Loading...
HomeMy WebLinkAboutSW1221002_Plansheet CL501B2.P2 - Other_20230223 zzz LEGEND PROPERTY LINE BUILDING LINE Gresham Smith W WATER LINE (SIZE VARIES) GS-NC P.C. W An Affiliate of Gresham Smith J o = _ _ _ _ _ = SANITARY SEWER Z � N ;- N O Q - CD 00 00 ❑ N �M �N �N - - - - - - M d C STORM SEWER N N N N N ao > > > > UG-E UNDERGROUND ELECTRIC 201 South College St. c� � zzzz G NATURAL GAS Suite 1950 Charlotte, NC 28244 — — — — — — — UTILITY EASEMENT 704.944.7970 ❑ — — — FIRE DEPARTMENT — — — CONNECTION (FDC) -- --------------------- _—_—_—__==—=--- ————— -- ————— FIRE HYDRANT REDUCER N WATER VALVE , REFER TO AIRSIDE CIVIL PLANS FOR PROPOSED GRADING AND SURROUNDING IMPROVEMENTS. WATER TEE (6) 2 PSI GAS METERS. SEE PLUMBING PLANS FOR DETAIL. 4 COORDINATE ALL FINAL PROPOSED DRAWINGS PRIOR TO CONSTRUCTION. SANITARY ANGLE Gresham SO ® SANITARY STRUCTURES Smith OS SANITARY MANHOLE ® SANITARY CLEANOUT APPROXIMATE GREASE w o � STRUCTURE A4 A5 INTERCEPTOR LOCATION SHOWN J Ch — co o o RIM:195.11 STRUCTURE LABEL / FOR REFERENCE ONLY. Z SEE PLUMBING PLANS FOR DETAIL. a N N N N N N > eville o0 > > > > > REG IONAL AIRPORT Asheville Regional NOTE: Airport 1. CONTRACTOR TO COORDINATE Terminal UNDERGROUND UTILITIES TO BE A MINIMUM OF 3 INCHES CLEAR BELOW THE BASE OF THE Modernization GRADE BEAMS WHEN PASSING UNDERNEATH. 2. NO UTILITY LINES SHALL PENETRATE THE 61 Terminal Drive Suite 1 FOOTING AT THE CENTRAL ENERGY PLANT Fletcher, North Carolina 28732 EXCEPT FUEL LINES. 3. CONTRACTOR TO COORDINATE ALL UNDERGROUND UTILITY ROUTINGS. UTILITIES 02/16/2022 SHALL BE KEPT A MINIMUM OF 12 INCHES CLEAR FROM ALL FOUNDATIONS IN PLAN. GS Project#: 43483.02 4. SEE SITE ELECTRICAL PLANS FOR POWER, COMMUNICATIONS, AND SITE LIGHTING. REFER TO AIRSIDE CIVIL PLANS FOR WORK TO BE COMPLETED IN THIS AREA uNgiii CARP %/x PROJECT SEAL 'a BOUNDARY = 053149 — • 10/2'4/2f .—.—.—.— ENE — —.—.—.—.—.—.—.—.—.—.— —.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.— f�IDIIII��Hvo\\N CY) N NATHAN HUDGENS, PE NC 053149 CV CV O REVISION N NO. DATE DESCRIPTION 1 02/16/22 ISSUE FOR CONSTRUCTION (U 2 03/28/22 ADDENDUM 03 O 3 05/02/22 AGENCY COMMENTS 4 10/24/22 AS 1 006 N U_ O LO U CNI O CV) 00 1* co w N N CL J O O_ Q U O i 20' 0 20' 40' O OGRAPHIC SCALE co UTILITY PLAN 00 KEYPLAN I �I Al ' A2 ' A3 CL501 B2 . P2 �0 - - - - -i - - - - - i- - - - - Q UTILITY PLAN B1 � B2 � B3 B2 SCALE: =20'1" O CONSTRUCTION DOCUMENTS I