Loading...
HomeMy WebLinkAboutSW8020510_Historical File_20021125State Stormwater Management Systems Permit No. SW8 020510 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO WDV, Inc. Waterford Phase II Brunswick County FOR THE construction, operation and maintenance of a non -discharging series of 3 wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 20, 2012 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. The pond is designed to store the runoff associated with a 25 year storm event. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The subdivision is permitted for 158 lots, each allowed a maximum amount or built -upon area as follows: Lots 1-45 @3,600 ft2; Lots 46-125 @5,800 ft2; and Lots 126-158 @5,000 W. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The runoff storage volume in the ponds will be re -circulated to maintain pond level and some will be used for irrigation of common areas. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 0 State Stormwater Management Systems Permit No. SW8 020510 DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Name of Receiving Stream / Index #: Classification of Water Body: Design Storm: Pond Depth, feet: Permanent Pool Elevation, FMSL: Drainage Area, acres: Total Impervious Surfaces, ftz: 158 lots, ftz: Roads/Parking, ftz Sidewalks, ftz Offsite Area entering Pond, ftz: Required Surface Area, ftz: Provided Surface Area, ftz: Required Storage Volume, ft3: Provided Storage Volume, ft3: Temporary Storage Elevation, FMSL: Controlling Orifice: Waterford Phase II SW8 020510 Brunswick County Mr. Bert Exum, Member/Manager WDV, Inc. 6314 Oleander Drive, Suite C Wilmington, NC 28403 November 20, 2002 Cape Fear / Sturgeon Creek / 18-77-1 "C Sw" 25 year 0 19, 21 and 22 96.46 1,040,400 791,000 241,900 7,500 None, per Engineer 58,423 1,055,089 95,502 667,672 19.5, 22, and 23 n/a non -discharging pond State Stormwater Management Systems Permit No. SW8 020510 II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If the permittee sets up an Architectural Review Committee (ARC) to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the ARC do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit as recorded in the deed restrictions. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 7. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4 State Stormwater Management Systems Permit No. SW8 020510 11. Decorative spray fountains will not be allowed in the stormwater treatment system 12. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 14. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 15. Prior to the sale of any lot, deed restrictions must be recorded which limit the built -upon area per lot to the amount as shown on the Project Data Sheet, per Section I, Part 2. The recorded statements must follow the form: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 020510, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is as follows: Lots 1-45 @3,600 ft2; Lots 46-125 @5,800 ft2; and Lots 126-158 @5,000 ft2. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 16. Prior to transfer of the permit, the pond must be inspected by DWQ personnel, and determined to be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. F J State Stormwater Management Systems Permit No. SW8 020510 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must bear the signature of the Permittee, the deed book number and page, and stamp/signature of the Register of Deeds. 18. This permit shall become voidable unless the facilities are constructed. in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 19. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by -appropriate documentation from the parties involved, including as may be required, but not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with the terms and conditions of this permit until such time as the State approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Cl State Stormwater Management Systems Permit No. SW8 020510 Permit issued this the 25th day of November, 2002. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ,V— A-j ^A A� o Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 020510 OFFICE USE ONLY D e Received Fee Paid Permit Number Z691 1,JWry6.-,L&S-10 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION: 1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): WDV, Inc. 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Bert Exum, Member/Manager 3. Mailing Address for person listed in item 2 above: 6314 Oleander Drive, Suite C City: Wilmington Telephone Number: (910 ) 392-9325 State: NC Zip: 28403 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Waterford Phase II 5. Location of Project (street address): Poole Road City: Leland Co...ty: Brunswick 6. Directions to project (from nearest major intersection): Follow Hwy 17 South out of Wilmington past Hwy 74, 76 overpass. First turn on right is Poole road. Project entrance straight off Poole road. 7. Latitude: 34013'45" Longitude: 78°1'15" 8. Contact person who can answer questions about the project: Name: Davis Fennell (Cape Fear Engineering) Telephone Number: (910) 383-1044 of project II. PERMIT INFORMATION: 1. Specify whether project is (check one): X New Renewal Modification Form: SWU-101 Version 3.99 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number And its issue date (if known) 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. All Stormwater runoff to be conveyed to non -discharge amenity pond system. 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Project Area: 96.46 acres 4. Project Built Upon Area: 24.76 % 5. How many drainage basins does the project have? 1 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Sturgeon Creek Receiving Stream Class SC Drainage Area 96.46 ac (4,201,844 sf) Existing Impervious* Area 0 ac Proposed Impervious* Area 23.88 ac (1,040,400 sf) % Impervious* Area (total) 24.76 % In4wrvious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 18.16 ac (791,000 sf) On -site Streets 5.55 ac (241,900 sf) On -site Parking 0 ac On -site Sidewalks 0.17 ac (7,500 sf) Other on -site 0 ac Off site 0 ac Total: 23.88 ac (1,040,400 sf) Total: mpeivtaus ureu is ueitneu as the ouait upon area znctuaing, out not unutea to, outlaings, roads, parking areas, sidewalks, gravel areas, etc. Form: SVdU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? N/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number SW8 020510 as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than ** square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. * * (3, 600sf for lots 1-45 ; 5, 800sf for lots 46-125 ; 5, 000sf for lots 126-158) 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess area of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWIJ-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form: SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment /management • Two copies of plans and specifications, including: -Development/Project name -Engineer and firm -Legend -North Arrow -Scale Initials it�C6 � -Revision number & date -Mean high water line -Dimensioned property / project boundary -Location map with named streets or NCSR numbers -Original contours, proposed contours, spot elevations, fmished floor elevations -Details of roads, drainage features, collection systems, and stormwater control measures -Wetlands delineated, or a note on plans that none exist -Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations -Drainage areas delineated -Vcgetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section: Designated agent (individual or firm): Cape Fear Engineering, Inc. Mailing Address: 151 Poole Road, Suite 100 City: Belville State: NC Phone: (910) 383-1044 Fax: (910) 383-1045 VIH. APPLICANT'S CERTIFICATION Zip: 28451 I, (print or type name of person listed in General Information, item 2) Bert Exum certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Signature: Date: I 1 Zo Z. Form: SWU-101 Version 3.99 Page 4 of 4 Permit No. SWYOOS%D (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORYIWATER MANAGEMENT PEIL IIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Waterford Phase 11 Contact Person: Bert Exum Phone Number: (910) 392-9325 For project with multiple basins, specify which basin this worksheet applies to: elevations Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation areas Permanent Pool Surface Area Drainage Area Impervious Area volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SA/DA' Diameter of Orifice Design Rainfall Design TSS Removal 2 13.0; 1 5.0; 1 G.0 ft. 19.0; 21 .O; 22.0 $, 19.5; 22.0; 23.0 $, 1,055,089 sq. ft. 9G.37 ac. 23.84 ac. 5,013,798 cu. ft. GG7,G72 cu. ft. N/A cu. ft. 1.40 N/A in. 1 in. 90 % Non-Di5charcge Pond System (3-tier) (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -site and off -site drainage to the basin) (combined volume of main basin and forebay) (volume detained above the permanent pool) (approximately 20% of total volume) (surface area to drainage area ratio from DWQ table) (2 to S day temporary pool draw -down required) (minimum 85% required) Form: SNM-102 Rev 3.99 Page 1 of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal. counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed tc provide 90% TSS removal. The NCDENR BNT manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials: _YV1a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). * b. The forebay volume is approximately equal to 20% of the basin volume. C3C' c. The temporary pool controls runoff from the design storm event. * d. The temporary pool draws down in 2 to 5 days. �i 4 e. If required, a 30-foot vegetative filter is provided at the outlet ( include non -erosive flow calculations) --Tr3 p f. The basin length to width ratio is greater than 3:1. (3 (' g. The basin side slopes above the permanent pool are no steeper than 3:1. * h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). .513 P i. Vegetative cover above the permanent pool elevation is specified. * j. A trash rack or similar device is provided for both the overflow and orifice. (� k. A recorded drainage easement is provided for each basin including access to nearest right - of —way. -:�-2 P 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. S T-1 in. A mechanism is specified which will drain the basin for maintenance or an emergency. * Non -discharge pond -these items are not required. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) does does Bnot incorporate a vegetated filter at the outlet. This system (check one) does does incorporate pretreatment other than a forebay. Form: SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.) The measuring device used to determine the sediment elevation shall be as such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads N/A feet in the forebay, the sediment shall be removed. BASIN DIAGRAM Permanent Pool Elevation = 19.0; 21 .0; 22.0 Sediment Removal Elevation = 14.5; 1 9.5; 17.50 5ediment Removal El"K Ion = N/A 75% / \ --------------- 75%- - Bottom Elevation =NSA \ 25%* Bottom Elevation = 13.0. 1 5.0; 16.0 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form: SNM-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Bert Exum Title: Member/Man Address: 6314 Oleander Drive, 5uite C Wilmington, NC 28403 Phone: (91 O) 392-9325 Signature:,— �✓ — Date: 9-/2-- 0z Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, �ryr� to , ,a Notary Public for the State of 41,p4 1- County of XleW L ",Oy ,do hereby certify that , 6g,7— ")C urs.7 personally appeared before me this day of 6Gr , Zoo Z ,and acknowledge the due execution of the foregoing wet detention basin maintenailce requirements. Witness my hand and official seal, 0 VOW"�"i Z, no SEAL My commission expires Aq'- f- "::�; 7 2 60 7 Form: SWU-102 Rev 3.99 Page 4 of 4 ^r` CAPE FEAR Engineering, Inc. N 0 V 2 0 2002 November 20, 2002 Y: Linda Lewis NCDENR Water Quality 127 Cardinal Dr. Ext. Wilmington, NC 28405 RE: Waterford Phase II (SW8 020510) Dear Ms. Lewis: Please find the enclosed response to your request for additional information for the above referenced project. 1. The volumes for both the 1" and 25 year events are shown on the attached calculations. The hydrograph summary report previously submitted shows a storage volume of 282,904cf for the highest level the ponds reach in the 25-year event. In this event, the ponds do not reach their full capacity and therefore have additional storage. The full capacity of the pond system (667,672cf) is shown in the attached reservoir reports. 2. The proposed deed restriction has been revised per your recommendation and included. I trust this information to be sufficient for your review and approval. If you have any questions or require additional information, please contact this office. Thank you Jeffrey Petroff, E.I. 151 Poole Road, Suite 100 • Nelville, NC 28451 • TEL: (910) 383-1044 • FAX (910) 363-1045 www.capOeareng.com DESIGN NARRATIVE 1. GENERAL: The project site is 'located in the northwest corner of the Waterford development adjacent to the Magnolia Greens development, within Brunswick County, North Carolina. The project site is approximately 69.36 acres. Drainage considerations are to be in accordance with DWQ stormwater requirements. The intent of this project is to develop the infrastructure to support a 133 lot residential community. This is a low -density submittal with curbed and guttered streets draining to a surrounding amenity pond system. 2. EXISTING SITE: Site topography in the area is relatively flat with slopes typically less than (2) percent. Wetlands are shown on the plan and will remain undisturbed. This site drains southward towards Jackeys Creek, which has a stream classification of SC. Vegetation consists primarily of grasses and minor ground cover within the areas of the improvement. Subsurface soils are typically a mixture of sands, silty sands and organics. 