Loading...
HomeMy WebLinkAboutSW6221008_Design Calculations_20221027Storm wafer Management Report June 24, 2022 Stone Creek Phil ipi Church Road Raeford, Hoke County, Prepared for: Double D Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 Prepared by: - Bowman North Carolina, Ltd. 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 (919) 553-6570 Firm#F-1445 Bowman 194 �rrrr���f ,\\, ca Ro�14,,.,,f,. F�.SS10,�;9:q 5EAL 05 571 OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP WATER SURFACE CLASSIFICATIONS HUG NOAA POINT PRECIPITATION FREQUENCY ESTIMATES WATER QUANTITY DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION OVERVIEW This report contains the storm water management overview for the residential project Stone Creek on Philippi Church Road in Hoke County. The project site is currently undeveloped. The proposed site consists of 53.696 acres. The proposed site is located in Flood Zone `X' as shown on FEMA FIRM Panel 3710945400J with an effective date of 10/17/06. Flood zones are subject to change by FEMA. There are existing stream or wetland features on the proposed property. In addition, there is 6,235 sf of surface waters within the property boundary. There is a storm water management facility (wet pond) outlined in this report and has been designed for post —development peak attenuation to treat the impervious areas of the development. The wet pond is designed to capture a drainage area of 38.16 ac with an impervious area of 17.42 ac. The balance of the site is open space and will by—pass the proposed SCMs. The SCMs are designed to treat a 1.0" storm event. Impervious Area Summary — Wet Pond SCM 1 Roadway 168,501 sf 3.87 ac Sidewalk 58,433 sf 1.34 ac Roof 133 lots @ 4,000 sf/lot 532,000 sf 12.21 ac Total IA to Pond 758,934 sf 17.42 ac Soils The County Soils Survey indicates that Blaney Loamy Sand and Candor Sand soils are present on the site. FIGURES 34o 59' 23" N m �i 34o 58' 55" N 669600 669700 669800 669900 Map Scale: 1:4,260 if printed on A portrait (8.5" x 11") sheet. Meters N 0 50 100 200 300 Feet 0 200 400 800 1200 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Hoke County, North Carolina 669600 6W700 669800 6699M 670000 670100 34o 59' 23" N r �i 670000 670100 r �i r �i r �i r �i g N r �i 34o 58' 55" N 5/24/2022 Pagel of 4 Hydrologic Soil Group —Hoke County, North Carolina MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Hoke County, North Carolina Survey Area Data: Version 19, Jan 21, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 1, 2018—Jul 31, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 5/24/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Hoke County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaD Blaney loamy sand, 8 to 15 percent slopes C 19.8 37.0% CaB Candor sand, 1 to 8 percent slopes A 28.0 52.3% JT Johnston loam A/D 5.4 10.1 % KaA Kalmia loamy sand, 0 to 2 percent slopes B 0.0 0.1 % W Water 0.3 0.6% WaB Wagram loamy sand, 0 to 6 percent slopes A 0.0 0.0% Totals for Area of Interest 63.6 100.0% USDA Natural Resources Web Soil Survey 5/24/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Hoke County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 5/24/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 National Flood Hazard Layer FI RMette 79o8'44"W 34o59'16"N W 3I1fJ94t;-bhUfJJ } T7 eff,11100 �, + 116'„ r ' r r' 4 t � • -*�. *4� AREA c:.'F r.1 ,IP.1.LA k F 'r *yfL t• •10F' *' r � y eff. 1o�i� J2oo� FEMA Legend SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT Without Base Flood Elevation (BFE) Zone A, V, A99 SPECIAL FLOOD Wit hBFE orDepthZoneAE,AO,AH,Ve,Aa HAZARD AREAS Regulatory Floodway Feet 1.61000 /9u8,/ W 34ub84/"N 0 250 500 1,000 1,500 2,000 Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 OTHER AREAS OF FLOOD HAZARD 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zonex Future Conditions 1% Annual 4 '- Chance Flood Hazard Zonex "Area with Reduced Flood Risk due to Levee. See Notes. Zone " Area with Flood Risk due to Leveezone D NOSCREEN Area of Minimal Flood Hazard Q Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard GENERAL - — - - Channel, Culvert, or Storm Sewer STRUCTURES IIIIIII Levee, Dike, or Floodwall e zo.z Cross Sections with 1% Annual Chance 17,5 Water Surface Elevation a - - - Coastal Transect ^^^^••sfa— Base Flood Elevation Line (BFE) Limit of Study Jurisdiction Boundary — --- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature Digital Data Available AN 0 No Digital Data Available MAP PANELS El Unmapped QThe pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 6/24/2022 at 11:07 AM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data overtime. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. r Rockfish Rd Rockfish Rd o 61 � r � U o 22 aBkS�fla Surface Water Cl a ssifi catio ns: der Stream Index- 1$-31-19-5 Q ' Stream Name: Beaver Creek Description: From source to Puppy Creek Classification: C Date of Class.: June 30 1973 Whatdoesthis Class. More info mean" River Basin: Cape Fear Zoom to ••• 2251t 4hdliAL Church Rd 023f fi v r 231 ff Ljvia Ln �y 7?5 R Dunde£ Gu ro L WailfbwerRd 3 9 ✓7 O L C7 � Marigold Ln'L i 22SA 7nq RGCkfiStl Rd- ------ ------------- 11186 Bfr}I Ln M (1 of 2} I. L❑ X 12-Digit HUC (Subwatershed) 12-Digit Name: Lower Puppy Creek 12-Digit Code: 030300040606 10-Digit Name: Rockfish Creek 10-Digit Code: 0303000406 8-Digit Code: 03030004 RiverBasin: Cape Fear 12-Digit Area (ac): 11,636.32 Zoom to Phimpo Church q6 9 d NOAA Atlas 14, Volume 2, Version 3 Location name: Raeford, North Carolina, USA*� 6� Latitude: 34.9847°, Longitude: -79.1392' g � Elevation: 227.02 ft** source: ESRI Maps W,00i " source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 I i =5 0�00 0.435 0.513 0.599 0.664 0.741 0.798 0.851 0.902 0.964 1.01 5-min (0.396-0.481) (0.467-0.568) (0.545-0.663) (0.602-0.733) (0.669-0.816) (0.718-0.876) (0.762-0.935) (0.803-0.990) (0.852-1.06) (0.889-1.11) 0.695 0.821 0.960 1.06 1.18 1.27 1.35 1.43 1.53 1.60 10-min (0.632-0.769) (0.747-0.909) (0.872-1.06) (0.962-1.17) (1.07-1.30) 11 (1.14-1.40) 1 (1.21-1.49) 1 (1.27-1.57) (1.35-1.67) (1.40-1.75) 0.869 1.03 1.21 1.34 1.50 1.61 1.71 1.80 1.92 2.00 15-min (0.790-0.961) (0.939-1.14) (1.10-1.34) 1 (1.35-1.65) 11 (1.45-1.77) 1 (1.53-1.88) 0.61-1.98) (1.70-2.11) (1.76-2.20) 1.19 1.43 1.73 1.95 2.22 2.42 2.62 2.81 3.06 3.24 30-min (1.08-1.32) (1.30-1.58) (1.57-1.91)1 (1.76-2.15) (2.00-2.44) (2.18-2.66) (2.34-2.88) (2.50-3.08) (2.70-3.35) (2.85-3.56) 1.49 1.79 2.21 2.53 2.95 3.28 3.61 3.94 F 4.38 4.73 60-min (1.35-1.64) (1.63-1.98) (2.01-2.45) (2.30-2.80) (2.67-3.25) (2.96-3.61) (3.23-3.96) (3.51-4.32) (3.87-4.81) (4.15-5.20) 1.73 2.09 2.64 3.05 3.61 4.06 4.51 4.98 F 5.61 6.11 2-h r (1.56-1.95)I (1.89-2.35)il (2.37-2.96) 11 (2.74-3.42) 11 (3.23-4.05) 11 (3.61-4.55) 1 (3.99-5.05) 1 (4.37-5.57) (4.88-6.27) (5.28-6.83) 1.83 2.22 2.80 3.27 3.92 4.45 5.00 5.59 F 6.41 7.07 3-hr (1.65-2.07) 1(2.00-2.50)1 (2.52-3.15) 1 (3.49-4.40) 11 (3.94-4.99) 1 (4.39-5.60) 1 (4.87-6.24) (5.52-7.16) (6.03-7.90) 2.19 2.65 3.35 3.91 4.70 5.35 6.04 6.77 F 7.80 8.64 6-hr (1.98-2.44) 11 (2.40-2.95) 11 (3.02-3.72) 11 (3.52-4.35) 11 (4.20-5.22) 11 (4.75-5.93) 1 (5.32-6.68) 1 (5.90-7.47) (6.72-8.60) (7.36-9.52) 2.58 3.12 3.96 4.66 5.64 6.46 7.33 8.27 F 9.62 10.7 12-hr (2.33-2.88) 1(2.82-3.48)1 (3.57-4.42) 11 (4.18-5.19) 11 (5.02-6.26) 11 (5.71-7.15) 1 (6.41-8.10) 1 (7.16-9.13) (8.20-10.6) (9.03-11.8) 3.03 3.67 4.66 5.45 6.53 7.41 8.31 9.24 F 10.5 11.6 24-h r (2.82-3.28) j (3.41-3.97) 11 (4.32-5.03) 11 (5.04-5.88) 11 (6.01-7.04) 11 (6.80-7.98) 1 (7.60-8.96) (8.43-9.96) (9.57-11.4) 1(10.4-12.5) 3.52 4.25 5.35 6.22 7.43 8.40 9.40 1 10.4 F 11.8 13.0 2-day (3.28-3.78) (3.96-4.57)1 (4.97-5.75) 11 (5.77-6.68) 11 (6.86-7.98) 11 (7.73-9.01) 1 (8.62-10.1) 1 (9.53-11.2) (10.8-12.8) (11.8-14.0) 3.74 4.51 5.64 6.54 7.78 8.78 9.80 10.9 12.3 13.5 3-day (3.50-4.01) (4.21-4.83) (5.26-6.04) 11 (6.09-7.00) 11 (7.21-8.32) 11 (8.11-9.39) (9.03-10.5) (9.96-11.6) (11.2-13.2) (12.2-14.5) 3.96 4.77 5.93 6.86 8.14 9.16 10.2 11.3 12.8 14.0 4-day (3.71-4.23) 1(4.47-5.09)1 (5.54-6.33) 11 (6.40-7.31) 11 (7.57-8.67) 11 (8.49-9.76) 1 (9.43-10.9) 1 (10.4-12.1) (11.7-13.7) (12.7-14.9) 7-day 4.60 5.51 6.78 7.78 9.16 7 10.3 11.4 12.5 14.1 7 15.4 (4.31-4.92) (5.15-5.89) (6.33-7.25) (7.26-8.32) 11 (8.51-9.78) (9.51-11.0) 1 (10.5-12.2) 1 (11.6-13.4) (13.0-15.2) (14.1-16.5) 10-day 5.28 6.30 7.63 8.66 10.1 11.2 12.3 13.4 14.9 16.1 (4.97-5.61) (5.92-6.69) (7.16-8.10) (8.13-9.19) (9.41-10.7) (10.4-11.8) 1 (11.4-13.0) 1 (12.4-14.3) (13.8-15.9) (14.8-17.2) 20-day 7.12 8.44 10.0 11.3 13.0 14.3 15.7 17.0 18.9 20.3 (6.72-7.55)1 (7.97-8.95) (9.47-10.7) (10.6-12.0) (12.2-13.8) (13.4-15.2) 1 (14.6-16.7) 1 (15.9-18.1) (17.5-20.1) (18.8-21.7) 30-day 8.85 10.4 12.2 13.6 15.4 16.8 18.2 19.6 21.4 22.8 (8.38-9.36) (9.88-11.0) (11.6-12.9) (12.8-14.4) (14.5-16.3) (15.8-17.8) (17.1-19.3) 1 (18.3-20.7) j(20.0-22.7) (21.2-24.3) 45-day 11.2 13.1 15.1 16.7 18.6 20.1 21.6 23.0 24.9 26.3 (10.6-11.8) (12.5-13.9) (14.3-16.0) (15.8-17.6) (17.6-19.7) (19.0-21.3) (20.3-22.8) (21.6-24.4) (23.3-26.4) (24.6-28.0) y 13.4 15.7 17.9 19.6 21.7 23.4 25.0 26.5 28.5 30.0 60-da (12.7-14.1) (14.9-16.5) (17.0-18.8) (18.6-20.6) (20.6-22.9) (22.1-24.6) (23.6-26.3) (25.0-27.9) (26.8-30.1) (28.1-31.7) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. 16141 W 5 Back to Top PF graphical PDS-based depth -duration -frequency (DDF) curves Latitude: 34.98470, Longitude: -79.1392° { 2 2- Or- a s rp rp rp -rag-rug -rug -rug r4 r4 ui oLA H r i fl� A 4 r� o o a Ur o r-I H H N rn -Y�.o Duration Average recurrence Mnimal {yearSj - 1 2 5 - 10 25 50 100 200 500 1000 30 25 C 20 4� a di 15 49 G 10 M-1 }ll 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMT}: Wed May 25 17:22:41 2022 Back to Top Maps & aerials Small scale terrain Duration — "in — 2-day — 10-min — 3-day 15-min — 4-day — 30-min — 7--day — 60-min — 1l1-clay — 24hr — 20-clay — "r — 30-clay — 6-fir — 45-clay — 12-hr — 60-clay 24-h r Large scale terrain Winston -Sal Elll + a G1.1r17all Greensboro • Raleigh NORTH C AROL INA Charlotte Fay,M-eji11,� , I' H CAR L I N A wilmingwi7 i 100km 60mi Large scale map Rocky Mount 49 Jacksor inston�lem Greensboro -P ourham Otte t00km --. J North Carolina I � I Back to Top Rocky Mount U gh Cre�nvi lie Jackson �I�nlln US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer �l D I D LL Lu �— Q wlo In ono Lu �- o0 J Q n f I > o r� I o w cc PRE -DEVELOPED ' s j DRAINAGE AREA 38.16 AC TIME OF CONCEN TIO I� 'I GRAPHIC SCALE WATER QUALITY/QUANTITY SUPPLEMENT-EZ COVER PAGE FORMS LOADED COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System Bioretention Cell 0 12 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Baylilter _ _ _ _ Filterra 0 26 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: 28 IOrgan 30 City, S 31 Phone 32 Email: Carlo Pardo. PE Bowman North Carolina, Ltd. Raleigh, NC 27609 919-553-6570 )ardotcDbowman.com Certification Statement: I certify, under penalty of law that this Supplement-FZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ,,�Illlif I I I!I f1//10// 1�H CA A������''-� •oF E5 Sip • SEAL. 051571 %rrrrf [r�� NGd�I�•E ��p��``•� Sipnafure of Designer Date DRAINAGE AREAS 1 Is this a high density ro ect? Yes 2 If so number of drainage areas/SCMs 1 3 Does this project have low densi areas? No 4 If so number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 4 Type of SCM Wet Pond 5 Total drainage area (sq ft 2338997 sf 1662362 6 Onsite drainage area (sq ft 2338997 sf 1662362 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft 758934 sf 758934 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10permitting) New BUA not on subdivided lots (subject to s Offsite BUA (sq ft 11 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft - Sidewalk (sq ft 58433 sf 58433 sf - Roof Lsq ft 532000 sf 532000 sf - Roadway s ft 168501 sf 168501 sf - Future (sq ft - Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 33.09% 45.7% 19 Design storm inches 1.0 in 20 Design volume of SCM cu ft 63847 cf 21 lCalculation method for design volume Simple Method ADDITIONAL INFORMATION ].—Please 22 use this space to provide any additional information about the drainage area(s): WET POND 1 Drainage area number 1 2 Minimum required treatment volume cu ft 63847 cf GENER AL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM H: ? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the desi n volume? Yes 9 What is the method for dewaterin the SCM for maintenance? Pumpreferred 10 If applicable , will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC 8 ? Yes 12 Does the drainage easement comply with General MDC 9 ? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 161 Does the SCM follow the devicespecific MDC? Yes 17 lWas the SCM designed by an NC licensedprofessional? Yes T POND MDC FROM 02H .1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 250.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 251.00 221 Elevation of the bottom of the vegetated shelf fmsl 258.50 23 Elevation of the permanent pool (fmsl) 259.00 24 Elevation of the top of the vegetated shelf (fms) 259.50 25 Elevation of the temporary pool fmsl 259.80 26 Surface area of the main permanent pool (square feet) 11690 27 Volume of the main permanent pool (cubic feet) 42894 cf 28 Avera a depth of the main pool feet 4.47 ft 29 Avera a depth euation used Equation 3 30 If using a uation 3, main pool perimeter feet) 747.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 32 Volume of the foreba cubic feet 8120 cf 33 Is this 15-20% of the volume in the mainpool? Yes 34 Clean -out depth for foreba inches 18 in 35 Design volume of SCM (cu ft) 63847 cf 361 Is the outlet an orifice or a weir? Orifice 371 If orifice, orifice diameter inches 1.75 in 38 If weir, weir height inches 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.52 41 Are the inlet(s) and outlet located in a manner that avoids short- circuitin ? Yes 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance (inches) 30 in 44 ebay at exit inches 24 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H: 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1 r 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC 9 is met, No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda 54 Hasa lantina Elan been erovided for the ve etated shelf? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about 55 the wet pond(s): Wet Pond 1 3:17 PM 6/30/2022 Bowman North Carolina, Ltd. Stone Creek, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions Drainage Area (acres): 38.16 Existing Soil Groups Soil Group Map Symbol Soil Description Acres Percent of DA A CaB Candor sand 31.11 82% C Bad Blaney Loamy Sand 7.05 18% Existing Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Wooded - Good Stand A 31.11 50 40.8 Wooded - Good Stand C 7.05 70 12.9 Cumulative Curve # = 53.7 Bowman North Carolina, Ltd. Stone Creek, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions Drainage Area (acres): 38.16 Existing Soil Groups Soil Group Map Symbol Soil Description Acres Percent of DA A CaB Candor sand 31.11 82% C Bad Blaney Loamy Sand 7.05 18% Proposed Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good Condition A 15.87 55 22.9 Open Space - Good Condition C 4.87 74 9.4 Impervious Area A/C 17.42 98 44.7 Cumulative Curve # = 77.1 Proposed Wet Pond Project Information Project Name: Stone Creek Project #: Designed by: CB Revised by: Checked by: Date: Date: Date: 5/26/2022 Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 38.16 Acres 1,662,362 sf Impervious Area (IA) = 17.42 Acres 758,934 sf Percent Impervious (1) = 45.65 % 45.65 % Required Surface Area Permament Pool Depth: 3.69 ft SA/DA = 1.478 Min Req'd Surface Area = 24,572 sf (at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.461 in/in Storage Volume Required = 63,847 cf (above Permanent Pool) Elevations Top of Pond Elevation = 184.00 ft Temporary Pool Elevation = 177.80 ft Permanent Pool Elevation = 176.00 ft Shelf Begining Elevation = 176.50 ft Forebay Weir = 175.50 ft Shelf Ending Elevation = 175.00 ft Bottom Elevation = 172.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 26,350 sf Volume of Temporary Storage = 65,167 cf Is Permenant Pool Surface Area Sufficient (yes/no)? Volume of Storage for Design Storm = 65,167 ( 26350 > 24572 ) sf Y ( 65167 > 63847 ) cf Incremental Drawdown Time Project Information Project Name: Project #: Designed by: Checked by: Water STORMWATER POND INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Stone Creek CB Date: 5/26/2022 Date: ity Orifice Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Orifice Diameter (D) = Cd = Ei = Zone 1 Range = Zone 2 Range = Zone 3 Range = Q3 = 0.0437 CD - D2 (Z-D/24-Ei)^(1/2) Qz = 0.372 CD ' D'(Z-Ei)^(3i2) m • in 0.6 176 Orifice Inv. 0.00 to 176 176 to 176.1 176.1 to 177 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 176.00 32,360 0 0.00 2.00 0.000 -- 176.50 35010 16,843 0.50 3.00 0.145 1,943 177.00 36670 17,920 1.00 3.00 0.221 1,353 177.80 1 39340 30,404 1.80 3.00 0.305 1,659 Total -- 65,167 -- -- -- Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume= 65,167 of Total Time = 4,955 min Total Time = 3.44 days 6/24/2022 Prop Wet Pond- new design (Stone Creek) 1 of 1 Project: Pond #1 Date: 6/24/2022 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 176 26,350 12,698 90,725 A2 (Perm -Pool) 175.5 24,440 12,063 78,028 Al (Bottom -Shelf) 175 23,810 23,195 65,965 174 22,580 21,980 42,770 173 21,380 20,790 20,790 172 20,200 0 0 A3 (Bottom -Pond) Forebay Contours -Volumes Elevation FB1 FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 176 5,780 5,780 2,780 15,875 175.5 5,340 5,340 2,560 13,095 175 4,900 4,900 4,475 10,535 174 4,050 4,050 3,635 6,060 173 3,220 3,220 2,425 2,425 172 1,630 1,630 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) Vpp permeter of shelf width of shelf Al (Bottom -Shelf): 17.5% *Between 15% & 20% 3.19 *At least 3' average depth 90,725 647 3 24,440 Average Depth = 3.69 Proposed Wet Pond Project Information Project Name: Stone Creek Project #: Designed by: CB Revised by: Checked by: Site Information Date: Date: Date: 5/26/2022 Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 38.16 Acres Impervious Area (IA) = 17.42 Acres Percent Impervious (I) = 45.65 % (Drainage Area) Orifice Sizing Orifice Size = 3.00 in Drawdown Time = 3.44 days less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 192.0 cf Weight: 11981 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 14,377 Ibs Volume of Concrete Req'd: 95.8 cf (Diameter) (Incremental Draw Down Method) (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 165.5 cf (4'x4' riser x 8' = 128sf, 5'x5' footing x 1.5'=37.5cf) STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0.0 176.0 32360 0 0 0.5 176.5 35010 16843 16843 1.0 177.0 36670 17920 34763 1.9 177.8 39340 30404 65167 (WQV) 2.0 178.0 40020 7936 73103 3.0 179.0 45040 42530 115633 4.0 180.0 47510 46275 161908 5.0 181.0 50020 48765 210673 6.0 182.0 52620 51320 261993 7.0 183.0 55270 53945 315938 8.0 184.0 57980 56625 372563 i 1 / ILL t SOD AREAS ABOVE NORMAL POOL _ _ / ,' / STORMWATER� EELVATION / \ 36" OUTLET PIPE REFER TO GRADING PLAN UvivUnt i t SEEPAGE � COLLAR / OUTLET CONTROL-:�/ STRUCTURE REFER j TO DETAILS ON � THIS SHEET i I N V_ 176. 0 50 LITORAL SHELF AREA-3,890 SF � REFER TO DETAIL � FOR PLANTINGS I MANAGEMENT � EASEMENT TOP OF EMBANKMENT FI F\/-1R4 (1 25 l- "t � al "19 � u M � I � L m 0 ImIffis"i � N � I 50 100 ( IN FEET 1 inch = 50 ft. more GRASS � - - � SPILLWAY � i / � STORMWATER MANAGEMENT EASEMENT PLAN VIEW STORM DRAINAGE BY OTHERS INLET PIPE WITH RIP -RAP APRON FOREBAY AREA INLET PIPE WITH RIP -RAP APRON 4' MIN EMBANKMENT WIDTH 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION 36" HDPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED PER DIRECTION OF GEOTECHNICAL ENGINEER 2 � 6" CLAY SOIL LINER ON INSIDE FACE OF EMBANKMENT 3' MIN CUTOFF TRENCH APPROXIMATE SIZE EXCAVATE AND BACKFILL WITH COMPACTED STRUCTURAL FILL AS DIRECTED BY GEOTECHNICAL 71'— 36" HDPE @ 1.41 161 TRASH RACK REFER TO DETAIL THIS SHEET 6" TOPSOIL ABOVE 6" CLAY LINER ON LITTORAL SHELF i 3 1 6 6FT LITTORAL SHELF INV=176.0 e a d o d a a` 0 1 da a ELEV=174.0 Wd a 1 4 a d a a O 0, 0 4' VIIN. ASTM C-923 SEAL KEY BETWEEN BARREL & RISER. RISER BASE TO BE FILLED WITH CONC. TO INVERT OF BARREL 8"X8"X1 "X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO BASE. PROVIDE 2-3/4" A307 BOLTS FROM ANGLE TO RISER AND 2—A307 "J" HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE. ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING STEEL. REFER TO DETAIL FOR INCREMENTAL WEIR 4'x4' PRECAST CONCRETE RISER (INSTALL STEPS AS NECESSARY) PVC ELBOW SEE DETAIL CONCRETE SHALL BE PLACED IN RISER AFTER ANGLES ARE SECURED TO BASE AND RISER. LL- 0 C6 TOP OF EMBANKMENT ELEVATION=184.0 100 YEAR STORM ELEVATION=183.44 10 YEAR STORM ELEVATION =1 80.69 2 YEAR STORM ELEVATION=179.57 1 YEAR STORM ELEVATION=179.22 1.0—INCH STORM ELEVATION=176.18 NORMAL POND ELEVATION=176.0 NOTE: 1.0" STORM ELEVATION IS 176.18 AND INTERMEDIATE WEIR IS ELEVATION 179.3. THERE IS ADDITIONAL STORAGE DESIGNED FROM THE 1.0" STORM ELEVATION TO THE INTERMEDIATE WEIR ELEVATION. EXISTING GRADE=190.0f 2 2 NOTE: PUMPS SHALL BE USED TO DRAIN � � THE POND WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. �f 5'x5'x1.5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE BETWEEN EDGE OF CONC. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=172.0 (BOTTOM OF SEDIMENT STORAGE)=171.0 6" CLAY SOIL LINER MAIN POOL 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION 6" TOPSOIL ABOVE 1 6" CLAY LINER 3:1 ON LITTORAL SHELF 6FT LITTORAL 6:1 SH ELF 2 -- -- CLASS 2 RIP -RAP COVERED WITH CLASS A RIP -RAP OVER FILTER FABRIC MIN. 4' WEIR AT ELEV=175.0 FOREBAY TOP ELEV= 178.0 WIDTH AT TOP = 2.0 FT BOTTOM OF SEDIMENT STORAGE/EXIT ELEV=174.0 SEDIMENT STORAGE TOP FOREBAY BOTTOM ELEV=172.0 FOREBAY ENTRANCE SHALL BE DEEPER THAN FOREBAY EXIT NOTE: PUMPS SHALL BE USED TO DRAIN THE FOREBAY WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. NORMAL POND ELEVATION BOTTOM LITTORAL SHELF ELEV. KENN Mimi (A� 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/ENTRANCE ELEV=171.0 Tip OF � FlR 1g0 8 IAi T, rno nr crgUCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR PERM. POND ELEV.=176.0 4" PVC SCREW CAP FOR CLEANING ACCESS 12" f 4"x4" PVC 1 3"DIA. HOLE DRILLE[ INTO BOTTOM CAP SCALE: N.T.S. nlCnn CTnl IFITI InF PVC DRAIN OUTLET SCALE: N.T.S. FLOW LONG TOP OF EMBANKMENT SPILLWAY Q(1 "'") S-0PEO H B W SS CHANNEL LINING ELEVATION SPILLWAY ELEVATION STRAW WITH NET NAG SPILLWAY 82.05CFS 0.5' 0' 0' 3:1 SHOREMAX W/ P550 184.0 183.5 W EXTEND LINING TO EXTEND LINING TO TOP OF SPILLWAY TOP OF SPILLWAY S,S H lz CHANNEL LINING MATTING SHALL BE AS NOTED OR APPROVED EQUAL. B GRASS SPILLWAY DETAIL C�D TOP OF EMBANKMENT-184.0 SPILLWAY ELEVATION=183.5 GRASS SOD ON SPILLWAY AND SIDE SLOPES 6/24/22, 1:56 PM NORTH AMERICAN GREEN SPILLWAY ANALYSIS > > > Grass Spillway Name Grass Spillway Discharge 82.05 Peak Flow Period 3 Channel Slope 0.3333 Channel Bottom Width 15 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Excellent > 95% Soil Type Sandy Loam (GM) Shoremax - Class C - Mix (Sod & Bunch) - Excellent > 95% ECMDS 7.0 North American Green 5401 St. Wendel -Cynthia na Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECM DS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 82.05 cfs 16.36 ft/s 0.33 ft 0.024 8.5 Ibs/ft2 6.81 Ibs/ft2 1.25 STABLE G P550 Unvegetated Underlying Straight 82.05 cfs 16.36 ft/s 0.33 ft 0.024 8.05 Ibs/ft2 6.56 Ibs/ft2 1.23 STABLE G Substrate Shoremax w/ Straight 82.05 cfs 17.13 ft/s 0.31 ft 0.022 14 Ibs/ft2 6.5 Ibs/ft2 2.16 STABLE G P550 Reinforced Vegetation Underlying Straight 82.05 cfs 17.13 ft/s 0.31 ft 0.022 8.5 Ibs/ft2 6.26 Ibs/ft2 1.36 STABLE G Substrate https://ecmds.com/project/l 51829/spillway-analysis/226738/show 1 /1 Pond Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Pond No. 1 - BMP Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 176.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 176.00 32,360 0 0 0.50 176.50 35,010 16,843 16,843 1.00 177.00 36,670 17,920 34,763 1.80 177.80 39,340 30,404 65,167 2.00 178.00 40,020 7,936 73,103 3.00 179.00 45,040 42,530 115,633 4.00 180.00 47,510 46,275 161,908 5.00 181.00 50,020 48,765 210,673 6.00 182.00 52,620 51,320 261,993 7.00 183.00 55,270 53,945 315,938 8.00 184.00 57,980 56,625 372,563 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 36.00 3.00 0.00 0.00 Span (in) = 36.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 176.00 176.00 0.00 0.00 Length (ft) = 71.00 0.50 0.00 0.00 Slope (%) = 1.41 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 8.00 4.00 RIM Weir Structures [A] [B] [C] [D] Crest Len (ft) = 4.00 12.00 15.00 0.00 Crest El. (ft) = 179.30 180.80 183.50 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = Rect Broad Broad --- Multi-Stage = Yes Yes No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 Total Q Elev (ft) 184.00 E&PA1I11 180.00 178.00 176.00 90.0 100.0 110.0 Discharge (cfs) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.554 2 754 24,082 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 71.28 2 718 142,542 ------ ------ ------ BMP Post -Developed 3 Reservoir 0.409 2 1444 101,041 2 179.22 125,803 Post Through Pond 5 SCS Runoff 0.566 2 360 6,339 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.055 2 366 5,099 5 176.18 6,081 1.0-in Storm Thru Pond Wet Pond -(Stone Creek).gpw Return Period: 1 Year Friday, 06 / 24 / 2022 Hydrograph Report 2 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 38.160 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.03 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 e 2 4 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP Pre -Developed Hyd. No. 1 -- 1 Year Friday, 06 / 24 / 2022 = 1.554 cfs = 12.57 hrs = 24,082 cuft = 53.7 = 0 ft = 32.60 min = Type II = 484 6 8 10 12 14 16 18 20 22 24 Q (cfs) 2.00 1.00 1 0.00 26 Time (hrs) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 71.28 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 142,542 cuft Drainage area = 38.160 ac Curve number = 77.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 80.00 70.00 40.00 20.00 10.00 BMP Post -Developed Hyd. No. 2 -- 1 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 1 1 ' ' ' ' 1 TTn ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 2 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.409 cfs Storm frequency = 1 yrs Time to peak = 24.07 hrs Time interval = 2 min Hyd. volume = 101,041 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 179.22 ft Reservoir name = BMP Pond Max. Storage = 125,803 cuft Storage Indication method used. Q (cfs) 0 Post Through Pond Hyd. No. 3 -- 1 Year Q (cfs) 0 0 10 — Hyd No. 3 20 30 40 Hyd No. 2 50 60 70 80 90 Total storage used = 125,803 cuft 100 Time (hrs) A Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 5 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 0.566 cfs Storm frequency = 1 yrs Time to peak = 6.00 hrs Time interval = 2 min Hyd. volume = 6,339 cuft Drainage area = 38.160 ac Curve number = 77.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 BMP Post -Developed Hyd. No. 5 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 - Hyd No. 5 Time (hrs) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.055 cfs Storm frequency = 1 yrs Time to peak = 6.10 hrs Time interval = 2 min Hyd. volume = 5,099 cuft Inflow hyd. No. = 5 - BMP Post -Developed Max. Elevation = 176.18 ft Reservoir name = BMP Pond Max. Storage = 6,081 cuft Storage Indication method used. Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 1.0-in Storm Thru Pond Hyd. No. 6 -- 1 Year 50 60 70 80 90 Total storage used = 6,081 cuft Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 11V 0.10 0.00 100 Time (hrs) Hydrograph Summary Report HydraflowHydrographsExtension for AutodeskOCivil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 5.520 2 740 50,239 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 101.30 2 718 203,222 ------ ------ ------ BMP Post -Developed 3 Reservoir 2.341 2 950 157,142 2 179.57 142,199 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.000 2 n/a 0 5 176.00 0.000 1.0-in Storm Thru Pond Wet Pond -(Stone Creek).gpw Return Period: 2 Year Friday, 06 / 24 / 2022 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 5.520 cfs Storm frequency = 2 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 50,239 cuft Drainage area = 38.160 ac Curve number = 53.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 32.60 min Total precip. = 3.67 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 0.00 0 2 4 — Hyd No. 1 BMP Pre -Developed Hyd. No. 1 -- 2 Year 6 8 10 12 14 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 V ' 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 101.30 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 203,222 cuft Drainage area = 38.160 ac Curve number = 77.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.67 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 120.00 100.00 40.00 20.00 0.00 ' 0 2 4 — Hyd No. 2 BMP Post -Developed Hyd. No. 2 -- 2 Year 6 8 10 12 14 Q (cfs) 120.00 100.00 40.00 20.00 0.00 16 18 20 22 24 26 Time (hrs) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 2.341 cfs Storm frequency = 2 yrs Time to peak = 15.83 hrs Time interval = 2 min Hyd. volume = 157,142 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 179.57 ft Reservoir name = BMP Pond Max. Storage = 142,199 cuft Storage Indication method used. Q (cfs) 120.00 100.00 40.00 20.00 0.00 ' __.kd§W9V 0 10 — Hyd No. 3 Post Through Pond Hyd. No. 3 -- 2 Year 20 30 40 Hyd No. 2 Q (cfs) 120.00 100.00 40.00 20.00 0.00 50 60 70 80 90 100 Time (hrs) Total storage used = 142,199 cult Hydrograph Summary Report 15 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 28.91 2 736 157,654 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 192.98 2 716 391,282 ------ ------ ------ BMP Post -Developed 3 Reservoir 22.28 2 738 344,523 2 180.69 195,669 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.000 2 n/a 0 5 176.00 0.000 1.0-in Storm Thru Pond Wet Pond -(Stone Creek).gpw Return Period: 10 Year Friday, 06 / 24 / 2022 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 28.91 cfs Storm frequency = 10 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 157,654 cuft Drainage area = 38.160 ac Curve number = 53.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 32.60 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 2 4 — Hyd No. 1 BMP Pre -Developed Hyd. No. 1 -- 10 Year 6 8 10 12 14 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 38.160 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.45 in Distribution Storm duration = 24 hrs Shape factor Friday, 06 / 24 / 2022 = 192.98 cfs = 11.93 hrs = 391,282 cuft = 77.1 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 210.00 BMP Post -Developed Hyd. No. 2 -- 10 Year Q (cfs) 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0 2 — Hyd No. 4 6 8 2 10 12 14 16 18 20 0.00 22 24 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 22.28 cfs Storm frequency = 10 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 344,523 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 180.69 ft Reservoir name = BMP Pond Max. Storage = 195,669 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) — Hyd No. 3 Hyd No. 2 Total storage used = 195,669 cult Hydrograph Summary Report 21 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 87.46 2 734 399,983 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 349.22 2 716 723,513 ------ ------ ------ BMP Post -Developed 3 Reservoir 82.05 2 724 676,220 2 183.44 340,851 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post -Developed 6 Reservoir 0.000 2 n/a 0 5 176.00 0.000 1.0-in Storm Thru Pond Wet Pond -(Stone Creek).gpw Return Period: 100 Year Friday, 06 / 24 / 2022 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 87.46 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 399,983 cuft Drainage area = 38.160 ac Curve number = 53.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 32.60 min Total precip. = 8.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 — Hyd No. 1 BMP Pre -Developed Hyd. No. 1 -- 100 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 349.22 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 723,513 cuft Drainage area = 38.160 ac Curve number = 77.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 0.00 0.0 2.0 4.0 - Hyd No. 2 6.0 BMP Post -Developed Hyd. No. 2 -- 100 Year Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 ' ' ' 0.00 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Friday, 06 / 24 / 2022 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 82.05 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 676,220 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 183.44 ft Reservoir name = BMP Pond Max. Storage = 340,851 cuft Storage Indication method used. Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) — Hyd No. 3 — Hyd No. 2 Total storage used = 340,851 cult OF CONCENTRATION ng Conditions DA OPEN CHANNEL SHALLOW CONIC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT1 Manning's Equation: Tc = (0.007ml-y0.8)/(P2"0.5)(s"0.4) 2-year24-hr �SEGMENTI Tc = L / 60'V V = 1.49R21IS112/ n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's T' Length Elev2 Elev3 Slope Condition Vavg T12 Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T�, T­ IL Tc(minimum) Tlag Basin fl fl/fl TP-40 in fl flAt TR-55 Fig. 3-1 fl/sec Flow Area (fl-2) (fl fl fl fl/fl (fps) 10 min 0.67c hrs 1 100 231.2 230.7 0.005 3.67 0.24 23.20 1565 230.7 185 0.02920 Unpaved 2.80 9.32 32.52 32.52 0.33 1