Loading...
HomeMy WebLinkAboutSW1221002_Plansheet CL101A1.P2 - Proposed Conditions/Site Plan_20230223 m�� o UGr o LEGEND Z ^ �h GT I U��Q��N PROPERTY LINE STORM STRUCTURE TO EXISTING UTILITY DEMOLITION -- — — — UGT _ GC BE REMOVED (TYP.) .^� CO EXISTING BUILDING DEMOLITION Gresham Smith // SHOWN FOR REFERENCE ONLY — — — STOP SIGN TO REMAIN v, // / // Nh � ° N / \ _ 0- u, N / I // /°/ U C) Q EXISTING PAVEMENT DEMOLITION GS-NC P.C. An Affiliate of Gresham Smith EXISTING CONCRETE DEMOLITION !✓ GF I �� �� I � �/ �/ � N CD<n 4U �' + + + + + + .4N +++++++++++++ EXISTING STRIPING DEMOLITION MISCELLANEOUS DEMOLITION 201 South College St. �\ 4 a W �� Suite 1950 X Charlotte, NC 28244 ° W ° W EXISTING TREE DEMOLITION 704.944.7970 W W NOTES: I �\ 1. ALL EXISTING LANDSCAPING TO REMAIN STORM PIPE TO BE REMOVED (TYP.) \ Q^CNN \ \ I� I UNLESS OTHERWISE NOTED. / �o�" Z \ I I§ \\ 2. SEE SITE ELECTRICAL PLANS FOR ALL POWER z AND COMM. DEMOLITION AND RELOCATION. 3. ALL INTIAL E&SC MEASURES SHALL BE IN PLACE PRIOR TO CONSTRUCTION. SEE SITE ELECTRICAL / ` \• \\ �0I Q W \� I \\ 4. SITE SIGNAGE TO BE SALVAGED AND PLANS FOR ALL POWER / \ AND COMM. DEMOLITION 3 // `\ km h� o`' = 1\\ \ �I°II `� RETURNED TO OWNER AND RELOCATION (TYP.) / \ m0 . Z 5. PROJECT IS TO BE COMPLETED IN MULTIPLE \ \ z �o(b�� N \\ _ �cQ 4 �Ilol \\ PHASES. PROJECT IS TO ALWAYS MAINTAIN / ON ^�'boo Q \\ � N��;, � I�it `` VEHICLE ACCESS TO PUBLIC SAFETY BUILDING \ ov \ �. . " \° \\ AND SIDEWALK FROM PUBLIC SAFETY BUILDING Gresham 4 6 \ \\ TO TERMINAL. COORDINATE WITH / ��� \ z \ \\ N^ \° \ CONTRACTOR PHASING DRAWINGS. Smith � 6. CONTRACTOR SHALL ENSURE ALL PROPOSED b\ \\ PIPE CONNECTIONS ARE TIED INTO THE \�°\ —— \\ —Foc———— EACH EXISTING INFRASTRUCTURE AND PRIOR TO ANY RAIN E END EVENOF T. � \ OC-- —FOC--- ASPHALT PAVEMENT TO BE REMOVED (TYP.) \ \\ , \\\ Z Z \ O\ ® \ ——Foc__———Foc— FOC x ® \\ \ \�o \ C)C) PROJECT BOUNDARY \ / \\ I¢ STORM PIPE TO BE REMOVED (TYP.) �\°\ s eville `\� REG IONAL AIRPORT U \�0 0 c � � �� Asheville Regional \�° N Airport X o m � / ° (20) \`\ PROJECT BOUNDARY \\\ \\ z���. Terminal S" ° ° \ Modernization 3 ° \ UGT � \ \\\ \\\ \\ 61 Terminal Drive Suite 1 CURB AND GUTTER TO BE REMOVED (TYP.) I / I �\ \\ Gc � Fletcher, North Carolina 28732 02/16/2022 CONCRETE SIDEWALK / I I Z. .^� h �� \ GS Project#: 43483.02 ID TO BE REMOVED (TYP.) a? O �z Q a, ICl J O�• h NN R Q N ^ Q UUQ of ° /// II I coco °coJ iv _ "Z ° QO " — c �`/ �I _=�Z���\:'��\� •CII IA•IIROUw) � " O / Q ^ " S S Ux " O � cnQ SEAL m � O STORM STRUCTURE TO BE REMOVED (TYP.) Q � N 053149 10/�2 •�/:/�4���/ii2 � zU N _ Op > > > -- - _ CQ o z -U � zzz wp USIGNREMOVAL (TYP.) Z� _ _ ________ � 9 FN �� ••�\ UG / \�\ ° ~ EXISTING UNDERGROUND DETENTION GGF = � / SYSTEM AND CORRELATING MANHOLES TO o / a \ / x \\ \\ \ \ BE MAINTAINED THROUGH CONSTRUCTION ¢ _ �� @ ° NATHAN HUDGENS, E UGE X \ \ \� \ ° \ - �� �\`` - N — NC 053149 N ��� \ \ \\ -__- O / \ / / \ \ \\ \ \ ° — REVISION N —x x \ �'�\ I SANITARY SEWER PIPE TO BE NO. DATE DESCRIPTION \ 3 / \\ � GAS LINE TO BE ABANDONED IN PLACE \ � + \ / %\ \\ �\ \ I REMOVED FOR SLOPE ADJUSTMENT 1 02/16/22 ISSUE FOR CONSTRUCTION � GAS LINE TO BE REMOVED \ 2 03/09/22 ADDENDUM 02 ,o \ _ _ Q M •ry / \ \ \ p ASPHALT PAVEMENT \ \ / 15, POST CURB TO BE 3 05/02/22 AGENCY COMMENTS � TO BE REMOVED (TYP.) •\ I � � \ / ` ./' '— � , II REMOVED (TYP.)\ •\• •�• •— — — •_•�,_,..�_ .—, 4 10/24/22 AS1006 I II UGE --- — / —S \ j � /x/ \ —sue s---- —s— �' s � J SIGN TO BE 21 -6 m m ° WATER METER AND VALVE \ / / / / / O � \ °rn 4 • II REMOVED TO BE RELOCATED TO `� \l ° \ x •—•—• x�—«—x sde S e ��. sV s , NORTH SIDE OF WATER LINE �I / / / / / / / / / / \ \ FIRE YDRAN BE REMOVED , p ° // CONTRACTOR TO PLUG TEE AND / / / / / / / / / c� z _z" O REMOVE VALVE ON WATERLINE +I STORM PIPE TO BE REMOVED (TYP.) LIMITS OF WORK PACKAGE 1 DEMOLITION _ — —_— —�c - x- 11 , j = N M GAS LINE TO BE REMOVED CONCRETE SIDEWALK — — Q) //�ml� z N I I' ° == z rn a a TO BE REMOVED (TYP.) x (� / II _ _M "t ofI v C,� = N GAS LINE TO BE ABANDONED IN PLACE + x x x x J / I U N N CN 0-1 c- c- U Oo / Q aO z z z �w U O o CONTRACTOR TO FIELD VERIFY WATER LINE TO BE U ~ — — I z � � � LOCATION OF FIRE HYDRANT BEFORE x II REMOVED (TYP.) Lu N RECONNECTING TO 8" WATER LINE o z z Lu ASPHALT PAVEMENT TO BE REMOVED (TYP.) II W I co M> I I > � ih � °5 °5 Z z w N m c`•) I 20' 0 20' 40' z N z LIMITS OF WORK PACKAGE 1 DEMOLITION I I 1 I' I O o- ` w 3on GRAPHIC SCALE � Oz M " DEMO PLAN °p MAILBOX TO BE RELOCATED KEYPLAN 1* LANDSCAPING TO BE — — x — O REMOVED (TYP.) ! I O GAZEBO TO BE SALVAGED AND RETURNED TO OWNER CL101A1 . P2 _0 DEMOLITION PLAN 1 - Al O SCALE: 1"=20' CONSTRUCTION DOCUMENTS I