCRETE SHALL BE 3,000 P.S.I. _ (95% STANDARD PROCTOR) 2. CONTRACTION JOINTS SHALL BE SPACED AT 10' INTERVALS. _ A 15' SPACING WILL BE ALLOWED WHEN A MACHINE IS USED.) SE-C�LLO�T_ B P SEI�TIQ A_A-- --.--` -` " 3. FINISH ALL CONCRETE WITH CURING COMPOUND. f,y\JiFhf,l4J\f4 !\r\J,J1lAll• " - -`•-'•'`::-':-.- .ry\,ivt yiv�r@rv@rwv3r4r"v ,lr,r *vclbCy,Y,Y \,H@:..:\ w, y�yv\ y yvvv PLANS FORR PIPE IPE NVERT .......... .r.r,ra .....r.. w .'.'.'.'. ELEVATIONS STORMWATER P0-N )LrTLET S-TR-UC-T._URE COMPACTED SUB BASrE "'"" - _ +y�y`r`r•r`y\py�yv,,y,y,py\+\y,y,y�y,r,,,y ,\y,nyv,y �,r 1 " /"Y DD p GUTTER �ll�, fr?: -a F -e PITS' ��gltigti �ti5,rrc`���i;;��tiyr �ti�y�i �ti �ygiy�yY` �2 -" MiLU__11�2�(2G D�'IlAII. �..: ?::f F:;.:: CAOSFi®STQiE - .'.I NTS ;;::::.. : -- _, ODI.WACTED SUBGRADE PAVEMENT DETAIL SECTION B-B SECTION A -A NTS TYPI-CAT GRATE _INLET CATCH BASIN NTS B R1/2" A 1 B p 1 VEGETATIVE FILTER OF VIGOROUS —----------------- _._'H3"' ' R3" R 1/8" 1 0 o STAND OF BERMUDAGRASS PREcnsr CONCBEr I----- 1 �L _ — A A 1 112" 1-2 ........... .......: 6 ABC OR I11 7 �--12" HDPE CUT IN HALFPLANe I� } 9" STBC P� � - _ _ � MANHOLE STONE-: _.. +:,: - - - 3 MIN.- -.CRUSHED .._ ;'. _ 1,-g, _ _ 6" -- 11 L� 26 RCP UNDER ROADWAY 1 - AND HOPE FOR y EL_O_W SP_REAI?ER ]ZETA IL NOTES. NON TRAFFIC LOAD 3 MN) SECTION A A SECTION B-B 1. CONCRETE SHALL BE 3,000 P_S.I. AREAS NTS 2. CONTRACTION JOINTS SHALL BE SPACED AT 10' INTERVALS. SEE PLANS CO (A 15' SPACING WILL BE ALLOWED WHEN A MACHINE IS USED.) FOR PIPE INVERT TYPICAL. METHOD OF ENDING —CURB_ AND TER 3. FNSH ALL CONCRETE WITH CURING COMPOUND. ELEVATIONS NTS _ _ _' I F _1 2'-�" STANDARD �TLR�& C=UTT . DF, AT CRUSHED , i I i i i This drawing is the property of HOUSTON and ASSOCIATES, P.A.and NTS----------------' `-----------------------' is not be reproduced in whole or in part wdtrolR written permission (Tom COMPACTED SUBGRADE 4-I -HOUSTON and ASSOCIATES, P.A. ©Copyrlght 20W SECTION P-B T77�T SECTION A -A 4) ALL RIGHTS RESERVED S AN A TCTION BO_Y t NTS N O Z EE-I To W A b o To 3 � t Z O`o 5 A ci �Q w1 U bN 3 A cm � CV • r o n W LO It OD W (1f %W U V1 z z W O) /R lJ Z cu Z j N p Z 00 OU O Ua In 1= W T T T Z m S v MN To LL V) N m E Q m Z T C UV m m fD m m .o iq o In U a A. BURYTHE TOP END OFTHE JUTE STRIPS INA -.. TRENCH 41NCHES OR MORE IN DEPTH. .--_--y- "`""`"` `= TOP ELEVATION OF STORMWATER •5'- 1' B. TAMP THE TRENCH FULL OF SOIL. SECURE .'.' .' - � .' �%ay.' WITH ROW OF STAPLES, 10 INCH SPACING, 41NCHES DOWN FROM TRENCH. � � � � � -� --------------------------------------- W V.:./50'-0" } O J/ t - .rr .' #5 WASHED 1 MAX. _ STONE EROSION CONTROL NARRATIVE o a E OVERFALL. - `y- C. OVERLAP -BURY UPPER END OF LOWER .:.Y-:.:.:.:. STRIP AS IN "A" AND "B". OVERLAP END OF TOP STRIP 41NCHES AND STAPLE. CHANNELSLOP 1 RIP -RAP A. PROJECT DESCRIPTION Meadow Ridge is located in southern Brunswick Counts- North Carolina. Meadow Rid is 31.13 OR WIDTH OF VARIES g g e a acre .-----.--'---'--.'. ABC PROPOSED STREET, ROADWAY? 25'-0' [tact of land that will include five,(5)future commercial developments and one 1 commercial storage () g *.0 �� '.'\.'.'. 'Y• WHICHEVER IS GREATER SECTIONVIEW facility, Access Storage II. The Access Storage D facility, the roadways. storm drainage, and utilities are being constructed. now. All stormwater is treated in three (3) Stormwater Ponds, including the future g ..µ . �. D. EROSION STOP- FOLD OF JUTE BURIED IN stormwater runoff from the future commercial developments. The future commercial developments are P P . e .,i.'.'.' EXISTING SLOPES - SLITTRENCH AND TAMPED, -.' � .'.' a allowed 85 /0 impervious coverage. Sediment storage is provided In the StOTnlw'atei Ponds- The Meadow' P g g DOUBLE ROW OF STAPLE' .. �_. ' •'t ' �- .' PLACE STAPLES 1.5 Ri d e project includes the construction of a lift station on -site and a roxnnatel' 10.700 feet of 8-inch force g P J ( ) PP � o .y �-... - TO 6 FEET APART AS 10'MIN. main. Most of the force main is Off Of the project i n i 1> p Ject site and s located in the NCDOT right-of-tvay. -- '. .-r..-.REQUIRED TO KEEP THE JUTE FIRMLY PRESSED INTO SOIL. 16-0' The Meadow Ridge drains m NOTE: HEIGHT & WIDTH DETERMINED BY project area to the Saw Pit Swam arid into the Shattotte River. Both are g P J P -\- - -�+--�-•• PLAN VIEW EXISTING AND .5'-1' SEDIMENT STORAGE REQUIRED classified as C; Swam according to the NCDEiSi' Classification and Water Standards." P g wvP""Pn It(�'ej'4t . �. -_ TYPICAL STAPLES y __ Current tan u f .h project i d use o the p olect area s woodland- #G-GAUGE WIRE NEW CONSTRUCTION EXISTING ROADWAY ¢ #5 WASHED ¢ STONE B. SOILS AND TERRAIN L = Q d -�"�-.'� �' = WOO � ' OJ - _-_ _ -_ 6" MIN. ..12" MIN. i•,,"•"- • � -- - ^,. ,,,�,+, �`„ The project area to be disturbed is slightly rolling with a consistent slope from the southern project boundary 2 7 s" to the northern project boundary. The Soil Survey of Brunswick County classifies the soil types within the Q@ SECTION VIEW FRONT VIEW project boundaries as Mandarin Fine Sands and Grifton fine sandy loam. These series of soils are J�4 F. PRESS ENDS OF JUTE 41NCHES INTO THE SOIL considered to be poorly drained - AROUND STRUCTURES AND STAPLE SECURELY. JUTE- THATCHMG-STABILIZATLOXDETAIL DONSTRUC_T_ID-N-ENTRANCE DETAIL TYPICATLCHECXDANLDYffAIL C. EROSION CONTROL MEASURES NTS NTS NTS The primary land disturbing activities for this project are related to construction of the roadways, Storage INS THATCHING IN SWALES Buildings (Access Storage 11), parking lots, installation and construction of storm drainage system including -JUTE s (SEE No Exe./ STEEL OR WOOD POST stormwater ponds, installation of under ground utilities, and the relocation of existing ditches. To prevent lY` STAY SPACING WDVEN WIRE FENCING AS RED'RD. sediment losses to off -site areas and erosion during construction, the following measures shall be used: silt WHERE APPLICABLE (SEE NOTE! 6.) fencing, seasonal grassing, construction entrance, inlet protection, outlet protection, and Three (3) SILT FENCE FABRIC Em EXTRA STRENGTH (50 #71 IN. MIN.) SYNTHETIC POROUS Stormwater Ponds will be. used as sediment basins. The three (3) Stormtv'ater Ponds are designed to the Jute thatching shall be used in swales where the slope exceeds 0.015 (1.5%) MIN. 12112 GA. FABRIC OF NYLON, POLYESTER, OR ETHYLENE YARNS. State's Specifications for stormwater treatment, and provide more than enough sediment Storage capacity. INTERMEDIATE c i FILL SLOPE WIRE --------------� All accumulated sediment shall be removed from the Stormwater Ponds prior to their use as permanent SPECIFICATION GUIDE _ -.. I I stormwater treatment BMP's. Sediment shall not. be allowed to leave the site at any time during A. Preparing a channel and seeding: To nrevent meandering,slope.channel to center to confine low flows totheit I 1 construction. Frequent inspections by the engineer shall be done to ensure that all erosion control measures F o W ri channel where thatching will be laid GRADE . -' • " 1 I iN are functioning properly. A ' U "Seeding MIN. COMPACTED FILL OVER SIRT' ..- ANCHOR SKIRT WITH MIN 4" LONG A I I A OOOr-IE_ r"i a = 1. Fertilization - Lime and fertilize as specified in Schedule". Disk as needed but do not cultipack. o WIRE STAPLES @ 12" O.C. O _.--, , "-+--+r-+ I I '` OOOOOOOO O O 3 2 2. Iegetative Sprigging -Plant grass sprigs or similar material before the thatching is put down. Spacings for FOR REPAIR OFTFAILURES, �"� �_ "�" USE #57 WASHEDSHED STONEONE IN IN LIEU OF I I z �������� H O Y� planting may van.COMPACTED ySuggested maximum is 10 x 20 inches. FILL. I OOO�O�OO I zp LL G 0 Q O I I TYP- ¢ p - EROSION CONTROL GENERAL NOTES v r Y 3. Seedings - Split the application. Sow half the seed before placing the thatching- Plant the remaining half after the FROKZVV1EW ,t��jt,�7S7 s1D I m¢ I z thatching is laid. a0 I o 0 1. All construction activities shall be performed in compliance with the Sedimentation Pollution Control c B. Lavin the Thatching: The thatching shall be laid on loose soil after all rocks, clods and sticks have been picked u - g g s p P that would contact with the soil surface. locations necessary to contrailesiltation th adjacent s areas. 1. Install silt fences as shown , t draws are atminimum 2 Where wood posts are used, they shall be a minimum of 3" in diameter aril a in length. Posts shall be creosote a treated southern --- `------------- I Z O Act Of 1973. �I i O m prevent - pentachlrropenol pineiv 9 Where steel posts are used they shall be S in length and be of the self fastener angle type. TREATED 2 X 4 POST & FRAME w (Yy F/-1 W 4 Woven wire fencing, where required (see Note # 6), shall conform to ASTM At 16 for class 3 galvanizing. Fabric shall 2. All land disturbing activity is to be planned and conducted to limit exposure to the shortest feasible 1. Start laying the thatching from the top of the channel and unroll down grade so that one edge of the strip coincides be a minimum of 32" wide and have a minimum of 6line wires with 12" stay spacing. The top and bcltan wires shall be 10 gauge, and intermediate wires shall be 12-1r2 gauge- Wire fabric shall be fastened to wood poxls with not less time. with the channel center. Lay a second strip parallel to the first on the other side of the channel and allow a 2 inch than #s staples 1 1rr lore_ overlap.If one roll of thatching does not extend the length of the channel, continue downhill with additional rolls. K g Fitter fabric shall be of nylon, polyester, propylene or ethylene yam with mirmium strength of 30Ib.Ain. in., Sod a as rcy_ Faboo shah contain treater, t id ize d g of haft s and stabilizers 5- minimum 85%is 3. All construction sites and severely eroded areas shall be stabilized b y the establishment of a y y Securing the Thatching Bury the to end of the jute strip in a trench 4 inches or more deg Tam the trench full g g- 1'3" P 1 P P� P the p used with a strength l) 60 in. or greater, and the pest spring does nd exceed 6', woven It finer tabrlo rs usetl 6. wire fencing is not required. Otherwise, woven wire forcing is requited, and post spacing shalt not exceed 9. PLAN VIEW SF,CTiON A A permanent ground cover. _ 2. of soil. Reinforce with a row of staples driven through the jute about 10 inches apart. Then staple the overlap in the channel center. These staples should be 3 to 4 feet apart. The outside edges may be stapled similarly at any 4. As soon as all areas are permanently stabilized, all permanent measures have been installed, and time alter the center has been stapled. Closer stapling along the sides is required where concentrated water may TV U T�. CATQ$ 3 jN PROTLj' (+TI)tN final approval is received by the Erosion Control Engineer, erosion control temporary measures may be flow into the channel. STANDARIZTEMOR. PARY SILT N FECE NTS removed. Whom one roll of thatching ends and another roll begins, the end of the top strip overlaps the trench where the NTS 5. Over the life of the project, the Owner shall make tic inspections o evaluate the success in upper end of the lower strip is buried. Make the overlap at least I inches and staple securely. crontrollbareas-If erosion of soils to off -site If areas arerefound where erosion is taking place, the Owner found Erosion. Stops - At any point the thatching may be folded for burying in slit trenches and secured as were the upper shalltake the necessary measures to remedy the situation. 3. ends. This checks water flow and erosion that may begin under the matting. It also gives improved tie -down. The La procedure is recommended on steeper slopes and gentler slopes of sandy suit or areas subject to seepage. Spacings of stops vary from 25 to 100 feet. N Diversions - Where diversion terraces outlet into the waterway, the outlet should be protected with thatching used I • CO 4. in the some manner as in the main channel. The thatching for the outlet is laid fist so that thatching in the main CONSTRUCTION SEQUENCE � channel will overlap the outlet strip. r Thatching - Soil Contact - Get contact between thatching and soil by rolling at right angle after laying, stapling and NOTES: O 5. seeding is complete. Perfect contact i vital tp keep water flew over not tinder the thatching. 1. Vigorous stand of permanent grass weer shall be established as soon as possible along the carter line and L Obtain approval Of Erosion C011tSgl Plan from NCDENR- Land Quality Section.FTl banks of channel. Where banks cannot be adequately stabilized with vegetation, an artificial liner such as rip -rap shall be used to protect the banks. RIP -RAP DISSIPATION PAD rY�( r Staples - Hairpin -shaped wire staples, number 8 gauge; 8 and 10 inches long have been used. The longer staples 2- Where slope of channel bottom exceeds 1.5%, jute thatching, or other effective channel lining material, as well bermudagrass be to fine 4' 2. Install Construction entrances. - r � 0) 6. are used in loose or wet soil. Wire staples are better than wooden pegs because the staples can be driven flush with as sod shall used protect channel center to a point on each side of center - (See "Installation of Jute Thatching in swales.'� PROPOSED FLARE EIO SECTION the matting. Wooden pegs extend above the thatching and may catch trash that diverts water flow out of the 3. Install temporary Silt fencing. N thateh protected channel. Wooden pegs may also set up a damaging turbulence. wmw w Inspection: After job completion, make sure the thatching is in contact with the soil at all places and the critical '- - '-`-'-.+, t ,�,,.'` •"-` '" - 4. Clear sites at Stormwater Pond locations and begin construction of Stormtater Ponds. ' ` C U Z S C. areas are secuielttapled down. a'r +,,""-` , .`"'- 6. Rough grade roadways and parking lots and install storm drainage system and begin ditch relocation td O O 1 MAX a.. PLAN VIEW U 5 .. +„_..