Loading...
HomeMy WebLinkAboutSW8070319_Current Permit_20220823ROY COOPER Governor EUZABETH & BISER Seeretdrp BR AN WRF-NN l uvaoor August 23, 2022 Wil Fergie, LLC Attn: James Anthony Jr., Manager 1201 Edwards Mill Road, Suite 300 Raleigh, NC 27607 NORTH C-ARQLINA EhykonMe0WQUaUty Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 070319 Ferguson Distributors New Hanover County Dear Mr. Anthony: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on August 12, 2022. The Division is hereby notifying you that permit SW8070319 has been renewed, updated, and re -issued on August 23, 2022, as attached. Please be aware that the renewal and re - issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until August 8, 2029 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fec (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment C — Permitting History Renewal Application Documents DES/ams: %StormwaterTermits & Projects12007\070319 HD12022 08 permit 070319 cc: Wilmington Regional Office Stormwater Pilc North Carolina Department of EnvironmentalQialityr I Division of EnMy d beral and Land6%sources W!lmington Regional Office 1 127 Cardinal Drive Extension I Wflnregton, North Carolina 28405 . ft 910.796370 Post -Construction Stormwater Management Permit No. SW8 070319 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Wil Fergie, LLC Ferguson Distributors 3881 U. S. Highway 421 North, New Hanover County FOR THE construction, operation and maintenance of one (1) wet detention pond and one (1) infiltration trench in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwaterrules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until August 8, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Sections 1.7 and 1.8 of this permit. The stormwater controls have been designed to handle the runoff from a total of 394,165 square feet of impervious area. The wet pond will treat 387,915 sf and the infiltration trench will treat 6,250 sf. 3. A 50' wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 240,185 sf to drain to the pond, which is included in the 387,915sf total impervious to drain to the pond. Page 1 of 5 Post -Construction Stormwater Management Permit No. SW8 070319 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control system. 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 12.44 Onsite, ft2: 542,000 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 387,915 Onsite, ft2: 387,915 Offsite, ft2: 0 C. Design Storm, inches: 1.5 d. Average Pond Design Depth, feet: 5.0 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 14.5 g. Permanent Pool Surface Area, ft2: 36,203 In. Permitted Storage Volume, ft3: 61,308 i. Temporary Storage Elevation, FMSL: 16.0 j. Pre-dev. 1 yr-24 hr. discharge rate, cfs: 0.62 k. Controlling Orifice: 3.0"0 pipe I. Orifice flowrate, cfs: 0.16 M. Permitted Forebay Volume, ft3: 36,473 n. Fountain Horsepower 3/4 o_ Receiving Stream/River Basin: Cape Fear River / Cape Fear p. Stream Index Number: 15-25-1-9 q. Classification of Water Body: "C; SW' 8. The following design criteria have been permitted for the infiltration trench system and must be provided and maintained at design condition. The infiltration trench has been designed to infiltrate the 10yr24hr storm event without discharging as calculated using one-half of the infiltration rate reported in the soils report. Therefore, no bypass or vegetated filter strip is required. The trench drains to the same receiving stream as the wet pond: a. Drainage Area, acres: 0.143 Onsite, ft2: 6,250 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 6,250 Onsite, ft2: 6,250 Offsite, ft2: 0 C. Design Storm (10yr24hr), inches: 7.13 d. Trench Length, feet: 105.00 e. Trench Width, feet: 13.25 f. Trench Depth, feet: 1.25 g. Bottom Elevation, FMSL: 13.20 h. Bottom Surface Area, ft2: 1,391 *j. Perforated Pipe Diameter, in.: 12 *k. Perforated Pipe Length, ft: 105 I. Permitted Storage Volume, i3: 745 M. Predevelopment 1 yr 24 hr peak flow, cfs: 0.01 n. Type of Soil: Medium Sand o. Infiltration Rate from Soils Report, in/hr: 24.0 (12" used for calc) P. Seasonal High Water Table, FMSL: 11.2 q. Time to Draw Down 10yr24hr Event, hours: 2.54 Page 2 of 5 Post -Construction Stormwater Management Permit No. SW8 070319 II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains are allowed in the pond, subject to the following criteria: a. The minimum permanent pool volume is 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. C. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The fountain may not be placed into the forebay. e. The falling water from the fountain must be centered in the main pond, away from the shoreline. f. The maximum horsepower for a fountain in this pond is 3/4 horsepower. 6. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 5 Post -Construction Stormwater Management Permit No. SW8 070319 11. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); Page 4 of 5 Post -Construction Stormwater Management Permit No. SW8 070319 b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS_ The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 23rd day of August 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ,,Brian Wrenn, Directdr Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History Ferguson Distributors Permit No. SW8 070319 „ y ` `� _ al i Permit Action Description of the Chwges Date Version construction, operation and maintenance of a wet detention 8/8/2007 Original Approval 1.0 pond in compliance with the provisions of 15A NCAC 2H 1000; The subdivision is permitted for 8 lots subject to the BUA listed in the permit text 2/18/2008 Modification 1.1 installation of storm sewers; total amount of impervious surface for this modification is 382, 5/15/2008 Modification 1.2 411 sf which will consist of a building, parking lot, sidewalk, and allocations for future development 7/l/2008 Modification 1.3 High density subdivision; Drainage Area: 602.992sgft; Impervious 3 82,411 High density commercial project; layout of the development changed; construction, operation and maintenance of one (1) 1/28/2010 Modification 1.4 wet detention pond and one (1) infiltration trench in compliance with the provisions of 15A NCAC 2H A 000 and Session Law 2008-211 6/7/2010 Plan Revision 1.5 reallocating existing and proposed built -upon area as shown in the table in the permit text Name/Ownership Previous signing official Jon Vincent, Manging Member to 8/4/2010 Application 1.6 current signing official McKinley D. Dull, Manager; Addres change; LLC is the same 10/8/2010 Plan Revision 1.7 include the reduction of 160 sf of side walk, an increase of 4,220 sf of paved parking area, and a project name change. 2/9/2015 Transfer 1.8 to Wil Fergie, LLC Project Name Change to Ferguson Distributors 8/23/2022 IRenewal 2 1 Expires August 8, 2029 AUG 18 2009 Permit Number: .�A4 "',_?, (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of lola approximately six inches. Form SW401-Wet Detention. Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: # 1 BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise dama ed. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. ' The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW4Q1-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 7.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads _. 7.50 feet in the forebay, the sediment shall be removed. Sediment Removal IA. 7_0 Bottom FORFBAY BASIN DIAGRAM ill in the blanks) ! ft Min. Sediment Storage Permanent Pool Elevation 14.50 Pool Sediment Removal Elevation 7_0 Volume Bottom Elevation MAIN POND 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Wolselev, N.A. - U.S. Hwy 421 Project BMP drainage area number:#1 Print name:McKinley D. Dull Title:Member - Hwy 421 Properties, LLC (see authorization letter from Jon T. Vincent - Managing Member) Address:1508 Military Cutoff Road, Suite 302, Wilmington, NC 28403 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Te msa J" 3 i Q '� rd_ , a Notary Public for the State of 1.0 IVO ft�h CQ r0 t t Yl a , County of Ned %%di n o VP r , do hereby certify that ffi C e n l ey D. Dull personally appeared before me this ( O day of , a o9 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, OptloQ 0 &� ret131� s NOTARY " Z PUBLIC st� SEAL My commission expires Q I a D 110 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number:_ --AVZ Infiltration Trench Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the infiltration trench will be carefully managed to reduce the sediment load to the sand filter. — The water level in the monitoring wells will be recorded once a month and after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). The infiltration trench will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash debris. The grass filter strip or other pretreatment area Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. The flow diversion structure (if applicable) The structure is clogged. Unclog the conveyance and dispose of any sediment off -site. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. yc.1 i \I inn JAN 0 6 2010 BY: Form SW40 1 -Infiltration Trench O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The trench Water is ponding on the surface for more than 24 Remove the accumulated sediment from the infiltration system and hours after a storm. dispose in a location that will not impact a stream or the BMP. The depth in the trench is Remove the accumulated sediment reduced to 75% of the original from the infiltration system and design depth. dispose in a location that will not impact a stream or the BMP. Grass or other plants are Remove the plants, preferably by growing on the surface of the hand. If pesticide is used, wipe it on trench. the plants rather than spraying. The observation well(s) The water table is within one Contact the DWQ Stormwater Unit foot of the bottom of the immediately at 919-733-5083. system for a period of three consecutive months. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. The emergency overflow berm Erosion or other signs of damage have occurred at the The emergency overflow berm will be repaired or replaced if beyond outlet. repair. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW40 1 -Infiltration Trench O&M-Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Wolseley, N.A. - U.S. Hwy 421 Project BMP drainage area number:42 Print name:McKinley D. Dull Title:Member-Hwy 421 Properties, LLC (letter from Jon Vincent - Managing Member) Address:508 Military Cutoff Road, Suite 302, Wilmington NC 28403 Date: I — !I- GO! U Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, —Fe r e S a J. R I Q :ffi P4 , a Notary Public for the State of n rah _a ro I i na , County of w Ra n dye r , do hereby certify that M c k i n l eu 1. I) (1 1 personally appeared before me this day of '�J a n U C! r 2 0 10 , and acknowledge the due execution of the forgoing infiltration trench maintenance requirements. Witness my hand and official �J seal, Z,`C'na. 0 ll * / N4 NOTgRY PUBLIC SEAL My commission expires. L114� O 110 Form SW401-Infiltration Trench O&M-Rev.3 Page 3 of 3 DEMLR USE ONLY Date 5eceiysd Fee Paid Permit Number 19 1 i 9 0-7 031 STATE STORMWATER: PERMIT INFOR � iATIOW UPDATE APPLICATION FORM I� There is NO FEE for updating project name or permittee information. ��,� This form is to only to be used by the current permittee to notify the Division of., 4(10 1) changes to the Point of Contact (signing official) for the current permittee (LLC, Corporation, HOA 61r, OA), 2) changes to the mailing address, phone number or email address of the current permittee; f' 3) changes to the name of the project; and 4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS. A. IIEVV PERMIT WFORMAT11011 State Stormwater Permit Number: SW8 070319 Are you updating (check all that apply): If so, please provide the updated information: ❑ Project name ❑ Corporation Name' ❑ Permit Contact Name2,3 ❑ Permit Contact Title [X Mailing Address3 -12-01 Edwards MITI Rd., Raleigh NC 27607 ❑ Phone number ❑ Email address Provide documentation such as a Name Change /Merger filed with the NCSOS. Provide supporting documentation such as NCSOS filing. The permit contact's position must be in accordance with 15A NCAC 02H .1040(1). if more than one point of contact or mailing address is being changed, please attach a separate sheet. B. '00EIRTIFICATION OF'FERUVIII TEE James I. Anthony, Jr. , the current permittee, hereby notify DEMLR that I am making the changes as listed in Section A above. I further attest that this application for an update to the permit information currently on file is accurate and complete to the beAt ofyny knolpat`dge. Signature: ElizabetthIA/Johnson a Notary Public for the State of NC County of Wake , do hereby certify that James I. Anthony, Jr. personally appeared before me this the day of August 20_2_2_, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) ELIZARTH A JOHNSON NOTARY PUBLIC / WAKE COU Notary Signature G 7 ,.Z71 A - (`Gl�v idt-J r,y cAmmi aim My commission expires June 5, 2023 Stonni:rat,er Permit information Updt;t:: Form Page 1 of 1 May 11, 2017 DEMLR USE ONLY Date ReViveg Fee Paid Permit Number 1a Ia O1 031 NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 070319 2. Project name: Ferguson Distributors 3. Project street address: 3881 US HWY 421 N. City: Wilmington County: 4. What, if any, changes have been made to the project as permitted? New Hanover Zip: 28401 If the project has changed from the original approved plans, please complete SVVU-101 for a Major Modification or Minor Modification Application 1bfm available at. https:Udeg.nc.gov/about/divisions/energy- mineral-land-resources/energy-mineral-land-rules/stormwater-program/post-construction. R. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/abouttdivisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State StormwaterPermits do not automatically transfer with the sale of the propeny. K Current Permit Holder's Company Name/Organization: _ Signing Official's Name: James I. Anthony, Jr. Wil Fergie LLC 3. Signing Official's Title: Manager 4. Mailing Address: 1201 Edwards Mill Road, Suite 300 City: Raleigh State: NC Zip: 27607 5. Street Address: 1201 Edwards Mill Road, Suite 300 City: Raleigh State: NC Zip: 27607 6. Phone: 919 832-1110 Email: janthony@aacre.com AUG 12 2022 BY: Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORIM. Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: x 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. x 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). hfps://www.sosnc.gov/online services/search/by title/ Business Registration AUG 12 2022 BY.— Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION I _ I, 4'e rw S L . the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. Signature: g Date: ? 2v f; V NOTARIZATION: I, Elizabeth Johnson , a Notary Public for the State of North Carolina , County of Wake , do hereby certify that James I. Anthony, Jr. personally appeared before me this the day of ��'i.�5�. , 20 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature: ' My commission expires It ELIZABETH A JOHNSON NOTARY PUBLIC WAKE COUNTY,. C My CaoaWAM F.xpka� A. AUG 12 2022 BY Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Permit (to be provided by DWQ) AUG 13 2009 BY: NGDEWR vWAT .7f +'ref STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required Information. I. PROJECT INFORMATION Project name Contact person Phone number Date Drainage area number H. DESIGN INFORMATION Site Characteristics Drainage area Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1 -yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Wolseley, N.A. - U S. Hwy421 Project Walter 'Pete' Avery (910) 396 - 6036 5•JuF09 #1 64ZOW its 387,915 le 71.57 % 1.5 in 47,028 ft3 ✓ 61,306 fl3 u�l fl9 ft 0 ft3 i OK OK, volume provided is equal to or in excess of volume required. N (Y or N) 4.0 in �0.15 (unitless) 0.72 (unitless) 0.17 inlhr OK 0.62 ff3lsec 21.29 felsec 5 m 20.67 felsec H YDROCIRAPH ROLM &1 y ✓ 16.00 fnsl ­*j &L&- OF 1"5'� VbLUIh E = 1 S , 66' ✓ 1.00 fmsl 13.OD fmsl a AS K&OMLY P99M I'TTM ✓ 15.00 fmsl 14.00 fmsl Data not needed for calculation option #1, but OK if provided. ✓ 7.00 fmsl 6.00 fmsl Data not needed for calculation option #1, but OK If provided. w 1.00 ft Is there additional volume stored above the state -required temp. pool? Y (Y or N) Elevation of the top of the additional volume 160 fmsl OK I Form SW401-Wet Detention Basin-Rev.6-2/20/09 Parts I. & H. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) fl. DESIGN INFORMATION T Surface Areas Area, temporary pool ✓ 43,872 if Area REQUIRED, permanent pool 27,493 if' SAIDA ratio 5.07 (unifless) Area PROVIDED, permanent pool, APB ,,d ✓ 36,203 fe OK Area, bottom of 1 Oft vegetated shelf, Ay"t sndf 32,375 ft` Area, sediment cleanout, top elevation (bottom of pond), AW-P d ✓ 15,667 fr Volumes Volume, temporary pool ✓ 61,308 ft3 Volume, permanent pool, Vim,,,-PW 182,373 if Volume, forebay (sum of forebays if more than one forebay) 36,473 e Forebay % of permanent pool volume f 20.0% % SAIDA Table Data Design TSS removal 90% Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 5.07 (unitess) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vmr„yod 182,373 ft' Area provided, permanent pool, Aps,,,,_,d 36,203 it' Average depth calculated 5.04 ft Average depth used in SAIDA, d. (Round to nearest 0.5ft) v 5.0 it Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, A,,,,,,w le Area, bottom of 10ft vegetated shelf, Abe ilz Area, sediment cleanout, top elevation (bottom of pond), Abntpow it2 "Depth' (distance bMr bottom of 10ft shelf and top of sediment) ft Average depth calculated ft Average depth used in SAIDA, d., (Round to nearest 0.5ft) ft Drawdown Calculatlons Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) i 3,0f , I Area of orifice (if -non -circular) in' Coefficient of discharge (CD) 0.60 (unifless) Driving head (H") 0.46 ft Drawdown through weir? N (Y or N) Weir type (unifless) Coefficient of discharge (C.) (unifless) Length of weir (L) ft Driving head (H) It Pre -development 1-yr, 24-hr peak flow t— 0.62 Osec Post -development 1-yr, 24-hr peak flow 21.29 Osec Storage volume discharge rate (through discharge orifice or weir) 0.16 folsec Storage volume drawdown time 3.40 days Additional Information Vegetated side slopes 3 :1 Vegetated shelf slope 10 :1 Vegetated shelf width 10.0 ft Length of flowpath to width ratio 3 :1 Length to width ratio 30 :1 Trash rack for overflow & orifice? Y (Y or N) Frocboard provided 1.5 It Vegetated filter provided? N (Y or N) Recorded drainage easement provided? Y (Y or N) Capures all runoff at ultimate build -out? Y (Y or N) Drain mechanism for maintenance or emergencies e� Pumps Ce73 OK OK OK OK OK OK Insufficient post -development peak flow. �SEE ew"'A- RA'N AMN6 OK, drays down in 2-5 days. SA GOYS 2 MIWI/lfUfl'1. G7E*At-#E OK, drawdown time is correct..> y.y pRYS ■ OW 6fjM SPp_N f "6 OK OK OK OK OK OK OK OK OK OK Form SW401-Wet Detention Basin-Rev.6-2/20/09 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ ) tIll. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. _ a„Q— SW-01 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, - Pretreatment system, - High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. J1ZC. 5w-01 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Sw"crL - Outlet structure with trash rack or similar, - Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and - Filter strip. JRL Ski—UZ 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. JIB %W —ot 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. Jrtr c4t4s. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. JRC SW —of 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. iRr— CA&CS. 7. The supporting calculations. 4,112c, SUPP. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. NOT' R&QUIR.615 9. A copy of the deed restrictions (if required). JIZC. SUPP• 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev,6-2/20/09 Part III. Requircd Items Checklist, Page 1 0l 1 Permit No. (to be provided by DWQ) ��OF DNA ]'�c • STORMWATER MANAGEMENT PERMIT APPLICATION FORM MCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. PROJECT WFOPURATOW Project name Wolseley, N.A - U.S Hwy 421 Proiect Contact person Walter "Pete" Avery Phone number (910) 395 - 6036 Date 4-,lar,00 Drainage area number I4, II?'I &GN fN{r=C*01AATCM Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24••hr runoff volume Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Trench Design Parameters Drawdown time Perforated pipe diameter Perforated pipe length Number of laterals Stone type (if used) Stone void ratio Stone is free of fines? ##2 6,25000 ftz 6,250.00 ft 100.0% % 1.50 in 3.79 in 0.16 in/hr 0.01 ft3/sec 0.02 ft3/sec 0.02,p ft3/sec 742.19 ft3 745.11 ft3 ft3 ft3 ft3 ft3 ft3 OK for non -SR waters Medium Sand 12.00 in/hr <-- *- WF11.,794770N RA-W (Z, ,X Jti►�M�, 1120 fmsl 0.11 days OK 12.00 in +c: pwv�m'" 105.00 ft 1 JAN 0 6 2010 Washed #57 40 Y (Y or N) OK BY: Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 13.20 fmsl OK Storage/overflow elevation 14.46 fmsl Top elevation 1445 fmsl Trench Dimensions Length (long dimension) 10500 ft Width (short dimension) 13.255 ft Height (depth) 1.25 ft OK Additional Information Maximum volume to each inlet into the trench? 0.21 ac-in OK Length of vegetative filter for overflow a.00 ft Filter is too short, must be � 30-ft Number of observation wells 1 OK Distance to structure 50.00 ft OK Distance from surface waters 325.00 ft OK Distance from water supply well(s) 585.00 ft OK SY5'TETYI pg�E7�/E►� 7a f N FIG17ZI9T> Separation from impervious soil layer 200 ft OK 9 57D12»'j t' fi Sd Depth of naturally occudng soil above SHWT 1.75 ft OK 7�'►t Aee NCr �ujrZL.D 7�}� Bottom covered with 4-in of clean sand? Y (Y or N) OKT7�ID F�CT���B'rPRs Pel.rCY_ Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? N (Y or N) Must provide bypass for larger flows Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided 2' Boys Sump Form SW401-Infiltration Trench-Rev.4 Parts I. & It. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. Jam` 5r-01 1. Plans (1" 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Trench dimensions, Pretreatment system, - High flow bypass system, - Maintenance access, Proposed drainage easement and public right of way (ROW), - Overflow device, and Boundaries of drainage easement. c4RL. SW -Ol 2. Partial plan (1" = 30' or larger) and details for the infiltration trench showing: Bypass structure, - Maintenance access, - Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. Y SW 3. Section view of the infiltration trench (1" 20' or larger) showing: Pretreatment and treatment areas, and Inlet and outlet structures. CA XS 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. s� -- 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 6. A construction sequence that shows how the infiltration hasin will he protected from sediment until the entire drainage area is stabilized. JRC_ C 7. The supporting calculations. Jzr_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Trench-Rev.4 Part ill. Required Items Checklist, Page 1 of 1 State Stormwater Management Systems Permit No. SW8 070319 Wolseley. N.A. — U.S. Hwy 421 Project Stormwater Permit No. SW8 070319 New Hanover County Designer's Certification 1, -7-5-e-iitv Y:K. �""e%mil as a duly registered o F .-.ram,. �.�,,,�,wL_ in the State of North Carolina, having been authorized to observe(Periodically/ weekly/ full time) the construction of the project, w oL SerL.C�, �/ .[( — f% Srfi�r Y�r (� a � �- .� 1 �r' = r�S✓F '%+2E�fCi (Project) for IYL.,'Y Y-L/ Ph.p--wrirr , IzL. (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations'from approved plans and specifications: Signature Registration Number Date 1--30-I5- IECIEIV FED 0 5 295 BY: SEAL CAR�y.�• oFSSS/o Q �9 9 SEAL 028858 � State Stormwater Management Systems Permit No. SW8 070319 Certification Requirements. - The drainage area to the system? contains approximately the permitted acreage. . -"c3P2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. SW4. All roof drains are located such that the runoff is directed into the system. "MP 5. The outlet structure elevations are per the approved plan. 3—W 6. The outlet structure is located per the approved plans. -C3? 7. Trash rack is provided on the outlet structure. �8. All slopes are grassed with permanent vegetation. suP 9. Vegetated slopes are no steeper than 3:1. 5t3p 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 75Q11. The permitted amounts of surface area and/or volume have been provided. 3(3�' 12. Required drawdown devices are correctly sized and located per the approved plans. 5�P 13. All required design depths are provided. 3C' 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 56c� 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections