Loading...
HomeMy WebLinkAboutNCC230541_ESC Approval Submitted_20230228ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality November 10, 2022 LETTER OF APPROVAL WITH MODIFICATIONS State of North Carolina - WRC ATTN: Mr. Gary Gardner 1720 Mail Service Center Raleigh, NC 27699 RE: Project Name: BURNSVILLE DEPOT Acres Approved: 3.2 Project ID: YANCE-2023-001 County: Yancey City: Prices Creek Address. Wildlife Ln. River Basin: French Broad Stream Classification: Cane River - CIass C, Trout Submitted By: Brooks Engineering Associates - Mr. Eric Hutchison, III, PE Date Received by LQS: October 13, 2022 Plan Type: Government Facility Dear Mr. Gardner, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. D E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office E 2090 U.S. Highway 70 ! Swannanoa, North Carolina 28778 wk- • 828.296A500 Letter of Approval with Modification Mr. Gary Gardner November 10, 2022 Page 2 of 5 Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan, North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, C�J Fred Walker, PE Engineer III Division of Energy, Mineral, and Land Resources Letter of Approval with Modification Mr. Gary Gardner November 10, 2022 Page 3 of 5 Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet Modifications ec: Mr. Eric Hutchison III, PE (ehutchison(@brooksea.com) Mr. Mack Granger - NCDEQ LQS (mack.granger@ncdenngov) Mr. Landon Davidson, PG - NCDEQ DWR (landon.davidson@ncdenr.gov) Mr. Andrew Moore, PG - NCDEQ DWR (andrew.w.moore(@ncdenr.gov) cc: Regional Office file Letter of Approval with Modification Mr. Gary Gardner November 10, 2022 Page 4 of 5 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: BURNSVILLE DEPOT Project ID: YANCEY-2023-001 County: Yancey For final plan approval please provide to this office the requested documents and revised plan sets that address the comments listed below. Construction activities cannot begin for this project until final approval is received from the Asheville Regional Office Land Quality Section. 1. Provide summary of impacts to trout buffer versus amount of trout buffer owned to determine if a Trout Buffer Waiver is required for this project. 2. Hatch all areas required to meet 7-day stabilization requirements in NPDES NCG010000. 3. Increase outlet dissipater length and width 25-50 percent for discharges onto grade 5 percent or greater or with discharge velocities 15 fps or greater. 4. Recommend moving sediment basin #2 to below the proposed septic field. The current sediment basin location creates a large fill slope embankment below the basin that is directly adjacent to trout waters, and a saturated zone at the toe of the fill slope above the basin. All sheet flow from fill slope must be directed towards a stabilized inlet that extends into the sediment basin floor. S. Clarify minimum width of stream buffer on plan sheet. Stream buffers are measured from top of bank, show top of bank for stream to illustrate an adequate stream buffer. {15A NCAC 04B .0106(a)(1)} 6. Use a runoff coefficient of 0.6 for runoff calculations. {15A NCAC 04B .0108} 7. Due to proximity to receiving trout stream remove generic fertilizer rates and instruct contractor to apply fertilizer per soil test recommendations. Provide mulching/stabilization detail, asphalt tackifier is not allowed due to proximity to trout stream. {G.S. 113A-57.31 8. Super silt fence is required between all construction activities and the receiving stream. 9. Revise construction sequence to include the following language: notify NCDEQ LQS inspector when project is ready for a close out inspection; file for NPDES NCGO10000 e-Notice of Termination when final close out inspection report is received from NCDEQ LQS; all work within riparian or trout buffers must be stabilized by the end of each workday; sediment basin and trap embankments shall be provided with adequate groundcover immediately upon construction; after the drainage areas to the basins and traps have been permanently stabilized, dewater the basins. Fill the basins using stockpiled soil and bring to finish grade in compacted lifts. Smooth the basin sites to blend with the surrounding area, ensuring the basin sites will not pond water, and immediately permanently stabilize; dewatering operations of sediment basins must be discharged into Letter of Approval with Modification Mr. Gary Gardner November 10, 2022 Page 5 of 5 adequate stilling basin or comparable measure to prevent the discharge of sediment; inspect and cleanout SW system before decommissioning sediment basins; request an inspection from ARO-LQS inspector before decommissioning sediment basin; site must be "storm ready" before any extended breaks in construction activities including weekends; for sites using slope drains, at the end of each day, the contractor shall establish a berm or ditch at the top of all fill slopes. The berm or ditch shall be constructed to prevent potential runoff from sheet flowing over and down the slope. Positive drainage shall be established to the inlets of any slope drains. {15A NCAC 04B .010b(a)(3)1 10. Provide verification that post -construction stormwater permitting has been approved, applied for, or is not required for this project. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities