Loading...
HomeMy WebLinkAboutNCC230348_ESC Approval Submitted_20230208ROY COOPER Governor d °A ELIZABETH BISER Secretary DOUGLAS ANSEL va Interim Director NORTH CAROLINA Envirot Me."tal Quelityi February 3, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Teramore Development, LLC Attention: Joe Strickland, Registered Agent 214 Klumac Road, Suite 101 Salisbury, NC 28144 RE: Project Name: Dollar General — Lexington -Acres Approved: 2.04 Project ID: DAVID-2023-037 County: Davidson . City: Lexington Address: Biesecker Road River Basin: Yadkin Pee -Dee Stream Classification: C Submitted By: BRBC, P.A. Date Received by LQS: January 23, 2023 Plan Type: Revised Dear Mr. Stickland: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee isprocessed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eN01 form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .011.8(a) and the NCG010000 permit require that the following documentation be kept on file at the job site: Morth Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Winston-Salem Regional Office [ 450 West Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105 "p' 336-776-9800 Letter of Approval with Modifications BREC, P.A. February 3, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Dollar General — Lexington Project ID: DAVID-2023-037 County: Davidson Modifications pursuant to applicable forth Carolina General Statutes and/or Regulations: 1. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 2. The NCG01 has a $100 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01 fee payment due dates. Be advised the project requires a closure inspection report by 'DEMLR prior to filing the Notice of Termination (NOT) to terminate NCG01 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities