Loading...
HomeMy WebLinkAboutSW6220703_Plansheet - Grading_Drainage Plan_20220810\\ I \ \ I\ EXISTING PINE STUMP \ I _ WITH NAIL ❑ MILLS FAMILY PROPERTIES, LLC 315 �\ / / /��- J - DB 3496, PG 751 ALAN EDWARD TYNDALL ���1 _ 54 -� O DB 3801, PG 981 1 � 38 77 �� 53 55 6 / 78 � —_-� — —. � I ,III , (/ / -�- � , // / /, 79 ••�- 76 R LEMON E Co �,• ��6 = . ` \ GROUND STABILIZATION CHART (SR1323) 1 L - w �, /W (Pl' 08 ` N`. ✓ / 331 3u ' wo h '� I I J� % 3 05 f Y r - . 1. f' ; /� o 77/-,!�Moo;ES;�I e I •��.1.`.`. ^/ o �• 9�- �� _ NORTH r 75 LAJ / \ � 1 f � � r 3�^,� v ��•L••�� � // w U� � f // J `�••�• ��+�.1�. .� !\ �_ � � I � / ,•�. •�•�•I •I I 5 I !l'� `�• r J I / (J 50 I I ����N�• / p 82 81 \ �'+: ; N+�� �) , �1 :'-'•� �• ,�; \ VICINITY MAP �� w % J59 /� 58 k w 5�. r l) ( ,( • • �►•• �:•` pl sf lJ o ill 74 , a NOT TO SCALE49 i i> i `.• / f , f :..�,• �.• .--.'.•.- rj 73 l\\` ( •'f_ �� �,y: .:X` ,o I III 84 • � 1 ) I iN/F +`+,`+ 83 1 \' �.� \8�� WILLIAMS C. SMITH &WIFE, f 2a J 1 M I r f 3° I a I �' \ ) , TTELIZABETH B. SMITH 47 / )� i/ ,��9�,`,' ; 1 I 0� \�\ l� �� �,�••'•••. DB 735, PG 838 C9 `\ •��� �S 62 1 1 / 3/0 O ❑ s I N 46 1 +%t •�• � LEGEND: EIP Oo EIP-EXISTING IRON PIPE EIR Oo EIR-EXISTING IRON ROD ERBO ERB-EXISTING REBAR SRBO SRB—SET REBAR N/F — NOW OR FORMERLY R/W — RIGHT OF WAY RCP — REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE RIGHT—OF—WAY OVERHEAD UTILITY WETLANDS PERMANENT EASEMENT TREE LINE 270 MAJOR CONTOUR 278 MINOR CONTOUR X 301.25' SPOT ELEVATION •� / Q (� ` \ J /, 1- \ BENCHMARK 0� : \I I / 01l�' 320 2g5/ / J .7 /` MAILBOX \�,`.w` \•I.•,` �� �� ^1 \� 86 f /1 t`.+`• .`� f // ,:'�,-�,• •,,,-�♦�c� t 2g�/`~�� ✓ PP TRANSFORMER 1 J \ �" \ f r ) l I ! , f, 11 • UTILITY POLE 45 , O �\ ` 11 \�\ �' �'` :[. ,\%�' 32 ( I 1 /" l l P` :•. �' �" , 1 I r� � o ) J �-�• •• ` � NOTIFICATION OF COMBINED SELF -MONITORING AND C• GUY WIRE O ok t1 / ` `�`.r x�: '�: .� ` , : `G: ;' •�" / SELF -INSPECTION FORM: T TELEPHONE PEDESTAL 87 ' / j - .�,.�,` a ( I 0 \ ��`�•;�"�` �� M� c� 8 3�� �� ��\\ \ A+��"� � I I N (� • / /// �'�� \\ ' � ` • ✓ j/ � ` THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN N WATER VALVE \a 0' 33s '_(` ///�����oC ( +'�•�'�' �` 'I/ / ;/ M r / �� �( �� �� 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR AFIRE HYDRANT N 572,380.020 //O �� 4q RAW<O 44 / �\ ^ '� �}� 1 i �� • •'J�. .C.�1/ h 88 / , `•?.`•`y \� /`• .`�// w ' I LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH y�o E 1,960,394.139 I 1/2"1c� (pie /�O / O�/ 0 65 \`1` ,.•� fo / N i / O I •,•,• r�� PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED [ WATER METER NC GRID NAD 83 EIP \ �/ /�/ try l /1,•\ / •+�`,',` �� (J (2011) / 43 UT / \\� 11�\\\ 1 �� ',' , �o� J / �,1 �/, , , /^S ^\ EROSION AND SEDIMENTATION CONTROL PLAN IS BEING ® CATCH BASIN /G, .YqC ���, 7 // / 1 I� , l l \ \ \ \ ^ • G� G 89/��� f ) r� /1 < • �-j ,�\ �� 1 \- FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE SHRUB I ( 42 -� S \\ \ �%� ��CM\ J\��O / //% •'••`i`+` (� •I'•.• �• / ��- /� INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. S h \)� `�� � �,� � Q-J . \� ( I /�I( / . � I / � ✓ � I ASPHALT 1/2° 1/2" \ 41 �'� o5j 66 \\ \� '� I �� 's J��� 90 f TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS WETLANDS ERB EIP( 67 69 l V, �' so. .O O� r •/ ` /j- -� `/ J� j`.•.,• `.' l: AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR UNSUITABLE SOILS 40 39 55 ��S 29 �-- SELF - INSPECTION �s\W \ 68l� 1 - Q�'�� \ 4gvg<`,A / /� I z • �S- . o , I DEVELOPED A COMBINED FORM. THE SELF INSPECTION O \ 1 l } �J �� s /�� - J I ( /`•`�` f /// \ 1 PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING LOC LIMITS OF CONSTRUCTION �-IJ r 2„ �^ / l \6 e �O �21 �"'' / _ Nf J' ( \ I •�// PROGRAM OF THE NPDES STORMWATER PERMIT FOR SF SILT FENCE LINE 1 2" 16 J I 1 ERe �� �1/ \ . �\ - - w Q` OC' l �O ,. �i 1 I I G / CA7`. f ���\ ( _\\ • I CONSTRUCTION ACTIVITIES. THE FOCUS OF THE JN JUTE NETTING E B -�� /` M D \ \�; 0_/315 ti // �`)/ \�,•+ SELF -INSPECTION REPORT IS THE INSTALLATION AND " 1/2 �f 38 o ' % �G I \, I <O�'Q C /` ��` / �� �I`� MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL DIV DIVERSION BERM 1/2 ERB f ` ^ 3o q OG �31 (� / ( h , / `\� MEASURES ACCORDING TO THE APPROVED PLAN. THE INLET PROTECTION 1/2" ERB �___ / / 36 i of 34 / �, s ( 91 ` \� `III I / // 1 `` I o - --/ �� O \ \ / / I INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF ERe \ 1121/2 r -,CHECK DAM WITH WEIR THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND ;ERB ri 14�, I 13 / I �,_ 6�—�-�__ 363 35 ' 1 COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: r 1 5 1 \ _ / r Mom 5 /8„� �� L ��320 �- �//� i/ FSSJ / ^ 01 , I 5/8' rn HTTP: //PORTAL,NCDENR.ORG/WEB/LR/EROSION I - 5 8 (J 1 ERB o / / / ���� J' % 7 316 \ O / 1� // p p9` I - Iv l / ERB\ ✓ M/ �J �� / 1 f/` - .� _ /� 3 I1 ,, / (j �/��' I IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, I R ERB '� ' //'✓ ; — �— ; = J\ J '7 . �c 1� _ 1 ERS p ` J / �i�✓ j f��- . - r- yam/ \ // /, I J� •\ '�•' • PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) OV�I `+':` _ �✓ l� t0_C �1 /� 433-3300. SR 1399 (SPRINv L� R/W\ ERB ' ' J %% /=T•%�;�`CA5 ��• ,/,�,y �„ T oo� �w>�\' // ���( �/ o \ • �.�. v ������✓ 1„ 50' P 1� /1<% . �'�—'" •� - �, a / 1j ✓ EIP CAROLINA SEASONS / '�_ PHASE 2 SECTION 1 ERB I // B / - - �` \� 1. 