HomeMy WebLinkAboutSW8070319_Current Permit_20220823ROY COOPER
Governor
EUZABETH & BISER
Seeretdrp
BR AN WRF-NN
l uvaoor
August 23, 2022
Wil Fergie, LLC
Attn: James Anthony Jr., Manager
1201 Edwards Mill Road, Suite 300
Raleigh, NC 27607
NORTH C-ARQLINA
EhykonMe0WQUaUty
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW8 070319
Ferguson Distributors
New Hanover County
Dear Mr. Anthony:
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on August 12, 2022. The Division is hereby notifying you that permit SW8070319 has been
renewed, updated, and re -issued on August 23, 2022, as attached. Please be aware that the renewal and re -
issuance of this stormwater permit does not imply that the site is currently in compliance.
This permit shall be effective until August 8, 2029 and does not supersede any other agency permit that may be
required. The project shall be subject to the conditions and limitations as specified therein. This permit does not
impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program
to provide you with a better understanding of your obligations under this permit. Failure to comply with these
requirements will result in future compliance problems. Please note that this permit is not transferable except
after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fec (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional
Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely,
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
DES/ams: %StormwaterTermits & Projects12007\070319 HD12022 08 permit 070319
cc: Wilmington Regional Office Stormwater Pilc
North Carolina Department of EnvironmentalQialityr I Division of EnMy d beral and Land6%sources
W!lmington Regional Office 1 127 Cardinal Drive Extension I Wflnregton, North Carolina 28405
. ft 910.796370
Post -Construction Stormwater Management
Permit No. SW8 070319
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Wil Fergie, LLC
Ferguson Distributors
3881 U. S. Highway 421 North, New Hanover County
FOR THE
construction, operation and maintenance of one (1) wet detention pond and one (1) infiltration trench
in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter
collectively referred to as the "stormwaterrules') and as outlined in the application, approved
stormwater management plans, supplement, calculations, operation and maintenance agreement,
recorded documents, specifications, and other supporting data (the "approved plans and
specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and
Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and
maintained in accordance with these approved plans and specifications. The approved plans and
specifications are incorporated by reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until August 8, 2029 and shall be subject to
the following specified conditions and limitations. The permit issued shall continue in force and effect
until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any condition. The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H.1000 and NCGS 143-215.1 et.al.
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Sections 1.7 and 1.8 of this permit. The stormwater controls have been designed
to handle the runoff from a total of 394,165 square feet of impervious area. The wet pond will
treat 387,915 sf and the infiltration trench will treat 6,250 sf.
3. A 50' wide vegetative buffer must be provided adjacent impounded structures, streams, rivers
and tidal waters.
4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and
per approved plans. The built -upon area for the future development is limited to 240,185 sf to
drain to the pond, which is included in the 387,915sf total impervious to drain to the pond.
Page 1 of 5
Post -Construction Stormwater Management
Permit No. SW8 070319
5. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans.
6. The runoff from all built -upon area within the permitted drainage areas of this project must be
directed into the permitted stormwater control system.
7. The following design criteria have been provided
in the wet detention pond and must be
maintained at design condition:
a.
Drainage Area, acres:
12.44
Onsite, ft2:
542,000
Offsite, ft2:
0
b.
Total Impervious Surfaces, ft2:
387,915
Onsite, ft2:
387,915
Offsite, ft2:
0
C.
Design Storm, inches:
1.5
d.
Average Pond Design Depth, feet:
5.0
e.
TSS removal efficiency:
90%
f.
Permanent Pool Elevation, FMSL:
14.5
g.
Permanent Pool Surface Area, ft2:
36,203
In.
Permitted Storage Volume, ft3:
61,308
i.
Temporary Storage Elevation, FMSL:
16.0
j.
Pre-dev. 1 yr-24 hr. discharge rate, cfs:
0.62
k.
Controlling Orifice:
3.0"0 pipe
I.
Orifice flowrate, cfs:
0.16
M.
Permitted Forebay Volume, ft3:
36,473
n.
Fountain Horsepower
3/4
o_
Receiving Stream/River Basin:
Cape Fear River / Cape Fear
p.
Stream Index Number:
15-25-1-9
q.
Classification of Water Body:
"C; SW'
8. The following design criteria have been permitted for the infiltration trench system and must be
provided and maintained at design condition. The infiltration trench has been designed to
infiltrate the 10yr24hr storm event without discharging as calculated using one-half of the
infiltration rate reported in the soils report. Therefore, no bypass or vegetated filter strip is
required. The trench drains to the same receiving stream as the wet pond:
a.
Drainage Area, acres:
0.143
Onsite, ft2:
6,250
Offsite, ft2:
0
b.
Total Impervious Surfaces, ft2:
6,250
Onsite, ft2:
6,250
Offsite, ft2:
0
C.
Design Storm (10yr24hr), inches:
7.13
d.
Trench Length, feet:
105.00
e.
Trench Width, feet:
13.25
f.
Trench Depth, feet:
1.25
g.
Bottom Elevation, FMSL:
13.20
h.
Bottom Surface Area, ft2:
1,391
*j.
Perforated Pipe Diameter, in.:
12
*k.
Perforated Pipe Length, ft:
105
I.
Permitted Storage Volume, i3:
745
M.
Predevelopment 1 yr 24 hr peak flow, cfs:
0.01
n.
Type of Soil:
Medium Sand
o.
Infiltration Rate from Soils Report, in/hr:
24.0 (12" used for calc)
P.
Seasonal High Water Table, FMSL:
11.2
q.
Time to Draw Down 10yr24hr Event, hours:
2.54
Page 2 of 5
Post -Construction Stormwater Management
Permit No. SW8 070319
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
3. The permittee shall at all time provide the operation and maintenance necessary to assure the
permitted stormwater system functions at the design condition. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch
basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR. The records will indicate the date, activity, name of person
performing the work and what actions were taken.
5. Decorative spray fountains are allowed in the pond, subject to the following criteria:
a. The minimum permanent pool volume is 30,000 cubic feet.
b. The fountain must draw its water from less than 2' below the permanent pool surface.
C. Separated units, where the nozzle, pump and intake are connected by tubing, may be
used only if they draw water from the surface in the deepest part of the pond.
d. The fountain may not be placed into the forebay.
e. The falling water from the fountain must be centered in the main pond, away from the
shoreline.
f. The maximum horsepower for a fountain in this pond is 3/4 horsepower.
6. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility.
9. Access to the stormwater facilities for inspection and maintenance shall be maintained via
appropriate recorded easements at all times.
10. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
Page 3 of 5
Post -Construction Stormwater Management
Permit No. SW8 070319
11. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
III. GENERAL CONDITIONS
CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement on -site
stormwater systems. These additional or replacement measures shall receive a permit from
the Division prior to construction.
2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to
the expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H.1045(3).
3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION.
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes.
4. TRANSFER. This permit is not transferable to any person or entity except after notice to and
approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This
request must be submitted within 90 days of the permit holder meeting one or more of
the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved;
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur,
V. The assignment of declarant rights to another individual or entity;
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2);
Page 4 of 5
Post -Construction Stormwater Management
Permit No. SW8 070319
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on -site stormwater system complies with
the permit conditions. Records of maintenance activities performed to date may be
requested. Projects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met.
5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of
this permit until the Division approves the transfer request.
a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee at
all times.
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the stormwater
rules is subject to enforcement procedures as set forth in NCGS 143 Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
projects conformance with permit conditions
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted
site does not meet one or more of the minimum requirements of the permit. Within the
time frame specified in the notice, the permittee shall submit a written time schedule to
the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of modified plans and certification in writing to the Director that the
changes have been made.
OTHER PERMITS_ The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction. Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals to
do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215.6.
Permit renewed, updated and reissued this the 23rd day of August 2022.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
,,Brian Wrenn, Directdr
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment C - Permitting History
Ferguson Distributors
Permit No. SW8 070319
„ y
` `� _ al
i Permit Action
Description of the Chwges
Date
Version
construction, operation and maintenance of a wet detention
8/8/2007
Original Approval
1.0
pond in compliance with the provisions of 15A NCAC 2H
1000; The subdivision is permitted for 8 lots subject to the
BUA listed in the permit text
2/18/2008
Modification
1.1
installation of storm sewers;
total amount of impervious surface for this modification is 382,
5/15/2008
Modification
1.2
411 sf which will consist of a building, parking lot, sidewalk,
and allocations for future development
7/l/2008
Modification
1.3
High density subdivision; Drainage Area: 602.992sgft;
Impervious 3 82,411
High density commercial project; layout of the development
changed; construction, operation and maintenance of one (1)
1/28/2010
Modification
1.4
wet detention pond and one (1) infiltration trench in compliance
with the provisions of 15A NCAC 2H A 000 and Session Law
2008-211
6/7/2010
Plan Revision
1.5
reallocating existing and proposed built -upon area as shown in
the table in the permit text
Name/Ownership
Previous signing official Jon Vincent, Manging Member to
8/4/2010
Application
1.6
current signing official McKinley D. Dull, Manager; Addres
change; LLC is the same
10/8/2010
Plan Revision
1.7
include the reduction of 160 sf of side walk, an increase of
4,220 sf of paved parking area, and a project name change.
2/9/2015
Transfer
1.8
to Wil Fergie, LLC
Project Name Change to Ferguson Distributors
8/23/2022
IRenewal
2
1 Expires August 8, 2029
AUG 18 2009 Permit Number: .�A4 "',_?,
(to be provided by DWQ)
Drainage Area Number:
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ® does not incorporate a vegetated filter at the outlet.
This system (check one):
❑ does ® does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
lola
approximately six inches.
Form SW401-Wet Detention. Basin O&M-Rev.4
Page 1 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number: # 1
BMP element:
Potentialproblem:
How I will remediate theproblem:
The inlet device: pipe or
The pipe is clogged.
Unclog the pipe. Dispose of the
swale
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise dama ed.
Erosion is occurring in the
Regrade the swale if necessary to
swale.
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design depth for
possible. Remove the sediment and
sediment storage.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The vegetated shelf
Best professional practices
Prune according to best professional
show that pruning is needed
practices
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
'
The main treatment area
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design sediment
possible. Remove the sediment and
storage depth.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Algal growth covers over
Consult a professional to remove
50% of the area.
and control the algal growth.
Cattails, phragmites or other
Remove the plants by wiping them
invasive plants cover 50% of
with pesticide (do not spray).
the basin surface.
Form SW4Q1-Wet Detention Basin O&M-Rev.4 Page 2 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 7.50 feet in the main pond, the
sediment shall be removed.
When the permanent pool depth reads _. 7.50 feet in the forebay, the sediment
shall be removed.
Sediment Removal IA. 7_0
Bottom
FORFBAY
BASIN DIAGRAM
ill in the blanks)
! ft Min.
Sediment
Storage
Permanent Pool Elevation 14.50
Pool
Sediment Removal Elevation 7_0 Volume
Bottom Elevation
MAIN POND
1-ft
Storage
Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Wolselev, N.A. - U.S. Hwy 421 Project
BMP drainage area number:#1
Print name:McKinley D. Dull
Title:Member - Hwy 421 Properties, LLC (see authorization letter from Jon T. Vincent -
Managing Member)
Address:1508 Military Cutoff Road, Suite 302, Wilmington, NC 28403
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, Te msa J" 3 i Q '� rd_ , a Notary Public for the State of
1.0
IVO ft�h CQ r0 t t Yl a , County of Ned %%di n o VP r , do hereby certify that
ffi C e n l ey D. Dull personally appeared before me this ( O
day of , a o9 , and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal, OptloQ 0 &�
ret131�
s
NOTARY "
Z PUBLIC
st�
SEAL
My commission expires Q I a D 110
Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number:_ --AVZ
Infiltration Trench Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area of the infiltration trench will be carefully managed to reduce
the sediment load to the sand filter.
— The water level in the monitoring wells will be recorded once a month and after
every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County).
The infiltration trench will be inspected once a quarter and within 24 hours after every
storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of
operation and maintenance will be kept in a known set location and will be available
upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash debris.
The grass filter strip or
other pretreatment area
Areas of bare soil and/or
erosive gullies have formed.
Regrade the soil if necessary to
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Sediment has accumulated to
Search for the source of the
a depth of greater than six
sediment and remedy the problem if
inches.