`'-= 7. Install water, sewer, and other utilities. W O r +� F` r� VL Z - MEDIUM STONE DIA. d50 MAX STONE DIa dinar 8. Within thirty days following final grading activities, seed and mulch disturbed areas which will not be �R m SEDINCT S( NED_ULE sLOPEow bait upon. `J - L All disturbed areas due to construction and any severely eroded areas shall be stabilized by the TYPICAT, VVV C�F,TATTVF St 7 ' . ' . _ - - - - - - - - - - - -- - - - -- -- - - -.' 9- Maintain temporary erosion control measures until permanent ground cover is established A � � establishment of a permanent grass cover. The seed species shall be selected based on the Yype, soil present, NTS UNOErLpr STONE APRON THICKNESS WITH EdrFlt CLOTH Z J seasonal conditions and other considerations. As an alternative, the contractor may use the methods and 10. Obtain certificate of compliance through and on -site inspection by NCDENR. Erosion Control Engineer. n schedules shown below; however, it is recommended that a specialist be consulted with attention given to site SECTION VIEW Contact person is Mr. Dan Sams, 910-395-3900. V tto specific conditions. OUTLET PRO_T_.ECTI ON DETAIL x Zj Z m 11. Remove temporary erosion control measures and stabilize these areas immediately- Permanent: erosion a. Cultivate area to a depth of 5 inches NTS control measures shall remain. All sediment is to be removed from Stormwater Ponds and they are to b. Apply agricultural lime at the rate of 40001bs. per acre be returned to their design spec cations before being used as permanent Bb1P's. U d c- Apply 10-`LO-20 commercial fertilizer at. the rate of 5001bs. per acre Outlet Pi Pipe d50 La 3Do W dmax Apron d. Sow grass seeds at the following rates: Size (Do) Thickness (in) (It) (ft) (ft) (ft) (ft) ({t) V1 Kind Rat Per Acre Intentionally left blank All Rip -Rap at Pipe Outlets 24 0.16 6 0.75 1.co Common Bermuda Grass 36 035 .6 18 9 21 21 0.9 1.35 eD unhulled 251bs- 48 0-8 22 12 26 1.2 1-80 Intentionally left blank = O d hulled 12 His. Stormwater Ported Structures 10' Weir 0.8 78 10 16 1-21.8 n Pensacola Bahia grass 50 lbs. Korean Lespedeza 25 lbs. I Emergency Spillways 20' Weir 0.8 18 20 30 1.2 1.8 r Tell Fescue 30 lbs. Intentionally left blank e. Mulch with straw at the rate of :3250 to 4350 tbs. per acre. £ Anchor straw with asphalt emulsion tack coat applied at the rate of 300 gallons per acre. 2. Where it is not possible to establish a permanent grass cover in a reasonably short period of time due to seasonal considerations, a temporary grass cover shall be established The temporary cover shall include the planting of annual grasses or small grains such as rve grass. Temporary covers shall not eliminate the requirement for permanent grass cover. Where the season or other conditions are not suitable for grooving a temporary erosion resistant cover, mulch may be applied; however, mulch used alone shall be for the shortest time practical A temporary or permanentt vegetative cover shall be established as soon as conditions are favorable. 3- Topsoil shall be used over unfavorable soil conditions for successful establishment of vegetative cover. 4. Irrigate as necessary to optimize plant growth. ED O Z mCC = o 3 0 0 _� N Q N m E 4-0 < n a Z This drawing is the property of HOUSTON and ASSOCIATES, P-A.and (� m 3 m is not be lep+xin whole or in part without written permission from m ttvo m ra 'p HOUSTON and ASSOCIATES, PA. (c� Copyright 2005 RIGHTS RESERVED N W 17 () a Al