Loading...
HomeMy WebLinkAboutNCC223949_FRO Submitted_20221128JOHNSTON COUNTY FINANCIAL RESPONSIBILITY/OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT No person may initiate any land -disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Johnston County Department of Public Utilities. (Please type or print and, if the question is not applicable or the e-mail and/or fax information unavailable, place N/A in the blank.) Part A. 1. Project Name Weston Hills Subdivision 2 3 4 Location of land -disturbing activity: City or Township Town of Benson Highway/Street N Honeycutt Street Latitude 35.391 Longitude-78.528 Approximate date land -disturbing activity will commence: August 1 , 2022 Purpose of development (residential, commercial, industrial, institutional, etc.): Residential 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 27 acres 6. Amount of fee enclosed: $ 5,925.00 . The application fee of $380.00 per acre (rounded up to the next acre) is assessed for the first 10 acres and an additional $125 per acre for each additional acre (rounded up to the next acre). Individual residential lots plans are $100 per lot. 7. Has an erosion and sediment control plan been filed? Yes ❑ No ❑ Enclosed 8. Person to contact should erosion and sediment control issues arise during land -disturbing activity: Name Shandy HIII E-mail Address shandy Cl 550Cashnow.com Telephone cell # (919) 550-2274 Fax # Landowner(s) of Record (attach accompanied page to list additional owners): 550-CASH,LLC (919) 550-2274 Name Telephone 3334 NC HWY 42 E 3334 NC HWY 42 E Current Mailing Address Current Street Address CLAYTON NC 27527 CLAYTON NC City State Zip City State 10. Deed Book No. 5743 Page No. 590 Part B. Fax Number 27527 Zip 1. Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide a comprehensive list of all responsible parties on an attached sheet): 550-CASH, LLC shandy@550cashnow.com Name 3334 NC HWY 42 E E-mail Address 3334 NC HWY 42 E Current Mailing Address Current Street Address CLAYTON NC 27527 CLAYTON NC 27527 City State Telephone (919) 550-2274 Zip City State Zip Fax Number 2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name E-mail Address Current Mailing Address Current Street Address City State Zip City State Zip Telephone Fax Number (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: Name of Registered Agent Current Mailing Address City State Telephone E-mail Address Current Street Address Zip City State Zip Fax Number The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attorney -in -fact, or if not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there be any change in the information provided herein. Shannon L. Hill Managing Member Type or rint name Title or Authority 'a'ZZ- Signature Dat I , � �1� Nam-- � r�� ✓� , a Notary Public of the County of C O,,f" vYt State of North Carolina, hereby certify that %r�N� N �. ( appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness my hand and notarial seal, this ),� day of J Ll t—f- , 20 0 :C3:� ame Spencer Notary Se IARY PUBLIC M county.NC My commission expires %� Ali &o�� JOHNSTON COUNTY EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST The following items shall be incorporated with respect to specific site conditions, in an erosion & sedimentation control plan: NPD/ES Construction Stormwater General Permit NCG010000 Y Designation on the plans where the 7 or 14 day ground stabilization requirements apply per Section II.B.2 of the permit. Design of basins with one acre or more of drainage area for surface withdrawal as per Section II.B.4 of the permit. LOCATION INFORMATION Project location & labeled vicinity map (roads, streets, landmarks) North arrow and scale Provide a copy of site located on applicable USGS quadrangle and NRCS Soils maps GENERAL SITE FEATURES (Plan elements) Property lines & ownership ID for adjoining properties Existing contours (topographic lines) Proposed contours Limits of disturbed area (provide acreage total, delineate limits, and label). Be sure to include all access to measures, lots that will be disturbed, and utilities that may extend offsite. Planned and existing building locations and elevations Planned & existing road locations & elevations, including temporary access roads Lot and/or building numbers Hydrogeologic features: rock outcrops, seeps, springs, wetland and their limits, streams, lakes, ponds, dams, etc. (include all required local or state buffer zones and any Riparian Buffer determinations) JEasements and drainageways, particularly required for offsite affected areas. Include copies of any recorded easements and/or agreements with adjoining property owners. Profiles of streets, utilities, ditch lines, etc. Stockpiled topsoil or subsoil locations If the same person conducts the land -disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, they shall be considered separate land -disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act. N/A Location and details associated with any onsite stone crushing or other processing of material excavated. If the affected area associated with excavation, processing, stockpiles and transport of such materials will comprise 1 or more acres, and materials will be leaving the development tract, a mining permit will be required. N/A Required Army Corps 404 permit and Water Quality 401 certification (e.g. stream disturbances over 150 linear feet) EROSION & SEDIMENT CONTROL MEASURES (on plan) N/ Legend (provide appropriate symbols for all measures and reference them to the construction details) Location of temporary measures Location of permanent measures Construction drawings and details for temporary and permanent measures. Show measures to scale on plan and include proposed contours where necessary. Ensure design storage requirements are maintained through all phases of construction. Maintenance requirements for measures Contact person responsible for maintenance SITE DRAINAGE FEATURES Existing and planned drainage patterns (include off -site areas that drain through project and address temporary and permanent conveyance of stormwater over graded slopes) VMethod used to determine acreage of land being disturbed and drainage areas to all proposed measures (e.g, delineation map) Size, pipe material and location of culverts and sewers Soil information: type, special characteristics Soil information below culvert storm outlets Name and classification of receiving water course or name of municipal operator (only where stormwater discharges are to occur) STORMWATER CALCULATIONS Pre -construction runoff calculations for each outlet from the site (at peak discharge points). Be sure to provide all supporting data for the computation methods used (rainfall data for required storm events, time of concentration/storm duration, and runoff coefficients). Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients for the site) Design calcs for culverts and storm sewers (include HW, TW and outlet velocities) Discharge and velocity calculations for open channel and ditch flows (easement & rights -of -way) Design calcs for cross sections and method of stabilization for existing and planned channels (include temporary linings). Include appropriate permissible velocity and/or shear stress data. Design calcs and construction details for energy dissipaters below culvert and storm sewer outlets (include stone/material specs & apron dimensions). Avoid discharges on fill slopes. Design calcs and dimension of sediment basins (note current surface area and dewatering standards as well as diversion of runoff to the basins). Be sure that all surface drains, including ditches and berms, will have positive drainage to the basins. VEGETATIVE STABILIZATION Area & acreage to be stabilized with vegetation Method of soil preparation Seed type & rates (temporary & permanent) Fertilizer type and rates Mulch type and rates (include mulch anchoring methods to be used) NOTE: Plan should include provisions for groundcover in accordance with NPDES Construction Stormwater General Permit NCG010000 and permanent groundcover for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. FINANCIAL RESPONSIBILITY/OWNERSHIP FORM Completed, signed & notarized FR/O Form Accurate application fee payable to Johnston County Public Utilities Certificate of assumed name, if the owner is a partnership Name of Registered Agent (if applicable) Copy of the most current Deed for the site. Please make sure the deed(s) and ownership information are consistent between the plan sheets, local records and this form. Provide latitude & longitude (in decimal degrees) at the project entrance. NARRATIVE AND CONSTRUCTION SEQUENCE Narrative describing the nature & purpose of the construction activity Construction sequence related to erosion and sediment control (including installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilized). Address all phases of construction and necessary practices associated with temporary stream bypasses and/or crossings. Bid specifications related only to erosion control JCPU ESC August 2013