Loading...
HomeMy WebLinkAboutSW8040215_HISTORICAL FILE_20111212 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Of 02 t S DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 l l 1 ? 12 YYYYMMDD LTMA KUM North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director December 12, 2011 Jay Bundy, General Partner Hunter & Bundy P.O. Box 11540 Goldsboro, NC 27532 Subject: Approved Plan Revision Eastern Aluminum Storage Facility Stormwater Project No. SW8 040215 Onslow County Dear Mr. Bundy: Dee Freeman Secretary On December 8, 2011, the Wilmington Regional Office received a plan revision for Stormwater Management Permit Number SW8 040215. The revisions include the addition of 5,760 square feet of impervious area (a gravel lot) on the west side of the building. This area was previously allocated as future impervious and most of it is now being claimed as impervious. The remaining area allocated for future impervious is now 1,740 square feet. Drainage piping and curbing has been added to transport the runoff to the forebay of the wet detention pond. It has been determined that a formal permit modification is not required for the proposed changes. We are forwarding you an approved copy of the revised plans for your files. Please add the attached plans to the previously approved plan sheets. Please be aware that all terms and conditions of the permit issued on March 3, 2004, remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case -by -case basis. Any other changes to this project must be approved through this Office prior to construction. The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. The issuance of this Plan Revision does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. Please refer to the September 15, 2011 Notice of inspection to determine whether all deficiencies have been resolved, perform the remaining actions to resolve the issues, and submit a letter stating that all necessary actions have been taken to resolve the deficiencies in the permit. Failure to correct deficiencies may initiate enforcement action. If you have any questions concerning this matter, please do not hesitate to call Georgette Scott or me at (910)796-7215. Sincerely, Steve G. Pusey Environmental Engineer GDS\sgp: S:\WQS\STORMWATER\ Permits & Projects\ 2004\ 040215 HD\ 201112 permit_pr 040215 cc: Karen Higgins, WBS-CPU Todd Jones, Branch Manager— Eastern Aluminum Supply City of Jacksonville Building Inspections Wil nington Regional Office 7 Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-7215 \ FAX: 910.350-20041 Customer Service: 1A77623-6748 NorthCarolina A. -Internet: htlp:llportal^ncdenr.org I rT - -. a'atuNR //l DWQ USE ONLY Date Received Fee Paid (express only) Permit Number DAD / State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT PLAN REVISION. APPLICATION FORM This form may be photocopied for use as an original 1. C17NERAL INFORMATION 1. Stormwater Management Permit Number: SW8 040215 2. Project Name: Eastern Aluminum Stormwater Facility 3. Permit Holder's name (specify the name of the corporation, individual, etc.): 4. Print Owner/Signing Official's name and title (person legally responsible for permit): Jay Bundy, General Partner 5. Mailing Address for person listed in item 2 above: City:Goldsboro State:NC Zip:27532 Phone: (919 ) 751-1440 Fax: (919 ) 751-1428 Emai I:ibu ndy©eastalu m.com H. PLAN REVISION INFORMATION 1. Summarize the plan revision proposed (attach additional pages if needed): The original permit allowed for a 7,500 SF future building expansion. At this time the permitee has chosen to add 5,760 SF of stone for storage of building materials in place of the building. An area of 1,740 SF of future stone has been denoted on the plan for the balance of the original 7,500 SF of impervious surface. Stormwater from the stone surface will be directed to the forebay of the existing wet detention basin. Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original & 1 copy of the Plan Revision Application Form • Two (2) copies of revised plans (must be revisions of original approved plan sheet(s)) If applying for Express review (onht available in 20 coastal counties): • Application fee of $500.00 (made payable to NCDENR) Plan Revision Form Rev 13.luly2010 Page I of 2 VI. APPLICANT'SCERTIFICATION 1, (print or type name of person listed in General Information, item 3) Jay Mundy, General Partner, llunter & certify that I have authorized these plan revisions and that the information included on this plan revision application is, to the best of myy�knowledge, correct and complete. Signature: /�`�'S� Date: NOV 2 3 2011 Plan Revision Form Rev Muly2010 Page 2 of 2 ■ GURLEY ENGINEERING, INC. Firm License No. C-2380 P.O. Box 10806 ■ Goldsboro, NC 27532 ■ (919) 581-8055 phone ■ (919) 581-8045 fax ■ main@gudeyengineer ng.com December 7, 2011 Mr. Steve G. Pusey Environmental Engineer Division of Water Quality NCDENR Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Plan Revision Stormwater Project No. SW8 040215 Eastern Aluminum Storage Facility Onslow County, NC Dear Mr. Pusey, Please find enclosed the following materials for the subject property: 1. Corrected Site Plan (Two copies) If I may answer any questions regarding this submittal, please do not hesitate to contact me. A ey) Gurley, III, PE cc: Bill Hunter, Eastern Aluminum RECEIVED DEC 0 8 2011 Pusey, Steven From: Trey Gurley [trey@gudeyengineering.coml Sent: Wednesday, December 07, 2011 1:23 PM To: Pusey, Steven Subject: RE: SW permit - Eastern Aluminum Facility Thanks Steve. Should be there tomorrow. ■ G(JIM, I NGINE RING, INC D.E. 'Trey" Gurley, III, PE Gurley Engineering, Inc. P.O. Box 10806 Goldsboro, NC 27532 (919) 581-8055 phone (919) 581-8045 fax trevDaudevenaineedno.com Firm License No. C-2380 From: Pusey, Steven fmailto:steven.ousev(o)ncdenr.00vl Sent: Wednesday, December 07, 2011 1:14 PM To: Trey Gurley Subject: RE: SW permit - Eastern Aluminum Facility Probably within a week once I receive your hard copy drawings. Thanks, Steve From: Trey Gurley[mailto:trey(a)aurlevengineerina.coml Sent: Wednesday, December 07, 2011 12:17 PM To: Pusey, Steven Subject: RE: SW permit - Eastern Aluminum Facility Steve I have made corrections, not sure what happened. I have attached a pdf and I will mail hard copies today. Could you give an idea of when an approval will be received? Thanks i i' .•ijrT vt i' ■ GURLEY f:GINITRINIG, INC D.E. "Trey" Gurley, III, PE Gurley Engineering, Inc. P.O. Box 10806 Goldsboro, NC 27532 (919) 581-8055 phone (919) 581-8045 fax trey saurlevengineering.com Firm License No. C-2380 From: Pusey, Steven rmailto:steven.ousevftncdenr.00vl Sent: Wednesday, December 07, 2011 11:29 AM To: Trey Gurley Subject: SW permit - Eastern Aluminum Facility Dear Mr. Gurley: I reviewed the plan revision for Eastern Aluminum Storage facility in Onslow County and request the following additional information before I can proceed with the review. The application states that they are using 5,760 sf for the current BUA addition and reserving 1,740 sf for the future, however the drawing shows 6,000 sf proposed CABC gravel and 1,000 sf for future. Also the site data on the drawing lists 1,440 sf for future. Can you please revise your drawing to make all these numbers correspond to the application or advise a reason for this discrepancy. I need your response no later than Monday, Dec. 19. Thanks, Steve stawnm G. -P Environmental Engineer NCDENR - Div. of Water Quality Surface Water Protection Ph (910) 796-7334 / Fax (910) 350-2004 `a Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. jr) 1. ItN I'••J4,!•1'j':� �.';�tlGbi. =1?[irl-.'.,' fL 1.(IG.. .:'IU:. .. / .r.' :. JI^,1. "1'J ��. :q:, „1,•.... Sd;; ' . .. �`�. a. li.•.. ...1 a1�.I !<, .I': '1: t:,ALA._ -f �� J I ',r if.i I) ... a •1 { It .. .t:. III;,.r1;11 n1 IC C�t"' .��LI•_ •J t':; r WC ;OLl,,: •(UZL•_i..i i1Jrt V - i t(silr. ti rl I:'J �: •.; 1I'il��r lll'al fl' a�J 4'.'lil ! i !V�'1?:' l9' IIt=� L.� .. ... 9;r � �r.''.�i, h: J��F �v �tali�^(^I .i �' •iiJl i r: -.Y ' Vv'. Storm Sewer Tabulation Page 1 Station LenHgARnoff coeff (C) Area c C Te Rain (I) (inlhr) Total flow (cfs) Cap full (cfs) Val (ft/s) Pipe Invert Elev HGL Elev Gmd I Rim Elev Line ID To Line(ft) Incr Total Inlet (min) Syst (min) Size (in) Slope (0% Up (ft) Dn (ft) Up (ft) Dn (ft) Up (ft) Dn A 1 End 141.0 0.14 0.14 0.90 0.13 0.13 5.0 5.0 8.9 1.12 1.34 3.99 8 0.89 40.75 39.50 41.25 40.00 42.60 0.00 Project File: Eastern Aluminum Storage - Jacksonville.stm Number of lines: 1 Run Date: 11-15-2011 NOTES: Intensity = 85.97 / (Inlet time + 12.20) A 0.80; Return period = 10 Yrs. Hydreflow Stom Sewers 2M5 Hydraulic Grade Line Computations Page 1 Line Size (in) Q (cfs) Downstream Len (ft) Upstream Check JL coeff Minor loss (ft) Invert elev (ft) HGL elev (ft) Depth (ft) Area (sgft) Vet (ft/s) Val head (ft) EGL elev (ft) Sf (%) Invert elev (ft) HGL elev (ft) Depth (ft) Area (sgft) Val (ft/s) Val head (ft) EGL elev (ft) Sf (%) Ave Sf (%) Enrgy loss (ft) (K) 1 8 1.12 39.50 40.00 0.50 0.28 3.99 0.25 40.25 0.743 141 40.75 41.25 j 0.50-- 0.28 3.99 0.25 41.50 0.743 0.743 n/a 1.00 n/a Project File: Eastern Aluminum Storage - Jacksonville.stm Number of lines: 1 Run Date: 11-15-2011 Notes: ;'" Critical depth.; j-Line contains hyd. jump. Hydrallo Storm Sewers 2(1o5 Pusey, Steven From: Pusey, Steven Sent: Monday, October 24, 2011 4:31 PM To: 'Trey Gurley' Subject: Eastern Aluminum Storage Facility Dear Mr. Gurley: We received your plan of action October 20, 2011 regarding the subject facility. Please direct your Plan Revision to my attention at the following address: NC DENR Division of Water Quality SWP - Stormwater Section 127 Cardinal Drive Extension Wilmington, NC 28405 I look forward to receiving your revised plans. In addition, an engineer certification will be required once the work is completed at the site. Please let me know if you have any questions. Regards, cVenvc.i Q. PUAe . Environmental Engineer NCDENR - Div. of Water Quality Surface Water Protection Ph (910) 796-7334 / Fax (910) 350-2004 `� Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records law and may be disclosed to third parties. Pusey, Steven From: Trey Gurley [trey@gurleyengineering.com] Sent: Friday, August 12, 2011 11:18 AM To: Pusey, Steven Subject: FW: Eastern Aluminum Jacksonville SW8040215 Attachments: Stormwater Permit Letter 070611.pdf Steve Attached is the correspondence I had sent Angela back in July. I spoke with Todd Jones at Eastern Aluminum this morning. He said the contractor will start work sometime next week. I will update you as soon as they let me know they have started. If possible, I would like to go when you do your inspection as I also have to sign off on the work. Please do not hesitate to call should you have any questions. Thanks GURLEY INIGI\EERINC, INC. D.E. "Trey" Gurley, III, PE Gurley Engineering, Inc. P.O. Box 10806 Goldsboro, NC 27532 (919) 581-8055 phone (919) 581-8045 fax trev anaurlevenaineerina.com Firm License No. C-2380 From: Trey Gurley[mailto:t=Cdgurleyengineering.coml Sent: Wednesday, July 06, 2011 4:26 PM To: 'angela.hammers@ncdenr.gov' Cc: 'bhunter@eastalum.com' Subject: Eastern Aluminum Jacksonville SW8040215 Angela Corrective actions letter attached per our letter on June 6, 2011. Please let me know you are in receipt of this. Thanks GURU FAIGINEERING, NC. D.E. 'Trey" Gurley, III, PE Gurley Engineering, Inc. P.O. Box 10806 Goldsboro, NC 27532 (919)581-8055 phone (919) 581-8045 fax trev(a)gurleyengineering. com Firm License No. C-2380 ■ GIJ M FAIGIM:F.RING, INC. Finn License No. C-2380 P.O. Box 10806 ■ Goldsboro, NC 27532 ■ (919) 581-8055 phone (919) 581-8045 fax ■ main@gudeyengineedng.com July 6, 2011 Ms. Angela Hammers Environmental Specialist Division of Water Quality NCDENR Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Corrective Actions Notice of Inspection Stormwater Project No. SW8 040215 Eastern Aluminum Storage Facility Onslow County, NC Dear Ms. Hammers, On June 8, 2011, 1 visited the NCDENR Wilmington Regional Office to conduct a file review for the subject projecL Copies were made of all relevant documents such that I could gain an understanding of the stormwater permit that was approved March 3, 2004. Upon leaving the NCDENR office, I traveled to the Eastern Aluminum Facility in Jacksonville, NC. An Inspection of the existing stormwater facilities was conducted with an emphasis on items addressed in you Notice of Inspection dated May 3, 2011. The following items will be addressed by the Owner. 1. The level spreader was discovered after digging with a hand shovel. It was constructed as shown in the original plan; however, the spreader has become buried by sediment. To bring the spreader into compliance, the Owner will remove all sediment from the structure. Disturbed areas will immediately be seeded and covered with excelsior matting to promote a fast growing ground cover. 2. Sediment will removed from the rip -rap near around the outfall pipe upstream of the level spreader. The rip -rap will be oriented in a manner to eliminate the channelization leading to the vegetated swale. 3. An approved herbicide will be used to safely remove cattails to an acceptable level. 4. Sediment will be removed from the pipe inverts. 5. Eroded side slopes will be re -graded and stabilized with seeding and excelsior matting. 6. The eroded areas at the roof drain outlets on the east side of the building will be filled and stabilized with seeding and excelsior matting. 7. The Owner will implement an O&M inspection process as noted in the original stormwater permit. 6. An engineer's certification will be submitted upon completion of the above items. If I may answer any questions regarding this submittal, please do not hesitate to contact me. 4STvid E. (T Gurley, III, PE cc: Bill Hunter, Eastern Aluminum c�( P% i/9-Sal-PJSS C 9-L-11hC qAf -e s')"s . ITre7 y f ke L,;(I c,.�( ����c �L:� 51 O CV�Jf^fCvCJ'�"US WD,( CO n r l e%l-L n i ,t 7 ti fir. � rv. '' - +. "_ ��il.aJ`• -.'.�� -'+`.- a :3�,',. � f,.aJln r: .r`:e- �11 x: ;6;.r,. NOV 2 3 2011 Y: Line Profile (Line 1) Elev ift� 4�.Oc 43.00 41.00 3900 35.00 i 0 Line 1 4� 0C 43.00 41.00 39.00 ill I I I I I I I I I I I I I I I I ' 35.00 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Reach (ft) Project File: No. Lines: 1 11-15-2011 Hyarellow Storm Sexare 2005 'Storm Sewer OF Curves IDF file: Onslow County.IDF Int (in/hr) 14.00 12.00 1400 1 00-yr WON 10.00 10.00 25-Yr 8.00 - — - 8.00 10-Yr 6.00 — ` \ - 6.00 5-Yr A nn -_ - - - - - - - - 4.00 2-Yr 2.00 - 2.00 1-Yr 0.00 0.00 0 5 10 15 20 25 30 35 40 45 50 55 60 Time (min) Hydraflow Storm Sewers 2005