21 ((� / /� I 97 0 •` PB 2009, PG 96 \ �__� ��((� / <'-� \ •/ O °'� �' ��� l\ �,f/ // �/ \ •�� 96 CA6 :�• / I ( `\` CONSTRUCTION SEQUENCE 110 \ / �// ��j�'�✓ ' ��`�- - �\ \� / / cY �� l y /� I 1 1 /f r 'J _ HOC '� /��� _ �\ 222 i►1 I " % J%}� i�� , �- os :- \ /f f \ ;'4� 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND 11 EIP) HOLD PRE CONSTRUCTION CONFERENCE. �f �/ `-�/ \ ` i `' j_ V� / r 15 /)/ / 1� 1 ` �v " , 2 : ' r' �� 2. INSTALL STONE CONSTRUCTION ENTRANCES, TEMPORARY O � I /� _�- \ �� I ,'"� � - o, J / �I 3 )�11 , // / r��� l� � U �. _ G SILT FENCE, AND TEMPORARY DIVERSION BERMS WHERE ERB \ I/// / / J� �s I/ f I�•'• SPECIFIED. �" J 338 1 •� 23 /' 1 g0o> / ram` ///� GOB -'\ O / f�,` � 3. CONSTRUCT TEMPORARY SKIMMER BASINS & SEDIMENT \ \ �rrJ / ��/// wt _ / /� / �`�% / rJ f 95 / GRADING NOTES AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE TRAPS. \ �-� f 31 j 32 j� P �o \ -/ I / 0 310 // �•,•,' / j "' \\� 1 •,• \ PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE 4. CLEAR AND GRUB THE SITE AS NEEDED, \ O f . % 1t / / •,• 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDINGOOw•// 1 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS BENCHMARK AND MUST BE VERIFIED BY THE GENERAL OPERATION. TO AREAS REMAIN GRASSED. / j \ Q % v 6. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. \ � � �� `�48 �sr0 � �, �� J � \� � \ / CA4 0� � � , ; •�,`' •� / /r� % Jam" \\o CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH 7. INSTALL UTILITIES. 1" EIP -Z _ I 1 ��:/// �o \�\ M /, +�./ I S 94 // Oafs \ l �� 1--� GRADE OF THE CURB, UNLESS OTHERWISE NOTED. DURING AND AFTER GRADING BY THE CONTRACTOR TO 8. INSTALL INLET PROTECTION ON ALL NEW STORM WATER (PINCHED)C\ S� \SRB _ %� \ �`_ � / % �% _ �„�•,�:.,� ��� `S� 3 ��-, \\ ' • JD 14 i 2 ALL SIDEWALKS CROSS PEDESTRIAN NO STEEPER THANSURFACES AND IS DETERMNE IF INED ANY SLOPE ERSTABILITY PROBLEMS ROSTABILITY EXIST. IF IT INLETS. ma's) \f �0 25 1 / f < ,� r� �\ ) �C 9. PERFORM FINE GRADING. ,✓� l I ��f ,) `j / �� O \(% �\ N F LONGITUDINAL SLOPE NO STEEPER THAN 5%. PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 10. INSTALL AND PREPARE BASE COURSE. �/ 30 _ -M I / // , j , 0 99 �` \` / 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT 3 / /I r�/--/ WILLIAM ARNOLD JOHNSON & LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED 11. PAVE ROADWAYS. CAROLYN KAY JOHNSON 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED WITH THE APPROVED EROSION AND SEDIMENTATION BY SILT FENCE. 26 / , �// 3�0 / 93 \� \� DB 816, PG 976 CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL AREAS. S�NSIDE6 -� 29 \ �// /� �i / w �/� t PB 1, PG 306 MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS 13. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO 1" EIP���jf� / //� V DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. IN PROGRESS. REMOVE ALL TEMPORARY MEASURES. O / ) III, o ��o O / [- \ �27 / � �J'I �' � � �//��. 100 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED QP28 �j / ( _ PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. l I (����J.• ) / �^� �h �� 101 BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HANDLE THE STORM WATER ARE CONSTRUCTED. THE 15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL 2" ✓ / 1/2 �(� / • l •r•r; r ((� / l - ��o \ HAS BEEN COMPLETED CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST a EIP / 1 sRD / , �`.,t • f l II I (�I 1 L \� \� 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF / //�i ,,,:i'C' .� l� �` 20 �r5 Q� �\ 1U, I\� CONTRACTOR AND THE OWNER TO PROTECT ADJACENT 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN TERMINATION (NOT). THE NOT IS AVAILABLE AT: / ❑ /j /2„ J 1/2'%/ ��/ /1(� L\O O 1 I \ PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR HTTPS://EDOCS.DEQ.NC,GOV/FORMS/NCG01-TERMINATION. ' jj1 �J / ( •, •+� �,�`, ` \\\ 19 1 1� PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT HEIR I • • \ \ OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR TO IMPLEMENTATION OF THE CHANGE. MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE N/Fl / \ -`�c�, `' , ) 18 \ \\ E 1,963,081.011 THE UNDERGROUND UTILITY PIPES, CONDUITS, OR 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR OF TERMINATION PROCESS. LEON UNDERWOOD III & WIFE,/2 / ���,�\�S \ 1 2„ 1� `NC GRID NAD 83 STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 SAMANTHA UNDERWOOD SRB /1-1 ���j���•-. I " 11` s s /N 17 \ \ (1� „ (2011) 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY TEMPORARY EROSION CONTROL BLANKET OR EQUAL / DB 3855, PG 336 d \ �•� .`•� J�7I� / �A 1" EIP I > ���� 1EIP v � THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE SUBSTITUTE. PB 2020, PG 206 / p �• ^ )_ 1 ( t,j \� EROSION CONTROL NOTES CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, ACTIVITIES. ► •� ~ �a GQ-� P \ ��� \ ✓/ STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE h� 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR OR OTHER MEANS. CONTROL EROSION FROM ALL ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES \ . ..`.�`"`:��` RB MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. PERFORMING WORK ON THIS PROJECT, \ SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE l ^ I �Q 0 10 AND INLET PROTECTION DEVICES WHEN THE STORAGE MUST BE NO LESS THAN FIVE FEET FROM THE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY \ •;•1 11 \ / �O �`^`' \ 3N5 `- -� �� CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ! 