Loading...
HomeMy WebLinkAboutSW6230104_Design Calculations_20230126Watershed Model Schematic Hydraflow Hydrographs Extension forAutodesk® Civil 3D® by Autodesk, Inc. v2020 1 CD Petco - Dunn, NC Storm Water Calculations "iIWIrlp1t t t aCL S a y = 04eM a y r 10.27.2022 2 CD Project: Dunn NC drainageBA.gpw Thursday, 10 / 27 / 2022 Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.054 2 722 5,576 ------ ------ ------ existing 2 SCS Runoff 5.400 2 716 11,101 ------ ------ ------ proposed 3 Reservoir 1.478 2 724 8,010 2 171.70 5,479 Pond routing Dunn NC drainageBA.gpw Return Period: 1 Year Thursday, 10 / 27 / 2022 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Thursday, 10 / 27 / 2022 Hyd. No. 3 Pond routing Hydrograph type = Reservoir Peak discharge = 1.478 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 8,010 cuft Inflow hyd. No. = 2 -proposed Max. Elevation = 171.70 ft Reservoir name = <New Pond> Max. Storage = 5,479 cuft Storage Indication method used. Q (cfs) 6.00 5.00 4.00 3.00 r M 1.00 Pond routing Hyd. No. 3 -- 1 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 — Hyd No. 2 Total storage used = 5,479 cult Pond Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Thursday, 10 / 27 / 2022 Pond No. 1 - <New Pond> Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 169.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 169.50 1,366 0 0 0.50 170.00 1,815 795 795 1.50 171.00 2,766 2,291 3,086 2.50 172.00 4,064 3,415 6,501 3.50 173.00 14,666 9,365 15,866 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 6.00 0.00 0.00 0.00 Crest Len (ft) = 20.00 0.00 0.00 0.00 Span (in) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 172.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 171.00 0.00 0.00 0.00 Weir Type = Rect --- --- --- Length (ft) = 1.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 4.00 Ulm RIM M 0.00 ' ' 0.00 7.00 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 14.00 21.00 28.00 35.00 42.00 49.00 56.00 Elev (ft) 173.50 172.50 171.50 170.50 169.50 63.00 70.00 Discharge (cfs) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 6.655 2 720 17,275 ------ ------ ------ existing 2 SCS Runoff 11.54 2 716 24,763 ------ ------ ------ proposed 3 Reservoir 9.509 2 720 21,672 2 172.22 8,595 Pond routing Dunn NC drainageBA.gpw Return Period: 10 Year Thursday, 10 / 27 / 2022 A Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Thursday, 10 / 27 / 2022 Hyd. No. 3 Pond routing Hydrograph type = Reservoir Peak discharge = 9.509 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 21,672 cuft Inflow hyd. No. = 2 -proposed Max. Elevation = 172.22 ft Reservoir name = <New Pond> Max. Storage = 8,595 cuft Storage Indication method used. Q (cfs) 12.00 10.00 M M 4.00 r M� Pond routing Hyd. No. 3 -- 10 Year Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 Total storage used = 8,595 cult Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 13.27 2 720 34,628 ------ ------ ------ existing 2 SCS Runoff 19.16 2 716 42,592 ------ ------ ------ proposed 3 Reservoir 17.36 2 718 39,501 2 172.37 9,925 Pond routing Dunn NC drainageBA.gpw Return Period: 100 Year Thursday, 10 / 27 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Thursday, 10 / 27 / 2022 Hyd. No. 3 Pond routing Hydrograph type = Reservoir Peak discharge = 17.36 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 39,501 cuft Inflow hyd. No. = 2 -proposed Max. Elevation = 172.37 ft Reservoir name = <New Pond> Max. Storage = 9,925 cuft Storage Indication method used. Q (cfs) 21.00 18.00 15.00 12.00 3.00 Pond routing Hyd. No. 3 -- 100 Year Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) — Hyd No. 3 Hyd No. 2 Total storage used = 9,925 cult Hydraflow Table of Contents Dunn NC drainageBA.gpw Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2020 Thursday, 10 / 27 / 2022 Watershed Model Schematic...................................................................................... 1 - Year SummaryReport......................................................................................................................... 2 HydrographReports................................................................................................................... 3 Hydrograph No. 3, Reservoir, Pond routing............................................................................. 3 PondReport - <New Pond>................................................................................................. 4 10 -Year SummaryReport......................................................................................................................... 5 HydrographReports................................................................................................................... 6 Hydrograph No. 3, Reservoir, Pond routing............................................................................. 6 100 - Year SummaryReport......................................................................................................................... 7 HydrographReports................................................................................................................... 8 Hydrograph No. 3, Reservoir, Pond routing............................................................................. 8