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
The flow diversion
structure (if applicable)
The structure is clogged.
Unclog the conveyance and dispose
of any sediment off -site.
The structure is damaged.
Make any necessary repairs or
replace if damage is too large for
repair.
yc.1 i \I inn
JAN 0 6 2010
BY:
Form SW40 1 -Infiltration Trench O&M-Rev.3 Page 1 of 3
BMP element:
Potentialproblem:
How I will remediate theproblem:
The trench
Water is ponding on the
surface for more than 24
Remove the accumulated sediment
from the infiltration system and
hours after a storm.
dispose in a location that will not
impact a stream or the BMP.
The depth in the trench is
Remove the accumulated sediment
reduced to 75% of the original
from the infiltration system and
design depth.
dispose in a location that will not
impact a stream or the BMP.
Grass or other plants are
Remove the plants, preferably by
growing on the surface of the
hand. If pesticide is used, wipe it on
trench.
the plants rather than spraying.
The observation well(s)
The water table is within one
Contact the DWQ Stormwater Unit
foot of the bottom of the
immediately at 919-733-5083.
system for a period of three
consecutive months.
The outflow pipe is clogged.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
The outflow pipe is damaged.
Repair or replace the pipe.
The emergency overflow
berm
Erosion or other signs of
damage have occurred at the
The emergency overflow berm will
be repaired or replaced if beyond
outlet.
repair.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality 401 Oversight Unit at 919-
outlet.
733-1786.
Form SW40 1 -Infiltration Trench O&M-Rev.3 Page 2 of 3
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Wolseley, N.A. - U.S. Hwy 421 Project
BMP drainage area number:42
Print name:McKinley D. Dull
Title:Member-Hwy 421 Properties, LLC (letter from Jon Vincent - Managing Member)
Address:508 Military Cutoff Road, Suite 302, Wilmington NC 28403
Date: I — !I- GO! U
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, —Fe r e S a J. R I Q :ffi P4 , a Notary Public for the State of
n rah _a ro I i na , County of w Ra n dye r , do hereby certify that
M c k i n l eu 1. I) (1 1 personally appeared before me this
day of '�J a n U C! r 2 0 10 , and acknowledge the due execution of the
forgoing infiltration trench maintenance requirements. Witness my hand and official
�J
seal, Z,`C'na. 0 ll * /
N4
NOTgRY
PUBLIC
SEAL
My commission expires. L114� O 110
Form SW401-Infiltration Trench O&M-Rev.3 Page 3 of 3
DEMLR USE ONLY
Date 5eceiysd
Fee Paid
Permit Number
19 1
i
9 0-7 031
STATE STORMWATER:
PERMIT INFOR � iATIOW UPDATE APPLICATION FORM I�
There is NO FEE for updating project name or permittee information. ��,�
This form is to only to be used by the current permittee to notify the Division of., 4(10
1) changes to the Point of Contact (signing official) for the current permittee (LLC, Corporation, HOA 61r, OA),
2) changes to the mailing address, phone number or email address of the current permittee; f'
3) changes to the name of the project; and
4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS.
A. IIEVV PERMIT WFORMAT11011
State Stormwater Permit Number: SW8 070319
Are you updating
(check all that apply):
If so, please provide the updated information:
❑ Project name
❑ Corporation Name'
❑ Permit Contact Name2,3
❑ Permit Contact Title
[X Mailing Address3
-12-01 Edwards MITI Rd., Raleigh NC 27607
❑ Phone number
❑ Email address
Provide documentation such as a Name Change /Merger filed with the NCSOS.
Provide supporting documentation such as NCSOS filing. The permit contact's position must be in accordance
with 15A NCAC 02H .1040(1).
if more than one point of contact or mailing address is being changed, please attach a separate sheet.
B. '00EIRTIFICATION OF'FERUVIII TEE
James I. Anthony, Jr. , the current permittee, hereby notify DEMLR that I am making the changes as listed
in Section A above. I further attest that this application for an update to the permit information currently on file is accurate
and complete to the beAt ofyny knolpat`dge.
Signature:
ElizabetthIA/Johnson
a Notary Public for the State of NC
County of Wake , do hereby certify that James I. Anthony, Jr.
personally appeared before me this the day of August 20_2_2_, and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Seal) ELIZARTH A JOHNSON
NOTARY PUBLIC
/ WAKE COU
Notary Signature G
7 ,.Z71 A - (`Gl�v idt-J r,y cAmmi aim
My commission expires June 5, 2023
Stonni:rat,er Permit information Updt;t:: Form Page 1 of 1 May 11, 2017
DEMLR USE ONLY
Date ReViveg
Fee Paid
Permit Number
1a Ia
O1
031
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60. (c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number:
SW8 070319
2. Project name:
Ferguson Distributors
3. Project street address: 3881 US HWY 421 N.
City: Wilmington County:
4. What, if any, changes have been made to the project as permitted?
New Hanover Zip: 28401
If the project has changed from the original approved plans, please complete SVVU-101 for a Major
Modification or Minor Modification Application 1bfm available at. https:Udeg.nc.gov/about/divisions/energy-
mineral-land-resources/energy-mineral-land-rules/stormwater-program/post-construction.
R. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https://deg.nc.gov/abouttdivisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State StormwaterPermits do not
automatically transfer with the sale of the propeny.
K
Current Permit Holder's Company Name/Organization: _
Signing Official's Name: James I. Anthony, Jr.
Wil Fergie LLC
3. Signing Official's Title: Manager
4. Mailing Address: 1201 Edwards Mill Road, Suite 300
City: Raleigh State: NC Zip: 27607
5. Street Address: 1201 Edwards Mill Road, Suite 300
City: Raleigh State: NC Zip: 27607
6. Phone: 919 832-1110 Email: janthony@aacre.com
AUG 12 2022
BY:
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORIM. Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
x 1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
4. O&M Agreements, Please select one:
❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
x 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
hfps://www.sosnc.gov/online services/search/by title/ Business Registration
AUG 12 2022
BY.—
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
I _
I, 4'e rw S L . the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correct and complete.
Signature: g Date: ? 2v
f;
V
NOTARIZATION:
I, Elizabeth Johnson , a Notary Public for the State of
North Carolina , County of Wake , do hereby certify
that James I. Anthony, Jr. personally appeared before me
this the day of ��'i.�5�. , 20 , and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Seal)
Notary Signature: '
My commission expires It
ELIZABETH A JOHNSON
NOTARY PUBLIC
WAKE COUNTY,. C
My CaoaWAM F.xpka�
A.
AUG 12 2022
BY
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
Permit
(to be provided by DWQ)
AUG 13 2009
BY:
NGDEWR
vWAT
.7f +'ref
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out printed and submitted.
The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required Information.
I. PROJECT INFORMATION
Project name
Contact person
Phone number
Date
Drainage area number
H. DESIGN INFORMATION
Site Characteristics
Drainage area
Impervious area, post -development
% impervious
Design rainfall depth
Storage Volume: Non -SA Waters
Minimum volume required
Volume provided
Storage Volume: SA Waters
1.5" runoff volume
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Peak Flow Calculations
Is the pre/post control of the lyr 24hr storm peak flow required?
1-yr, 24-hr rainfall depth
Rational C, pre -development
Rational C, post -development
Rainfall intensity: 1 -yr, 24-hr storm
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Pre/Post 1-yr, 24-hr peak flow control
Elevations
Temporary pool elevation
Permanent pool elevation
SHWT elevation (approx. at the perm. pool elevation)
Top of 1Oft vegetated shelf elevation
Bottom of 1 Oft vegetated shelf elevation
Sediment cleanout, top elevation (bottom of pond)
Sediment cleanout, bottom elevation
Sediment storage provided
Wolseley, N.A. - U S. Hwy421 Project
Walter 'Pete' Avery
(910) 396 - 6036
5•JuF09
#1
64ZOW its
387,915 le
71.57 %
1.5 in
47,028 ft3
✓ 61,306 fl3
u�l
fl9
ft
0 ft3
i
OK
OK, volume provided is equal to or in excess of volume required.
N (Y or N)
4.0 in
�0.15 (unitless)
0.72 (unitless)
0.17 inlhr OK
0.62 ff3lsec
21.29 felsec 5 m
20.67 felsec
H YDROCIRAPH ROLM &1 y
✓ 16.00 fnsl *j &L&- OF 1"5'� VbLUIh E = 1 S , 66'
✓ 1.00 fmsl
13.OD fmsl
a AS K&OMLY P99M I'TTM
✓ 15.00 fmsl
14.00 fmsl Data not needed for calculation option #1, but OK if provided.
✓ 7.00 fmsl
6.00 fmsl Data not needed for calculation option #1, but OK If provided.
w 1.00 ft
Is there additional volume stored above the state -required temp. pool? Y (Y or N)
Elevation of the top of the additional volume 160 fmsl OK
I
Form SW401-Wet Detention Basin-Rev.6-2/20/09 Parts I. & H. Design Summary, Page 1 of 2
Permit
(to be provided by DWQ)
fl. DESIGN INFORMATION T
Surface Areas
Area, temporary pool ✓ 43,872 if
Area REQUIRED, permanent pool 27,493 if'
SAIDA ratio 5.07 (unifless)
Area PROVIDED, permanent pool, APB ,,d ✓ 36,203 fe OK
Area, bottom of 1 Oft vegetated shelf, Ay"t sndf 32,375 ft`
Area, sediment cleanout, top elevation (bottom of pond), AW-P d ✓ 15,667 fr
Volumes
Volume, temporary pool
✓ 61,308 ft3
Volume, permanent pool, Vim,,,-PW
182,373 if
Volume, forebay (sum of forebays if more than one forebay)
36,473 e
Forebay % of permanent pool volume
f 20.0% %
SAIDA Table Data
Design TSS removal
90%
Coastal SAIDA Table Used?
Y (Y or N)
Mountain/Piedmont SAIDA Table Used?
N (Y or N)
SAIDA ratio
5.07 (unitess)
Average depth (used in SAIDA table):
Calculation option 1 used? (See Figure 10-2b)
Y (Y or N)
Volume, permanent pool, Vmr„yod
182,373 ft'
Area provided, permanent pool, Aps,,,,_,d
36,203 it'
Average depth calculated
5.04 ft
Average depth used in SAIDA, d. (Round to nearest 0.5ft)
v 5.0 it
Calculation option 2 used? (See Figure 10-2b)
N (Y or N)
Area provided, permanent pool, A,,,,,,w
le
Area, bottom of 10ft vegetated shelf, Abe
ilz
Area, sediment cleanout, top elevation (bottom of pond), Abntpow it2
"Depth' (distance bMr bottom of 10ft shelf and top of sediment)
ft
Average depth calculated
ft
Average depth used in SAIDA, d., (Round to nearest 0.5ft)
ft
Drawdown Calculatlons
Drawdown through orifice?
Y (Y or N)
Diameter of orifice (if circular)
i 3,0f , I
Area of orifice (if -non -circular)
in'
Coefficient of discharge (CD)
0.60 (unifless)
Driving head (H")
0.46 ft
Drawdown through weir?
N (Y or N)
Weir type
(unifless)
Coefficient of discharge (C.)
(unifless)
Length of weir (L)
ft
Driving head (H)
It
Pre -development 1-yr, 24-hr peak flow
t— 0.62 Osec
Post -development 1-yr, 24-hr peak flow
21.29 Osec
Storage volume discharge rate (through discharge orifice or weir)
0.16 folsec
Storage volume drawdown time
3.40 days
Additional Information
Vegetated side slopes
3 :1
Vegetated shelf slope
10 :1
Vegetated shelf width
10.0 ft
Length of flowpath to width ratio
3 :1
Length to width ratio
30 :1
Trash rack for overflow & orifice?
Y (Y or N)
Frocboard provided
1.5 It
Vegetated filter provided?
N (Y or N)
Recorded drainage easement provided?
Y (Y or N)
Capures all runoff at ultimate build -out?
Y (Y or N)
Drain mechanism for maintenance or emergencies
e� Pumps
Ce73
OK
OK
OK
OK
OK
OK
Insufficient post -development peak flow. �SEE ew"'A- RA'N AMN6
OK, drays down in 2-5 days. SA GOYS 2 MIWI/lfUfl'1. G7E*At-#E
OK, drawdown time is correct..> y.y pRYS ■ OW 6fjM SPp_N f "6
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Form SW401-Wet Detention Basin-Rev.6-2/20/09 Parts I. & II. Design Summary, Page 2 of 2
Permit No.
(to be provided by DWQ )
tIll. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
_ a„Q— SW-01
1. Plans (1" - 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
Basin dimensions,
- Pretreatment system,
- High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
Boundaries of drainage easement.
J1ZC. 5w-01
2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
Sw"crL
- Outlet structure with trash rack or similar,
- Maintenance access,
Permanent pool dimensions,
Forebay and main pond with hardened emergency spillway,
Basin cross-section,
Vegetation specification for planting shelf, and
- Filter strip.
JRL Ski—UZ
3. Section view of the wet detention basin (1" = 20' or larger) showing:
- Side slopes, 3:1 or lower,
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
JIB %W —ot
4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified
on the plans prior to use as a wet detention basin.
Jrtr c4t4s.
5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay,
to verify volume provided.
JRC SW —of
6. A construction sequence that shows how the wet detention basin will be protected from sediment until the
entire drainage area is stabilized.
iRr— CA&CS.
7. The supporting calculations.
4,112c, SUPP.
8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
NOT' R&QUIR.615
9. A copy of the deed restrictions (if required).
JIZC. SUPP• 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
Form SW401-Wet Detention Basin-Rev,6-2/20/09 Part III. Requircd Items Checklist, Page 1 0l 1
Permit No.
(to be provided by DWQ)
��OF DNA ]'�c
•
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
MCDENR
401 CERTIFICATION APPLICATION FORM
INFILTRATION TRENCH SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information.
PROJECT WFOPURATOW
Project name Wolseley, N.A - U.S Hwy 421 Proiect
Contact person Walter "Pete" Avery
Phone number (910) 395 - 6036
Date 4-,lar,00
Drainage area number
I4, II?'I &GN fN{r=C*01AATCM
Site Characteristics
Drainage area
Impervious area
Percent impervious
Design rainfall depth
Peak Flow Calculations
1-yr, 24-hr rainfall depth
1-yr, 24-hr intensity
Pre -development 1-yr, 24-hr discharge
Post -development 1-yr, 24-hr discharge
Pre/Post 1-yr, 24-hr peak flow control
Storage Volume: Non -SA Waters
Minimum volume required
Volume provided
Storage Volume: SA Waters
1.5" runoff volume
Pre -development 1-yr, 24-hr runoff volume
Post -development 1-yr, 24••hr runoff volume
Minimum volume required
Volume provided
Soils Report Summary
Soil type
Infiltration rate
SHWT elevation
Trench Design Parameters
Drawdown time
Perforated pipe diameter
Perforated pipe length
Number of laterals
Stone type (if used)
Stone void ratio
Stone is free of fines?
##2
6,25000 ftz
6,250.00 ft
100.0% %
1.50 in
3.79
in
0.16
in/hr
0.01
ft3/sec
0.02
ft3/sec
0.02,p
ft3/sec
742.19 ft3
745.11 ft3
ft3
ft3
ft3
ft3
ft3
OK for non -SR waters
Medium Sand
12.00 in/hr <-- *- WF11.,794770N RA-W (Z, ,X Jti►�M�,
1120 fmsl
0.11 days OK
12.00 in +c: pwv�m'"
105.00 ft
1 JAN 0 6 2010
Washed #57
40
Y (Y or N) OK
BY:
Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2
Permit No.
(to be provided by DWQ)
Trench Elevations
Bottom elevation
13.20
fmsl
OK
Storage/overflow elevation
14.46
fmsl
Top elevation
1445
fmsl
Trench Dimensions
Length (long dimension)
10500
ft
Width (short dimension)
13.255
ft
Height (depth)
1.25
ft
OK
Additional Information
Maximum volume to each inlet into the trench?
0.21
ac-in
OK
Length of vegetative filter for overflow
a.00
ft
Filter is too short, must be � 30-ft
Number of observation wells
1
OK
Distance to structure
50.00
ft
OK
Distance from surface waters
325.00
ft
OK
Distance from water supply well(s)
585.00
ft
OK
SY5'TETYI pg�E7�/E►� 7a f N FIG17ZI9T>
Separation from impervious soil layer
200
ft
OK
9 57D12»'j t' fi Sd
Depth of naturally occudng soil above SHWT
1.75
ft
OK
7�'►t Aee NCr �ujrZL.D 7�}�
Bottom covered with 4-in of clean sand?
Y
(Y or N)
OKT7�ID
F�CT���B'rPRs Pel.rCY_
Proposed drainage easement provided?
Y
(Y or N)
OK
Capures all runoff at ultimate build -out?
Y
(Y or N)
OK
Bypass provided for larger storms?
N
(Y or N)
Must provide bypass for larger flows
Trench wrapped with geotextile fabric?
Y
(Y or N)
OK
Pretreatment device provided
2' Boys Sump
Form SW401-Infiltration Trench-Rev.4 Parts I. & It. Design Summary, Page 2 of 2
Permit No.
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Page/ Plan
Initials Sheet No.
Jam` 5r-01 1. Plans (1" 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Trench dimensions,
Pretreatment system,
- High flow bypass system,
- Maintenance access,
Proposed drainage easement and public right of way (ROW),
- Overflow device, and
Boundaries of drainage easement.
c4RL. SW -Ol 2. Partial plan (1" = 30' or larger) and details for the infiltration trench showing:
Bypass structure,
- Maintenance access,
- Basin bottom dimensions,
Basin cross-section with benchmark for sediment cleanout,
- Flow distribution detail for inflow,
- Vegetated filter, and
- Pretreatment device.
Y SW 3. Section view of the infiltration trench (1" 20' or larger) showing:
Pretreatment and treatment areas, and
Inlet and outlet structures.
CA XS 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
s� -- 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
6. A construction sequence that shows how the infiltration hasin will he protected from sediment until the
entire drainage area is stabilized.
JRC_ C 7. The supporting calculations.
Jzr_ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
9. A copy of the deed restrictions (if required).
Form SW401-Infiltration Trench-Rev.4 Part ill. Required Items Checklist, Page 1 of 1
State Stormwater Management Systems
Permit No. SW8 070319
Wolseley. N.A. — U.S. Hwy 421 Project
Stormwater Permit No. SW8 070319
New Hanover County
Designer's Certification
1, -7-5-e-iitv Y:K. �""e%mil as a duly registered o F .-.ram,. �.�,,,�,wL_ in the
State of North Carolina, having been authorized to observe(Periodically/ weekly/ full
time) the construction of the project,
w oL SerL.C�, �/ .[( — f% Srfi�r Y�r (� a � �- .� 1 �r' = r�S✓F '%+2E�fCi
(Project)
for IYL.,'Y Y-L/ Ph.p--wrirr , IzL. (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations'from approved plans and specifications:
Signature
Registration Number
Date 1--30-I5-
IECIEIV
FED 0 5 295
BY:
SEAL
CAR�y.�•
oFSSS/o
Q
�9 9
SEAL
028858 �
State Stormwater Management Systems
Permit No. SW8 070319
Certification Requirements. -
The drainage area to the system? contains approximately the permitted
acreage. .
-"c3P2.
The drainage area to the system contains no more than the permitted
amount of built -upon area.
3.
All the built -upon area associated with the project is graded such that the
runoff drains to the system.
SW4.
All roof drains are located such that the runoff is directed into the system.
"MP 5.
The outlet structure elevations are per the approved plan.
3—W 6.
The outlet structure is located per the approved plans.
-C3? 7.
Trash rack is provided on the outlet structure.
�8.
All slopes are grassed with permanent vegetation.
suP 9.
Vegetated slopes are no steeper than 3:1.
5t3p 10.
The inlets are located per the approved plans and do not cause short-
circuiting of the system.
75Q11.
The permitted amounts of surface area and/or volume have been
provided.
3(3�' 12.
Required drawdown devices are correctly sized and located per the
approved plans.
5�P 13.
All required design depths are provided.
3C' 14.
All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15.
The required system dimensions are provided per the approved plans.
56c� 16.
All components of the stormwater BMP are located in either recorded
common areas, or recorded easements.
cc: NCDENR-DWQ
Regional Office
New
Hanover County Building Inspections