1 I L�'" DSO, 166 WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL MORE THAN 24 HOURS. ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE \ ❑ 15 f Qo R, w ps/�jti1 \\ ❑ ' NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. j / O _ C (Ve ON N/F \ </C TR 1/2 33i I 11 REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING 14. PURSUANT TO G.S. 113A-57 2 THE ANGLE FOR GRADED � JEAN M. WILLS ( ), 1 / r 0 O El w� C 8 �• (/ FF EIP BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT DRAINAGE AREA HAS BEEN STABILIZED. INSPECT SLOPES AND FILLS SHALL BE NO GREATER THAN THE RTY •�•� 1 / �h \ o Tk/TY O/� \\ DB 1698, PG 900 FENCE PROPER WILL BE REPAIRED AS NEEDED TO MAINTAIN A AEMEROSION AND SEDIMENT CONTROL DEVICES ON ANGLE THAT CAN ERETAINED OVER OR DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, GED, R OTHER ADEQUATE EROSION CONTROL DEVICES OR ti ( 1 1 \ O (OC qC PB 1, PG 306 SS) \\\\1(L 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, cl1Tt� ` 3qs \\� 12 2 . PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF 8• TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY l o f�tiL AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED N/F f C O WILLIAM COLEMAN OVERTON _ - 6 � �- BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE DENUDED AREAS IN WHICH GRADING OR SITE BUILDING WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES TRACT 2 OF 3 w G/ �� \/ '� 1/2" Q ill OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 13 C-4 EIP OO CONSTRUCTION. AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR DB 3561, PG 73 / C TRACT 2 OF 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION T �� �� z �� O �. ✓ ( I DB 906, PG 850 \ 1/z' r C-5 1 \ CA3 SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR CONTROL MATTING, AND/OR SODDING AND STAKING IN MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN I / EIP / i �J I - / PC #E, SLIDE 2-B �� 1-' SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH GREEN SPACE AREAS AND OTHERWISE APPROPRIATE 90 CALENDAR DAYS FOLLOWING COMPLETION OF !- , I �)�G3,� CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON CONSTRUCTION OR DEVELOPMENT. r)) I' F' `• I - SRB w r JIIIIII \ 11 DESIGN MANUAL. AREAS TO BE PAVED. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION � 14 / � _- \ / / 103 /11� /( N/F 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL CONTROL MEASURES SHOWN AND ANY ADDITIONAL ��/) 1/2" ' �1 �\ J 330 �111 I SAMMY D. THOMAS OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING I J /EIP r G6 , 2" EIP O DB 3366, PG 626 LAND DISTURBING ACTIVITIES. 910-433-3300 FINAL STABILIZATION AND PERMANENT VEGETATION HAS THE COURSE OF CONSTRUCTION. / / ` (PINCHED) o" -- 3 /'! .r1/2" PB 1, PG 306 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS f o YS ( \� O� J �� 1 / j / EIP OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE APPROVE THE ACTION PRIOR TO REMOVAL. NECESSARY, AND MULCHED ACCORDING TO THE DETAILS / ( / /% \ CAROLINA SEASONS �� o� / / //1/2", PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED HEREIN. //� D EIP !I �� SECTION ONE r�� �1 �� L2 �\ 104 // ,N IP,/ / 1 /z1 C-7 , C-2 �� - �j CA2 ' WHEN TRACKING OCCURS. CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT PC #E, SLIDE 85-C 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET ACTIVITY. ARISE ON SITE IS SHAUN GARDNER. CONTACT /� /� o o \� \ �v� - FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE 11, THE INSTALLATION OF EROSION CONTROL MEASURES SHALL 910-988-8172, I / / - _ � -- - TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION - /��- 1EIP' 1EIP ' �� 2,. GRAPHIC SCALE I r�A-3 N EIP- • 150 0 75 150 300 600 A4 ) I � A__ / _ CA1 p I TBM 4D DISK #3 1 N 570,310.618 _ ( IN FEET ) / EIP E ELEV2354. 617 \ ERB r EIP 1 inch = 150 ft. i�-� \ INC GRID NAD 83 Z�_ _ _ EIP Know what's below. 1 ; A-5 ; NAVD 188 SR 1323 (PONDEROSA TRAIL) Call before you dig. 1EIP — moo} _ _ _ _ 60' PUBLIC R/W THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) 4DSite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com ,�` IIA "0 z C�1 ``ZOO•• ..•R• % %z SS J SEA • 02 () I I1118) ``` ` 0 7 2 7- 22 REVISIONS PROJECT NAME MAGNOLIA HILLS SUBDIVISION OVERALL GRADING AND EROSION CONTROL PLAN CLIENT GALT LAN D DEVELOPMENT, LLC 206 Shoreline Drive Raeford, North Carolina 28376 Phone: (910) 988-8172 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1631 DRAWING SCALE HORIZONTAL: 1 "=150' DATE RELEASED J U LY 27, 2022 SHEET NUMBER C-3nO LC • �- - - TEMPORARY SEDIMENT TRAP #4, y oo� L=35', W=20', D=4' I NFL • • 0� SIDE SLOPES= 2:1 TOP OF BASIN: 302.00' C3.6 �• PIPE 4 ' BOTTOM OF BASIN: 298.00' / / ♦ FET C, C3.5 95.38 LF ® 1.63% 66" . x O 6 EMERGENCY SPILLWAY: 301,00' CLASS III RCP(__ SIDE SLOPES OF BASIN ARE TO o n / BE SEEDED WITHIN SEVEN DAYS. / / f l i l / C3'3 NV 296.00 / i p�J o° CA7 �\�e soL�T� /OC'VE(GETATIVE / I W '``— / / ` �310 \`D� = =/ // �� jJ 93 / // // ��� �" j / SHEET KEY C3.1 /// to BUFFER I v v �� S+�► W % // /� / / ,� p �� `�� \\ \ FROM TOP OF BANK I / /Z / / w ���1 CASlk i DITCH #14 / / WO1 \ 1 30' VEGETATIVE BUFFER �c 19VoNAG S75 Cl)00 / I ` FROM TOP 0 iBANK / / ( \ / z TEMPORARY SEDIMENT TRAP #3 �, L=45', W=25', D=5' / ALL DITCHES AND r'V \ / // \ �- �� \ I ♦SFF Y / SIDE SLOPES= 2:1 DIVERSIONS TO BE SEEDED o �� 338.15 338.27 101 S TOP OF BASIN: 306.00' WITHIN 7 DAYS c 0'0 •-7� / o / \ \ \ O \ \ \ �- �\ \\ ♦ HEFT C z G / // v l BOTTOM OF BASIN: 301.00'--335.99�DITCH I r- // /r / 6' EMERGENCY SPILLWAY: 304.00' (/ , DITCH #13 /4OC. �`' /NAG S56/ SIDE SLOPES OF BASIN ARE TO m I /%/ / NAG C125 M 337.07. 340.-* BE SEEDED WITHIN SEVEN DAYS. I 1 / \ C�0 / �3a� O� 0 J/ .t / /v �� w v/ w .✓ w ' I I I I I 1 I I \ \ \ ( 342.59 °� Gj y w �W w W w 11 I �, I ICI III 111\\\ 1 ,�°40 \\ \ 4, ' Q20 Loc 4 • , \ \ \ \ / / J / I19 2 MITS 4 AC F CONSTRUCTIONOC \ I I I I 40c \ \ \ \ \ I \ 1 1 �`W<O 349.19 �- v .v .v I ( \ l ' 00 ( ( I 17 DITCH #12 c % 1 \ � NAG S75 349.75 \ � 11 1 I I N\ 571,140.312 \ / / l 011 \ DITCH #, o l 0'r \Jg NAG S75 E 1,W16'N 1 8 \ `F �, I �^ J (�--� �� 1/2" EIP ) l NC GRID NAD 83 350.31 �? (2011) INSIDE I \��P�-1_EIP \ \ ( 349.54 \JQ� 1\ l \ (� \ 1\ S\\ ( `0 -� 348.49 \ \ \ RIP RAP DISSIPATER/ 40'\ \\ \ / / (� I 1 11 ( 350.68 \ \ L=9' W=5/11' \ 1 \ DAB,. Drnx=1 2" ,� l w l l _i` �� //1►�\J/ / / / // I I J / / oo CLASS B 18" THICK w w w .✓\ W I INO '337.70 \ DITCH #9 �0, J0, ° ?�W ps/MM� - \ 1 G v NAG SC150 e</C N \ °C )/G�T PIPE 3 61.98 L C ®SS1.74V RCP PO 111-11 L0C N/Fw w � � � � � y w W I/ �O \ INV 338.78 \��O CAROLINA SEASONS PROPERTY \ , w u u l y y I / I I I �,"- ALL'DITCHES AND C OWNERS ASSOCIATION, INC. I I f I l l ( \ \ DIVERSIONS TO BE SEEDED W W DB 947, PG 533 W W W W y y 1 l / WITHIN 7 DAYS N/F WILLIAM COLEMAN OVERTON TRACT 2 OF 3 ) i I I / / o \ \O DB 3561, PG 73 y I TEMPORARY SEDIMENT TRAP #11 TRACT 2 OF L=30', W=12', D=4' / _ DB 906, PG 850 it SIDE SLOPES= 2:1 PC #E, SLIDE 2-B v w b 1 TOP OF BASIN: 341.00' v ( I I \ \ wso \ \ r BOTTOM OF BASIN: 337.00' I 6' EMERGENCY SPILLWAY: 340.00' SIDE SLOPES OF BASIN ARE TO � 41 W W BE SEEDED WITHIN SEVEN DAYS. Y Y Y W W 1 / / / 11'Ir JO \ J /' �yry J EIP 1 v / 4 1 /2„ Oo SRB W I I I�j�O 343.68 34S G 1EIP LEGEND: y \� 337.33 DITCH #11 / C-4 ; EIP 0o EIP-EXISTING IRON PIPE 339.10 /NAG SC150BN / \ EIR / EIR-EXISTING IRON ROD \ TEMPORARY ACCESS- 341.43 M\ / EASEMENT` \ o�' I / N/ F ERGOo O ERB-EXISTING REBAR v 1 � \ � AMBER MORRIS sRe i .87 I & HUSBAND, O SRB-SET REBAR y \\ N (I BRADLEY MORRIS N/F - NOW OR FORMERLY DB 2278, PG 349 R/W - RIGHT OF WAY y 1 11r 1338.061 PC #E, SLIDE 85-C , RCP - REINFORCED CONCRETE PIPE - TEMPORARY TURN 336.82 M� 13 / / \ , PROPERTY LINE AROUND \ \ \\ SILT FENCE �o\ / (--� \ - - ADJACENT PROPERTY LINE OUTLET /w > / / G5 ; \ RIGHT-OF-WAY OVERHEAD UTILITY HOC \ \ \ I / \ I I / CARRIE JOHNSON \ - - WETLANDS I ( \/ ( & HUSBAND, PERMANENT EASEMENT y IP I I \ ANTHONY L. JOHNSON \ � TREE LINE DB 2943, PG 40 , (r I I o ( / 270 MAJOR CONTOUR 1/2" \ PC E, SLIDE 85-C 1/ \) x soi.zs SPOT$ELEVATION OR CONTOUR / , ( EIP / \ BENCHMARK MAILBOX \ , m TRANSFORMER C-6) \ PP• UTILITY POLE N/F \ C GUY WIRE GEORGE W. CHRISTMAN & WIFE, I, GERALDINE R. CHRISTMAN 0 TELEPHONE PEDESTAL DB 2511, PG 851 D4 WATER VALVE PC #E, SLIDE 85-C FIRE HYDRANT 4 // I \ 0 WATER METER 1/2"\ , ® CATCH BASIN � � � / � EIP SHRUB ASPHALT GRAPHIC SCALE W ✓�/ / / / I ,- \ \ 0 WETLANDS v I / C-7 0 UNSUITABLE SOILS 50 0 25 50 100 200 /� LOC LIMITS OF CONSTRUCTION N/F SF SILT FENCE LINE V/ ,JESSE J. PORTER & WIFE, \ / � ( " 11 I EVELYN T. PORTER , JN JUTE NETTING IN FEET 1/B1 DB 2096, PG 245 � � /' � � PC #E, SLIDE 85-C DIV DIVERSION BERM 1 inch = 50 ft. / / o 0INLET PROTECTION / EIP CHECK DAM WITH WEIR THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I G-2354 www.4Dsitesotutions.com `'`N►►CA UO 2 : pF SS 0 ..�L Q� �r•; SEA • 02 •: z��� REVISIONS PROJECT NAME MAGNOLIA HILLS SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT GALT LAN D DEVELOPMENT, LLC 206 Shoreline Drive Raeford, North Carolina 28376 Phone: (910) 988-8172 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1631 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED J U LY 27, 2022 C-302 LEGEND: EiP 00 EIP-EXISTING IRON PIPE EIR 00 EIR-EXISTING IRON ROD ERB0 ERB-EXISTING REBAR SRB0 SRB-SET REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE - - RIGHT-OF-WAY OVERHEAD UTILITY WETLANDS PERMANENT EASEMENT TREE LINE 270 MAJOR CONTOUR 278 MINOR CONTOUR x 301.25SPOT ELEVATION BENCHMARK B MAILBOX m TRANSFORMER PP UTILITY POLE C• GUY WIRE ❑T TELEPHONE PEDESTAL wV D4 WATER VALVE FIRE HYDRANT ❑❑ WATER METER ® CATCH BASIN SHRUB 0 ASPHALT 0 WETLANDS = UNSUITABLE SOILS LOC LIMITS OF CONSTRUCTION SF SILT FENCE LINE JN JUTE NETTING DIV DIVERSION BERM 0INLET PROTECTION OCHECK DAM WITH WEIR _ ` MATCH LINE- SEE SHEET C-3.6 vEll o SILT FENCE I i / v v IV 0001 ✓ I l I ( \ , l y W %/� W W ✓J� O >OUTLET (TYP) 40, 01 S 0 C /w// /� IV /_/ \\ - \ 1 1 t2STOCKPILE AREA l / I ,ol r/�� �I .� w // � y✓ W � �' /®� � 7 � � ^ i . I l 1 j / & l v / w-,► / / � JI v I / \w ) E /ry�w 290 - / I ♦ y I��, y Ar� tJ 4f'�� WI _( (phi i�1 I i CA7 - W I y I LINE THE CHANNEL NTH RIP RAP 30' DOWNSTREAM y W ��` W W .l l W II \ ♦ .l .l y OF PIPE END D50=10" DMAX=15" CLASS 1 _ \ \ I ��� I�w w �� w' // / // /- / / \ � \ 1 l I♦W / W I y f LINE FILL SLOPE WITH \ I I ( ( o ♦ i� ' NAG S150 SPL C %� •� y W w •v w w / I 1 �\ w w w TEMPORARY SEDIMENT TRAP #7 \ I \ \ \ I 1 \ \ 41 L=35', W=20'_D=3' �\ \ \ I I I ` \ \ J1�\ \ u W � /w i J 1 SIDE SLOPES= 2:1 \ \ \ \ I l \ SILT FENCE y �/ :r / J \ l ( \ W TOP OF BASIN: 305.00'\\ \ \ OUTLET (TYP) //� ♦ / f > I 1 G BOTTOM OF BASIN: 302.00' - \ \ STOCKPILE \ o 6' EMERGENCY SPILLWAY: 304.00' \ \ \ 11 \ I AREA \ RIP RAP DISSIPATER \ / SIDE SLOPES OF BASIN ARE TO \ \ 1 ` �l / �\ \ / I // ♦_1 / / p� �� I / '313.52 \ / BE SEEDED WITHIN SEVEN DAYS. \ 1 ` 1 �� \ Ar' 1 / �j p01 5 LpGJ D�4" D /6" 1 1 ) L=4' W=2 4' J / \ \ \ 1 I I ' / S / / / ` 0/\00> Opt SF G 1 JCLASS A 12" THICK 314.20 S 92 1 I 1 I \ \ \ / / III / SF LOG ♦. ALL DITCHES AND 1I / \ , ` / I I ♦ / / ) / o �pG / DIVERSIONS TO BE SEEDED 315.12 S' -WITHIN 7 DAYS 1 I 1 l w / / / /®J )41 I ��`%V / n TEMPORARY SKIMMER BASIN #1 316.24 / L=60', W=25', D=4' ® / �� ( I W /W W W / \W i \\ I / / ♦ SIDE SLOPES= 2:1 1 \_ 2 317.35 \ 1 L / I I f W %v W W ` / TOP OF BASIN: 295.50'�\ \ I I ♦ v vI / �.v >) I I I pOe ♦ BOTTOM OF BASIN: 291.50' \� \\I I I S 6' EMERGENCY SPILLWAY: 294.50' C / �/ / o> INVERT OF SKIMMER: 291.50' I �- OOl O SIDE SLOPES OF BASIN ARE TO \ 1 T PO 7 �On �vo> \\\ \ \ \ \ /vi y� �`� i Z j��wC ♦ I/ I /r I `� /�� - �- p `JO ^� \ / `,** BE SEEDED WITHIN SEVEN DAYS. W W ♦ o i f/NV 311.95 \ / / / W /� y > W / 1 _ o> \ 1 ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) ) _ W W 1 0� �p� X \ SF\W W /W �� W / / W W y\ y/ W W W /W W / _ 1 ) / \ oWITH 1.2" ORIFICE FOR DEWATERING THE I1 / \y III / / / \�V ' I 1 i / / / / I o SEDIMENT BASIN DURING CONSTRUCTION. ti DITCH #17 pO LIMITS OF CONSTRUCTIONy �� / / ✓ r- ->NO CLEAR I ,^ �, NAG S75 �, \ \ \ ,� 21.4 AC r'/ / o I v v v v v , Op/ o a \\ \\\ v y�\ v p\ 4 .�// .� .� .� /Iy` v v v v , / / 0 - o RIP RAP DISSIPATER �♦♦\ \y I W �j 5�``��9�G, c1 ���\ ��' 1 II I\\\\� I� �1 1I / I�1I J I 1 \1 �j� \I J1 \l \ �\>\%CC l\ ♦'v1I/�Ww I w/ �)v vI Ww /v \7�,//w W w / / / // /�/// �, / / �// �J lI /-/ J // / i/ o L=9'W=5/11' o /w D 8"D 12" �CLASS \ 18" THICK3p wO\DITCH #18 C125 P NO CLEAR O\\\\\ T / / IV /� �I IW \� ♦ / v/ / / c> i 7\ w PO 6 ./ �� ♦ / /� / / m , �° , 1 I 1 I I,�� W �- o \ / \ y CA6 v •v •v •v \ / INV 311.00 ,yj G / I (/ I\ / l! JI \ I I �\ / � J\ � l �\ I .y / � l I J % o IILT FENCE 1 // �i/ I �� PIPE 6 \ I OUTLET TYP v� v v v y �I / . G STOCKPILE 1 l (TYP) ` / J / ( / OOL 56.62 LF ®8.12% 18"i / / 1 / / AREA I 1 I ` . y �� w w w w 1 1 / J/ / �� / 307.54\3os / CLASS III RCP 22 *' I /1 / / / O / / / 1 11 v ��� PO 5r / o / // / / / l I \v� , \INV�15.60 / / n m1 / / / �/l JYI / 1/ J I \ /I♦ + %MAIL KIOSK AREA / W 1i�y y /1' 310 V \ Y Y �Y Y Y Y J O Y Y Y Y Y Y r � CHECK DAM WITH WEIR TO � C -/ < o r O p ) r r_ > ♦ � r�/� � y � � 1 BE PLACED IN ALL ROADWAY > / I / / _1 3 DITCHES EVERY 100' I / I I w / W / I ;♦ ` \ \ 1 / / 311.00 �( \\ w\ w w w w w \ DITCH #15 �/ // SILT FENCE ( / \\ 1 � I 1 � / / r NAG S75 / OUTLET (TYP) // �\ I 313.17' G m I 3' STREAM 1 / I I I � � I � -/ / � � / / r � ` y 2 LIMITS4 A OF CONSTRUCTION i/ " y 0' VEGETATIVE BUFFER TEMPORARY SEDIMENT TRAP #5 I \ % J W W W ,� . FROM TOP OF BANK v L=35', 20', D=4' �\ \ G \\ W W \- ,/ N A SIDE SLOPES= 2:1 y \� /� I - // �- O \ t N I\ - /�o TOP OF ,�ASIN: 302.00' 95 c' DI,V BOTTOM pF BASIN: 298.00' I 330 I / / / / _// k k k 6 EMERGENCY SPILLWAY: 301.00' J iSLOPES✓ / M SIDE OF BASIN ARE TO BE SEED) WITHIN SEVEN DAYS.310 SC 50BN16 ,� / / // / Q �J DITCH #37� \ NAG C125 W W W W I / S ) // 30' VEGETATIVE BUFFER► S J TEMPORARY SEDIMENT TRAP 2 FROM TOP OF BANK w S L-46 , W-26' D-5' 0 1 Laoff' \ \ - W \ SIDE SLOPES= 2:1 ✓�' / .l w w/ v �lv /� ♦ / ( I / / �/ O I Fj TOP OF BASIN: 306.00' ..A4 9 / / f I \ \ \ C / BOTTOM OF BASIN: 301.00' / // LINE THE CHANNEL WITH / / ) l f I r /, 6' EMERGENCY SPILLWAY: 304.00' ^� / RIP RAP 30' DOWNSTREAM / I I r// v A SIDE SLOPES OF BASIN ARE TO 1j / ' o OF PIPE END D50=10" DMAX=15"♦ / / 1 1 J 11 / / �,o �, \ \\ \ BE SEEDED WITHIN SEVEN DAYSJ/ J / / W CLASS 1 /� \ \\ \ \ \ \ 1 IPO 294.45 r' �go 00000 / 94 / // /� I I / I t�\ l / p // / I 1 1 ♦ / �/ /� / \ / // / ALL DITCHES AND DIVERSIONS TO BE SEEDED Mq ���, ✓ hr / WITHIN 7 DAYS SEE �i� /�j/ j \ %21 ��- CURVE TABLE CURVE LENGTH RADIUS BEARING CHORD C17 106.75 205.00 N27°47'26"W 105.55 C18 39.27 25.00 N87°42'31 "W 35.36 C19 36.36 205.00 S42°12'34"W 36.32 C30 45.23 255.00 N42°12'34"E 45.17 C31 39.27 25.00 NO2°17'29"E 35.36 C91 85.79 255.00 S33°04'15"E 85.39 C92 47.00 255.00 S18°09'09"E 46.93 C95 30.77 25.00 N09°38'12"W 28.87 C96 110.98 50.00 N18°41'05"E 89.56 C97 52.36 0 U z *Irz 'I, *j jpo 8 IN � INV 3�09.95 � PIPE 55 ,' 45.57 LF ® 4.39% 1 "' CLASS IV RCP 5F /RIPAP DISS PI ATER L=9' W=5/11' D-8" D-12" y---CLASS B 18" THICK ZV IV 99 �14�� / \ \ 11 WILLIAM ARNOLD JOHNSON & WIFE, 00 W CAROLYN KAY JOHNSON \DB 816, PG 976 PB 1, PG 306 GRAPHIC SCALE - 50 0 25 50 100 200 50.00 S67°43'45"E 50.00 50.00 S06°03'03"E 52.52 ( IN FEET ) 1 inch = 50 ft. , THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com .````��`►►CA /?O 2:"kSS0..�L • SEA • 02 •:• �� TT 1111111101 0 7 2 7- 22 REVISIONS PROJECT NAME MAGNOLIA HILLS SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT GALT LAN D DEVELOPMENT, LLC 206 Shoreline Drive Raeford, North Carolina 28376 Phone: (910) 988-8172 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1631 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED J U LY 27, 2022 SHEET NUMBER C-3n3 LEGEND: EIP Oo EIP-EXISTING IRON PIPE EIR Oo EIR-EXISTING IRON ROD ERB0 ERB-EXISTING REBAR SRB0 SRB-SET REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY OVERHEAD UTILITY - - WETLANDS PERMANENT EASEMENT TREE LINE 270 MAJOR CONTOUR 278 MINOR CONTOUR x 301.25' SPOT ELEVATION BENCHMARK MB MAILBOX m TRANSFORMER PP UTILITY POLE C• GUY WIRE ❑T TELEPHONE PEDESTAL wV N WATER VALVE to ♦�S .00v v�/ w /w �_w v �• JI .yam ♦c\3 6 30' VEGETATIVE BUFFER �=+ W JFROM TOP OF BANK �Y �Y + �Y Y `Y �_�L ��L \�L �Y �Y J/ �Y �J f- �� �I •-� I \ y-10 w 9 + - - I��� SOto /\ 0 tP ZYYIFIRE HYDRANT �y �� / / I — u� // / / _yam �0 0�' A \ 4 S ❑❑ WATER METER / / �� / -� \ I I i / "� -r P QJ v TEMPORARY SEDIMENT TRAP #12 FF ® CATCH BASIN I \ �/�_ �y�� L=50', W=20', D=5' SS �� SIDE SLOPES= 2:1 SHRUB \ �// / / / \ I I 1 I,� 1 \ \\ / _ o �, '/ TOP OF BASIN: 327.00' ASPHALT BOTTOM OF BASIN: 322.00' 0 WETLANDS _ _ \ \ `� — j 0 F� �0 \ 1 1 1 \ �i / / 6' EMERGENCY SPILLWAY. 326.00' 3 UNSUITABLE SOILS _ / / srQ.c� 1� 1 /W // /�/ SIDE SLOPES OF BASIN ARE TO \ / Y y .ry \� DITCH #19 BE SEEDED WITHIN SEVEN DAYS. l LOC LIMITS OF CONSTRUCTION / / \ / / `5 348 \� I 1 11 y/ // /� / NAG C125 — SF SILT FENCE LINE 347.52 , \ � � � � JN JUTE NETTING Re" _ DIV DIVERSION BERM s/ �\ �� �� ��j / ♦ o INLET PROTECTION — l f �� � �� 347.70 347.20\�o � OCHECK DAM WITH WEIR �� 0 ��- 25 50 0 46.66 _'v*"'LIMITS OF CONSTRUCTION 21A f_ IERB 5/8 DE 1NSEP�� O C\ BOG/ 26 / / / / I SRB EIP I /��� GRAPHIC SCALE N F / LEON UNDERWOOD III & WIFE, 25 50 100 200 / 1/2 / / / / / SAMANTHA UNDERWOOD 1 / / / / / / / / SRB DB 3855, PG 336 I / / PB 2020, PG 206 / / J 1 ( IN FEET )12 1 inch = 50 ft. , / / )) / 41* 1 /2 SRB THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED I / / AF ■ 4 sl e solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com `````��`►►CA "O �Z// SEA 02 ' V//;CTT , ,O I11118� 0 7 2 7- 22 REVISIONS PROJECT NAME MAGNOLIA HILLS SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT GALT LAN D DEVELOPMENT, LLC 206 Shoreline Drive Raeford, North Carolina 28376 Phone: (910) 988-8172 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1631 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED J U LY 27, 2022 SHEET NUMBER C-304 W �► - r � , �► may- 0 1 ♦ / �\ 1 1 46 o0 1 \ \ N `) \ \ \C DITCH #31 r "63 - 3 w TEMPORARY SEDIMENT TRAP #14\onw L=35', W=15', D=4'NAG S150 � 1 / yW 11 W CWlW ( SIDE SLOPES= 2:1 �33650 % �i RIP RAP DISSIPATER TOP OF BASIN: 346.00' �, � • s ��, \ /,� �, �, / � % L=12' W=6/14" \ / 45 BOTTOM OF BASIN: 342.00' ro 'EMERGENCY SPILLWAY: 345.00' "336.96D8D=12 I ) SIDE SLOPES OF BASIN ARE TO ! I I \ I CO Q\ CLASS B 18" THICK `I I I� t I I I ^� `- A � / / � � � � / � � 3 0 BE SEEDED WITHIN SEVEN DAYS.301 � \ \ \ 1 I / � � •� \ 1335.25 S,cZ- \ W y W J l / / / / o o \ ♦� v w W 0 336.48 \�° PO 2 \\� \ / � / p� DITCH #33 \ \ \ 1 C9 5 INV 330.24. �� w l w y/ `i' i I / NAG S75 \3� 1335.25\ \ - \OS,c� `�\ DITCH #30_ �� I� y w W ` n0 34& �0 z\ o S \ NAG S75 / /�/ / /°> \ > 336 -�/ w y/ y / / / / / Opp I ` ( 1 \ \ \ I I C W I w L Wes\ \ .y \ .y.,/ l• .Y .y .y / / / ^ LOC_k N 572,380.020 \ \ O PO \ 33S �0® 1 y / 0 LOC E 1,960,394.139INV 30.54 - -� \ ( / l C l \ I I > ,NC GRID NAD 83 3q4 •o ` I / / / (2011) \ \ \ r. / /DITCH #32 1,44 NAG S75 41 .�\'k ✓/ v Ai��.� / . 01 EIPR/v4< I dD5D))\ (pFR J .� I co ( I PIPE 9 V 174/ \ ry 43 44.00 LF 0 0.67% 24" CLASS V RCP C ° p�V \ - LOC/ DITCH #28F- / \ \ \ �V NAG S75 / I 1 \ 1 \ \ W DITCH #29 3 .41 I \ \ \ \ \ 1 I � \ \ 1 \ W w NAG S75 - oc �J \ \ l \ \ \ \ \ \ \ 1 \ �1 TEMPORARY SKIMMER BASIN 13 '°h°\ _ 353.40 r - '°' \ \ l \ \ \ \ \ \ ` I _ cn 1 3 .52 352.96/ l 1 L=91', W=46'_D=4' # / / W I I \ \ \ SIDE SLOPES= 2:1 / �`0 66 I \ 1 1 ` `�� �Z / \ 41 - \ TOP OF BASIN: 337.00' C 3 2.52 �� / 354.48 0) \ \ O \ I I \ 1 I \ \ \ \� 1 \ \ \ \ I l \\ 1 l W BOTTOM OF BASIN: Y: 3.00' \ / / \ Opp \ y J 1/2" 1 6' EMERGENCY SPILLWAY: 336.00' � DITCH #27° 355.56 \ \ \ � 1\ 67 ERB _� \ SIDE SLOPES OF BASIN ARE TO ��pC •_ 353.99 / / Opp \ \ \ _ 1 �\ \ \ \ I I \ 69 I I y Q BE SEEDED WITHIN SEVEN DAYS. NAG C125 � 1EIPi / ` 40 **ATTACH A 2.5" FAIRCLOTH SKIMMER (OR EQUAL) 3g j • ,� /355�355.56 , s3 \ \ WITH 1.9" ORIFICE FOR DEWATERING THE / . 355.46. s \ \ \ \ I \ \ P68 SEDIMENT BASIN DURING CONSTRUCTION./55.51�1 \ 1 n -� 355.46 Cn I UTILITY c EASEMENT I �0 I I III) 1 ♦�,�/� / 1/2ERB ` 16 / _� 35 - / • / J / �.°G I I 41 4# � �" ik - _ l 1/2"\ / 1/2" DITCH #26 �v�o o LOC ERB NAG S75��QJ LIMITS OF CONSTRUCTION �\ tpC p `� 3 21.4 AC COC W �p OF w 0 I„� / _� _.✓DITCH 25/ �p R e<1c &F o ° I I 1 \ I DITCH #23 ERe -J �/ / 36 h� NAG S75 / 36 C� U�</py 0 l I I \ \ NAG SC150BN 1/2"/ ) Ol \\ - ERB 1/2 / \ / ALL DITCHES AND �p �^JO OOl �oG. / ER` DIVERSIONS TO BE SEEDED / I 1ERe /- _ / o / / / WITHIN 7 DAYS/gyp `/ALL DITCHES AND / / / COC 13 I - / / o DIVERSIONS TO BE SEEDED / WITHIN 7 DAYS / 35 / i / <OC G/ J / 1I ///Z W��,�I �( �/ v//✓/ /// //"/ C� UNO/ C 154 LO/ 3639cITCH #2 .0 AG SC150BNrry� 37 .0 365.13 p 5/8„ 3_362.45 636 `(/ /toERB V5/s„ LEGEND ERB 10 EiP - PC-_ I / OEIP-EXISTING IRON PIPE 61.7 EIR / J/" � / ♦ I _/ I / 30' VEGETATIVE BUFFER .00EIR-EXISTING IRON ROD SPRING FLS R ERB v FROM TOP OFBANKi S O ERB-EXISTING REBAR �C sR6" �' .v v 0 SRB-SET REBAR /'/ J/ - / N/F -NOW OR FORMERLY / 1 \ �--�-�_ �w /� /� /w v v v R/W -RIGHT OF WAY 339`�` I / / I � / l l I� � 1 f` / � � RCP -REINFORCED CONCRETE PIPE C3.7 PROPERTY LINE / / l ( /•�^ J �HE ADJACENT PROPERTY LINE / �// l` / // E -- RIGHT-OF-WAY ��` '/5,s>, l l l r l w \ v .� %� y M; v / v�/ v MF\�C • •_ SEE OVERHEAD UTILITY C3.6 \ ERB / / / �j/ \ y Y\ Y >✓ W ) W W ' WETLANDS ��� 5 a . PERMANENT EASEMENT CAROLINA SEASONS ERB y✓ PHASE 2 SECTION 1 TREE LINE C3.3 PB 2009, PG 96 270 MAJOR CONTOUR 1 278 MINOR CONTOUR 5 C3.4 RI3 x 301.25' SPOT ELEVATION BENCHMARK \ 11 r- v� I + FMB] MAILBOX I+ m TRANSFORMER C3.2 I \ JAMES DAVID MCCALL PPS UTILITY POLE SHEET KEY ID r C3.1 \ DB 3519, PG 444 / / y .v •v C• GUY WIRE I _ PB 2009, PG 96 ❑T TELEPHONE PEDESTALwv N WATER VALVE 10,E FIRE HYDRANT I N/F \ I W W y ,� _ MRH LAND HOLDINGS III, LLC W W J J 1 WATER METER I DB 3910, PG 323 ® CATCH BASIN \ PB 2009, PG 96 SHRUB ASPHALT R \ I j WETLANDS 1 ERB W W UNSUITABLE SOILS LOC LIMITS OF CONSTRUCTION \ SF SILT FENCE LINE JN JUTE NETTING DIV DIVERSION BERM \ \ W W W INLET PROTECTION o OCHECK DAM WITH WEIR GRAPHIC SCALE 50 0 25 50 100 200 \ \X/ ( IN FEET 1 inch = 50 ft. \\\ \ \ CURVE TABLE CURVE LENGTH RADIUS BEARING CHORD C33 368.70 325.00 S79°47'29"W 349.24 C34 39.27 25.00 S67°17'29"W 35.36 C35 39.19 25.00 S2237'04"E 35.30 C36 32.32 25.00 N59°19'20"E 30.11 C37 39.27 25.00 N22°42'31 "W 35.36 C38 21.03 25.00 S88°11'47"W 20.41 C39 14.66 50.00 S72°29'55"W 14.60 C40 125.96 50.00 N26°55'58"W 95.20 C41 100.57 50.00 S77°08'24"E 84.45 C42 21.03 25.00 S4336'50"E 20.41 C43 39.27 25.00 N67°17'29"E 35.36 C44 81.06 1975.00 N21 °06'56"E 81.06 C65 90.01 2025.00 S20°16'51 "W 90.00 C66 26.05 2025.00 S21 °55'22"W 26.05 C67 39.27 25.00 S22°42'31 "E 35.36 C68 151.92 275.00 S8332'07"E 150.00 C69 160.05 275.00 N63°57'53"E 157.80 3- THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED losite civillutions gineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com X \A CA O SS '''' fo..- SEA • 02 COTT REVISIONS PROJECT NAME MAGNOLIA HILLS SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT GALT LAN D DEVELOPMENT, LLC 206 Shoreline Drive Raeford, North Carolina 28376 Phone: (910) 988-8172 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1631 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED J U LY 27, 2022 SHEET NUMBER C-3m5 IT —se Ld LLJ GO 1 / w Wl�w LL i W W y W � W 1 1 �.1. .l. 41 I 'I '+ Y 1 W y Jl Ld w WW1 -¢rx wCn \, w CA8 C I O° �00> J w / - DITCH #35 �. NAG SC150BN o , - I " JN l o RIP RAP DISSIPATER L=12' W=5/11' I D-8" D-12" w CLASS B 18" THICK`% ro I `V 314.30 `r PIPE 8� y 43.26 LF ® 0.77% 18" CLASS IV RCP%' j o SEEDED WITHIN SEVEN DAYS. DITCH #34/F M C�a / C9\'(E Soto O O N MA TCH LINE — SEE SHEET C 3.7 0 Cl) W W W y y U 'o I I 84 \1 W l W CA7 .v w �w '0 w 1 I : I \ �Y �Y \ �L�� \ \ ► \ I l \ . , \ Y,, Y `L y / . `� �W- IV 1 1 l I I I ♦ y y L L -W- L— _ I I I I WI I 0 ` ft 2`9& / �\\ \ ' \� l \ \ - I I I 001 ) \ \ \ I Y Y \ IV `�Y II O % :, `Y `1' `Y `1' `1' `Y `1' `Y `1' Ala I W W \� 0 001 ,G y f l \ ) I I v \� +\� 6 <, , / `Y `Y `Y / / `Y `Y- � I 1 I / / � �Y + - \ �Y �Y �Y � W W �Y/ \ \ 308 \ \ \ / I l \ // /* \ \ g10, \ ° LOC �� I 1- TEMPORARY SEDIMENT TRAP #8 SIDE SLOPES= 2:1 \ \ TOP OF BASIN: 303.00' \ \ BOTTOM OF BASIN: 299.00' i 6' EMERGENCY SPILLWAY: 302,00' ;0_ i 315 \ \ SIDE SLOPES OF BASIN ARE TO j BE SEEDED WITHIN SEVEN DAYS. / \ \ '316.74 - \ I \ 86 / . / 317.91 \ LIMITS OF CONSTRUCTION I J I I y W 1' J W \ \ 21.4 AC1k Ile 1 Y �Y �Y �Y -1p 1p IV IV 30' VEGETATIVE BUFFER FROM TOP OF BANK w I I y w 87 41 Y '� I / I I \ �" ■ I/ / / / / • - t• t• � �` Illllr try � �l t• � IIIII. _ �\� /� � I� Illlli I� � MATCH LINE— SEE SHEET C-3.3 /= Mir MPORARY SEDIMENT TRAP #6 4, \W L=35', W=20', D=4' l SIDE SLOPES= 2:1 I j/ TOP OF BASIN: 308.00' BOTTOM OF BASIN: 304.00' /ter )w H\ SIDE SLOPES OF BASIN AJ BE SEEDED WITHIN SEVfW J IW LEGEND: EiP Oo EIP-EXISTING IRON PIPE EiR OO EIR-EXISTING IRON ROD ERBO ERB-EXISTING REBAR SRBO SRB-SET REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY OVERHEAD UTILITY WETLANDS PERMANENT EASEMENT TREE LINE 270 MAJOR CONTOUR 278 MINOR CONTOUR X 301.25' SPOT ELEVATION BENCHMARK MB MAILBOX m TRANSFORMER pp UTILITY POLE C• GUY WIRE ❑T TELEPHONE PEDESTAL wv N WATER VALVE FIRE HYDRANT 16 WATER METER ® CATCH BASIN SHRUB ASPHALT WETLANDS 0 UNSUITABLE SOILS LOC LIMITS OF CONSTRUCTION SF SILT FENCE LINE JN JUTE NETTING DIV DIVERSION BERM OINLET PROTECTION OCHECK DAM WITH WEIR / GRAPHIC SCALE �- 41 �� — = 1 \ \ 50 0 25 50 100 ,o, \ C3.2 MgTcyy`\ , �� �—�7 CA5 y SHEET KEY F� ( IN FEET ) SEF s W W L 1 inch = 50 ft. THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 200 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com `````��`►►CA "O �Z/' SEA 02CTT ' z 1fiO I I1118� 0 7 2 7- 22 REVISIONS PROJECT NAME MAGNOLIA HILLS SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT GALT LAN D DEVELOPMENT, LLC 206 Shoreline Drive Raeford, North Carolina 28376 Phone: (910) 988-8172 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1631 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED J U LY 27, 2022 SHEET NUMBER C-3m6 \ \ I \ \ I \ \ EXISTING \ PINE STUMP WITH NAIL SILT FENCE ---\- TEMPORARY SEDIMENT TRA\#161 \ \ y 1 I / / / / OUTLET (TYP) ._ L=80', W=20', D=4' z \ \\\ /— f / SIDE SLOPES= 2:1 �� \ TOP OF BASIN: 301.00' BOTTOM OF BASIN: 297.00' J01 cD -� 6' EMERGENCY SPILLWAY: 300.00' z ✓ _/ / ,_ ✓ SIDE SLOPES OF BASIN ARE TO BE SEEDED WITHIN SEVEN DAYS. 53 (7 O 55 \\ I TEMPORARY SEDIMENT TRAP #17 L=40' W=16' D=4' SIDE SLOPES= 2:1 TOP OF BASIN: 306.00' c r BOTTOM OF BASIN: 302.00' 6' EMERGENCY SPILLWAY: 305.00' �W /w� ` / SIDE SLOPES OF BASIN ARE TO BE SEEDED WITHIN SEVEN DAYS. rJ0 0 N/F MILLS FAMILY PROPERTIES, LLC DB 3496, PG 751 I / N/F � \- � � 0 91bel di —f— o I ° I .� .� . I , � / LEMO ALAN EDWARD TYNDALL / —� / 0� � — D • I , I I l ( / / l 1 309.55 308.56 50' R/yy (pue FREE COURT I DB 3801, PG 981 / / I� \ ' _ 3os — UTILITY ACC u' O / 310.53 •+u. _ .— 306 — - Al 0 qX 4 V 59 / •� , I h 1 f� I � � I % y� 1 0 t I 'CONSTRUCTION LIMITS � F CON �TRUCTION �/ ` \. � � � � / I --/ o 21.4 AC AL .J / / o6110 LLJ LLJ LLJ Cn Mq TCy I \ \ \ \ \ I I I I \lo \ 1 C-3 W I I \ \ J C3.7 ( I \ \ C3.6 C3.5 C3.3 �W .► y� . y y/ � C3.4 GRAPHIC SCALE 50 0 25 50 100 200 C3,2 SHEET KEY C3.1 ( IN FEET ) 1 inch = 50 ft. O 'V:j ♦w Io IV v ♦♦ LIMITS OF CONST 4 00 21.4 AC I \\TEMPORARY SEDIMENT TRAP #9 \ \ \ L=50', W=25', D=4' SIDE SLOPES= 2:1 \ 80 TOP OF BASIN: 292.00' \ \\ BOTTOM OF BASIN: 288.00' \ I I 6' EMERGENCY SPILLWAY: 291.00' /1 I SIDE SLOPES OF BASIN ARE TO I I BE SEEDED WITHIN SEVEN DAYS. ILI MATCH LINE_ 14. SEE SHEET C-3.6 �' W LEGEND: EIP 00 EIP—EXISTING IRON PIPE EIR 00 EIR—EXISTING IRON ROD ERBO ERB—EXISTING REBAR SRBO SRB—SET REBAR N/F — NOW OR FORMERLY R/W — RIGHT OF WAY RCP — REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE — — RIGHT—OF—WAY OVERHEAD UTILITY WETLANDS PERMANENT EASEMENT TREE LINE 270 MAJOR CONTOUR 278 MINOR CONTOUR x 301.25' SPOT ELEVATION BENCHMARK MB MAILBOX [I]TRANSFORMER pp UTILITY POLE C• GUY WIRE ❑T TELEPHONE PEDESTAL wv N WATER VALVE FIRE HYDRANT ❑❑ WATER METER ® CATCH BASIN SHRUB 0 ASPHALT WETLANDS UNSUITABLE SOILS LOC LIMITS OF CONSTRUCTION SF SILT FENCE LINE JN JUTE NETTING DIV DIVERSION BERM 0INLET PROTECTION OCHECK DAM WITH WEIR 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I G-2354 www.4Dsitesotutions.com `````��`►►CA R1/O % �Z/' per•• � ..•• � SS SEA • 02 •:• �� zO ii �in%e� 0 7 2 7- 22 REVISIONS PROJECT NAME MAGNOLIA HILLS SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT GALT LAN D DEVELOPMENT, LLC 206 Shoreline Drive Raeford, North Carolina 28376 Phone: (910) 988-8172 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1631 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED J U LY 27, 2022 SHEET NUMBER C-307 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 0 M 00 0 z 0 z ♦ I � , ♦ I , \ I ` _ _ I \ _ ♦ I _ I \-� I C3.7 DITCH #7 �� I N NAG S75 C3.6 C3.3 I C3.4 OC C3.2 -DITc � _ \ \ \ RIP RAP DISSIPATER SHEET KEY NAG S75 _ 40C SO S \ L=9 W=5/11 \ C3■ 1 Riw pS�Mtijo S� \ CLASS B 18" THICK -ALL DITCHES AND Ugh/C T \ DIVERSIONS TO BE SEEDED LOC � R, S� 33, \ WITHIN 7 DAYS HOC 34a 11,76 4y \ NOV 342.50 `'Z CcFSS) �F 1E P DITCH #6 \ \\ \\ \\ \ \S75/(D 400 - PIPE 10 ` \ \ 0 �\ 46.39 LF ® 1.08% 18" • OC CLASS IV RCP INOV 1343.00\ ` 'RIP RAP DISSIPATER < \ \ OC \ D-8" D11 �12" 40 \ \ ` ` �, CLASS B 18" THICK N/F —� GEORGE W. WILLIAMS & WIFE,\ PHYLLIS S. WILLIAMS r \ ` DB 1292, PG 319 II \ \ LOTS C2 & C-3 OF PC #E, SLIDE 85-C l \ '1 /2„ SR \ 2" EIP \ (PINCHED) \ - - N/F \ GEORGE W. WILLIAMS & WIFE, \ PHYLLIS S. WILLIAMS \ DB 1292, PG 319 LOTS C2 & C-3 OF PC #E, SLIDE 85-C \ 1 /2„ EIP A_1 ; N/F GEORGE W. WILLIAMS & WIFE,- PHYLLIS S. WILLIAMS DB 3649, PG 240 PC #E, SLIDE 85-C ���j16�— N/F JEAN M. WILLS DB 1698, PG 900 CA3 LIMITS OF CONSTRUCTION21.4 AC \ 3 / 001 313 CHECK DAM PIPE gl j L� WITH WEIR / 11 LF ® 1.66% 30" O -- ' 317.271r r/ / /(n'P) CLASS V RCP 317.29 i DITCH #1 3'\1„316.12 G�NAG C125 / O � 316.66 / �-' � Po s RIP RAP DISSIPATER /INV 312.00 L=20' W=8/23' ,\ / ���,• j TEMPORARY D-10" D-15" �00� ! / ' 1 OC COON CLASS 1 24" THICK •PO 15ENTRANCE O UOCINV 313.00 �OODITCH #1 NAG C125 EXISTING WOODS TO QUALIFY FOR 30' BUFFER DO NOT CLEAR EIP ' \ 5/8" I \ ERB L EIP SR 1323 (PONDEROSA TRAIL) 60' PUBLIC R/W 1" EIP --�-- __ -- WITH NAIL AT BASE LEGEND: EIP Oo EIP-EXISTING IRON PIPE EIR Oo EIR-EXISTING IRON ROD ERBO ERB-EXISTING REBAR SRBO SRB-SET REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY OVERHEAD UTILITY WETLANDS PERMANENT EASEMENT TREE LINE 270 MAJOR CONTOUR 278 MINOR CONTOUR x 301.25SPOT ELEVATION BENCHMARK M MAILBOX m TRANSFORMER PPS UTILITY POLE C• GUY WIRE ❑T TELEPHONE PEDESTAL wv D4 WATER VALVE FIRE HYDRANT ❑❑ WATER METER ® CATCH BASIN SHRUB 0 ASPHALT 0 WETLANDS UNSUITABLE SOILS LOC LIMITS OF CONSTRUCTION SF SILT FENCE LINE JN JUTE NETTING DIV DIVERSION BERM OINLET PROTECTION OCHECK DAM WITH WEIR I \ I 1, 1 I / N/F I SAMMY D. THOMAS I / DB 3366, PG 626 PB 1, PG 306 J , 1EIP EXISTING WOODS TO QUALIFY FOR 30' BUFFER DO NOT CLEAR GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) 1 inch = 50 ft. 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com `````'`N►►CA UO ���' per•• � ...R• SEA 02 ' G I NE•.•'��� 0 7 2 7- 22 REVISIONS PROJECT NAME MAGNOLIA HILLS SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT GALT LAN D DEVELOPMENT, LLC 206 Shoreline Drive Raeford, North Carolina 28376 Phone: (910) 988-8172 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1631 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED J U LY 27, 2022 SHEET NUMBER C-3n 1 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED