Loading...
HomeMy WebLinkAboutNCC204947_MODIFICATION Supporting Documents_20221115 (3)Jr CONSTRUCTION SEQUENCE STAGE 1 1. SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH JOHNSTON COUNTY PUBLIC UTILITIES. ( _ N/ 1 l / / 2. AFTER THE PRE -CONSTRUCTION MEETING IS HELD, THE CONTRACTOR CAN DELINEATE \163802-58-)66 THE TREE LINE / DISTURBANCE LIMIT LINE AND INSTALL INITIAL EROSION CONTROL (OHN JOHNSJN I I / % / / / / / / / / MEASURES ONLY. THIS INCLUDES, BUT IS NOT LIMITED TO, CONSTRUCTION ENTRANCE, D 1902 PG 9 � — — — � / / / / / SILT FENCE/TREE PROTECTION FENCE, TEMPORARY SKIMMER BASINS, TEMPORARY RISER BASIN #3, AND EXISTING INLET PROTECTION. PERMANENT POND #4 (TRB#3) WILL / / \ \ I / / I REMAIN A TEMPORARY RISER BASIN THROUGH CONSTRUCTION OF THESE PHASES. / / / // \ \ I I / I / I / EXCAVATE THE TEMPORARY RISER BASINS AND THE TEMPORARY SKIMMER BASINS AND ADD THE FAIRCLOTH SKIMMERS AND THE COIR BAFFLES. ONCE THESE BASINS ARE INSTALLED AND OPERATIONAL, CONSTRUCT THE TEMPORARY DIVERSION CHANNEUBERM. INSTALL SUBSURFACE DRAINAGE Cl 78A, Cl 78 TO EXISTING Cl 14 FOR OUTLET OF SKB-3. ONCE PERMANENT POND 3 BASIN IS COMPLETED, INSTALL // \ / / / \ l I I \ / / � �� SUBSURFACE PIPING FROM FES 20C TO MH 20B JUST SHORT OF MH 2OA. 30" RCP TO BE ALL 3,[y, / / / / / / / INST STLT _ _ I I I \ \ I / �� EXTENDED AS TEMPORARY INLET FOR POND 3. INSTALL DIVERSION BERM TO DIRECT ASS /� KIPR IF�BA FLEE INALI/CLA�S B/ F CE (TYP.) 2 \ I \ \ I I I \ I I / / / / / UPSTREAM FLOW TO 30" RCP TO POND 3 ALONG WITH ALL OTHER TEMPORARY -RET�IFORC / \ / �TOI�4E RIPr>`2A j / / / / / / / \ DIVERSIONS. / /( / / / / / / / / \ \ \ \ \ / I 1 / / / / / 3. LIMIT CLEARING AND LAND DISTURBING ACTIVITY TO ONLY THE AREA NECESSARY TO TALLY / / / n / / / / / \ INSTALL THE PERMITTED MEASURES. / / / / / / \ I \ \ I / I / / 4. CALL JOHNSTON COUNTY PUBLIC UTILITIES FOR AN ONSITE INSPECTION TO CONTINUE /RE.NV ORCED / J / / I / / / \ I \ I I 1 I I // CONSTRUCTION. O(1 5. UPON APPROVAL OF THE STORMWATER SITE INSPECTION, COMMENCE PERMITTED LAND / / / / �/ \ I I I I / N DISTURBING ACTIVITY - CLEARING AND GRUBBING FOR STAGE 1. ALL EROSION IIJST LL ( 15"I 1 I \ / / — �\ ` \ �0 pF x \ I I I I I I I CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED, IF NEEDED, AT LEAST JA�JY "I /SLOPE D,RtAIN I ONCE PER WEEK AND AFTER EVERY RAINFALL EVENT. _ I sTAGE1A / T? L2'sIL� / E ((p, / / — — — — — IN TALL�1l24" / I ) \ I I f 1) IN ORDER TO BRING PHASE 3 AREA TO GRADE CONTINUE INSTALLATION OF / / / — — INS'fALLSsLASS � 20h / / / OBEDRAIN I I I \ \ I ZTON RIP RAO / / I ALL cc LLA$S B J I I J ( \ \ SUBSURFACE DRAINAGE FROM 30" RCP TO MH 2OA, Cl 20, Cl 21, Cl 21A, AND FES 21 B. / � fST 1 / / / B-Y / / / / /STIP RAP / / / / ` / / / J I / \ \ \ xl I I \ \ I \ \ I INSTALL HORSESHOE INLET PROTECTION AT FES 21 B. BRING GRADES UP AS I C / 260 — — / / FREVS4,, AI2Ek' 269`AC / / / I I / / / \ / \ \ \ APPROPRIATE AND INSTALL