Loading...
HomeMy WebLinkAboutSW8110716_CURRENT PERMIT_20220607STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 07 16 DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2022 06 p 7 YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director June 27'", 2022 Taylor & Sullivan, LLC Attn: Robert Taylor, Manager 7290-3 Beach Drive, SW Ocean Isle Beach, NC 28469 NORTH CAROLINA Envlronmenral Quality Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 110716 Family Dollar Holden Beach Brunswick County Dear Mr. Taylor: Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR" ). All previous references to DWQ will remain in older permits issued Prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on June 24'", 2022. The Division is hereby notifying you that permit SW8 110716 has been renewed, updated, and re -issued on June 27'", 2022, as attached. Please be aware that the renewal and re -issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until August 29", 2029 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Wilmington Regional Office. If you have any questions concerning this permit, please contact Dylan McPeake in the Wilmington Regional Office at (910) 796-7215 or dylan.mcpeake@ncdenr.gov. Sincerely, .9PBrian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment C— Permitting History Renewal Application Documents DES/DM: \\\Stormwater\Permits & Projects\201 1\1 10716 I ID\2022 06 permit 110716 cc: Wilmington Regional Office Storrnwater File D_EQ,� North Carolina Department of EnvironmentalQpallry I Division of Energy, Mineral and land Resources ./ Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 2E405 910.796,7215 Post -Construction Stormwater Management Permit No. SW8 110716 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Taylor & Sullivan, LLC Family Dollar Holden Beach 1123 Sabbath Home Rd SW, Supply, Brunswick County FOR THE construction, operation and maintenance of one infiltration basin in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until August 181, 2029 shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 30,027 square feet of impervious area. Page 1 of 6 Post -Construction Stormwater Management Permit No. SW8 110716 3. This project has been designed to infiltrate the 10-year 24-hour storm even without discharge at half of the infiltration rate reported by the soils report. Therefore, no bypass, vegetated filter strip or additional storage volume is required. 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 on page 2 of this permit, and as shown on the approved plans. The built -upon area for the future development is limited to 0 square feet. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 7. The project shall provide a 50' wide vegetated buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high-water line of tidal waters. 8. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: a. Drainage Area, acres: 0.915 Onsite, ftz: 39,870 Offsite, ftz: 0 b. Total Impervious Surfaces, ftz: 30,027 Onsite, ftz: 30,027 Offsite, ftz: 0 C. Design Storm, inches: 7.08 (10yr storm) d. Basin Depth, feet: 3.5 e. Bottom Elevation, FMSL: 35.5 f. Bottom Surface Area, ft2: 4.033 h. Permitted Storage Volume (10yr), ft3: 19,410 i. Predevelopment 1 yr 24 hr peak flow, cfs: 0.27 j. Post -development 1 yr 24 hr peak flow, cfs: 0.00 k. Type of Soil: Sand 1. Expected Infiltration Rate, in/hr: 13.5 (per soils report) M. Seasonal High -Water Table, FMSL: 33.5 n. Time to Draw Down, hours: 7.6 o. Receiving Stream/River Basin: ICWW / Lumber P. Stream Index Number: 15-25 q. Classification of Water Body*: "SA; HQW' *This site drains to SA waters, but is over a half mile from the receiving stream. It. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 2 of 6 Post -Construction Stormwater Management Permit No. SW8 110716 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 5. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 10. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of Page 3 of 6 Post -Construction Stormwater Management Permit No. SW8 110716 the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur; V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); Page 4 of 6 Post -Construction Stormwater Management Permit No. SW8 110716 b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143- 215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 5 of 6 Post -Construction Stormwater Management Permit No. SW8 110716 Permit renewed and reissued this the 27t' day of June, 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION �1 Nct r };-fB�- "ia -�I fn— renn— Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 6 of 6 Attachment C - Permitting History Permit No. SW8 110716 Approval Date Permit Action BIM Version Description of the Changes 8/29/201 1 Original Approval 1.0 6/27/2022 Renewal 2.0 Expires on 8/29/2029 Permit Number: (to be provided by DWQ� Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the infiltration basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future roblems-wither Sion. JUL 0 5 2011 Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. g2�C�IVEY� JUL 0 5 2011 LY:-- Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 JUL 19,2011 11:50A 000-000-00000 page 3 Permit Number: (to be provided by UWQ) I acknowledge and agree by my signature below that 1 am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Projeci nume:F'antily Dollar Holden Beach BMP drainage area number: Print name:Robert A, Ta• for Title:Mcmber Mana lc•r _ Address:7057 41 Beach Drive, Occan Isle Beach, NC: 28469 Phone:910-57.-02 ' Signature:_ . Date:_. '% /9—z a// Note: The legally responsible petty should not be a homeowners asSooialion unless more then 50%of the lots have been sold and a resident ol'the subdivision has been named the president. 1, s 1^U\ 11.E N .� T `�t C C A�, a Notary Public for the State of County 01'_ ('11 C-) _ do hereby certify that _1S&qA.b personally appeared before me this day of__�Ul q — b _,and acknowledge the due execution of tile forgoing infiltration basin maintenance ��.• �� Jt/ •rr� SEAL r uirements. Witness my hand and official )An My commission expires.ao I C' Fonn SW401-Inflltmtion fiaSln O&M -Rev., RECEIVED JUL 21 2011 BY: Page 3 of 3 ,.�. �� �_ .. i, i — J =l� i a � � �� .... r� �, � � ' �i '� 1 `� � I ` I Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Famil BMP drainage area Print Phone: Signature: Date: -7- / - // Note: The legally responsible party should not be a homeownersi the lots have been sold and a resident of the subdivision has tion unless more than 50% of named the president. the State of �ltSY� i nmIA'na , County of - ender , do hi reb A I MMMI i I O,IkTr personally appeared bf day of G i_,2oll and acknowledge the due execut forgoing infiltration basin maintenance requirements. Witness my hand ``1p1\ 11111111 � MOO a. 40TAR) - = o. 9 COU�\ ��lllllll nwO' SEAL My commission expires In 15- I I certify that •e me this 1 n\ f the nd\official seal, JUL 0 5 2011 Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 110716 2. Project name: FAMILY DOLLAR HOLDEN BEACH 3. Project street address: 1123 SABBATH HOME ROADSW City: SUPPLY County: BRUNSWICK ZIP: 28462 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https //deo nc gov/about/divisions/energv- mineral-la nd-resources/energy-mineral-land-rules/stormwate r-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https //deo nc gov/aboutidivisions/energv-mineral-land resources/energy-mineral-land-rules/stormwater-grogram/postconstruction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: TAYLOR & SULLIVAN LLC 2. Signing Official's Name: ROBERT TAYLOR 3. Signing Official's Title: MANAGER 4. Mailing Address: 7290-3 BEACH DRIVE, SW City: OCEAN ISLE BEACH State: N. C. ZIP: 28469 5. Street Address: 7290-3 BEACH DRIVE, SW City: OCEAN ISLE BEACH State: N. C. ZIP: 28469 6. Phone: (910) 579-3521 Email: wftproperties0atmc.net rJ CEIVE UN 2 4 2022 BY: Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 W, r C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph',2, USMP, Non -Coastal HQW/0RW9. Only applications packages that include all required items listed'below will be accepted and reviewed. In f 'al each item below to indicate that the required information Is provided in the application package: 1. A Hermit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy, and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the, signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. 0M Agreements, Please select one: I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the. project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/bv title/ Business Registration ECEIVE JUN 2 4 2022 Stormwater Permit Renewal Application Form Page 2 of 3 May I i, 2018 D. PERM!IITTE,(E'S/ CERTIFICATION I; �7P1 / f( �i L , the person legally responsible for the permit, certify that I have a copy of the Permit alhd O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SC.Mms. or ownership. AlljyDqation provided on this permit renewal application is, to the best of my knowledge, correc co pi Signature: Date: NOTARIZATION I; /1 Q tl r 5 e. Ye & '04 /i , a Notary Public for the State of AlAr-fX( (Aa rO�ln , County of �Pru n/S' uQ i C�, do hereby certify that /T Q.le r 7Z- I i—a bzler personally appeared before me this the ".'V '/X'— day of _-// Ne— , 202,? , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, EGEIVE JUN 2 4 2022 BY: Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 i, �.l q1t ~ Permit No. (to be provided by DWQ) _o?oF warE,yo` A STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Contact Person Phone Number Date Drainage Area Number II. DESIGN INFORMATION . Site Characteristics Drainage area 39,870.00 ry� Impervious area 30,027.00 rye Percent impervious 0.75 % Design rainfall depth 2.18 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area 3.88 in 4.87 inlhr 0.27 ft'/sec 0.00 ft'/sec -0.27 ft'/sec 5,298.00 ft' 19,410.00 ft' ft' ft' ft' it, ft' Sand 13.50 inmr 33.50 fmsl 0.10 days ;1.uu :1 35.50 fmsl 392 fmsl 7,170.00 ftz 39.00 fmsl 75.00 ft 50.00 ft 4,033.00 ft' OK for non -SA waters OK OK OK gECFIVED AUG 2 2 2011 BY:_------- Form SW401-Ingnreriun Basin-Rev.4 Parts I. & 11. Design Summery, Page 1 of 2 Permit No. (to be Provided by DWO) Additional Information Maximum runoff to each inlet to the basin? 2.00 ac-in OK Length of vegetative filter for overflow na ft OK Distance to structure na fit OK Distance from surface waters 3000+ ff OK Distance from water supply well(s) 100+ It OK Separation from impervious soil layer 2.0+ It OK Naturally occuring soil above shwt 2.00 it OK Bottom covered with 4-in of clean sand? y (Y or N) OK Proposed drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Bypass provided for larger storms? na (Y or N) OK Pretreatment device provided Conveyance swat and drop inlets AUG 2 2 2011 BY: Form SW401-Inftlretion Basin-Rev.4 Parts I. ti 11. Design Summary. Page 2 of 2 Permit No. (to be provided by DINO) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. C ( 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. 6X r 0 2 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. S 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. errs 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 6. A construction sequence that shows how the infiltration basin will be protected from sediment unfit the entire drainage area is stabilized. ' rs lK /0 _ 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). REC�IVED JUL 0 5 2011 BY:_----- Farm SW401-Infiltration Basin-Rev.4 Page 1 of 1 Parr III. Required Items Checklist, Page 1 of 1 TE 10045 State Stormwater Management Systems Permit No. SW8 110716 Family Dollar Holden Beach RECEIVED V�2 Stormwater Project No. SW8 110716 Brunswick County MAR 1 5 2012 Engineer's Certification I, Phillip G. Tripp , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, Family Dollar Holden Beach (Project) for Taylor & Sullivan, LLC (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registratic Date 3 - 1+• li2 ```e��unrrr�7j O CA -� FESS Ro�i��; � QUO 0�,, •. i i SEAL 17374 Q4 iryEFR ��� tEAL 'EGO0>>��� nnn%�� r� State Stormwater Management Systems Permit No. SW8 110716 Certification Requirements: Page 2 of 2 er� 1!7;0- 1. The drainage area to the system contains approximately the permitted acreage. � 2. The drainage area to the system contains no more than the permitted amount of built -upon area. �3. All the built -upon area associated with the project is graded such that the runoff drains to the system. � 4. All roof drains are located such that the runoff is directed into the system. � 5. The bypass structure weir elevation is per the approved plan. _.0_6. The bypass structure is located per the approved plans. _QD__7. A trash rack is provided on the bypass structure. ,8. All slopes are grassed with permanent vegetation. �9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. �11. The permitted amounts of surface area and/or volume have been provided. c�12. All required design depths are provided. t^13. All required parts of the system are provided. 014. The required system dimensions are provided per the approved plan.