Loading...
HomeMy WebLinkAboutNCC223421_ESC Approval Submitted_20221003ITown of • 1 e NORTH CAROLINA September 26, 2022 LETTER OF APPROVAL — EROSION CONTROL PLANS McCord Development, LLC ATTN: Britton Winterer 150 S Sth Street, Suite 2675 Minneapolis, MN SS402 RE: Project Name: McCord Road Industrial Disturbed Acres Approved: 44 acres (17.6 acres in Catawba Basin, 26.4 acres in Yadkin Pee Dee) Project ID: 435809 County: Mecklenburg City: Huntersville Address: 11705 McCord Road River Basin: Catawba, Yadkin Pee Dee Stream Classification: WS-IV (Catawba), C (Yadkin Pee Dee) Submitted By: Luke Bugenske Date Accepted for Review by LQS: April 14, 2022 Plan Type: Commercial Dear Britton Winterer, This office has reviewed the subject commercial site plan including the erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval as Noted. The Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the Letter of Approval McCord Development, LLC September 26, 2022 Page 2 of 3 COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Retaining wall design review and approval is required prior to CO issuance. Submit retaining wall plans to Eian Fowler at efowler@hunterville.org for review. No work shall begin on site prior to the pre -construction meeting. Please contact the Town of Huntersville Erosion Control Coordinator, Anne Loftin at (704) 579-1090, or via email at aloftin@huntersville.org to set up a pre -construction meeting after providing the Recorded PCO19 Form and after obtaining your Certificate of Coverage (COC) from NCDEQ. Please refer to the attached Fact Sheet for additional information. Letter of Approval McCord Development, LLC September 26, 2022 Page 3 of 3 The Financially Responsible Owner (FRO) is responsible for ensuring this project meets all federal, state, and local town codes, ordinances and standards. Approved and stamped plans are accessible through the "Approved Package" section in EPM for print. Please keep one set of stamped plans onsite at all times. Your cooperation is appreciated. Sincerely, Eian Fowler, PE Engineering Project Manager Enclosures: e-NOI Tips for Applicants NPDES NCG01 Fact Sheet Huntersville Sediment and Erosion Control Ordinance cc: Town of Huntersville Planning Department - Brian Richards Town of Huntersville Engineering- Eian Fowler Town of Huntersville Construction Engineer - Kevin Garton Town of Huntersville Erosion Control Coordinator - Anne Loftin Town of Huntersville Executive Assistant Engineering - Kim Behrenbrinker Town of Huntersville Land Development Inspector - Cecil Talbot Mecklenburg County GIS - Angela Norward OAK Engineering, PLLC - Greg Welsh, PE File Path: M:\PLANNING\Commercial Site Plans\McCord Road Industrial\1. Original (#43 5 809) \Approved Package #435809