TEMPORARY INLET PROTECTION AS STRUCTURES ARE DI,Sk.AREA�,6,30.A�INSTALLED. INSTALL DIVERSIONS AS NECESSARY TO DIRECT FLOW AS SHOWN ON 2EQ//1,494 SF / / // I I I / / / / \ I / \ \ I \ \ 163802- 7-4894 \ APPROVED PLAN. / ffOWEIED.8A // 1.,688 SF i \ \ MORRIS H LIDAY RfzQUIRED STD 11,3�0 CF —' / h / I I I ' I ` / l _ \ I / \ \ \ \ \ \ \ DB 4930 P 57 \ 2) AT MAIN ENTRANCE TO PHASE 3 OFF OF CORNWALLIS ROAD INSTALL SUBSURFACE iPROAO D S`T ,AGE 13,920 CF — / ti^ / i I I f l / / \ \ \ \ \ \ \ \ \ \ f(NEf��I0162'(W)x124'(C)xg{D� / o \ / / — — / \ \ X \ \ DRAINAGE AT ENTRANCE FROM Cl 83A, CI83B, MH 83C TO FES 84C. INSTALL �/�N LL C�i�K / / — — / / / /"�S�kIf�MR 1.9 ORRICE N / / / % I / / / / — — \ \ �/ EXISTING \ \ \ \ \ \ \ \ \ TEMPORARY INLET PROTECTION AS STRUCTURES ARE INSTALLED. p ) //// /// � 265 � / / 2�0 �//�� i 275�� /���// / // / / I / // INST?LLCH CK/ / — \ \ \ POND D�M (TYP T6PORARY DIVERSION 1 \ \ \ • f i \ \ \ EXI�STII�G - / / / (� `` 772 LF P-3-7�w/3:1 SIDE SLOPES \\ \ \ �/ETLAN RA Y DIVER�N 5 / / — / / / / / / / / / — ' — — / / — / / NAG DS150 TEMPORA&Y LINER— \ \ \ \ \ � \ • \ � � I / / / / � / / J � J // / / a� 40% wYl"0:1(L), 3: (� / / / / / / � / 285 / � / — � / / PES 3j150 TE�PORAY LINE �\ \ // s I /-----_/ XISTING) .TORMPP TEMP JiA0DIVERSION2 INS 4LL CHEC< 52�@ 5.44% �:1�1DE-SIDE / NAG DS75 TEMPORARY LINER M(TY`1' / '300 /\, 01 305 \cos\ \ \ EXISTING \ \ \ I 'N / ( \ \ �\ I ► I I I \\ \ \ \ \ \ \\ \ \ `� \\ \ \\ \\ \ � // I\ \\ v �° �--�----`—�J —_— �\\ \\ \ \\�_ ��\ \�� POND \ \ \\ \\ \ --QQNSTRUCT \ \ \ c \ \ \ \/-- \ /-31N`RANC�TYP� <0 \ \\ \ \ \\ \ \ \ \ \ JoWASHO P.) \ \ \ SON ETE I\ \ \ o \ \ \ \ J I \lI \ \ \\ \\ \\ l \ \ \s �\ o\\\ d� / l s 1 \ \\ \\ \ \\ \ \ 1 \ \ \ �\ ��%�, �-� g05 \\ BIORETENTION / --� J / \ \ I I I I \\\\�,� \ \ \ \ \ \ \ I I \ % L;_%�i/ ��I � • \ � � �—� r'- _ _ `J — _ � =3os =-�1/ �—s^wM a yin— ---3 I o-- L / �275 / / ti / — /-- j// / / / /' /' / \ \ \ \ \ \ ���///' \I \ \ 72 \ \ \ \ \ 95/� AN r \ \ \ \ \\ \ z 2b5— j r / / \ rr // 280 75(_�-295 \I IllI�---1\III \III 1\IIII 63 \\1 \\ \_J ��M..,a \ ' \\ \\\\ \ \ 1 III/, ��II 16 \11M F62 ROPO K� \ --�D0 GROUND STABILIZATION " SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS Perimeter dikes, swales, ditches 7 days None and slopes High Quality Water (HOW) 7 days None Zones Slopes steeper 7 days If slopes are 10' or less in length and than 3:1 are not steeper than 2:1, 14 days allowed Slopes 3:1 or 14 days 7-days for slopes greater flatter than 50-feet in length All other areas None with slopes flatter 14 days (except for perimeters and than 4:1 HOW Zones) * "Extensions of time may be approved by the permitting authority based on weather or other site -specific conditions that make compliance impracticable." (Section II.B (2)(b) BASIN REMOVAL SEQUENCE 1. SCHEDULE A SITE MEETING WITH THE ENVIRONMENTAL INSPECTOR TO DETERMINE IF A BASIN CAN BE REMOVED. INSTALL SILT FENCING OR OTHER TEMPORARY EROSION CONTROL MEASURES AS NEEDED PRIOR TO REMOVAL OF THE BASIN. 2. REMOVE BASIN(S) AND ASSOCIATED TEMPORARY DIVERSION DITCHES. IF CULVERT PIPES NEED TO BE EXTENDED, PERFORM THIS OPERATION AT THIS TIME. FINE GRADE AREA IN PREPARATION FOR SEEDING. 3. PERFORM SEEDBED PREPARATION, SEED, MULCH AND ASPHALT TACK ANY RESULTING BARE AREAS IMMEDIATELY. 4. INSTALL VELOCITY DISSIPATORS AND/OR LEVEL SPREADERS AS REQUIRED ON THE EROSION CONTROL PLAN. 5. WHEN SITE IS FULLY STABILIZED, CONTACT ENVIRONMENTAL INSPECTOR FOR APPROVAL OF REMOVING REMAINING TEMPORARY EROSION CONTROL MEASURES AND ADVICE ON WHEN SITE CAN BE ISSUED A CERTIFICATE OF COMPLETION. EROSION CONTROL NOTES ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. SUFFICIENT EROSION CONTROL PRACTICES MUST BE INSTALLED AND MAINTAINED TO RETAIN SEDIMENT WITHIN THE BOUNDARIES OF THE SITE. GROUND COVER STABILIZATION SHALL BE IN ACCORDANCE WITH NPDES PERMIT AND STABILIZATION CHART ABOVE. TEMPORARY GROUND COVER WILL BE INSTALLED ON ALL EXPOSED SLOPES IN 7 OR 14 DAYS. MAINTENANCE: ALL EROSION AND SEDIMENT CONTROL PRACTICES TO BE INSPECTED WEEKLY AND AFTER EVERY RUNOFF PRODUCING RAINFALL EVENT. NEEDED REPAIRS WILL BE MADE IMMEDIATELY. MAXIMUM GRADED SLOPE SHALL NOT EXCEED THREE (3) TO ONE (1). TOTAL DISTURBED SOIL AREA IS 45 ACRES. STOCKPILE NOTES: 1. HEIGHT SHALL NOT EXCEED 35 FEET. 2. SLOPES SHALL NOT EXCEED 2:1 STOCKPILE MAINTENANCE REQUIREMENTS 1. SEEDING OR COVERING STOCKPILES WITH TARPS OR MULCH IS REQUIRED AND WILL REDUCE EROSION PROBLEMS. TARPS SHOULD BE KEYED IN AT THE TOP OF THE SLOPE TO KEEP WATER FROM RUNNING UNDERNEATH THE PLASTIC. 2. IF A STOCKPILE IS TO REMAIN FOR FUTURE USE AFTER THE PROJECT IS COMPLETE (BUILDERS, ETC.), THE FINANCIAL RESPONSIBLE PARTY MUST BE NOTIFY WAKE COUNTY OF A NEW RESPONSIBLE PARTY FOR THAT STOCKPILE. 3. THE APPROVED PLAN SHALL PROVIDE FOR THE USE OF STAGED SEEDING AND MULCHING ON A CONTINUAL BASIS WHILE THE STOCKPILE IS IN USE. 4. ESTABLISH AND MAINTAIN A VEGETATIVE BUFFER AT THE TOE OF THE SLOPE (WHERE PRACTICAL). EROSION CONTROL LEGEND ��`GK811BFF0�� F O J G v G) INGpP��� G TEMPORARY DIVERSION DITCH TEMPORARY SILT FENCE >� O REINFORCED SILT FENCE OUTLET TEMPORARY SILT BAG INLET PROTECTION TEMPORARY BLOCK & GRAVEL INLET PROTECTION — — — — LIMIT OF DISTURBANCE EXISTING TREE LINE IJIJ`JlJ`JlJ NEW TREE LINE TEMPORARY ROCK CHECK DAM 13 CONCRETE WASH AREA ® RIPRAP APRON VELOCITY DISSIPATOR NORTH 60' 0 60' 120' SCALE: 1 " = 60' 0 ao Q w z > w 0 LL W z O O Z O CO z O w w w CO w —0 CE GROUP 301 GLENWOOD AVE. 220 RALEIGH,NC 27603 PHONE. 919-367-8790 FAX 919-322-0032 www.cegroupinc.com License # C-1739 0.11 & x 0890 ' x Q J Z 0 J U) Qz z� J 0 0 0-Z U� zQ I�,z0 0 O C) W 0 Z LU 0 Z U z W z 00 CAP UCU Qcn VJ Z 0 Date: MARCh 3 1 , 2021 Scale: I"=Ga Drawn: RJ h Checked: AJF Project No. 1 27-239 Computer Dwg. Name 1 27-239 ph2-4 stage I ec Sheet No: