Loading...
HomeMy WebLinkAboutSW8001009_HISTORICAL FILE_20010213STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 po\oog DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Zoo 1 02 ►3 YYYYMMDD Staic,of North Carolina = Deliartinent of Environment and Natural Resources Wilmington Regional Office Michael F. Lasley, Governor William G. Ross, Jr., Secretary Division of Water Quality Mr. Rick Blacher, Owner 5665 Market Street Wilmington, NC 28405 Dear Mr. Blacher: 4 r1 r NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCE5 February 13, 2001 Subject: Permit No. SW8 001009 Smith Creek Boat Storage High Density Stormwater Project New Hanover County The Wilmington Regional Office received a complete Stormwater Management Permit Application for Smith Creek Boat Storage on January 17, 2001. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000. We are forwarding Pennit No. SW8 001009 dated February 13, 2001, for the construction of Smith Creek Boat Storage. This permit shall be effective from the date of issuance until February 13, 2011, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance ofthe stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicator), hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/sav: S:\WQS\STORM WAT\PERMIT\00 1009. FEB cc: Jim Honeycutt, P.E. Tony Roberts, New Hanover County Inspections Scott Vinson Wilmington Regional Office Central Files 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 500/, recycied/10 % post -consumer paper State Stormwater Management Systems Permit No. SW8 001009 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMN'ATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes ofNorth Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Rick Blucher Smith Creek Bout Storage New Hanover County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 13, 2011 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as -described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 120,200 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. The runoff from all ofsite and offsite built -upon area permitted with this project must be directed into the permitted stormwater control system. 2 State Stormwater Management Systems Permit No. SW8 001009 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: Smith Creek Boat Storage Permit Number: SW8 001009 Location: New Hanover County Applicant: Mr. Rick Blacher, Owner Mailing Address: 5665 Market Street Wilmington, NC 28405 Application Date: January 17, 2001 Name of' Receiving Strcam/Index 9: Spring Branch / CFR 18-74-63-1 Classification of Water Body: "C Sw" If Class SA, chloride sampling results: n/a Pond Depth, Icet: 6.50 Permanent Pool Elevation. I'MSL: 24.00 Drainage Area, acres: 3.64 Total lnlperVlOUS SUI'faCCS, ftz: 120,200 Buildings, ft': 49,188 Parking, ft2: 71,012 Offsite Area entering Pond, ft': none, per Engineer Required Surface Area, f': 5,944 Provided Surface Area, It': 6,603 Required Storage VOIU111e, ft': 9,675 Provided Storage Volume, fP: 10,620 Temporary Storage Elevation, 1'MSL: 25.43 Controlling Orifice: 1.50 pipe 3 State Stormwater Management Systems Permit No. SW8 001009 11. SCIIEDULE OF COMPLIANCE The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas ofthe system will be repaired immediately. The perntitlee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. P. Access to the outlet structure must be available at all lines. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. A modification must be permitted prior to any construction. The following items will require a modification to the permit. The Director may determine that other revisions to the project should require a modification to the permit: I . Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. C. Furthcrsubdivision,acquisition, or sale oftheprojcctarca.Theprojectareaisdefinedits all property owned by the permittec, for which Sedimentation and Erosion Control Plan approval was sought. F. Filling in, aftering, or piping of any vegetative conveyance shown on the approved plan. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a mininnum of ten years front the date of the completion of construction. l State Stormwater Management Systems Permit No. SW8 001009 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed 13UA exceeds the pemitted amount, a modification to the permit must be submitted and approved prior to construction. 12. Prior to the sale ofany portion of the property, an access/maintenance casement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale ofany portion of the property. 13. The permitter is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within thetime frame specified in thenolice, thepermittee shall submita written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The permittee shall notify the Division ofany name, ownership or mailing address changes within 30 days HL GENERAL CONDITIONS '['his permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. '['he issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which havejurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall lake immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DLNR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Permit issued this the 13th day of February, 2001. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ✓1 e Kerr'- 1'� Stevens, Director' T� Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 001009 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION I. Applicants name (specify the name of the corporation, individual, etc. who owns the project): RICK BLACHER 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): RICK BLACHEP-- OWNER 3. Mailing Address for person listed in item 2 above: (o(o5 MA2KET 5TREET' City: W 1 LMI N G -M N State: NC, Zip: Z S 4.05 Telephone Number: ( 9 10 ) —799- 54 3 3 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): SMITH CP-EEk BOAT SToaAGE 5. Location of Project (street address): EPWICE ()-Oft "B" oFF MARKET ST2EE'1- WILMWG-roN 6. Directions to project (from nearest major intersection): County: NEW H"OVF—R TQpJEL NORTH ON 1Y%A9_4ZT 5-MEEr,CaOSS SMITH C.QEEK PA21CWAy, 7uetj LeFr oN Sek%il E 2040- PP-OPE2TV ON RIGHT Ac4Zt75S Flom W1Lft�)QvTbN 7. Latitude: Longitude: of project 8. Contact person who can answer questions about the project: Name: RICK BLACHEL Telephone Number:( 911) ) 799-5`F33 II. PERMIT INFORMATION: I. Specify whether project is (check one): New Renewal Modification Form SWU-101 Version 3,99 Page I of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number /A and its issue date (if known) 3. Specify the type of project (check one): _Low Density High Density _Redevelop _General Permit _Other 4. Additional Project Requirements (check applicable blanks): _LAMA Major V Sedimentation/Erosion Control _404/401 Permit ---NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. WET POND 2. Stormwater runoff from this project drains to the CAPE FEAR River basin. 3. Total Project Area: 3, G 4 acres 4. Project Built Upon Area: 7 S % TOTAL_ 51-rE (0.54 Ac2ES LPHA5E I 5. How many drainage areas does the project have? I 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. r PH A56 I PHASE 2—FUTUZE Basin hformahon ? y �' s DrainagArear 1 bra 7 +82ANCH Yxl�ia�nage Area 2 Ym Receiving Stream Name SPR1n16 SP iNG 82ANCH Receiving Stream Class C SW C S w Drainage Area 15 8 449 1 2. (0 4 7 (o Existing Impervious* Area PQ A N/A Proposed Im ervious*Area I Z 2 7 cl C) F U T U it E % Impervious* Area (total) $ F U TU k E Im ious uifaceyArea a al D_,zra , 'vb �I; a'_ � , pg 2r: .rrn On -site Buildings y 9 1 $g FUTU2E On -site Streets r'J /A FU TU2 E On -site Parking -] I p I Z FU TU 2 E On -site Sidewalks "'/A F U TU RE Other on -site N/A FUTWLE Off -site /A FU TOP-E Total: 12 2 -799 Total: FU -ro 12 E Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the offsite impervious area listed above derived? N I R IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not befilled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5093 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 'JI A VA hurvi an V, WOUPT7,15 AfTravvy 5"Unaw! Lao -if. donL&I bt,h it, yuki yKnIgHd 111, *(-"Y 191, TON iji ynao,j4 VA ,;;I I in -;Ut 11:;AJ -,(J� fi:;- UY" g Ann rr 04 An" yi- 4 09A _Vil�r,j;, *,:)Z Ww, 11110Y.0 I aw" now ew (ice pi OW" 01 n1bol usit A—mi 2"r ink , n V.Pi7 lit nraws wosif ;QwQ city! 1( 'on, xiwrl OKI! "A sm"IR QUO aq w 1; bovulonva 1w w1v Soon, Qwv, at: n a, VAY S, am Rw wn 4"" wn TITTV', Q 4: Z;T, 7,:. -W 1014: 'Ali: 1-). r,lqp•i i; 1"I. Y4,,r3fFI1'T 9*Y0,!:,.-.g b"S "nY w tool huhus"I imp "Wife oromw in Qvnea ad union j;y; 0 10, 011!jt r%+ ( I<f.;iw nw ;R x 1, i , qc q. .3 % K 01 wi-q in: w." Ili%, m* L;,t; 90.1 10i Wow, If} n"a whAd AS uns"7 fewwWWWaST lo vii1j'IMIT'vo Ah wis it) z J`- k. q,:c1-! -E 0 i -U 11PR i-n iiC, U1,12 -1 favvi !aBjgqqqUA jeS VU,,,g Ad W, MIS, VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. I. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VIL AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): H o H EY CU T T E N 61 N E E R-I M ro GO (,hp AN y Mailing Address: P. 0 • so). 1503 (P City: W I L-fy) I N Ca To N State: M• C. yip: Z$ 4 O S Phone: L 910 3SO- 0(031 Fax:( 910 ) 350-010 3I VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. / Signature:_ /L�� 04 Date: Form SWU-101 Version 3.99 Page 4 of 4 Permit No. SW1491) 9 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: SMITH C R-EEIL BOAT S T02A6E Contact Person: RICK BLACHER Phone Number: (QIO ) 1 qq- 5433 For projects with multiple basins, specify which basin this worksheet applies to: elevations Basin Bottom Elevation 11. 5o ft. Permanent Pool Elevation 24- 00 ft. Temporary Pool Elevation 25.143 ft. areas Permanent Pool Surface Area (o (D O 3 sq. ft. Drainage Area 3. 64 ac. Impervious Area 2.7 (D ac. volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SA/DAI Diameter of Orifice Design Rainfall Design TSS Removal 2 (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on -site and off site drainage to the basin) (on -.rite and off -site drainage to the basin) 14 -7 2(o cu. ft. (combined volume of main basin and forebay) 1 0 (D G 7 cu. ft. (volume detained above the permanent pool) ,-549*e-' cu, ft, (approximately 20%of total volume) 3�p1 S.'U a s peir N �„�ycv�l" in kAe, rece"wJ 1�17�01, a/t3ta1 O. O 375 (surface area to drainage area ratio from DWQ table) 1.5 in. (2 to 5 day temporary pool draw -down required) I in. 9 O % (minimum 85% required) Fonn SWU-IQ2 Rev 3.99 Page 1 of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Initials a�,erugt. -11/7_ a. The permanent pool depth is between 3 and.6" feet (required minimum of 3 feet). L— b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) I. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. in. A mechanism is specified which will drain the basin for maintenance or an emergency. I L WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does This system (check one) 0 does I,f ,does not incorporate a vegetated filter at the outlet. 9 does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads ._ feet in the main pond, the sediment shall be removed. When the permanent pool depth reads Sediment Bottom El. LILZ ------------ on IySU FOREBAY feet in the forebay, the sediment shall be removed. BASIN DIAGRAM III in the blanks) Permanent Pool Elevation 2 9, C 6 Sediment Removal Elevation 1 q, 12- ------------------------- o Bottom Elevation I7 i 25910 MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 l 4 V. Ali components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system responsible party. Print name: /✓ Date: 2% 20/l0 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, }heee2 l7 • ! C�Ci�lt lu a Notary Public for the State of cage�t County of nPW 1JA/SOY(92 do hereby certify that 104A213��- personally appeared before me this Iq day of ,�?pPlFm/aE2 O_, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires _ V i t��Q�9 Form S W U-102 Rev 3.99 Page 4 of 4 HONEYCUTT ENGINEERING CO. CONSULTING ENGINEERS 610 HIDDEN VALLEY ROAD WILMINGTON, NC 28409 910-350-0631 January 8, 2001 State of North Carolina Department of Environment And Natural Resources Division of Water Quality Re: Smith Creek Boat Storage Stormwater Project Number SW8 001009 Dear Mr. Vinson: JAN 17 dol I have reduced the size of the fore bay and have included two drawings and new calculations for your review. Sincerely, James R. Honeycutt, Jr. P.E. 9 Drainage Calculations for Smith Creek Boat Storage Market St. Wilmington, NC Project 00-004 A site - 284925A site = 6.541 acres ...total area 43560 A total = A site A total = 6.541 At := 158449 Al = 3.6375 43560 26 1476 A2 = A2 = 2.9035 43560 Al paved - 71012 Al paved = 1.63 acres acres - Phase 1 acres - Phase 2 43560 Al side 0 43560 Al side = 0 acres 49188 Al bldg = 1.129 At bldg 43560 Al imp = At paved' Al side ...total drainage area acres ...paved area phase 1 .. sidewalk areas phase 1 acres ....building area phase 1 Page 1 9/12/00 Revised 1/04/01 nE C E I V ED IIUUnnSS�� JAN 1' 7 2001 DWQ PROD 9 Al imp = 1.63 acres - total impervious area excl. bldgs phase 1 Al other At - Al imp - Al bldg Al other = 0.878 phase 1 C pfe .30 ...pre -development C C imp = .95 ...paved area C C bldg := 1.00 C1 ._ �C �Al otherl CAl imp1 +C pre Al / imp' I\ Al j bldg- comp 1 Al CI comp = 0.81 ... phase 1 composite C (post -development) A2 paved 5 A2 A2 aved = 1.452 acres ...paved area phase 2 A2 side = 0 A2 bldg:= .3•A2 P A2 side = 0 A2 bldg = 0.871 acres ... sidewalk areas phase 2 acres ....building area phase 2 �,.... CAR,.,,.. * { SEAL T_ 9524 A2 imp := A2 paved +- A2 side A2 imp = 1.452 acres - total impervious area excl. bidgs phase 2 A2 other = A2 - A2 imp - A2 bldg A2 other = 0.581 phase C2 comp _ C pre' (A2other� + C imp' ( A2 p� + C bldg' (A2 A2 bldg) C2 comp = 0.83 ... phase 2 composite C (post -development) L := 710 ft .hydraulic length PC-. H := 15 ft ( 31 385 \H/ T c 128 T c = 5.41 ...time of concentration Drainage Calculations for Smith Creek Boat Storage Market St. Wilmington, NC ...height Intensity -Duration -Frequency Relationships: Values of G and H' R G H 10 252 30 50 338 33 R= Return Period 'Source: Master Drainage Plan for City of Wilmington T := T c Time of duration G 10 := 252 H 10 := 30 G 10 1 10 '= (H 10 + T) 110 = 7.12 in/hr G 50 '= 338 H 50 := 33 G 50 150 := (H 50 + T) 150 = 8.8 in/hr Compute runoff rates Q pre C pre' 1 10' (A total) Q pre = 13.96 cfs Q1preCpre- 110-(Al ) Q1 pre = 7.77 cfs 02pre C pre'l 10.(A2) Q2 pfe = 6.2 cfs Q1 10 := C1 comp-1 10-(A1 ) 10 year storm intensity ...50 year storm ...total pre -development runoff from 10 yr. storm ...phase 1 pre -development runoff from 10 yr. storm ...phase 2 pre -development runoff from 10 yr. storm Q1 t0 = 20.93 cfs ...phase 1 post -development discharge rate to pond from 10 yr. storm Qt 50 C1 comp" 50'(A1 ) Q1 50 = 25.88 cfs ...phase 1 post -development discharge rate to pond from 50 yr. storm Page 2 Drainage Calculations for Smith Creek Boat Storage Market St. Wilmington, NC Q2 10 C2 comp' 110' (A2 ) Q2 10 = 17.25 cis ...phase 1 post -development discharge rate to pond from 10 yr. storm Q2 50 C2 comp' 150.(A2) Q2 50 = 21.33 cfs ...phase 1 post -development discharge rate to pond from 50 yr. storm Volume of runoff from developed area of site: P := 4.8 in CN 76 Curve No. S = 1000) _ 10 S = 3.158 CN R (P - 0.2 S )2 R 2.372 in. ...runoff depth depth P + .8 S depth = R1 vol R depth'(Al ) 43560. 12 R1 vol = 31316 cubic feet ...phase 1 runoff volume T1 := Rdepth'(A1) 1 43560 p 1.39.(Q110) (12) 60 T1 p = 17.94 ...time to peak flow phase 1 R2 vol R depth' (A2)'43560. 12 R2 vol = 24997 cubic feet ...phase 2 runoff volume T2 P - R depth' (A2) (12/ � 1.43560 1 T2 P = 17.37 ...time to peak flow phase 1 1.391(Q210\f 60 PHASE 1 POND: Determine size of pond without vegetative filter: depth := 6.5 ft IMP% Al imp + Al bldg IMP% = 0.7586 Al IMP% 70 :_ .034 IMP% 80 = .040 i = 0..1 xi vyi 70 L'MP%70 P% 80 vxi := xi IMP := linterp(vx, vy, IMP% 100 ) IMP = 0.037516 Page 3 Drainage Calculations for Page 4 Smith Creek Boat Storage Market St. Wilmington, NC DA :_ (A1 )•43560 SA req :_ (IMP). DA SA req = 5944 sq.ft slope 1 6 ...min. slope of shelf slope 2 2.5 ...min. slope of pond below shelf shelf 2 ft. ...depth of shelf w :_ ( depth - shelf) - slope 2.2 + shelf. slope 1.2 w = 46.5 ...minimum width of permanent pool w : = w ft. - width chosen w = 46.5 ft. I := 3•w 1 = 139.5 ft. ...min. length of permanent pool 1 := 142 ft. - length chosen ...Required surface area SA prov I.w SA prov = 6603 ...sq.ft. of surface area provided must be =SA feq = 5944 sq.ft. Determine storage volume required for treatment of first inch of runoff: C1 comp = 0.809 V := 112 (At )•43560•C1 comp V = 10677 cubic feet of storage required Solve for depth "d" to provide required storage: d = 1.5 ...guess value f(d) := I•w+ (I + 6•d)•(w r 6•d).d 2 g(d) := V d = root((f(d) - g(d)),d) ...function of d for rectangular pond w/3:1 side slopes d = 1.43 ft. - depth required to provide required storage for 1 inch with site fully developed Q 2day 2 24 60 60 Q 2day = 0.0618 cfs ...Max discharge for 2 day drawdown V 0 5day :- 5 24.60-60 Q 5day = 0.0247 g,=32.2 Cd:=.6 cfs ...Max discharge for 5 day drawdown ...orifice coefficient h.=d h=0.717 ft 2 Drainage Calculations for Smith Creek Boat Storage Market St. Wilmington, NC .avg. head A = Q 2day A - 0.015 Square ft. orifice s orifice Cd(2gh)' s D := 4• A orifice 12 D = 1.668 3.14 Q 5day = 0.0247 cfs Q in. - for 2 day drawdown A 5day_ A = 6.064.10S uare ft. orifice = orifice q Cd(2gh)'5 5 A orifice D 4• 12 D = 1.055 ( 3.14 Use 1.5 inch diameter pipe in routing chart in - for 5 day drawdown Determine volume of permanent pool in order to size forebay: is=0..7 k:=1..7 Ai := ...area of contour 24.00 ...area of contour 23.00 ...area of contour 22.00 ...area of contour 21.00 ...area of contour 20.00 ...area of contour 19.00 ...area of contour 18.00 ...area of contour 17.50 Akk-1 {'Ak Vk:= 2 Dk ...incremental volume DI corresponding depth from contour above V pond = �V ...total volume equals the sum of the incremental volumes V pond = 14726•ft3 ...total volume in permanent pool V required .20• V pond ...forebay volume equals 20% of total pool volume V required = 2945•ft3 ...cu.ft. required in forebay Page 5 Drainage Calculations for Page 6 Smith Creek Boat Storage Market St. Wilmington, NC Determine volume in forebay: m:=0..7 n,=1..7 am := dm := corresponding depth from contour below ...area of contour 17.50 ...area of contour 18.00 ...area of contour 19.00 ...area of contour 20.00 ...area of contour 21.00 ...area of contour 22.00 0. ry' .5.ft1 1-ft' 1-ft 1. ftt 1. ftt area of contour 23.00 1•ft1 area of contour 24.00 1. ftt an vn := a"- 1 } -dn ...incremental volume 2 V forebay Iv ...total volume in forebay equals the sum of the incremental volumes V forebay = 3018•ft3 ...total volume in forebay must be >= V required = 2945*ft3 Check capacity of emergency spillway to pass 50 year peak flow: L 18 ft ... Length of weir H 8 ft ...Driving head C W := 3.0 ...Weir coefficient 12 Q := C w' L- H1.5 ...Weir capacity Q = 29.39 must be => Q1 50 = 25.88 O.K. Using a 15" barrel, check velocity at outlet from pond: D := 1.25 ft q 7 8.63 cfs ...max barrel discharge from routing sheets n DZ A pipe := 4 A pipe = 1.227 V outlet q _ V outlet = 7.03 fps A pipe Determine outlet apron dimensions and riprap size for discharge from pond: From Figure 8.06.b.1 and Figure 8.06.b.2 choose Zone 2. L a := 6• D L a = 7.5 ft - minimum length of apron from figure BMW W := 3 D W = 3.75 ft - minimum width of apron from figure 8.06b2 dia := 6 diameter of stone in inches d max 1.5 die d max = 9 max. stone diameter t := 16 in. min. thickness of apron in inches Drainage Calculations for Smith Creek Boat Storage Market St. Wilmington, NC Determine outlet apron dimensions and riprap size for discharge to pond V := 5.1 fps - from pipe sizing chart D:=2 ft From Figure 8.06.b.1 and Figure 8.06.b.2 choose Zone 1. L a := 4• D L a = 8 ft - minimum length of apron from figure 8.06b2 W := 3• D W = 6 ft - minimum width of apron from figure 8.06b2 dia := 6 diameter of stone in inches d max 1.5-dia d max = 9 max. stone diameter t := 18 in. min. thickness of apron in inches Check velocity at pipe outlet under entrance drive: D:=4 ft headwater := 35.00 - 26.00 headwater = 9 ft. hwd headwater hwd = 2.25 q pipe 165 cfs - From "Hydraulic Design of Highway Culverts", a 48" pipe with headwater depth of 9' Using this flow, calculate velocity of water exiting pipe: n DZ A pipe := 4 q pipe Voutlet '` A pipe A pipe = 12.566 V outlet = 13.1 fps Determine outlet apron dimensions and riprap size for entrance drive: From Figure 8.06.b.1 and Figure 8.06.b.2 choose Zone 3. L a := 8 D L a = 32 ft - minimum length of apron from figure 8,06b2 W := 3• D W = 12 ft - minimum width of apron from figure 8.06b2 dia := 13 diameter of stone In inches d max 1.5• dia d max = 20 max. stone diameter t 24 in, min. thickness of apron in inches Now calculate velocities in diversion swale and check channel liner requirements: A _ 32174 A - 0.739 acres draining to Swale Swale 43560 Swale - A 3275 A - 0.075 acres disturbed area draining to Swale swaledist '- 43560 swaledist q 1 C pre1 10' A Swale q 1 = 1.577 ..total flow in channel in cfs from routing chart Page 7 Drainage Calculations for Smith Creek Boat Storage Market St. Wilmington, NC B := 0 ...bottom width of channel (ft) M := 3 ...side slopes typical of all ditches length := 530 fall := 11 8 := fall s = 0.021 ...channel slope length n := 0.20 ...roughness coeff. for retardance factor "C' (must be consistent with depth of flow) n Z feq := 1 � Z req = 1.469 ...Z required (from R.Malcolm) 1.49• N s y :_ .922 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A := B• y 1- M• (y)2 A = 2.55 ...Cross -sectional area of flow (sq.ft.) at depth y P := B+ 2-Y.1 .i_ M2 P= 5.831 R := A P 2 Zav:=A(R)3 R = 0.437 Z av = 1.469 Now compute velocity at this depth: 2 1 V = 1.49 R3 S2 n V-R = 0.27 V = 0.618 ...Z available fps Wetted perimeter (ft.) at depth y Hydraulic radius (ft.) at depth y Using this value, choose n from Figure 8.05c page 8.05.7 and adjust n above until consistent From Table 8.06a page 8.05A: V P := 4.5 fps - Permissible Velocity for channels lined with specified grass with slopes 0-4.5% in easily erodible non -plastic soils Since V<Vp, permanent channel lininta O.K. Now check velocity In bare soil to determine If a temporary channel liner Is required: n := 0.02 ...roughness coeff. for bare soil from Table 8.05b Using normal depth procedure, calculate depth of flow: Z req q 1 n Z req = 0.147 ...Z required (from R.Malcolm) 1.49. � y :_ .389 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A B- y i- M• (y )2 A = 0.454 ...Cross -sectional area of flow (sq.ft.) at depth y Page 8 P:=Br2•y 1+M2 P=2.46 R := A P 2 Zav:=A(R)3 R = 0.185 Z av = 0.147 Now compute velocity at this depth: Drainage Calculations for Smith Creek Boat Storage Market St. Wilmington, NC ...Z available Wetted perimeter (ft.) at depth y Hydraulic radius (ft.) at depth y 2 1 V := 149•R3•82 V = 3.479 fps n From Table 8.05d page 8.05.9: V p := 2.5 fps - Permissible Velocity for unprotected soils (fine sand) in channels Since V>Vp, a temporary channel lining is required Compute velocity in swale again assuming a curled wood mat as the temporary liner: n = 0.035 ...roughness coeff. from Table 8.05e Using normal depth procedure, calculate depth of flow: n Z req := 1 r Z req = 0.257 ...Z required (from R.Malcolm) 1.49• N s y := .48 ...depth of flow (ft.) - vary this number until Zav (below) is approx. equal to Z.req (above) - may also have to vary n above to be consistent with this depth A = B•y + M (y)2 A = 0.691 ...Cross -sectional area of flow (sq.ft.) at depth y P := B + 2•y 1 + M2 P = 3.036 ...Wetted perimeter (ft.) at depth y R := A R = 0.228 ...Hydraulic radius (ft.) at depth y P 2 Z av = A 3 (R) Zav = 0.258 .Z available Now compute velocity at this depth: 2 1 V 1.49 R3•s2 V = 2.287 fps n Calculate shear stress for this velocity: T allow = 1.55 lb per sq.ft allowable shear stress y := 62.4 ...unit weight of water Page 9 Drainage Calculations for Page 10 Smith Creek Boat Storage Market St. Wilmington, NC T',=yys T = 0.622 ...shear stress Since T<Tallow, temporary channel lining is O.K. REFER TO ATTACHED SHEETS FOR ROUTING RESULTS Note: References to chart nos., table nos., and page nos, refer to Erosion and Sediment Control Planning and Design Manual unless noted otherwise `:: C-. .. * * * COMMUNICATION RESULT REPORT ( NOV.29.2000 11:03AM ) * * * P. 1 FILE MODE -------------- 219 MEMORY TX OPTION REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER ADDRESS (GROUP) 9-3500631 �Gf 00SG� TTI NCDENR WIRO SULT P_9GE OK /' P. 1 E-2) BUSY E-4) NO FACSIMILE CONNECTION State of North Carolina Department of Environment and Natural Resources Division of Water Quality Wilmington Regional OEfee James B, Hunt, Governor Bill Holman, Secretary FAX COVER SHEET Date: November 29, 2000 No.'of Pages: 1 To: Jim Honeycutt, P.E. From: Scott Vinson Company: Honeycutt Engineering Co. Water Quality Section - Stormwater FAX #: 350-0631 FAX #: • 910-350-2004 Phone #: 910-395-3900 DWQ Stormwater Project #SWS 001009 Project Name: Smith Creek Boat Storage MESSAGE: Jim, everything on the application looks great except the size of the fore bay. Please reduce the size of the fore bay down from roughly 25% of the permanent pool volume to around 20%. Two new sets of plans will need to be submitted and once the new numbers and page 6 of the calculations are submitted I wil I be glad to correct the supplement form so there will not be a need to mail them back and forth between us. Please call if you have any questions. Thanks, Scott. Slate of North Carolina Department of 13nvironment and Natural Resources Division of Water Quality Wilmington Regional Office .lames B. I lunl, Governor FAX COVER SIIEET Date: November 29, 2000 To: Jim lioncycutt, P.E. Company: lioncycutt Engineering Co. FAX #: 350-0631 DWQ Stormwater Project #SW8 (101009 Project Name: Smith Creek Boat Storage M ESSAC E: Bill Holman, Secretary No.'of Pages: 1 From: Scott Vinson Water Quality Section - Storinwater FAX #: 910-350-2004 Phone #: 910-395-3900 Jim, everything on the application looks great except the sire of the fore bay. Please reduce the sire ofthe fore bap down from roughly 25%ofthe permanent pool volume to around 20%. Two new sets of plans will need to be submitted and once the new numbers and page 6 of the calculations are submitted I will be glad to correct the supplement form so there will not be a need to mail them back and forth between us. Please call if you have any questions. Thanks, Scott. S:\WQS\S"fORM WA'IAADDINI--O\001009.NOV 127 Cardinal Drive Batcnsion, Wilmington, NC 28405-3845'1'etephone (910) 395-3900 FAX (910) 350-2004 An liqual Opportunity Affirmative Action Employer BOAT STORAGE FACILITY MARKET STREET NARRATIVE ON STORMWATER MANAGEMENT This site consists of 6.54 acres that will be developed in two phases. A drainage ditch running from south to north divides the site into two drainage basins. That part of the site on the eastern side of the ditch consists of 3.63 acres that will be developed as Phase 1. It is that portion of the site for which this permit application has been prepared. It is planned to construct two buildings and the associated drives to access these buildings. The storm water runoff will be collected and treated in a wet pond in the northwest comer of Phase 1. Since there are two distinct drainage basins it is anticipated that each basin will be permitted as if they were separate sites with individual wet ponds for each phase. The second phase of this project has not been planned at this time. Some references to Phase 2 will be seen in the calculations for planning purposes but should be ignored for this application. A pocket of wetlands exists in the northwest corner of Phase 2. These wetlands will not be disturbed during the first phase of construction. The bottom of the drainage ditch for its entire length through the site is also considered wetlands. These wetlands will be disturbed only in those areas necessary to gain access to the site and to construct the outlet and overflow structures for the pond. New // T/ 1/ O WP RECEIVED OCT 0 6 2000 DWQ PROJ # I