Loading...
HomeMy WebLinkAboutSW6221004_Construction Sequence_20221021Frank �ej a• e Rd. (n a V O CD a df �04 SITE 9 Myrtle O� Dr. Buie Q� A �c ra �c Bryan i Pal er'al7a br I U VICINITY MA NITS 7 DAY GROUND STABILIZATION REQ'D. (TYP.) S45°49' 06"E 7.67'(TIE) TSSB#1 W/ SKIMMER & COIR BAFFLES **SEE TSSB CHART THIS SHEET FOR SIZING & SKIMMER INFO (TYP,) FES #1 INV 18" IN:208.25 SILT #2 FEN CE ATE: 212.82 (TYP. ' 18" IN:208.44 18" OUT:208.44 TEMPORARY SEDIMENT SKIMMER BASIN CRITERIA TSSB #1 DRAINAGE AREA 4•60 DISTURBED AREA 4.60 REQUIRED SURFACE AREA (SF) 4,097 REQUIRED STORAGE (CF) 8,280 LENGTH @ S.A. ELEV 115 WI ©TH S.A. ELEV. 65 DEPTH 1.5 ACTUAL SURFACE AREA (SF) 7,427 ACTUAL STORAGE VOLUME (CF) 10,058 TOP ELEVATION 212.25 EMERGENCY SPILLWAY ELEVATION 210.75 S.A. ELEVATION 210.75 BOTTOM ELEVATION (Includes 9'Sed. Storage) 208.25 SKIMMER SIZE 2. 0" SKIMMER ORFICE DIAMETER 1.75" EMERGENNCY SPILLWAY WIDTH 12' Rational Method Q=CIA (C=0.5, I=varies, A=above) 12.6 1 "intensity" 5.5 BAFFLES % INLET ZONE 25% 28.75 FIRST CHAMBER 25%r 28.75 SECOND CHAMBER 25% 28.75 OUTLET ZONE 25% 28.75 N /F FTPA STORAGE MID PINE LLC DB 9424 PG 826 LOT 1 PB 106 PG 54 PIN: 0425-37--9041 7 DAY GROUND STABILIZATION REQ'D. (TYP.) PURSUANT TO G.S.113A-5712) The for SITE NOTES: CONSTRUCTION SEQUENCE: angle graded slopes and fills shall be no greater than the angle 1. OWNER: EEB HOLDINGS, Ll that can be retained by vegetative cover or other adequate ,within control devices or structures. In any event, slopes left exposed will, within 7357 MARINERS LANDING DRIVE 1. Obtain all permits before beginning construction. '4 calendar days of completion of any phase of grading, be planted or FAYETTEVILLE, NC 28306 2. Install gravel construction entrance, sediment fence & reinforced silt fence outlets, otherwise provided with temporary or permanent ground cover, devices or structures sufficient to restrain erosion. 2. PIN: 0425-36-6892 3. Clear/grub only within the limits of construction. Install the temporary skimmer sediment basin. PURSUANT TO G.S. 113A-5713j Provisions for permanent ground cover sufficient to restrain erosion must DB 11153, PG 0126 3• SITE'S TOTAL ACREAGE: 4.98 ACRES 4. Strip topsoil from the temporary skimmer basin area, building pad & parking lot areas that are to be graded. Install temporary diversion berms to divert be accomplished for all disturbed areas within 15 working days or 90 4. SITE'S TOTAL DISTURBED ACREAGE: 4.98 ACRES runoff towards the skimmer basin. calendar days (whichever is shorter) fallowing completion of construcfion or development. 5. ZONED: C(P) - COMMERCIAL_ 5. Grade the building pad & parking lot as reflected on the erosion control & grading/drainage plans. Ensure that all runoff continues be diverted to the 6. PROPOSED AUTOMOTIVE MAINTENANCE SHOP temporary sediment skimmer basin by adjusting temporary diversion berms as necessary. GROUND STABILIZATION NOTES (PREFABRICATED METAL BUILDING) 7. PROPOSED PARKING LOT - STRIP PAVEMENT WITH STORM 8. Install storm drainage lines, drop inlets, flared end sections, roof drain leaders & rip rap outlet protection. Add inlet protection to the various inlets as Site Area Stabilization Stabilization Time specified on the erosion control plan. 7. Install water lines, appurtenances and laterals. 8. Fine grade the building pad, parking lot & the driveway areas. Seed & mulch the areas outside of the paved parking lot & building slab within 7 days for permanent stabilization. 9. Install ABC stone base material within the parking lot area & driveway apron. Fine grade and compact the stone while maintaining inlet protection measures for storm drainage. 10. Adjust storm inlets to finish grade. Then pave the parking lot & driveway. New inlet protection devices to be implemented as necessary per erosion control plan. 11. Repread topsoil on the disturbed areas outside of the building slab, parking lot & driveway areas then fine grade. 12. After completion of all finish grading, seed and mulch all disturbed areas for permanent stabilization. 13, Inspect project with NCDEQ and request to close out the permanently stabili7ed site. 14. Convert the temporary sediment skimmer basin to a permanent infiltration basin once the contributing area has been completely stabilized. PROJECT CLOSEOUT NOTE: UPON COMPLETION OF THE SITE'S CONSTRUCTION, NCDEQ REQUESTS THAT THE DEVELOPER OBTAIN A NOTICE OF TERMINATION THROUGH NCDEQ TO FINALIZE THE PROJECT-S CLOSE OUT OF THE Pil 11O--EDIMENTATin N CONTROL PERMIT. LIMITS OF CONSTRUCTION PARCEL'S ARE THE PARCEL'S BOUNDARY BOUNDARY (TYP.) (TYP.) DIVERSION BERM W/ 16 � TURF MATTING (TYP.) p Description Time Frame Frame Exceptions Permiter dikes, swales, ditches None and slopes 7 days High Quality Water (HQW) None Zones 7 days If slopes are 10' or less in Slopes steeper length and are not steeper than 3:1 than 2:1, 14 days are 7 days allowed Slopes 3:1 or 7-days for slopes greater flatter 14 days than 50 feet in length All other areas None (except for 1xith slopes flatter perimeters and HQW than 4A 14 days Zones) -'Extensions of time may be approved by the permitting authority based on weather or other site -specific conditions that make compliance impracticable." (Section ll.B(2)(b)) I S45'49'06"E 621.73' IRF- Q &C�<gd �<9p 5€3q <atl fi<ap �<8p �<aii <90 �<a❑ <ep �<ap f�<9p �<80 �<ap �<gp �<atl<ap fi<ap �<6p<9q CLASS B RIP RAP f ` -219 - /-,aa APRON W/ FABRIC i \� �2�7 �65 L= 16', W= 12', N op 214 rl`� N d50� S' TI-LICK= 18„ u _ N SOI j ...o OX a k RPZ 214 oe X I I ° O o t0 Bore #3 L � 4 �I' - 1 s' 80 0 . ' STORAGE/ KITCHEN/ CONFERENCE p {�a LrJ ', LAUNDRY BREAK ROOM ' 400 SF) ROOM (600 SF)ZD Q ZD ! Z N, iv cy m I I 1 ' r I o r� {em u HALLWAY (866 SF) SUPPLY La n C] Q z I I i ` ° CLOSET263 SF BUSINESS c ) OFFICE BLDG F.F.E. 2'14.25 Co � aJ Q 3 N I + I M y UNISEX (750 SF) "a - R p- w �y I C) PROPOSED o i � �� BATHROOM t„o5rf so3 sF ( } SHOP SPACE ° iJ f 1 INFILTRATION I m�a •s' ENTRY HALLWAY (866 SF} {12,000 SF) W/ COIR BASIN (GRASSED) I a AREA (450 SF) FFErION1sT FFET!vESKIMMER oICNoC BAFFLES- SEE CHART (625 SP) (875 5F) FOR MORE INFO (TYP.) gC 14' BAY 14' BAY 14' BAY '�° ^' 15" INV OUT 208.40 I Soil m O DOOR D00R DOOR 9- oQ c� Bore #2 14.1 WMf 214 . I -- - -- --_.- .. k " E 0 0 0 � O a `,moo,0-`�% � - L Al71NG Z E .oso11'-a°RGPaQ040% 00 LIMITS OF J7 211 ,. Q. ,a CONSTRUCTION ( TYP.) A a Q a:. " . Q... o ." o �s y tool , ) Op 21 �5 213 6,5 op 213.5,5 Qp 213. 2� 213 15 2.12 n " INLET o o o �,: . ". ; ..• " . r} PROTECTION �3 c�+ TYP. ( ) �" Q .. LPG' �� `L OA 13 213.50 2 AOP INL 2 #4 GRaTE2 3T13 NV 15" x 0 G TE: IN:211.13 1 " 1N:210.75 f 15" OUT: 13 m r� hlA1V 15" T:210.75 213- n) Cv N /F EB HOLDINGS, LLC B 11153 PG 126 N: 0425-36-6692 O a O ,92 INLET PROTECTION (TYP.) OP INi ET 96 GR 213.5o INV 15" 0 :211,49 TEMP GRAVEL _ "♦' P LL! [Y CONST. ENTRANCE oA OR , 212,7 DROP INLET#3 LL- ^� (TYP,) 212.8 `9O 0 GRATE:212.D0 x �J IL a % INV 15 IN:2s39,52 Li <( 1 INV 18" OUT:209. 2 m jO QQ �V 212 �N45'46 "E 30 80' �° 277 TEMP. RE1NF. SILT �c�O '2 W � � �' FENCE OUTLET (TYP.) <BO�r<ep <e <ep ��«v llllllll■r�<ea lip<�a IIIIIII�<atl ��<aa Q �<ea o �■<sa �<ea II��<aa <aa ��<aa �I� a <aa <aa < � 212 213 (Y < F F d R • F F F F~ F F F F �.� F F 110.51 ' S 2 f 1' F �" F F SF 11 22.4.99� IPF , i 12 4.86 I N /F i f INLET i S44°50'09'E 883.93'(TOTAL) BOBBY N B�INNELLS N f F N/F � � PROTECTION and wife N°/F TYP. CHUCK JA,,O�.BRITT� EDVUARD RAY WILLIS DALE ANN TRIPP(LIFE ESTATE) r MAR N./HA N III MARY BI NNELLS DB 8091 PG 5 - and wife TABITHA TRO N(REMAINDER-MA I N��N DB 7974 PG 477 ) DB 1 002 PG 178 OT 1 LOT 2 RUBY LEE WILLIS DB 6 49 PG 69 OT 5 l PB 26 PG 8 B 8328 PG 645 PB 26 PG 8 L T 4 PB PG �10 PIN:0425-36- PIN:0425-36-3684 LOT 3 PB 3 PG 10 3711 B 26 PC 8 PIN:0425- 6-5520 PIN:OL2-36'-6411 LIMITS OF CONSTRUCTION PIN: 25-36-4558 � ii ARE THE PARCEL'S 1 BOUNDARY (TYP-) �- MAINTENANCE PLAN I. If is the responsibility of the developer to inspect or have inspected all erosion control measures no less than once a week and after each run off producing rain event. Any repairs should be made immediately to retain ill control measures. 2. Maintain the gravel pad of the construction entrance, The entrance should be checked weekly and after each high traffic event. This will help to prevent sediment from leaving fhe construction site, Periodic tcpdressing with 2-3 inch Slone moy be required. lmmediately remove all objectionable materials spilled, washed or tracked onfo public roads. 4. inspect silt fence at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric collapse, teor or become ineffective, replace immediately. NORTH CAROhIl�hA DEPARTMENT Remove sediment deposits as needed to provide adequate storage volume for the next rain event and to reduce preswre on the fencing materials. 5edimenf should never exceed half (H TRANSPORTATION DEP RT ALL DRAINAGE EASEMENTS SHALL BE the designed storage volume. DEDICATED AS PUBLICS AND IT SHALL BE 5. Inspect hardware clot I p hand gravel inlet protection measures at least once a week and after each rain event. Clear the wire mesh of any debris to provide adequate flow for D VISIOt+I OF HfGf-Ellllf\YS� -j}{E RESPONSIBILITY O; THE PROPERTY ONLY NORTH G`ARQLINR DEPARTMENT subsequent rains" Take care not fo damage ur undercut the wire rxsesh when removing sediment or cleaning. Replace stone cs needed to maintain design specifications. DRIVEWAY PERMIT APPRO s Q� TRANSPORTATION APPROVED 6. Inspect "gravel" pipe inlet protection at least once a week and after each rainfall. Reshape inlet rotecfon as needed to maintain control of an sediment de osition. Clogged or OWNERS TO MAIN LAIN' THE DRAINAGE STRUCTURES RES ARE TO O p p Y P of DocuSigned by: EASEMENTS AND ANY URArhlACl= missing gravel will result in sediment deposits into the drainage pipe culvert. Gleaning or gravel replacement should #eke place during dry periods. Clean the area in front of the gravel CONSTRUCTED ON PUBLIC inlet protection when inspection shows debris and sediment deposits. If all tha gravel becomes contaminated with sediment accumulation then replace gravel immediately. BY S STRiJCTURES F iERC itl, 5a AS TO rJfAiNTAIN 7. All vegetated areas will be reseeded, fertilized and mulched as necessary to maintain a dense vegetative cover. Check for dcmoge and washing out of materials after each rain. THE RE I THERE RITY C]E THE DRAINAGE RIGHT OF VIWY, C26498D929294B9.., Repair amage ,bare or sparse areas by filling any gullies, reseeding and mulching. Tacking of mulch with netting or a tackifier may be necessary in areas of concentrated flaw, If SYSTEitI! AND INSIJL�i` POSITIVE DRAINAGE. vegetation fails to emerge, have a soil test performed and re-evoulate the choice of plant material. 07/06/2022 - 8. Inspect mulches after every rainfall to check for rill erosion and dislocation of materials. Where erosion is witnessed, apply additional mulch. Mulch should be applied to 100% soil DATE coverage. If necessary anchor mulches by tacking with asphalt, netting or crimping with a mulch anchoring tool. A disk with blades set nearly straighf can be used as a mulch anchoring tool. J dg JS AS L RBF �<ea SILT FENCE ♦ (TYP.) DIVERSION BERM W/ TURF MATTING (TYP.) **ADJUST BERM AS NECESSARY TO ENSURE THAT ADJOINING RESIDENTIAL LOTS TO THE SOUTH DO NOT HAVE DRAINAGE ISSUES ,l 217 ■r<aa �<9a ar F 124.97' - N /F JUVANCIA STEFANKO and husband PHILLIP M. EDMONDSON DB 8188 PG 334 LOT 6 PB 36 PG 10 Pf :0425-36-7302 ANY PARCELS OR EXCLUDED AREAS ARE TO RE SERVED INTERNALLY WrM NO ACCESS ONTO DEPARTMENTAL MEAL RIGHT OF WAY 9' spa s �7 6' dj. co ` N /F SONOCO RECYCLING LLC DB 8874 PG 667 LOT 3 PB 82 PG 183 PiN: 0425-46-1693 PARCEL'S BOUNDARY (TYP.) 7 DAY GROUND STABILIZATION -- / _ REQ'D. (TYP.) LLf U- Lf_1 :D -J LL __J m _ _ _ SILT FENCE V) ( <8 (TYP.) 0 Q D s IPF ` s3.2 r r) SF F SF g cl� Sp F -- 145.22' 78.18' RBS PARCEL'S BOUNDARY (TYP.) N /E CARLA M CARTE /F CHARLE L CART R LAWREN E E MORRIS husband and wi e DB 11 55 PG 778 DB 7680 PG 8 3 LOT 9 I:.OT 7 P 26 PG 8 PB P 0 , PIN: 425-36--8172 PIN: 0425- 7293 I SCALE 1 " = 30' 30 0 30 60 90 J J 0 0 J 2 00 W Lll I N � -" n `= m Y 0) Z 0 O W 7 0 Z * I � Z c O U -J Z J Q J J � w 0 zw Ice o Z m W O w m F- Z Lu W O O Z w VI W J � 12 > W ce I- It- UJ W w a DRAWN BY: KWS CHECKED BY KWS REVIEWED BY: KWS DATE: 1-24-2022 PROJECT #: 21-004 CA `��'�yyiPdpg p�p`r SS]� 9 '. SEAS i 45277 a fit. 2► �•�. •a era • � 4~ alldN� EE/B� HOLDINGS, LLC. 7357 MARINERS LANDING IIRiVE FAYETTEVILLE, NC (408)-712-0245 benborger@me.com 0 Z W CV > Im L11 V J � � � M J 0. �o �4 U J Z Z ; G d' I� W en N C7 a /Z� Z Z Z�` at V W w W ZZ 0°C LL. W 2 U ,Z _ W W 2CL II= a H cn _ OF~C J LU F- V? ILU Ill a a CV Z a SCALE: AS NOTED FIELD BOOKS: SHEET: 2