3. PROPOSED IMPROVEMENTS: Improvements proposed include curbed and guttered streets carrying stormwater to the amenity pond system. Drainage for the most part will be contained within the streets, which will have curb and gutter to direct drainage to low points. Drainage at the low points in the streets will flow into either curb cuts draining to water quality swales or curb inlets that outlet to the surrounding amenity pond system. Curb cuts will be used wherever possible. They will outlet to water quality swales of at least 100' with 5:1 side slopes. The treated water will then be captured in a yard inlet and transported to the amenity pond system. Piping is used sparingly for road culvert crossings and where necessitated due to adverse topographical limitations. The three locations where piping is required (CB-1, CB-3, CB-4) have conditions that prevent the installation of water quality swales. The catch basins outlet to a large non -discharge amenity pond system. The amenity ponds provide treatment in excess of a typical water quality swale. SAMPLE STORMWATER DEED RESTRICTIONS WATERFORD PHASE II S. Stormwater Runoff. Regulations: All Lots are subject to the State of North Carolina rules and regulations concerning stormwater runoff as these rules and regulations are amended from time to time. These regulations currently provide that the maximum built upon area of each Lot in Lots 1-45 will be restricted to 3,600 SF of built upon area, each Lot in Lots 46-125 will be restricted to 5,800 SF of built upon area, and each Lot in Lots 126-158 will be restricted to 5,000 SF of built upon area. Built upon area shall include impervious surfaces such as foundation; structures; pavement; concrete; driveways, including that portion of the driveway located within a street right-of-way, which runs from the property line to the road pavement; and walkways or patios of brick, stone or slate, and gravel, marl or stone covered areas, not including wood decking. The DEVELOPER reserves the right to recalculate the maximum allowable built upon area in accordance with the stormwater runoff rules and regulations of the State of North Carolina. All drainage swales or drainage patterns used to treat stormwater runoff as required by the State of North Carolina may not be filled in, piped or changed without the consent of the DEVELOPER, its designee, the Association, or the State of North Carolina and shall be maintained as set forth in Section V below. The State of North Carolina is hereby made a beneficiary of these PROTECTIVE COVENANTS to the extent necessary to enforce its stormwater runoff regulations as the same may be amended from time to time. This paragraph cannot be changed or deleted without the consent of the State of North Carolina. These covenants are to run with the land and be binding on all persons and parties claiming under them. RECEIVED NOV 2 0 2002 DWQ PRoa # Sw8 OZ0510 P. 1 COMMUNICATION RESULT REPORT ( NOV.19.2002 5:43PM } TTI NCDENR WIRO FILE MODE OPTION ADDRESS (GROUP) RESULT PAGE 819 MEMORY TX 8-9103831045 OK P. 3/3 REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-2) BUSY E-3) NO ANSWER E-4) NO FACSIMILE CONNECTION State of North Carolina Depannient ofEnvironment and Natural Resources J.• Wilmington Regional Office i Mic1e1 F. Esaleyy I�o vapor William G. Ross Jr., Setury FAX COVER SHEET 0205/0 Date: 9 -Z OZ No. Of Pages: To: vts ' From: Lyf e.wP� CO; 2 Fe ri CO: `( FAX #• 44 I'AM: 910-350..200 . Kai 046 ,11 127 Cardinal De BatM10n, VVllmingon, N.C. 2B405.WS Telephone (910) 39$.39M Fax (910) 35o. M jl An Equal opportanity AtDrmative AMIon Raiployer SEP 4FCAPE FEAR Engineering, Inc. September 12, 2002 Linda Lewis NCDENR Water Quality 127 Cardinal Dr. Ext. Wilmington, NC 28405 RE: Waterford Phase II (SW8 020510) Dear Ms. Lewis: TUCY, R z ds Due to the inability to permit a couple of small collection systems to the amenity ponds under low density, the project has shifted to high density. This high density project will remain relatively unchanged from the low density submittal with the exception of a few collection systems discharging directly to the amenity pond system. The pond system will be non -discharge with recirculation and irrigation pumps. The application, supplements, narrative and calculations have been revised to show this shift to high density. The following response is from your request for additional information: 1. Poole Road is shown and labeled on the vicinity map. 2. N/A 3. A copy of the proposed deed restrictions is included. 4. The drainage areas have been revised and recalculated. 5. N/A 6. A cul-de-sac detail has been added to the detail sheet. Road "G" has a planter. 7. Existing contours have been numbered. 8. All flow depths 1.0 ft, therefore all drainage easements will remain at 20' 9. Page 3 of the application has been revised. I trust this information to be sufficient for your review and approval. If you have any questions or require additional information, please contact this office. Thank you Jeffrey Petroff, E.I. 151 Poole Road, Suite 100 • Belville, NC 28451 • TEL: (910) 383-1044 • FAX (910) 383-1045 www.cap0mrang.com CALCULATIONS PROJECT: 1/t/ATrtj FioQp—�r�,gri 1Z DATE: _ 12v Cvim CLIENT: PROJ. NO.: SUBJECT .2 � ���.H a r Yr�9 DESIGNED BY: V. I. V.r c F- r2 2< < E-. c -r Al2a A — IG .'3 7 Az 02 edr �Mn Sit ✓ierr Y. / dw ' / p T Rv = e.oS -f- 6.004 C-"_) = o.oc +- 6.06Y6 y,7) = O. V73 �✓= Rr►.✓c.FF Li�jpr-rc.�BrT (/ e.L v.N fF f l E Q✓ 1 it 0+A = TA A 14, Poe L. t- ✓ X I DRAW*-, r Ag 6-4 le Z CFTIs.) Y Y j 7 3 96.37r) '� z X y3sav RECEIVED NN 2 0 2002 DWQ PROD • _W'8610SI0 '-I-"C o2 25 —rCR�t vgrT leTitL votunn6 = /f/%fX. �Ta?i44E OP 3 pa.,or . P/tEYswrLY SUQ."/TrreA H yt>4 a 4f?A p.+ _570 r101A yr Rtrj"T Sys �/7 Gli)3ic �EET 151 Poole Road, Suite 100 i3elvTEL: (e 0) M-1 CAPE FEAR TEL: (910) 383-1044 FAX (910) 38sEngineering, Inc. ww.capefsareng.com wco CALCULATIONS PROJECT: ► A rER i ioac CLIENT DATE: 11/�%y PROJ. NO.: SUBJECT: .�� �/04amt ��o a DESIGNED R✓ = �.oS t O.o�o9 �_� D.os -+- D.c�y� y•7� = O.073 exxxxxst;s4aasis,sF� �ov6z 2 r SEAS_ F C249 'O •rfrjrBDr� '�� •v��4 .. 1 = Piac�rt 1.,Pow.a.,,,r 1/otvr+ar IC EQ✓�rcEA = RAw�.acc X Q ✓ x 1 ,9,4 MrG /¢4«-4 X sZ CFr/s.) rY3 Z .C� (X D. 2- 7 3 6-:0 x 96. 3 7 f �j � S CJ .•_ G s. rs +� rr67 V I L&VI C --ez -L. S — Zvi,.• -r %eT�tL VoLe+.r. ,, = /�/%iX. S-TiR�44E G F 3 f:rl?s ='r �?�✓iwTctQ^ J u>3,.�ITT�!> H YDRO 4✓!/a PN SUwtMA•.tY , `��/!T .2F.:2 `'lOy aF 39S 76 6L731G FEET 151 Poole Road, Suite 100 TEL: le, 0) &3-1 CAPE` FEAR TEL: (910) 383-1044 FAX (910)Ws-1045 En wgineering, Inc. ww.rapefsarumaxom Reservoir Report Page 1 Reservoir No. 1 - Pond Sys 1 English Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sgft cuft cuft 0.00 22.00 137,460 0 0 1.00 23.00 152,249 144,855 144,855 2.00 24.00 167,137 159,693 304,548 3.00 25.00 182,075 174,606 479,154 4.00 26.00 197,119 189,597 668,751 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] IB] [C] [D] Rise in = 24.0 3.0 0.0 0.0 Crest Len ft = 16.00 0.00 0.00 0.00 Span in = 24.0 3.0 0.0 0.0 Crest El. ft = 23.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 18.00 22.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 400.0 3.0 0.0 0.0 Multi -Stage = Yes No No No Slope % = 0.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage - ---- Yes No No Tailwater Elevation = 21.00 ft Stage 0 Storage /Discharge Table Note: All outflows have been analyzed under inlet and outlet control. Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft tuft ft efs cfs cfs afs cfs cfs cfs cfs cfs 0.00 0 22.00 9.94 0.00 --- --- 0.00 --- -- --- 0.00 0.10 14,485 22.10 10.43 0.02 --- --- 0.00 --- --- --- 0.02 0.20 28,971 22.20 10.89 0.06 --- --- 0.00 --- --- --- 0.06 0.30 43,456 22.30 11.34 0.06 --- -- 0.00 --- --- --- 0.06 0.40 57,942 22.40 11.77 0.11 --- --- 0.00 --- --- --- 0.11 0.50 72,427 22.50 12.18 0.14 --- --- 0.00 --- --- --- 0.14 0.60 86,913 22.60 12.58 0.16 --- --- 0.00 --- -- --- 0.16 0.70 101,398 22.70 12.97 0.18 --- -- 0.00 --- -- --- 0.18 0.80 115,884 22.80 13.34 0.19 --- --- 0.00 --- --- --- 0.19 0.90 130,369 22.90 13.71 0.21 --- -- 0.00 -- --- 0.21 1.00 144,855 23.00 14.06 0.22 --- -- 0.00 --- --- 0.22 Continues on next page... Pond Sys 1 Stage / Storage / Discharge Table Page 2 Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.10 160,824 23.10 14.41 0.23 --- --- 1.52 --- --- --- 1.75 1.20 176,793 23.20 14.75 0.25 --- --- 4.29 --- --- _-- 4.54 1.30 192,762 23.30 15.08 0.26 --- --- 7.89 --- --- --- 8.14 1.40 208,732 23.40 15.41 0.27 --- --- 12.14 --- --- --- 12.41 1.50 224,701 23.50 15.72 0.23 --- --- 16.97 --- --- --- 15.72 1.60 240,670 23.60 16.03 0.00 --- -- 22.31 --- -- --- 16.03 1.70 256,640 23.70 16.34 0.00 --- -- 28.11 --- --- --- 16.34 1.80 272,609 23.80 16.64 0.00 --- --- 34.35 --- -- --- 16.64 1.90 288,578 23.90 16.93 0.00 --- --- 40.98 --- --- --- 16.93 2.00 304,548 24.00 17.22 0.00 --- --- 48.00 --- --- --- 17.22 2.10 322,008 24.10 17.51 0.00 --- --- 55.38 --- --- --- 17.51 2.20 339,469 24.20 17.79 0.00 --- -- 63.10 --- --- --- 17.79 2.30 356,929 24.30 18.06 0.00 --- --- 71.15 --- --- --- 18.06 2.40 374,390 24.40 18.34 0.00 --- --- 79.51 --- --- --- 18.34 2.50 391,851 24.50 18.60 0.00 --- -- 88.18 --- -- _-- 18.60 2.60 409,311 24.60 18.87 0.00 --- --- 97.15 --- --- --- 18.87 2.70 426,772 24.70 19.13 0.00 --- --- 106.39 --- -- --- 19.13 2.80 444,232 24.80 19.38 0.00 --- --- 115.92 --- --- --- 19.38 2.90 461,693 24.90 19.64 0.00 --- --- 125.71 --- --- --- 19.64 3.00 479,154 25.00 19.89 0.00 --- -- 135.76 --- --- 19.89 3.10 498,113 25.10 20.14 0.00 --- --- 146.07 --- --- --- 20.14 3.20 517,073 25.20 20.38 0.00 -- 156.63 --- -- --- 20.38 3.30 536,033 25.30 20.62 0.00 -- 167.43 --- -- --- 20.62 3.40 554,992 25.40 20.86 0.00 --- 178.47 --- - --- 20.86 3.50 573,952 25.50 21.09 0.00 --- --- 189.74 --- -- --- 21.09 3.60 592,912 25.60 21.33 0.00 --- --- 201.23 --- -- --- 21.33 3.70 611,871 25.70 21.56 0.00 --- --- 212.95 --- --- --- 21.56 3.80 630,831 25.80 21.79 0.00 --- -- 224.89 --- --- --- 21.79 3.90 649,791 25.90 22.01 0.00 --- --- 237.05 --- --- --- 22.01 4.00 668,751 26.00 22.24 0.00 --- -- 249.42 --- --- --- 22.24 ... End Reservoir Report Reservoir No. 2 - Pond Sys 2 Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation ft ft 0.00 21.00 1.00 22.00 2.00 23.00 3.00 24.00 4.00 25.00 Contour area Incr. Storage Total storage sqft cuft cuft 102,315 0 0 117,114 109,715 109,715 132,214 124,664 234,379 147,615 139,915 374,293 163,319 155,467 529,760 Page 1 English Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 24.0 3.0 0.0 0.0 Crest Len ft = 16.00 0.00 0.00 0.00 Span in = 24.0 3.0 0.0 0.0 Crest El. ft = 22.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 16.70 21.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 130.0 5.0 0.0 0.0 Multi -Stage = Yes No No No Slope % = 0.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage = ----- Yes No No Tailwater Elevation = 19.00 ft Note: All oultlows have been analyzed under inlet and outlet control Stage /Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 21.00 20.24 0.00 --- --- 0.00 --- --- --- 0.00 0.10 10,971 21.10 20.74 0.02 --- -- 0.00 --- -- --- 0.02 0.20 21,943 21.20 21.23 0.06 --- --- 0.00 --- --- --- 0.06 0.30 32,914 21.30 21.71 0.06 --- --- 0.00 --- -- --- 0.06 0.40 43,886 21.40 22.18 0.10 --- --- 0.00 --- --- --- 0.10 0.50 54,857 21.50 22.63 0.13 --- --- 0.00 --- --- --- 0.13 0.60 65,829 21.60 23.08 0.15 --- -- 0.00 --- --- --- 0.15 0.70 76,800 21.70 23.52 0.17 --- --- 0.00 --- --- --- 0.17 0.80 87,772 21.80 23.95 0.19 --- -- 0.00 --- --- --- 0.19 0.90 98,743 21.90 24.38 0.20 --- --- 0.00 --- --- --- 0.20 1.00 109,715 22.00 24.79 0.22 --- --- 0.00 --- --- --- 0.22 Continues on next page... Pond Sys 2 Stage / Storage / Discharge Table Page 2 Stage Storage Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.10 122,181 22.10 25.20 0.23 --- --- 1.52 --- --- --- 1.75 1.20 134,647 22.20 25.61 0.24 --- --- 4.29 --- --- ___ 4.54 1.30 147,114 22.30 26.00 0.26 --- --- 7.89 --- --- --- 8.14 1.40 159,580 22.40 26.40 0.27 --- --- 12.14 --- -- --- 12.41 1.50 172,047 22.50 26.78 0.28 --- -- 16.97 --- --- --- 17.25 1.60 184,513 22.60 27.16 0.29 --- --- 22.31 --- --- --- 22.60 1.70 196,979 22.70 27.54 0.26 --- --- 28.11 --- -- --- 27.54 1.80 209,446 22.80 27.91 0.00 --- --- 34.35 --- --- --- 27.91 1.90 221,912 22.90 28.27 0.00 --- -- 40.98 --- --- --- 28.27 2.00 234,379 23.00 28.63 0.00 --- --- 48.00 --- --- --- 28.63 2.10 248,370 23.10 28.99 0.00 --- --- 55.38 --- --- --- 28.99 2.20 262,361 23.20 29.34 0.00 --- --- 63.10 --- -- --- 29.34 2.30 276,353 23.30 29.68 0.00 --- --- 71.15 --- -- --- 29.68 2.40 290,344 23.40 30.03 0.00 --- -- 79.51 --- --- --- 30.03 2.50 304,336 23.50 30.37 0.00 --- -- 88.18 --- --- --- 30.37 2.60 318,327 23.60 30.70 0.00 --- --- 97.15 --- -- --- 30.70 2.70 332,319 23.70 31.03 0.00 --- --- 106.39 --- --- --- 31.03 2.80 346,310 23.80 31.36 0.00 --- -- 115.92 --- --- --- 31.36 2.90 360,302 23.90 31.69 0.00 --- --- 125.71 --- --- --- 31.69 3.00 374,293 24.00 32.01 0.00 --- 135.76 --- --- --- 32.01 3.10 389,840 24.10 32.33 0.00 --- --- 146.07 --- --- --- 32.33 3.20 405,386 24.20 32.64 0.00 --- --- 156.63 --- -- --- 32.64 3.30 420,933 24.30 32.96 0.00 --- --- 167.43 --- --- --- 32.96 3.40 436,480 24.40 33.27 0.00 --- -- 178.47 --- -- --- 33.27 3.50 452,026 24.50 33.57 0.00 --- --- 189.74 --- -- --- 33.57 3.60 467,573 24.60 33.88 0.00 --- --- 201.23 --- --- --- 33.88 3.70 483,120 24.70 34.18 0.00 --- -- 212.95 --- --- --- 34.18 3.80 498,667 24.80 34.48 0.00 --- 224.89 --- --- --- 34.48 3.90 514,213 24.90 34.77 0.00 --- 237.05 --- --- --- 34.77 4.00 529,760 25.00 35.06 0.00 --- 249.42 --- --- --- 35.06 ...End Reservoir Report Page 1 Reservoir No. 3 - Pond Sys 3 English Pond Data Pond storage is based on known contour areas Stage 1 Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sqft cuft cuft 0.00 19.00 815,314 0 0 1.00 20.00 837,094 826,204 826,204 2.00 21.00 902,541 869,818 1,696,022 3.00 22.00 946,306 924,424 2,620,445 4.00 23.00 990,176 968,241 3,588,686 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 18.0 0.0 0.0 0.0 Crest Len ft = 6.00 0.00 0.00 0.00 Span in = 18.0 0.0 0.0 0.0 Crest El. ft = 20.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 16.00 0.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 50.0 0.0 0.0 0.0 Multi -Stage = Yes No No No Slope % = 0.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = ---- No No No Tailwater Elevation = 0.00 ft Stage 1 Storage / Discharge Table Note: All outflows have been analyzed under inlet and outlet control. Stage Storage Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 19.00 11.20 --- --- -- 0.00 --- --- --- 0.00 0.10 82,620 19.10 11.57 --- --- --- 0.00 --- --- --- 0.00 0.20 165,241 19.20 11.93 --- --- --- 0.00 --- --- --- 0.00 0.30 247,861 19.30 12.27 --- --- -- 0.00 --- --- -- 0.00 0.40 330,482 19.40 12.61 --- --- --- 0.00 --- -- --- 0.00 0.50 413,102 19.50 12.94 --- --- --- 0.00 --- --- --- 0.00 0.60 495,722 19.60 13.26 --- --- -- 0.00 --- -- --- 0.00 0.70 578,343 19.70 13.57 --- --- --- 0.00 --- --- --- 0.00 0.80 660,963 19.80 13.87 --- --- --- 0.00 -- --- --- 0.00 0.90 743,584 19.90 14.17 --- --- --- 0.00 --- --- --- 0.00 1.00 826,204 20.00 14.46 --- --- -- 0.00 -- --- 0.00 Continues on next page... Pond Sys 3 Page 2 Stage / Storage / Discharge Table Stage Storage Elevation Civ A Civ B Civ C Civ D Wr A Wr B Wr C Wr D Discharge ft tuft ft efs cfs cfs efs cfs cfs cfs cfs cfs 1.10 913,186 20.10 14.75 --- --- -- 0.57 -- -- -- 0.57 1.20 1,000,168 20.20 15.03 --- --- --- 1.61 --- -- -- 1.61 1.30 1,087, i 49 20.30 15.31 -- --- -- 2.96 --- --- -- 2.96 1.40 1,174,131 20.40 15.58 --- --- -- 4.55 --- --- --- 4.55 1.50 1,261,113 20.50 15.84 --- --- -- 6.36 --- --- --- 6.36 1.60 1,348,095 20.60 16.11 --- --- --- 8.37 --- -- --- 8.37 1.70 1,435,076 20.70 16.36 --- --- -- 10.54 --- -- --- 10.54 1.80 1,522,058 20.80 16.62 --- --- --- 12.88 --- -- --- 12.88 1.90 1,609,040 20.90 16.87 --- --- -- 15.37 --- --- 15.37 2.00 1,696,022 21.00 17.11 --- --- -- 18.00 --- --- -- 17.11 2.10 1,788,464 21.10 17.36 -- --- =- 20.77 --- --- --- 17.36 2.20 1,880,906 21.20 17.60 --- --- --- 23.66 --- --- --- 17.60 2.30 1,973,349 21.30 17.83 --- --- -- 26.68 --- -- --- 17.83 2.40 2,065,791 21.40 18.07 --- --- --- 29.82 --- --- --- 18.07 2.50 2,158,233 21.50 18.30 --- - - 33.07 --- -- --- 18.30 2.60 2,250,676 21.60 18.52 --- --- --- 36.43 --- --- --- 18.52 2.70 2,343,118 21.70 18.75 -- --- -- 39.90 --- --- --- 18.75 2.80 2,435,560 21.80 18.97 --- --- -- 43.47 -- --- --- 18.97 2.90 2,528,002 21.90 19.19 --- --- --- 47.14 --- --- --- 19.19 3.00 2,620,445 22.00 19.40 --- --- 50.91 --- --- --- 19.40 3.10 2,717,269 22.10 19.62 -- -- 54.78 --- --- --- 19.62 3.20 2,814,093 22.20 19.83 -- 58.74 --- --- 19.83 3.30 2,910,917 22.30 20.04 --- --- 62.79 --- - --- 20.04 3.40 3,007,741 22.40 20.22 --- 66.93 --- 20.22 3.50 3,104,565 22.50 20.40 --- 71.15 --- --- 20.40 3.60 3,201,389 22.60 20.58 75.46 --- --- --- 20.58 3.70 3,298,213 22.70 20.75 --- --- --- 79.86 --- -- --- 20.75 3.80 3,395,037 22.80 20.93 --- --- --- 84.34 --- -- --- 20.93 3.90 3,491,861 22.90 21.10 --- --- 88.89 --- --- --- 21.10 4.00 3,588,686 23.00 21.27 93.53 --- -- --- 21.27 ... End ichael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources k � November 19, 2002 Mr. Bert Exum, Member/Manager WDV, Inc. 6314 Oleander Drive, Suite C Wilmington, NC 28403 M Alan W. Klimek, P.E., Director Division of Water Quality Wilmington Regional Office Subject: REQUEST FORADDITIONAL INFORMATION Stormwater Project No. SW8 020510 Waterford Phase II Brunswick County Dear Mr. Exum: The Wilmington Regional Office received a Stormwater Management Permit Application for Waterford Phase H on September 13, 2002. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide calculations that show what the 1" required volume is, what the 25 year volume is, and how you determined that 667,672 cubic feet of volume has been provided. The spreadsheet information is fine, but I don't see where it provides the necessary information to check the volume. Using the hydrograph summary report, it appears that the maximum storage volume is 282,904 cubic feet. 2. The "sample" proposed deed restrictions indicate that the "land area" of each lot in Lots 1-45 will be restricted to 3,600 ft2 of built -upon area-.. To avoid any confusion as to what this means, please revise it to read "the maximum built -upon area per lot for Lots 1-45 is 3,600 ftz...", etc. The permit has been drafted. I am awaiting this final information to send it up for signature. N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900 Fax (910) 350-2004 Customer Service 800-623-7748 Mr. Exum November 19, 2002 Stormwater Project No. SW8 020510 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to December 19, 2002, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWATIADDINFO\2002\020510.NOV cc: Linda Lewis Davis Fennell, P.E. (via fax) Michael F. Easley, Governor North Carolina Department of Environment and NaturalrResources Alan W. Klimek P.E., Director Division R Water Quality Wilmington Regional Office July 16, 2002 Mr. Bert Exum, Member/Manager WDV, Inc. 6314 Oleander Drive, Suite C Wilmington, NC 28403 Subject: REQUEST FORADDITIONAL INFORMATION Stormwater Project No. SW8 020510 Waterford Phase II Brunswick County Dear Mr. Exum: The Wilmington Regional Office received a Stormwater Management Permit Application for Waterford Phase Il on May 10, 2002. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please show and label Poole Road on the vicinity map. 2. Please report all built -upon areas in square feet on the application. If the BUA per lot is 5,079 ft, as indicated on the supplement, the total lot BUA is 15.5075 acres, not 15.33 acres. Please correct and revise. If 5,079 ft' is incorrect, please correct page 1 of the .low density supplement. 3. Please provide a copy of the proposed deed restrictions to include all required conditions and limitations as shown on the attached document. 4. Please check the proposed BUA for swales 1 A,1 B, and 1 C. I am getting significantly more built -upon area than is reported on the curb outlet supplement. For those lots where the drainage area line includes just the first 20' or so of the lot, please allow about 1000 ft' to drain to the swale from that lot. Unless the lot falls away from the street very steeply, the lot is usually graded high in the middle, and the entire driveway is usually graded to drain to the street. 5. The proposed collection system which takes runoffto the ponds in two locations does not meet th6 intent of low density. You must either -provide a curb outlet swale in those locations, or get the pond permitted as -a storm -water control device. Use of a wet pond in place of a Swale is OK, but you need -to.get the pond permitted. 6. Please provide a cul-de-sac detail. Does the sac at the end of Road "G" have a planter? 7. Please number the existing contours. 8. I will be checking the drainage easement widths based on the existing and proposed contour information. Easements need to be wide enough to accommodate the entire 5:1 slope required to get back to natural ground. N I RNR N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900 Fax (910) 350-2004 Customer Service 800-623-7748 Vii . EXUm July 16, 2002 Stormwater Project No. SW8 020510 9. Lots 1-43 are significantly smaller than the rest. My review directive states that no more than 10% of the lots may be smaller than the average. In this case, 32% of the lots are smaller. Please reduce the proposed BUA• on Lots 1-43 (somewhere in the neighborhood of 3,500 ft2 or less) and redistribute the leftover to Lots 44-133. Show the calculations on the supplement form and specify the BUA per lot on page 3 of the application. Please note that this request for additional information ism' response to a preliminary review. The requested information should be received by this Office prior to August 16, 2002, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395=3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\2002\020510.JUL cc: Linda Lewis Davis Fennell, P.E. IPCAPE FEAR ''ga'�S-'/`' Engineering, Inc. RECEIVE; 151 Poole Road, Suke 100 l e,28451 TEL i\K/) TEL (010 ) saalo4a MAY 10 2002 FAX (910) 383-1045 www.capefearen_q.com BY. To: NCDENR-Div. Water Quality Attn: 0 As Requested ❑ Sent via Mail REMARKS CC: Transmittal vvaeerrora — t'nase ii Low Density Stormwater Submittal ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Courier Cape Fear Engineering, Inc. Signed j�#irey B. doff, E.I. Transmittal-NCDENR L/- / Z- 66-112/531 DATE 02508 PAY TO THE ORDER OF Cef $ DOLLARS BWELITE BUSINESS BRANCH BANKING AND TRUST COMPANY WRIG14TSVILLE BEACH, NORTH CAROUNA F OR WJCIA�d f4liLa S,jorj. ptk AP e� :7 --c yffi A X "' R�'e A % 5w MR. SEP 13 2002 DWQ PROD # 6205/(3 Design Narrative and Supporting Calculations For Waterford, Phase II Brunswick County, North Carolina Prepared for WDV, Inc. 6314 Oleander Drive, Suite C Wilmington, North Carolina 28403 (910) 392-9325 Date: May, 2002 (Revised September, 2002) Prepared by Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville, North Carolina 28451 (910) 383-1044 DESIGN NARRATIVE 1. GENERAL: The project site is located in the northwest corner of the Waterford development adjacent to the Magnolia Greens development, within Brunswick County, North Carolina. The project site is approximately 96.37 acres. Drainage considerations are to be in accordance with DWQ stormwater requirements. The intent of this project is to develop the infrastructure to support a 158 lot residential community. This is a high -density submittal with curbed and guttered streets draining to a surrounding non -discharge lake system. 2. EXISTING SITE: Site topography in the area is relatively flat with slopes typically less than (2) percent. Wetlands are shown on the plan and will remain undisturbed. This site drains to the east; under US Highway 74/76, and ultimately to Sturgeons Creek, which has a stream classification of SC. Vegetation consists primarily of grasses and minor ground cover within the areas of the improvement. Subsurface soils are typically a mixture of sands, silty sands and organics. 3. PROPOSED IMPROVEMENTS: Improvements proposed include curbed and guttered streets carrying stormwater to the non - discharge lake system. Drainage for the most part will be contained within the streets, which will have curb and gutter to direct drainage to low points. Drainage at the low points in the streets will flow into either curb cuts or curb inlets draining to swales that outlet to the surrounding non - discharge lake system. The non -discharge lake system is a three tier system with normal water surfaces of 19.0, 21.0 and 22.0 controlled by riser structures. System number one has a drainage are of 8 acres, comprised mainly of runoff from the back of lots 97-102 and lots 116-125. A small portion of Road F will also drain to system number one. The proposed lakes in system number one shall have a normal water surface at elevation 22.0', maintained by a pond outlet structure with an orifice. The water level in system number one rises only 0.10 feet in response to the 25 year storm event, discharging a negligible volume to system number two. System number 2 has a drainage area of 24 acres, comprised of lot and road drainage from Roads F, J, K, L, and M (see plan for specific drainage area). System number two also receives the lake discharge from system number one. The proposed lakes in system number two shall have a normal water surface elevation of 21.0', maintained by a pond outlet structure with an orifice. The water level in system number two rises 0.9 feet in response to the 25 year storm event, discharging a negligible volume to system number three. System number three has a drainage area of 62 acres, comprised of the balance of the project. System number three also receives the lake discharge from system number two. The proposed lakes in system number three shall have a normal water surface elevation of 19.0', with storage to elevation 20.0'. The storage elevation is maintained by a pond outlet structure with the rim of the riser set at elevation 20.0'. The riser will only discharge in response to storm events much greater than the 25 year storm. The normal water surface elevation of 19.0' shall be maintained by a recirculation pump. The recirculation pump shall be controlled by float switches that activate the pumps when the water in system number three rises to the 25 year storm storage elevation, about elevation 19.4'. The recirculation pump will pump the storage volume back to system number one, returning the water in system number three to its normal elevation of 19.0'. In this manner the storage in system number three is maintained such that there is always storage available for the runoff from a 25 year storm event. The excess volume in systems one and two, created by the recirculation system, will be used to charge an irrigation system for landscaping in the right of way and common areas of the project. The water demand for irrigation, combined with normal evaporation (generally accepted to be about 0.25 inches per day in this area), will restore the normal water surface elevations in systems one and two. Flood control for storm event greater than the 25 year storm has also been incorporated into this design. Systems one and two utilize pond outlet structures that will discharge flow from the risers to system number three only in events greater than the 25 year storm, otherwise only orifice discharge occurs. System number three shall utilize a pond outlet structure and emergency spillway to attenuate the runoff from storms greater than the 25 year storm event, otherwise no discharge will occur from system number three. The proposed non -discharge lakes not only provide stormwater treatment and flood control, but will provide a tremendous recreational amenity to the residents of Waterford. The lakes have been designed to promote active recreation for the residents, such as canoeing, kayaking, and fishing. All the lakes will be stocked with game fish to create a healthy fish population. The game fish population will be maintained not only to provide recreation to the residents of Waterford, but also to control any nuisance insects. DESIGN CALCULATIONS - Drainage Area Calculations with Sample Swale Calc.'s - Hydraflow Model with Hydrographs Waterford Phase II Drainage Area - Sample Calculations for Swales (DA2) Columns correspond to attached spreadsheet. C (Column "4' ) C = Composite rational runoff coefficient = (Impervious area (Column "2'9 * 0.95 + Pervious area (Column "3 ") * 0.25)/Drainage area (Column "F) = 0.59 The Flowrate was calculated using the following Intensity equation: ho (Column "6') (Brunswick County IDF) I,o = Rainfall intensity (in/hr) = 121.796 6.31 in./hr (T, + 23.5y" Tc (Column "F) = Time of concentration (min) Assume: If Drainage Area < 4 Acres, Tc = 5 min. If Drainage Area > 4 Acres, Tc = 10 min. Q (Column "7") Q = Flowrate (cfs) = C (Column "4'') * I (Column "6„) * A (Column "I ") = 0.59 * 6.31 in/hr * 3.57 ac =13.36 cfs The depth of flow was calculated by reworking the following equations: Depth (Column "I]') Depth (ft) = y Use mannings equation to solve for y: Q t 40A*RY *SY=13.36cfs n Stormwater Calculations Waterford Phase II n = Mannings roughness coefficient = 0.03 A = Cross sectional area of flow (sf) (Bottom width * Depth) + (Side slope ratio Depth2)=0+5y2 R = Hydraulic radius (ft) = A P P = Wetted perimeter (ft) Bottom width + 2 * Depth * I + Side slope ratio' = 0 + 2y 1 + 5' therefore R = 0.49y L (Column " 8') = Length of run (ft) =100 ft H (Column "9 ") = Elevation change (ft) 0.75 ft S (Column "10') = Longitudinal slope (fifft) 0.008 Reformulate mannings equation: 8 y _ 13.21 y =1.00 ft The velocity was calculated using the following equation: Velocity (Column "12') V = Velocity (fps) V = Q = 2.67 fps Stormwater Calculations C O N 75 U (0 U N a E (u O O LL N C 7 O U C O E O C cu a) a a) CD f0 C .O ❑ N 3 E O I )� I r j a p v ti CO ti I LO N IN I M I N ti 11t M N M ti r r Lo f• CO Cn CC)I In ti In 00 CO � ti I= f )> N N I IN I N (,j N Ce) r N N I N N I I av O LO j I ti i 0 0 0 M T M T Lo I (O T IT oao E I 0>r*Coo"tU�q Eti aoao O O O O O r O O O O O O O Q CO aI CO i di co0a'00lwrl-w000C)w OI O_ -0 O r -0l0 C'!OI0 O O O O O r O r O r O r O O O 0.00 lr Cj,0 r T O co L° 0l0 r91OO O o 66 0 0 0 (°100 0 O Ci I i I � i I I CI c �� C6 (O i I _ r. i O GiIZ L I +VI�I� -C Vlr*_ I- M C�IT ChIOI�I� O N iN �iLo I f OI r i (DIOjC CD I I i C7�r r 00 Olr rIM i w O i �' C j O O IOIr O O MIMICO I Lo '�t NI(MIM I I O I Lo I 10 I 0 I rlTlri I 0. O O IttIM I LO iN Nic� MO M CO;NIr-- N r COi 00 r �I3 U - I U') j Or O CO j lC) 0) I4 co "t I Ito LO r O tt 00 ti O CD i CO CO (O I CA CO ai I N rr- f� r-- W O) j E: M jIC Mir r N CO co I I CO IM1r NiN•N M co N MIM 0fcv) N N I rlM M lr NIM r M r M N v i IC (� O CO ti: ti ti CO I-- CO ! CO ti ti CO I I O CO O Co IU •C ' O O O O O Oi0 OOI10O O IO O O .O nI O O'OOO Ln LOOO O C5 oO01O o OO O O OOq O .Oi:10 0 lO IT �r j r IO IT T r _ IU ()C) 100 I 0) �rIr� OICA r I OjrIM I 00i0 N N (� LO Lo LO Lo LO LO '4: Lo LO L(7 : I- LO LO I LO LO LO O'OIO O'OIO O O O O Oi0i0I6I0 O OI 70 N it!> ' I I I co N: MI�10'O (DII�;f�IC� 1�'OCC7iO M C101 _M N f0 00 001� 00'rirl04 rIO 0Ir'r!r100!OICD �I r 1 Q O_r r O.,r;r N r r M1O-0:N!O:r Ir rl I I i I I NiN O M LO O 10) O CO co; co CM 00 N . O I �to I LO ti Mires (D'.CO OICDO co M:M!I�IC33 O r ,Q N O IC) OIOIrIOIr rl0 O rl0'O rIT: ' I I II C'jOM ) ,-.,�ID CO 1Oco:I !. I LO Lo ti CO cc!: r- ! fM P,.! O CA I M "'t "t CO O CO CA ca M'NO O C")Ie-:NININ Q I I I i . r M lCi CO 00 0) O r NCO LO CO r` a a a a a a a a r r r r r r r r O J ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ U D2AGVA4E ii!teAs T RO ..o Srrr# 1 �Rov re o T,z v q 1 O -0 - j-J re, , W 1. R607- 0 T NR iJ 1-o.✓b S}%rre-*l , �2/�l✓AGE Anew, To lRAw.4Gtr /7r2E.4r ; Flo ✓/� SYrrE.-, v7-6D f-o.- p 57k r-,-, :r-* 3 Project: Pond Sys-Rational-1 stotnlOTrPWunCo hydrograph_ver ,3Wd's 1 09-10-2002 Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational 24.10 1 10 14,460 25 -- -- — — dal 2 Reservoir 0.02 1 20 1,609 25 1 14,448 dal thru pondl 3 Rational 45.46 1 36 98,203 25 — da2 4 Combine 45.48 1 36 99,811 25 2 + 3 da2+pondl 5 Reservoir 0.20 1 72 16,032 25 4 da2+pond1 thru pon 6 Rational 111.20 1 40 266,872 25 — da3 7 Combine 111.33 1 40 282,904 25 5 + 6 da3+pond2 8 Reservoir 0.00 0 0 25 7 282,904 da3+pond2 thru pon a � 0 4 Z nn oV r rk I W Proj. file: Pond Sys -Rational -1st rni : BrunCo_hydrograph vet lrDffate: 09-10-2002 Hydrograph Report Page 1 English Hyd. No. 1 dal Hydrograph type = Rational Weak discharge = 24.10 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 8.0 ac Runoff coeff. = 0.42 Intensity = 7.17 in Time of conc. (Tc) = 10 min I-D-F Curve = BrunCo hydrograph_ver6.IDF' Reced. limb factor = 1 Total Volume=14,460 cuft Hydrograph Discharge Table Time -- Outflow (hrs cfs) 0.02 2.41 0.03 4.82 0.05 7.23 0.07 9.64 0.08 12.05 0.10 14.46 0.12 16.87 0.13 19.28 0.15 21.69 0.17 24.10 0.18 21.69 0.20 19.28 0.22 16.87 0.23 14.46 0.25 12.05 0.27 9.64 0.28 7.23 0.30 4.82 0.32 2.41 End Hydrograph Report Page 1 English Hyd. No. 2 dal thru pondl Hydrograph type = Reservoir Peak discharge = 0.02 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 1 Reservoir name = Pond Sys 1 Max. Elevation = 22.1Oft Max. Storage = 14,448 cuft Storage Indication method used. Total Volume = 1,609 cult Hydrograph Discharge Fable Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs Cfs cfs 0.03 4.82 22.00 9.95 0.00 ----- ----- ----- ----- ----- ---- 0.00 0.05 7.23 22.00 9.97 0.00 ---- ----- ---- ----- ---- ----- 0.00 0.07 9.64 22.01 9.98 0.00 ----- ----- ---- ----- ----- ---- 0.00 0.08 12.05 22.01 10.00 0.00 ----- ---- ----- ---- ----- 0.00 0.10 14.46 22.02 10.03 0.00 ----- ----- ----- ----- ----- 0.00 0.12 16.87 22.02 10.06 0.00 ---- ---- ----- ----- ---- 0.00 0.13 19.28 22.03 10.10 0.01 ----- ----- ---- ----- ----- ----- 0.01 0.15 21.69 22.04 10.14 0.01 ----- ----- ----- ----- ----- ---- 0.01 0.17 24.10 << 22.05 10.19 0.01 ----- ----- ----- ----- ---- ----- 0.01 0.18 21.69 22.06 10.23 0.01 ----- ----- --- ----- ----- ----- 0.01 0.20 19.28 22.07 10.27 0.01 ----- - - ----- ---- ----- ----- 0.01 0.22 16.87 22.08 10.31 0.01 ----- ----- ----- ----- ----- ---- 0.01 0.23 14.46 22.08 10.34 0.02 ----- ----- ----- ----- ----- ----- 0.02 0.25 12.05 22.09 10.37 0.02 ----- ----- ----- ----- ----- ----- 0.02 0.27 9.64 22.09 10.39 0.02 ----- ---- ----- ----- ---- ----- 0.02 0.28 7.23 22.10 10.41 0.02 ---- ----- ----- ----- ---- ---- 0.02 0.30 4.82 22.10 10.42 0.02 ----- ----- ---- ---- ----- ---- 0.02 0.32 2.41 22.10 10.43 0.02 ----- ----- ----- ----- ---- ----- 0.02 0.33 0.00 22.10 10.43 0.02 ----- --- ----- -___ ----- ----- 0.02 << 0.35 0.00 22.10 10.43 0.02 ----- ----- ----- ----- ----- ----- 0.02 0.37 0.00 22.10 10.43 0.02 ---- ----- ----- ----- ----- ----- 0.02 0.38 0.00 22.10 10.43 0.02 ----- ----- ---- ----- ----- ----- 0.02 0.40 0.00 22.10 10.43 0.02 ----- ----- ----- ----- ----- ----- 0.02 0.42 0.00 22.10 10.43 0.02 ----- ----- ----- ----- ---- ----- 0.02 0.43 0.00 22.10 10.43 0.02 ---- ----- ----- ----- ----- ----- 0.02 0.45 0.00 22.10 10.43 0.02 ----- ---- ---- ----- ----- ----- 0.02 0.47 0.00 22.10 10.43 0.02 ----- ---- ----- ----- ----- ----- 0.02 0.48 0.00 22.10 10.43 0.02 ----- ---- ----- ----- - - - ----- 0.02 0.50 0.00 22.10 10.43 0.02 ----- ----- ----- ----- ----- ----- 0.02 0.52 0.00 22.10 10.43 0.02 ----- ----- ----- ----- ----- ---- 0.02 0.53 0.00 22.10 10.43 0.02 ----- ----- ---- ----- ----- ---- 0.02 0.55 0.00 22.10 10.43 0.02 ---- ----- ---- ----- ----- ---_ 0.02 0.57 0.00 22.10. 10.43 0.02 ----- ----- ----- ----- ----- ----- 0.02 0.58 0.00 22.10 10.43 0.02 ---- ----- ----- ----- ----- ----- 0.02 0.60 0.00 22.10 10.43 0.02 ----- ----- ----- ----- ----- ----- 0.02 0.62 0.00 22.10 10.43 0.02 ---- ---- ----- ----- ----- ---- 0.02 Hydrograph Report Page 1 Hyd. No. 3 da2 English Hydregraph type = Rational Peak discharge = 45.46 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 24.0 ac Runoff coeff. = 0.42 Intensity = 4.51 in Time of conc. (Tc) = 36 min I-D-F Curve = BrunCo hydrograph_ver6.ID5 Reced. limb factor = 1 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 0.02 1.26 0.55 41.68 0.03 2.53 0.57 42.94 0.05 3.79 0.58 44.20 0.07 5.05 0.60 45.46 << 0.08 6.31 0.62 44.20 0.10 7.58 0.63 42.94 0.12 8.84 0.65 41.68 0.13 10.10 0.67 40.41 0.15 11.37 0.68 39.15 0.17 12.63 0.70 37.89 0.18 13.89 0.72 36.62 0.20 15.15 0.73 35.36 0.22 16.42 0.75 34.10 0.23 17.68 0.77 32.84 0.25 18.94 0.78 31.57 0.27 20.21 0.80 30.31 0.28 21.47 0.82 29.05 0.30 22.73 0.83 27.78 0.32 24.00 0.85 26.52 0.33 25.26 0.87 25.26 0.35 26.52 0.88 24.00 0.37 27.78 0.90 22.73 0.38 29.05 0.92 21.47 0.40 30.31 0.93 20.21 0.42 31.57 0.95 18.94 0.43 32.84 0.97 17.68 0.45 34.10 0.98 16.42 0.47 35.36 1.00 15.15 0.48 36.62 1.02 13.89 0.50 37.89 1.03 12.63 0.52 39.15 1.05 11.37 0.53 40.41 1.07 10.10 Time -- Outflow (hrs cfs) 1.08 8.84 1.10 7.58 1.12 6.31 1.13 5.05 1.15 3.79 1.17 2.53 1.18 1.26 ... End Total Volume = 98,203 cult . flydrograph Report Page 1 English Hyd. No. 4 da2+pond1 Hydrograph type = Combine peak discharge = a5.43 cfs Storm frequency = 25 yrs Time interval = 1 min 1 st inflow hyd. No. = 2 2nd inflow hyd. No .= 3 Total Volume = 99,811 cuft Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) cfs cfs cfs 0.02 0.00 1.26 1.26 0.03 0.00 2.53 2.53 0.05 0.00 3.79 3.79 0.07 0.00 5.05 5.05 0.08 0.00 6.31 6.32 0.1.0 0.00 7.58 7.58 0.12 0.00 8.84 8.85 0.13 0.01 10.10 10.11 0.15 0.01 11.37 11.37 0.17 0.01 12.63 12.64 0.18 0.01 13.89 13.90 0.20 0.01 15.15 15.17 0.22 0.01 16.42 16.43 0.23 0.02 17.68 17.70 0.25 0.02 18.94 18.96 0.27 0.02 20.21 20.22 0.28 0.02 21.47 21.49 0.30 0.02 22.73 22.75 0.32 0.02 24.00 24.01 0.33 0.02 << 25.26 25.28 0.35 0.02 26.52 26.54 0.37 0.02 27.78 27.80 0.38 0.02 29.05 29.07 0.40 0.02 30.31 30.33 0.42 0.02 31.57 31.59 0.43 0.02 32.84 32.86 0.45 0.02 34.10 34.12 0.47 0.02 35.36 35.38 0.48 0.02 36.62 36.64 0.50 0.02 37.89 37.91 0.52 0.02 39.15 39.17 0.53 0.02 40.41 40.43 0.55 0.02 41.68 41.70 0.57 0.02 42.94 42.96 0.58 0.02 44.20 44.22 0.60 0.02 45.46 << 45.48 << Hydrograph Report Page 1 English Hyd. No. 5 da2+pondl thru pond2 Hydrograph type = Reservoir Peak discharge = 0.20 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 4 Reservoir name = Pond Sys 2 Max. Elevation = 21.89 ft Max. Storage = 97,824 cuft Storage Indication method used. Total Volume = 16,032 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.33 25.28 21.14 20.93 0.04 ----- ----- ---- ----- ----- ----- 0.04 0.50 37.91 21.19 21.18 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.67 40.43 21.54 22.82 0.13 ----- ----- ----- ----- ----- ----- 0.13 0.83 27.80 21.73 23.64 0.17 ----- ----- ----- ----- ----- ----- 0.17 1.00 15.17 21.84 24.14 0.19 ---- ---- ----- ----- ---- ----- 0.19 1.17 2.55 21.89 24.34 0.20 ----- ----- ----- ---- ----- ----- 0.20 1.33 0.02 21.89 24.34 0.20 ----- ----- ----- ----- ----- ----- 0.20 1.50 0.02 21.89 24.33 0.20 ----- ---- ----- ----- ---- ----- 0.20 1.67 0.02 21.89 24.33 0.20 ----- ----- ----- ----- ----- ----- 0.20 1.83 0.02 21.89 24.33 0.20 ----- ----- ----- ----- ----- ----- 0.20 2.00 0.02 21.89 24.32 0.20 ----- ----- ----- ----- ----- ---- 0.20 2.17 0.02 21.89 24.32 0.20 --- ---- ----- ----- ----- ----- 0.20 2.33 0.02 21.88 24.31 0.20 ----- ----- ----- ----- ----- ----- 0.20 2.50 0.02 21.88 24.31 0.20 ---- ----- ----- ----- ----- ----- 0.20 2.67 0.02 21.88 24.31 0.20 ---- ---- ---- ----- ---- ---- 0.20 2.83 0.02 21.88 24.30 0.20 ---- ---- ----- ----- ---- ----- 0.20 3.00 0.02 21.88 24.30 0.20 ---- ---- ---- ----- ----- ----- 0.20 3.17 0.02 21.88 24.29 0.20 ----- ----- ----- ----- ---- ----- 0.20 3.33 0.02 21.88 24.29 0.20 ----- ----- ----- ---- ---- ----- 0.20 3.50 0.02 21.88 24.28 0.20 ----- ---- ----- ----- ---- ---- 0.20 3.67 0.02 21.88 24.28 0.20 ----- ----- ----- ----- ----- ----- 0.20 3.83 0.02 21.88 24.28 0.20 ----- ----- ----- ---- ----- ----- 0.20 4.00 0.02 21.88 24.27 0.20 ----- ----- ----- ----- ----- ----- 0.20 4.17 0.02 21.87 24.27 0.20 ----- ----- ---- ----- ----- ----- 0.20 4.33 0.02 21.87 24.26 0.20 ----- ----- ----- ----- ----- ----- 0.20 4.50 0.02 21.87 24.26 0.20 ----- ----- ----- ----- ----- ----- 0.20 4.67 0.02 21.87 24.26 0.20 ----- ----- ----- ----- ---- ----- 0.20 4.83 0.02 21.87 24.25 0.20 ----- ----- ----- ----- ----- ----- 0.20 5.00 0.02 21.87 24.25 0.20 ----- ----- ----- ----- ---- ----- 0.20 5.17 0.02 21.87 24.24 0.20 ---- ----- ----- ---- ----- ----- 0.20 5.33 0.02 21.87 24.24 0.20 ----- ----- ----- ----- ----- ----- 0.20 5.50 0.02 21.87 24.24 0.20 ----- ----- ----- ---- ----- ----- 0.20 5.67 0.02 21.87 24.23 0.20 ---- ----- ----- ----- ----- ----- 0.20 5.83 0.02 21.86 24.23 0.20 ---- ----- ----- ----- ----- ----- 0.20 6.00 0.02 21.86 24.22 0.20 ----- ----- ----- ----- ----- ----- 0.20 6.17 0.02 21.86 24.22 0.20 ---- ----- ----- ----- ----- ----- 0.20 Hydrograph Report Page 1 Hyd. No. 6 da3 English Hydrograph type = Rational Peak discharge = 111.20 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 61.9 ac Runoff coeff. = 0.42 Intensity = 4.28 in Time of conc. (Tc) = 40 min I-D-F Curve = BrunCo hydrograph_ver6.IDF' Reced. limb factor = 1 Total Volume = 266,872 cult Hydrograph Discharge Table Time -- Outflow Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) (hrs cfs) 0.02 2.78 0.55 91.74 1.08 41.70 0.03 5.56 0.57 94.52 1.10 38.92 0.05 8.34 0.58 97.30 1.12 36.14 0.07 11.12 0.60 100.08 1.13 33.36 0.08 13.90 0.62 102.86 1.15 30.58 0.10 16.68 0.63 105.64 1.17 27.80 0.12 19.46 0.65 108.42 1.18 25.02 0.13 22.24 0.67 111.20 << 1.20 22.24 0.15 25.02 0.68 108.42 1.22 19.46 0.17 27.80 0.70 105.64 1.23 16.68 0.18 30.58 0.72 102.86 1.25 13.90 0.20 33.36 0.73 100.08 1.27 11.12 0.22 36.14 0.75 97.30 1.28 8.34 0.23 38.92 0.77 94.52 1.30 5.56 0.25 41.70 0.78 91.74 1.32 2.78 0.27 44.48 0.80 88.96 0.28 47.26 0.82 86.18 0.30 50.04 0.83 83.40 ...End 0.32 52.82 0.85 80.62 0.33 55.60 0.87 77.84 0.35 58.38 0.88 75.06 0.37 61.16 0.90 72.28 0.38 63.94 0.92 69.50 0.40 66.72 0.93 66.72 0.42 69.50 0.95 63.94 0.43 72.28 0.97 61.16 0.45 75.06 0.98 58.38 0.47 77.84 1.00 55.60 0.48 80.62 1.02 52.82 0.50 83.40 1.03 50.04 0.52 86.18 1.05 47.26 0.53 88.96 1.07 44.48 `Hydrograph Report Page 1 Hyd. No. 7 da3+pond2 Hydrograph type = Combine Storm frequency = 25 yrs 1 st inflow hyd. No. = 5 English Peak discharge = 111.33 cfs Time interval = 1 min 2nd inflow hyd. No: 6 Total Volume = 282,904 cuft Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow =hrsj cfs cfs cfs 0.25 0.02 41.70 41.71 0.50 0.06 83.40 83.46 0.75 0.16 97.30 97.45 1.00 0.19 55.60 55.79 End C .-Hydrograph Report Hyd. No. 8 da3+pond2 thru pond3 I-lydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 7 Max. Elevation = 19.34 ft Storage Indication method used. Hydrograph Discharge Table Peak discharge Time interval Reservoir name Max. Storage Page 1 English = 0.00 cfs = 1 min = Pond Sys 3 = 282,904 cult Total Volume = 0 cuft Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0.00 19.00 ----- ----- ---- ----- ---- ----- ---- ----- 0.00 << 0.02 2.78 0.00 -58.61 ----- ---- ----- ---- ----- ----- ----- 0.00 << ...End Mr. Bert Exum, Member/Manager WDV, Inc. 6314 Oleander Drive, Suite C Wilmington, NC 28403 Dear Mr. Exum: Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality -Wilmington Regional Office November 25, 2002 Subject: Permit No. SW8 020510 Waterford Phase Il High Density Subdivision Stormwater Project Brunswick County The Wilmington Regional Office received a complete Stormwater Management Permit Application for Waterford Phase H on November 20, 2002. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding permit No. SW8 020510, dated November 25, 2002, for the construction of the project, Waterford Phase H. This permit shall be effective from the date of issuance until November 25, 2012, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/:arl S:IWQSISTORMWATIPERMIT\020510.NOV cc: Davis Fennell, P.E. Delaney Aycock, Brunswick County Inspections Linda Lewis Wilmington Regional Office Central Files N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmin ton . g , N.C. 28405 (910) 395-3900 Fax (910) 350-2004 CustomerService 800-623-7748 %.+ State Stormwater Management Systems Permit No. SW8 020510 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO WDV, Inc. Waterford Phase H Brunswick County FOR THE construction, operation and maintenance of a non -discharging series of 3 wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 20, 2012 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data: The pond is designed to store the runoff associated with a 25 year storm event. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The subdivision is permitted for 158 lots, each allowed a maximum amount or built -upon area as follows: Lots 1-45 @3,600 ft2; Lots 46-125 @5,800 ft2; and Lots 126-158 @5,000 W. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The runoff storage volume in the ponds will be re -circulated to maintain pond level and some will be used for irrigation of common areas. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 2 State Stormwater Management Systems Permit No. SW8 020510 DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Name of Receiving Stream / Index #: Classification of Water Body: Design Storm: Pond Depth, feet: Permanent Pool Elevation, FMSL: Drainage Area, acres: Total Impervious Surfaces, ft2: 158 lots, ft2: Roads/Parking, ft2 Sidewalks, ft2 Offsite Area entering Pond, ft2: Required Surface Area, ft2: Provided Surface Area, ft2: Required Storage Volume, f13: Provided Storage Volume, ft3: Temporary Storage Elevation, FMSL: Controlling Orifice: Waterford Phase II" SW8 020510 Brunswick County Mr. Bert Exum, Member/Manager WDV, Inc. 6314 Oleander Drive, Suite C Wilmington, NC 28403 November 20, 2002 Cape Fear / Sturgeon Creek / 18-77-1 "C Sw 1 25 year 6 19, 21 and 22 96.46 1,040,400 791,000 241,900 7,500 None, per Engineer 58,423 1,055,089 95,502 667,672 19.5, 22, and 23 n/a non -discharging pond 3 State Stormwater Management Systems Permit No. SW8 020510 II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If the permittee sets up an Architectural Review Committee (ARC) to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the ARC do not relieve the homeowner of the responsibility to maintain compliance with -the permitted BUA limit as recorded in the deed restrictions. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 7. The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4 State Stormwater Management Systems Permit No. SW8 020510 11. Decorative spray fountains will not be allowed in the stormwater treatment system 12. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 14. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 15. Prior to the sale of any lot, deed restrictions must be recorded which limit the built -upon area per lot to the amount as shown on the Project Data Sheet, per Section I, Part 2. The recorded statements must follow the form: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 020510, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is as follows: Lots 1-45 @3,600 ft2; Lots 46-125 @5,800 ft2; and Lots 126-158 @5,000 ft2. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 16. Prior to transfer of the permit, the pond must be inspected by DWQ personnel, and determined to be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. i State Stormwater Management Systems Permit No. SW8 020510 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must bear the signature of the Permittee, the deed book number and page, and stamp/signature of the Register of Deeds. 18. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 19. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved, including as may be required, but not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with the terms and conditions of this permit until such time as the State approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Z State Stormwater Management Systems Permit No. SW8 020510 Permit issued this the 25th day of November, 2002. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 020510 7 State Stormwater Management Systems Permit No. SW8 020510 Waterford Phase II Stormwater Permit No. SW8 020510 Brunswick County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: f*Jmy,t" Signature Registration Number Date State Stormwater Management Systems Permit No. SW8 020510 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Delaney Aycock, Brunswick County Building Inspections 9 SAMPLE STORMWATER DEED RESTRICTIONS WATERFORD S. Stormwater Runoff Regulations: All Lots are subject to the State of North Carolina rules and regulations concerning stormwater runoff as these rules and regulations are amended from time to time. These regulations currently provide that the maximum built upon area in Tract `B' of each Lot in Lots 1-45 will be restricted to 3,600 SF of built upon area, each Lot in Lots 46-102 will be restricted to 5,800 SF of built upon area, and each Lot in Lots 103-130 will be restricted to 4,500 SF of built upon area, each Lot in Lots 131-163 will be restricted to 5,000 SF of built upon area. These regulations currently provide that the maximum built upon area in Tract `C' of each Lot in Lots 1-96 will be restricted to 3,600 SF of built upon area. Built upon area shall include impervious surfaces such as foundation; structures; pavement; concrete; driveways, including that portion of the driveway located within a street right-of-way, which runs from the property line to the road pavement; and walkways or patios of brick, stone or slate, and gravel, marl or stone covered areas, not including wood decking. The DEVELOPER reserves the right to recalculate the maximum allowable built upon area in accordance with the stormwater runoff rules and regulations of the State of North Carolina. All drainage swales or drainage patterns used to treat stormwater runoff as required by the State of North Carolina may not be filled in, piped or changed without the consent of the DEVELOPER, -its designee, the Association, or the State of North Carolina and shall be maintained as set forth in Section V below. The State of North Carolina is hereby made a beneficiary of these PROTECTIVE COVENANTS to the extent necessary to enforce its stormwater runoff regulations as the same may be amended from time to time. This paragraph cannot be changed or deleted without the consent of the State of North Carolina. These covenants are to run with the land and be binding on all persons and parties claiming under them. [Fwd: Question] Subject: [Fwd: Question] Date: Thu, 15 Aug 2002 09:34:55 -0400 From: Darren England <darren.england@ncmail.net> To: Linda Lewis <linda.lewis@ncmail.net> Subject: Question Date: Thu, 15 Aug 2002 08:46:08 -0400 From: Linda Lewis <Linda.Lewis@ncmail.net> Organization: NC DENR To: Darren England <darren.england@ncmail.net> Dear Darren: I had Davis Fennell and Andy Mills in my office yesterday and they have an overall low density subdivision with curbs and gutters which is completely surrounded by a manmade lake. All of the lots will have water access. They do not want to permit the lake as a stormwater pond because they do not want forebays and vegetated shelves. They think that the presence of cattails and other vegetation along the edge of the pond will promote snakes and keep people from getting into the lake with a canoe or other watercraft. In two places, the street has a collection system, which discharges directly into the lake. Everywhere else they have 100' curb outlet swales which drain into the lake. Is it possible to permit this lake as an alternative system? They say they can store the 25 year storm, but they are concerned about how to draw down the pond. In a related matter, the 5:1 slopes for the curb outlet swales can create a wide easement between lots. I have routinely required that the entire slope back up to natural ground be included in the easement. Davis and Andy want to know if they can base the necessary easement width on the projected depth of the 10 year storm in the Swale. For example if the surrounding lots are elevation 10, and the bottom of the swale is elevation 7, I would require an easement width of 30' ((10-7)x5x2). If the 10 year flow depth is only 11, they want to be able to provide an easement width of only 10' (lx5x2). If we allow this, T request that an additional 1' of depth be added for safety, so that the easement width would be 201. Adjacent to this new subdivision is a previously permitted low density subdivision with curbs and gutters. A portion of that subdivision was sold and the area was incorporated into this new subdivision with the lake. Some offsite runoff will be cut off when the new subdivision goes in, so they are proposing 500' of piping to transport this runoff along the property line between the two low density subdivisions. I did not want to see this piping since they are both supposed to be low density projects. Some runoff from the road ditches of the previously approved subdivision will enter the pipe. Apparently, a ditch is out of the question because it will be too deep, which I'm not sure I completely understand since a pipe is usually deeper than a ditch. Could we use flat grade perforated pipe with a weir on the end to promote infiltration? As always, thanks for your help. I have copied this email to Davis and Andy. If they need to make any clarifications or provide additional explanation, they will probably contact you. They request that before any proposal is turned down, that you meet with them. Linda 1 of 2 9, CAPE FEAR RIVER BASIN Name of Stream Subbasin Stream Index Number Map Number Class Intracoastal Waterway CPF24 18-87-(23.5) K27NE2 SA;HQW Intrac �Lstal Waterway CPF24 18-87-(25.5) K27NE5 SA;ORW Intracoastal- Waterway CPF24 18-87-(30.5) K27SW3 SA;HQW Intracoastal Waterway CPF17 18-88-9 L26NE4 SA;HQW Intracoastal Waterway CPF17 18-88-9-(3.5) L26NE9 SC Island Creek CPF22 18-74-27 H27SW4 C;Sw Island Creek CPF23 18-74-50 J27SE5 C;Sw Jack Branch CPFOS 16-41-6-1-(1) D23SW9 C;NSW Jack Branch CPF05 16-41-6-1-(2) D23SW9 WS-IV;NSW Jackeys Czeek CPF'-7 18-77-3 K26NE6 C;Sw Jacks Ford Branch CPF15 18-31-24-5-2 G23SW1 C James Creek CPF14 18-23-13 G21NE5 WS-III Jennie Creek CPF15 18-31-2 G21NE7 C Jenny Branch CPFO8 17-8-2 D19NE1 WS-IV:* Jim Branch CPF07 18-7-4 E23SW3 C Joes Fork CPF14 18-23-3-1 G21NW1 WS-III John Creek CPF24 18-87-30 K27SE1 SA;ORW Johns Branch CPF17 18-64-6 J25SE8 C;SW Johns Swamp Branch CPF20 18-68-17-6 I25SE1 C;Sw Johnson Branch CPF04 16-31-1 D21SE4 C;NSW Johnson Branch CPF13 18-20-25-1 F23NW9 C Johnson Creek CPF12 17-43-6-1 D21SW5 WS-III Johnson Mill Race CPF19 18-68-1-17-13 H25SW2 C;SW Jolly Branch CPF06 16-41-1-15-1-2 D22NE5 C;NSW Janes Branch CPF05 16-41-4-1-1 D22SE5 WS-IV;NSW Jones Branch CPF21 18-74-8-2 G27NE4 C;Sw Jones Creek CPF02 16-14-5-1 C21NW1 WS-II;HQW,NSW Jones Creek CPF06 16-41-1-15-1-1 D22NE1 C;NSW Jones Creek CPF13 18-20-12 F23SW1 C Jones Creek (Lake Ann) CPF20 18-68-16-1 I26SW4 C;Sw Jones Lake CPF16 18-46-7-1 I24NE4 R Jones Swamp CPF18 18-68-12-4 G24SW3 C;SW Jordan Creek CPF02 16-14-6-(0.5) C21NE1 WS-II;HQW,NSW Jordan Creek CPF02 16-14-6-(3) C21NW6 WS-IT;HQW,NSW,CA Jorden Branch CPF02 16-11-14-1-4 C20SW1 C;NSW Jump and Run CPF22 18-74-22.5 H27NE7 C;Sw Jump and Run Creek CPF17 18-88-9-3-2 L26NE5 SC;SW Jump -and -Run Branch CPF19 18-68-2-12-1 H25NE6 C;SW Jumping Run CPF18 18-68-12-2-4-1-1 G24NE2 C;Sw Jumping Run CPF21 18-74-10 G27NE7 C;Sw Jumping Run CPF23 18-74-38 127SE5 C;SW Jumping Run Branch CPF21 18-74-6 G27NW5 C;Sw Jumping Run Branch CPF23 18-74-55-5 J26NE2 C;SW Jumping Run Branch CPF17 18-76-1-3 K27NW2 C;Sw Jumping Run Creek CPF14 18-23-20 G22NW9 WS-III Jumping Run Creek CPF14 18-23-29 F22SF..9 C Jumping Run Creek CPF18 18-68-12-15 T25NE1 C;Sw Juniper Branch CPF13 18-20-24 F23SW3 C Juniper Branch CPF14 18-23-3-2 G21NW2 WS-III Juniper Branch CPF19 18-68-5 I25NE3 C;SW Juniper Branch CPF21 18-74-6-1 G27NW5 C;Sw Juniper Branch CPF21 18-74-13-2 G27SE3 C;Sw Juniper Branch CPF23 18-74-55-10 J26NE9 C;SW Juniper Creek CPF13 18-20-6-(5) F22NW9 B Page 13 of 3C Design Narrative and Supporting Calculations For Waterford Brunswick County, North Carolina Prepared for WDv, Inc. P.O. Box 1967 Wilmington, North Carolina 28402 (910) 540-9716 Date: February 2003 Revised: June 2003 Prepared by Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville, North Carolina 28451 (910) 383-1044 of � �,�' c c, •-,; .R! A� L SEAL. } 024908 � 6S r67 DESIGN NARRATIVE L GENERAL: The project site is located within Brunswick County, North Carolina and is bound by US Hwy. 74/76 to the north, Magnolia Greens Golf Plantation to the west, US Hwy. 17 to the east, and Lincoln Industrial Park to the south. The project site is approximately 566 acres. Drainage considerations are to be in accordance with DWQ stormwater requirements. The intent of this project is to develop the infrastructure to support a residential and commercial development. This is a high -density submittal with curbed and guttered streets draining to a surrounding non -discharge lake system. 2. EXISTING SITE: Site topography in the area is relatively flat with slopes typically less than (2) percent. Areas of environmental concern, including potential wetland areas, are shown on the plan and will remain undisturbed. Most of the site drains to the east, under US Highway 74/76, and ultimately to Sturgeons Creek, which has a stream classification of SC. A small portion of the project will drain to the south, under US Highway 17, and ultimately to Jackeys Creek which also has a stream classification of SC. Vegetation consists primarily of grasses and minor ground cover within the areas of the improvement. Subsurface soils are typically a mixture of sands, silty sands and organics. 3. PROPOSED IMPROVEMENTS: Proposed improvements include the installation of municipal utilities (water, sewer, and storm drainage), small utilities (power, cable, telephone), and curb and gutter streets to serve a mixed use development of single family residential, multi -family residential, a recreation center, and commercial development. Drainage for the most part will be contained within the streets, which will have curb and gutter to direct drainage to low points. Drainage at the low points in the streets will flow into a storm drain collection system that will convey all runoff to inter- connected non -discharge stormwater lakes. The non -discharge lake system is an eight tier system with normal water surfaces controlled by riser structures. Pond #1 has a drainage area of approximately 4 acres. The entrance and main roadway make up the majority of the drainage area to Pond #1. The water level in Pond #1 rises only 0.20 feet in response to the 25 year storm event, discharging a negligible volume to Pond #2. Pond #2 and Pond #5 are interconnected by a 24" pipe. The Pond #245 system has a drainage area of approximately 32.9 acres. Surrounding roadways, all of the residential Tract `C' and Tract `F' drain to this system. In the 25 year storm event, the ponds rise 1.60', discharging a negligible volume to Swale #7, which drains to Pond #8. Pond system #3 has a drainage area of approximately 5.41 acres. The surrounding roadways and a portion of the amenity center (Tact D) drain to this system. In the 25 year storm event, the pond rises 0.45', discharging a negligible volume to Pond #2. Pond system #4 is an isolated amenity pond without any storage. No area drains to Pond # 4 and it discharges directly to Pond #2. Swale #7 has a drainage area of approximately 11.6 acres. It connects the outfall of Pond #5 to Pond #8. Swale #7 claims no retention and is simply a connection for the pond system. No proposed improvements drain to this area. Pond system #10 has a drainage area of approximately 8 acres, comprised mainly of runoff from the back of lots 97-102 and lots 119-130 of Tract `B'. A small portion of the main road will also drain to Pond #10. The water level in Pond #10 rises only 0.10 feet in response to the 25 year storm event, discharging a negligible volume to Pond #9. Pond 49 has a drainage area of 24 acres, comprised of lot and road drainage from Roads F, J, K, L, and M of Tract `B' (see plan for specific drainage area). Pond #9 also receives the lake discharge from Pond #10. The water level in Pond #9 rises 0.89 feet in response to the 25 year storm event, discharging a negligible volume to Pond #8. Pond #8 has a drainage area of 109.3 acres, comprised of the balance of Tract `B', the balance of the amenity Tract `D', all of Tract `E' and connecting roadways. Pond #8 also receives the lake discharge from Pond #9 and Swale #7. Pond #8 shall have a normal water surface elevation of 19.0', with storage to elevation 20.0'. The storage elevation is maintained by a pond outlet structure with the rim of the riser set at elevation 20.0'. The riser will only discharge in response to storm events greater than the 25 year storm. The normal water surface elevation of 19.0' shall be maintained by two recirculation pumps. The recirculation pumps shall be controlled by float switches that activate the pumps when the water in Pond #8 rises to the 25 year storm storage elevation, about elevation 19.47'. The recirculation pumps will pump the storage volume back to Ponds 410 and 93, returning the water in Pond #8 to its normal elevation of 19.0'. In this manner the storage in Pond #8 is maintained such that there is always storage available for the runoff from a 25 year storm event. The excess volume in the remaining ponds, created by the recirculation system, will be used to charge an irrigation system for landscaping in the right of ways and common areas of the project. The water demand for irrigation, combined with normal evaporation (generally accepted to be about 0.25 inches per day in this area), will restore the normal water surface elevations in all the ponds. Flood control for storm event greater than the 25 year storm has also been incorporated into this design. All of the ponds require a storm event greater than the 25 year to discharge through the riser, otherwise only orifice discharge occurs. The proposed non -discharge lakes not only provide stormwater treatment and flood control, but will provide a tremendous recreational amenity to the residents of Waterford. The lakes have been designed to promote active recreation for the residents, such as canoeing, kayaking, and fishing. All the lakes will be stocked with gam e fish to create a healthy fish population. The game fish population will be maintained not only to provide recreation to the residents of Waterford, but also to control any nuisance insects. 4. PERMITTING STRATEGY: The non -discharge lakes shall ultimately be expanded to serve the entire 566 acre development. To facilitate the accounting of impervious areas and treatment areas over the 'life of the project, we proposed to break the project up into multiple tracts with individual tract boundaries following development phase lines. The Stormwater Management Plans are designed to be flexible and stream line the review process for future modifications to this large permit. Each tract has been dedicated a single sheet in the plan set, and the single sheet includes all necessary details and impervious calculations. Upon approval, each of the individual tract plans sheets shall bear an approval stamp from DWQ including the date approved. When the need to modify the permit arises due to future development, copies of individual plans for all previously approved tracts will be resubmitted with the revised plan set bearing the approval stamp from DWQ. The tracts that bear approval stamps will indicate to the reviewer that nothing has changed within that particular tract and the reviewer can then limit analysis of proposed modifications to only those tracts that have changed. For example, the current submittal includes tracts A, B, C, D, E and F. The next tract to be developed will be Tract G. At the appropriate time a permit modification will be submitted showing revisions to Tract A and a new Tract G, but tracts B, C, D, E and F will be resubmitted as previously approved (including a copy of the approved plan bearing the DWQ stamp). To simplify the accounting of impervious areas, a tracking chart has been devised and is shown on the cover of the plan set. This tracking chart includes all impervious areas, by tract, and includes the total impervious area for the project to date. The total of impervious coverages will correspond to the application and, ultimately, the permit. The goal of this permitting strategy is to avoid the pitfalls in the permitting and tracking of stormwater management plans for larges developments that we have experienced in the past. This strategy accomplishes that goal by ensuring that the treatment device and the development share a common permit and by eliminating the need for multiple permits (sometimes as many as three) to develop a single tract. 5. TRACT SUMMARY: Tract A includes the collector roads and all undeveloped areas of the project, Over time, the area Of Tract A will decrease as future phases are developed and accounted for separately. Currently, Tract A encompasses 406.02 acres. The balance of the project area is found in tracts B, C, D, E and F. Tract B is the first phase of single family development. This tract was originally approved on November 25, 2002 and was assigned the permit number SW8 020510. This project includes the first phase of the non -discharge lake system, and is the basis for creating the overall stormwater management plan to include all of the expanded non -discharge lake and all of the property. The lots within Tract B have been revised, increasing the total to 163. The landscape islands previously shown in all cul-de-sacs have been deleted and will now be paved, also netting a small increase in impervious area. The sidewalk area remains unchanged. Tract C is the next phase of single family development and includes 96 lots on 24.70 acres. Stormwater runoff collected in Tract C drains to the non -discharge lake system for treatment. Tract D is the amenity center for the development and includes a clubhouse, sales center, swimming pool and cabana, tennis courts, and associated parking areas and sidewalks. Tract D covers 6.49 acres and is 51.93% impervious. Stormwater runoff collected in Tract D drains to the non -discharge lake system for treatment. Tract E is to be sold and developed by others. The developer of Tract E will have to obtain an individual state stormwater permit for any work done within that tract. Tract E is being allocated 15.00 acres of impervious draining to the non -discharge lake system for treatment. Tract F is also being sold and developed by others. The developer of Tract F will have to obtain an individual state stormwater permit for any work done within that tract. Tract F is being allocated 2.77 acres of impervious draining to the non -discharge lake system for treatment. DESIGN CALCULATIONS - Hydraflow Model with Hydrographs - Reservoir Report - Volume Calculations Pond Volume and Stage Information Pond Info. 25-yr Storm Info. Maximum Ind Pond Normal Water Surface Elev. (sf) 25 year Storm Elev. Vol. Required (cf) Maximum Storage Elev. Vol. Provided (cf) 1 21.00 21.20 7,835 23.00 52,370 2-5 20.004E]21.95 1.60 137,683 22.00 174,645 3 21.50 14,132 23.50 66,896 4 2.3.00 23.01 188 23.00 8 19.00 19.47 569,682 20.00 1,218,755 9 21.00 21.89 97,800 22.00 109,715 10 22.00 22.10 14,448 23.00 144,855 Total --- --- 841,768 --- 1,767,236 Volume for the I " event Total Area = 566.41 acres Total Imp. Area = 61.93 acres Percent Impervious (I) = 10.93 % - Runoff Volume Per Simple Method Rv = 0.05 + 0.009 (I) Rv = 0.05 + 0.009 (10.93) Rv = 0.1484 Volume Required = (Rainfall) x (Rv) x (Drainage Area) V = (1 in) x (0.1484 in/in) x (566.41 acres) x (1/12 ft/in) x (43560 sf/ac) V = 305,121 cubic feet Volume for the 25-year event Total Volume = Storage of 8 pond system in the 25-year event as shown on attached Hydrograph Summary Report Total Volume = 7,835cf + 14,132cf + 188cf +137,683cf + 569,682cf + 97,800cf + 14,448cf Total Volume = 841,768 cubic feet Hydrograph Summary Report Page , Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Return period (yrs) Inflow i Maximum hyd(s) elevation i (ft) Maximum storage (cult) Hydrograph description 1 Rational 18.73 1 7 7,865 25 ---- ------ ----- Ent. draining to P 2 Reservoir 0.06 1 857 4,689 25 1 21.20 7,835 DA thru Pond#1 4 Rational 23.67 1 10 14,202 25 ---- ------ ---- Area draining to P 5 Reservoir 0.12 1 20 6,871 25 4 21.95 14,132 DA thru Pond#3 7 Rational 3.14 1 1 188 25 ---- ------ ------ Area draining to P 8 Reservoir 0.00 1 2 162 25 7 23.01 188 DA thru Pond#4 10 Rational 114.77 1 20 137,729 25 ---- ------ ----- Area drain to Pond 11 Combine 114.84 1 20 142,418 25 10 + 2 ------ ------ DA#2,5 + Pond#1 12 Combine 114.96 1 20 149,289 25 11 + 5 _-_-_ ------ DA#2+Pd#1+Pd#3 13 Combine 114.96 1 20 149,451 25 12 + 8 ------ ------ DA#2+Pd#1+Pd#3+Pd# I 14 Reservoir 0.29 1 40 24,034 25 13 21.60 137,683 Pd's#1,2,3,4 th Pd 16 Rational 31.75 1 1 1,905 25 ---- ------ ------ Area draining to S j 17 Combine 31.75 1 1 25,939 25 14 + 16 ______ DA#7+Pond#2-5 19 Rational 24.10 1 10 14,460 25 ---- ---- ----- Area draining to P j 20 Reservoir 0.02 1 20 1,609 25 19 22.10 14,448 i Pond#10 22 Rational 45.46 1 36 98,203 25 ---- ------ ----- Area draining to P 23 Combine 45.48 1 36 99,811 25 20 + 22 —---- _____ DA#9 + Pond #10 I 24 I Reservoir 0.21 1 72 16,681 25 23 21.89 97,800 Pond #9 26 Rational 219.61 1 40 527,062 25 ---- ------ ----- Area draining to P 27 Combine 31.75 1 1 42,620 25 17 + 24 ----- ----- SW #7 + Pnd#9 28 Combine 220.04 1 40 569,682 25 26 + 27 ---- Pnds7,9 + DA#8 29 I Reservoir 0.00 1 0 0 25 28 19.47 569,682 Pond #8 Proj. file: AII-Ponds-minusTGPV� OF file: BrunCo_hydrographiveftOffate: 06-04-2003 �nt.a D a R,.✓, �h Reservoir Report Page 1 Reservoir No. 1 - Pond #1 .. English Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sgft cuft tuft 0.00 21.00 22,283 0 0 1.00 22.00 26,171 24,227 24,227 2.00 23.00 30,115 28,143 52,370 " 3.00 24.00 34,116 32,116 84,486 4.00 25.00 38,173 36,145 120,630 5.00 26.00 42,287 40,230 160,860 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 24.0 3.0 0.0 0.0 Crest Len ft = 12.00 0.00 0.00 0.00 Span in = 24.0 3.0 0.0 0.0 Crest El. ft = 23.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 15.00 21.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 75.0 10.0 0.0 0.0 Multi -Stage = Yes No No No Slope % = 0.00 0.00 0.00 0.00 N-Value = .010 .010 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage = ----- Yes No No Tailwater Elevation = 21.00 ft Stage / Storage / Discharge Table Note: Nloutflows have been analyzed under inlet and outlet control. Stage ft Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 21.00 0.00 0.00 --- --- 0.00 --- --- --- 0.00 1.00 24,227 22.00 15.12 0.21 --- --- 0.00 --- --- --- 0.21 2.00 52,370 23.00 21.39 0.32 --- --- 0.00 --- --- --- 0.32 3.00 84,486 24.00 26.20 0.00 --- --- 36.00 --- --- --- 26.20 4.00 120,630 25.00 30.25 0.00 --- --- 101.82 --- --- --- 30.25 5.00 160,860 26.00 33.82 0.00 --- --- 187.06 --- --- --- 33.82 Reservoir Report Page 1 Reservoir No. 2 - Pond #2 English Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sqft cuft tuft 0.00 20.00 75,983 0 0 1.00 21.00 87,294 81,639 81,639 2.00 22.00 98,718 93,006 174,645 --, 3.00 23.00 110,256 104,487 279,132 4.00 24.00 121,907 116,082 395,213 5.00 25.00 133,671 127,789 523,002 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 24.0 3.0 0.0 0.0 Crest Len ft = 12.00 0.00 0.00 0.00 Span in = 24.0 3.0 0.0` 0.0 Crest El. ft = 22.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 19.00 20.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 216.0 5.0 0.0 0.0 Multi -Stage = Yes No No No Slope % = 0.20 0.00 0.00 0.00 N-Value = .010 .010 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage = ----- Yes No No Tailwater Elevation = 20.00 ft Note: All outflows have been analyzed under inlet and outlet control Stage /Storage /Discharge Table Stage ft Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 20.00 0.00 0.00 --- --- 0.00 -- --- --- 0.00 1.00 81,639 21.00 9.45 0.22 --- --- 0.00 --- --- --- 0.22 2.00 174,645 22.00 17.21 0.32 --- --- 0.00 --- --- --- 0.32 3.00 279,132 23.00 22.42 0.00 --- --- 36.00 --- --- 22.42 4.00 395,213 24.00 26.64 0.00 --- --- 101.82 --- --- --- 26.64 5.00 523,002 25.00 30.27 0.00 --- --- 187.06 --- --- --- 30.27 Reservoir Report Page 1 Reservoir No. 3 - Pond #3 English Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sqft tuft tuft 0.00 21.50 28,830 0 0 1.00 22.50 33,434 31,132 31,132 2.00 23.50 38,094 35,764 66,896 r- 3.00 24.50 42,810 40,452 107,348 4.00 25.50 47,583 45,197 152,545 5.00 26.50 52,412 49,998 202,542 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 24.0 3.0 0.0 0.0 Crest Len ft = 12.00 0.00 0.00 0.00 Span in = 24.0 3.0 0.0 0.0 Crest El. ft = 23.50 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 21.50 21.50 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 240.0 5.0 0.0 0.0 Multi -Stage = Yes No No No Slope % = 0.00 0.00 0.00 0.00 N-Value = .010 .010 .000 .000 Orif. Coeff. = 0.60 0:60 0.00 0.00 Multi -Stage = ----- Yes No No Tailwater Elevation 21.50 ft Stage /Storage Discharge Table Note: All outflows have been analyzed under inlet and outlet control. / Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 21.50 0.00 0.00 --- --- 0.00 --- - - -- 0.00 1.00 31,132 22.50 5.62 0.22 --- --- 0.00 --- --- 0.22 2.00 66,896 23.50 15.12 0.32 --- --- 0.00 --- --- --- 0.32 3.00 107,348 24.50 13.99 0.00 --- --- 36.00 --- --- --- 13.99 4.00 152,545 25.50 19.78 0.00 --- --- 101.82 --- --- --- 19.78 5.00 202,542 26.50 24.22 0.00 --- --- 187.06 --- --- --- 24.22 Reservoir Report Reservoir No. 4 - Pond #4 Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sqft cuft tuft 0.00 23.00 26,514 0 0 1.00 24.00 28,877 27,696 27,696 2.00 25.00 31,295 30,086 57,782 3.00 26.00 33,770 32,533 90,314 Culvert / Orifice Structures [A] [B] [C] [D] Rise in = 18.0 0.0 0.0 0.0 Span in = 18.0 0.0 0.0 0.0 No. Barrels = 1 0 0 0 Invert El. ft = 23.00 0.00 0.00 0.00 Length ft = 120.0 0.0 0.0 0.0 Slope % = 0.42 0.00 0.00 0.00 N-Value = .010 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage ----- No No No Stage / Storage / Discharge Table Weir Structures [A] Crest Len ft = 0.00 Crest El. ft = 0.00 Weir Coeff. 0.00 Eqn. Exp. = 0.00 Multi -Stage = No Page 1 English [B] [C] [D] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 No No No Tailwater Elevation = 21.50 ft ­.= - uuinurva nave oeen anaiyzea under Inlet and oullel control. Stage ft Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 23.00 0.00 1.00 27,696 24.00 4.31 --- --- --- 0.00 --- --- --- 2.00 57,782 25.00 8.52 --- 4.31 --- --- 3.00 90,314 26.00 12.03 --- --- --- --- 8.52 --- --- --- --- --- --- 12.03 Reservoir Report Reservoir No. 8 - Pond #8 Page 1 English Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sqft cuft tuft 0.00 19.00 1,188,454 0 0 1.00 20.00 1,249,055 1,218,755 1,218,755 E- 2.00 21.00 1,309,837 1,279,446 2,498,201 3.00 22.00 1,367,965 1,338,901 3,837,102 Culvert / Orifice Structures Weir Structures [A►] [B] [C] [D] [A►] [B] [C] [D] Rise in = 24.0 0.0 0.0 0.0 Crest Len ft = 0.00 0.00 0.00 0.00 Span in = 24.0 0.0 0.0 0.0 Crest El. ft = 0.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert El. ft = 20.00 0.00 0.00 0.00 Eqn. Exp. = 0.00 0.00 0.00 0.00 Length ft = 20.0 0.0 0.0 0.0 Multi -Stage = No No No No Slope % = 0.00 0.00 0.00 0.00 N-Value = .010 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage - ----- No No No Tailwater Elevation = 0.00 ft Stage / Storage / Discharge Table Note: All outflows have been analyzed under inlet and nutlet control. Stage Storage Elevation Clv A Clv ft B Clv C Clv D Wr A Wr B Wr C Wr D Discharge cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 19.00 0.00 --- --- --- --- --- --- --- 0.00 1.00 1,218,755 20.00 0.00 --- --- --- --- --- --- --- 0.00 2.00 2,498,201 21.00 5.62 --- --- --- --- --- --- --- 5.62 3.00 3,837,102 22.00 15.12 --- --- --- --- --- --- --- 15.12 Reservoir Report Page 1 Reservoir No. 9 -Pond #9 English Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sqft cuft cuft 0.00 21.00 102,315 0 0 1.00 22.00 117,114 109,715 109,715 2.00 23.00 132,214 124:664 234,379 3.00 24.00 147,615 139,915 374,293 4.00 25.00 163,319 155,467 529,760 Culvert / Orifice Structures [A] [B] [C] Rise in = 24.0 3.0 0.0 Span in = 24.0 3.0 0.0 No. Barrels = 1 1 0 Invert El. ft = 16.70 21.00 0.00 Length ft = 130.0 5.0 0.0 Slope % = 0.50 0.00 0.00 N-Value = .010 .010 .000 Orif. Coeff. = 0.60 0.60 0.00 Multi -Stage = ----- Yes No Stage / Storage / Discharge Table [D] 0.0 0.0 0 0.00 0.0 0.00 .000 0.00 No Weir Structures [A] Crest Len ft = 24.00 Crest El. ft = 22.00 Weir Coeff. = 3.00 Eqn. Exp. = 1.50 Multi -Stage = Yes [B] [C] [D] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 No No No Tailwater Elevation = 19.00 ft Note: All outflows have been analyzed under inlet and outlet control. Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 21.00 21.39 0.00 --- --- 0.00 --- --- --- 1.00 109,715 22.00 26.20 0.22 --- --- 0.00 --- --- --- 2.00 234,379 23.00 30.25 0.00 --- --- 72.00 --- --- --- 3.00 374,293 24.00 33.82 0.00 --- --- 203.65 --- --- --- 4.00 529,760 25.00 37.05 0.00 --- --- 374.12 --- --- Discharge cfs 0.00 0.22 30.25 33.82 37.05 Reservoir Report Reservoir No. 10 - Pond #10 Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sqft cuft tuft 0.00 22.00 137,460 0 0 1.00 23.00 152,249 144,855 144,855 2.00 24.00 167,137 159,693 304,548 3.00 25.00 182,075 174,606 479,154 4.00 26.00 197,119 189,597 668,751 Culvert / Orifice Structures [A] [B] [C] [D] Rise in = 24.0 3.0 0.0 0.0 Span in = 24.0 3.0 0.0 0.0 No. Barrels = 1 1 0 0 Invert El. ft = 18.00 22.00 0.00 0.00 Lenoth ft = 400.0 5.0 0.0 0.0 Slope % = 0.00 0.00 0.00 0.00 N-Value = .010 .010 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage = ----- Yes No No Weir Structures [A] Crest Len ft = 12.00 Crest El. ft = 23.00 Weir Coeff. = 3.00 Eqn. Exp. _ 1.50 Multi -Stage = Yes Page 1 English [B] [C] [D] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 No No No Tailwater Elevation = 21.00 ft Note: All outflows have been analyzed under inlet and outlet control Stage /Storage /Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 22.00 12.00 0.00 --- --- 0.00 --- - 0.00 1.00 144,855 23.00 16.97 0.22 --- --- 0.00 --- --- --- 0.22 2.00 304,548 24.00 20.78 0.00 --- --- 36.00 --- --- 20.78 3.00 479,154 25.00 23.99 0.00 --- --- 101.82 --- --- --- 23.99 4.00 668,751 26.00 26.83 0.00 --- --- 187.06 --- --- -- 26.83 Hydrograph Report Page 1 English Hyd. No. 1 Ent. draining to Pond #1 Hydrograph type = Rational Peak discharge = 18.73 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 3.9 ac Runoff coeff. = 0.62 Intensity = 7.72 in Time of conc. (Tc) = 7 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 7,865 cuft Hydrograph Discharge Table Time -- Outflow (min cfs) 1 2.68 2 5.35 3 8.03 4 10.70 5 13.38 6 16.05 7 18.73 << 8 16.05 9 13.38 10 10.70 11 8.03 1 5.35 13 2.68 ... End Hydrograph. Report Page 1 English Hyd. No. 2 DA thru Pond#1 Hydrograph type = Reservoir Peak discharge = 0.06 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 1 Reservoir name = Pond #1 Max. Elevation = 21.20 ft Max. Storage = 7,835 cuft Storage Indication method used. Total Volume = 4,689 cult Hydrograph Discharge Fable Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.07 10.70 21.05 2.53 0.01 ----- ----- ----- ----- ----- ----- 0.01 0.08 13.38 21.08 3.96 0.02 ----- ----- ----- ----- ----- ----- 0.02 0.10 16.05 21.12 5.16 0.03 ---- ----- ----- ----- ----- ----- 0.03 0.12 18.73 << 21.16 6.01 0.05 ----- ----- ----- ----- ----- ----- 0.05 0.13 16.05 21.20 6.74 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.15 13.38 21.19 6.57 0.06 ---=- ----- ----- ----- ----- ----- 0.06 0.17 10.70 21.18 6.43 0:06 ----- ----- ----- ----- ----- ----- 0406 0.18 8.03 21.18 6.32 0.05 ----- ---- ----- ----- ----- ----- 0.05 0.20 5.35 21.19 6.47 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.22 2.68 21.19 6.64 0.06 ---- ----- ----- ----- ----- ----- 0.06 0.23 0.00 21.20 6.70 0.06 ----- ----- ----- ----- ----- 0.06 0.25 0:00 21.20 6.69 0.06 ----- ----- ----- ----- ----- 0.06 0.27 0.00 21.20 6.69 0.06 ----- ----- ----- 0.06 0.28 0.00 21.20 6.69 0.06 ----- ----- ----- 0.06 0.30 0.00 21.20 6.69 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.32 0.00 21.20 6.68 0.06 ---- ----- ----- ----- ----- ----- 0.06 0.33 0.00 21.20 6.68 0.06 -=--- ----- ----- ----- ----- ----- 0.06 0.35 0.00 21.20 6.68 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.37 0.00 21.20 6.67 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.38 0.00. 21.20 6.67 0.06 ----- ----- . ----- ----- ----- ----- 0.06 0.40 0.00 21.20 6.67 0.06 ----- ---- ----- ----- ----- ----- 0.06 0.42 0.00 21.20 6.67 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.43 0.00 21.19 6.66 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.45 0.00 21.19 6.66 0.06 ----- ---- ----- ----- ----- ----- 0.06 0.47 0.00 21.19 6.66 0.06 ---- ----- ----- ----- ----- ----- 0.06 0.48 0.00 21.19 6.66 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.50 0.00 21.19 6.65 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.52 0.00 21.19 6.65 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.53 0.00 21.19 6.65 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.55 0.00 21.19 6.64 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.57 0.00 21.19 6.64 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.58 0.00 21.19 6.64 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.60 0.00 21.19 6.64 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.62 0.00 21.19 6.63 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.63 0.00 21.19 6.63 0.06 ----- ----- ----- ----- ----- ----- 0.06 0.65 0.00 21.19 6.63 0.06 ----- ----- ----- ----- ----- ----- 0.06 Continues on next page... Hydrograph Report Page 1 English Hyd. No. 4 Area draining to Pond #3 Hydrograph type = Rational Peak discharge = 2 3.6 7 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 5.4 ac Runoff coeff. = 0.61 Intensity = 7.17 in Time of conc. (Tc) = 10 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Hydrograph Discharge Table Time -- Outflow (min cfs) 1 2.37 2 4.73 3 7.10 4 9.47 5 11.84 6 14.20 7 16.57 8 18.94 9 21.30 10 23.67 << 11 21.30 12 18.94 13 16.57 14 14.20 15 11.84 16 9.47 17 7.10 18 4.73 19 2.37 End Total Volume = 14,202 cult Hydrograph Report Page 1 English Hyd. No. 5 DA thru Pond#3 Hydrograph type = Reservoir Peak discharge = 0.12 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 4 Reservoir name = Pond #3 Max. Elevation = 21.95 ft Max. Storage = 14,132 cuft Storage Indication method used. Total Volume = 6,871 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 5 11.84 21.56 0.04 0.01 ----- ----- ----- ----- ----- ----- 0.01 10 23.67 << 21.70 0.27 0.06 ----- ----- ----- ----- ----- 0.06 15 11.84 21.90 1.00 0.10 ---- ----- ----- ----- ----- 0.10 20 0.00 21.95 << 1.29 0.12 ----- ----- ----- ----- ----- -- 0.12 «- 25 0.00 21.95 1.28 0.12 ----- ----- ----- ----- ----- -- 0.12 30 0.00 21.95 1.27 0.12 ----- _---- ----- ----- ----- ----- 0.12 35 0.00 21.95 1.27 0.12 ----- ----- ----- ----- ----- ----- 0.12 40 0.00 21.95 1.26 0.12 ----- ----- ----- ----- ----- ----- 0.12 45 0.00 21.95 1.26 0.12 ---- ----- ----- ----- ----- ----- 0.12 50 0.00 21.95 1.25 0.12 ----- ----- ----- ----- ----- ----- 0.12 55 0:00 21.95 1.24 0.12 ---- ----- ----- ----- ----- ----- 0.12 60 0.00 21.94 1:24 0.12 ----- ----- ----- ----- ----- ----- 0.12 65 0.00 21.94 1.23 0.12 ----- ----- ----- ----- ----- ----- 0.12 70 0.00 21.94 1.23 0.12 ----- ----- ----- ----- ----- ----- 0.12 75 0.00 21.94 1.22 0.12 ----- ----- ----- ----- ----- 0.12 80 0.00 21.94 1.21 0.12 ----- ----- ----- ----- ----- 0.12 85 0.00 21.94 1.21 0.12 ----- :---- ----- ----- ----- 0.12 90 0.00 21.94 1.20 0.12 ----- ----- ----- ----- ----- 0.12 95 0.00 21.94 1.20 0.12 ----- ----- ----- ----- 0.12 100 0.00 21.94 1.19 0.12 ----- ----- ----- ----- ----- ----- 0.12 105 0.00 21.93 1.18 0.12 ----- ----- ----- ----- ----- 0.12 110 0.d0 21.93 1.18 0.12 ----- ----- ----- ----- ----- 0.12 115 0.00 21.93 1.17 0.12 ----- ----- ----- ----- ----- ----- 0.12 120 0.00 21.93 1.17 0.12 ---- ----- _---- ----- ----- ----- 0.12 125 0.00 21.93 1.16 0.12 ----- ----- ----- ----- ----- 0.12 130 0.00 21.93 1.16 0.11 ----- ----- ----- ----- ----- ----- ----- 0.11 135 0.00 21.93 1.15 0.11 ----- ----- ----- ----- ----- ----- 0.11 140 0.00 21.93 1.14 0.11 ----- ----- ----- ----- ----- ---- 0.11 145 0.00 21.93 1.14 0.11 ----- ----- ----- ----- ----- 0.11 150 0.00 21.92 1.13 0.11 ----- ----- ----- ----- ----- ----- 0.11 155 0.00 21.92 1.13 0.11 ----- ----- ----- ----- ----- ----- 0.11 160 0.00 21.92 1.12 0.11 ----- ----- ----- ----- ----- 0.11 165 0.00 21.92 1.12 0.11 -- ----- 0.11 170 0.00 21.92 1.11 0.11 ---- 0.11 175 0.00 21.92 1.10 0.11 0.11 180 0.00 21.92 1.10 0.11 - ----- ----- ----- 0.11 Continues on next page... Hydrograph Report Page 1 English Hyd. No. 7 Area draining to Pond #4 Hydrograph type = Rational Peak discharge = 3.14 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 1.4 ac Runoff coeff. = 0.25 Intensity = 9.16 in Time of conc. (Tc) = 1 min I-D-F Curve = BrunCo hydrograph_ver6.IDF Reced. limb factor = 1 Hydrograph Discharge Table Total Volume = 188 cult Time -- Outflow (min cfs) 1 3.14 << ... End Hydrograph Report Page 1 English Hyd. No. 8 DA thru Pond#4 Hydrograph type = Reservoir Peak discharge = 0.00 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 7 Reservoir name = Pond #4 Max. Elevation = 23.01 ft Max. Storage = 188 cuft Storage Indication method used. Total Volume = 162 Cuft Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B CIV C CIV D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 5 0.00 23.01 0.00 ----- ----- ----- ----- ----- ---- 0.00 10 0.00 23.01 0.00 ----- ----- ----- ----- 0.00 15 0.00 23.01 0.00 ----- ----- ----- 0.00 20 0.00 23.01 0.00 ---- ----- ----- -- 0.00 25 0.00 23.01 0.00 0.00 30 0.00 23.01 0.00 ----- 0.00 35 0.00 23.01 0.00 ----- ----- 0.00 40 0.00 23.01 0.00 ---- ----- ----- 0.00 45 0.00 23.01 0.00 ----- ----- ----- -- 0.00 50 0.00 23.01 0.00 ----- ----- ----- ----- 0.00 55 0.00 23.01 0.00 ----- -• - -- ----- ----- ----- ---. 0.00 60 0.00 23.01 0.00 ----- ----- ----- ----- ----- ----- --- 0.00 65 0.00 23.01 0.00 ----- ----- ----- ----- ----- ----- 0.00 70 0.00 23.01 0.00 ----- ----- ----- ----- ----- ----- 0.00 75 0.00 23.01 0.00 ----- ----- ----- ----- ----- ----- --- 0.00 80 0.00 23.01 0.00 ----- ----- ----- ----- ----- ----- --- 0.00 85 0.00 23.01 0.00 ---- ----- ----- ----- ----- ----- ----- 0.00 90 0.00 23.01 0.00 ---- ----- ----- ----- ----- ----- 0.00 95 0.00 23.01 0.00 - ---- -,--- ----- ----- ----- ----- 0.00 100 0.00 23.01 0.00 ----- -=--- ----- ----- ----- -- -- 0.00 105 0.00 23.01 0.00 ----- ----- ----- ----- ----- 0.00 110 0.00 23.01 0.00 ----- ----- ----- ----- ----- ----- 0.00 115 0.00 23.01 0.00 ---- ----- ----- ----- ----- ----- 0.00 120 0.00 23.01 0.00 ---- ----- ----- ----- ----- ----- 0.00 125 0.00 23.01 0.00 ----- ----- ----- ----- ----- ----- 0.00 130 0.00 23.01 0.00 --- ----- ----- ----- ----- ----- 0.00 135 0.00 23.01 0.00 ---- ----- _____ ----- ____ 0.00 140 0.00 23.01 0.00 ---- ----- ----- ----- ----- ---- 0.00 145 0.00 23.01 0.00 ----- ----- ----- ----- ----- 0.00 150 0.00 23.01 0.00 ----- ----- ----- --_-- 0.00 155 0.00 23.01 0.00 ----- ----- ----- ----- 0.00 160 0.00 23.01 0.00 ----- ----- ----- 0.00 165 0.00 23.01 0.00 ----- ----- ----- ----- ----- 0.00 170 0.00 23.01 0.00 ----- ----- ----- ----- 0.00 175 0.00 23.01 0.00 ----- ----- ----- ----- ----- ----- 0.00 180 0.00 23.01 0.00 ----- ----- ----- ----- ----- ----- ----- 0.00 Continues on next page... Hydrograph Report Hyd. No. 10 Area drain to Pond #2,5 Page 1 English Hydrograph type = Rational Peak discharge = 114.77 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 32.9 ac Runoff coeff. = 0.6 Intensity = 5.82 in Time of conc. (Tc) = 20 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 137,729 cuft Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 4 22.95 36 22.95 5 28.69 6 34.43 7 40.17 ... End 8 45.91 9 51.65 10 57.39 11 63.13 12 68.86 13 74.60 14 80.34 15 86.08 16 91.82 17 97.56 18 103.30 19 109.04 20 114.77 21 109.04 22 103.30 23 97.56 24 91.82 25 86.08 26 80.34 27 74.60 28 68.86 29 63.13 30 57.39 31 51.65 32 45.91 33 40.17 34 34.43 35 28.69 Hydrograph Report Hyd. No. 11. DA#2,5 + Pond#1 Hydrograph type = Combine Storm frequency = 25 yrs 1 st inflow hyd. No. = 10 Hydrograph Discharge Table Page 1 English Peak discharge = 114.84 cfs Time interval = 1 min 2nd inflow hyd. No .= 2 Time 1st Inflow + 2::d Inflow = Outflow (min) cfs cfs cfs 5 28.69 0.02 28.71 10 57.39 0.06 57.44 15 86.08 0.06 86.14 20 114.77 << 0.06 114.84 << 25 86.08 0.06 86.14 30 57.39 0.06 57.45 35 28.69 0.06 28.76 ...End Total Volume = 142,418 cuft Hydrograph Report Hyd. No. 12 DA#2+Pd#1+Pd#3 Hydrograph type = Combine Storm frequency = 25 yrs 1 st inflow hyd. No. = 11 Page 1 English Peak discharge = 114.96 cfs Time interval = 1 min 2nd inflow hyd. No. 5 Total Volume = 149,289 cuft Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow - outflow (min) cfs cfs cfs 5 28.71 0.01 28.72 10 57.44 0.06 57.51 15 86.14 0.10 86.25 20 114.84 << 0.12 << 114.96 << 25 86.14 0.12 86.27 30 57.45 0.12 57.57 35 28.76 0.12 28.88 ...End Hydrograph Report Hyd. No. 13 DA#2+Pd#1+Pd#3+Pd#4 Hydrograph type = Combine Storm frequency = 25 yrs 1 st inflow hyd. No. = 12 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = (min) cfs cfs 5 28.72 0.00 10 57.51 0.00 15 86.25 0.00 20 114.96 << 0.00 25 86.27 0.00 30 57.57 0.00 35 28.88 0.00 End Page 1 English Peak discharge = 114.96 cfs Time interval = 1 min 2nd inflow hyd. No = 8 Outflow cfs 28.73 57.51 86.25 114.96 << 86.27 57.58 28.88 Total Volume 149,451 cuft Hydrograph Report Page 1 English Hyd. No. 14 Pd's#1,2,3,4 th Pd#2,5 Hydrograph type = Reservoir Peak discharge = 0.29 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 13 Reservoir name = Pond #2 Max. Elevation = 21.60 ft Max. Storage = 137,683 cuft Storage Indication method used. Total Volume = 24,034 cuft Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 10 57.51 20.20 4.31 0.06 ----- ----- ----- ----- ----- ----- 0.06 20 114.96 << 20.84 9.59 0.20 ----- ----- ----- ----- ----- ----- 0.20 30 57.58 21.42 13.25 0.27 ----- ----- ----- ----- ----- ----- 0.27 40 0.19 21.60 << 14.62 0.29 ----- ----- ----- ----- ----- ----- 0.29 << 50 0.19 21.60 14.62 0.29 ----- ----- ----- - ----- ----- 0.29 60 0.18 21.60 14.61 0.29 ----- ----- ----- -- ----- ----- 0.29 70 0.18 21.60 14.61 0.29 ----- ----- ----- ----- ----- ----- 0.29 80 0.18 21.60 14.61 0.29 ----- ----- ----- ----- ----- ----- 0.29 90 0.18 21.60 14.60 0.29 ----- ----- ----- ----- ----- ----- 0.29 100 0.18 21.60 14.60 0.29 ----- ----- ----- ----- ----- ----- 0.29 110 0.18 21.60 14.59 0.29 ----- ----- ----- ----- ----- ----- 0.29 120 0.18 21.60 14.59 0.29 ----- ----- ----- ----- ----- ----- 0.29 130 0.17 21.60 14.58 0.29 ----- ----- ----= ----- ----- ----- 0.29 140. 0.17 21.60 14.57 0.29 ----- ----- ----- ----- ----- ----- 0.29 150 0.17 21.59 14.57 0.29 ----- ----- ----- ----- ----- ----- 0.29 160 0.17 21.59 14.56 6.29 ----- ----- ----- ----- ----- ----- 0.29 170 0.17 21.59 14.56 0.29 ----- ---- ----- ----- ----- ----- 0.29 180 0.17 21.59 14.55 0.29 ----- ----- ----- ----- ----- -=--- 0.29 190 0.17 21.59 14.55 0.29 ----- ----- ----- ----- ----- ----- 0.29 200 0.17 21.59 14.54 0.29 ----- ----- ----- ----- ----- ----- 0.29 210 0.17' 21.59 14.54 0.29 ----- ----- ----- ----- ----- ----- 0.29 220 0.17 21.59 14.53 0.29 ----- ----- ----- ----- ----- ----- 0.29 230 0.17 21.59 14.53 0.29 ----- ---- ----- ----- ----- ----- 0.29 240 0.17 21.59 14.52 0.29 ----- ----- ----- ----- ----- ----- 0.29 250 0.16 21.59 14.51 0.29 ----- ----- ----- ----- ----- ----- 0.29 260 0.16 21.59 14.51 0.29 ----- ----- ----- ----- ----- ----- 0.29 270 0.16 21.59 14.50 0.29 ----- ----- ----- ----- ----- ----- 0.29 280 0.16 21.58 14.50 0.29 ----- ----- ----- ----- ----- ----- 0.29 290 0.16 21.58 14.49 0.29 ----- ----- ----- ----- ----- ----- 0.29 300 0.16 21.58 14.49 0.29 ----- ----- ----- ----- ----- ----- 0.29 310 0.16 21.58 14.48 0.29 ----- ----- ----- ----- ----- ----- 0.29 320 0.16 21.58 14.47 0.29 ----- ----- ----- ----- ----- ----- 0.29 330 0.16 21.58 14.47 0.29 ----- ----- ----- ----- ----- ----- 0.29 340 0.16 21.58 14.46 0.29 ----- ----- ----- ----- ----- ----- 0.29 350 0.16 21.58 14.46 0.28 ----- ----- ----- ----- ----- ----- 0.28 360 0.16 21.58 14.45 0.28 ----- ----- ----- ----- ----- ----- 0.28 Continues on next page... Hydrograph Report Hyd. No. 16 Area draining to Swale #7 Page 1 English Hydrograph type = Rational Peak discharge = 31.75 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 11.6 ac Runoff coeff. = 0.3 Intensity = 9.16 in Time of conc. (Tc) = 1 min I-D-F Curve = BrunCo hydrograph_ver6.IDF Reced. limb factor = 1 Hydrograph Discharge Table Time -- Outflow (min cfs) 31.75 << W Total Volume = 1,905 cuft Hydrograph Report Hyd. No. 17 DA#7+Pond#2-5 Hydrograph type = Combine Storm frequency = 25 yrs 1 st inflow hyd. No. = 14 Hydrograph Discharge Table Time 1st Inflow f 2nd Inflow _ (min) cfs cfs 1 0.00 31.75 << ...End Page 1 English Peak discharge = 31.75 cfs Time interval = 1 min 2nd inflow hyd. No. 16 Outflow cfs 31.75 << Total Volume = 25,939 cult Hydrograph Report Page 1 English Hyd. No. 19 Area draining to Pond #10 Hydrograph type = Rational Peak discharge = 24.10 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 8.0 ac Runoff coeff. = 0.42 Intensity = 7.17 in Time of conc. (Tc) = 10 min -D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 14,460 cuft Hydrograph Discharge Table Time -- Outflow (min cfs) 1 2.41 6 14.46 11 21.69 16 9.64 ...End Hydrograph Report Hyd. No. 20 Pond #10 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 19 Max. Elevation = 22.10 ft Storage Indication method used. Hydrograph Discharge Table Peak discharge Time interval Reservoir name Max. Storage Page 1 English = 0.02 cfs = 1 min = Pond #10 = 14,448 cuft Total Volume = 1,609 tuft Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 5 12.05 22.01 12.07 0.00 ----- ----- ----- ----- ----- ----- 0.00 10 24.10 << 22.05 12.29 0.01 ----- ----- ----- ----- ----- ----- 0.01 15 12.05 22.09 12.51 0.02 ----- ----- ----- ----- ----- ----- 0.02 20 0.00 22.10 << 12.58 0.02 ----- ----- ----- ----- ----- ----- 0.02 25 0.00 22.10 12.58 0.02 ----- --:-= ----- ----- ----- ----- 0.02 30 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ---- 0.02 35 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ---- 0.02 40 0.00 22.16 12.58 0.02 ----- ----- ----- ----- ----- ----- 0.02 45 0.00 22.10 12.58 0.02 ----- ----- ----- ---- ---- ----- 0.02 50 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ----= 0.02 55 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ----- 0.02 60 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ----- 0.02 65 0.00 22.10 12.58 0.02 ----- ----- ----- . ----- -- -- --- 0.02 70 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ----- 0.02 75 0.00 22.10 12.58 0.02 ----- ---- ----- ----- ----- ----- 0.02 80 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- --- 0.02 85 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ---- 0.02 90 0.00 22.10 12.58 0.02 ----- ----- ---- ----- ----- ----- 0.62 95 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ---- ----- 0.02 100 0.00 22.10 12.58 0.02 ----- ---- ----- ----- ----- --- 0.02 105 0.00 22.10 12.58 0.02 ----- ---=- ----- ---- - ----- ----- 0.02 110 0.00 22.10 12.58 0.02 ----= ----- ----- ----- ----- ----- 0.02 115 0.00 22.10 12.58 0.02 ----- ----- ----- ----- - ----- ----- 0.02 120 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ----- 0.02 125 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ----- 0.02 130 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ---- 0.02 135 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ---- ----- 0.02 140 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ----- 0.02 145 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ----- 0.02 150 0.00 22.10 12.58 0.02 ----- ----- ----- ----- ----- ----- 0.02 155 0.00 22.10 12.57 0.02 ----- ----- ----- ----- ----- ----- 0.02 160 0.00 22.10 12.57 0.02 ----- ----- ----- ----- ----- ----- 0.02 165 0.00 22.10 12.57 0.02 ----- ----- ----- ----- ----- ---- 0.02 170 0.00 22.10 12.57 0.02 ----- ----- ----- ----- ----- ----- 0.02 175 0.00 22.10 12.57 0.02 ----- ----- ----- ----- -. -- ----- 0.02 180 0.00 22.10 12.57 0.02 ----- ----- ----- ----- ----- ---- 0.02 Continues on next page... Hydrograph Report Hyd. No. 22 Area draining to Pond #9 Page 1 English Hydrograph type = Rational Peak discharge = 45.46 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 24.0 ac Runoff coeff. = 0.42 Intensity = 4.51 in Time of conc. (Tc) = 36 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 98,203 cuft Hydrograph Discharge Table Time -- Outflow (min cfs) 4 5.05 9 11.3.7 14 17.68 19 24.00 24 30.31 29 36.62 34 42.94 39 41.68 44 35.36 49 29.05 54 22.73 59 16.42 64 10.10 ...End Hydrograph Report Hyd. No. 23 DA#9 + Pond #10 Hydrograph type = Combine Storm frequency = 25 yrs 1 st inflow hyd. No. = 20 Page 1 English Peak discharge = 45.48 cfs Time interval = 1 min 2nd inflow hyd. No. 22 Total Volume = 99,811 cuft Hydrograph Discharge Table T-me 1st Inflow + 2nd Inflow = Outflow (min) cfs cfs cfs 5 0.00 6.31 6.32 10 0.01 12.63 12.64 15 0.02 18.94 18.96 20 0.02 << 25.26 25.28 25 0.02 31.57 31.59 30 0.02 37.89 37.91 35 0.02 44.20 44.22 40 0.02 40.41 40.43 45 0.02 34.10 34.12 50 0.02 27.78 27.80 55 0.02 21.47 21.49 60 0.02 15.15 15.17 65 0.02 8.84 8.86 ...End Hydrograph Report Page 1 English Hyd. No. 24 Pond #9 Hydrograph type = Reservoir Peak discharge = 0.21 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 23 Reservoir name = Pond #9 Max. Elevation = 21.89 ft Max. Storage = 97,800 cuft Storage Indication method used. Total Volume = 16,681 tuft Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 30 37.91 21.31 22.99 0.07 ----- ----- ----- ----- ----- ----- 0.07 40 40.43 21.54 24.11 0.15 ----- ----- ----- ----- ----- ----- 0.15 50 27.80 21.73 24.97 0.18 ----- ----- ----- ----- ----- -=--- 0.18 60 15.17 21.84 25.50 0.20 ----- ----- ----- ----- 0.20 70 2.55 21.89 25.71 0.21 ----- ----- ----- ----- ----- 0.21 80 0.02 21.89 25.71 0.21 ----- ----- ----- ----- ----- 0.21 90 0.02 21.89 25.71 0.21 ----- ----- ----- ----- ----- 0.21 100 0.02 21.89 25.71 0.21 ----- ----- ----- ----- ----- 0.21 110 0.02 21.89 25.70 0.21 ----- ----- ----- ----- ----- ----- 0.21 120 0.02 .21.89 25.70 0.21 ----- ----- ----- ----- ----- ----- 0.21 130 0.02 21.89 25M 0.21 ----- ----- ----- ----- ----- ----- 0.21 140 0.02 21.88 25.69 0.21 ----- ----- ----- ----- ----- ----- 0.21 150 0.02 21.88 25.68 0.21 ----- ----- ----- ----- ----- ----- 0.21 160 0.02 21.88 25.68 0.21 ----- ----- ----- ----- ----- ----- 0.21 170 0.02 21.88 25.67 0.21 ----- ----- ----- ----- ----- - ----- 0.21 180 0.02 21.88 25.67 0.21 ----- ----- ----- ----- ----- ----- 0.21 190 0.02 21.88 25.66 0.21 ----- ----- ----- ----- ----- ----- 0.21 200 0.02 21.88 25.66 0.21 - --- ----- ----- ----- ----- ----- 0.21 210 0.02 21.88 25.66 0.20 ----- ----- ----- ----- ----- ----- 0.20 220 0.02 21.88 25.65 0.20 ----- ----- ----- ----- ----- ----- 0.20 230 0.02 21.88 25.65 0.20 ----- ----- ----- ----- ----- ----- 0,20 240 0.02 21.87 25.64 0.20 ----- ----- ----- ----- ----- ----- 0.20 250 0.02 21.87 25.64 0.20 ----- ----- ----- ----- ----- ----- 0.20 260 0.02 21.87 25.63 0.20 ----- ----- ----- ----- ----- ----- 0.20 270 0.02 21.87 25.63 0.20 ----- ----- ----- ----- ----- ----- 0.20 280 0.02 21.87 25.62 0.20 ----- ----- ----- ----- ----- ----- 0.20 290 0.02 21.87 25.62 0.20 ----- ----- ----- ----- ----- ----- 0.20 300 0.02 21.87 25.61 0.20 ----- ----- ----- ----- ----- ----- 0.20 310 0.02 21.87 25.61 0.20 ----- ----- ----- ----- ----- ----- 0.20 320 0.02 21.87 25.61 0.20 ----- ----- ----- ----- ----- ----- 0.20 330 0.02 21.87 25.60 0.20 ----- ----- ----- ----- ----- ----- 0.20 340 0.02 21.86 25.60 0.20 ----- ----- ----- ----- ----- ----- 0.20 350 0.02 21.86 25.59 0.20 ----- ----- ----- ----- ----- ----- 0.20 360 0.02 21.86 25.59 0.20 ----- ----- ----- ----- ----- ----- 0.20 370 0.02 21.86 25.58 0.20 ----- ----- ----- ----- ------ ----- 0.20 380 0.02 21.86 25.58 0.20 ----- ----- ----- ----- ----- ----- 0.20 Continues on next page... Hydrograph Report Hyd. No. 26 Area draining to Pond #8 Page 1 English Hydrograph type = Rational Peak discharge = 219.61 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 109.3 ac Runoff coeff. = 0.47 Intensity = 4.28 in Time of conc. (Tc) = 40 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 527,062 cuft Hydrograph Discharge Table Time -- Outflow (min cfs) 4 21.96 9 49.41 14 76.86 19 104.31 24 131.77 29 159.22 34 186.67 39 214.12 44 197.65 49 170.20 54 142.75 59 115.29 64 87.84 69 60.39 74 32.94 End Hydrograph Report Hyd. No. 27 SW #7 + Pnd#9 Hydrograph type = Combine Storm frequency = 25 yrs 1 st inflow hyd. No. = 17 Page 1 English Peak discharge = 31.75 cfs Time interval = 1 min 2nd inflow hyd. No. 24 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = outflow (min) cfs cfs cfs 1 31.75 << 0.00 31.75 << 27 0.26 0.06 0.32 28 0.26 0.06 0.32 29 0.26 0.06 0.33 30 0.27 0.07 0.33 31 0.27 0.08 0.35 32 0.28 0.08 0.36 33 0.28 0.09 0.37 34 0.28 0.11 0.39 35 0.28 0.11 0.40 36 0.28 0.12 0.40 37 0.29 0.13 0.41 38 0.29 0.14 0.42 39 0.29 0.14 0.43 40 0.29 0.15 0.43 41 0.29 0.15 0.44 42 0.29 0.16 0.44 43 0.29 0.16 0.45 44 0.29 0.17 0.45 45 0.29 0.17 0.46 46 0.29 0.17 0.46 47 0.29 0.18 0.46 48 0.29 0.18 0.47 49 0.29 0.18 0.47 50 0.29 0.18 0.47 51 0.29 0.19 0.47 52 0.29 0.19 0.47 53 0.29 0.19 0.48 54 0.29 0.19 0.48 55 0.29 0.19 0.48 56 0.29 0.19 0.48 57 0.29 0.20 0.48 58 0.29 0.20 0.48 59 0.29 0.20 0.49 60 0.29 0.20 0.49 61 0.29 0.20 0.49 Continues on next page... Total Volume = 42,620 cuft Hydrograph Report Hyd. No. 28 Pnds7,9 + DA#8 Hydrograph type = Combine Storm frequency = 25 yrs 1 st inflow hyd. No. = 26 Hydrograph Discharge Table Time 1st Inflow # 2nd Inflow (min) cfs cfs 5 27.45 0.01 10 54.90 0.07 15 82.35 0.14 20 109.80 0.24 25 137.26 0.31 30 164.71 0.33 35 192.16 0.40 40 219.61 << 0.43 45 192.16 0.46 50 164.71 0.47 55 137.26 0.48 60 109.80 0.49 65 82.35 0.49 70 54.90 0.49 75 27.45 0.49 ...End Page 7 English Peak discharge = 220.04 cfs Time interval = 1 min 2nd inflow hyd. No: 27 Outflow cfs 27.46 .54.97 82.50 110.04 137.56 165.04 192.55 220.04 << 192.61 165.18 137.74 110.29 82.85 55.40 27.94 Total Volume = 569,682 cuft Hydrograph Report Hyd. No. 29 Pond #8 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 28 Max. Elevation = 19.47 ft Storage Indication method used. Hydrograph Discharge Table Peak discharge Time interval Reservoir name Max. Storage Page 1 English = 0.00 cfs = 1 min = Pond #8 = 569,682 cuft Total Volume = 0 cuft Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0 0.00 19.00 ----- ----- ---- ----- ----- ----- ----- ----- 0.00 << 10 54.97 0.00 ----- ----- ----- ----- ----- ----- ----- ----- 0.00 << ...End