Loading...
HomeMy WebLinkAboutSW8961234_HISTORICAL FILE_19970918STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 ') IZ3y DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS r HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE �qq1 UPI l� YYYYMMDD State of North Carolina Department of Environment, Health and Natural Resources Wilmington Regional Office Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director September 18, 1997 Mr. Joe Hearne, General Partner Kure Beach Associates 637 Fort Fisher Boulevard, NPO Box 22 Kure Beach, NC 28449 Subject: Permit No. SW8 961234 Kure Dunes Phase IV High Density Commercial Stormwater Project New Hanover County Dear Mr. Hearne: The Wilmington Regional Office received the Stormwater Management Permit Application for Kure Dunes Phase IV on December 27, 1996, with final information on September 17, 1997. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 961234 dated September 18, 1997, for the construction of Kure Dunes Phase IV. This permit shall be effective from the date of issuance until September 18, 2007, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, i (— Rick Shiver, P.G. Acting Regional Water Quality Supervisor RSS/arl: S:\WQS\STORMWAT\PERMIT\961234.SEP cc: Dan Dawson, P.E. Bill Hannah, Kure Beach Building Inspections Tony Roberts, New Hanover County Inspections Linda Lewis cW.ilm ington=Reg Tonal=Office Central Files P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer State Stormwater Management Systems Permit No SW8 961234 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Kure Beach Associates Kure Dunes Phase IV New Hanover County FOR THE construction, operation and maintenance of a detention pond and an infiltration gallery in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 18, 2007 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater'described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater detention pond has been designed to handle the runoff from 165,890 ftz, and the infiltration gallery has been designed for 18,367 ftz of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 2 State Stormwater Management Systems Permit No. SW8 961234 DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name: Kure Dunes Phase IV Permit Number: 961234 Location: New Hanover County Applicant: Mr. Joe Hearne, General Partner Mailing Address: Kure Beach Associates 637 Fort Fisher Boulevard, NPO Box 22 Kure Beach, NC 28449 Application Date: December 27, 1996 Water Body Receiving Stormwater Runoff: Atlantic Ocean Classification of Water Body: "SB" POND INFILTRATION Pond Depth: 4.5' 2.75' feet Permanent Pool/Bottom Elevation: 17.75 FMSL 21,5 FMSL Total Impervious Surfaces Allowed: 165,890 ft2 18,367 ft2 Offshe Area entering Pond: N/A (This pond drains into the Keys pond, SW8 940217) Required Surface Area: 12,927 ft2 N/A Provided Surface Area: 12,970 ft2 1,280 ft2 @21.5 Required Storage Volume: 13,876 ft3 1,530 ft3 Provided Storage Volume: 14,043 ft3 1,530 ft3 Temporary Storage Elevation: 18.75 FMSL 24.25 FMLS Controlling Orifice: 2" pipe overflow catch basin to Phase II pond 0c3 State Stormwater Management Systems Permit No SWS KW4 The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built - upon area. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the project area. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 8. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. IL SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surface except roads. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. C. All connections into the stormwater system from future areas/outparcels shall be made such that short- circuiting of the system does not occur. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 4. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. State Stormwater Management Systems Permit No SW8 961234 5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 7. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143- 215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DEHNR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 18th day of September, 1997, NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION t, C- LL '�' � t' \'/� t— t� A. Preston Howard, Jr., P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 961234 State Stormwater Management Systems Permit No. SW8 961234 Kure Dunes Phase IV Stormwater Permit No. SW8 961234 New Hanover County Engineer's Certification 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date UNDERGROUND INFILTRATION TRENCH MAINTENANCE REQUIREMENTS Project Name: Phase IV, Kure Dunes sc"J 9c'�z 34 Responsible Party: Joe Hearne, General Partner (Please 7jape or print clearly) Address: P.O. Box 22, Kure Beach, NC 28449 Phone No. 910-458-4046 1. The trenches will be constructed in accordance with the approved stormwater plans and specifications, including traffic bearing piping, and compacted void ratio verification. 2. Inlet catch basins and piping will be inspected monthly or after every runoff producing rainfall event, whichever comes first. The basins, grates, piping and bypass weirs will be cleared of accumulated trash. 3. Swales and vegetated filters will be inspected monthly or after every runoff producing rainfall event, whichever occurs first. Eroded areas will be repaired before the next storm event. 4. The water level in the monitoring wells will be recorded once a month or after a 1" rainfall event, whichever comes first. Chronic high water table elevations (within P of the bottom of the system for a period of 3 months) must be reported to DWQ, 395-3900. 5. If the system is failing, as determined by DWQ, the system will be immediately repaired or replaced to original design specifications. Repair may include the necessity of removing existing pavement to reach the underlying trench. If the system cannot be repaired to function, other stormwater control devices, as allowed by NCAC 2H.1000, must be designed, approved and constructed. 6. Annual testing/cleaning of the system will be performed by an approved method. By my signature below, I acknowledge that I am responsible for performing the maintenance as outlined above. '<'vQ-c %tA 0ia ass ar Signature: Revised 2/25/97 1 SEP 17 1997 Date: l� UIvMUN OF WATER QUALITY NORTH CAROLINA STORMWATER MANAGEMENT PERMIT VACATION I. GENERAL INFORMATION (Pkare prktt ekarry or type) I. Project Name Phase I 2. Location, directions to project (include County, Address, State Road) Attach map. New Hanover 00unt , Kure Beach, NC 3.OwneesNams Kure Beach Associates Phone (91,0) 458-4046 4.Owner'BMailingAddress 637 Fort Fisher Blvc City. Kure Beach .0. Box 22 NC Zip28449 5.NearestReceivingStream_ Cane Fear River q�s Sc ' II. PERMIT INFORMATION 1. 2. assuming 48.2% 29, 1997 1 resub. 9-IS-Q-7 S 385.00 3.PermitType: x New Renewal Modification(mistingPermift) 4. Project Type: Low Density x Detention x Infiltration_Redevelop--- General_Alter_Offsite 5. Other StatofFederal Permits/Approvals Required (cheer appropriate blanks) CAMA Major SedimentationlErosion Control x 404 Permit III. BUILT UPON AREA (Please see NCde 2H.I005 m,a .r007for applicable density kndts) in Infiltration Breakdown of impervious Area 5 n n '1 — (Please Indicate below dm desi8n LnperW. area) Pond Infiltratio Classification SC SC Buildirip.78,372 st -1RT sT ExistrngBuilt-upon Area 0 ac 0 $�40,086 sf 4,183 sf Proposed Built -upon Area Total Project Area 3.81ac 0.42 ac 7.90 0.85 ac ,600 19,832 sf % Built -upon Area 48.2 % 49.9% Totals 165, 890 sf 18, 367 sf IV. STORMWATER TREATMENT (Descao bow the runoff will be ereared) The 7.9 acre drainage area will be treated by the use of a wet detention be treated by infiltration. �E c E' V ED SEp 151997 D E M PROJ#_'- V. ' DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded for the type of project applied for. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the covenant cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. VI. OWNER'S CERTIFICATION I, .Tna Haa me . General Partner certify that the information included on this permit (Please print clearly or type) application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the proposed project complies with the requirements of 15A NCAC 2H.1000. I authorize the below named person or firm to submit stormwater plans on my behalf. Authorized Agent Signature and -7✓-9 Date VII. AGENT AUTHORIZATION (Please fill in the name of die engineerkurveyor awhoriud to submit plans onthe owners behalf.) Person or firm name Dawson Enqineeri Mailing Address 3177 Wrightsville Avenue CityWilmington StateNC Zip_ 28403 Phone9l 0-762-4200 Please submit application, fee, plans and calculations to the appropriate Regional Office. cc: Applicant/WiRO//Central Files e only STOUWATE D E C E I V E D MAY 0 6 1997 PRoJ Engineering Land Planning Surveying Date: _I—/ o��1 l / To: L K GC A L+Pt✓ r C Project: kV I'r- /al K lSS' A / I/ ❑ Enclosed Herewith ❑ Under Separate Cover ❑ For Your File Items Sent: Comments DAWSON ENGINEERING, SEP 117 11997 -;< ) ❑ As Requested ❑ For Review and Comment ❑ For Approval ❑ Via No. of Copies nvr P.O. Box 42 Wilmington, N.C. 28402 (919) 762-4200 Dated: Engineering Land Planning Surveying September 15, 1997 Ms. Linda Lewis N.C. Department of Environment, Health, and Natural Resources Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Kure Dunes, Phase IV New Hanover County Project No. 9611 Dear Ms. Lewis: DAWSON ENGINEERING 3177 Wrightsville Avenue Wilmington, NC 29403 (910) 762-4200 STORMWATER E C E I V E SEP 151997 D D E M PROJ # In response to your letter dated September 4, 1997, the following information is provided in response to your questions and concerns. 1) The calculations have been revised to reflect 41 townhomes units draining to the pond instead of 38. 2) A note has been added to sheet C-1 stating that no construction of buildings and driveways maybe started until siteplan modifications have been approved by NCDWQ. 3) The recreation area has been labeled on the plans. 4) The detail of the outlet structure has been modified, and a typical section of the pond with elevations have been provided. 5) A breakdown of the impervious area of the trench has been provided and is shown on page 4 of the revised calculations. 6) Elevations have been provided on the recharge trench detail. 7) A note has been placed on the sheet C-2 stating that all stormwater runoff in excess of the 10-yr, 24 hour storm shall run along the curb into the drainage system in Phase II which will direct the stormwater to the wet pond in Phase III. 8) A signed Operation and Maintenance plan for the infiltration area will be provided to you once it has been signed. The applicant is out of town and will be back tomorrow on 9/16/97. 9) The permit application has been modified to reflect all the changes in impervious areas for the pond and infiltration trench. Two sets of the following plan sheets are being provided to you: C-1 "Drainage Plan", dated 10/9/96, revised 9/15/97 C-2 "Kure Dunes Lane Plan/Profile", dated 4/28/97, revised 9/15/97 C-3 "Anchor Way Plan/Profile", dated 4/28/97 C-4 "Sandman Drive Plan/Profile", dated 4/28/97 C-5 "Miscellaneous Details", dated 4/28/97, revised 9/15/97 C-6 "Construction Option", dated 4/28/97 C-7 "Overall Layout of Kure Dunes", dated 4/28/97 If you need additional information please call. Very truly yours, DAWSON ENGINEERING N,� Mark N. Hargrove, P.E. cc: Joe Hearne w/ enclosures STORMWATER CALCULATIONS FOR KURE DUNES PHASE IV KURE BEACH, NC STORMNATER E C E I V E D SEP 1 51997 PREPARED BY D E PROJ k l(Z34t DAWSON ENGINEERING 3177 WRIGHTSVILLE AVENUE WILMINGTON, N.C. 28403 (910)762-4200 APRIL 28, 1997 Revised 9/15/97 = 10357, f 4 •.,yt�"E pfytiJ�,d ' . DAWSON ENGINEERING Engineering 3177 Wrightsville Avenue Land Planning Wilmington, NC 28403 Surveying (910)762-4200 TOTAL AREA DRAINING TO POND: =344,133 SF = 7.90 ACRES (SEE SHEET C-1, DRAINAGE PLAN) TOTAL PROPOSED IMPERVIOUS SURFACE AREA DRAINING TO POND: ROADS = 40,086 SF 41 TOWNHOUSE UNITS = 72,324 SF 1 QUADRAPLEX UNIT = 6,048 SF 46 DRIVEWAYS = 27,600 SF RECREATION AREA = 7,741 SF 2-2/3 LOTS 0, 4,534 SF/LOT FROM PHASE III = 12,091 SF = 165,890 SF = 3.81 ACRES (SEE C-1) REQUIRED STORAGE FOR 1-INCH OF RUNOFF FOR POND: (use Schueler Method) = 0.05 + 0.009 (I) = 0.05 + 0.009(48.2) = 0.484 = (1")(0.484)(1/12)(7.90)(43,560) =13,880 CF (14,210 CF PROVIDED - SEE NEXT PAGE) REQUIRED STORAGE FOR FOREBAY: 20% OF FIRST 1-INCH RUNOFF = (0.2)(13,880) = 2,776 CF (3,101 CF PROVIDED - SEE NEXT PAGE) PERCENT IMPERVIOUS DRAINAGE AREA FOR POND: = 165,890 SF / 344,133 SF = 48.2 % POND DEPTH SA/DA % POND SURFACE AREA (MIN.) (FT) (SF) 4.5 3.76 12,939 IF POND DEPTH = 4.5 FT, MINIMUM SURFACE AREA = 12,939 SF USED 90% TSS CHART TO SIZE POND AREA @ ELEVATION 17.75 = 12,970 SF > 12,939 SF (SEE SHEET C-1) REVISED 9115/97 PROJECT: KURE DUNES, PHASE IV SUBJECT: POND CALCULATIONS JOB NO.: 9611 PREPARED BY: DATE: CHECKED BY: DATE: 9 ri 1 J PAGE NOOF DAWSON ENGINEERING Engineering 3177 Wrightsville Avenue Land Planning Wilmington, NC 28403 Surveying (910) 762-4200 STAGE - AREA - STORAGE FOR 14NCH RUNOFF (SEE SHEET C-1) ELEV. AREA STORAGE TOT. STORAGE (F7) (SF) (CF) (CF) NORMAL 17.75 12970 0 POOL 3351 18.00 13840 3351 10859 I"RUNOFF 18.76 15116 14210 STAGE -AREA -STORAGE FOR FOREBAY (SEE SHEET C4) ELEV. AREA STORAGE TOT.STORAGE (F7) (SF) (CF) (CF) FOREBAY INV 16.00 614 0 345 15.50 764 345 423 16.00 929 768 510 16.50 1109 1278 603 17.00 1302 1881 758 17.50 1731 2639 462 , BERM ELEV 17.75 1966 3101 REVISED 9/15/97 PROJECT: KURE DUNES, PHASE IV SUBJECT: POND CALCULATION JOB NO.: 9611 PREPARED BY: DATE: CHECKED BY: -tl& DATE: 9 If 0 PAGE NO L OF ` - DAWSON ENGINEERING Engineering 3177 Wrightsville Avenue Land Planning Wilmington, NC 28403 Surveying (910) 7624200 POND RELEASE TIME FOR CONTROL PIPE: ELEV. EFF. STORAGE VOL. RELEASED OUTFLOW RATE RELEASE TIME (F7) (CF) (CF) (CFS) (HOURS) 18.75 15,116 4,418 0.105 11.7 18.50 10,698 3,673 0.091 11.2 18.25 7,025 3,674 0.074 13.7 18.00 3,351 3,351 0.053 17.7 17.75 - TOTAL HOURS 54.4 DAYS 2.3 CONTROL PIPE : 2- USED ORIFICE EQUATION TO DETERMINE OUTFLOW RATE O = Cd•A' 2 h A1/2 REVISED 9/15/97 PROJECT: KURE DUNES, PHASE IV SUBJECT: POND CALCULATIONS JOB NO.: 9611 PREPARED BY: DATE: CHECKED BY: Z� DATE: q li R7 PAGE NO 3 OF4 400 1 ' ' � DAWSON ENGINEERING Engineering Land Planning Surveying RECHARGE TRENCH STA ± 8+10, KURE DUNES LANE DRAINAGE AREA = 36,833 SF = 0.846 AC 3177 Wrightsville Avenue Wilmington, NC 28403 (910)762-4200 TOTAL PROPOSED IMPERVIOUS SURFACE AREA DRAINING TO INFILTRATION TRENCH ROADS = 4,183 SF 6 TOWNHOUSE UNITS = 10,584 SF 6 DRIVEWAYS = 3,600 SF = 18,367 SF % IMP = (18,367/36,833) = 49.9% REQUIRED STORAGE FOR 1-INCH OF RUNOFF FOR DRAINAGE AREA: (use Schueler Method) = 0.05 + 0.009 (I) = 0.05 + 0.009(49.9) = 0.499 = (1")(0.499)(1/12)(.846)(43,560) =1,532CF USE 2.75'x 10.0' RECHARGE TRENCH W/ 2 - 12" PERFORATED PIPES STORAGE VOLUME PER FOOT = PI(DA2)/4 = (PI)(l)/4 = 0.79 SF x 2 = 1.58 CF/LF STONE VOLUME = (2.75 x 10.0)- 1.58 = 25.92 CF/LF STORAGE = (25.92 SF x 0.4(VOIDS)) + 1.58 SF = 11.95 CF/FI' L = STORAGE/(I 1.95 CF/FT) L = 1,532 CF/11.95 CF/FT = 128 LF NEEDED —( SEE PLANS SHEET C-2) NOTE: 128 LF OF TWIN 12" PERFORATED PIPES IN A 10' WIDE TRENCH IS PROVIDED CHECK INFILTRATION RATE: INFILTRATE WITHIN 5 DAYS 1,532/(5 DAYS)(24 HRS) = 12.77 CF/HR OR 95.5 GAL/HR FROM SOILS REPORT, MINIMUM INFILTRATION RATE WAS 5.5 GAL/HR. USE FACTOR OF SAFETY OF 2 = 2.75 GAL/HR/SF AS SYSTEM RATE AVAILABLE RATE = 10' x 125' x 2.75 GAIAWSF = 3,438 GAL/HR THEREFORE, SYSTEM RATE EXCEEDS REQUIRED EXFILTRATION REVISED 9/15/97 PROJECT: KURE DUNES, PHASE IV SUBJECT: POND CALCULATIO S JOB NO.: i961PREPARED BY: DATE: CHECKED BY: tJ2�_ DATE: 9 4_7 PAGE NO4—O From: "Steve Tedder" <steve@dem.ehnr.state.nc.us> Organization: DWQ Water Quality To: bradley@dem.ehnr.state.nc.us Date sent: Mon, 8 Sep 1997 10:36:24 EST Subject: REP. DANNY MCCOMAS CURIE DUNES PROJECT Send reply to: steve®dem.ehnr.state.nc.us Copies to: dons@dem.ehnr.state.nc.us, N1EG705@wiro.ehnr.state.nc.us Priority: urgent I WAS CONTACTED BY REP. MCCOMAS THIS MORNING INVOLVING A PROJECT OF ONE OF HIS CONSTITUENTS. THE SHORT VERSION FROM DANNY WAS THAT WE HAVE HAD A PROJECT IN HOUSE SINCE DECEMBER. LAST WEEK HE SPOKE TO YOU AND APPEARED ALL OK FINALLY AND THAT THE PERMIT WOULD BE ISSUED FRIDAY. THEN THE CONSTITUTIENT ON SATURDAY RECEIVED ANOTHER LETTER FROM LINDA LEWIS ASKING FOR MORE INFORMATION. I'M SURE THERE IS ANOTHER SIDE TO THE STORY. SO I NEED SOMEONE TO TELL ME OUR VERSION BEFORE I CALL DANNY BACK TODAY. THANKS State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. Division of Water Quality Wayne McDevitt Governor Water Quality Section Secretary September 4, 1997 Mr. Dan Dawson, P.E. Dawson Engineering 3177 Wrightsville Avenue Wilmington, NC 28403 Subject: REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 961234 Kure Dunes Phase IV New Hanover County Dear Mr. Dawson: The Wilmington Regional Office received previously requested information for the Stormwater Management Permit Application for Kure Dunes Phase IV on August 15, 1997. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the storruwater review: 1. The drainage areas delineation you provided indicates that there are 41 buildings which will drain to the pond, not 38. 2. Not all of the driveways are 32' long. This appears to be the minimum, with 40' being the maximum. Since the building location is ]mown, please calculate the total driveway coverage based on the actual driveway length. The quad building is considerably further than 32' from the road. Again, calculate the actual driveway coverage, and draw and dimension the quad drives on the plans. 3. Please label the recreation area. 4. The detail for the outlet structure does not include the required 6:1 shelf. Please add this to the detail, including the width and begin and end elevations. According to the BMP manual, the shelf should be located just below permanent pool, and be about 10' wide. 5. Breakdown the impervious area to the recharge trench, ie., buildings, street, etc. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3945 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Dawson September 4, 1997 Stormwater Project No. SW8 961234 6. Please indicate the maximum cover over the recharge trench detail, or note the deepest bottom elevation allowed and still keep the 2' separation from the SHWT. 7. How are you proposing to bypass the excess runoff? I see no bypass structure on the plans. If bypassing cannot be done, you must redesign the system for the 25 year, 24 hour storm of 8". 8. Provide a signed Operation and Maintenance plan for the infiltration area. 9. Add the pertinent information for the infiltration trench to the second column of the permit application, and in the breakdown section. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to October 4, 1997, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, ,� cla-," Ms. Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\961234.SEP cc: Linda Lewis Central Files 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opporrunity ATm alive Action Employer From: <bradley@dem.ehnr.state.nc.us> Organization: DWQ Water Quality To: Linda Lewis <N1EW456@wiro.ehnr.state.nc.us> Date sent: Fri, 29 Aug 1997 9:38:35 EST Subject: Forwarded: Kure Dunes Phase IV Stormwater Revi Priority: normal Linda, I have looked through the numbers Dan sent up on Kure Dunes. I agree with you that it seems appropriate to proceed with the permit. I also agree that we should continue to monitor the pond system and make sure things are working appropriately. If the monitoring wells you have will give us the info we need then I think we should but one in at the Key Pond. Please add any conditions in the permit that you and Rick feel are appropriate. Please let me know when the permit is issued. (I have to call Rep. McComas and let him know.) Thanks for your help. Sorry this took so long. I know I have a couple of other emails from you that I need to address. I'll try and get responses to you on Tuesday if that is okay. If you have one you really need to discuss, let me know before 12 since I am supposed to be off today I think I will at least try and take half a day. BB Date: Wed, 20 Aug 1997 23:04:06 -0400 From: daweng <daweng@ibm.net> To: Linda Lewis <N1EW456@wiro.ehnr.state.nc.us> Cc: Bradley Bennett <bradley@dem.ehnr.state. nc.us> Subject: Kure Dunes Phase IV Stormwater Review Dear Linda, It is my understanding that our office submitted in July the additional information that DWQ requested. We have tried repeatedly to contact you by telephone but have not been successful. As you know we submitted this project for approval in December of 1996. Please lets know of the project review status. Dan rrrrrxrrxrwrwrrwxwxxwxwwxwwwwxwxxr»errrrrrrrrwrrrxrrrwxrwxwxwwxwxrwxwrxr Bradley Bennett • Phone: (919) 733-5083 x525 NC Division of Water Quality Water Quality Section - Technical Support Branch PO Box 29535 Email: Raleigh, NC 27626-0535 rrrrrrrrrrrxrxrwrrwrrxrrxwwwwxwxwwxwwxw»rrrerrrrrrrrrrrrwxwwxwxwwxwxxrxr C6„d;h6,73: Y diell (�ace�meht lay -fAe Sf2fe , seed ofhe,— ocsflQf � Gcu/7 edxl.anS2 17 �nCrr rim Y�Sv�fs conclude K 5 i5 (1 -/ ' e�f #�1 v- e ¢xce 55oVe s 'rn 7 5 d� dr2u,dGw+�� DAWSON ENGINEERING Engineering 3177 Wrightsville Avenue Land Planning Wilmington, NC 28403 Surveying (910) 762-4200 July 21, 1997 Ms. Linda Lewis N.C. Department of Environment, jug 211997 Health, and Natural Resources Water Quality Section BY: 127 Cardinal Drive Extension 4L Wilmington, NC 28405 Re: Request for Additional Information - Analysis of l-inch Storm on Keys Pond Kure Dunes, Phase IV, Stormwater Project No. SW8 961234 New Hanover County, Dawson Engineering Project No. 9611 Dear Ms. Lewis: In response to your letter dated July 3, 1997, we have prepared the following calculations and analyses of the I - inch storm on the Keys pond and the impact of the proposed Kure Dunes Phase IV pond discharging into the Keys pond. The DWQ regulations require the treatment of the first 1-inch of runoff from impervious areas. The volume of I - inch runoff required for the Kure Dunes Phase IV project is 12,790 cubic feet and the volume of 1-inch runoff required for the Keys and Kure Beach Village projects is 48,153 cubic feet. These volumes were determined using the Schueler Method. The first attachment is a copy of the "KURE BEACH VILLAGE - PHASE III Stormwater Detention Pond Calculations" prepared by Mr. Joseph S. Hill, P.E. Mr. Hill uses a non -routing analysis to estimate that it will take 3.9 days for the pond at the Keys to release the required 1-inch of runoff volume (56,974 cubic feet) stored in the pond from Kure Beach Village and the Keys (see pages 1 and 5 of Mr. Hill's calculations). Based on field topography survey of the constructed pond and using the Schueler Method, our non -routing analysis estimates it will take 3.7 days to release the required 1-inch runoff volume (see attached "KEYS POND CALCULATIONS'). The effective storages were calculated from actual field survey data of the Keys pond. We are proposing to discharge the outflow of the proposed Kure Dunes Phase IV pond into the existing pond serving Kure Beach Village and the Keys. To accurately model this situation, we have prepared manual hydrographs of storms producing one -inch of runoff for Kure Dunes Phase IV, and Kure Beach Village and the Keys. The manual hydrographs produced are based on a quick 15 minute storm which is typical for our area. The Kure Dunes Phase IV 15-minute storm was developed to produced 12,790 cubic feet of runoff. The peak discharge was determined by dividing the volume (12,790 cubic feet) by 10 minutes to obtain 21.32 cfs. A manual hydrograph was produced to have a peak discharge of 21.32 cfs at 5 and 10 minutes and 0 cfs at 0 and 15 minutes. The same procedure was utilized for the Keys and Kure Beach Village projects. Based on Mr. Hill's calculations, the impervious area for the Keys and Kure Beach Village projects total 13.32 acres of the total drainage area of 25.51 acre, or 52.2 % impervious. Based on the Schueler Method, the volume of runoff required to be stored and released over a 2-5 day period is 48,153 cf. REQUIRED STORAGE FOR I -INCH OF RUNOFF FOR THE KEYS POND: (use Schueler Method) = 0.05 + 0.009 (I) = 0.05 + 0.009(52.2) = 0.52 _ (1 ")(0.52)(1/12)(25.51)(43,560) = 48,153 CF A peak discharge rate for a 15 minute storm was determined by dividing the volume (48,153 cubic feet) by 10 1 minutes to obtain 80.26 cfs. A manual hydrograph was produced to have a peak discharge of 80.26 cfs at 5 and 10 minutes and 0 cfs at 0 and 15 minutes. In routing the storms, some assumptions were used: 1) The size of the orifice used was 3.25 inches (from Mr. Hill's calculations dated 8/14/97) 2) The crest elevation of the 36-inch riser is 16.9 (from survey data) 3) The orifice invert is elevation 14.40 (from survey data) Please see the schematic diagram of the hydrographs. Numbers 1 through 7 refer to hydrographs previously provided while hydrographs 8-12 and 13 & 14 are for the new calculations. The first set of hydrograph calculations (STORMWATER CALCULATIONS FOR ROUTING 1-INCH RUNOFF FROM THE KEYS & KURE BEACH VILLAGE ONLY) refer to runoff from the 1-inch storm for Kure Beach Village and the Keys. In referring to the hydrographs, hydrograph No. 13 is the 1-inch storm hydrograph from Kure Beach Village and the Keys. Hydrograph No. 14 is the routed outflow hydrograph of the Key's pond which indicates a maximum total storage volume in the pond of 48,039 cubic feet with a peak outflow rate of 0.22 cfs and a peak stage elevation of 15.19 feet. The second set of hydrograph calculations (STORMWATER CALCULATIONS FOR ROUTING 1-INCH RUNOFF FROM KURE DUNES PHASE IV, THE KEYS & KURE BEACH VILLAGE) refer to runoff from the 1-inch storm for Kure Dunes Phase IV, Kure Beach Village, and the Keys. In referring to the hydrographs, hydrograph No. 8 is the 1-inch storm hydrograph for Kure Dunes Phase IV. Hydrograph No. 8 flows into No. 10, which is the Kure Dunes Phase IV pond (Reservoir No. 2). Hydrograph No. 9, which is the flow from the Keys and Kure Beach Village, is then combined with the outflow of hydrograph No. 10 to form hydrograph No. 11. Hydrograph No. 12 is the routed outflow hydrograph of the Key's pond which indicates a maximum total storage volume in the pond of 48,090 cubic feet with a peak outflow rate of 0.22 cfs and a peak stage elevation of 15.19 feet. The routing method analyses indicate there is only a 0.04 ft difference in maximum pond elevation, a 0.02 cfs difference in outflow at the end of 5 days and 51 cubic feet of extra storage volume in the Key's pond after the Kure Dunes pond is allowed to discharge into the Key's pond. Therefore the impact of discharging the Kure Dunes Phase 1V pond outflow into the Keys pond will be insignificant. We hope this clarifies the effect the Kure Dunes Phase W pond has on the Keys pond. If you need additional information please call. Very truly yours, DAWSON ENGINEERING Mark N. Hargrove, P.E. Enclosures: As noted above cc: Kure Beach Associates I r il STORMWATER CALCULATIONS FOR KURE BEACH VILLAGE - PHASE HI PREPARED BY JOSEPH S. HIIJ 9 P.E. r i 1 1 1 i I 1 I r `1 I I AUG 1 5 1995 D.EMSo814 PROJ 5W F q&E8 r- KURE BEACH VILLAGE - PHASE III Stormwater Detention Pond Calculations Stormwater runoff from the project will be retained in an existing wet detention pond serving The keys of Kure Beach (Stormwater Permit No. SW8 940217).Since runoff from Kure Beach Village - Phase III will be added to the runoff generated by The Keys of Kure Beach, modifications are necessary to make the pond capable of storing the combined .runoff generated by 1 inch 11 of rainfall from both projects. The pond area required to remove 90% .of total suspended solids was calculated using the SA/DA Percentage Chart (see chart) for North Carolina 1 coastal regions. rRunoff Calculations Impervious Surfaces: 42 units @ 3,200 Each = 134,400 Sq. Ft. Streets and cul-de-sac = 57,410 Sq. Ft. Tennis Court and Parking = 10.320 Sq. Ft. Keys of Kure Beach (see calculations for SW8 940217) = 378,090 So. Ft. Total Impervious Area = 580,220 Sq. Ft. = 13.32 AC. Pervious Surfaces (Grassed, Landscaped areas) = 226,940 Sq. Ft. Keys of Kure Beach (see calculations for SW8 940217) = 304,060 Sq. Ft. = 531,000 Sq. Ft. 1 = 12.19 Ac. rj 0.� 580,220 x 0.083' Runoff = 48,159 CF (Impervious) ��l�'ill,,;,,53.1 00 x 0.083' Runoff x 0.2 (R.O. Coefficient) = 8.815 CF (Pervious) Car'�!j ., Total Runoff (1" Rainfall) = 56,974 CF �:p���✓' 1' = 427,305 Gallons c .c KBIII SW - Page 1 • `, ✓GFH.......... Detention Pond Calculations rPond surface area at storage pool elevation of 15.35' _ *62,118 Sq. Ft. Pond surface area @ permanent pool elevation of 14.35' 59,850 Sq. Ft. ✓• ' Pond surface area (average) = 60,984 Sq. Ft. (*Not possible to measure difference between original permanent pool elevation of 14.95' and revised permanent pool elevation of 15.30' by planimeter.) 1 56,974 CF 60,984 Sq. Ft. = 0.95' Storage Depth Required. ' Solids Settling Area Calculations Total watershed area = 25.51 AC. Impervious % = 13.32 AC r 25.51 AC. = 52.2% 1 Basin Depth = 4.0' SA/DA% required for 90%,solids removal (see chart) = 4.5% 4.5% x 25.51 AC = 1.15 AC. ' Basin Surface area @ permanent pool elev. of 14.35' = 1.37 Ac. Basin is therefore adequate for 90% solids removal. i r 'Rr;CAR j•, 0� :y SEAL ESS: KBIII SW — Page 2 l r SA/DA - 85% TSS REMOVAL WITH 30' VEGETATIVE FILTER IMPER.% 3.OFT 3.5FT 4.OFT 4.5FT 5.OFT 5.5FT 6.OFT 6.5FT 7.OFT 7.5FT 10% .9 .8 .7 .6 .5 20% 1.7 , 1.3 1.2 1.1 1.0 .9 .8. .7 .6 .5 L 30% 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 .9 40% 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50% 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70% 6.0 5.2 4.5 4.1 3.7 3.1 2.9 2.5 2.1 1.8 80% 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90% 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100% 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 SA/DA - > 90% TSS REMOVAL FOR WET DETENTION WITHOUT VEGETATIVE FILTER IMPER.% 3.OFT 3.5FT 4.OFT 4.5FT 5.OFT 5..5FT 6.OFT 6.5FT 7.OFT 7.5FT 10% 1.3 1.0 .7 .6 .5 .4 .3 .2 .1 20% 30% 2.4 3.5 2.0 3.0 1.8 2.7 1.7 2.5 1.5 2.2 1.4 1.9 1.2 1.6 1.0 1.3 .9 1.1 .6 .8 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 32 9, 50% 5.6 5.0 4.3 3.9 3:5 3.1 2.7 2.3 1.9 1.5 60% 7.0 6.0 - 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 3.6 i I 1 L p 1 ORIFICE DISCHARGE RATE CALCULATIONS r Use 3.25" diameter orifice for outlet. rCalculate average discharge rate and time to lower orifice head from 0.95' to 0.85': 0.10' pond height x 60,984 Sq. ft. pond area x 7.48 gal/ft3 = 45,616 Gallon Storage ' Average head on orifice from 0.95' to 0.85' = 0.90' ' Average discharge rate @ 0.90' head: Q(GPM) = (449)c A 2gh Q(GPM) = Volume discharged in gallons per minute ' c = discharge coefficient = 0.6 A = orifice area in square feet - g = gravity = 32.2 h = head above center of orifice Q(GPM) = (449)(.6)(.0576) (2)(32.2)(0.90) Q = 118 GPM ' Time required to lower pond 0.10' @ 0.90' average head: T = 45,616 Gal. o- 118 GPM = 387 minutes 118 GPM vs 387 minutes plotted on curve (See Discharge Curve). Discharge rate and time to lower head from 0.85' to 0.75' Q = 111 GPM T = 45,616 Gal. - 111' GPM = 411 minutes Ill GPM vs 798 minutes plotted on curve. r KBIII SW - Page 3 ' Discharge rate and time to lower head from 0.75' to 0.65': Q = 104 GPM T = 45,616 Gal. r 104 GPM = 439 minutes 104 GPM vs 1,237 minutes plotted on curve. Discharge rate and time to lower head from 0.65' to 0.55': Q = 96 GPM T = 45,616 Gal. t. 96 GPM = 475 minutes 96 GPM vs 1712 minutes plotted on curve. Discharge rate and time to lower head from 0.55' to 0.45': Q = 88 GPM T = 45,616 Gal. :- 88 GPM = 518 minutes 88 GPM vs 2,230 minutes plotted on curve. IDischarge rate and time to lower head from 0.45' to 0.351: Q = 79 GPM T = 45,616 Gal, o- 79 GPM = 577 minutes 79 GPM vs 2,807 minutes plotted on curve. ' Discharge rate and time to lower head from 0.35' to 0.251: Q = 68 GPM T = 45,616 Gal, r 68 GPM = 670 minutes 68 GPM vs 3,477 minutes plotted on curve. 1 Discharge rate and time to lower head from 0.25' to 0.15': Q = 56 GPM T = 45,616 Gal. r 56 GPM = 814 minutes 56 GPM vs 4,291 minutes plotted on curve. KBIII SW — Page 4 oQ�F� CAR�� 6� :�ESSIpZ..q ;O i SEAL �•: Glr�� } 1 0 Discharge rate and time to lower head from 0.15' to 0.051: tQ = 39 GPM T = 45,616 Gal. *-39 GPM = 930 minutes ' 39 GPM vs 5,222 minutes plotted on curve. ' Discharge rate and time to lower head from 0.10' to 0.00': Q = 28 GPM T = 45,616 Gal. r 28 GPM = 814 minutes 28 GPM vs 6,036 minutes plotted on curve. L I i [1 I I I The outlet structure will discharge the total calculated runoff volume of 427,305 gallons in approximately 3.9 days (See Orifice Discharge Curve). KBIII SW - Page 5 � r ai. r �.i ri i■i� � r +w � � � r � r � � � 210 200 160 RA TE CG.P.. m.} 120 90 q0 0 KORF B ACHOLLAGE -PHASEff 5TOR11IM1 T FR P•-)ND DISCIIARGE CURVE 112 rrPM1387 MIN. III &PM1790MW Io4 GPM/1237MIN. g6GP11/ 11712 MIN. �89GPM12230M11d. /( 79 GI't•1/21107 Hd N GPM/ 3 97714IN. 56 G•PP1l 42 91 M 1N• e. 3.2.Y-$6 ORIFICE DISCHARGE CALLULATEDRUN OFF of 1}2 7/ 305 &ALI-ONS IN 3.q DAY5 39 bPM/S227-MIN L � �2 B 6-PM� 6, 03 6 MIN, DAY 1 DAY DAY3 DAY I�15FjRrA.�G.) (122j966C-) - (g610006) i i61�200G.) i 0 1000 2000 3007 ¢i!t34 so0:; 6000 7000 TIM1c (MINu-fFs) 8000 g000 I I 1 11 DAWSON ENGINEERING OF DRAWDOWN OF POND tSERVING KURE BEACH VILLAGE AND THE KEYS I 1 I p `SEAL 1035Z o 1 1 1 1 I 1 1 1 1 Engineering Land Planning Surveying DAWSON ENGINEERING 114WMa)►II•ZK:MOR W II 1111INty 3177 Wrightsville Avenue Wilmington, NC 28403 (910) 762-4200 POND RELEASE TIME FOR CONTROL PIPE: THE KEYS ELEV. EFF. STORAGE VOL. RELEASED OUTFLOW RATE RELEASE TIME (F7) (CF) (CF) (CFS) (HOURS) 15.35 57491 21890 0.270 22.5 15.00 35601 12144 0.215 15.7 14.80 23457 11867 0.175 18.8 14.60 11590 5829 0.124 13.1 14.50 5761 5761 0.088 18.2 14.40 0 TOTAL HOURS 88.3 DAYS 3.7 CONTROL PIPE: 3.25 INCH USED ORIFICE EQUATION TO DETERMINE OUTFLOW RATE Q = Cd`A' 2 h Al/2 NOTE: ]-inch storage elevation of 15.35 is from KB III SW - Page 2. Volume required per Mr. Hill was 56,974 cubic feet (page 1). Actual Volume available for storage at elevation 15.35 is 57,491 cubic feet based on field survey data. PROJECT: KURE DUNES, PHASE V SUBJECT: KEYS POND CALCULATI NS JOB NO.: 9611 PREPARED BY: UM DATE: '7 18 4 CHECKED BY: b" DATE:y B i7 PAGE NO I OF STORMWATER CALCULATIONS FOR 1-INCH ROUTING RUNOFF FROM THE KEYS & KURE BEACH VILLAGE ONLY 1 Legend Runoff Combined Channel Reach ' + Pond Route 1 Proj. file: I lNCH2.GPW OF file: WILM.IDF 14 hydrographs 07-18-1997 C Hydrograph Report Page 1 Hyd. No. 13 1-INCH STORM THE KEYS Hydrograph type = Manual Storm frequency = 10 yrs Hydrograph Discharge Table Time -- Outflow (hrs cfs) 0.08 80.26 << 0.17 80.26 << ...End Peak discharge = 80.26 cfs Time interval = 5 min Total Volume = 48,156 cult,1.106 acft Hydrograph Report ' Page 1 Hyd. No. 14 THE KEYS Hydrograph type Storm frequency Inflow hyd. No. Max. Elevation = Reservoir = 10 yrs = 13 = 15.19 ft Peak discharge Time interval Reservoir name Max. Storage = 0.22 cfs = 5 min = THE KEYS = 48,039 cuft St 96 indweaon m od used. Total Volume = 45,9M cult, 1.054 aoft ' Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A WeirEl Weir C Outflow (hrs) (cfs) (ft) Ids) Ids) Ids) (Cfs) Ids) Ids) (cfs) 0.08 80.26 << 14.60 15.44 0.09 - - - - 0.09 0.17 80.26 << 15.00 20.00 0.19 - - 0.19 ' 0.25 0.00 15.19 21.50 0.22 - 0.22 << 0.33 0.00 15.19 21.49 0.22 - - - 0.22 0.42 0.00 15.18 21.49 0.22 - - - - 0.22 ' 0.50 0.00 0.58 0.00 15.18 15.18 21.48 21.47 0.22 0.22 - _ _ - 0.22 0,22 0.67 0.00 15.18 21.47 0.22 - - - - 0.22 0.75 0.00 15.18 21.46 0.22 - - - - 0.22 0.83 0.00 15.18 21.45 0.22 - - 0,22 0.92 0.00 15.18 21.45 0.22 _ _ 0.22 1.00 0.00 15.18 21.44 0.22 - - - - 0,22 1.0.00 1.17 17 0.00 15.18 15.18 21.43 21.43 0.22 0.22 - _ _ - 0.22 0,22 1.25 0.00 15.17 21.42 0.22 - - - 0,22 1.33 0.00 15.17 21.41 0.22 - - - - 0,22 1.42 0.00 15.17 21.41 0.22 - 0.22 ' 1.50 0.00 15.17 21.40 0.22 - - - 0,22 1.58 0.00 15.17 21.40 0.22 - - - - 0.22 1.67 0.00 15.17 21.39 0.22 - - 0_22 ' 1.75 0.00 15.17 21.38 0.22 0,22 1.83 0.00 15.17 21.38 0.22 - - - - 0,22 1.92 0.00 15.17 21.37 0.22 - - - - 0.Y2 ' 2.00 0.00 2.08 0.00 15.17 15.16 21.36 21.36 0.22 0.22 - _ _ - 0.22 2.17 0.00 15.16 21.35 0.22 - - - 0,22 - 0.22 2.25 0.00 15.16 21.34 0.22 - - - - 0_22 2.33 0.00 15.16 21.34 0.22 - - 0,22 ' 2.42 0.00 15.16 21.33 0.22 _ _ 0,22 2.50 0.00 15.16 21.32 0.22 - - - - 0,22 2.58 0.00 2.67 0.00 15.16 15.16 21.32 21.31 0.22 0.22 _ _ _ - 0.22 0.22 2.75 0.00 15.16 21.30 0.22 - - - - 0,22 2.83 0.00 15.16 21.30 0.22 - - - - 0,22 2.92 0.00 15.15 21.29 0.22 0.22 ' 3.00 0.00 15.15 21.29 0.22 - - - - 0,22 ' Continues on next page... ' THE KEYS Page 2 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) Ids) (cfs) (cfs) (cfs) (cfs) (cfs) 3.08 0.00 15.15 21.28 0.22 - - 0,22 ' 3.17 0.00 15.15 21.27 0.22 _ _ 0.22 3.25 0.00 15.15 21.27 0.22 - - - - 0.22 3.33 0.00 15.15 21.26 0.22 - - - - 0.22 3.42 0.00 15.15 21.25 0.22 - - 0.22 3.50 0.00 15.15 21.25 0.22 _ _ 0.22 3.58 0.00 15.15 21.24 0.22 - - - - 0.22 ' 3.67 3.75 0.00 0.00 15.15 15.14 2123 21.23 0.22 0.22 _ _ _ - 0.22 0.22 3.83 0.00 15.14 21.22 0.22 - - - - 0.22 3.92 0.00 15.14 21.22 0.22 - - - - 0.22 4.00 0.00 15.14 21.21 0.22 - 0.22 4.08 0.00 15.14 21.20 0.22 _ _ = 0.22 4.17 0.00 15.14 21.20 0.22 - - - - 0.22 4.25 0.00 15.14 21.19 0.22 - - - - 0.22 ' 4.33 0.00 15.14 21.18 0,21 0.21 4.42 0.00 15.14 21.18 0.21 _ _ _ = 0.21 4.50 0.00 15.14 21.17 0.21 - - - - 0.21 ' 4.58 0.00 0.00 15.13 15.13 21.16 21.16 0.21 0.21 - _ _ - 0.214.67 0.21 4.75 0.00 15.13 21.15 0.21 - - - - 0.21 4.83 0.00 15.13 21.15 0.21 - - - - 021 4.92 0.00 15.13 21.14 0.21 - - 0.41 5.00 0.00 15.13 21.13 0.21 _ _ 021 5.08 0.00 15.13 21.13 0.21 - - - - 021 5. 0.00 15.13 21.1 0.21 0.21 5.25 25 0.00 15.13 21.11 0.21 - 0.21 5.33 0.00 15.13 21.11 0.21 - - - 0.21 5.42 0.00 15.12 21.10 0.21 - - - - 0.21 ' 5.50 0.00 0.00 15.12 15.12 21.10 21.09 0.21 0.21 - _ _ - 0.215.58 5.67 0.00 15.12 21.08 0.21 021 - - - - 0.21 5.75 0.00 15.12 21.08 0.21 021 5.83 0.00 15.12 21.07 0.21 0.21 5.92 0.00 15.12 21.06 0.21 - - - - 021 6.00 0.00 15.12 21.06 0.21 - - - - 021 6. 6.17 17 0.00 0.00 15.12 15.12 21.05 21.05 0.21 0.21 - _ _ - 00.211 0.21 6.25 0.00 15.11 21.04 0.21 - - - - 0.21 6.33 0.00 15.11 21.03 0.21 - - - - 021 6.42 0.00 15.11 21.03 0.21 - 0.21 ' 6.50 0.00 15.11 21.02 0.21 _ _ _ 021 6.58 0.00 15.11 21.01 0.21 - - - - 0.21 6. 0.00 15.11 21.01 0.21 00.211 6.75 75 D.00 15.11 21.00 0.21 - _ _ - 0.21 V, 6.83 0.00 15.11 21.00 0.21 - 021 6.92 0.00 15.11 20.99 0.21 - - - - 021 7.0 0.00 15.11 20.98 0.21 0.21 7.08 0.00 15.10 20.98 0.21 - - - - 0.21 ,' Continues on next page... THE KEYS Page 3 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) 7.17 0.00 15.10 20.97 0.21 - 0.21 7.25 0.00 15.10 20.96 0.21 - - - 0.21 7.33 0.00 15.10 20.96 0.21 - - - - 0.21 7.42 0.00 15.10 20.95 0.21 - - - - 0.21 ' 7.50 0.00 15.10 20.95 0.21 - - 0.21 7.58 0.00 15.10 20.94 _ _ 0.21 021 7.67 0.00 15.10 20.93 0.21 - - - - 021 7.75 0.00 0.00 15.10 15.10 20.92 20.91 0.21 - _ _ - 0.21 0.217.83 021 7.92 0.00 15.10 20.90 0.21 - - - - 0.21 8.00 0.00 15.09 20.89 0.21 - - - - 0.Y1 8.08 0.00 15.09 20.88 0.21 - - 0.21 8.17 0.00 15.09 20.87 _ _ 0.21 021 8.25 0.00 15.09 20.86 0.21 - - - - 021 8.33 0.00 15.09 20.85 0.21 - - - - 0.21 ' 8.42 0.00 15.09 20.84 0.21 - 0.21 8.50 0.00 15.09 20.83 0.21 - - - 021 8.58 0.00 15.09 20.83 0.21 - - - - 0.21 ' 8.67. 0.00 0.00 15.09 15.09 20.82 20.81 0.21 - _ _ - 0.21 0.218.75 0.21 8.83 0.00 15.08 20.80 0.21 - - - - 021 8.92 0.00 15.08 20.79 0.21 - - - - 0.21 9.00 0.00 15.08 20.78 0.21 - - 0.219.08 0.00 15.08 20.77 _ _ 0.20 0.20 9.17 0.00 '15.08 20.76 0.20 - - - - 0.20 9. 0.00 15.08 20.7 0.20 0.20 ' 9.33 33 9.42 0.00 15.08 20.74 - _ _ - 0.20 0.20 0.00 15.08 20.73 0.20 - - 0.20 9.50 0.00 15.08 20.72 0.20 - - - - 0.20 9.58 9.67 0.00 0.00 15.08 15.08 20.71 20.71 0.20 - _ _ - 0.20 0.20 9.75 0.00 15.07 20.70 0.20 - - - - 0.20 0.20 9.83 0.00 15.07 20.69 0.20 - - - - 0.20 ' 9.92 0.00 15.07 20.68 0.20 - - 0.20 10.00 0.00 15.07 20.67 _ _ 0.20 0.20 10.08 0.00 15.07 20.66 0.20 - - - - 0.20 10.17 10.25 0.00 0.00 15.07 15.07 20.65 20.64 0.20 - _ _ - 0.20 0.20 0.20 10.33 0.00 15.07 20.63 0.20 - - - - 0.20 10.42 0.00 15.07 20.62 0.20 - - - - 0.20 10.50 0.00 15.07 20.61 0.20 - - 0.20 ' 10.58 0.00 15.07 20.61 _ _ 0.20 0.20 10.67 0.00 15.06 20.60 0.20 - - - - 0.20 10.75 0.00 15.06 20.59 0.20 - 0.20 10.83 0.00 15.06 20.58 0.20 - - - 0.20 10.92 0.00 15.06 20.57 _ 0.20 - - 0.20 11.00 0.00 15.06 20.56 0.20 - - - - 0.20 11.08 0.00 15.06 20.55 0.20 - - 0.20 ' 11.17 0.00 15.06 20.54 _ _ 0.20 0.20 Continues on next page... 1 ' THE KEYS Page 4 Hydrograph Discharge Table ' Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hm) (cfs) (ft) (cfs) (Cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.25 0.00 15.06 20.53 0.20 - - 0.20 ' 11.33 0.00 15.06 20.52 _ _ 0.20 0.20 11.42 0.00 15.06 20.51 0.20 - - - - 0.20 11.50 0.00 15.05 20.51 0.20 - - - - 0.20 ' 11.58 0.00 15.05 20.50 0.20 - - 0.20 11.67 0.00 15.05 20.49 _ _ 0.20 0.20 11.75 0.00 15.05 20.48 0.20 - - - - 0.20 ' 11.83 11.92 0.00 0.00 15.05 15.05 20.47 20.46 0.20 - _ _ - 0.20 0.20 0.20 12.00 0.00 15.05 20.45 0.20 - - - - 0.20 12.08 0.00 15.05 20.44 0.20 - - - - 0.20 12.17 0.00 15.05 20.43 0.20 - - 0.20 12.25 0.00 15.05 20.43 _ _ 0.20 0.20 12.33 0.00 15.05 20.42 0.20 - - - - 0.20 12. 0.00 15.04 20.41 0.20 00.200 12.50 50 0.00 15.04 20.40 - _ _ - 0.20 0.20 12.58 0.00 15.04 20.39 0.20 0.20 12.67 0.00 15.04 20.38 0.20 - - - - 0.20 12.75 0.00 15.04 20.37 0.20 - - 0.20 ' 12.83 0.00 15.04 20.36 _ _ 0.20 0.20 12.92 0.00 15.04 20.35 0.20 - - - - 0.20 13.00 0.00 15.04 20.35 0.20 - - - - 0.20 13.08 0.00 15.04 20.34 0.20 - 0.20 13.17 0.00 15.04 20.33 _ _ _. 0.20 0.20 13.25 0.00 15.04 20.32 0.20 - - - - 0.20 13.33 13.42 0.00 0.00 15.03 15.03 20.31 20.30 0.20 - - - - 0.20 - - - - 0.20 0.20 13.50 0.00 15.03 20.29 0.20 - - - 0.20 13.58 0.00 15.03 20.28 0.20 - - - - 0.20 13.67 0.00 15.03 20.27 0.20 - 0.20 ' 13.75 0.00 15.03 20.27 _ _ _ 0.19 0.19 13.83 0.00 15.03 20.26 0.19 - - - - 0.19 13.92 0.00 15.03 20.25 0.19 - - - - 0.19 14.00 0.00 15.03 20.24 0.19 - - 0.19 14.08 0.00 15.03 20.23 _ _ 0.19 0.19 14.17 0.00 15.03 20.22 0.19 - - - - 0.19 ' 14.25 14.33 0.00 0.00 15.02 15.02 20.21 20.20 0.19 - _ _ - 0.19 0.19 0.19 14.42 0.00 15.02 20.20 0.19 - - - - 0.19 14.50 0.00 15.02 20.19 0.19 - - - - 0.19 14.58 0.00 15.02 20.18 0.19 - - 0.19 ' 14.67 0.00 15.02 20.17 _ _ 0.19 0.19 14.75 0.00 15.02 20.16 0.19 - - - - 0.19 14.83 14.92 0.00 0.00 15.02 15.02 20.15 20.14 0.19 = _ _ - 0.19 0.19 0.19 15.00 0.00 15.02 20.14 0.19 - - - - 0.19 15.08 0.00 15.02 20.13 0.19 - - - - 0.19 15.17 0.00 15.02 20.12 0.19 - 0.19 15.25 0.00 15.01 20.11 = _ _ 0.19 0.19 Continues on next page... THE. KEYS Hydrograph Discharge Table Page 5 Time Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) M (CIS) (CIS) (cfs) (CIS) (cfs) (CIS) (cfs) 15.33 0.00 15.01 20.10 0.19 - - - - 0.19 15.42 0.00 15.01 20.09 0.19 - - - - 0.19 15.50 0.00 15.01 20.08 0.19 - - - - 0.19 15.58 0.00 15.01 20.08 0.19 - - - - 0.19 15.67 0.00 15.01 20.07 0.19 - - - - 0.19 15.75 0.00 15.01 20.06 0.19 - - - - 0.19 15.83 0.00 15.01 20.05 0.19 - - - - 0.19 15.92 0.00 15.01 20.04 0.19 - - - - 0.19 16.00 0.00 15.01 20.03 0.19 - - - - 0.19 16.08 0.00 15.01 20.02 0.19 - - - - 0.19 16.17 0.00 15.00 20.02 0.19 - - - - 0.19 16.25 0.00 15.00 20.01 0.19 - - - - 0.19 16.33 0.00 15.00 20.00 0.19 - - - - 0.19 16.42 0.00 15.00 19.99 0.19 - - - - 0.19 16.50 0.00 15.00 19.98 0.19 - - - - 0.19 16.58 0.00 15.00 19.97 0.19 - - - - 0.19 16.67 0.00 15.00 19.96 0.19 - - - - 0.19 16.75 0.00 15.00 19.95 0.19 - - - - 0.19 16.83 0.00 15.00 19.94 0.19 - - - - 0.19 16.92 0.00 15.00 19.93 0.19 - - - - 0.19 17.00 0.00 15.00 19.92 0.19 - - - - 0.19 17.08 0.00 14.99 19.91 0.19 - - - - 0.19 17.17 0.00 14.99 19.90 0.19 - - - - 0.19 17.25 0.00 14.99 19.90 0.19 - - - - 0.19 17.33 0.00 14.99 19.89 0.19 - - - - 0.19 17.42 0.00 14.99 19.88 0.19 - - - - 0.19 17.50 0.00 14.99 19.87 0.19 - - - - 0.19 17.58 0.00 14.99 19.86 0.19 - - - - 0.19 17.67 0.00 14.99 19.85 0.19 - - - - 0.19 17.75 0.00 14.99 19.84 0.19 - - - - 0.19 17.83 0.00 14.99 19.83 0.19 - - - - 0.19 17.92 0.00 14.98 19.82 0.19 - - - - 0.19 18.00 0.00 14.98 19.81 0.19 - - - - 0.19 18.08 0.00 14.98 19.80 0.19 - - - - 0.19 18.17 0.00 14.98 19.79 0.19 - - - - 0.19 18.25 0.00 14.98 19.78 0.19 - - - - 0.19 18.33 0.00 14.98 19.77 0.18 - - - - 0.18 18.42 0.00 14.98 19.76 0.18 - - - - 0.18 18.50 0.00 14.98 19.75 0.18 - - - - 0.18 18.58 0.00 14.98 19.74 0.18 - - - - 0.18 18.67 0.00 14.98 19.73 0.18 - - - - 0.18 18.75 0.00 14.98 19.72 0.18 - - - - 0.18 18.83 0.00 14.97 19.71 0.18 - - - - 0.18 18.92 0.00 14.97 19.71 0.18 - - - - 0.18 19.00 0.00 14.97 19.70 0.18 - - - - 0.18 19.08 0.00 14.97 19.69 0.18 - - - - 0.18 19.17 0.00 14.97 19.68 0.18 - - - - 0.18 19.25 0.00 14.97 19.67 0.18 - - - - 0.18 19.33 0.00 14.97 19.66 0.18 - - - - 0.18 Continues on next page... THE KEYS Hydrograph Discharge Table Page e Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (ds) WS) (Cfs) (Cfs) 19.42 0.00 14.97 19.65 0.18 - - - - 0.18 19.50 0.00 14.97 19.64 0.18 - - - - 0.18 19.58 0.00 14.97 19.63 0.18 - - - - 0.18 19.67 0.00 14.97 19.62 0.18 - - - - 0.18 19.75 0.00 14.96 19.61 0.18 - - - - 0.18 19.83 0.00 14.96 19.60 0.18 - - - - 0.18 19.92 0.00 14.96 19.59 0.18 - - - - 0.18 . 20.00 0.00 14.96 19.58 0.18 - - - - 0.18 20.08 0.00 14.96 19.57 0.18 - - - - 0.18 20.17 0.00 14.96 19.57 0.18 - - - - 0.18 20.25 0.00 14.96 19.56 0.18 - - - - 0.18 20.33 0.00 14.96 19.55 0.18 - - - - 0.18 20.42 0.00 14.96 19.54 0.18 - - - - 0.18 20.50 0.00 14.96 19.53 0.18 - - - - 0.18 20.58 0.00 14.96 19.52 0.18 - - - - 0.18 20.67 0.00 14.95 19.51 0.18 - - - - 0.18 20.75 0.00 14.95 19.50 0.18 - - - - 0.18 20.83 0.00 14.95 19.49 0.18 - - - - 0.18 . 20.92 0.00 14.95 19.48 0.18 - - - - 0.18 21.00 0.00 14.95 19.47 0.18 - - - - 0.18 21.08 0.00 14.95 19.46 0.18 - - - - 0.18 21.17 0.00 14.95 19.45 0.18 - - - - 0.18 21.25 0.00 14.95 19.45 0.18 - - - - 0.18 21.33 0.00 14.95 19.44 0.18 - - - - 0.18 21.42 0.00 14.95 19.43 0.18 - - - - 0.18 21.50 0.00 14.95 19.42 0.18 - - - - 0.18 21.58 0.00 14.94 19.41 0.18 - - - - 0.18 21.67 0.00 14.94 19.40 0.18 - - - - 0.18 21.75 0.00 14.94 19.39 0.18 - - - - 0.18 21.83 0.00 14.94 19.38 0.18 - - - - 0.18 21.92 0.00 14.94 19.37 0.18 - - - - 0.18 22.00 0.00 14.94 19.36 0.18 - - - - 0.18 22.08 0.00 14.94 19.35 0.18 - - - - 0.18 22.17 0.00 14.94 19.35 0.18 - - - - 0.18 22.25 0.00 14.94 19.34 0.18 - - - - 0.18 22.33 0.00 14.94 19.33 0.18 - - - - 0.18 22.42 0.00 14.94 19.32 0.18 - - - - 0.18 22.50 0.00 14.93 19.31 0.18 - - - - 0.18 22.58 0.00 14.93 19.30 0.18 - - - - 0.18 22.67 0.00 14.93 19.29 0.17 - - - - 0.17 22.75 0.00 14.93 19.28 0.17 - - - - 0.17 22.83 0.00 14.93 19.27 0.17 - - - - 0.17 22.92 0.00 14.93 19.26 0.17 - - - - 0.17 23.00 0.00 14.93 19.25 0.17 - - - - 0.17 23.08 0.00 14.93 19.24 0.17 - - - - 0.17 23.17 0.00 14.93 19.23 0.17 - - - - 0.17 23.25 0.00 14.93 19.22 0.17 - - - - 0.17 23.33 0.00 14.93 19.22 0.17 - - - - 0.17 23.42 0.00 14.93 19.21 0.17 - - - - 0.17 Continues on next page... THE KEYS 1 1 Hydrograph Discharge Table Page 7 Time Inflow Elevation Culy. A Culy. B Culy. C WeirA Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 23.50 0.00 14.92 19.20 0.17 - - - - 0.17 23.58 0.00 14.92 19.19 0.17 - - - - 0_17 23.67 0.00 14.92 19.18 0.17 - - - - 0.17 23.75 0.00 14.92 19.17 0.17 - - - - 0.17 23.83 0.00 14.92 19.16 0.17 - - - - 0.17 23.92 0.00 14.92 19.15 0.17 - - - - 0.17 24.00 0.00 14.92 19.14 0.17 - - - - 0.17 24.08 0.00 14.92 19.13 0.17 - - - - 0.17 24.17 0.00 14.92 19.12 0.17 - - - - 0.17 24.25 0.00 14.92 19.12 0.17 - - - - 0.17 24.33 0.00 14.92 19.11 0.17 - - - - 0.17 24.42 0.00 14.91 19.10 0.17 - - - - 0.17 24.50 0.00 14.91 19.09 0.17 - - - - 0.17 24.58 0.00 14.91 19.08 0.17 - - - - 0.17 24.67 0.00 14.91 19.07 0.17 - - - - 0.17 24.75 0.00 14.91 19.06 0.17 - - - - 0.17 24.83 0.00 14.91 19.05 0.17 - - - - 0.17 24.92 0.00 14.91 19.04 0.17 - - - - 0.17 25.00 0.00 14.91 19.03 0.17 - - - - 0.17 25.08 0.00 14.91 19.03 0.17 - - - - 0.17 25.17 0.00 14.91 19.02 0.17 - - - - 0.17 25.25 0.00 14.91 19.01 0.17 - - - - 0.17 25.33 0.00 14.91 19.00 0.17 - - - - 0.17 25.42 0.00 14.90 18.99 0.17 - - - - 0.17 25.50 0.00 14.90 18.98 0.17 - - - - 0.17 25.58 0.00 14.90 18.97 0.17 - - - - 0.17 25.67 0.00 14.90 18.96 0.17 - - - - 0.17 25.75 0.00 14.90 18.95 0.17 - - - - 0.17 25.83 0.00 14.90 18.95 0.17 - - - - 0.17 25.92 0.00 14.90 18.94 0.17 - - - - 0.17 26.00 0.00 14.90 18.93 0.17 - - - - 0.17 26.08 0.00 14.90 18.92 0.17 - - - - 0.17 26.17 0.00 14.90 18.91 0.17 - - - - 0.17 26.25 0.00 14.90 18.90 0.17 - - - - 0.17 26.33 0.00 14.90 18.89 0.17 - - - - 0.17 26.42 0.00 14.89 18.88 0.17 - - - - 0.17 26.50 0.00 14.89 18.87 0.17 - - - - 0.17 26.58 0.00 14.89 18.87 0.17 - - - - 0.17 26.67 0.00 14.89 18.86 0.17 - - - - 0.17 26.75 0.00 14.89 18.85 0.17 - - - - 0.17 26.83 0.00 14.89 18.84 0.17 - - - - 0.17 26.92 0.00 14.89 18.83 0.16 - - - - 0.16 27.00 0.00 14.89 18.82 0.16 - - - - 0.16 27.08 0.00 14.89 18.81 0.16 - - - - 0.16 27.17 0.00 14.89 18.80 0.16 - - - - 0.16 27.25 0.00 14.89 18.80 0.16 - - - - 0.16 27.33 0.00 14.89 18.79 0.16 - - - - 0.16 27.42 0.00 14.88 18.78 0.16 - - - - 0.16 27.50 0.00 14.88 18.77 0.16 - - - - 0.16 Continues on next page... THE KEYS Page 8 ' Hydrograph Discharge Table ' Time Inflow Elevation Culy. A Culv. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ids) ' 27.58 27.67 0.00 0.00 14.88 14.88 18.76 18.75 0.16 - _ 0.16 _ - 0.16 27.75 0.00 14.88 18.74 0.16 - - 0.16 - - 0.16 27.83 0.00 14.88 18.74 0.16 - - - - 0.16 27.92 0.00 14.88 18.73 0.16 0.16 28.00 0.00 14.88 18.72 0.16 - - - - 0.16 28.08 0.00 14.88 18.71 0.16 - - - - 0.16 28.17 28.25 0.00 0.00 14.88 14.88 18.70 18.69 0.16 0.16 - - 0.16 - - 0.16 28.33 0.00 14.88 18.68 0.16 - - - - 0.16 28.42 0.00 14.87 18.67 0.16 - - - - 0.16 28.50 0.00 14.87 18.66 0.16 - - 0.16 28.58 0.00 14.87 18.66 _ 0.16 _ 0.16 28.67 0.00 14.87 18.65 0.16 - - - - 0.16 28.75 0.00 14.87 18.64 0.16 - - - - 0.16 ' 28.83 0.00 14.87 18.63 0.16 - - 0.16 28.92 0.00 14.87 18.62 _ 0.16 _ 0.16 29.00 0.00 14.87 18.61 0.16 - - - - 0.16 ' 29.08 29.17 0.00 0.00 14.87 14.87 18.60 18.59 0.16 - _ 0.16 _ - 0.16 0.16 29.25 0.00 14.87 18.59 0.16 - - - - 0.16 29.33 0.00 14.87 18.58 0.16 - - - - 0.16 29.42 0.00 14.86 18.57 0.16 - - 0.16 t 29.50 0.00 14.86 18.56 _ 0.16 _ 0.76 29.58 0.00 14.86 18.55 0.16 - - - - 0.16 29.67 0.00 14.86 18.54 0.16 - 0.16 ' 29.75 0.00 14.86 18.53 0.16 - - 0.16 29.83 0.00 14.86 18.53 _ 0.16 _ - 0.16 29.92 0.00 14.86 18.52 0.16 - - - - 0.16 30.00 0.00 14.86 18.51 0.16 - - 0.16 ' 30.08 0.00 14.86 18.50 _ 0.16 _ 0.16 30.17 0.00 14.86 18.49 0.16 - - - - 0.16 30.25 0.00 14.86 18.48 0.15 - - - - 0.15 30.33 0.00 14.86 18.47 0.15 - - 0.15 30.42 0.00 14.86 18.47 _ 0.15 _ 0.15 30.50 0.00 14.85 18.46 0.15 - - - - 0.15 30.58 30.67 0.00 0.00 14.85 14.85 18.45 18.44 0.15 - _ 0.15 _ - 0.15 0.15 30.75 0.00 14.85 18.43 0.15 - - - - 0.15 30.83 0.00 14.85 18.42 0.15 - - - - 0.15 30.92 0.00 14.85 18.42 0.15 - - 0.15 31.00 0.00 14.85 18.41 _ 0.15 _ 0.15 31.08 0.00 14.85 18.40 0.15 - - - - 0.15 31. 0.00 14.85 18.3 0.15 0.15 ' 31.25 25 0.00 14.85 18.38 - _ 0.15 _ - 0.15 31.33 0.00 14.85 18.37 0.15 - - 0.15 31.42 0.00 14.85 18.37 0.15 - - - - 0.15 31.50 0.00 14.85 18.36 0.15 - - 0.15 ' 31.58 0.00 14.84 18.35 _ 0.15 _ 0.15 ' Continues on next page... i\I I ' THE KEYS Hydrograph Discharge Table Pegs 9 Time Inflow Elevation Culy. A Culy. B Cuty. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) Ids) (cfs) (Cfs) (cfs) (Cfs) (cfs) (cfs) 31.67 0.00 14.84 18.34 0.15 0.15 31.75 0.00 14.84 18.33 0.15 - - - - 0.15 31.83 0.00 14.84 18.32 0.15 - - - - 0.15 31.92 0.00 14.84 18.32 0.15 - - - - 0.15 ' 32.00 0.00 14.84 18.31 0.15 - - 0.15 32.08 0.00 14.84 18.30 _ _ 0.15 0.15 32.17 0.00 14.84 18.29 0.15 - - - - 0.15 ' 32.25 32.33 0.00 0.00 14.84 14.84 18.28 18.28 0.15 - _ _ - 0.15 0.15 0.15 32.42 0.00 14.84 18.27 0.15 - - - - 0.15 32.50 0.00 14.84 18.26 0.15 - - - - 0.15 32.58 0.00 14.84 18.25 0.15 - 0.15 32.67 0.00 14.83 18.24 _ _ _ 0.15 0.15 32.75 0.00 14.83 18.24 0.15 - - - - 0.15 32. 0.00 14.83 18.23 0.15 0.15 ' 32.92 92 0.00 14.83 18.22 _ _ - 0.15 0.15 33.00 0.00 14.83 18.21 0.15 - 0.15 33.08 0.00 14.83 18.20 0.15 - - - - 0.15 33.17 0.00 14.83 18.20 0.15 - - 0.15 ' 33.25 0.00 14.83 18.19 _ _ 0.15 0.15 33.33 0.00 14.83 18.18 0.15 - - - - 0.15 33.42 0.00 14.83 18.17 0.15 - - - - 0.15 33.50 0.00 14.83 18.16 0.14 - - 0.14 33.58 0.00 14.83 18.16 _ _ 0.14 0.14 33.67 0.00 14.83 18.15 0.14 - - - - 0.14 ' 33.75 33.83 0.00 0.00 14.83 14.82 18.14 18.13 0.14 - _ _ - 0.14 0.14 0.14 33.92 0.00 14.82 18.12 0.14 - - - - 0.14 34.00 0.00 14.82 18.12 0.14 - - - - 0.14 34.08 0.00 14.82 18.11 0.14 - - 0.14 ' 34.17 0.00 14.82 18.10 _ _ 0.14 0.14 34.25 0.00 14.82 18.09 0.14 - - - - 0.14 34.33 0.00 14.82 18.08 0.14 - - - - 0.14 ' 34.42 0.00 14.82 18.08 0.14 - - 0.14 34.50 0.00 14.82 18.07 _ _ 0.14 0.14 34.58 0.00 14.82 18.06 0.14 - - - - 0.14 34.67 34.75 0.00 0.00 14.82 14.82 18.05 18.04 0.14 - _ _ - 0.14 0.14 0.14 34.83 0.00 14.82 18.04 0.14 - - - - 0.14 34.92 0.00 14.81 18.03 0.14 - - - - 0.14 35.00 0.00 14.81 18.02 0.14 - - 0.14 t 35.08 0.00 14.81 18.01 _ _ 0.14 0.14 35.17 0.00 14.81 18.00 0.14 - - - - 0.14 ' 35.25 35.33 0.00 0.00 14.81 14.81 18.00 17.99 0.14 - _ _ - 0.14 0.14 0.14 35.42 0.00 14.81 17.98 0.14 - - - - 0.14 35.50 0.00 14.81 17.97 0.14 - - - - 0.14 35.58 0.00 14.81 17.96 0.14 - - 0.14 ' 35.67 0.00 14.81 17.96 _ _ 0.14 0.14 Continues on next page... 1 I 1 1 1 I 1 1 THE KEYS Hydrograph Discharge Table Page 10 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) Ids) Ids) (cfs) (cfs) (cfs) (cfs) (cfs) 35.75 0.00 14.81 17.95 0.14 - - - - 0.14 35.83 0.00 14.81 17.94 0.14 - - - - 0.14 35.92 0.00 14.81 17.93 0.14 - - - - 0.14 36.00 0.00 14.81 17.92 0.14 - - - - 0.14 36.08 0.00 14.81 17.92 0.14 - - - - 0.14 36.17 0.00 14.80 17.91 0.14 - - - - 0.14 36.25 0.00 14.80 17.90 0.14 - - - - 0.14 36.33 0.00 14.80 17.89 0.14 - - - - 0.14 36.42 0.00 14.80 17.88 0.14 - - - - 0.14 36.50 0.00 14.80 17.88 0.14 - - - - 0.14 36.58 0.00 14.80 17.87 0.14 - - - - 0.14 36.67 0.00 14.80 17.86 0.14 - - - - 0.14 36.75 0.00 14.80 17.85 0.14 - - - - 0.14 36.83 0.00 14.80 17.85 0.14 - - - - 0.14 36.92 0.00 14.80 17.84 0.14 - - - - 0.14 37.00 0.00 14.80 17.83 0.14 - - - - 0.14 37.08 0.00 14.80 17.82 0.14 - - - - 0.14 37.17 0.00 14.80 17.81 0.14 - - - - 0.14 . 37.25 0.00 14.80 17.81 0.14 - - - - 0.14 37.33 0.00 14.79 17.80 0.14 - - - - 0.14 37.42 0.00 14.79 17.79 0.14 - - - - 0.14 37.50 0.00 14.79 17.78 0.14 - - - - 0.14 37.58 0.00 14.79 17.77 0.14 - - - - 0.14 37.67 0.00 14.79 17.77 0.14 - - - - 0.14 37.75 0.00 14.79 17.76 0.14 - - - - 0.14 37.83 0.00 14.79 17.75 0.14 - - - - 0.14 37.92 0.00 14.79 17.74 0.14 - - - - 0.14 38.00 0.00 14.79 17.74 0.14 - - - - 0.14 38.08 0.00 14.79 17.73 0.14 - - - - 0.14 38.17 0.00 14.79 17.72 0.14 - - - - 0.14 38.25 0.00 14.79 17.71 0.14 - - - - 0.14 38.33 0.00 14.79 17.70 0.14 - - - - 0.14 38.42 0.00 14.79 17.70 0.14 - - - - 0.14 38.50 0.00 14.78 17.69 0.14 - - - - 0.14 38.58 0.00 14.78 17.68 0.14 - - - - 0.14 38.67 0.00 14.78 17.67 0.14 - - - - 0.14 38.75 0.00 14.78 17.67 0.14 - - - - 0.14 38.83 0.00 14.78 17.66 0.14 - - - - 0.14 38.92 0.00 14.78 17.65 0.14 - - - - 0.14 39.00 0.00 14.78 17.64 0.14 - - - - 0.14 39.08 0.00 14.78 17.64 0.14 - - - - 0.14 39.17 0.00 14.78 17.63 0.13 - - - - 0.13 39.25 0.00 14.78 17.62 0.13 - - - - 0.13 39.33 0.00 14.78 17.61 0.13 - - - - 0.13 39.42 0.00 14.78 17.60 0.13 - - - - 0.13 39.50 0.00 14.78 17.60 0.13 - - - - 0.13 39.58 0.00 14.78 17.59 0.13 - - - - 0.13 39.67 0.00 14.78 17.58 0.13 - - - - 0.13 39.75 0.00 14.77 17.57 0.13 - - - - 0.13 Continues on next page... 1 ' THE KEYS pap I I Hydrograph Discharge Table ' Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (Cfs) (Cfs) (cfs) (Cfs) (cfs) (Cfs) (cfs) 39.83 0.00 14.77 17.57 0.13 - - 0.13 39.92 0.00 14.77 17.56 _ _ 0.13 0.13 40.00 0.00 14.77 17.55 0.13 - - - - 0.13 40.08 0.00 14.77 17.54 0.13 - - - - 0.13 40.17 0.00 14.77 17.54 0.13 - - 0.13 40.25 0.00 14.77 1T53 _ _ 0.13 0.13 40.33 0.00 14.77 17.52 0.13 - - - - 0.13 40.42 0.00 14.77 17.51 0.13 - - 0.13 40.50 0.00 14.77 17.51 _ _ 0.13 0.13 40.58 0.00 14.77 17.50 0.13 - - - - 0.13 40.67 0.00 14.77 17.49 0.13 - - - - 0.13 40.75 0.00 14.77 17.48 0.13 - - 0.13 40.83 0.00 14.77 17.48 _ _ 0.13 0.13 40.92 0.00 14.77 17.47 0.13 - - - - 0.13 41.0 41.08 0.00 0.00 14.76 14.76 17.4 17.45 0.13 - _ _ - 0.13 0.13 0.13 41.17 0.00 14.76 17.45 0.13 0.13 41.25 0.00 14.76 17.44 0.13 - - - - 0.13 41.33 0.00 14.76 17.43 0.13 - - 0.13 ' 41.42 0.00 14.76 17.42 _ _ 0.13 0.13 41.50 0.00 14.76 17.42 0.13 - - - - 0.13 41.58 0.00 14.76 17.41 0.13 - - - - 0.13 41.67 0.00 14.76 17.40 0.13 - - 0.13 41.75 0.00 14.76 17.39 _ _ 0.13 0.13 41.83 0.00 14.76 17.38 0.13 - - - - 0.13 41.92 42.00 0.00 0.00 14.76 14.76 17.38 17.37 0.13 - _ _ - 0.13 0.13 0.13 42.08 0.00 14.76 17.36 0.13 - - - - 0.13 42.17 0.00 14.76 17.35 0.13 - - - - 0.13 42.25 0.00 14.75 17.35 0.13 - _ - 0.13 ' 42.33 0.00 14.75 17.34 _ 0.13 0.13 42.42 0.00 14.75 17.33 0.13 - - - - 0.13 42.50 0.00 14.75 17.32 0.13 - - - - 0.13 ' 42.58 0.00 14.75 17.32 0.13 - - 0.13 42.67 0.00 14.75 17.31 _ _ 0.13 0.13 42.75 0.00 14.75 17.30 0.13 - - - - 0.13 42.83 0.00 14.75 17.29 0.13 - - 0.13 42.92 0.00 14.75 17.29 _ _ 0.13 0.13 43.00 0.00 14.75 17.28 0.13 - - - - 0.13 43.08 0.00 14.75 17.27 0.13 - - - - 0.13 ' 43.17 0.00 14.75 17.26 0.13 - - 0.13 43.25 0.00 14.75 17.26 _ _ 0.13 0.13 43.33 0.00 14.75 17.25 0.13 - - - - 0.13 ' 43.42 43.50 0.00 0.00 14.75 14.74 17.24 17.23 0.13 - _ _ - 0.13 0.13 '0.13 43.58 0.00 14.74 17.23 0.13 - - - - 0.13 43.67 0.00 14.74 17.22 0.13 - - - - 0.13 43.75 0.00 14.74 17.21 0.13 - - 0.13 ' 43.83 0.00 _ 14.74 17.20 _ _ 0.13 0.13 ' Continues on next page... 1 THE KEYS Hydrograph Discharge Table Page 12 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hm) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) Ids) 43.92 0.00 14.74 17.20 0.13 - - - - 0.13 44.00 0.00 14.74 17.19 0.13 - - - - 0.13 44.08 0.00 14.74 17.18 0.13 - - - - 0.13 44.17 0.00 14.74 17.17 0.13 - - - - 0.13 44.25 0.00 14.74 17.17 0.12 - - - - 0.12 44.33 0.00 14.74 17.16 0.12 - - - - 0.12 44.42 0.00 14.74 17.15 0.12 - - - - 0.12 44.50 0.00 14.74 17.14 0.12 - - - - 0.12 44.58 0.00 14.74 17.14 0.12 - - - - 0.12 44.67 0.00 14.74 17.13 0.12 - - - - 0.12 44.75 0.00 14.74 17.12 0.12 - - - - 0.12 44.83 0.00 14.73 17.11 0.12 - - - - 0.12 44.92 0.00 14.73 17.11 0.12 - - - - 0.12 45.00 0.00 14.73 17.10 0.12 - - - - 0.12 45.08 0.00 14.73 17.09 0.12 - - - - 0.12 45.17 0.00 14.73 17.09 0.12 - - - - 0.12 45.25 0.00 14.73 17.08 0.12 - - - - 0.12 45.33 0.00 14.73 17.07 0.12 - - - - 0.12 45.42 0.00 14.73 17.06 0.12 - - - - 0.12 45.50 0.00 14.73 17.06 0.12 - - - - 0.12 45.58 0.00 14.73 17.05 0.12 - - - - 0.12 45.67 0.00 14.73 17.04 0.12 - - - - 0.12 45.75 0.00 14.73 17.03 0.12 - - - - 0.12 45.83 0.00 14.73 17.03 0.12 - - - - 0.12 45.92 0.00 14.73 17.02 0.12 - - - - 0.12 46.00 0.00 14.73 17.01 0.12 - - - - 0.12 46.08 0.00 14.73 17.01 0.12 - - - - 0.12 46.17 0.00 14.72 17.00 0.12 - - - - 0.12 46.25 0.00 14.72 16.99 0.12 - - - - 0.12 46.33 0.00 14.72 16.99 0.12 - - - - 0.12 46.42 0.00 14.72 16.98 0.12 - - - - 0.12 46.50 0.00 14.72 16.97 0.12 - - - - 0.12 46.58 0.00 14.72 16.96 0.12 - - - - 0.12 46.67 0.00 14.72 16.96 0.12 - - - - 0.12 46.75 0.00 14.72 16.95 0.12 - - - - 0.12 46.83 0.00 14.72 16.94 0.12 - - - - 0.12 46.92 0.00 14.72 16.94 0.12 - - - - 0.12 47.00 0.00 14.72 16.93 0.12 - - - - 0.12 47.08 0.00 14.72 16.92 0.12 - - - - 0.12 47.17 0.00 14.72 16.91 0.12 - - - - 0.12 47.25 0.00 14.72 16.91 0.12 - - - - 0.12 47.33 0.00 14.72 16.90 0.12 - - - - 0.12 47.42 0.00 14.72 16.89 0.12 - - - - 0.12 47.50 0.00 14.72 16.89 0.12 - - - - 0.12 47.58 0.00 14.71 16.88 0.12 - - - - 0.12 47.67 0.00 14.71 16.87 0.12 - - - - 0.12 47.75 0.00 14.71 16.87 0.12 - - - - 0.12 47.83 0.00 14.71 16.86 0.12 - - - - 0.12 47.92 0.00 14.71 16.85 0.12 - - - - 0.12 Continues on next page... ' THE KEYS Page 13 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 48.00 0.00 14.71 16.85 0.12 - - 0.12 48.08 0.00 14.71 16.84 _ _ 0.12 0.12 48.17 0.00 14.71 16.83 0.12 - - - - 0.12 48.25 0.00 14.71 16.82 0.12 - - - - 0.12 48.33 0.00 14.71 16.82 0.12 - - 0.12 48.42 0.00 14.71 16.81 _ _ 0.12 0.12 48.50 0.00 14.71 16.80 0.12 - - - - 0.12 48.58 48.67 0.00 0.00 14.71 14.71 16.80 16.79 0.11 - _ _ - 0.11 0.11 0.11 48.75 0.00 14.71 16.78 0.11 - - - - 0.11 48.83 0.00 14.71 16.78 0.11 - - - - 0.11 48.92 0.00 14.71 16.77 0.11 0.11 49.00 0.00 14.70 16.76 0.11 - - - - 0.11 49.08 0.00 14.70 16.76 0.11 - - - - 0.11 49.17 0.00 14.70 16.75 0.11 - 0.11 49.25 0.00 14.70 16.74 0.11 - - 0.11 49.33 0.00 14.70 16.74 _ _ 0.11 0.11 49.42 0.00 14.70 16.73 0.11 - - - - 0.11 49.50 49.58 0.00 0.00 14.70 14.70 16.72 16.72 0.11 - _ _ - 0.11 0.11 49.67 0.00 14.70 16.71 0.11 - - - - 0.11 0.11 49.75 0.00 14.70 16.70 0.11 - - - 0.11 49.83 0.00 14.70 16.70 0.11 - - 0.11 49.92 0.00 14.70 16.69 _ _ 0.11 0.11 50.00 0.00 14.70 16.68 0.11 - - - - 0.11 ' 50.08 50.17 0.00 0.00 14.70 14.70 16.68 16.67 0.11 - - - - 0.11 - - - 0.11 0.11 50.25 0.00 14.70 16.66 - 0.11 - - - - 0.11 50.33 0.00 14.70 16.66 0.11 - - - - 0.11 50.42 0.00 14.70 16.65 0.11 - - 0.11 50.50 0.00 14.69 16.64 _ _ 0.11 0.11 50.58 0.00 14.69 16.63 0.11 - - - - 0.11 50.67 0.00 14.69 16.63 0.11 - - - - 0.11 ' 50.75 0.00 14.69 16.62 0.11 - - 0.11 50.83 0.00 14.69 16.61 _ _ 0.11 0.11 50.92 0.00 14.69 16.61 0.11 - - - - 0.11 51.00 51.08 0.00 0.00 14.69 14.69 16.60 0.11 - _ _ - 0.11 0.11 0.11 51.17 0.00 14.69 .16.59 16.59 0.11 - - - - 0.11 51.25 0.00 14.69 16.58 0.11 - - - - 0.11 0.00 14.69 16.57 0.11 - - 0.11 '51.33 51.42 0.00 14.69 16.57 _ _ 0.11 0.11 51.50 0.00 14.69 16.56 0.11 - - - - 0.11 1. 0.00 14.69 16.55 0.11 0.11 ' 67 51.67 0.00 14.69 16.55 - _ _ - 0.11 0.11 51.75 0.00 14.69 16.54 0.11 - - - 011 51.83 0.00 14.69 16.53 0.11 - - - - 0.11 0.00 14.69 16.53 0.11 - 0.11 '51.92 52.00 0.00 14.68 16.52 _ _ = 0.11 0.11 Continues on next page... I ' THE KEYS Pap 14 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 52.08 0.00 14.68 16.51 0.11 - - 0.11 52.17 0.00 14.68 16.51 _ _ 0.11 0.11 52.25 0.00 14.68 16.50 0.11 - - - - 0.11 52.33 0.00 14.68 16.49 0.11 - - - - 0.11 52.42 0.00 14.68 16.49 0.11 - - 0.11 52.50 0.00 14.68 16.48 _ _ 0.11 0.11 52.58 0.00 14.68 16.47 0.11 - - - - 0.11 52.67 52.75 0.00 0.00 14.68 14.68 16.47 16.46 0.11 - _ _ - 0.11 0.11 52.83 0.00 14.68 16.45 0.11 - - - - 0.11 0.11 52.92 0.00 14.68 16.45 0.11 - - - - 0.11 53.00 0.00 14.68 16.44 0.11 - - 0.11 53.08 0.00 14.68 16.43 _ _ 0.11 0.11 53.17 0.00 14.68 16.43 0.11 - - - - 0.11 53.25 0.00 14.68 16.42 0.11 - - 0.11 ' 53.33 0.00 14.68 16.41 0.11 - - 0.11 53.42 0.00 14.68 16.41 _ _ 0.11 - 0.11 53.50 0.00 14.67 16.40 0.11 - - - - 0.11 . ' 53.58 53.67 0.00 0.00 14.67 14.67 16.39 16.39 0.11 - _ _ - 0.11 0.11 0.11 53.75 0.00 14.67 16.38 0.11 - - - - 0.11 53.83 0.00 14.67 16.37 0.11 - - - - 0.11 53.92 0.00 14.67 16.37 0.10 - - 0.10 54.00 0.00 14.67 16.36 _ _ 0.10 0.10 54.08 0.00 14.67 16.36 0.10 - - - - 0.10 ' 54.17 54.25 0.00 0.00 14.67 14.67 16.35 16.34 0.10 - - - 0.10 - - - - 0.10 0.10 54.33 0.00 14.67 16.34 0.10 - - - 0.10 54.42 0.00 14.67 16.33 0.10 - - - - 0.10 54.50 0.00 14.67 16.32 0.10 - - 0.10 ' 54.58 0.00 14.67 16.32 _ _ 0.10 0.10 54.67 0.00 14.67 16.31 0.10 - - - - 0.10 54.75 0.00 14.67 16.30 0.10 - - - - 0.10 54.83 0.00 14.67 16.30 0.10 - - 0.10 54.92 0.00 14.67 16.29 _ _ 0.10 0.10 55.00 0.00 14.67 16.29 0.10 - - - - 0.10 55.08 55.17 0.00 0.00 14.66 14.66 16.28 16.27 0.10 - _ _ - 0.10 0.10 55.25 0.00 14.66 16.27 0.10 - - - - 0.10 0.10 55.33 0.00 14.66 16.26 0.10 - - - - 0.10 55.42 0.00 14.66 16.25 0.10 - - 0.10 ' 55.50 0.00 14.66 16.25 _ _ 0.10 0.10 55.58 0.00 14.66 16.24 0.10 - - , - - 0.10 ' 5. 55.75 75 0.00 0.00 14.66 14.66 16.23 16.23 0.10 - _ _ - 0.10 0.10 0.10 55.83 0.00 14.66 16.22 0.10 - - - 0.10 55.92 0.00 14.66 16.22 0.10 - - - - 0.10 56.00 0.00 14.66 16.21 0.10 - - - - 0.10 f 56.08 0.00 14.66 16.20 0.10 - - - - 0.10 I Continues on next page... I THE KEYS Page 75 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (Cfs) (cfs) (cfs) (cfs) 56.17 0.00 14.66 16.20 0.10 - - 0.10 56.25 0.00 14.66 16.19 _ _ 0.10 0.10 56.33 0.00 14.66 16.18 0.10 - - - - 0.10 56.42 0.00 14.66 16.18 0.10 - - - - 0.10 56.50 0.00 14.66 16.17 0.10 - - 0.10 56.58 0.00 14.66 16.17 _ _ 0.10 0.10 56.67 0.00 14.65 16.16 0.10 - - - - 0.10 ' 56. 56.83 83 0.00 0.00 14.65 14.65 16.15 16.15 0.10 - _ _ - 0.10 0.10 0.10 56.92 0.00 14.65 16.14 0.10 - - 0.10 57.00 0.00 14.65 16.14 0.10 - - - - 0.10 57.08 0.00 14.65 16.13 0.10 - - 0.10 57.17, 0.00 14.65 16.12 _ _ 0.10 0.10 57.25 0.00 14.65 16.12 0.10 - - - - 0.10 57.33 0.00 14.65 16.11 0.10 - - - - 0.10 1 57.42 0.00 14.65 16.10 0.10 - - 0.10 57.50 0.00 14.65 16.10 _ _ 0.10 0.10 57.58 0.00 14.65 16.09 0.10 - - - - 0.10 57.67 57.75 0.00 0.00 14.65 14.65 16.09 16.08 0.10 - - - - 0.10 - - 0.10 0.10 57.83 0.00 14.65 16.07 - - 0.10 - - - - 0.10 57.92 0.00 14.65 16.07 0.10 - - - - 0.10 58.00 0.00 14.65 16.06 0.10 - - 0.10 58.08 0.00 14.65 16.06 _ _ 0.10 0.10 58.17 0.00 14.65 16.05 0.10 - - - - 0.10 58.25 0.00 14.65 16.04 0.10 - 0.10 ' 58.33 0.00 14.64 16.04 0.10 - - 0.10 58.42 0.00 14.64 16.03 _ _ 0.10 0.10 58.50 0.00 14.64 16.03 0.10 - - - - 0.10 ' 58.58 58.67 0.00 0.00 14.64 14.64 16.02 16.01 0.10 - _ _ - 0.10 0.10 58.75 0.00 14.64 16.01 0.10 - - - - 0.10 0.10 58.83 0.00 14.64 16.00 0.10 - - - - 0.10 58.92 0.00 14.64 16.00 0.10 - - 0.10 59.00 0.00 14.64 15.99 _ _ 0.10 0.10 59.08 0.00 14.64 15.98 0.10 - - - - 0.10 59.17 59.25 0.00 0.00 14.64 14.64 15.98 15.97 0.10 - _ _ - 0.10 0.10 0.10 59.33 0.00 14.64 15.97 0.10 - - - - 0.10 59.42 0.00 14.64. 15.96 0.10 - - - - 0.10 0.00 14.64 15.95 0.10 - - 0.10 '59.50 59.58 0.00 14.64 15.95 _ _ 0.10 0.10 59.67 0.00 14.64 15.94 0.10 - - - - 0.10 59.75 0.00 14.64 15.93 0.10 - - - 0.10 '59.83 0.00 14.64 15.93 0.10 - - 0.10 59.92 0.00 14.64 15.92 _ _ 0.10 0.10 60.00 0.00 14.64 15.92 0.10 - - - - 0.10 60.08 60.17 0.00 0.00 14.63 14.63 15.91 15.90 0.09 - _ _ - 0.09 0.09 0.09 IContinues on next page... I THE KEYS Page 16 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) Ids) (ft) (cfs) (Cfs) (Cfs) (cfs) (Cfs) (Cfs) (Cfs) 60.25 0.00 14.63 15.90 0.09 - - - - 0.09 I 60.33 0.00 14.63 15.89 0.09 - - - - 0.09 60.42 0.00 14.63 15.89 0.09 - - - - 0.09 60.50. 0.00 14.63 15.88 0.09 - - - 0.09 60.58 0.00 14.63 15.87 0.09 - - 0.09 60.67 0.00 14.63 15.87 _ _ 0.09 0.09 60.75 0.00 14.63 15.86 0.09 - - - - 0.09 60.83 60.92 0.00 0.00 14.63 14.63 15.86 15.85 0.09 - _ _ - 0.09 0.09 0.09 61.00 0.00 14.63 15.84 0.09 - - - - 0.09 61.08 0.00 14.63 15.84 0.09 - - - - 0.09 61.17 0.00 14.63 15.83 0.09 - - 0.09 61.25 0.00 14.63 15.82 _ _ 0.09 0.09 61.33 0.00 14.63 15.82 0.09 - - - - 0.09 61.42 0.00 14.63 15.81 0.09 - 0.09 ' 61.50 0.00 14.63 15.81 0.09 - - - 0.09 61.58 0.00 14.63 15.80 _ 0.09 - - 0.09 61.67 0.00 14.63 15.79 0.09 - - - - 0.09 61.75 0.00 14.63 15.79 0.09 - - 0.09 61.83 0.00 14.62 15.78 _ _ 0.09 0.09 61.92 0.00 14.62 15.78 0.09 - - - - 0.09 62.00 0.00 14.62 15.77 0.09 - - 0.09 62.08 0.00 14.62 15.76 0.09 - - 0.09 62.17 0.00 14.62 15.76 _ _ 0.09 0.09 62.25 0.00 14.62 15.75 0.09 - - - - 0.09 62.33 62.42 0.00 0.00 14.62 14.62 15.75 15.74 0.09 - _ _ - 0.09 0.09 0.09 62.50 0.00 14.62 15.73 0.09 - - - - 0.09 62.58 0.00 14.62 15.73 0.09 - - - - 0.09 62.67 0.00 14.62 15.72 0.09 - - 0.09 62.75 0.00 14.62 15.72 _ _ 0.09 0.09 62.83 0.00 14.62 15.71 0.09 - - - - 0.09 62.92 0.00 14.62 15.71 0.09 - - - - 0.09 63.00 0.00 14.62 15.70 0.09 - - 0.09 63.08 0.00 14.62 15.69 _ _ 0.09 0.09 63.17 0.00 14.62 15.69 0.09 - - - - 0.09 63.25 63.33 0.00 0.00 14.62 14.62 15.68 15.68 0.09 - _ _ - 0.09 0.09 63.42 0.00 14.62 15.67 0.09 - - - - 0.09 0.09 63.50 0.00 14.62 15.66 0.09 - - - - 0.09 '63.58 0.00 14.62 15.66 0.09 - - 0.09 63.67 0.00 14.61 15.65 _ _ 0.09 0.09 63.75 0.00 14.61 15.65 0.09 - - - - 0_09 63.83 63.92 0.00 0.00 14.61 14.61 15.64 15.63 0.09 - _ _ - 0.09 0.09 0.09 64.00 0.00 14.61 15.63 0.09 - - - - 0.09 64.08 0.00 14.61 15.62 0.09 - - - - 0.09 64.17 0.00 14.61 15.62 0.09 - - 0.09 64.25 0.00 14.61 15.61 _ _ 0.09 0.09 I Continues on next page... I THE KEYS Page 17 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (Cfs) (cfs) 64.33 0.00 14.61 15.61 0.09 - - - - 0.09 64.42 0.00 14.61 15.60 0.09 - - - - 0.09 64.50 0.00 14.61 15.59 0.09 - - - - 0.09 64.58 0.00 14.61 15.59 0.09 - - - - 0.09 64.67 0.00 14.61 15.58 0.09 - - 0.09 64.75 0.00 14.61 15.58 _ 0.09 _ 0.09 64.83 0.00 14.61 15.57 0.09 - - - - 0.09 ' 64.92 65.00 0.00 0.00 14.61 14.61 15.57 15.56 0.09 - _ 0.09 _ - 0.09 0.09 65.08 0.00 14.61 15.55 0.09 - - - - 0.09 65.17 0.00 14.61 15.55 0.09 - - - - 0.09 65.25 0.00 14.61 15.54 0.09 - - 0.09 65.33 0.00 14.61 15.54 _ 0.09 _ 0.09 65.42 0.00 14.61 15.53 0.09 - - - - 0.09 65.50 0.00 14.60 15.52 0.09 - - - 0.09 ' 65.58 0.00 14.60 15.52 0.09 - - 0.09 65.67 0.00 14.60 15.51 _ 0.09 _ 0.09 65.75 0.00 14.60 15.51 0.09 - - - - 0.09 65.83 65.92 0.00 0.00 14.60 14.60 15.50 15.50 0.09 - _ 0.09 _ - 0.09 0.09 66.00 0.00 14.60 15.49 0.09 - - - - 0.09 66.08 0.00 14.60 15.48 0.09 - - - - 0.09 1 66.17 0.00 14.60 15.48 0.09 - - 0.09 66.25 0.00 14.60 15.47 _ 0.09 _ 0.09 66.33 0.00 14.60 15.47 0.09 - - - - 0.09 66. 0.00 14.60 15.46 0.09 0.09 66.50 50 0.00 14.60 15.46 - _ 0.09 _ - 0.09 66.58 0.00 14.60 15.45 0.09 - - 0.09 66.67 0.00 14.60 15.45 0.09 - - - - 0.09 66.75 0.00 14.60 15.44 0.09 - - 0.09 ' 66.83 0.00 14.60 15.43 _ 0.09 _ 0.09 66.92 0.00 14.60 15.43 0.09 - - - - 0.09 67.00 0.00 14.60 15.42 0.09 - - - - 0.09 67.08 0.00 14.60 15.42 0.09 - - 0.09 67.17 0.00 14.60 15.41 _ 0.09 _ 0.09 67.25 0.00 14.60 15.41 0.09 - - - - 0.09 '67.33 67.42 0.00 0.00 14.59 14.59 15.40 15.39 0.09 - _ 0.09 _ - 0.09 0.09 67.50 0.00 14.59 15.39 0.09 - - - - 0.09 67.58 0.00 14.59 15.38 0.09 - - - - 0.09 67.67 0.00 14.59 15.38 0.09 - - 0.09 67.75 0.00 14.59 15.37 _ 0.09 _ 0.09 67.83 0.00 14.59 15.37 0.09 - - - - 0.09 6. 68.00 00 0.00 0.00 14.59 14.59 15.36 15.36 0.09 - _ 0.09 _ - 0.09 0.09 68.08 0.00 14.59 15.35 0.09 - 0.09 68.17 0.00 14.59 15.34 0.09 - - - - 0.09 68.25 0.00 14.59 15.34 0.09 - - 0.09 68.33 0.00 14.59 15.33 _ 0.09 _ 0.09 Continues on next page... THE KEYS Pape 78 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B CUIV. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (Cfs) (Cfs) Ids) (Cfs) (Cfs) (Cfs) 68.42 0.00 14.59 15.33 0.09 - - 0.09 68.50 0.00 14.59 15.32 _ _ 0.09 0.09 68.58 0.00 14.59 15.32 0.09 - - - - 0.09 68.67 0.00 14.59 15.31 0.08 - - - - 0.08 1 68.75 0.00 14.59 15.31 0.08 - - 0.08 68.83 0.00 14.59 15.30 _ _ 0.08 0.08 68.92 0.00 14.59 15.30 0.08 - - - - 0.08 ' 69.00 69.08 0.00 0.00 14.59 14.59 15.29 15.28 0.08 - _ _ - 0.08 0.08 0.08 69.17 0.00 14.59 15.28 0.08 - - - - 0.08 69.25 0.00 14.58 15.27 0.08 - - - - 0.08 69.33 0.00 14.58 15.27 0.08 - 0.08 69.42 0.00 14.58 15.26 = _ _ 0.08 0.08 69.50 0.00 14.58 15.26 0.08 - - - - 0.08 69. 0.00 14.58 15.25 0.08 0.08 69.67 67 0.00 14.58 15.25 _ _ - 0.08 0.08 69.75 0.00 14.58 15.24 0.08 - 0.08 69.83 0.00 14.58 15.24 0.08 - - - - 0.08 69.92 0.00 14.58 15.23 0.08 - - 0.08 70.00 0.00 14.58 15.22 _ _ 0.08 0.08 70.08 0.00 14.58 15.22 0.08 - - - - 0.08 70.17 0.00 14.58 15.21 0.08 - - - - 0.08 ' 70.25 0.00 14.58 15.21 0.08 - - 0.08 70.33 0.00 14.58 15.20 _ _ 0.08 0.08 70.42 0.00 14.58 15.20 0.08 - - - - 0.08 ' 70.5 70.58 0.00 0.00 14.58 14.58 15.19 15.19 0.08 - _ _ - 0.08 0.08 0,08 70.67 0.00 14.58 15.18 0.08 - - - 0.08 70.75 0.00 14.58 15.17 0.08 - - - - 0.08 70.83 0.00 14.58 15.17 0.08 - - 0.08 ' 70.92 0.00 14.58 15.16 _ _ 0.08 0.08 71.00 0.00 14.58 15.16 0.08 - - - - 0.08 71.08 0.00 14.58 15.15 0.08 - - - 0.08 71.17 0.00 14.58 15.15 0.08 - - 0.08 71.25 0.00 14.57 15.14 _ _ 0.08 0.08 71.33 0.00 14.57 15.14 0.08 - - - - 0.08 ' 71.42 71.50 0.00 0.00 14.57 14.57 15.13 15.12 0.08 - _ _ - 0.08 0.08 0.08 71.58 0.00 14.57 15.12 0.08 - - - - 0.08 71.67 0.00 14.57 15.11 0.08 - - - - 0.08 71.75 0.00 14.57 15.11 0.08 - - 0.08 I 71.83 0.00 14.57 15.10 _ _ 0.08 0.08 71.92 0.00 14.57 15.10 0.08 - - - - 0.08 72,00 72.08 0.00 0.00 14,57 14.57 15.09 15.09 0.08 - - - - 0.08 - - - - 0.08 0.08 72.17 0.00 14.57 15.08 0.08 - - - - 0.08 72.25 0.00 14.57 15.07 0.08 - - - - 0.08 72.33 0.00 14.57 15.07 0.08 - - 0.08 72.42 0.00 14.57 15.06 _ _ 0.08 0.08 ' Continues on next page... THE KEYS Page 78 Hydrograph Discharge Table Time Inflow Elevation Culv. A Culy. B Culy. C WeirA Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (cfs) (Cfs) (cfs) 72.50 0.00 14.57 15.06 0.08 - - 0.08 72.58 0.00 14.57 15.05 _ _ 0.08 0.08 72.67 0.00 14.57 15.05 0.08 - - - - 0.08 72.75 0.00 14.57 15.04 0.08 - - - - 0.08 ' 72.83 0.00 14.57 15.04 0.08 - - 0.08 72.92 0.00 14.57 15.03 _ _ 0.08 0.08 73.00 0.00 14.57 15.03 0.08 - - - - 0.08 I 73.011 73.17 0.00 0.00 14.57 14.57 15.02 15.01 0.08 - _ _ - 0.08 0.08 0.08 73.25 0.00 14.57 15.01 0.08 - - - - 0.08 73.33 0.00 14.56 15.00 0.08 - - - - 0.08 73.42 0.00 14.56 15.00 0.08 - - 0.08 73.50 0.00 14.56 14.99 _ _ 0.08 0.08 73.58 0.00 14.56 14.99 0.08 - - - - 0.08 73.67 0.00 14.56 14.98 0.08 - - - - 0.08 ' 73.75 0.00 14.56 14.98 0.08 - 0.08 73.83 0.00 14.56 14.97 _ _ 0.08 - 0.08 73.92 0.00 14.56 14.97 0.08 - - - - 0.08 74.00 74.08 0.00 0.00 14.56 14.50 14.96 14.96 0.08 - _ _ - 0.08 0.08 0.08 74.17 0.00 14.56 14.95 0.08 - - - - 0.08 74.25 0.00 14.56 14.94 0.08 - - - - 0.08 74.33 0.00 14.56 14.94 0.08 - 0.08 74.42 0.00 14.56 14.93 = _ _ 0.08 0.08 74.50 0.00 14.56 14.93 0.08 - - - - 0.08 74.58 0.00 14.56 14.92 0.08 - 0.08 '74.67 0.00 14.56 14.92 0.08 - - 0.08 74.75 0.00 14.56 14.91 _ _ 0.08 0.08 74.83 0.00 14.56 14.91 0.08 - - - - ' 0.08 74.92 75.00 0.00 0.00 14.56 14.56 14.90 14.90 0.08 - _ _ - 0.08 0.08 75.08 0.00 14.56 14.89 0.08 - - - - 0.08 0.08 75.17 0.00 14.56 14.89 0.08 - - - - 0.08 75.25 0.00 14.56 14.88 0.08 - - 0.08 75.33 0.00 14.56 14.88 _ _ 0.08 0.08 75.42 0.00 14.55 14.87 0.08 - - - - 0.08 '75.50 75.58 0.00 0.00 14.55 14.55 14.87 14.86 0.08 - _ _ - 0.08 0.08 0.08 75.67 0.00 14.55 14.86 0.08 - - - - 0.08 75.75 0.00 14.55 14.85 0.08 - - - - 0.08 75.83 0.00 14.55 14.84 0.08 - - 0.08 75.92 0.00 14.55 14.84 _ _ 0.08 0.08 76.00 0.00 14.55 14.83 0.08 - - - - 0.08 0.00 14.55 14.83 0.08 0.08 '76.17 76.17 0.00 14.55 14.82 - _ _ - 0.08 0.08 76.25 0.00 14.55 14.82 0.08 0.08 76.33 0.00 14.55 14.81 0.08 - - - - 0.08 76.42 76.50 0.00 0.00 14.55 14.55 14.81 0.08 - _ _ - 0.08 14.80 0.08 0.08 Continues on next page... I THE KEYS Hydrograph Discharge Table Page 20 Time Inflow Elevation Culv. A Culy. B CUIV. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (CIS) (cfs) (Cfs) (Cfs) (Cfs) (cfs) (cfs) 76.58 0.00 14.55 14.80 0.08 - - - - 0.08 76.67 0.00 14.55 14.79 0.08 - - - - 0.08 76.75 0.00 14.55 14.79 0.08 - - - - 0.08 76.83 0.00 14.55 14.78 0.08 - - - - 0.08 76.92 0.00 14.55 14.78 0.08 - - - - 0.08 77.00 0.00 14.55 14.77 0.07 - - - - 0.07 77.08 0.00 14.55 14.77 0.07 - - - - 0.07 77.17 0.00 14.55 14.76 0.07 - - - - 0.07 77.25 0.00 14.55 14.76 0.07 - - - - 0.07 77.33 0.00 14.55 14.75 0.07 - - - - 0.07 77.42 0.00 14.55 14.75 0.07 - - - - 0.07 77.50 0.00 14.55 14.74 0.07 - - - - 0.07 77.58 0.00 14.54 14.74 0.07 - - - - 0.07 77.67 0.00 14.54 14.73 0.07 - - - - 0.07 77.75 0.00 14.54 14.73 0.07 - - - - 0.07 77.83 0.00 14.54 14.72 0.07 - - - - 0.07 77.92 0.00 14.54 14.72 0.07 - - - - 0.07 78.00 0.00 14.54 14.71 0.07 - - - - 0.07 78.08 0.00 14.54 14.71 0.07 - - - - 0.07 78.17 0.00 14.54 14.70 0.07 - - - - 0.07 78.25 0.00 14.54 14.70 0.07 - - - - 0.07 78.33 0.00 14.54 14.69 0.07 - - - - 0.07 78.42 0.00 14.54 14.69 0.07 - - - - 0.07 78.50 0.00 14.54 14.68 0.07 - - - - 0.07 78.58 0.00 14.54 14.68 0.07 - - - - 0.07 78.67 0.00 14.54 14.67 0.07 - - - - 0.07 78.75 0.00 14.54 14.67 0.07 - - - - 0.07 78.83 0.00 14.54 14.66 0.07 - - - - 0.07 78.92 0.00 14.54 14.66 0.07 - - - - 0.07 79.00 0.00 14.54 14.65 0.07 - - - - 0.07 79.08 0.00 14.54 14.65 0.07 - - - - 0.07 79.17 0.00 14.54 14.64 0.07 - - - - 0.07 79.25 0.00 14.54 14.64 0.07 - - - - 0.07 79.33 0.00 14.54 14.63 0.07 - - - - 0.07 79.42 0.00 14.54 14.63 0.07 - - - - 0.07 79.50 0.00 14.54 14.62 0.07 - - - - 0.07 79.58 0.00 14.54 14.62 0.07 - - - - 0.07 79.67 0.00 14.54 14.61 0.07 - - - - 0.07 79.75 0.00 14.54 14.61 0.07 - - - - 0.07 79.83 0.00 14.53 14.60 0.07 - - - - 0.07 79.92 0.00 14.53 14.60 0.07 - - - - 0.07 80.00 0.00 14.53 14.59 0.07 - - - - 0.07 80.08 0.00 14.53 14.59 0.07 - - - - 0.07 80.17 0.00 14.53 14.58 0.07 - - - - 0.07 80.25 0.00 14.53 14.58 0.07 - - - - 0.07 80.33 0.00 14.53 14.57 0.07 - - - - 0.07 80.42 0.00 14.53 14.57 0.07 - - - - 0.07 80.50 0.00 14.53 14.56 0.07 - - - - 0.07 80.58 0.00 14.53 14.56 0.07 - - - - 0.07 Continues on next page... r I i THE KEYS Hydrograph Discharge Table Page 21 Time Inflow Elevation Culy. A Culy. B CUIV. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) Ids) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) 80.67 0.00 14.53 14.55 0.07 - - - - 0.07 80.75 0.00 14.53 14.55 0.07 - - - -- 0.07 80.83 0.00 14.53 14.54 0.07 - - - - 0.07 80.92 0.00 14.53 14.54 0.07 - - - - 0.07 81.00 0.00 14.53 14.54 0.07 - - - - 0.07 81.08 0.00 14.53 14.53 0.07 - - - - 0.07 81.17 0.00 14.53 14.53 0.07 - - - - 0.07 81.25 0.00 14.53 14.52 0.07 - - - - 0.07 81.33 0.00 14.53 14.52 0.07 - - - - 0.07 81.42 0.00 14.53 14.51 0.07 - - - - 0.07 81.50 0.00 14.53 14.51 0.07 - - - - 0.07 81.58 0.00 14.53 14.50 0.07 - - - - 0.07 81.67 0.00 14.53 14.50 0.07 - - - - 0.07 81.75 0.00 14.53 14.49 0.07 - - - - 0.07 81.83 0.00 14.53 14.49 0.07 - - - - 0.07 81.92 0.00 14.53 14.48 0.07 - - - - 0.07 82.00 0.00 14.53 14.48 0.07 - - - - 0.07 82.08 0.00 14.53 14.47 0.07 - - - - 0.07 82.17 0.00 14.52 14.47 0.07 - - - - 0.07 82.25 0.00 14.52 14.46 0.07 - - - - 0.07 82.33 0.00 14.52 14.46 0.07 - - - - 0.07 82.42 0.00 14.52 14.45 0.07 - - - - 0.07 82.50 0.00 14.52 14.45 0.07 - - - - 0.07 82.58 0.00 14.52 14.44 0.07 - - - - 0.07 82.67 0.00 14.52 14.44 0.07 - - - - 0.07 82.75 0.00 14.52 14.44 0.07 - - - - 0.07 82.83 0.00 14.52 14.43 0.07 - - - - 0.07 82.92 0.00 14.52 14.43 0.07 - - - - 0.07 83.00 0.00 14.52 14.42 0.07 - - - - 0.07 83.08 0.00 14.52 14.42 0.07 - - - - 0.07 83.17 0.00 14.52 14.41 0.07 - - - - 0.07 83.25 0.00 14.52 14.41 0.07 - - - - 0.07 83.33 0.00 14.52 14.40 0.07 - - - - 0.07 83.42 0.00 14.52 14.40 0.07 - - - - 0.07 83.50 0.00 14.52 14.39 0.07 - - - - 0.07 83.58 0.00 14.52 14.39 0.07 - - - - 0.07 83.67 0.00 14.52 14.38 0.07 - - - - 0.07 83.75 0.00 14.52 14.38 0.07 - - - - 0.07 83.83 0.00 14.52 14.37 0.07 - - - - 0.07 83.92 0.00 14.52 14.37 0.07 - - - - 0.07 84.00 0.00 14.52 14.36 0.07 - - - - 0.07 84.08 0.00 14.52 14.36 0.07 - - - - 0.07 84.17 0.00 14.52 14.35 0.07 - - - - 0.07 84.25 0.00 14.52 14.35 0.07 - - - - 0.07 84.33 0.00 14.52 14.35 0.07 - - - - 0.07 84.42 0.00 14.52 14.34 0.07 - - - - 0.07 84.50 0.00 14.52 14.34 0.07 - - - - 0.07 84.58 0.00 14.52 14.33 0.07 - - - - 0.07 84.67 0.00 14.51 14.33 0.07 - - - - 0.07 Continues on next page... r THE KEYS - Page 72 ' Hydrograph Discharge Table ' Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (cfs) (Cfs) 84.75 0.00 14.51 14.32 0.06 - - 0.06 ' 84.83 0.00 14.51 14.32 _ _ 0.06 0.06 84.92 0.00 14.51 14.31 0.06 - - - - 0.06 85.00 0.00 14.51 14.31 0.06 - - - - 0.06 ' 85.08 0.00 14.51 14.30 0.06 - - 0.06 85.17 0.00 14.51 14.30 _ _ 0.06 0.06 85.25 0.00 14.51 14.29 0.06 - - - - 0.06 85.33 85.42 0,00 0.00 14,51 14.51 14.29 14.28 0.00 - _ _ - 0.06 0.06 0.06 85.50 0.00 14.51 14.28 0.06 - - - - 0.06 85.58 0.00 14.51 14.28 0.06 - - - - 0.06 85.67 0.00 14.51 14.27 0.06 - - 0.06 85.75 0.00 14.51 14.27 _ _ 0.06 0.06 85.83 0.00 14.51 14.26 0.06 - - - - 0.06 85.92 0.00 14.51 14.26 0.06 - - - 0.06 ' 86.00 0.00 14.51 14.25 0.06 - - 0.06 86.08 0.00 14.51 14.25 _ _ 0.06 - 0.06 86.17 0.00 14.51 14.24 0.06 - - - - 0.06 86.25 86.33 0.00 0.00 14.51 14.51 14.24 14.23 0.06 - _ _ - 0.06 0.06 86.42 0.00 14.51 14.23 0.06 - - - - 0.06 0.06 86.50 0.00 14.51 14.23 0.06 - - - - 0.06 86.58 0.00 14.51 14.22 0.06 - - 0.06 86.67 0.00 14.51 14.22 _ _ 0.06 0.06 86.75 0.00 14.51 14.21 0.06 - - - - 0.06 86. 0.00 14.51 14.21 0.06 0.06 86.92 92 0.00 14.51 14.20 - _ _ - 0.06 006 87.00 0.00 14.51 14.20 0.06 - - 0.06 87.08 0.00 14.51 14.20 0.06 - - - - 0.06 87.17 0.00 14.51 14.19 0.06 - - 0.06 ' 87.25 0.00 14.50 14.19 _ _ 0.06 0.06 87.33 0.00 14.50 14.18 0.06 - - - - 0.06 87.42 0.00 14.50 14.18 0.06 - - - - 0.06 I 87.50 0.00 14.50 14.17 0.06 - - 0.06 87.58 0.00 14.50 14.17 _ _ 0.06 0.06 87.67 0.00 14.50 14.17 0.06 - - - - 0.06 87.75 87.83 0.00 0.00 14.50 14.50 14.16 14.16 0.06 - _ _ - 0.06 0.06 0.06 87.92 0.00 14.50 14.15 0.06 - - - - 0.06 88.00 0.00 14.50 14.15 0.06 - - - - 0.06 88.08 0.00 14.50 14.14 0.06 - - 0.06 88.17 0.00 14.50 14.14 _ _ 0.06 0.06 88.25 0.00 14.50 14.14 0.06 - - - - 0.06 88. 88.42 42 0.00 0.00 14.50 14.50 14.13 14.13 0.06 - _ _ - 0.06 0.06 0,06 88.50 0.00 14.50 14.12 0.06 - - - 0.06 88.58 0.00 14.50 14.12 0.06 - - - - 0.06 88.67 0.00 14.50 14.11 0.06 - - 0.06 88.75 0.00 14.50 14.11 _ _ 0.06 0.06 Continues on next page... THE KEYS Hydrograph Discharge Table Page 23 Time Inflow Elevation Culy. A Culv. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) Ids) (cfs) Ids) (cfs) 88.83 0.00 14.50 14.11 0.06 - - - - 0.06 88.92 0.00 14.50 14.10 0.06 - - - - 0.06 89.00 0.00 14.50 14.10 0.06 - - - - 0.06 89.08 0.00 14.50 14.09 0.06 - - - - 0.06 89.17 0.00 14.50 14.09 0.06 - - - 0.06 89.25 0.00 14.50 14.09 0.06 - - - - 0.06 89.33 0.00 14.50 14.08 0.06 - - - - 0.06 89.42 0.00 14.50 14.08 0.06 - - - - 0.06 89.50 0.00 14.50 14.07 0.06 - - - - 0.06 89.58 0.00 14.50 14.07 0.06 - - - - 0.06 89.67 0.00 14.50 14.07 0.06 - - - - 0.06 89.75 0.00 14.50 14.06 0.06 - - - 0.06 89.83 0.00 14.50 14.06 0.06 - - - - 0.08 89.92 0.00 14.50 14.05 0.05 - - - - 0.05 90.00 0.00 14.50 14.05 0.05 - - - - 0.05. 90.08 0.00 14.50 14.05 0.05 - - - - 0.05 90.17 0.00 14.49 14.04 0.05 - - - - 0.05 90.25 0.00 14.49 14.04 0.05 - - - - 0.05 90.33 0.00 14.49 14.03 0.05 - - - - 0.05 90.42 0.00 14.49 14.03 0.05 - - - - 0.05 90.50 0.00 14.49 14.03 0.05 - - - - 0.05 90.58 0.00 14.49 14.02 0.05 - - - - 0.05 90.67 0.00 14.49 14.02 0.05 - - - - 0.05 90.75 0.00 14.49 14.02 0.05 - - - - 0.05 90.83 0.00 14.49 14.01 0.05 - - - - 0.05 90.92 0.00 14.49 14.01 0.05 - - - - 0.05 91.00 0.00 14.49 14.00 0.05 - - - - 0.05 91.08 0.00 14.49 14.00 0.05 - - - - 0.05 91.17 0.00 14.49 14.00 0.05 - - - - 0.05 91.25 0.00 14.49 13.99 0.05 - - - - 0.05 91.33 0.00 14.49 13.99 0.05 - - - - 0.05 91.42 0.00 14.49 13.98 0.05 - - - - 0.05 91.50 0.00 14.49 13.98 0.05 - - - - 0.05 91.58 0.00 14.49 13.98 0.05 - - - - 0.05 91.67 0.00 14.49 13.97 0.05 - - - - 0.05 91.75 0.00 14.49 13.97 0.05 - - - - 0.05 91.83 0.00 14.49 13.97 0.05 - - - - 0.05 91.92 0.00 14.49 13.96 0.05 - - - - 0.05 92.00 0.00 14.49 13.96 0.05 - - - - 0.05 92.08 0.00 14.49 13.95 0.05 - - - - 0.05 92.17 0.00 14.49 13.95 0.05 - - - - 0.05 92.25 0.00 14.49 13.95 0.05 - - - - 0.05 92.33 0.00 14.49 13.94 0.05 - - - - 0.05 92.42 0.00 14.49 13.94 0.05 - - - - 0.05 92.50 0.00 14.49 13.94 0.05 - - - - 0.05 92.58 0.00 14.49 13.93 0.05 - - - - 0.05 92.67 0.00 14.49 13.93 0.05 - - - - 0.05 92.75 0.00 14.49 13.93 0.05 - - - - 0.05 92.83 0.00 14.49 13.92 0.05 - - - - 0.05 Continues on next page... ' THE KEYS Page 24 Hydrograph Discharge Table Time Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (cfs) (Cfs) 92.92 0.00 14.49 13.92 0.05 - - 0.05 93.00 0.00 14.49 13.91 _ 0.05 _ 0.05 93.08 0.00 14.49 13.91 0.05 - - - - 0.05 93.17 0.00 14.49 13.91 0.05 - - - 0.05 ' 93.25 0.00 14.49 13.90 0.05 - - 0.05 93.33 0.00 14.48 13.90 _ 0.05 _ 0.05 93.42 0.00 14.48 13.90 0.05 - - - - 0.05 93.50 93.58 0.00 0.00 14.48 14.48 13.89 13.89 0.05 - _ 0.05 _ - 0.05 0.05 93.67 0.00 14.48 13.89 0.05 - - - - 0.05 93.75 0.00 14.48 13.88 0.05 - - - - 0.05 93.83 0.00 14.48 13.88 0.05 - - 0.05 ' 93.92 0.00 14.48 13.88 _ 0.05 _ 0.05 94.00 0.00 14.48 13.87 0.05 - - - - 0.05 94.08 0.00 14.48 13.87 0.05 - 0.05 94.17 0.00 14.48 13.87 0.05 - - 0.05 94.25 0.00 14.48 13.86 _ 0.05 _ - 0.05 94.33 0.00 14.48 13.86 0.05 - - - - 0.05 94.42 0.00 14.48 13.86 0.05 - - 0.05 94.50 0.00 14.48 13.85 _ 0.05 _ 0.05 94.58 0.00 14.48 13.85 0.05 - - - - 0.05 94.67 0.00 14.48 13.85 0.05 - - - - 0.05 1 94.75 0.00 14.48 13.84 0.05 - - 0.05 94.83 0.00 14.48 13.84 _ 0.05 _ 0.05 94.92 0.00 14.48 13.84 0.05 - - - - 0.05 95.00 95.08 0.00 0.00 14.48 14.48 13.83 13.83 0.05 - _ 0.05 _ - 0.05 0.05 95.17 0.00 14.48 13.82 0.05 - - - - 0.05 95.25 0.00 14.48 13.82 0.05 - - - - 0.05 95.33 0.00 14.48 13.82 0.05 - - 0.05 ' 95.42 0.00 14.48 13.81 _ 0.05 _ 0.05 95.50 0.00 14.48 13.81 0.05 - - - - 0.05 95.58 0.00 14.48 13.81 0.05 - - - - 0.05 95.67 0.00 14.48 13.81 0.05 - 0.05 95.75 0.00 14.48 13.80 _ 0.05 _ _ 0.05 95.83 0.00 14.48 13.80 0.05 - - - - 0.05 95.92 96.00 0.00 0.00 14.48 14.48 13.80 13.79 0.05 - _ 0.05 _ - 0.05 0.05 96.08 0.00 14.48 13.79 0.04 - - - - 0.04 96.17 0.00 14.48 13.79 0.04 - - - - 0.04 ' 96.25 0.00 14.48 13.78 0.04 - 0.04 96.33 0.00 14.48 13.78 0.04 - - - 0.04 96.42 0.00 14.48 13.78 0.04 - - - - 0.04 96.50 96.58 0.00 0.00 14.48 14.48 13.77 13.77 0.04 - _ 0.04 _ - 0.04 0.04 96.67 0.00 14.48 13.77 0.04 - - - - 0.04 96.75 0.00 14.48 13.76 0.04 - - - - 0.04 0.00 14.48 13.76 0.04 - 0.04 '96.83 96.92 0.00 14.47 13.76 _ 0.04 _ = 0.04 rContinues on next page... r I THE KEYS ' Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (cfs) ' 97.00 97.08 0.00 0.00 14.47 14.47 13.75 13.75 0.04 - _ _ - 0.04 0.04 0.04 97.17 0.00 14.47 13.75 0.04 - - - - 0.04 97.25 0.00 14.47 13.74 0.04 - - - - 0_04 ' 97.33 0.00 14.47 13.74 0.04 - - 0.04 97.42 0.00 14.47 13:74 _ _ 0.04 0.04 97.50 0.00 14.47 13.73 0.04 - - - - 0.04 97.58 97.67 0.00 0.00 14.47 14.47 13.73 13.73 0.04 - _ _ - 0.04 0.04 97.75 0.00 14.47 13.73 0.04 - - - - 0.04 0.04 97.83 0.00 14.47 13.72 0.04 - - - - 0.04 97.92 0.00 14.47 13.72 0.04 - - 0.04 98.00 0.00 14.47 13.72 _ _ 0.04 0.04 98.08 0.00 14.47 13.71 0.04 - - - - 0.04 98.17 0.00 14.47 13.71 0.04 - - - - 0.04 ' 98.25 0.00 14.47 13.71 0.04 - . - 0.04 98.33 0.00 14.47 13.70 _ _ 0.04 0 04 98.42 0.00 14.47 13.70 0.04 - - - - 0.04 ' 98.50 98.58 0.00 0.00 14.47 14.47 13.70 13.70 0.04 - _ _ - 0.04 0.04 0.04 98.67 0.00 14.47 13.69 0.04 - - - - 0.04 98.75 0.00 14.47 13.69 0.04 - - - - 0.04 98.83 0.00 14.47 13.69 0.04 - 0.04 98.92 0.00 14.47 13.68 _ 0.04 _ _ 0_04 99.00 0.00 14.47 13.68 0.04 - - - - 0.04 99.08 0.00 14.47 13.68 0.04 0.04 99.17 0.00 14.47 13.67 0.04 - - 0.04 99.25 0.00 14.47 13.67 _ _ 0.04 - 0.04 99.33 0.00 14.47 13.67 0.04 - - - - 0.04 99.42 99.50 0.00 0.00 14.47 14.47 13.67 13.66 0.04 - _ _ - 0.04 0.04 0.04 99.58 0.00 14.47 13.66 0.04 - - - - 0.04 99.67 0.00 14.47 13.66 0.04 - - - - 0.04 0.00 14.47 13.65 0.04 - - 0.04 '99.75 99.83 0.00 14.47 13.65 _ _ 0.04 0.04 99.92 0.00 14.47 13.65 0.04 - - - - 0.04 '100.00 100.08 0.00 0.00 14.47 14.47 13.65 13.64 0.04 - _ _ - 0.04 0.04 100.17 0.00 14.47 13.64 0.04 - - - - 0.04 0.04 100.25 0.00 14.47 13.64 0.04 - - - - 0.04 100.33 0.00 14.47 13.63 0.04 - - 0.04 100.42 0.00 14.47 13.63 _ _ 0.04 0.04 100.50 0.00 14.47 13.63 0.04 - - - - 0.04 100.58 0.00 14.47 13.63 0.04 0.04 100.67 0.00 14.47 13.62 0.04 - - 0.04 100.75 0.00 14.47 13.62 _ _ 0.04 - 0.04 100.83 0.00 14.47 13.62 0.04 - - - - 0.04 0.00 14.46 13.62 0.04 - - 0.04 '100.92 101.00 0.00 14.46 13.61 _ _ 0.04 0.04 Continues on next page... I THE KEYS Page 26 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) 101.08 0.00 14.46 13.61 0.04 - - 0.04 ' 101.17 0.00 14.46 13.61 _ _ 0.04 0.04 101.25 0.00 14.46 13.60 0.04 - - - - 0.04 101.33 0.00 14.46 13.60 0.04 - - - _ 0.04 101.42 0.00 14.46 13.60 0.04 - - 0.04 101.50 0.00 14.46 13.60 _ _ 0.04 0.04 101.58 0.00 14.46 13.59 0.04 - - - - 0.04 101.67 101.75 0.00 0.00 14.46 14.46 13.59 13.59 0.04 - _ _ - 0.04 0.04 0.04 101.83 0.00 14.46 13.59 0.04 - - - - 0.04 101.92 0.00 14.46 13.58 0.04 - - - _ 0.04 102.00 0.00 14.46 13.58 0.04 - - 0.04 1 102.08 0.00 14.46 13.58 _ _ 0.04 0.04 102.17 0.00 14.46 13.57 0.04 - - - - 0,04 102.25 0.00 14.46 13.57 0.04 - - - - 0.04 102.33 0.00 14.46 13.57 0.04 - 0.04 102.42 0.00 14.46 13.57 _ _ = 0.04 0.04 102.50 0.00 14.46 13.56 0.04 - - - - 0.04 ' 102.58 102.67 0.00 0.00 14.46 14.46 13.56 13.56 0.04 - _ _ - 0.04 0.04 0_04 102.75 0.00 14.46 13.56 0.04 - - - - 0.04 102.83 0.00 14.46 13.55 0.04 - - - - 0.04 102.92 0.00 14.46 13.55 0.04 - - 0.04 ' 103.00 0.00 14.46 13.55 _ _ 0.04 0.04 103.08 0.00 14.46 13.55 0.04 - - - - 0.04 103.17 0.00 14.46 13.54 0.04 0.04 ' 103.25 0.00 14.46 13.54 0.04 - - - 0.04 103.33 0.00 14.46 13.54 _ 0.04 - - 0.04 103.42 0.00 14.46 13.53 0.04 - - - - 0.04 103.50 0.00 14.46 13.53 0.04 - - 0.04 ' 103.58 0.00 14.46 13.53 _ _ 0.04 0.04 103.67 0.00 14.46 13.53 0.03 - - - - 0.03 103.75 0.00 14.46 13.52 0.03 - - - - 0.03 ' 103.83 0.00 14.46 13.52 0.03 - - 0.03 103.92 0.00 14.46 13.52 _ _ 0.03 0.03 104.00 0.00 14.46 13.52 0.03 - - - - 0.03 104.08 104.17 0.00 0.00 14.46 14.46 13.51 13.51 0.03 - _ _ - 0.03 0.03 0.03 104.25 0.00 14.46 13.51 0.03 - - - - 0.03 104.33 0.00 14.46 13.51 0.03 - - - - 0.03 104.42 0.00 14.46 13.50 0.03 - - 0.03 104.50 0.00 14.46 13.50 _ _ 0.03 0.03 104.58 0.00 14.46 13.50 0.03 - - - - 0.03 '104. 104.75 75 0.00 0.00 14.46 14.46 13.49 13.49 0.03 - _ _ - 0.03 0.03 0.03 104.83 0.00 14.46 13.49 0.03 - - 0.03 104.92 0.00 14.46 13.49 0.03 - - - - 0.03 0.00 14.46 13.48 0.03 - - 0.03 '105.00 105.08 0.00 14.46 13.48 _ _ 0.03 0.03 Continues on next page... I [1 I THE KEYS page 27 Hydrograph Discharge Table Time Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) 105.17 0.00 14.46 13.48 0.03 - - - - 0.03 105.25 0.00 14.46 13.48 0.03 - - - - 0.03 105.33 0.00 14.46 13.47 0.03 - - - - 0.03 105.42 0.00 14.46 13.47 0.03 - - - - 0.03 105.50 0.00 14.46 13.47 0.03 - - - - 0.03 105.58 0.00 14.45 13.47 0.03 - - - - 0.03 105.67 0.00 14.45 13.46 0.03 - - - - 0.03 105.75 0.00 14.45 13.46 0.03 - - - - 0.03 105.83 0.00 14.45 13.46 0.03 - - - - 0.03 105.92 0.00 14.45 13.46 0.03 - - - - 0.03 106.00 0.00 14.45 13.45 0.03 - - - - 0.03 106.08 0.00 14.45 13.45 0.03 - - - - 0.03 106.17 0.00 14.45 13.45 0.03 - - - - 0.03 106.25 0.00 14.45 13.45 0.03 - - - - 0.03 106.33 0.00 14.45 13.44 0.03 - - - - 0.03 106.42 0.00 14.45 13.44 0.03 - - - - 0.03 106.50 0.00 14.45 13.44 0.03 - - - - 0.03 106.58 0.00 14.45 13.44 0.03 - - - - 0.03 106.67 0.00 14.45 13.43 0.03 - - - - 0.03 106.75 0.00 14.45 13.43 0.03 - - - - 0.03 106.83 0.00 14.45 13.43 0.03 - - - - 0.03 106.92 0.00 14.45 13.43 0.03 - - - - 0.03 107.00 0.00 14.45 13.42 0.03 - - - - 0.03 107.08 0.00 14.45 13.42 0.03 - - - - 0.03 107.17 0.00 14.45 13.42 0.03 - - - - 0.03 107.25 0.00 14.45 13.42 0.03 - - - - 0.03 107.33 0.00 14.45 13.42 0.03 - - - - 0.03 107.42 0.00 14.45 13.41 0.03 - - - - 0.03 107.50 0.00 14.45 13.41 0.03 - - - - 0.03 107.58 0.00 14.45 13.41 0.03 - - - - 0.03 107.67 0.00 14.45 13.41 0.03 - - - - 0.03 107.75 0.00 14.45 13.40, 0.03 - - - - 0.03 107.83 0.00 14.45 13.40 0.03 - - - - 0.03 107.92 0.00 14.45 13.40 0.03 - - - - 0.03 108.00 0.00 14.45 13.40 0.03 - - - - 0.03 108.08 0.00 14.45 13.39 0.03 - - - - 0.03 108.17 0.00 14.45 13.39 0.03 - - - - 0.03 108.25 0.00 14.45 13.39 0.03 - - - - 0.03 108.33 0.00 14.45 13.39 0.03 - - - - 0.03 108.42 0.00 14.45 13.39 0.03 - - - - 0.03 108.50 0.00 14.45 13.38 0.03 - - - - 0.03 108.58 0.00 14.45 13.38 0.03 - - - - 0.03 108.67 0.00 14.45 13.38 0.03 - - - - 0.03 108.75 0.00 14.45 13.38 0.03 - - - - 0.03 108.83 0.00 14.45 13.37 0.03 - - - - 0.03 108.92 0.00 14.45 13.37 0.03 - - - - 0.03 109.00 0.00 14.45 13.37 0.03 - - - - 0.03 109.08 0.00 14.45 13.37 0.03 - - - - 0.03 109.17 0.00 14.45 13.37 0.03 - - - - 0.03 Continues on next page... THE KEYS L 11 Hydrograph Discharge Table Page 28 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (cfs) 109.25 0.00 14.45 13.36 0.03 - - - - 0.03 109.33 0.00 14.45 13.36 0.03 - - - - 0.03 109.42 0.00 14.45 13.36 0.03 - - - - 0.03 109.50 0.00 14.45 13.36 0.03 - - - - 0.03 109.58 0.00 14.45 13.35 0.03 - - - - 0.03 109.67 0.00 14.45 13.35 0.03 - - - - 0.03 109.75 0.00 14.45 13.35 0.03 - - - - 0.03 109.83 0.00 14.45 13.35 0.03 - - - - 0.03 109.92 0.00 14.45 13.35 0.03 - - - - 0.03 110.00 0.00 14.45 13.34 0.03 - - - - 0.03 110.08 0.00 14.45 13.34 0.03 - - - - 0.03 110.17 0.00 14.45 13.34 0.03 - - - - 0.03 110.25 0.00 14.45 13.34 0.03 - - - - 0.03 110.33 0.00 14.45 13.33 0.03 - - - - 0.03 110.42 0.00 14.45 13.33 0.03 - - - - 0.03 110.50 0.00 14.45 13.33 0.03 - - - - 0.03 110.58 0.00 14.45 13.33 0.03 - - - - 0.03 110.67 0.00 14.45 13.33 0.03 - - - - 0.03 110.75 0.00 14.45 13.32 0.03 - - - - 0.03 110.83 0.00 14.45 13.32 0.03 - - - - 0.03 110.92 0.00 14.45 13.32 0.03 - - - - 0.03 111.00 0.00 14.45 13.32 0.03 - - - - 0.03 111.08 0.00 14.44 13.32 0.03 - - - - 0.03 111.17 0.00 14.44 13.31 0.03 - - - - 0.03 111.25 0.00 14.44 13.31 0.03 - - - - 0.03 111.33 0.00 14.44 13.31 0.03 - - - - 0.03 111.42 0.00 14.44 13.31 0.03 - - - - 0.03 111.50 0.00 14.44 13.31 0.03 - - - - 0.03 111.58 0.00 14.44 13.30 0.03 - - - - 0.03 111.67 0.00 14.44 13.30 0.03 - - - - 0.03 111.75 0.00 14.44 13.30 0.03 - - - - 0.03 111.83 0.00 14.44 13.30 0.03 - - - - 0.03 111.92 0.00 14.44 13.30 0.03 - - - - 0.03 112.00 0.00 14.44 13.29 0.03 - - - - 0.03 112.08 0.00 14.44 13.29 0.03 - - - - 0.03 112.17 0.00 14.44 13.29 0.03 - - - - 0.03 112.25 0.00 14.44 13.29 0.03 - - - - 0.03 112.33 0.00 14.44 13.29 0.03 - - - - 0.03 112.42 0.00 14.44 13.28 0.03 - - - - 0.03 112.50 0.00 14.44 13.28 0.03 - - - - 0.03 112.58 0.00 14.44 13.28 0.03 - - - - 0.03 112.67 0.00 14.44 13.28 0.03 - - - - 0.03 112.75 0.00 14.44 13.28 0.03 - - - - 0.03 112.83 0.00 14.44 13.27 0.03 - - - - 0.03 112.92 0.00 14.44 13.27 0.03 - - - - 0.03 113.00 0.00 14.44 13.27 0.02 - - - - 0.02 113.08 0.00 14.44 13.27 0.02 - - - - 0.02 113.17 0.00 14.44 13.27 0.02 - - - - 0.02 113.25 0.00 14.44 13.26 0.02 - - - - 0.02 Continues on next page... THE KEYS Hydrograph Discharge Table Page 29 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 113.33 0.00 14.44 13.26 0.02 - - - - 0.02 113.42 0.00 14.44 13.26 0.02 - - - - 0.02 113.50 0.00 14.44 13.26 0.02 - - - - 0.02 113.58 0.00 14.44 13.26 0.02 - - - - 0.02 113.67 0.00 14.44 13.26 0.02 - - - - 0.02 113.75 0.00 14.44 13.25 0.02 - - - - 0.02 113.83 0.00 14.44 13.25 0.02 - - - - 0.02 113.92 0.00 14.44 13.25 0.02 - - - - 0.02 114.00 0.00 14.44 13.25 0.02 - - - - 0.02 114.08 0.00 14.44 13.25 0.02 - - - - 0.02 114.17 0.00 14.44 13.24 0.02 - - - - 0.02 114.25 0.00 14.44 13.24 0.02 - - - - 0.02 114.33 0.00 14.44 13.24 0.02 - - - - 0.02 114.42 0.00 14.44 13.24 0.02 - - - - 0.02 114.50 0.00 14.44 13.24 0.02 - - - - 0.02 114.58 0.00 14.44 13.23 0.02 - - - - 0.02 114.67 0.00 14.44 13.23 0.02 - - - - 0.02 114.75 0.00 14.44 13.23 0.02 - - - - 0.02 . 114.83 0.00 14.44 13.23 0.02 - - - - 0.02 114.92 0.00 14.44 13.23 0.02 - - - - 0.02 115.00 0.00 14.44 13.23 0.02 - - - - 0.02 115.08 0.00 14.44 13.22 0.02 - - - - 0.02 115.17 0.00 14.44 13.22 0.02 - - - - 0.02 115.25 0.00 14.44 13.22 0.02 - - - - 0.02 115.33 0.00 14.44 13.22 0.02 - - - - 0.02 115.42 0.00 14.44 13.22 0.02 - - - - 0.02 115.50 0.00 14.44 13.22 0.02 - - - - 0.02 115.58 0.00 14.44 13.21 0.02 - - - - 0.02 115.67 0.00 U." 13.21 0.02 - - - - 0.02 115.75 0.00 14.44 13.21 0.02 - - - - 0.02 115.83 0.00 14.44 13.21 0.02 - - - - 0.02 115.92 0.00 14.44 13.21 0.02 - - - - 0.02 116.00 0.00 U." 13.20 0.02 - - - - 0.02 116.08 0.00 14.44 13.20 0.02 - - - - 0.02 116.17 0.00 14.44 13.20 0.02 - - - - 0.02 116.25 0.00 14.44 13.20 0.02 - - - - 0.02 116.33 0.00 14.44 13.20 0.02 - - - - 0.02 116.42 0.00 14.44 13.20 0.02 - - - - 0.02 116.50 0.00 14.44 13.19 0.02 - - - - 0.02 116.58 0.00 14.44 13.19 0.02 - - - - 0.02 116.67 0.00 14.44 13.19 0.02 - - - - 0.02 116.75 0.00 14.44 13.19 0.02 - - - - 0.02 116.83 0.00 14.44 13.19 0.02 - - - - 0.02 116.92 0.00 14.44 13.19 0.02 - - - - 0.02 117.00 0.00 U." 13.18 0.02 - - - - 0.02 117.08 0.00 14.44 13.18 0.02 - - - - 0.02 117.17 0.00 14.44 13.18 0.02 - - - - 0.02 117.25 0.00 14.44 13.18 0.02 - - - - 0.02 117.33 0.00 14.44 13.18 0.02 - - - - 0.02 Continues on next page... THE KEYS Page 30 Hydrograph Discharge Table ' Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (cfs) (cfs) (Cfs) (Cfs) (Cfs) 117.42 0.00 14.44 13.18 0.02 - - 0.02 ' 117.50 0.00 14.44 13.17 _ _ 0.02 0.02 117.58 0.00 14.44 13.17 0.02 - - - - 0.02 117.67 0.00 14.44 13.17 0.02 - - - - 0.02 117.75 0.00 14.44 13.17 0.02 - - 0.02 ' 117.83 0.00 14.44 13.17 _ _ 0.02 0.02 117.92 0.00 14.44 13.17 0.02 - - - - 0.02 ' 118.0 118.08 0.00 0.00 14.44 14.43 13.16 13.16 0.02 - _ _ - 0.02 0.02 0.02 118.17 0.00 14.43 13.16 0.02 0.02 118.25 0.00 14.43 13.16 0.02 - - - - 0.02 118.33 0.00 14.43 13.16 0.02 - - 0.02 118.42 0.00 14.43 13.16 _ _ 0.02 0.02 118.50 0.00 14.43 13.16 0.02 - - - - 0.02 118.58 0.00 14.43 13.15 0.02 - - - - 0.02 ' 118.67 0.00 14.43 13.15 0.02 - - 0.02 118.75 0.00 14.43 13.15 _ _ 0.02 0.02 118.83 0.00 14.43 13.15 0.02 - - - - 0.02 . 118,92 119.00 0,00 0.00 14,43 14.43 13.15 13.15 0.02 - _ _ - 0.02 0.02 0.02 119.08 0.00 14.43 13.14 0.02 - - - - 0.02 119.17 0.00 14.43 13.14 0.02 - - - - 0.02 119.25 0.00 14.43 13.14 0.02 - - 0.02 ' 119.33 0.00 14.43 13.14 _ _ 0.02 0.02 119.42 0.00 14.43 13.14 0.02 - - - - 0.02 119.5 0.00 14.43 13.14 0.02 0.02 119.58 0.00 14.43 13.13 = _ _ - 0.02 0.02 119.67 0.00 14.43 13.13 0.02 0.02 119.75 0.00 14.43 13.13 0.02 - - - - 0.02 ' 119.83 119.92 0.00 0.00 14.43 14.43 13.13 13.13 0.02 - _ _ - 0.02 0.02 0.02 120.00 0.00 14.43 13.13 0.02 - - - - 0.02 ' ...End 1 Reservoir Report _ Page t Reservoir No. 1 ' THE KEYS Culvert / Orifice Structures Weir Structures [A] [B] [C] [A] [B] [C] Rise (in) = 36.0 3.3 0.0 Crest Len (ft) = 12.6 0.0 0.0 Span (in) = 36.0 3.3 0.0 Crest El. (ft) = 16.90 0.00 0.00 ' No. Barrels = 1 1 Invert El. (ft) = 14.00 14.40 0 0.00 Weir Coeff. Eqn. Exp. = 3.00 3.00 = 1.50 1.50 3.00 1.50 Length (ft) = 292.0 1.0 0.0 Multistage = Yes No No Slope (%) = 0.40 1.00 0.00 ' N-Value = .023 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 Multistage = - Yes No Tailwater Elevation = 14.00 it Note: All aNlow h . been enely[etl untkr inM eld Mkt cmtrd. Stage / Storage / Discharge Table ' Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cult) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 0.0 00 14.00 0.00 0.00 - 0.00 - - 0.00 0.0 01 14.04 3.94 0.00 0.00 0.00 0.1 02 14.08 5.58 0.00 - 0.00 - - 0.00 0.1 03 14.12 6.83 0.00 - 0.00 - - 0.00 0.2 04 14.16 7.89 0.00 - 0.00 - - 0.00 ' 0.2 06 14.19 8.82 0.00 0.00 0.00 0.2 07 14.23 9.66 0.00 - 0.00 - - 0.00 ' 0.3 08 14.27 0.3 09 14.31 10.43 11.16 0.00 0.00 - 0.00 0.00 _ _ 0.00 0.00 0.4 10 14.35 11.83 0.00 0.00 - - 0.00 0.4 11 14.39 12.47 0.00 - 0.00 - - 0.00 0.4 40 14.39 12.49 0.00 - 0.00 - 0.00 ' 0.4 68 14.39 12.50 0.00 0.00 _ 0.00 0.4 97 14.39 12.52 0.00 - 0.00 - - 0.00 0.4 125 14.39 12.54 0.00 - 0.00 - - 0.00 0.4 154 14.40 12.55 0.00 - 0.00 - - 0.00 0.4 183 14.40 12.57 0.00 0.00 0.00 0.4 211 14.40 12.58 0.00 - 0.00 - - 0.00 ' 0.4 240 14.40 0.4 268 14.40 12.60 12.62 0.00 0.00 - 0.00 0.00 - _ 0.00 0.00 0.4 297 14.40 12.63 0.00 - 0.00 - - 0.00 0.5 3,857 14.46 13.55 0.04 - 0.00 - - 0.04 0.5 7,418 14.52 14.40 0.07 0.00 - 0.07 0.6 10,978 14.58 15.21 0.08 _ 0.00 = 0.08 11 Continues on next page... I ' THE KEYS 1 I7 L� I I 11 1 Stage / Storage / Discharge Table Page 2 Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cuft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 0.6 14,538 14.64 15.98 0.10 - 0.00 - - 0.10 0.7 18,099 14.70 16.71 0.11 - 0.00 - - 0.11 0.8 21,659 14.76 17.41 0.13 - 0.00 - - 0.13 0.8 25,219 14.82 18.08 0.14 - 0.00 - - 0.14 0.9 28,779 14.88 18.73 0.16 - 0.00 - - 0.16 0.9 32,340 14.94 19.36 0.18 - 0.00 - - 0.18 1.0 35,900 15.00 19.97 0.19 - 0.00 - - 0.19 1.1 42,396 15.10 20.95 0.21 - 0.00 - - 0.21 1.2 48,892 15.20 21.58 0.23 - 0.00 - - 0.23 - 1.3 55,388 15.30 27.44 0.24 - 0.00 - - 0.24 1.4 61,884 15.40 28.48 0.26 - 0.00 - - 0.26 1.5 68,381 15.50 29.48 0.27 - 0.00 - - 0.27 1.6 74,877 15.60 30.44 0.29 - 0.00 - - 0.29 1.7 81,373 15.70 31.38 0.30 - 0.00 - - 0.30 1.8 87,869 15.80 32.29 0.31 - 0.00 - - 0.31 1.9 94,365 15.90 33.17 0.32 - 0.00 - - 0.32 2.0 100,861 16.00 34.04 0.34 - 0.00 - - 0.34 2.1 108,093 16.10 34.88 0.35 - 0.00 - - 0.35 2.2 115,325 16.20 35.70 0.36 - 0.00 - - 0.36 2.3 122,558 16.30 36.50 0.37 - 0.00 - - 0.37 2.4 129,790 16.40 37.28 0.38 - 0.00 - - 0.38 2.5 .137,022 16.50 38.05 0.39 - 0.00 - - 0.39 2.6 144,254 16.60 38.81 0.40 - 0.00 - - 0.40 2.7 151,486 16.70 39.55 0.41 - 0.00 - - 0.41 2.8 158,719 16.80 40.27 0.42 - 0.00 - - 0.42 2.9 165,951 16.90 40.98 0.43 - 0.00 - - 0.43 3.0 173,183 17.00 41.68 0.44 - 1.19 - - 1.63 3.1 181,287 17.10 43.05 0.44 - 3.37 - - 3.82 3.2 189,390 17.20 44.37 0.45 - 6.20 - - 6.65 3.3 197,494 17.30 45.66 0.46 - 9.54 - - 10.00 3.4 205,597 17.40 46.91 0.47 - 13.33 - - 13.80 3.5 213,701 17.50 48.13 0.48 - 17.53 - - 18.00 3.6 221,805 17.60 49.32 0.46 - 22.09 - - 22.55 3.7 229,908 17.70 50.48 0.44 - 26.98 - - 27.42 3.8 238,012 17.80 51.61 0.44 - 32.20 - - 32.64 3.9 246,115 17.90 52.72 0.40 - 37.71 - - 38.11 4.0 254,219 18.00 53.81 0.34 - 43.51 - - 43.84 11 [1 1 1 STORMWATER CALCULATIONS FOR I► Ili i 1 YI► : 1► 1 y FROM ' KURE DUNES PHASE IV, THE KEYS & KURE BEACH VILLAGE I 1 rl 1 II u 4 1 35 ` O ;ar 9��EC NE D �S0i I Legend Runoff Combined Channel Reach Pond Route Proj. file: 1 lNCH2.GPW I OF file: WILM.IDF 1 14 hydrographs 1 07-18-1997 Hydrograph Report Page , Hyd. No. 8 1-INCH STORM KURE DUNES PH IV Hydrograph type = Manual Peak discharge = 21.32 cfs Storm frequency = 10 yrs Time interval = 5 min Total Volume - 12.792 cult, 0.294 SO Hydrograph Discharge Table Time -- Outflow (hrs cfs) 0.08 21.32 << 0.17 21.32 << ...End 1 Hydrograph Report Page' 1 Hyd. No. 10 1 KURE DUNES 1 Hydrograph type Storm frequency = Reservoir = 10 yrs Peak discharge Time interval = 0.09 cis = 5 min Inflow hyd. No. = 8 Reservoir name = PHASE 4 - KURE 1 Max. Elevation = 18.63 ft Max. Storage = 12,742 cult 'S`O 1nd� n1stlio° ii . Total Volume - 12,M curt, 0.= acn 1 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C outflow 1 (hrs) (cfs) (ft) (cfs) Ids) (cfs) (cfs) (cfs) (cfs) (cfs) 0.08 21.32 << 17.98 3.79 0.04 - - - - 0.04 0.17 21.32 << 18.42 4.08 0.08 - - - - 0.08 0.25 0.00 18.63 << 4.22 0.09 - 0.00 - 0.09 << 1 0.33 0.00 18.63 4.22 0.09 0.00 = 0.09 0.42 0.00 18.63 4.22 0.09 - 0.00 - - 0.09 0.50.00 0.58 0.00 18.63 18.63 4.22 4.22 0.09 0.09 = 0.00 - 0.00 - 0.09 0.09 0.67 0.00 18.62 4.21 0.09 0.00 0.09 0.75 0.00 18.62 4.21 0.09 - 0.00 - - 0.09 0.83 0.00 18.62 4.21 0.09 0.00 - - 0.09 1 0.92 0.00 18.62 4.21 0.09 = 0.00 0.09 1.00 0.00 18.62 4.21 0.09 - 0.00 - - 0.09 1.08 0.00 18.62 4.21 0.09 - 0.00 - - 0.09 1 1.17 0.00 18.61 4.21 0.09 0.00 - - 0.09 1.25 0.00 18.61 4.21 0.09 = 0.00 0.09 1.33 0.00 18.61 4.20 0.09 - 0.00 - - 0.09 1 1,42 0.00 1.50 0.00 18.61 18.61 4.20 4.20 0.09 0.09 - 0.00 - 0.00 - 0.09 0.09 1.58 0.00 18.60 4.20 0.09 - 0.00 - - 0.09 1.67 0.00 18.60 4.20 0.09 - 0.00 - - 0.09 1.75 0.00 18.60 4.20 0.09 - 0_00 - - 0.09 1 1.83 0.00 18.60 4.20 0.09 0.09 1.92 0.00 18.60 4.20 0.09 - - - - 0.09 2.00.00 18.59 4.19 0.09 0.09 1 2.08 0.00 18.59 4.19 0.09 - _ _ - 0.09 2.17 0.00 18.59 4.19 0.09 0.09 2.25 0.00 18.59 4.19 0.09 - - - - 0.09 2.33 0.00 18.59 4.19 0.09 - - 0.09 1 2.42 0.00 18.59 4.19 0.09 _ _ 0.09 2.50 0.00 18.58 4.19 0.09 - - - - 0.09 2.58 0.00 18.58 4.19 0.09 - - - 0.09 1 2.67 0.00 18.58 4.19 0.09 - 0.09 2.75 0.00 18.58 4.18 0.09 _ _ _ 0.09 2.83 0.00 18.58 4.18 0.09 - - - - 0.09 1 2.92 0.00 3.00 0.00 18.57 18.57 4.18 4.18 0.09 0.09 - _ _ - 0.09 0.09 Continues on next page... 1 KURE DUNES Page 2 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) ids) (cfs) (cfs) (cfs) (cfs) 3.08 3.17 0.00 0.00 18.57 18.57 4.18 4.18 0.09 - _ _ - 0.09 0.09 3.25 0.00 18.57 4.18 0.09 - - - - 0.09 0.09 3.33 0.00 18.56 4.18 0.09 - - - - 0.09 3.42 0.00 18.56 4.17 0.09 - - 0.09 ' 3.50 0.00 18.56 4.17 _ _ 0.09 0.09 3.58 0.00 18.56 4.17 0.09 - - - - 0.09 ' 3.67 3.75 0.00 0.00 18.56 18.56 4.17 4.17 0.09 - _ _ - 0.09 0.09 0.09 3.83 0.00 18.55 4.17 0.09 - - - - 0.09 3.92 0.00 18.55 4.17 0.09 - - - - 0.09 4.00 0.00 18.55 4.17 0.09 - - 0.09 ' 4.08 0.00 18.55 4.17 _ _ 0.09 0.09 4.17 0.00 18.55 4.16 0.09 - - - - 0.09 4.25 0.00 18.54 4.16 0.09 - - - - 0.09 ' 4.33 0.00 18.54 4.16 0.09 - - 0.09 4.42 0.00 18.54 4.16 _ _ 0.09 0.09 4.50 0.00 18.54 4.16 0.09 - - - - 0.09 ' 4.58 4.67 0.00 0.00 18.54 18.54 4.16 4.16 0.09 - _ - 0.09 - 0.09 0.09 4.75 0.00 18.53 4.16 0.09 - - - - 0.09 4.83 0.00 18.53 4.15 0.09 - - - - 0.09 4.92 0.00 18.53 4.15 0.09 - - 0.09 ' 5.00 0.00 18.53 4.15 _ _ 0.09 0.09 5.08 0.00 18.53 4.15 0.09 - - - - 0.09 5.17 0.00 18.53 4.15 0.09 - - - - 0.09 5.25 0.00 18.52 4.15 0.09 - - 0.09 5.33 0.00 18.52 4.15 _ _ 0.09 0.09 5.42 0.00 18.52 4.15 0.09 - - - - 0.09 5.50 5.58 0.00 0.00 18.52 18.52 4.15 4.14 0.09 - _ _ - 0.09 0.09 0.09 5.67 0.00 18.51 4.14 0.09 - - - - 0.09 5.75 0.00 18.51 4.14 0.09 - - - 0.09 5.83 0.00 18.51 4.14 0.09 - - 0.09 ' 5.92 0.00 18.51 4.14 _ _ 0.09 0.09 6.00 0.00 18.51 4.14 0.09 - - - - 0.09 6. 6.17 17 0.00 0.00 18.51 18.50 4.14 4.14 0.09 - _ _ - 0.09 6.09 0.09 6.25 0.00 18.50 4.14 0.09 - - - 0.09 6.33 0.00 18.50 4.13 0.09 - - - - 0.09 6.42 0.00 18.50 4.13 0.09 - - 0.09 ' 6.50 0.00 18.50 4.13 _ _ 0.09 0.09 6.58 0.00 18.50 4.13 0.09 - - - - 0.09 6.67 0.00 18.49 4.13 0.09 - - - - 0.09 6.75 0.00 18.49 4.13 0.09 - - 0.09 6.83 0.00 18.49 4.13 _ _ 0.09 0.09 6.92 0.00 18.49 4.13 0.08 - - - - 0.08 7.00 0.00 18.49 4.13 0.08 - - 0.08 7.08 0.00 18.48 4.12 _ _ 0.08 0.08 Continues on next page... 1 KURE DUNES Page 3 Hydrograph Discharge Table ' Time Inflow Elevation Culy. A Culy. B CUIV. C WeirA Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (cfs) Ids) (Cfs) (cfs) (cfs) 7.17 0.00 18.48 4.12 0.08 - - 0.08 7.25 0.00 18.48 4.12 _ _ 0.08 0.08 7.33 0.00 18.48 4.12 0.08 - - - - 0.08 7.42 0.00 18.48 4.12 0.08 - - - - 0.08 7.50 0.00 18.48 4.12 0.08 - 0.08 7.58 0.00 18.47 4.12 _ _ _ 0.08 0.08 7.67 0.00 18.47 4.12 0.08 - - - - 0.08 ' 7.75 7.83 0.00 0.00 18.47 18.47 4.12 4.11 0.08 - _ _ - 0.08 0.08 0.08 7.92 0.00 18.47 4.11 0.08 - - - - 0.08 8.00 0.00 18.47 4.11 0.08 - - - - 0.08 8.08 0.00 18.46 4.11 0.08 - - 0.08 8.17 0.00 18.46 4.11 _ _ 0.08 0.08 8.25 0.00 18.46 4.11 0.08 - - - -. 0.08 8.33 0.00 18.46 4.11 0.08 - - - - 0.08 ' 8.42 0.00 18.46 4.11 0.08 0.08 8.50 0.00 18.46 4.11 0.08 - - - - 0.08 8.58 0.00 18.45 4.10 0.08 - - - - 0.08 . ' 8.67 8.75 0.00 0.00 18.45 18.45 4.10 4.10 0.08 - _ _ - 0.08 0.08 0.08 8.83 0.00 18.45 4.10 0.08 - - - - 0.08 8.92 0.00 18.45 4.10 0.08 - - - - 0.08 9.00 0.00 18.45 4.10 0.08 - - 0.08 ' 9.08 0.00 18.44 4.10 _ _ 0.08 0.08 9.17 0.00 18.44 4.10 0.08 - - - - 0.08 9.33 0.00 18.44 4.09 0.08 0.08 9.33 0.00 18.44 4.09 - _ _ - 0.08 0.08 9.42 0.00 18.44 4.09 0.08 0.08 9.50 0.00 18.44 4.09 0.08 - - - - 0.08 9.58 0.00 18.43 4.09 0.08 - - 0.08 ' 9.67 0.00 18.43 4.09 _ _ 0.08 0.08 9.75 0.00 18.43 4.09 0.08 - - - - 0.08 9.83 0.00 18.43 4.09 0.08 - - - - 0.08 ' 9.92 0.00 18.43 4.09 0.08 - - 0.08 10.00 0.00 18.43 4.09 _ _ 0.08 0.08 10.08 0.00 18.42 4.08 0.08 - - - - 0.08 ' 10.17 10.25 0.00 0.00 18.42 18.42 4.08 4.08 0.08 - _ _ - 0.08 0.08 0.08 10.33 0.00 18.42 4.08 0.08 - - - - 0.08 10.42 0.00 18.42 4.08 0.08 - - - - 0.08 10.50 0.00 18.42 4.08 0.08 - - 0.08 ' 10.58 0.00 18.41 4.08 _ _ 0.08 0.08 10.67 0.00 18.41 4.08 0.08 - - - - 0.08 10.83 0.00 18.41 4.08 0.08 0.08 ' 10.83 0.00 18.41 4.08 - _ _ - 0.08 0.08 10.92 0.00 18.41 4.07 0.08 0.08 11.00 0.00 18.41 4.07 0.08 - - - - 0.08 11.08 0.00 18.40 4.07 0.08 - 0.08 ' 11.17 0.00 18.40 4.07 _ _ = 0.08 0.08 1 Continues on next page... �I 11 1 1 1 I KURE DUNES Page 4 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C WeirA Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (Cfs) 11.25 0.00 18.40 4.07 0.08 - - - - 0.08 11.33 0.00 18.40 4.07 0.08 - - - - 0.08 11.42 0.00 18.40 4.07 0.08 - - - - 0.08 11.50 0.00 18.40 4.07 0.08 - - - - 0.08 11.58 0.00 18.39 4.07 0.08 - - - - 0.08 11.67 0.00 18.39 4.06 0.08 - - - - 0.08 11.75 0.00 18.39 4.06 0.08 - - - - 0.08 11.83 0.00 18.39 4.06 0.08 - - - - 0.08 11.92 0.00 18.39 4.06 0.08 - - - - 0.08 12.00 0.00 18.39 4.06 0.08 - - - - 0.08 12.08 0.00 18.39 4.06 0.08 - - - - 0.08 12.17 0.00 18.38 4.06 0.08 - - - - 0.08 12.25 0.00 18.38 4.06 0.08 - - - - 0.08 12.33 0.00 18.38 4.06 0.08 - - - - 0.08 12.42 0.00 18.38 4.06 0.08 - - - - 0.08 12.50 0.00 18.38 4.05 0.08 - - - - 0.08 12.58 0.00 18.38 4.05 0.08 - - - - 0.08 12.67 0.00 18.37 4.05 0.08 - - - - 0.08 12.75 0.00 18.37 4.05 0.08 - - - - 0.08 12.83 0.00 18.37 4.05 0.08 - - - - 0.08 12.92 0.00 18.37 4.05 0.08 - - - - 0.08 13.00 0.00 18.37 4.05 0.08 - - - - 0.08 13.08 0.00 18.37 4.05 0.08 - - - - 0.08 13.17 0.00 18.36 4.05 0.08 - - - - 0.08 13.25 0.00 18.36 4.04 0.08 - - - - 0.08 13.33 0.00 18.36 4.04 0.08 - - - - 0.08 13.42 0.00 18.36 4.04 0.08 - - - - 0.08 13.50 0.00 18.36 4.04 0.08 - - - - 0.08 13.58 0.00 18.36 4.04 0.08 - - - - 0.08 13.67 0.00 18.36 4.04 0.08 - - - - 0.08 13.75 0.00 18.35 4.04 0.08 - - - - 0.08 13.83 0.00 18.35 4.04 0.08 - - - - 0.08 13.92 0.00 18.35 4.04 0.08 - - - - 0.08 14.00 0.00 18.35 4.04 0.08 - - - - 0.08 14.08 0.00 18.35 4.03 0.08 - - - - 0.08 14.17 0.00 18.35 4.03 0.08 - - - - 0.08 14.25 0.00 18.34 4.03 0.08 - - - - 0.08 14.33 0.00 18.34 4.03 0.07 - - - - 0.07 14.42 0.00 18.34 4.03 0.07 - - - - 0.07 14.50 0.00 18.34 4.03 0.07 - - - - 0.07 14.58 0.00 18.34 4.03 0.07 - - - - 0.07 14.67 0.00 18.34 4.03 0.07 - - - - 0.07 14.75 0.00 18.34 4.03 0.07 - - - - 0.07 14.83 0.00 18.33 4.03 0.07 - - - - 0.07 14.92 0.00 18.33 4.02 0.07 - - - - 0.07 15.00 0.00 18.33 4.02 0.07 - - - - 0.07 15.08 0.00 18.33 4.02 0.07 - - - - 0.07 15.17 0.00 18.33 4.02 0.07 - - - - 0.07 15.25 0.00 18.33 4.02 0.07 - - - - 0.07 Continues on next page... 11 11 1 1 1 1 [] k 1 p 1 KURE DUNES Page 5 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) Ids) Ids) (cfs) (cfs) (cfs) (cfs) (cfs) 15.33 0.00 18.32 4.02 0.07 - - - - 0.07 15.42 0.00 18.32 4.02 0.07 - - - - 0.07 15.50 0.00 18.32 4.02 0.07 - - - - 0.07 15.58 0.00 18.32 4.02 0.07 - - - - 0.07 15.67 0.00 18.32 4.02 0.07 - - - - 0.07 15.75 0.00 18.32 4.01 0.07 - - - - 0.07 15.83 0.00 18.32 4.01 0.07 - - - - 0.07 15.92 0.00 18.31 4.01 0.07 - - - - 0.07 16.00 0.00 18.31 4.01 0.07 - - - -. 0.07 16.08 0.00 18.31 4.01 0.07 - - - - 0.07 16.17 0.00 18.31 4.01 0.07 - - - - 0.07 16.25 0.00 18.31 4.01 0.07 - - - - 0.07 16.33 0.00 18.31 4.01 0.07 - - - - 0.07 16.42 0.00 18.31 4.01 0.07 - - - - 0.07 16.50 0.00 18.30 4.01 0.07 - - - - 0.07 16.58 0.00 18.30 4.00 0.07 - - - - 0.07 16.67 0.00 18.30 4.00 0.07 - - - - 0.07 16.75 0.00 18.30 4.00 0.07 - - - - 0.07 16.83 0.00 18.30 4.00 0.07 - - - - 0.07 16.92 0.00 18.30 4.00 0.07 - - - - 0.07 17.00 0.00 18.30 4.00 0.07 - - - - 0.07 17.08 0.00 18.29 4.00 0.07 - - - - 0.07 17.17 0.00 18.29 4.00 0.07 - - - - 0.07 17.25 0.00 18.29 4.00 0.07 - - - - 0.07 17.33 0.00 18.29 4.00 0.07 - - - - 0.07 17.42 0.00 18.29 4.00 0.07 - - - - 0.07 17.50 0.00 18.29 3.99 0.07 - - - - 0.07 17.58 0.00 .18.29 3.99 0.07 - - - - 0.07 17.67 0.00 18.28 3.99 0.07 - - - - 0.07 17.75 0.00 18.28 3.99 0.07 - - - - 0.07 17.83 0.00 18.28 3.99 0.07 - - - - 0.07 17.92 0.00 18.28 3.99 0.07 - - - - 0.07 18.00 0.00 18.28 3.99 0.07 - - - - 0.07 18.08 0.00 18.28 3.99 0.07 - - - - 0.07 18.17 0.00 18.28 3.99 0.07 - - - - 0.07 18.25 0.00 18.27 3.99 0.07 - - - - 0.07 18.33 0.00 18.27 3.98 0.07 - - - - 0.07 18.42 0.00 18.27 3.98 0.07 - - - - 0.07 18.50 0.00 18.27 3.98 0.07 - - - - 0.07 18.58 0.00 18.27 3.98 0.07 - - - - 0.07 18.67 0.00 18.27 3.98 0.07 - - - - 0.07 18.75 0.00 18.27 3.98 0.07 - - - - 0.07 18.83 0.00 18.26 3.98 0.07 - - - - 0.07 18.92 0.00 18.26 3.98 0.07 - - - - 0.07 19.00 0.00 18.26 3.98 0.07 - - - - 0.07 19.08 0.00 18.26 3.98 0.07 - - - - 0.07 19.17 0.00 18.26 3.97 0.07 - - - - 0.07 19.25 0.00 18.26 3.97 0.07 - - - - 0.07 19.33 0.00 18.26 3.97 0.07 - - - - 0.07 Continues on next page... 11 ' KURE DUNES pap 6 Hydrograph Discharge Table ' Time Inflow Elevation Culy. A Culy. B CuIv. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) Ids) (Cfs) (cfs) 19.42 0.00 18.25 3.97 0.07 - - 0.07 ' 19.50 0.00 18.25 3.97 _ _ 0.07 0.07 19.58 0.00 18.25 3.97 0.07 - - - - 0.07 19.67 0.00 18.25 3.97 0.07 - - - - 0.67 19.75 0.00 18.25 3.97 0.07 - - 0.07 19.83 0.00 18.25 3.97 _ _ 0.07 0.07 19.92 0.00 18.25 3.97 0.07 - - - - 0.07 20,00 20.08 0.00 0.00 18,24 18.24 3.97 3.96 0.07 - _ _ - 0.07 0.07 0.07 20.17 0.00 18.24 3.96 0.07 - - - - 0.07 20.25 0.00 18.24 3.96 0.07 - - - - 0.07 20.33 0.00 18.24 3.96 0.07 - 0.07 ' 20.42 0.00 18.24 3.96 = _ _ 0.07 0.07 20.50 0.00 18.24 3.96 0.07 - - - - 0.07 20.58 0.00 18.23 3.96 0.07 - - - - 0.07 ' 20.67 0.00 18.23 3.96 0.07 0.07 20.75 0.00 18.23 3.96 = _ _ = 0.07 0.07 20.83 0.00 18.23 3.96 0.07 - - - - 0.07 . 20.92 21.00 0.00 0.00 18.23 18.23 3.96 3.95 0.07 = _ _ - 0.07 0.07 0.07 21.08 0.00 18.23 3.95 0.07 - - - - 0.07 21.17 0.00 18.23 3.95 0.07 - - - - 0.07 21.25 0.00 18.22 3.95 0.07 - 0.07 ' 21.33 0.00 18.22 3.95 = _ _ 0.07 0.07 21.42 0.00 18.22 3.95 0.07 - - - 0.07 21.5 0.00 18.22 3.95 0.07 0.07 ' 21.58 0.00 18.22 3.95 = _ _ - 0.07 0.07 21.67 0.00 18.22 3.95 0.07 0.07 21.75 0.00 18.22 3.95 0.06 - - - - 0.06 21.83 0.00 18.21 3.95 0.06 - 0.06 ' 21.92 0.00 18.21 3.94 = _ _ 0.08 0.06 22.00 0.00 18.21 3.94 0.06 - - - - 0.06 22.08 0.00 18.21 3.94 0.06 - - - - 0.06 ' 22.17 0.00 18.21 3.94 0.06 - - 0.06 22.25 0.00 18.21 3.94 _ _ 0.06 0.06 22.33 0.00 18.21 3.94 0.06 - - - - 0.06 ' 22,42 22.50 0,00 0.00 18.21 18.20 3.94 3.94 0.06 - _ _ _ 0.06 0.06 0.06 22.58 0.00 18.20 3.94 0.06 - - - - 0.06 22.67 0.00 18.20 3.94 0.06 - - - - 0.06 22.75 0.00 18.20 3.94 0.06 - 0.06 ' 22.83 0.00 18.20 3.94 = _ _ 0.06 0.06 22.92 0.00 18.20 3.93 0.06 - - - - 0.06 23.0 0.00 18.20 3.93 0.06 0.06 ' 23.08 0.00 18.20 3.93 = _ _ - 0.06 0.06 23.17 0.00 18.19 3.93 0.06 0.06 23.25 0.00 18.19 3.93 0.06 - - - - 0.06 23.33 0.00 18.19 3.93 0.06 0.06 ' 23.42 0.00 18.19 3.93 _ _ _ = 0.06 0.06 Continues on next page... t IJ I I I t I I 1 I 1 I I I I 1 KURE DUNES Hydrograph Discharge Table Pegs 7 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (CIS) (Cfs) (Cfs) (Cfs) 23.50 0.00 18.19 3.93 0.06 - - - - 0.06 23.58 0.00 18.19 3.93 0.06 - - - - 0,06 23.67 0.00 18.19 3.93 0.06 - - - - 0.06 23.75 0.00 18.18 3.93 0.06 - - - - 0.06 23.83 0.00 18.18 3.92 0.06 - - - - 0.06 23.92 0.00 18.18 3.92 0.06 - - - - 0.06 24.00 0.00 18.18 3.92 0.06 - - - - 0.06 24.08 0.00 18.18 3.92 0.06 - - - - 0.06 24.17 0.00 18.18 3.92 0.06 - - - - 0.06 24.25 0.00 18.18 3.92 0.06 - - - - 0.06 24.33 0.00 18.18 3.92 0.06 - - - - 0.06 24.42 0.00 18.17 3.92 0.06 - - - - 0.06 24.50 0.00 18.17 3.92 0.06 - - - - 0.06 24.58 0.00 18.17 3.92 0.06 - - - - 0.06 24.67 0.00 18.17 3.92 0.06 - - - - 0.06 24.75 0.00 18.17 3.92 0.06 - - - - 0.06 24.83 0.00 18.17 3.91 0.06 - - - - 0.06 24.92 0.00 18.17 3.91 0.06 - - - - 0.06 25.00 0.00 18.17 3.91 0.06 - - - - 0.06 25.08 0.00 18.16 3.91 0.06 - - - - 0.06 25.17 0.00 18.16 3.91 0.06 - - - - 0.06 25.25 0.00 18.16 3.91 0.06 - - - - 0.06 25.33 0.00 18.16 3.91 0.06 - - - - 0.06 25.42 0.00 18.16 3.91 0.06 - - - - 0.06 25.50 0.00 18.16 3.91 0.06 - - - - 0.06 25.58 0.00 18.16 3.91 0.06 - - - - 0.06 25.67 0.00 18.16 3.91 0.06 - - - - 0.06 25.75 0.00 18.16 3.91 0.06 - - - - 0.06 25.83 0.00 18.15 3.90 0.06 - - - - 0.06 25.92 0.00 18.15 3.90 0.06 - - - - 0.06 26.00 0.00 18.15 3.90 0.06 - - - - 0.06 26.08 0.00 18.15 3.90 0.06 - - - - 0.06 26.17 0.00 18.15 3.90 0.06 - - - - 0.06 26.25 0.00 18.15 3.90 0.06 - - - - 0.06 26.33 0.00 18.15 3.90 0.06 - - - - 0.06 26.42 0.00 18.15 3.90 0.06 - - - - 0.06 26.50 0.00 18.14 3.90 0.06 - - - - 0.06 26.58 0.00 18.14 3.90 0.06 - - - - 0.06 26.67 0.00 18.14 3.90 0.06 - - - - 0.06 26.75 0.00 18.14 3.90 0.06 - - - - 0.06 26.83 0.00 18.14 3.89 0.06 - - - - 0.06 26.92 0.00 18.14 3.89 0.06 - - - - 0.06 27.00 0.00 18.14 3.89 0.06 - - - - 0.06 27.08 0.00 18.14 3.89 0.06 - - - - 0.06 27.17 0.00 18.13 3.89 0.06 - - - - 0.06 27.25 0.00 18.13 3.89 0.06 - - - - 0.06 27.33 0.00 18.13 3.89 0.06 - - - - 0.06 27.42 0.00 18.13 3.89 0.06 - - - - 0.06 27.50 0.00 18.13 3.89 0.06 - - - - 0.06 Continues on next page... I I I I I I I I I I i I :i I KURE DUNES Hydrograph Discharge Table Page 8 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) Ids) (cfs) (cfs) (cfs) 27.58 0.00 18.13 3.89 0.06 - - - - 0.06 27.67 0.00 18.13 3.89 0.06 - - - - 0.06 27.75 0.00 18.13 3.89 0.06 - - - - 0.06 27.83 0.00 18.13 3.88 0.06 - - - - 0.06 27.92 0.00 18.12 3.88 0.06 - - - - 0.06 28.00 0.00 18.12 3.88 0.06 - - - - 0.06 28.08 0.00 18.12 3.88 0.06 - - - - 0.06 28.17 0.00 18.12 3.88 0.06 - - - - 0.06 28.25 0.00 18.12 3.88 0.06 - - - - 0.06 28.33 0.00 18.12 3.88 0.06 - - - - 0.06 28.42 0.00 18.12 3.88 0.06 - - - - 0.06 28.50 0.00 18.12 3.88 0.06 - - - - 0.06 28.58 0.00 18.12 3.88 0.06 - - - - 0.06 28.67 0.00 18.11 3.88 0.06 - - - - 0.06 28.75 0.00 18.11 3.88 0.06 - - - - 0.06 28.83 0.00 18.11 3.88 0.06 - - - - 0.06 28.92 0.00 18.11 3.87 0.06 - - - - 0.06 29.00 0.00 18.11 3.87 0.06 - - - - 0.06 29.08 0.00 18.11 3.87 0.06 - - - - 0.06 29.17 0.00 18.11 3.87 0.05 - - - - 0.05 29.25 0.00 18.11 3.87 0.05 - - - - 0.05 29.33 0.00 18.10 3.87 0.05 - - - - 0.05 29.42 0.00 18.10 3.87 0.05 - - - - 0.05 29.50 0.00 18.10 3.87 0.05 - - - - 0.05 29.58 0.00 18.10 3.87 0.05 - - - - 0.05 29.67 0.00 18.10 3.87 0.05 - - - - 0.05 29.75 0.00 18.10 3.87 0.05 - - - - 0.05 29.83 0.00 18.10 3.87 0.05 - - - - 0.05 29.92 0.00 18.10 3.87 0.05 - - - - 0.05 30.00 0.00 18.10 3.86 0.05 - - - - 0.05 30.08 0.00 18.10 3.86 0.05 - - - - 0.05 30.17 0.00 18.09 3.86 0.05 - - - - 0.05 30.25 0.00 18.09 3.86 0.05 - - - - 0.05 30.33 0.00 18.09 3.86 0.05 - - - - 0.05 30.42 0.00 18.09 3.86 0.05 - - - - 0.05 30.50 0.00 18.09 3.86 0.05 - - - - 0.05 30.58 0.00 18.09 3.86 0.05 - - - - 0.05 30.67 0.00 18.09 3.86 0.05 - - - - 0.05 30.75 0.00 18.09 3.86 0.05 - - - - 0.05 30.83 0.00 18.09 3.86 0.05 - - - - 0.05 30.92 0.00 18.08 3.86 0.05 - - - - 0.05 31.00 0.00 18.08 3.86 0.05 - - - - 0.05 31.08 0.00 18.08 3.86 0.05 - - - 0.05 31.17 0.00 18.08 3.85 0.05 - - - - 0.05 31.25 0.00 18.08 3.85 0.05 - - - - 0.05 31.33 0.00 18.08 3.85 0.05 - - - - 0.05 31.42 0.00 18.08 3.85 0.05 - - - - 0.05 31.50 0.00 18.08 3.85 0.05 - - - - 0.05 31.58 0.00 18.08 3.85 0.05 - - - - 0.05 Continues on next page... 1 KURE DUNES pW 9 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) ids) (cfs) (Cfs) (cfs) (cfs) (cfs) 31.67 0.00 18.07 3.85 0.05 - - 0.05 ' 31.75 0.00 18.07 3.85 _ _ 0.05 0.05 31.83 0.00 18.07 3.85 0.05 - - - - 0.05 31. 0.00 18.07 3.85 0.05 0.05 32.00 00 0.00 18.07 3.85 - _ _ - 0.05 0.05 32.08 0.00 18.07 3.85 0.05 0.05 32.17 0.00 18.07 3.85 0.05 - - - - 0.05 32.25 32.33 0.00 0.00 18.07 18.07 3.85 3.84 0.05 - _ _ - 0.05 0.05 0.05 32.42 0.00 18.07 3.84 0.05 - - - - 0.05 32.50 0.00 18.06 3.84 0.05 - - - - 0.05 32.58 0.00 18.06 3.84 0.05 - - 0.05 32.67 0.00 18.06 3.84 _ _ 0.05 0.05 32.75 0.00 18.06 3.84 0.05 - - - - 0.05 32. 32.92 92 0.00 0.00 18.06 18.06 3.84 3.84 0.05 - _ _ - 0.05 0.05 0.05 33.00 0.00 18.06 3.84 0.05 - - 0.05 33.08 0.00 18.06 3.84 0.05 - - - - 0.05 33.17 0.00 18.06 3.84 0.05 - - 0.05 33.25 0.00 18.06 3.84 _ _ 0.05 0.05 33.33 0.00 18.05 3.84 0.05 - - - - 0.05 33.42 0.00 18.05 3.84 0.05 - - - - 0.05 33.50 0.00 18.05 3.83 0.05 - - - - 0.05 33.58 0.00 18.05 3.83 0.05 - - - - 0.05 33.67 0.00 18.05 3.83 0.05 - - - - 0.05 ' 33.75 33.83 0.00 0.00 18.05 18.05 3.83 3.83 0.05 - _ _ - 0.05 0.05 0.05 33.92 0.00 18.05 3.83 0.05 - - - - 0.05 34.00 0.00 18.05 3.83 0.05 - - - - 0.05 34.08 0.00 18.05 3.83 0.05 - - 0.05 34.17 0.00 18.04 3.83 _ _ 0.05 0.05 34.25 0.00 18.04 3.83 0.05 - - - - 0.05 34.33 0.00 18.04 3.83 0.05 - - - - 0.05 34.42 0.00 18.04 3.83 0.05 - - 0.05 34.50 0.00 18.04 3.83 _ _ 0.05 0.05 34.58 0.00 18.04 3.83 0.05 - - - - 0.05 34.67 0.00 18.04 3.83 0.05 - - 0.05 34.75 0.00 18.04 3.82 _ _ 0.05 0.05 34.83 0.00 18.04 3.82 0.05 - - - - 0.05 34.92 0.00 18.04 3.82 0.05 - - - - 0.05 35.00 0.00 18.04 3.82 0.05 - - 0.05 35.08 0.00 18.03 3.82 _ _ 0.05 0.05 35.17 0.00 18.03 3.82 0.05 - - - - 0.05 35.25 35.33 0.00 0.00 18.03 18.03 3.82 3.82 0.05 - _ _ - 0.05 0.05 0.05 35.42 0.00 18.03 3.82 0.05 - - - - 0.05 35.50 0.00 18.03 3.82 0.05 - - - - 0.05 35.58 0.00 18.03 3.82 0.04 - - 0.04 35.67 0.00 18.03 3.82 _ _ 0.04 0.04 Continues on next page... ' KURE DUNES p9e 10 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A WeirEl Weir C Outflow (hrs) (cfs) (ft) (CIS) (cfs) (cfs) (cfs) (Cfs) (Cfs) (cfs) 35.75 0.00 18.03 3.82 0.04 - 0.04 35.83 0.00 18.03 3.82 _ _ _ 0.04 0.04 35.92 0.00 18.03 3.82 0.04 - - - - 0.04 36.0 0.00 18.02 3.81 0.04 0.04 36.08 0.00 18.02 3.81 - _ _ - 0.04 0,04 36.17 0.00 18.02 3.81 0.04 0.04 36.25 0.00 18.02 3.81 0.04 - - - - 0.04 36.33 36.42 0.00 0.00 18.02 18.02 3.81 3.81 0.04 - _ _ - 0.04 0.04 0,04 36.50 0.00 18.02 3.81 0.04 - - - - 0,04 36.58 0.00 18.02 3.81 0.04 - - - - 0.04 ' 36.67 0.00 18.02 3.81 0.04 - - 0.04 36.75 0.00 18.02 3.81 _ _ 0.04 0.04 36.83 0.00 18.02 3.81 0.04 - - - - 0.04 3. 37.00 00 0.00 0.00 18.01 18.01 3.81 3.81 0.04 - _ _ = 0.04 0.04 0.04 37.08 0.00 18.01 3.81 0.04 - - 0.04 37.17 0.00 18.01 3.81 0.04 - - - - 0.04 . 37.25 0.00 18.01 3.81 0.04 0.04 ' 37.33 0.00 18.01 3.80 0.04 - - - - 0.04 37.42 0.00 18.01 3.80 0.04 - - - - 0.04 37.5 0.00 18.01 3.80 0.04 0.04 37.58 0.00 18.01 3.80 - _ _ - 0.04 p,04 37.67 0.00 18.01 3.80 0.04 0.04 37.75 0.00 18.01 3.80 0.04 - - - - 0.04 ' 37.83 37.92 0.00 0.00 18.00 18.00 3.80 3.80 0.04 - _ _ - 0.04 0.04 0.04 38.00 0.00 18.00 3.80 0.04 - - - - 0.04 38.08 0.00 18.00 3.80 0.04 - - - - 0.04 38.17 0.00 18.00 3.80 0.04 - 0.04 38.25 0.00 18.00 3.80 _ _ _ 0.04 0.04 38.33 0.00 18.00 3.80 0.04 - - - - 0.04 38. 0.00 18.00 3.80 0.04 0.04 ' 38.50 50 0.00 18.00 3.80 - _ _ - 0.04 0.04 38.58 0.00 18.00 3.80 0.04 0.04 38.67 0.00 18.00 3.80 0.04. - - - - 0.04 38.75 0.00 18.00 3.79 0.04 - - 0.04 ' 38.83 0.00 17.99 3.79 _ _ 0.04 0.04 38.92 0.00 17.99 3.79 0.04 - - - - 0.04 39.00 0.00 17.99 3.79 0.04 - - - - 0.04 1 39.08 0.00 17.99 3.79 0.04 0.04 39.17 0.00 17.99 3.79 0.04 - - - - 0.04 39.25 0.00 17.99 3.79 0.04 - - - - 0.04 39.33 39.42 0.00 0.00 17.99 17.99 3.79 3.79 0.04 - - - - 0.04 - - - - 0.04 0.04 39.50 0.00 17.99 3.79 0.04 - - - - 0.04 39.58 0.00 17.99 3.79 0.04 - - - - 0.04 39.67 0.00 17.99 3.79 0.04 - - 0.04 1� 39.75 0.00 17.98 3.79 _ _ 0.04 0.04 1 Confines on next page... ,1 KURE DUNES page 11 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (Cfs) (cfs) (cfs) (cfs) (cfs) 39.83 0.00 17.98 3.79 0.04 - - 0.04 39.92 0.00 17.98 3.79 _ 0.04 _ 0.04 40.00 0.00 17.98 3.79 0.04 - - - - 0.04 40.08 0.00 17.98 3.78 0.04 - - - - 0.04 1 40.17 0.00 17.98 3.78 0.04 - - 0.04 40.25 0.00 17.98 3.78 _ 0.04 _ 0.04 40.33 0.00 17.98 3.78 0.04 - - - 0.04 40. 40.50 50 0.00 0.00 17.98 17.98 3.78 3.78 0.04 - _ 0.04 _ - 0.04 0.04 40.58 0.00 17.98 3.78 0.04 - - - 0.04 40.67 0.00 17.97 3.78 0.04 - - - - 0.04 40.75 0.00 17.97 3.78 0.04 - - 0.04 40.83 0.00 17.97 3.78 _ 0.04 _ 0.04 40.92 0.00 17.97 3.78 0.04 - - - - 0.04 41.0 0.00 17.97 3.78 0.04 0.04 41.08 0.00 17.97 3.78 - _ 0.04 _ - 0.04 41.17 0.00 17.97 3.78 0.04 0.04 41.25 0.00 17.97 3.78 0.04 - - - - 0.04 41. 41.42 42 0.00 0.00 17.97 17.97 3.78 3.77 0.04 - _ 0.04 _ - 0.04 0.04 41.50 0.00 17.97 3.77 0.04 0.04 41.58 0.00 17.96 3.77 0.04 - - - - 0.04 41.67 0.00 17.96 3.77 0.04 - - - - 0.04 41.75 0.00 17.96 3.77 0.04 - - - - 0.04 41.83 0.00 17.96 3.77 0.04 - - - - 0.04 41. 0.00 17.96 3.77 0.04 0.04 1 42.00 00 0.00 17.96 3.77 - _ 0.04 _ - 0.04 42.08 0.00 17.96 3.77 0.04 0.04 42.17 0.00 17.96 3.77 0.04 - - - - 0.04 42.25 0.00 17.96 3.77 0.04 - - 0.04 42.33 0.00 17.96 3.77 _ 0.04 _ 0.04 42.42 0.00 17.96 3.77 0.04 - - - - 0.04 42.50 0.00 17.96 3.77 0.04 - - - - 0.04 42.58 0.00 17.95 3.77 0.04 - - 0.04 ' 42.67 0.00 17.95 3.77 _ 0.04 _ 0.04 42.75 0.00 17.95 3.77 0.04 - - - - 0.04 42. 0.00 17.95 3.76 0.04 0.04 42.92 92 0.00 17.95 3.76 - _ 0.04 _ - 0.04 43.00 0.00 17.95 3.76 0.04 - - 0.04 43.08 0.00 17.95 3.76 0.04 - - - - 0.04 43.17 0.00 17.95 3.76 0.04 - - 0.04 43.25 0.00 17.95 3.76 _ 0.04 _ 0.04 43.33 0.00 17.95 3.76 0.04 - - - 0.04 43,42 0,00 17,95 3.76 0.04 - - - - 0.04 43.50 0.00 17.95 3.76 0.04 - - - - 0.04 43.58 0.00 17.95 3.76 0.04 - - - - 0.04 43.67 0.00 17.94 3.76 0.03 - - - - 0.03 43.75 0.00 17.94 3.76 0.03 - - - - 0.03 ,�. 43.83 0.00 17.94 3.76 0.03 - - - - 0.03 Continues on next page... I I I I i I KURE DUNES Hydrograph Discharge Table Page 12 Time Inflow Elevation Culy. A Culy. B Cuhr. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 43.92 0.00 17.94 3.76 0.03 - - - - 0.03 44.00 0.00 17.94 3.76 0.03 - - - - 0.03 44.08 0.00 17.94 3.76 0.03 - - - - 0.03 44.17 0.00 17.94 3.76 0.03 - - - - 0.03 44.25 0.00 17.94 3.75 0.03 - - - - 0.03 44.33 0.00 17.94 3.75 0.03 - - - - 0.03 44.42 0.00 17.94 3.75 0.03 - - - - 0.03 44.50 0.00 17.94 3.75 0.03 - - - - 0.03 44.58 0.00 17.94 3.75 0.03 - - - - 0.03 44.67 0.00 17.94 3.75 0.03 - - - - 0.03 44.75 0.00 17.93 3.75 0.03 - - - - 0.03 44.83 0.00 17.93 3.75 0.03 - - - - 0.03 44.92 0.00 17.93 3.75 0.03 - - - - 0.03 45.00 0.00 17.93 3.75 0.03 - - - - 0.03 45.08 0.00 17.93 3.75 0.03 - - - - 0.03 45.17 0.00 17.93 3.75 0.03 - - - - 0.03 45.25 0.00 17.93 3.75 0.03 - - - - 0.03 45.33 0.00 17.93 3.75 0.03 - - - - 0.03 45.42 0.00 17.93 3.75 0.03 - - - - 0.03 45.50 0.00 17.93 3.75 0.03 - - - - 0.03 45.58 0.00 17.93 3.75 0.03 - - - - 0.03 45.67 0.00 17.93 3.75 0.03 - - - - 0.03 45.75 0.00 17.93 3.75 0.03 - - - 0.03 45.83 0.00 17.93 3.75 0.03 - - - - 0.03 45.92 0.00 17.92 3.74 0.03 - - - - 0.03 46.00 0.00 17.92 3.74 0.03 - - - - 0.03 46.08 0.00 17.92 3.74 0.03 - - - - 0.03 46.17 0.00 17.92 3.74 0.03 - - - - 0.03 46.25 0.00 17.92 3.74 0.03 - - - - 0.03 46.33 0.00 17.92 3.74 0.03 - - - - 0.03 46.42 0.00 17.92 3.74 0.03 - - - - 0.03 46.50 0.00 17.92 3.74 0.03 - - - - 0.03 46.58 0.00 17.92 3.74 0.03 - - - - 0.03 46.67 0.00 17.92 3.74 0.03 - - - - 0.03 46.75 0.00 17.92 3.74 0.03 - - - - 0.03 46.83 0.00 17.92 3.74 0.03 - - - - 0.03 46.92 0.00 17.92 3.74 0.03 - - - - 0.03 47.00 0.00 17.92 3.74 0.03 - - - - 0.03 47.08 0.00 17.91 3.74 0.03 - - - - 0.03 47.17 0.00 17.91 3.74 0.03 - - - - 0.03 47.25 0.00 17.91 3.74 0.03 - - - - 0.03 47.33 0.00 17.91 3.74 0.03 - - - - 0.03 47.42 0.00 17.91 3.74 0.03 - - - - 0.03 47.50 0.00 17.91 3.74 0.03 - - - - 0.03 47.58 0.00 17.91 3.73 0.03 - - - - 0.03 47.67 0.00 17.91 3.73 0.03 - - - - 0.03 47.75 0.00 17.91 3.73 0.03 - - - - 0.03 47.83 0.00 17.91 3.73 0.03 - - - - 0.03 47.92 0.00 17.91 3.73 0.03 - - - - 0.03 Confines on next page... KURE DUNES Page 13 Hydrograph Discharge Table Time Inflow Elevation Cuiv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (Cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 48.00 0.00 17.91 3.73 0.03 - - 0.03 48.08 0.00 17.91 3.73 _ 0.03 _ 0.03 48.17 0.00 17.91 3.73 0.03 - - - - 0.03 48.25 0.00 17.91 3.73 0.03 - - - - 0.03 48.33 0.00 17.90 3.73 0.03 - - 0.03 48.42 0.00 17.90 3.73 _ 0.03 _ 0.03 48.50 0.00 17.90 3.73 0.03 - - - - 0.03 1 48.58 48.67 0.00 0.00 17.90 17.90 3.73 3.73 0.03 - - 0.03 - - - 0.03 - - 0.03 48.75 0.00 17.90 3.73 _ 0.03 - - 0.03 48.83 0.00 17.90 3.73 0.03 - - - - 0.03 48.92 0.00 17.90 3.73 0.03 - - 0.03 49.00 0.00 17.90 3.73 _ 0.03 _ 0.03 49.08 0.00 17.90 3.73 0.03 - - - - 0.03 49. 0.00 17.90 3.73 0.03 0.03 1 49.25 25 0.00 17.90 3.73 - _ 0.03 _ - 0.03 49.33 0.00 17.90 3.72 0.03 0.03 49.42 0.00 17.90 3.72 0.03 - - - - 0.03 49.50 0.00 17.90 3.72 0.03 - - 0.03 49.58 0.00 17.89 3.72 _ 0.03 _ 0.03 49.67 0.00 17.89 3.72 0.03 - - - - 0.03 49.75 0.00 17.89 3.72 0.03 - - - - 0.03 49.83 0.00 17.89 3.72 0.03 - - 0.03 49.92 0.00 17.89 3.72 _ 0.03 _ 0.03 50.00 0.00 17.89 3.72 0.03 - - - - 0.03 t 50. 50.17 17 0.00 0.00 17.89 17.89 3.72 3.72 0 0.03- _ 0.03 _ - 0.03 0.03 50.25 0.00 17.89 3.72 0.03 0.03 50.33 0.00 17.89 3.72 0.03 - - - - 0.03 50.42 0.00 17.89 3.72 0.03 - - - - 0.03 50.50 0.00 17.89 3.72 0.03 - - - - 0.03 50.58 0.00 17.89 3.72 0.03 - - - - 0.03 50.67 0.00 17.89 3.72 0.03 - - - - 0.03 50.75 0.00 17.89 3.72 0.03 - - 0.03 50.83 0.00 17.89 3.72 _ 0.03 _ 0.03 50.92 0.00 17.88 3.72 0.03 - - - - 0.03 51.00 51.08 0.00 0.00 17.88 17.88 3.72 3.72 0.03 - - 0.03 - - - - 0.03 - - 0.03 51.17 0.00 17.88 3.72 0.03 - - - - 0.03 51.25 0.00 17.88 3.71 0.03 - - - - 0.03 51.33 0.00 17.88 3.71 0.03 - - 0.03 51.42 0.00 17.88 3.71 _ 0.03 _ 0.03 51.50 0.00 17.88 3.71 0.03 - - - - 0.03 51. 0.00 17.88 3.71 0.03 0.03 51.67 67 0.00 17.88 3.71 - _ 0.03 _ - 0.03 51.75 0.00 17.88 3.71 0.03 0.03 51.83 0.00 17.88 3.71 0.03 - - - - 0.03 51.92 0.00 17.88 3.71 0.03 - - - - 0.03 52.00 0.00 17.88 3.71 0.03 - - - - 0.03 "r Coniinues on next page... I KURE DUNES page 14 Hydrograph Discharge Table Time Inflow Elevation Culy. A CuN. B CuIv. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (efs) (cfs) (cfs) (cfs) (cfs) 52.08 0.00 17.88 3.71 0.03 - 0.03 52.17 0.00 17.88 3.71 _ _ _ 0.03 0.03 52.25 0.00 17.88 3.71 0.03 - - - - 0.03 52.33 0.00 17.87 3.71 0.03 - - - - 0.03 52.42 0.00 17.87 3.71 0.03 - - 0.03 1 52.50 0.00 17.87 3.71 _ _ 0.03 0.03 52.58 0.00 17.87 3.71 0.03 - - - - 0.03 52. 52.75 75 0.00 0.00 17.87 17.87 3.71 3.71 0.03 - _ _ - 0.03 0.03 0.03 52.83 0.00 17.87 3.71 0.03 0.03 52.92 0.00 17.87 3.71 0.03 - - - - 0.03 53.00 0.00 17.87 3.71 0.03 - - - - 0.03 53.08 0.00 17.87 3.71 0.03 - - - - 0.03 53.17 0.00 17.87 3.70 0.03 - - - - 0.03 53.25 0.00 17.87 3.70 0.03 - - - - 0.03 ' 53.33 0.00 17.87 3.70 0.03 - - 0.03 53.42 0.00 17.87 3.70 _ _ 0.03 0.03 53.50 0.00 17.87 3.70 0.03 - - - - 0.03 . 53.58 0.00 17.87 3.70 0.03 - - 0.03 53.67 0.00 17.87 3.70 _ _ 0.03 0.03 53.75 0.00 17.86 3.70 0.03 - - - - 0.03 53.83 0.00 17.86 3.70 0.03 - - - - 0.03 53.92 0.00 17.86 3.70 0.03 - - 0.03 54.00 0.00 17.86 3.70 _ _ 0.02 0.02 54.08 0.00 17.86 3.70 0.02 - - - - 0.02 54.17 0.00 17.86 3.70 0.02 - - - - 0.02 '. 54.25 0.00 17.86 3.70 0.02 - - 0.02 54.33 0.00 17.86 3.70 _ _ 0.02 0.02 54.42 0.00 17.86 3.70 0.02 - - - - 0.02 54.50 0.00 17.86 3.70 0.02 - - - - 0.02 54.58 0.00 17.86 3.70 0.02 - - - - 0.02 54.67 0.00 17.86 3.70 0.02 - - - - 0.02 54.75 0.00 17.86 3.70 0.02 - - - - 0.02 54.83 0.00 17.86 3.70 0.02 - - 0.02 54.92 0.00 17.86 3.70 _ _ 0.02 0.02 55.00 0.00 17.86 3.70 0.02 - - - - 0.02 55.08 55.17 0.00 0.00 17.86 17.86 3.70 3.70 0.02 - _ _ - 0.02 0.02 0.02 55.25 0.00 17.86 3.69 0.02 - - - - 0.02 55.33 0.00 17.85 3.69 0.02 - - - - 0.02 55.42 0.00 17.85 3.69 0.02 - - 0.02 55.50 0.00 17.85 3.69 _ _ 0.02 0.02 55.58 0.00 17.85 3.69 0.02 - - - - 0.02 55. 0.00 17.85 3.69 0.02 0.02 55.75 75 0.00 17.85 3.69 - _ _ - 0.02 0.02 55.83 0.00 17.85 3.69 0.02 0.02 55.92 0.00 17.85 3.69 0.02 - - - - 0.02 56.00 0.00 17.85 3.69 0.02 - - 0.02 I 56.08 0.00 17.85 3.69 _ _ 0.02 0.02 .1 Confines on next page... KURE DUNES Page 15 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (Cfs) (Cfs) (cfs) (Cfs) (cfs) (Cfs) (cfs) 56.17 0.00 17.85 3.69 0.02 - - 0.02 56.25 0.00 17.85 3.69 _ 0.02 _ 0.02 56.33 0.00 17.85 3.69 0.02 - - - - 0.02 56.42 0.00 17.85 3.69 0.02 - - - - 0.02 1 56.50 0.00 17.85 3.69 0.02 - - 0.02 56.58 0.00 17.85 3.69 _ 0.02 _ 0.02 56.67 0.00 17.85 3.69 0.02 - - - - 0.02 56.75 0.00 17.85 3.69 0.02 - - 0.02 56.83 0.00 17.85 3.69 _ 0.02 _ 0.02 56.92 0.00 17.84 3.69 0.02 - - - - 0.02 57.00 0.00 17.84 3.69 0.02 - - - - 0.02 57.08 0.00 17.84 3.69 0.02 - - 0.02 57.17 0.00 17.84 3.69 _ 0.02 _ 0.02 57.25 0.00 17.84 3.69 0.02 - - - - 0.02 57. 0.00 17.84 3.69 0.02 0.02 57.42 42 0.00 17.84 3.69 - _ 0.02 _ - 0.02 57.50 0.00 17.84 3.68 0.02 0.02 57.58 0.00 17.84 3.68 0.02 - - - - 0.02 . 57.67 0.00 17.84 3.68 0.02 - - 0.02 57.75 0.00 17.84 3.68 _ 0.02 _ 0.02 57.83 0.00 17.84 3.68 0.02 - - - - 0.02 57.92 0.00 17.84 3.68 0.02 - - - - 0.02 58.00 0.00 17.84 3.68 0.02 - 0.02 58.08 0.00 17.84 3.68 _ 0.02 _ _. 0.02 58.17 0.00 17.84 3.68 0.02 - - - - 0.02 58. 58.33 33 0.00 0.00 17.84 17.84 3.68 3.68 0.02 - _ 0.02 _ - 0.02 0.02 58.42 0.00 17.84 3.68 0.02 - 0.02 58.50 0.00 17.84 3.68 0.02 - - - - 0.02 58.58 0.00 17.83 3.68 0.02 - - 0.02 1 58.67 0.00 17.83 3.68 _ 0.02 _ 0.02 58.75 0.00 17.83 3.68 0.02 - - - - 0.02 58.83 0.00 17.83 3.68 0.02 - - - - 0.02 58.92 0.00 17.83 3.68 0.02 - - 0.02 59.00 0.00 17.83 3.68 _ 0.02 _ 0.02 59.08 0.00 17.83 3.68 0.02 - - - - 0.02 59.17 0.00 17.83 3.68 0.02 - - 0.02 59.25 0.00 17.83 3.68 _ 0.02 _ 0.02 59.33 0.00 17.83 3.68 0.02 - - - - 0.02 59.42 0.00 17.83 3.68 0.02 - - - - 0.02 59.50 0.00 17.83 3.68 0.02 - - 0.02 59.58 0.00 17.83 3.68 _ 0.02 _ 0.02 59.67 0.00 17.83 3.68 0.02 - - - - 0.02 59.83 0.00 17.83 3.67 0.02 0.02 59.83 0.00 17.83 3.67 - _ 0.02 _ - 0.02 59.92 0.00 17.83 3.67 0.02 0.02 60.00 0.00 17.83 3.67 0.02 - - - - 0.02 60.08 0.00 17.83 3.67 0.02 - - 0.02 1 60.17 0.00 17.83 3.67 _ 0.02 _ 0.02 Continues on next page... I KURE DUNES page 16 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A WeirEl Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 60.25 0.00 17.83 3.67 0.02 - - 0.02 60.33 0.00 17.82 3.67 _ _ 0.02 0.02 60.42 0.00 17.82 3.67 0.02 - - - - 0.02 60.50 0.00 17.82 3.67 0.02 - - - - 0.02 ' 60.58 0.00 17.82 3.67 0.02 - - 0.02 60.67 0.00 17.82 3.67 _ _ 0.02 0.02 60.75 0.00 17.82 3.67 0.02 - - - - 0.02 1 60.83 60.92 0.00 0.00 17.82 17.82 3.67 3.67 0.02 - _ _ - 0.02 0.02 0.02 61.00 0.00 17.82 3.67 0.02 - - - - 0.02 61.08 0.00 17.82 3.67 0.02 - - - - 0.02 61.17 0.00 17.82 3.67 0.02 0.02 61.25 0.00 17.82 3.67 0.02 - - - - 0.02 61.33 0.00 17.82 3.67 0.02 - - - - 0.02 61. 0.00 17.82 3.67 0.02 0.02 ' 61.50 50 0.00 17.82 3.67 - _ _ = 0.02 0,02 61.58 0.00 17.82 3.67 0.02 0.02 61.67 0.00 17.82 3.67 0.02 - - - - 0.02 61.75 0.00 17.82 3.67 0.02 - 0.02 61.83 0.00 17.82 3.67 _ _ = 0.02 0.02 61.92 0.00 17.82 3.67 0.02 - - - - 0.02 62.00 0.00 17.82 3.67 0.02 - - - - 0.02 62.08 0.00 17.82 3.67 0.02 - - - - 0.02 62.17 0.00 17.82 3.67 0.02 - - - - 0.02 62.25 0.00 17.81 3.67 0.02 - - - - 0.02 62. 62.42 42 0.00 0.00 17.81 17.81 3.67 3.67 0.02 - _ _ - 0.02 0.02 0.02 62.50 0.00 17.81 3.66 0.02 - - - 0.02 62.58 0.00 17.81 3.66 0.02 - - - - 0.02 62.67 0.00 17.81 3.66 0.02 - - 0.02 62.75 0.00 17.81 3.66 _ _ 0.02 0.02 62.83 0.00 17.81 3.66 0.02 - - - - 0.02 62.92 0.00 17.81 3.66 0.02 - - - - 0.02 ' 63.00 0.00 17.81 3.66 0.02 - - 0.02 63.08 0.00 17.81 3.66 _ _ 0.02 0.02 63.17 0.00 17.81 3.66 0.02 - - - - 0.02 ' 63.25 63.33 0.00 0.00 17.81 17.81 3.66 3.66 0.02 - _ _ - 0.02 0.02 0.02 63.42 0.00 17.81 3.66 0.02 - - - - 0.02 63.50 0.00 17.81 3.66 0.02 - - - - 0.02 ' 63.58 0.00 17.81 3.66 0.02 - - 0.02 63.67 0.00 17.81 3.66 _ _ 0.02 0.02 63.75 0.00 17.81 3.66 0.02 - - - - 0.02 1 63. 63.92 92 0.00 0.00 17.81 17.81 3.66 3.66 0.02 - _ _ - 0.02 0.02 0,02 64.00 0.00 17.81 3.66 0.02 - - - 0.02 64.08 0.00 17.81 3.66 0.02 - - - - 0.02 0.00 17.81 3.66 0.02 - - 0.02 '64.17 64.25 0.00 17.81 3.66 _ _ 0.02 0.02 ' Continues on next page... 1 1 KURE DUNES page 17 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (cfs) (Cfs) (Cfs) 64.33 0.00 17.80 3.66 0.02 - - 0.02 1 64.42 0.00 17.80 3.66 _ 0.02 _ 0.02 64.50 0.00 17.80 3.66 0.02 - - - - 0.02 64.58 0.00 17.80 3.66 0.02 - - - - 0.02 64.67 0.00 17.80 3.66 0.02 - - 0.02 64.75 0.00 17.80 3.66 _ 0.02 _ 0.02 64.83 0.00 17.80 3.66 0.02 - - - - 0.02 64.92 0.00 17.80 3.66 0.02 - - 0.02 65.00 0.00 17.80 3.66 _ 0.02 _ 0.02 65.08 0.00 17.80 3.66 0.02 - - - - 0.02 65.17 0.00 17.80 3.66 0.02 - - - - 0.02 65.25 0.00 17.80 3.66 0.02 - - 0.02 I 65.33 0.00 17.80 3.66 _ 0.02 _ 0.02 65.42 0.00 17.80 3.65 0.02 - - - - 0.02 65.50. 65.58 0.00 0.00 17.80 17.80 3.65 3.65 0.02 - _ 0.02 _ - 0.02 0.02 65.67 0.00 17.80 3.65 0.02 0.02 65.75 0.00 17.80 3.65 0.02 - - - - 0.02 65.83 0.00 17.80 3.65 0.02 - - 0.02 65.92 0.00 17.80 3.65 _ 0.02 _ 0.02 66.00 0.00 17.80 3.65 0.02 - - - - 0.02 66.08 0.00 17.80 3.65 0.02 - - - - 0.02 66.17 0.00 17.80 3.65 0.02 - - 0.02 66.25 0.00 17.80 3.65 _ 0.02 _ 0.02 66.33 0.00 17.80 3.65 0.02 - - - - 0.02 66. 66.50 50 0.00 0.00 17.80 17.80 3.65 3.65 0.02 - _ 0.02 _ - 0.02 0.02 66.58 0.00 17.79 3.65 0.02 - - - 0.02 66.67 0.00 17.79 3.65 0.02 - - - - 0.02 66.75 0.00 17.79 3.65 0.02 - - 0.02 I 66.83 0.00 17.79 3.65 _ 0.02 _ 0.02 66.92 0.00 17.79 3.65 0.02 - - - - 0.02 67.00 0.00 17.79 3.65 0.02 - - - - 0.02 67.08 0.00 17.79 3.65 0.02 - - 0.02 67.17 0.00 17.79 3.65 _ 0.02 _ 0.02 67.25 0.00 17.79 3.65 0.02 - - - - 0.02 67.33 0.00 17.79 3.65 0.01 - - 0.01 67.42 0.00 17.79 3.65 _ 0.01 _ 0.01 67.50 0.00 17.79 3.65 0.01 - - - - 0.01 67.58 0.00 17.79 3.65 0.01 - - - - 0.01 67.67 0.00 17.79 3.65 0.01 - - 0.01 67.75 0.00 17.79 3.65 _ 0.01 _ 0.01 67.83 0.00 17.79 3.65 0.01 - - - - 0.01 1 6. 68.00 00 0.00 0.00 17.79 17.79 3.65 3.65 0.01 - _ 0.01 _ - 0.01 0.01 68.08 0.00 17.79 3.65 0.01 - - - 0.01 68.17 0.00 17.79 3.65 0.01 - - - - 0.01 68.25 0.00 17.79 3.65 0.01 - - 0.01 68.33 0.00 17.79 3.65 _ 0.01 _ 0.01 Continues on next page... KURE DUNES Page 18 1 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) Ids) (cfs) (cfs) (cfs) (cfs) (cfs)' (cfs) 68.42 0.00 17.79 3.65 0.01 - - 0.01 68.50 0.00 17.79 3.65 _ _ 0.01 0.01 68.58 0.00 17.79 3.65 0.01 - - - - 0.01 68.67 0.00 17.79 3.65 0.01 - - - - 0.01 I 68.75 0.00 17.79 3.64 0.01 - - 0.01 68.83 0.00 17.79 3.64 _ _ 0.01 0.01 68.92 0.00 17.79 3.64 0.01 - - - - 0.01 69.0 69.08 0.00 0.00 17.7 17.788 3.64 3.64 0.01 - _ _ - 0.01 0.01 0.01 69.17 0.00 17.78 3.64 0.01 - 0.01 69.25 0.00 17.78 3.64 0.01 - - - - 0.01 69.33 0.00 17.78 3.64 0.01 - - 0.01 69.42 0.00 17.78 3.64 _ _ 0.01 0.01 69.50 0.00 17.78 3.64 0.01 - - - - 0.01 69.58 0.00 17.78 3.64 0.01 - - - - 0.01 69.67 0.00 17.78 3.64 0.01 - 0.01 69.75 0.00 17.78 3.64 _ _ = 0.01 0.01 69.83 0.00 17.78 3.64 0.01 - - - - 0.01 1 69.92 70.00 0.00 0.00 17.78 17.78 3.64 3.64 0.01 - _ _ = 0.01 0.01 0.01 70.08 0.00 17.78 3.64 0.01 - - - - 0.01 70.17 0.00 17.78 3.64 0.01 - - - - 0.01 70.25 0.00 17.78 3.64 0.01 - 0.01 ' 70.33 0.00 17.78 3.64 _ _ = 0.01 0.01 70.42 0.00 17.78 3.64 0.01 - - - - 0.01 70.5 0.00 17.78 3.64 0.01 0.01 70.58 0.00 17.78 3.64 - _ _ - 0.01 0.01 70.67 0.00 17.78 3.64 0.01 0.01 70.75 0.00 17.78 3.64 0.01 - - - - 0.01 70.83 0.00 17.78 3.64 0.01 - - 0.01 70.92 0.00 17.78 3.64 _ _ 0.01 0.01 71.00 0.00 17.78 3.64 0.01 - - - - 0.01 71.08 0.00 17.78 3.64 0.01 - - - - 0.01 ' 71.17 0.00 17.78 3.64 0.01 - - 0.01 71.25 0.00 17.78 3.64 _ _ 0.01 0.01 71.33 0.00 17.78 3.64 0.01 - - - - 0.01 71. 71.50 50 0.00 0.00 17.78 17.78 3.64 3.64 0.01 - _ _ - 0.01 0.01 0.01 71.58 0.00 17.78 3.64 0.01 - - - - 0.01 71.67 0.00 17.78 3.64 0.01 - - - - 0.01 71.75 0.00 17.78 3.64 0.01 - - 0.01 ' 71.83 0.00 17.78 3.64 _ _ 0.01 0.01 71.92 0.00 17.78 3.64 0.01 - - - - 0.01 72.0 0.00 17.77 3.64 0.01 0.01 1 72.08 0.00 17.77 3.64 - _ _ - 0.01 0.01 72.17 0.00 17.77 3.64 0.01 0.01 72.25 0.00 17.77 3.64 0.01 - - - - 0.01 72.33 0.00 17.77 3.64 0.01 - 0.01 1 72.42 0.00 17.77 3.64 = _ _ 0.01 0.01 I Confinues on next page... KURE DUNES page 19 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 72.50 0.00 17.77 3.64 0.01 - - - - 0.01 72.58 0.00 17.77 3.64 0.01 - - - - 0.01 72.67 0.00 17.77 3.64 0.01 - - - - 0.01 72.75 0.00 17.77 3.63 0.01 - - - - 0.01 72.83 0.00 17.77 3.63 - . 0.01 - - - - '0.01 72.92 0.00 17.77 3.63 0.01 - - - - 0.01 73.00 0.00 17.77 3.63 0.01 - - - - 0.01 73.08 0.00 17.77 3.63 0.01 - - - - 0.01 73.17 0.00 17.77 3.63 0.01 - - - - 0.01 73.25 0.00 17.77 3.63 0.01 - - - - 0.01 End Reservoir Report Page t Reservoir No. 2 PHASE 4 - KURE DUNES Culvert / Orifice Structures Weir Structures [A] [B] [C] [A] [B] [C] Rise (in) = 15.0 2.0 0.0 Crest Len (ft) = 8.0 10.0 0.0 Span (in) = 15.0 2.0 0.0 Crest El. (ft) = 18.70 21.50 0.00 No. Barrels = 1 1 0 Weir Coeff. = 3.00 3.00 3.00 Invert El. (ft) = 16.22 17.75 0.00 Eqn. Exp. = 1.50 1.50 1.50 Length (ft) = 725.0 0.0 0.0 Multistage = Yes Yes No Slope (%) = 0.30 0.00 0.00 N-Value = .013 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 Multistage = - Yes No Tailwater Elevation = 15.18 it IJo[e: III oWlo have peen amyied under Inlet aM ou t wneol. 1 '/ Stage / Storage Discharge Table Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cuft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 0.0 00 16.22 0.00 0.00 0.00 0.00 - 0.00 0.2 01 16.37 1.63 0.00 _ 0.00 0.00 0.00 0.3 01 16.52 2.30 0.00 - 0.00 0.00 - 0.00 ' 0.5 02 0.6 02 16.68 16.83 2,82 2.96 0.00 0.00 - 0.00 0.00 0.0o 0.00 - 0.00 0.00 0.8 03 16.98 3.10 0.00 0.00 0.00 0.00 0.9 04 17.13 3.23 0.00 - 0.00 0.00 - 0.00 1.1 04 17.28 3.35 0.00 0.00 0.00 0.00 1 1.2 05 17.44 3.41 0.00 _ 0.00 0.00 _ 0.00 1.4 05 17.59 3.50 0.00 - 0.00 0.00 - 0.00 1.5 06 17.74 3.61 0.00 - 0.00 0.00 - 0.00 1.5 12 17.74 3.61 0.00 0.00 0.00 - 0.00 1.5 19 17.74 3.61 0.00 _ 0.00 0.00 0.00 1.5 25 17.74 3.61 0.00 - 0.00 0.00 - 0.00 1.5 32 1.5 38 17.74 17.74 3.61 3.61 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 1.5 44 17.75 3.62 0.00 - 0.00 0.00 - 0.00 1.5 51 17.75 3.62 0.00 - 0.00 0.00 - 0.00 1.5 57 17.75 3.62 0.00 0.00 0.00 0.00 1.5 64 17.75 3.62 0.00 _ 0.00 0.00 _ 0.00 1.5 70 17.75 3.62 0.00 - 0.00 0.00 - 0.00 1 1.6 405 1.6 740 17,77 17.80 3.64 3.65 0.01 0.02 - 0,00 0.00 0,00 0.00 - 0.01 0.02 1.6 1,075 17.82 3.67 0.02 0.00 0.00 0.02 I Continues on next page... I JL PHASE 4 - KURE DUNES Page 2 Stage / Storage / Discharge Table Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cuft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 1.6 1,410 17.85 3.69 0.02 - 0.00 0.00 0.02 ' 1.7 1,746 17.87 3.71 0.03 0.00 _ 0.00 0.03 1.7 2,081 17.90 3.73 0.03 - 0.00 0.00 - 0.03 1.7 2,416 17.92 3.75 0.03 - 0.00 0.00 - 0.03 1.7 2,751 17.95 3.76 0.04 - 0.00 0.00 - 0.04 1.8 3,086 17.97 3.78 0.04 0.00 0.00 0.04 1.8 3,421 18.00 3.80 0.04 - 0.00 0.00 - 0.04 1.9 2.0 4,890 6,360 18.10 18.20 3.87 3.94 0.05 - 0.06 0.00 0.00 0.00 _ 0.00 0.05 0.06 2.1 7,829 18.30 4.00 0.07 0.00 0.00 - 0.07 2.2 9,298 18.40 4.07 0.08 - 0,00 0.00 - 0.08 2.3 10,767 18.50 4.13 0.09 - 0.00 0.00 0.09 2.4 12,237 18.60 4.20 0.09 0.00 _ 0.00 0.09 2.5 13,706 18.70 4.26 0.10 - 0.00 0.00 - 0.10 2.6 15,175 18.80 4.32 0.10 - 0.78 0.00 - 0.86 2.7 16,645 18.90 4.38 0.11 - 2.15 0.00 - 2.26 2.8 18,114 19.00 4.44 0.11 3.94 0.00 4.06 2.9 19,757 19.10 4.50 0.09 - 6.07 0.00 - 4.50 1 3.0 3.1 21,400 23,043 19.20 19.30 4.56 4.62 0.00 _ 0.00 8.49 11.15 0.00 - 0.00 4.56 4.62 3.2 24,686 19.40 4.68 0.00 - 14.06 0.00 - 4.68 3.3 26,329 19.50 4.74 0.00 - 17.17 0.00 - 4.74 3.4 27,972 19.60 4.79 0.00 - 20.49 0.00 - 4.79 3.5 29,615 19.70 4.85 0.00 24.00 0.00 4.85 3.6 31,258 19.80 4.90 0.00 - 27.69 0.00 - 4.90 3.7 32,901 19.90 4,96 0,00 - 31.55 0,00 - 4,96 ' 3.8 34,544 20.00 5.01 0.00 35.57 0.00 5.01 3.9 36,444 20.10 5.06 0.00 39.76 0.00 5.06 4.0 38,344 20.20 5.11 0.00 - 44.09 0.00 - 5.11 4.1 40,243 20.30 5.17 0.00 48.57 0.00 5.17 ' 4.2 42,143 20.40 5.22 _ 0.00 53.20 _ 0.00 5.22 4.3 44,043 20.50 5.27 0.00 - 57.96 0.00 - 5.27 4.4 45,943 20.60 5.32 0.00 - 62.86 0.00 - 5.32 ' 4.5 47,843 20.70 5.37 0.00 - 67.88 0.00 5.37 4.6 49,742 20.80 5.42 0.00 73.04 _ 0.00 5.42 4.7 51,642 20.90 5.47 0.00 - 78.32 0.00 - 5.47 4.8 4.8 53,542 54,614 21.00 21.05 5.52 5.54 0.00 _ 0.00 83.71 86.46 0.00 _ 0.00 5.52 5.54 4.9 55,687 21.10 5.56 0.00 - 89.23 0.00 - 5.56 4.9 56,759 21.15 5.59 0.00 - 92.04 0.00 - 5.59 5.0 57,831 21.20 5.61 0.00 94.87 0.00 5.61 ' 5.0 58,904 21.25 5.64 _ 0.00 97.73 _ 0.00 5.64 5.1 59,976 21.30 5.66 0.00 - 100.62 0.00 - 5.66 5.1 61,048 21.35 5.68 0.00 - 103.53 0.00 - 5.68 5.2 62,120 21.40 5.71 0.00 106.48 0.00 5.71 5.2 63,193 21.45 5.73 0.00 109.45 0.00 5.73 5.3 64,265 21.50 5.75 0.00 - 112.45 0.00 - 5.75 I I Hydrograph Report Hyd. No. 9 1-INCH STORM THE KEYS Hydrograph type = Manual Storm frequency = 10 yrs Hydrograph Discharge Table Time -- Outflow (hrs cfs) 0.08 80.26 << 0.17 80.26 << ... End Page 1 Peak discharge = 80.26 cis Time interval = 5 min Total Volume = 48,156 cult, 1.106 aoft Hydrograph Report page I Hyd. No. 11 Hydrograph type = Combine Peak discharge = 80.34 cfs Storm frequency = 10 yrs Time interval = 5 min 1 st inflow hyd. No. = 9 2nd inflow hyd. No. = 10 ' = 60,077 1.M acft Total volume curt, Hydrograph Discharge Table ' Time 1st Inflow + 2nd Inflow _ Outflow (hrs) (cfs) (cfs) (cfs) 0.08 8026 << 0.04 80.30 0.17 80.26 << 0.08 80.34 << 0.25 0.00 0.09 << 0.09 0.33 0.00 0.09 0.09 0.42 0.00 0.09 0.09 1 0,50 0.00 0.58 0.00 0.09 0.09 0.09 0.09 0.67 0.00 0.09 0.09 0.75 0.00 0.09 0.09 0.83 0.00 0.09 0.09 0.92 0.00 0.09 0.09 1.00 0.00 0.09 0.09 1.08 0.00 0.09 0.09 1.17 0.00 0.09 0.09 ' 1.25 0.00 0.09 0.09 1.33 0.00 0.09 0.09 1.42 0.00 0.09 0.09 1 1.50 0.00 0.09 0.09 1.58 0.00 0.09 0.09 1.67 0.00 0.09 0.09 1.75 0.00 0.09 0.09 1.83 0.00 0.09 0.09 1.92 0.00 0.09 0.09 2,00 0,00 0.09 0.09 2.08 0.00 0.09 0.09 2.17 0.00 0.09 0.09 2.25 0.00 0.09 0.09 2.33 0.00 0.09 0.09 2.42 0.00 0.09 0.09 2.50 0.00 0.09 0.09 2.58 0.00 0.09 0.09 2.67 0.00 0.09 0.09 2.75 0.00 0.09 0.09 2.83 0.00 0.09 0.09 2.92 0.00 0.09 0.09 3.00 0.00 0.09 0.09 Continues on next page... I L rJ L7 I 11 I I I I Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 3.08 0.00 0.09 0.09 3.17 0.00 0.09 0.09 3.25 0.00 0.09 0.09 3.33 0.00 0.09 0.09 3.42 0.00 0.09 0.09 3.50 0.00 0.09 0.09 3.58 0.00 0.09 0.09 3.67 0.00 0.09 0.09 3.75 0.00 0.09 0.09 3.83 0.00 0.09 0.09 3.92 0.00 0.09 0.09 4.00 0.00 0.09 0.09 4.08 0.00 0.09 0.09 4.17 0.00 0.09 0.09 4.25 0.00 0.09 0.09 4.33 0.00 0.09 0.09 4.42 0.00 0.09 0.09 4.50 0.00 0.09 0.09 4.58 0.00 0.09 0.09 4.67 0.00 0.09 0.09 4.75 0.00 0.09 0.09 4.83 0.00 0.09 0.09 4.92 0.00 0.09 0.09 5.00 0.00 0.09 0.09 5.08 0.00 0.09 0.09 5.17 0.00 0.09 0.09 5.25 0.00 0.09 0.09 5.33 0.00 0.09 0.09 5.42 0.00 0.09 0.09 5.50 0.00 0.09 0.09 5.58 0.00 0.09 0.09 5.67 0.00 0.09 0.09 5.75 0.00 0.09 0.09 5.83 0.00 0.09 0.09 5.92 0.00 0.09 0.09 6.00 0.00 0.09 0.09 6.08 0.00 0.09 0.09 6.17 0.00 0.09 0.09 6.25 0.00 0.09 0.09 6.33 0.00 0.09 0.09 6.42 0.00 0.09 0.09 6.50 0.00 0.09 0.09 6.58 0.00 0.09 0.09 6.67 0.00 0.09 0.09 6.75 0.00 0.09 0.09 6.83 0.00 0.09 0.09 6.92 0.00 0.08 0.08 7.00 0.00 0.08 0.08 7.08 0.00 0.08 0.08 Continues on next page... Pape 2 Page 3 Hydrograph Discharge Table rTime 1st Inflow + 2nd Inflow = outflow (hrs) (cfs) (cfs) (cfs) 7.17 0.00 0.08 0.08 7.25 0.00 0.08 0.08 7.33 0.00 0.08 0.08 7.42 0.00 0.08 0.08 7.50 0.00 0.08 0.08 7.58 0.00 0.08 0.08 7.67 0.00 0.08 0.08 7.75 0.00 0.08 0.08 7.83 0.00 0.08 0.08 7.92 0.00 0.08 0.08 8.00 0.00 0.08 0.08 8.08 0.00 0.08 0.08 8.17 0.00 0.08 0.08 8.25 0.00 0.08 0.08 8.33 0.00 0.08 0.08 0.08 0.08 8.42 0.00 8.50 0.00 0.08 0.08 8.58 0.00 0.08 0.08 ' 8.67 0.00 0.08 0.08 8.75 0.00 0.08 0.08 8.83 0.00 0.08 0.08 8.92 0.00 0.08 0.08 9.00 0.00 0.08 0.08 9.08 0.00 0.08 0.08 9.17 0.00 0.08 0.08 9.25 0.00 0.08 0.08 0.08 9.33 0.00 0.08 9.42 0.00 0.08 0.08 9.50 0.00 0.08 0.08 1 9.58 0.00 0.08 0.08 9.67 0.00 0.08 0.08 9.75 0.00 0.08 0.08 9.83 0.00 0.08 0.08 0.08 0.08 9.92 0.00 10.00 0.00 0.08 0.08 10.08 0.00 0.08 0.08 10.17 0.00 0.08 0.08 10.25 0.00 0.08 0.08 10.33 0.00 0.08 0.08 10.42 0.00 0.08 0.08 ' 10.50 0.00 0.08 0.08 10.58 0.00 0.08 0.08 10.67 0.00 0.08 0.08-, ' 10.75 0.00 0.08 0.08 0.08 10.83 0.00 0.08 10.92 0.00 0.08 0.08 11.00 0.00 0.08 0.08 ' 11.08 0.00 0.08 0.08 11.17 0.00 0.08 0.08 Continues on next page... I P r I H i I F 11 [1 I I I L Hydrograph Discharge Table Time 1st inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 11.25 0.00 0.08 0.08 11.33 0.00 0.08 0.08 11.42 0.00 0.08 0.08 11.50 0.00 0.08 0.08 11.58 0.00 0.08 0.08 11.67 0.00 0.08 0.08 11.75 0.00 0.08 0.08 11.83 0.00 0.08 0.08 11.92 0.00 0.08 0.08 12.00 0.00 0.08 0.08 12.08 0.00 0.08 0.08 12.17 0.00 0.08 0.08 12.25 0.00 0.08 0.08 12.33 0.00 0.08 0.08 12.42 0.00 0.08 0.08 12.50 0.00 0.08 0.08 12.58 0.00 0.08 0.08 12.67 0.00 0.08 0.08 12.75 0.00 0.08 0.08 12.83 0.00 0.08 0.08 12.92 0.00 0.08 0.08 13.00 0.00 0.08 0.08 13.08 0.00 0.08 0.08 13.17 0.00 0.08 0.08 13.25 0.00 0.08 0.08 13.33 0.00 0.08 0.08 13.42 0.00 0.08 0.08 13.50 0.00 0.08 0.08 13.58 0.00 0.08 0.08 13.67 0.00 0.08 0.08 13.75 0.00 0.08 0.08 13.83 0.00 0.08 0.08 13.92 0.00 0.08 0.08 14.00 0.00 0.08 0.08 14.08 0.00 0.08 0.08 14.17 0.00 0.08 0.08 14.25 0.00 0.08 0.08 14.33 0.00 0.07 0.07 14.42 0.00 0.07 0.07 14.50 0.00 0.07 0.07 14.58 0.00 0.07 0.07 14.67 0.00 0.07 0.07 14.75 0.00 0.07 0.07 14.83 0.00 0.07 0.07 14.92 0.00 0.07 0.07 15.00 0.00 0.07 0.07 15.08 0.00 0.07 0.07 15.17 0.00 0.07 0.07 15.25 0.00 0.07 0.07 Continues on next page... Page 4 I I I I I I i 1 r Hydrograph Discharge Table Time 7st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 15.33 0.00 0.07 0.07 15.42 0.00 0.07 0.07 15.50 0.00 0.07 0.07 15.58 0.00 0.07 0.07 15.67 0.00 0.07 0.07 15.75 0.00 0.07 0.07 15.83 0.00 0.07 0.07 15.92 0.00 0.07 0.07 16.00 0.00 0.07 0.07 16.08 0.00 0.07 0.07 16.17 0.00 0.07 0.07 16.25 0.00 0.07 0.07 16.33 0.00 0.07 0.07 16.42 0.00 0.07 0.07 16.50 0.00 0.07 0.07 16.58 0.00 0.07 0.07 16.67 0.00 0.07 0.07 16.75 0.00 0.07 0.07 16.83 0.00 0.07 0.07 16.92 0.00 0.07 0.07 17.00 0.00 0.07 0.07 17.08 0.00 0.07 0.07 17.17 0.00 0.07 0.07 17.25 0.00 0.07 0.07 17.33 0.00 0.07 0.07 17.42 0.00 0.07 0.07 17.50 0.00 0.07 0.07 17.58 0.00 0.07 0.07 17.67 0.00 0.07 0.07 17.75 0.00 0.07 0.07 17.83 0.00 0.07 0.07 17.92 0.00 0.07 0.07 18.00 0.00 0.07 0.07 18.08 0.00 0.07 0.07 18.17 0.00 0.07 0.07 18.25 0.00 0.07 0.07 18.33 0.00 0.07 0.07 18.42 0.00 0.07 0.07 18.50 0.00 0.07 0.07 18.58 0.00 0.07 0.07 18.67 0.00 0.07 0.07 18.75 0.00 0.07 0.07 18.83 0.00 0.07 0.07 18.92 0.00 0.07 0.07 19.00 0.00 0.07 0.07 19.08 0.00 0.07 0.07 19.17 0.00 0.07 0.07 19.25 0.00 0.07 0.07 19.33 0.00 0.07 0.07 Continues on next page... Page 5 I d I u I I I I 11 �1 1 I Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 19.42 0.00 0.07 0.07 19.50 0.00 0.07 0.07 19.58 0.00 0.07 0.07 19.67 0.00 0.07 0.07 19.75 0.00 0.07 0.07 19.83 0.00 0.07 0.07 19.92 0.00 0.07 0.07 20.00 0.00 0.07 0.07 20.08 0.00 0.07 0.07 20.17 0.00 0.07 0.07 20.25 0.00 0.07 0.07 20.33 0.00 0.07 0.07 20.42 0.00 0.07 0.07 20.50 0.00 0.07 0.07 20.58 0.00 0.07 0.07 20.67 0.00 0.07 0.07 20.75 0.00 0.07 0.07 20.83 0.00 0.07 0.07 20.92 0.00 0.07 0.07 21.00 0.00 0.07 0.07 21.08 0.00 0.07 0.07 21.17 0.00 0.07 0.07 21.25 0.00 0.07 0.07 21.33 0.00 0.07 0.07 21.42 0.00 0.07 0.07 21.50 0.00 0.07 0.07 21.58 0.00 0.07 0.07 21.67 0.00 0.07 0.07 21.75 0.00 0.06 0.08 21.83 0.00 0.06 0.06 21.92 0.00 0.06 0.06 22.00 0.00 0.06 0.06 22.08 0.00 0.06 0.06 22.17 0.00 0.06 0.06 22.25 0.00 0.06 0.06 22.33 0.00 0.06 0.06 22.42 0.00 0.06 0.06 22.50 0.00 0.06 0.06 22.58 0.00 0.06 0.06 22.67 0.00 0.06 0.06 22.75 0.00 0.06 0.06 22.83 0.00 0.06 0.06 22.92 0.00 0.06 0.06 23.00 0.00 0.06 0.06 23.08 0.00 0.06 0.06 23.17 0.00 0.06 0.06 23.25 0.00 0.06 0.06 23.33 0.00 0.06 0.06 23.42 0.00 0.06 0.06 Continues on next page... Page 6 Page 7 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 23.50 0.00 0.06 0.06 23.58 0.00 0.06 0.06 23.67 0.00 0.06 0.06 23.75 0.00 0.06 0.06 23.83 0.00 0.06 0.06 23.92 0.00 0.06 0.06 24.00 0.00 0.06 0.06 24.08 0.00 0.06 0.06 24.17 0.00 0.06 0.06 24.25 0.00 0.06 0.06 24.33 0.00 0.06 0.06 24.42 0.00 0.06 0.06 24.50 0.00 0.06 0.06 24.58 0.00 0.06 0.06 24.67 0.00 0.06 0.06 24.75 0.00 0.06 0.06 24.83 0.00 0.06 0.06 24.92 0.00 0.06 0.06 25.00 0.00 0.06 0.06 25.08 0.00 0.06 0.06 25.17 0.00 0.06 0.06 25.25 0.00 0.06 0.06 25.33 0.00 0.06 0.06 25.42 0.00 0.06 0.06 25.50 0.00 0.06 0.06 25.58 0.00 0.06 0.06 25.67 0.00 0.06 0.06 25.75 0.00 0.06 0.06 25.83 0.00 0.06 0.06 25.92 0.00 0.06 0.06 26.00 0.00 0.06 0.06 26.08 0.00 0.06 0.06 26.17 0.00 0.06 0.06 26.25 0.00 0.06 0.06 26.33 0.00 0.06 0.06 26.42 0.00 0.06 0.06 26.50 0.00 0.06 0.06 26.58 0.00 0.06 0.06 26.67 0.00 0.06 0.05 26.75 0.00 0.06 0.06 26.83 0.00 0.06 0.06 26.92 0.00 0.06 0.06 27.00 0.00 0.06 0.06 27.08 0.00 0.06 0.06 27.17 0.00 0.06 0.06 27.25 0.00 0.06 0.06 27.33 0.00 0.06 0.06 27.42 0.00 0.06 0.06 27.50 0.00 0.06 0.06 Continues on next page... I 1 C 11 L Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 27.58 0.00 0.06 0.06 27.67 0.00 0.06 0.06 27.75 0.00 0.06 0.06 27.83 0.00 0.06 0.06 27.92 0.00 0.06 0.06 28.00 0.00 0.06 0.06 28.08 0.00 0.06 0.06 28.17 0.00 0.06 0.06 28.25 0.00 0.06 0.06 28.33 0.00 0.06 0.06 28.42 0.00 0.06 0.06 28.50 0.00 0.06 0.06 28.58 0.00 0.06 0.06 28.67 0.00 0.06 0.06 28.75 0.00 0.06 0.06 28.83 0.00 0.06 0.06 28.92 0.00 0.06 0.06 29.00 0.00 0.06 0.06 29.08 0.00 0.06 0.06 29.17 0.00 0.05 0.05 29.25 0.00 0.05 0.05 29.33 0.00 0.05 0.05 29.42 0.00 0.05 0.05 29.50 0.00 0.05 0.05 29.58 0.00 0.05 0.05 29.67 0.00 0.05 0.05 29.75 0.00 0.05 0.05 29.83 0.00 0.05 0.05 29.92 0.00 0.05 0.05 30.00 0.00 0.05 0.05 30.08 0.00 0.05 0.05 30.17 0.00 0.05 0.05 30.25 0.00 0.05 0.05 30.33 0.00 0.05 0.05 30.42 0.00 0.05 0.05 30.50 0.00 0.05 0.05 30.58 0.00 0.05 0.05 30.67 0.00 0.05 0.05 30.75 0.00 0.05 0.05 30.83 0.00 0.05 0.05 30.92 0.00 0.05 0.05 31.00 0.00 0.05 0.05 31.08 0.00 0.05 0.05 31.17 0.00 0.05 0.05 31.25 0.00 0.05 0.05 31.33 0.00 0.05 0.05 31.42 0.00 0.05 0.05 31.50 0.00 0.05 0.05 31.58 0.00 0.05 0.05 Continues on next page... Page 8 I I 71 LJ I 11 1 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 31.67 0.00 0.05 0.05 31.75 0.00 0.05 0.05 31.83 0.00 0.05 0.05 31.92 0.00 0.05 0.05 32.00 0.00 0.05 0.05 32.08 0.00 0.05 0.05 32.17 0.00 0.05 0.05 32.25 0.00 0.05 0.05 32.33 0.00 0.05 0.05 32.42 0.00 0.05 0.05 32.50 0.00 0.05 0.05 32.58 0.00 0.05 0.05 32.67 0.00 0.05 0.05 32.75 0.00 0.05 0.05 32.83 0.00 0.05 0.05 32.92 0.00 0.05 0.05 33.00 0.00 0.05 0.05 33.08 0.00 0.05 0.05 33.17 0.00 0.05 0.05 33.25 0.00 0.05 0.05 33.33 0.00 0.05 0.05 33.42 0.00 0.05 0.05 33.50 0.00 0.05 0.05 33.58 0.00 0.05 0.05 33.67 0.00 0.05 0.05 33.75 0.00 0.05 0.05 33.83 0.00 0.05 0.05 33.92 0.00 0.05 0.05 34.00 0.00 0.05 0.05 34.08 0.00 0.05 0.05 34.17 0.00 0.05 0.05 34.25 0.00 0.05 0.05 34.33 0.00 0.05 0.05 34.42 0.00 0.05 0.05 34.50 0.00 0.05 0.05 34.58 0.00 0.05 0.05 34.67 0.00 0.05 0.05 34.75 0.00 0.05 0.05 34.83 0.00 0.05 0.05 34.92 0.00 0.05 0.05 35.00 0.00 0.05 0.05 35.08 0.00 0.05 0.05 35.17 0.00 0.05 0.05 35.25 0.00 0.05 0.05 35.33 0.00 0.05 0.05 35.42 0.00 0.05 0.05 35.50 0.00 0.05 0.05 35.58 0.00 0.04 0.04 35.67 0.00 0.04 0.04 Continues on next page... Page 9 I i 1 1 F 1 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 35.75 0.00 0.04 0.04 35.83 0.00 0.04 0.04 35.92 0.00 0.04 0.04 36.00 0.00 0.04 0.04 36.08 0.00 0.04 0.04 36.17 0.00 0.04 0.04 36.25 0.00 0.04 0.04 36.33 0.00 0.04 0.04 36.42 0.00 0.04 0.04 36.50 0.00 0.04 0.04 36.58 0.00 0.04 0.04 36.67 0.00 0.04 0.04 36.75 0.00 0.04 0.04 36.83 0.00 0.04 0.04 36.92 0.00 0.04 0.04 37.00 0.00 0.04 0.04 37.08 0.00 0.04 0.04 37.17 0.00 0.04 0.04 37.25 0.00 0.04 0.04 37.33 0.00 0.04 0.04 37.42 0.00 0.04 0.04 37.50 0.00 0.04 0.04 37.58 0.00 0.04 0.04 37.67 0.00 0.04 0.04 37.75 0.00 0.04 0.04 37.83 0.00 0.04 0.04 37.92 0.00 0.04 0.04 38.00 0.00 0.04 0.04 38.08 0.00 0.04 0.04 38.17 0.00 0.04 0.04 38.25 0.00 0.04 0.04 38.33 0.00 0.04 0.04 38.42 0.00 0.04 0.04 38.50 0.00 0.04 0.04 38.58 0.00 0.04 0.04 38.67 0.00 0.04 0.04 38.75 0.00 0.04 0.04 38.83 0.00 0.04 0.04 38.92 0.00 0.04 0.04 39.00 0.00 0.04 0.04 39.08 0.00 0.04 0.04 39.17 0.00 0.04 0.04 39.25 0.00 0.04 0.04 39.33 0.00 0.04 0.04 39.42 0.00 0.04 0.04 39.50 0.00 0.04 0.04 39.58 0.00 0.04 0.04 39.67 0.00 0.04 0.04 39.75 0.00 0.04 0.04 Continues on next page... Page 10 i page 11 Hydrograph Discharge Table ' Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 39.83 0.00 0.04 0.04 39.92 0.00 0.04 0.04 40.00 0.00 0.04 0.04 40.08 0.00 0.04 0.04 40.17 0.00 0.04 0.04 40.25 0.00 0.04 0.04 40.33 0.00 0.04 0.04 ' 40.42 0.00 0.04 0.04 40.50 0.00 0.04 0.04 40.58 0.00 0.04 0.04 40.67 0.00 0.04 0.04 40.75 0.00 0.04 0.04 40.83 0.00 0.04 0.04 40.92 0.00 0.04 0.04 41.00 0.00 0.04 0.04 ' 41.08 0.00 0.04 0.04 41.17 0.00 0.04 0.04 41.25 0.00 0.04 0.04 41.33 0.00 0.04 0.04 41.42 0.00 0.04 0.04 41.50 0.00 0.04 0.04 41.58 0.00 0.04 0.04 41.67 0.00 0.04 0.04 41.75 0.00 0.04 0.04 41.83 0.00 0.04 0.04 41.92 0.00 0.04 0.04 42.00 0.00 0.04 0.04 42.08 0.00 0.04 0.04 42.17 42.25 0.00 0.00 0.04 0.04 0.04 0.04 42.33 0.00 0.04 0.04 42.42 0.00 0.04 0.04 42.50 0.00 0.04 0.04 42.58 0.00 0.04 0.04 42.67 0.00 0.04 0.04 42.75 0.00 0.04 0.04 42.83 0.00 0.04 0.04 42.92 0.00 0.04 0.04 43.00 0.00 0.04 0.04 43.08 0.00 0.04 0.04 ' 43.17 0.00 0.04 0.04 43.25 0.00 0.04 0.04 43.33 0.00 0.04 0.04 43.42 0.00 0.04 0.04 43.50 0.00 0.04 0.04 43.58 0.00 0.04 0.04 43.67 0.00 0.03 0.03 ' 43.75 0.00 0.03 0.03 43.83 0.00 0.03 0.03 Continues on next page... I 1 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 43.92 0.00 0.03 0.03 44.00 0.00 0.03 0.03 44.08 0.00 0.03 0.03 44.17 0.00 0.03 0.03 44.25 0.00 0.03 0.03 44.33 0.00 0.03 0.03 44.42 0.00 0.03 0.03 44.50 0.00 0.03 0.03 44.58 0.00 0.03 0.03 44.67 0.00 0.03 0.03 44.75 0.00 0.03 0.03 44.83 0.00 0.03 0.03 44.92 0.00 0.03 0.03 45.00 0.00 0.03 0.03 45.08 0.00 0.03 0.03 45.17 0.00 0.03 0.03 45.25 0.00 0.03 0.03 45.33 0.00 0.03 0.03 45.42 0.00 0.03 0.03 45.50 0.00 0.03 0.03 45.58 0.00 0.03 0.03 45.67 0.00 0.03 0.03 45.75 0.00 0.03 0.03 45.83 0.00 0.03 0.03 45.92 0.00 0.03 0.03 46.00 0.00 0.03 0.03 46.08 0.00 0.03 0.03 46.17 0.00 0.03 0.03 46.25 0.00 0.03 0.03 46.33 0.00 0.03 0.03 46.42 0.00 0.03 0.03 46.50 0.00 0.03 0.03 46.58 0.00 0.03 0.03 46.67 0.00 0.03 0.03 46.75 0.00 0.03 0.03 46.83 0.00 0.03 0.03 46.92 0.00 0.03 0.03 47.00 0.00 0.03 0.03 47.08 0.00 0.03 0.03 47.17 0.00 0.03 0.03 47.25 0.00 0.03 0.03 47.33 0.00 0.03 0.03 47.42 0.00 0.03 0.03 47.50 0.00 0.03 0.03 47.58 0.00 0.03 0.03 47.67 0.00 0.03 0.03 47.75 0.00 0.03 0.03 47.83 0.00 0.03 0.03 47.92 0.00 0.03 0.03 Continues on next page... Page 12 11 1 11 1 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 48.00 0.00 0.03 0.03 48.08 0.00 0.03 0.03 48.17 0.00 0.03 0.03 48.25 0.00 0.03 0.03 48.33 0.00 0.03 0.03 48.42 0.00 0.03 0.03 48.50 0.00 0.03 0.03 48.58 0.00 0.03 0.03 48.67 0.00 0.03 0.03 48.75 0.00 0.03 0.03 48.83 0.00 0.03 0.03 48.92 0.00 0.03 0.03 49.00 0.00 0.03 0.03 49.08 0.00 0.03 0.03 49.17 0.00 0.03 0.03 49.25 0.00 0.03 0.03 49.33 0.00 0.03 0.03 49.42 0.00 0.03 0.03 49.50 0.00 0.03 0.03 49.58 0.00 0.03 0.03 49.67 0.00 0.03 0.03 49.75 0.00 0.03 0.03 49.83 0.00 0.03 0.03 49.92 0.00 0.03 0.03 50.00 0.00 0.03 0.03 50.08 0.00 0.03 0.03 50.17 0.00 0.03 0.03 50.25 0.00 0.03 0.03 50.33 0.00 0.03 0.03 50.42 0.00 0.03 0.03 50.50 0.00 0.03 0.03 50.58 0.00 0.03 0.03 50.67 0.00 0.03 0.03 50.75 0.00 0.03 0.03 50.83 0.00 0.03 0.03 50.92 0.00 0.03 0.03 51.00 0.00 0.03 0.03 51.08 0.00 0.03 0.03 51.17 0.00 0.03 0.03 51.25 0.00 0.03 0.03 51.33 0.00 0.03 0.03 51.42 0.00 0.03 0.03 51.50 0.00 0.03 0.03 51.58 0.00 0.03 0.03 51.67 0.00 0.03 0.03 51.75 0.00 0.03 0.03 51.83 0.00 0.03 0.03 51.92 0.00 0.03 0.03 52.00 0.00 0.03 0.03 Continues on next page... Page 13 L1 Li 1 1 I 1 1 1 Hydrograph Discharge Table Time Ist Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 52.08 0.00 0.03 0.03 52.17 0.00 0.03 0.03 52.25 0.00 0.03 0.03 52.33 0.00 0.03 0.03 52.42 0.00 0.03 0.03 52.50 0.00 0.03 0.03 52.58 0.00 0.03 0.03 52.67 0.00 0.03 0.03 52.75 0.00 0.03 0.03 52.83 0.00 0.03 0.03 52.92 0.00 0.03 0.03 53.00 0.00 0.03 0.03 53.08 0.00 0.03 0.03 53.17 0.00 0.03 0.03 53.25 0.00 0.03 0.03 53.33 0.00 0.03 0.03 53.42 0.00 0.03 0.03 53.50 0.00 0.03 0.03 53.58 0.00 0.03 0.03 53.67 0.00 0.03 0.03 53.75 0.00 0.03 0.03 53.83 0.00 0.03 0.03 53.92 0.00 0.03 0.03 54.00 0.00 0.02 0.02 54.08 0.00 0.02 0.02 54.17 0.00 0.02 0.02 54.25 0.00 0.02 0.02 54.33 0.00 0.02 0.02 54.42 0.00 0.02 0.02 54.50 0.00 0.02 0.02 54.58 0.00 0.02 0.02 54.67 0.00 0.02 0.02 54.75 0.00 0.02 0.02 54.83 0.00 0.02 0.02 54.92 0.00 0.02 0.02 55.00 0.00 0.02 0.02 55.08 0.00 0.02 0.02 55.17 0.00 0.02 0.02 55.25 0.00 0.02 0.02 55.33 0.00 0.02 0.02 55.42 0.00 0.02 0.02 55.50 0.00 0.02 0.02 55.58 0.00 0.02 0.02 55.67 0.00 0.02 0.02 55.75 0.00 0.02 0.02 55.83 0.00 0.02 0.02 55.92 0.00 0.02 0.02 56.00 0.00 0.02 0.02 56.08 0.00 0.02 0.02 Continues on next page... Page 14 �I ri U L.� 1 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 56.17 0.00 0.02 0.02 56.25 0.00 0.02 0.02 56.33 0.00 0.02 0.02 56.42 0.00 0.02 0.02 56.50 0.00 0.02 0.02 56.58 0.00 0.02 0.02 56.67 0.00 0.02 0.02 56.75 0.00 0.02 0.02 56.83 0.00 0.02 0.02 56.92 0.00 0.02 0.02 57.00 0.00 0.02 0.02 57.08 0.00 0.02 0.02 57.17 0.00 0.02 0.02 57.25 0.00 0.02 0.02 57.33 0.00 0.02 0.02 57.42 0.00 0.02 0.02 57.50 0.00 0.02 0.02 57.58 0.00 0.02 0.02 57.67 0.00 0.02 0.02 57.75 0.00 0.02 0.02 57.83 0.00 0.02 0.02 57.92 0.00 0.02 0.02 58.00 0.00 0.02 0.02 58.08 0.00 0.02 0.02 58.17 0.00 0.02 0.02 58.25 0.00 0.02 0.02 58.33 0.00 0.02 0.02 58.42 0.00 0.02 0.02 58.50 0.00 0.02 0.02 58.58 0.00 0.02 0.02 58.67 0.00 0.02 0.02 58.75 0.00 0.02 0.02 58.83 0.00 0.02 0.02 58.92 0.00 0.02 0.02 59.00 0.00 0.02 0.02 59.08 0.00 0.02 0.02 59.17 0.00 0.02 0.02 59.25 0.00 0.02 0.02 59.33 0.00 0.02 0.02 59.42 0.00 0.02 0.02 59.50 0.00 0.02 0.02 59.58 0.00 0.02 0.02 59.67 0.00 0.02 0.02 59.75 0.00 0.02 0.02 59.83 0.00 0.02 0.02 59.92 0.00 0.02 0.02 60.00 0.00 0.02 0.02 60.08 0.00 0.02 0.02 60.17 0.00 0.02 0.02 Continues on next page... Page 15 [1 1 u 1 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 60.25 0.00 0.02 0.02 60.33 0.00 0.02 0.02 60.42 0.00 0.02 0.02 60.50 0.00 0.02 0.02 60.58 0.00 0.02 0.02 60.67 0.00 0.02 0.02 60.75 0.00 0.02 0.02 60.83 0.00 0.02 0.02 60.92 0.00 0.02 0.02 61.00 0.00 0.02 0.02 61.08 0.00 0.02 0.02 61.17 0.00 0.02 0.02 61.25 0.00 0.02 0.02 61.33 0.00 0.02 0.02 61.42 0.00 0.02 0.02 61.50 0.00 0.02 0.02 61.58 0.00 0.02 0.02 61.67 0.00 0.02 0.02 61.75 0.00 0.02 0.02 61.83 0.00 0.02 0.02 61.92 0.00 0.02 0.02 62.00 0.00 0.02 0.02 62.08 0.00 0.02 0.02 62.17 0.00 0.02 0.02 62.25 0.00 0.02 0.02 62.33 0.00 0.02 0.02 62.42 0.00 0.02 0.02 62.50 0.00 0.02 0.02 62.58 0.00 0.02 0.02 62.67 0.00 0.02 0.02 62.75 0.00 0.02 0.02 62.83 0.00 0.02 0.02 62.92 0.00 0.02 0.02 63.00 0.00 0.02 0.02 63.08 0.00 0.02 0.02 63.17 0.00 0.02 0.02 63.25 0.00 0.02 0.02 63.33 0.00 0.02 0.02 63.42 0.00 0.02 0.02 63.50 0.00 0.02 0.02 63.58 0.00 0.02 0.02 63.67 0.00 0.02 0.02 63.75 0.00 0.02 0.02 63.83 0.00 0.02 0.02 63.92 0.00 0.02 0.02 64.00 0.00 0.02 0.02 64.08 0.00 0.02 0.02 64.17 0.00 0.02 0.02 64.25 0.00 0.02 0.02 Continues on next page... Page 16 1 11 11 I 1 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 64.33 0.00 0.02 0.02 64.42 0.00 0.02 0.02 64.50 0.00 0.02 0.02 64.58 0.00 0.02 0.02 64.67 0.00 0.02 0.02 64.75 0.00 0.02 0.02 64.83 0.00 0.02 0.02 64.92 0.00 0.02 0.02 65.00 0.00 0.02 0.02 65.08 0.00 0.02 0.02 65.17 0.00 0.02 0.02 65.25 0.00 0.02 0.02 65.33 0.00 0.02 0.02 65.42 0.00 0.02 0.02 65.50 0.00 0.02 0.02 65.58 0.00 0.02 0.02 65.67 0.00 0.02 0.02 65.75 0.00 0.02 0.02 65.83 0.00 0.02 0.02 65.92 0.00 0.02 0.02 66.00 0.00 0.02 0.02 66.08 0.00 0.02 0.02 66.17 0.00 0.02 0.02 66.25 0.00 0.02 0.02 66.33 0.00 0.02 0.02 66.42 0.00 0.02 0.02 66.50 0.00 0.02 0.02 66.58 0.00 0.02 0.02 66.67 0.00 0.02 0.02 66.75 0.00 0.02 0.02 66.83 0.00 0.02 0.02 66.92 0.00 0.02 0.02 67.00 0.00 0.02 0.02 67.08 0.00 0.02 0.02 67.17 0.00 0.02 0.02 67.25 0.00 0.02 0.02 67.33 0.00 0.01 0.01 67.42 0.00 0.01 0.01 67.50 0.00 0.01 0.01 67.58 0.00 0.01 0.01 67.67 0.00 0.01 0.01 67.75 0.00 0.01 0.01 67.83 0.00 0.01 0.01 67.92 0.00 0.01 0.01 68.00 0.00 0.01 0.01 68.08 0.00 0.01 0.01 68.17 0.00 0.01 0.01 68.25 0.00 0.01 0.01 68.33 0.00 0.01 0.01 Continues on next page... Page 17 11 1 1 1 I I 1 �J Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow (hrs) (cfs) (cfs) Outflow (cfs) 68.42 0.00 0.01 0.01 68.50 0.00 0.01 0.01 68.58 0.00 0.01 0.01 68.67 0.00 0.01 0.01 68.75 0.00 0.01 0.01 68.83 0.00 0.01 0.01 68.92 0.00 0.01 0.01 69.00 0.00 0.01 0.01 69.08 0.00 0.01 0.01 69.17 0.00 0.01 0.01 69.25 0.00 0.01 0.01 69.33 0.00 0.01 0.01 69.42 0.00 0.01 0.01 69.50 0.00 0.01 0.01 69.58 0.00 0.01 0.01 69.67 0.00 0.01 0.01 69.75 0.00 0.01 0.01 69.83 0.00 0.01 0.01 69.92 0.00 0.01 0.01 70.00 0.00 0.01 0.01 70.08 0.00 0.01 0.01 70.17 0.00 0.01 0.01 70.25 0.00 0.01 0.01 70.33 0.00 0.01 0.01 70.42 0.00 0.01 0.01 70.50 0.00 0.01 0.01 70.58 0.00 0.01 0.01 70.67 0.00 0.01 0.01 70.75 0.00 0.01 0.01 70.83 0.00 0.01 0.01 70.92 0.00 0.01 0.01 71.00 0.00 0.01 0.01 71.08 0.00 0.01 0.01 71.17 0.00 0.01 0.01 71.25 0.00 0.01 0.01 71.33 0.00 0.01 0.01 71.42 0.00 0.01 0.01 71.50 0.00 0.01 0.01 71.58 0.00 0.01 0.01 71.67 0.00 0.01 0.01 71.75 0.00 0.01 0.01 71.83 0.00 0.01 0.01 71.92 0.00 0.01 0.01 72.00 0.00 0.01 0.01 72.08 0.00 0.01 0.01 72.17 0.00 0.01 0.01 72.25 0.00 0.01 0.01 72.33 0.00 0.01 0.01 72.42 0.00 0.01 0.01 Continues on next page... Page 18 Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow (hrs) (cfs) (cfs) 72.50 0.00 0.01 72.58 0.00 0.01 72.67 0.00 0.01 72.75 0.00 0.01 72.83 0.00 0.01 72.92 0.00 0.01 73.00 0.00 0.01 73.08 0.00 0.01 73.17 0.00 0.01 73.25 0.00 0.01 End Outflow (cfs) 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Pap 19 I 1 1 L� 1 1 Hydrograph Report Page t Hyd. No. 12 THE KEYS Hydrograph type = Reservoir Peak discharge = 0.22 cfs Storm frequency = 10 yrs Time interval = 5 min Inflow hyd. No. = 11 Reservoir name = THE KEYS Max. Elevation = 15.19 ft Max. Storage = 48,090 cult sw.� ledlw mathatl u . Hydrograph Discharge Table Total Volume - 56,613 cult, 1.3W acft Time Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) Ids) 0.08 80.30 14.60 15.44 0.09 - - - - 0.09 0.17 80.34 << 15.00 20.00 0.19 - - - - 0.19 0.25 0.09 15.19 << 21.50 0.22 - - - - 0.22 << 0.33 0.09 15.19 21.50 0.22 - - - - 0,22 0.42 0.09 15.19 21.50 0.22 - - - - 0,2 0.50 0.09 15.19 21.49 0.22 - - - - 0.22 0.58 0.09 15.19 21.49 0.22 - - - - 0.22 0.67 0.09 15.18 21.49 0.22 - -, - - 0,22 0.75 0.09 15.18 21.48 0.22 - - - - 0_22 0.83 0.09 15.18 21.48 0.22 - - - - 0.22 0.92 0.09 15.18 21.47 0.22 - - - - 0,22 1.00 0.09 15.18 21.47 0.22 - - - - 0.22 1.08 0.09 15.18 21.47 0.22 - - - - 0.22 1.17 0.09 15.18 21.46 0.22 - - - - 0,22 1.25 0.09 15.18 21.46 0.22 - - - - 0.22 1.33 0.09 15.18 21.46 0.22 - - - - 0,22 1.42 0.09 15.18 21.45 0.22 - - - - 0,22 1.50 0.09 15.18 21.45 0.22 - - - - 0,22 1.58 0.09 15.18 21.44 0.22 - - - - 0.22 1.67 0.09 15.18 21.44 0.22 - - - - 0.22 1.75 0.09 15.18 21.44 0.22 - - - - 0,22 1.83 0.09 15.18 21.43 0.22 - - - - 0.22 1.92 0.09 15.18 21.43 0.22 - - - - 0,22 2.00 0.09 15.18 21.42 0.22 - - - - 0,22 2.08 0.09 15.17 21.42 0.22 - - - - 0,22 2.17 0.09 15.17 21.42 0.22 - - - - 0,22 2.25 0.09 15.17 21.41 0.22 - - - - 0,22 2.33 0.09 15.17 21.41 0.22 - - - - 0.22 2.42 0.09 15.17 21.41 0.22 - - - - 0,22 2.50 0.09 15.17 21.40 0.22 - - - - 0.22 2.58 0.09 15.17 21.40 0.22 - - - - 0.22 2.67 0.09 15.17 21.39 0.22 - - - - 0.22 2.75 0.09 15.17 21.39 0.22 - - - - 0,22 2.83 0.09 15.17 21.39 0.22 - - - - 0.22 2.92 0.09 15.17 21.38 0.22 - - - - 0.22 3.00 0.09 15.17 21.38 0.22 - - - - 0,22 Continues on next page... THE KEYS ' Hydrograph Discharge Table Page 2 ' Time Inflow Elevation Culy. A Culy. B CuIv. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (Cfs) (Cfs) Ids) (cfs) (cfs) 3.08 0.09 15.17 21.37 0.22 0.22 3.17 0.09 15.17 21.37 0.22 - - - - 0.Y2 3.25 0.09 15.17 21.37 0.22 - - - - 0.22 3.33. 0.09 15.17 21.36 0.22 - - - - 0,22 ' 3.42 0.09 15.16 21.36 0.22 - - 0.22 3.50 0.09 15.16 21.36 _ _ 0.22 0_22 3.58 0.09 15.16 21.35 0.22 - - - - 0.22 3.67 3.75 0.09 0.09 15.16 15.16 21.35 21.34 0.22 - _ _ - 0.22 0.22 0.22 3.83 0.09 15.16 21.34 0.22 - - - - 0,22 3.92 0.09 15.16 21.34 0.22 - - - - 0,22 4.00 0.09 15.16 21.33 0.22 - 0,22 ' 4.08 0.09 15.16 21.33 _ _ = 0.22 0.22 4.17 0.09 15.16 21.32 0.22 - - - - 0.22 4.25 0.09 15.16 21.32 0.22 - - - - 0,22 ' 4.33 0.09 15.16 21.32 0.22 - 0,22 4.42 0.09 15.16 21.31 _ _ = 0.22 0,22 4.50 0.09 15.16 21.31 0.22 - - - - 0,22 ' 4.58 4.67 0.09 0.09 15.16 15.16 21.31 21.30 0.22 - _ _ - 0.22 0,22 0,22 4.75 0.09 15.16 21.30 0.22 - - - - 0,22 4.83 0.09 15.15 21.29 0.22 - - - - 0.22 4.92 0.09 15.15 21.29 0.22 - - 0_22 ' 5.00 0.09 15.15 21.29 _ _ 0.22 0,22 5.08 0.09 15.15 21.28 0.22 - - - - 0.22 5.17 0.09 15.15 21.28 0.22 - 0.22 ' 5.25 0.09 15.15 21.27 0.22 - 0.22 5.33 0.09 15.15 21.27 0.22 - - - 0.22 5.42 0.09 15.15 21.27 0.22 - - - - 0.22 ' 5.50 5.58 0.09 0.09 15.15 15.15 21.26 21.26 0.22 - _ _ - 0.22 0,22 0.22 5.67 0.09 15.15 21.26 0.22 - - - - 0.22 5.75 0.09 15.15 21.25 0.22 - - - - 0.22 5.83 0.09 15.15 21.25 0.22 0.22 5.92 0.09 15.15 21.24 0.22 - - - - 0.22 6.00 0.09 15.15 21.24 0.22 - - - - 0.22 6.08 6.17 0.09 0.09 15.15 15.14 21.24 21.23 0.22 - 0.22 - - 0.22 0.22 6.25 0.09 15.14 21.23 - 0.22 - - - - 0.22 6.33 0.09 15.14 21.23 0.22 - - - - 0,22 6.42 0.09 15.14 21.22 0.22 0,22 6.50 0.09 15.14 21.22 0.22 - - - - 0.22 6.58 0.09 15.14 21.21 0.22 - - - - 0.22 6.67 0.09 15.14 21.21 0.22 - 0.22 ' 6.75 0.09 15.14 21.21 0.22 - 0,22 6.83 0.09 15.14 21.20 0.22 - - - 0.22 6.92 0.08 15.14 21.20 0.22 - - - - 0.22 7.00 0.08 15.14 21.19 0.22 0.22 ' 7.08 0.08 15.14 21.19 0.22 - - - - 0.22 1 Continues on next page... THE KEYS I I I ,I I i I 11 I 1 I l 1 Hydrograph Discharge Table Page 3 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (Cfs) (Cfs) 7.17 0.08 15.14 21.19 0.22 - - - - 0.22 7.25 0.08 15.14 21.18 0.21 - - - - 0.21 7.33 0.08 15.14 21.18 0.21 - - - - 0.21 7.42 0.08 15.14 21.18 0.21 - - - - 021 7.50 0.08 15.14 21.17 0.21 - - - - 0.21 7.58 0.08 15.13 21.17 0.21 - - - - 021 7.67 0.08 15.13 21.16 0.21 - - - - 0.21 7.75 0.08 15.13 21.16 0.21 - - - - 0.21 7.83 0.08 15.13 21.16 0.21 - - - - 0.21 7.92 0.08 15.13 21.15 0.21 - - - - 0.21 8.00 0.08 15.13 21.15 0.21 - - - - 0.21 8.08 0.08 15.13 21.14 0.21 - - - - 0.21 8.17 0.08 15.13 21.14 0.21 - - - - 0.21 8.25 0.08 15.13 21.14 0.21 - - - - 0.21 8.33 0.08 15.13 21.13 0.21 - - - - 0.21 8.42 0.08 15.13 21.13 0.21 - - - - 0.21 8.50 0.08 15.13 21.13 0.21 - - - - 021 8.58 0.08 15.13 21.12 0.21 - - - - 0.21 8.67 0.08 15.13 21.12 0.21 - - - - 0.21 8.75 0.08 15.13 21.11 0.21 - - - - 021 8.83 0.08 15.13 21.11 0.21 - - - - 0.21 8.92 0.08 15.13 21.11 0.21 - - - - 0.21 9.00 0.08 15.12 21.10 0.21 - - - - 0.21 9.08 0.08 15.12 21.10 0.21 - - - - 0.21 9.17 0.08 15.12 21.09 0.21 - - - - 021 9.25 0.08 15.12 21.09 0.21 - - - - 0.21 9.33 0.08 15.12 21.09 0.21 - - - - 021 9.42 0.08 15.12 21.08 0.21 - - - - 0.21 9.50 0.08 15.12 21.08 0.21 - - - - 0.21 9.58 0.08 15.12 21.08 0.21 - - - - 0.21 9.67 0.08 15.12 21.07 0.21 - - - - 0.21 9.75 0.08 15.12 21.07 0.21 - - - - 021 9.83 0.08 15.12 21.06 0.21 - - - - 021 9.92 0.08 15.12 21.06 0.21 - - - - 0.21 10.00 0.08 15.12 21.06 0.21 - - - - 021 10.08 0.08 15.12 21.05 0.21 - - - - 0.21 10.17 0.08 15.12 21.05 0.21 - - - - 021 10.25 0.08 15.12 21.04 0.21 - - - - 021 10.33 0.08 15.11 21.04 0.21 - - - - 021 10.42 0.08 15.11 21.04 0.21 - - - - 0.21 10.50 0.08 15.11 21.03 0.21 - - - - 021 10.58 0.08 15.11 21.03 0.21 - - - _ 0.21 10.67 0.08 15.11 21.03 0.21 - - - - 0.21 10.75 0.08 15.11 21.02 0.21 - - - - 0.21 10.83 0.08 15.11 21.02 0.21 - - - - 0.21 10.92 0.08 15.11 21.01 0.21 - - - - 0.21 11.00 0.08 15.11 21.01 0.21 - - - - 0.21 11.08 0.08 15.11 21.01 0.21 - - - - 0.21 11.17 0.08 15.11 21.00 0.21 - - - - 021 Continues on next page... I ' THE KEYS Page 4 Hydrograph Discharge Table Time Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.25 0.08 15.11 21.00 0.21 0.21 11.33 0.08 15.11 20.99 0.21 - - - - 0.21 11.42 0.08 15.11 20.99 0.21 - - - - 6.21 11.50 0.08 15.11 20.99 0.21 - - - 021 1 11.58 0.08 15.11 20.98 0.21 - 0.21 11.67 0.08 15.11 20.98 0.21 - - - 0.21 11.75 0.08 15.10 20.98 0.21 - - - _ 0.21 ' 11.83 11.92 0.08 0.08 15.10 15.10 20.97 20.97 0.21 0.21 0.21 - 12.00 0.08 15.10 20.96 0.21 - - - 0.21 - - - - 0.21 12.08 0.08 15.10 20.96 0.21 - - - - 0.21 12.17 0.08 15.10 20.96 0.21 - 0.21 12.25 0.08 15.10 20.95 0.21 - - - 021 12.33 0.08 15.10 20.95 0.21 - - - - 0.21 12. 0.08 15.10 20.94 0.21 0.21 ' 12.50 50 0.08 15.10 20.94 0.21 - - 0.21 12.58 0.08 15.10 20.93 0.21 - - 021 12.67 0.08 15.10 20.93 0.21 - - - - 0.21 t 12.75 12.83 0.08 0.08 15.10 15.10 20.92 20.91 0.21 0.21 0.21 - - - - 0.21 12.92 0.08 15.10 20.91 0.21 - - - - 0.21 13.00 0.08 15.10 20.90 0.21 - - - - 0.21 13.08 0.08 15.09 20.90 0.21 - - 0.21 13.17 0.08 15.09 20.89 0.21 _ _ 0.21 13.25 0.08 15.09 20.88 0.21 - - - - 021 13. 13.42 42 0.08 0.08 15.09 15.09 20.8 20.87 0.21 0.21 - _ _ - 0.21 021 13.50 0.08 15.09 20.87 0.21 - - - 0.21 13.58 0.08 15.09 20.86 0.21 - - - - 0.21 13.67 0.08 15.09 20.85 0.21 - - 0.21 ' 13.75 0.08 15.09 20.85 0.21 _ _ 0.21 13.83 0.08 15.09 20.84 0.21 - - - - 0.21 13.92 0.08 15.09 20.84 0.21 - - 0.21 t 14.00 0.08 15.09 20.83 0.21 - - 0.21 14.08 0.08 15.09 20.83 0.21 _ _ 0.21 14.17 0.08 15.09 20.82 0.21 - - - - 0.21 14.25 0.08 15.09 20.81 0.21 - 0.21 14.33 0.07 15.09 20.81 0.21 - - - 0.21 14.42 0.07 .15.09 20.80 0.21 - - - - 0.21 14.50 0.07 15.08 20.80 0.21 - - - - 0.21 '14.58 0.07 15.08 20.79 0.21 - - 0.21 14.67 0.07 15.08 20.78 0.21 _ _ 0.21 14.75 0.07 15.08 20.78 0.21 - - - - 0.21 0.07 15.08 20.77 0.20 - - 0.20 '14.83 14.92 0.07 15.08 20.77 0.20 _ _ 0.20 15.00 0.07 15.08 20.76 0.20 - - - - 0.20 15.08 0.07 15.08 20.75 0.20 - - - - 0.20 15.17 0.07 15.08 20.75 0.20 - - 0.20 15.25 0.07 15.08 20.74 0.20 _ _ 0.20 ' Continues on next page... 1 THE KEYS Page 5 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culv. B Culy. C Weir A Weir B Weir C Outflow (hrs) Ids) (ft) (cfs) Ids) (cfs) Ids) (cfs) (Cfs) (cfs) 15.33 0.07 15.08 20.74 0.20 - - 0.20 15.42 0.07 15.08 20.73 _ _ 0.20 0.20 15.50 0.07 15.08 20.73 0.20 - - - - 0.20 15. 0.07 15.08 20.72 0.20 0.20 ' 15.67 67 0.07 15.08 20.71 - _ _ - 0.20 0.20 15.75 0.07 15.08 20.71 0.20 0.20 15.83 0.07 15.07 20.70 0.20 - - - - 0.20 15.92 0.07 15.07 20.70 0.20 - - 0.20 ' 16.00 0.07 15.07 20.69 _ _ 0.20 0.20 16.08 0.07 15.07 20.68 0.20 - - - - 0.20 16.17 0.07 15.07 20.68 0.20 - - - - 0.20 16.25 0.07 15.07 20.67 0.20 - - 0.20 16.33 0.07 15.07 20.67 _ _ 0.20 020 16.42 0.07 15.07 20.66 0.20 - - - - 0.20 1 16.50 16.58 0.07 0.07 15.07 15.07 20.65 20.65 0.20 - - - - 0.20 - - - - 0.20 0.20 16.67 0.07 15.07 20.64 0.20 - - - - 0.20 16.75 0.07 15.07 20.64 0.20 - - - - 0.20 16.83 0.07 15.07 20.63 0.20 - - 0.20 16.92 0.07 15.07 20.63 _ _ 0.20 0.20 17.00 0.07 15.07 20.62 0.20 - - - - 0.20 17.08 0.07 15.07 20.61 0.20 - - - - 0.20 ' 17.17 0.07 15.07 20.61 0.20 - - 0.20 17.25 0.07 15.06 20.60 _ _ 0.20 0.20 17.33 0.07 15.06 20.60 0.20 - - - - 0.20 ' 17.42 17.50 0.07 0.07 15.06 15.06 20.59 20.58 0.20 - _ _ - 0.20 0.20 0.20 17.58 0.07 15.06 20.58 0.20 - - - - 0.20 17.67 0.07 15.06 20.57 0.20 - - - - 0.20 17.75 0.07 15.06 20.57 0.20 - - 0.20 17.83 0.07 15.06 20.56 _ _ 0.20 0.20 17.92 0.07 15.06 20.55 0.20 - - - - 0.20 18.0 0.07 15.06 20.5 0.20 00.200 18.08 0.07 15.06 20.54 - _ _ - 0.20 0.20 18.17 0.07 15.06 20.54 0.20 - - 0.20 18.25 0.07 15.06 20.53 0.20 - - - - 0.20 18.33 0.07 15.06 20.53 0.20 - - 0.20 18.42 0.07 15.06 20.52 _ _ 0.20 0.20 18.50 0.07 15.06 20.51 0.20 - - - - 0.20 18.58 0.07 15.06 20.51 0.20 - - - - 0.20 18.67 0.07 15.05 20.50 0.20 - - 0.20 18.75 0.07 15.05 20.50 _ _ 0.20 0.20 18.83 0.07 15.05 20.49 0.20 - - - - 0.20 18.92 19.00 0.07 0.07 15.05 15.05 20.48 20.48 0.20 - _ _ - 0.20 0.20 0.20 19.08 0.07 15.05 20.47 0.20 - - - - 0.20 19.17 0.07 15.05 20.47 0.20 - - - - 0.20 19.25 0.07 15.05 20.46 0.20 - 0.20 19.33 0.07 15.05 20.46 _ _ 0.20 _ 0.20 Continues on next page.. THE KEYS - Pap 6 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) Ids) Ids) Ids) Ids) Ids) (cfs) (Cfs) 19.42 0.07 15.05 20.45 0.20 - - 0.20 19.50 0.07 15.05 20.44 _ _ 0.20 0.Y0 19.58 0.07 15.05 20.44 0.20 - - - - 0.20 19.67 0.07 15.05 20.43 0.20 - - - - 0.20 19.75 0.07 15.05 20.43 0.20 - - 0.20 19.83 0.07 15.05 20.42 _ _ 0.20 0.20 19.92 0.07 15.05 20.41 0.20 - - - - 0.20 20.00 0.07 0.07 15.04 15.04 20.41 20.40 0.20 - _ _ - 0.20 0.2020.08 0.20 20.17 0.07 15.04 20.40 0.20 - - - - 020 20.25 0.07 15.04 20.39 0.20 - - - - 0.20 20.33 0.07 15.04 20.38 0.20 - - - - 0.20 20.42 0.07 15.04 20.38 0.20 - - - - 0.20 20.50 0.07 15.04 20.37 0.20 - - - - 0.20 20.58 0.07 15.04 20.37 0.20 - - - 0.20 L 20.67 0.07 15.04 20.36 0.20 - - 0.20 20.75 0.07 15.04 20.36 _ _ 0.20 0.20 20.83 0.07 15.04 20.35 0.20 - - - - 0.20 20.92 21.00 0.07 0.07 15.04 15.04 20.34 20.34 0.20 - _ _ - 0.20 0.20 0.20 21.08 0.07 15.04 20.33 0.20 - - - - 0.20 21.17 0.07 15.04 20.33 0.20 - - - - 0.20 ' 21.25 0.07 15.04 20.32 0.20 - - 0.2021.33 0.07 15.04 20.31 _ _ 0.20 0.20 21.42 0.07 15.03 20.31 0.20 - - - - 0.20 ' 21.5 21.58 0.07 0.07 15.03 15.03 20.30 20.30 0.20 - _ _ - 0.20 0.20 0.20 21.67 0.07 15.03 20.29 0.20 - - 0.20 21.75 0.06 15.03 20.28 0.20 - - - - 0.20 21.83 0.06 15.03 20.28 0.20 - - 0.20 21.92 0.06 15.03 20.27 _ _ 0.20 0.20 22.00 0.06 15.03 20.27 0.19 - - - - 0.19 22.08 0.06 15.03 20.26 0.19 - - - - 0.19 22.17 0.06 15.03 20.26 0.19 - - 0.19 22.25 0.06 15.03 20.25 _ _ 0.19 - - 0.19 22.33 0.06 15.03 20.24 0.19 - - - - 0.19 22.42 22.50 0.06 0.06 15.03 15.03 20.24 20.23 0.19 - - - - 0.19 - - - 0.19 0.19 22.58 0.06 15.03 20.23 - 0.19 - - - - 0.19 22.67 0.06 15.03 20.22 0.19 - - - - 0.19 22.75 0.06 15.02 20.21 0.19 - - 0.19 22.83 0.06 15.02 20.21 _ _ 0.19 0.19 22.92 0.06 15.02 20.20 0.19 - - - - 0.19 23.00 0.06 15.02 20.20 0.19 - 0.19 23.08 0.06 15.02 20.19 0.19 - - 0.19 23.17 0.06 15.02 20.19 _ _ 0.19 - 0.19 23.25 0.06 15.02 20.18 0.19 - - - - 0.19 23.33 0.06 15.02 20.17 0.19 - - 0.19 23.42 0.06 15.02 20.17 _ _ 0.19 0.19 1 Continues on next page... I THE KEYS page T Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs). (ft) (cfs) (cfs) (cfs) (Cfs) (cfs) (cfs) (cfs) 23.50 0.06 15.02 20.16 0.19 - - 0.19 23.58 0.06 15.02 20.16 _ _ 0.19 0.19 23.67 0.06 15.02 20.15 0.19 - - - - 0.19 23.75 0.06 15.02 20.14 0.19 - - - - 0,19 23.83 0.06 15.02 20.14 0.19 - - 0.19 23.92 0.06 15.02 20.13 _ _ 0.19 0.19 24.00 0.06 15.02 20.13 0.19 - - - - 0.19 24.08 0.06 15.02 20.12 0.19 - 0.19 24.17 0.06 15.01 20.11 _ _ _ 0.19 0.19 24.25 0.06 15.01 20.11 0.19 - - - - 0.19 24.33 0.06 15.01 20.10 0.19 - - - - 0.19 24.42 0.06 15.01 20.10 0.19 - - 0.19 24.50 0.06 15.01 20.09 _ _ 0.19 0.19 24.58 0.06 15.01 20.09 0.19 - - - - 0.19 L 24.67 24.75 0.06 0.06 15.01 15.01 20.08 20.07 0.19 - - - - 0.19 - - 0.19 0.19 24.83 0.06 15.01 20.07 _ _ 0.19 - 0.19 24.92 0.06 15.01 20.06 0.19 - - - - 0.19 25.00 0.06 15.01 20.06 0.19 - - 0.19 I 25.08 0.06 15.01 20.05 _ _ 0.19 0.19 25.17 0.06 15.01 20.04 0.19 - - - - 0.19 25.25 0.06 15.01 20.04 0.19 - - - - 0.19 ' 25.33 0.06 15.01 20.03 0.19 - - 0.19 25.42 0.06 15.01 20.03 _ _ 0.19 0.19 25.50 0.06 15.01 20.02 0.19 - - - - 0.19 ' 25.58 25.67 0.06 0.06 15.00 15.00 20.01 20.01 0.19 - _ _ - 0.19 0.19 0.19 25.75 0.06 15.00 20.00 0.19 - - - - 0.19 25.83 0.06 15.00 20.00 0.19 - - - - 0.19 25.92 0.06 15.00 19.99 0.19 - - 0.19 26.00 0.06 15.00 19.99 _ _ 0.19 0.19 26.08 0.06 15.00 19.98 0.19 - - - - 0.19 26. 0.06 15.00 19.97 0.19 0.19 26.25 25 0.06 15.00 19.97 - _ _ - 0.19 0.19 26.33 0.06 15.00 19.96 0.19 0.19 26.42 0.06 15.00 19.95 0.19 - - - - 0.19 26.50 0.06 15.00 19.95 0.19 - - 0.19 26.58 0.06 15.00 19.94 _ _ 0.19 0.19 26.67 0.06 15.00 19.93 0.19 - - - 0.19 26.75 0.06 15.00 19.93 0.19 - - - - 0.19 26.83 0.06 15.00 19.92 0.19 0.19 26.92 0.06 14.99 19.91 0.19 - - - - 0.19 27.00 0.06 14.99 19.91 0.19 - - - - 0.19 27.08 27.17 0.06 0.06 14.99 14.99 19.90 19.89 0.19 - _ _ - 0.19 0.19 0.19 27.25 0.06 14.99 19.89 0.19 - - - - 0.19 27.33 0.06 14.99 19.88 0.19 - - - - 0.19 27.42 0.06 14.99 19.87 0.19 - - 0.19 27.50 0.06 14.99 19.87 _ _ 0.19 0.19 IContinues on next page... I THE KEYS pap 8 Hydrograph Discharge Table Time Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) 27.58 0.06 14.99 19.86 0.19 - - 0.19 27.67 0.06 14.99 19.85 _ 0.19 _ 0.19 27.75 0.06 14.99 19.85 0.19 - - - - 0.19 27.83 0.06 14.99 19.84 0.19 - - - - 0.19 27.92 0.06 14.99 19.83 0.19 0.19 28.00 0.06 14M 19.83 0.19 - - - - 0.19 28.08 0.06 14.99 19.82 0.19 - - - - 0.19 28.17 0,06 14.98 19.81 0.19 - - 0.19 28.25 0.06 14.98 19.81 _ 0.19 _ 0.19 28.33 0.06 14.98 19.80 0.19 - - - - 0.19 28.42 0.06 14.98 19.79 0.19 - - - - 0.19 28.50 0.06 14.98 19.79 0.19 - - 0.19 28.58 0.06 14.98 19.78 _ 0.19 _ 0.19 28.67 0.06 14.98 19.77 0.18 - - - - 0.18 � 28. 28.83 83 0.06 0.06 14.98 14.98 19.7 19.76 0.18 0.18 0.18 0.18 28.92 0.06 14.98 19.75 0.18 - - - - 0.18 29.00 0.06 14.98 19.75 0.18 - - - - 0.18 29.08 0.06 14.98 19.74 0.18 - - - - 0.18 29.17 0.05 14.98 19.73 0.18 - - - - 0.18 29.25 0.05 14.98 19.73 0.18 - - - - 0.18 29.33 0.05 14.98 19.72 0.18 - - - - 0.18 ' 29.42 0.05 14.97 19.71 0.18 - - 0.18 29.50 0.05 14.97 19.71 _ 0.18 _ 0.18 29.58 0.05 14.97 19.70 0.18 - - - - 0.18 ' 29,67 29.75 0,05 0.05 14,97 14.97 19.70 19.69 0.18 - _ 0.18 _ - 0.18 0.18 29.83 0.05 14.97 19.68 0.18 - - - - 0.18 29.92 0.05 14.97 19.68 0.18 - - - - 0.18 30.00 0.05 14.97 19.67 0.18 - - 0.18 30.08 0.05 14.97 19.66 _ 0.18 _ 0.18 30.17 0.05 14.97 19.66 0.18 - - - - 0.18 30.25 0.05 14.97 19.65 0.18 - - - - 0.18 30.33 0.05 14.97 19.64 0.18 - - 0.18 30.42 0.05 14.97 19.64 _ 0.18 _ 0.18 30.50 0.05 14.97 19.63 0.18 - - - - 0.18 30.58 0.05 14.97 19.62 0.18 - - - - 0.18 �. 30.67 0.05 14.96 19.62 0.18 - - - - 0.18 30.75 0.05 14.96 19.61 0.18 - - - - 0.18 30.83 0.05 14.96 19.60 0.18 - - - - 0.18 30.92 0.05 14.96 19.60 0.18 - - 0.18 31.00 0.05 14.96 19.59 _ 0.18 _ 0.18 31.08 0.05 14.96 19.58 0.18 - - - - 0.18 31. 31.25 25 0.05 0.05 14.96 14.96 19.58 19.57 0.18 - _ 0.18 _ - 018 0.18 31.33 0.05 14.96 19.56 0.18 - - - - 0.18 31.42 0.05 14.96 19.56 0.18 - - - - 0.18 31.50 0.05 14.96 19.55 0.18 - - 0.18 31.58 0.05 14.96 19.54 _ 0.18 _ 0.18 Continues on next page... I THE KEYS page 9 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (efs) (cfs) 31.67 0.05 14.96 19.54 0.18 0.18 31.75 0.05 14.96 19.53 0.18 - - - - 0.18 31.83 0.05 14.96 19.52 0.18 - - - - 0.18 31.92 0.05 14.96 19.52 0.18 - - - - 0.18 32.00 0.05 14.95 19.51 0.18 - - 0.18 32.08 0.05 14.95 19.50 _ 0.18 _ 0.18 32.17 0.05 14.95 19.50 0.16 - - - - 0.18 32,25 32.33 0.05 0.05 14,95 14.95 19.49 19.48 0.18 - _ 0.18 _ - 0.18 0.18 32.42 0.05 14.95 19.48 0.18 - - - - 0.18 32.50 0.05 14.95 19.47 0.18 - - - - 0.18 32.58 0.05 14.95 19.46 0.18 0.18 32.67 0.05 14.95 19.46 = _ 0.18 _ = 0.18 32.75 0.05 14.95 19.45 0.18 - - - - 0.18 32.83 0.05 14.95 19.44 0.18 - - - - 0.18 32.92 0.05 14.95 19.44 0.18 - 0.18 33.00 0.05 14.95 19.43 _ 0.18 _ = 0.18 33.08 0.05 14.95 19.42 0.18 - - - - 0.18 33.17 33.25 0.05 0.05 14.95 14.94 19.42 19.41 0.18 - - 0.18 - - - - 0.18 - - 0.18 33.33 0.05 14.94 19.40 0.18 - - - - 0.18 33.42 0.05 14.94 19.40 0.18 - - - - 0.18 33.50 0.05 14.94 19.39 0.18 - - 0.18 33.58 0.05 14.94 19.38 _ 0.18 _ 0.18 33.67 0.05 14.94 19.38 0.18 - - - - 0.18 33. 33.83 83 0.05 0.05 14.94 14.94 19.3 19,36 0.18 - _ 0.18 _ - 0.18 0.18 33.92 0.05 14.94 19.36 0.18 - 0.18 34.00 0.05 14.94 19.35 0.18 - - - - 0.18 34.08 0.05 14.94 19.34 0.18 0.18 34.17 0.05 14.94 19.34 0.18 - - - - 0.18 34.25 0.05 14.94 19.33 0.18 - - - - 0.18 34,33 0.05 14.94 19.32 0.18 - - - - 0.18 34.42 0.05 14.94 19.32 0.18 - 0.18 34.50 0.05 14.93 19.31 _ _ 0.18 _ 0.18 34.58 0.05 14.93 19.30 0.18 - - - - 0.18 34.67 34.75 0.05 0.05 14.93 14.93 19.30 19.29 0.17 - _ 0.17 _ - 0.17 0.17 34.83 0.05 14.93 19.28 0.17 - - - - 0.17 34.92 0.05 14.93 19.28 0.17 - - - - 0.17 35.00 0.05 14.93 19.27 0.17 - - 0.17 ' 35.08 0.05 14.93 19.26 _ 0.17 _ 0.17 35,17 0.05 14.93 19.26 0.17 - - - - 0.17 35. 35.33 33 0.05 0.05 14.93 14.93 19.2 19.24 0.17 - _ 0.17 _ - 017 0.17 35.42 0.05 14.93 19.24 0.17 - 0.17 35.50 0.05 14.93 19.23 0.17 - - - - 0.17 35.58 0.04 14.93 19.22 0.17 - - - - 0.17 35.67 0.04 14.93 19.21 0.17 - - - - 0.17 Continues on next page... I 1 THE KEYS Page 10 Hydrograph Discharge Table Time Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hm) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) 35.75 0.04 14.83 19.21 0.17 - - 0,17 35.83 0.04 14.92 19.20 _ 0.17 _ 0,17 35.92 0.04 14.92 19.19 0.17 - - - - 0.17 36.00 0.04 14.92 19.19 0.17 - - - - 0,17 36.08 0.04 14.92 19.18 0.17 0.17 36.17 0.04 14.92 19.17 0.17 - - - - 0.17 36.25 0.04 14.92 19.17 0.17 - - - - 0,17 36.33 36.42 0.04 0.04 14.92 14.92 19.16 19.15 0.17 - _ 0.17 _ - 0.17 0,17 36.50 0.04 14.92 19.15 0.17 - - - - 0,17 36.58 0.04 14.92 19.14 0.17 - - - - 0,17 36.67 0.04 14.92 19.13 0.17 - - - - 0.17 36.75 0.04 14.92 19.13 0.17 - - - - 0.17 36.83 0.04 14.92 19.12 0.17 - - - - 0.17 3. 0.04 14.92 19.11 0.17 0.17 37.00 00 0.04 14.92 19.11 0.17 - 0,17 37.08 0.04 14.91 19.10 0.17 - - - - 0.17 37.17 0.04 14.91 19.09 0.17 - - - - 0.17 37.25 0.04 14.91 19.09 0.17 - - 0,17 ' 37.33 0.04 14.91 19.08 _ 0.17 _ 0,17 37.42 0.04 14.91 19.07 0.17 - - - - 0.17 37.50 0.04 14.91 19.07 0.17 - - - - 0,17 37.58 0.04 14.91 19.06 0.17 - - 0,17 37.67 0.04 14.91 19.05 _ 0.17 _ 0.17 37.75 0.04 14.91 19.05 0.17 - - - - 0.17 37,83 37.92 0,04 0.04 14.91 14.91 19.04 19.03 0.17 - _ 0.17 _ - 0,17 0,17 38.00 0.04 14.91 19.03 0.17 - - - - 0,17 38.08 0.04 14.91 19.02 0.17 - - - - 0.17 38.17 0.04 14.91 19.01 0.17 0.17 38.25 0.04 14.91 19.00 0.17 - - - - 0.17 38.33 0.04 14.91 19.00 0.17 - - - - 0,17 38.50 38.50 0.04 0.04 14.90 14.90 18.98 18.98 0.17 - _ 0.17 _ - 0,17 0,17 38.58 0.04 14.90 18.98 0.17 0.17 38.67 0.04 14.90 18.97 0.17 - - - - 0.17 38.75 38.83 0.04 0.04 14.90 14.90 18.96 18.96 0.17 - - 0.17 - - - - 0,17 - - 0,17 38.92 0.04 14.90 18.95 0.17 - - - - 0,17 39.00 0.04 14.90 18.94 0.17 - - - - 0,17 39.08 0.04 14.90 18.94 0.17 - - 0,17 39.17 0.04 14.90 18.93 _ 0.17 _ 0_17 39.25 0.04 14.90 18.92 0.17 - - - - 0.17 39.33 39.42 0.04 0.04 14.90 14.90 18.92 18.91 0.17 - _ 0.17 _ - 0,17 0,17 39.50 0.04 14.90 18.90 0.17 - - - - 0.17 39.58 0.04 14.90 18.90 0.17 - - - - 0.17 39.67 0.04 14.89 18.89 0.17 0.17 1 39.75 0.04 14.89 18.88 0.17 - - - - 0,17 iContinues on next page... I I ' THE KEYS Page » Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C WeirA Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 39.83 0.04 14.89 18.88 0.17 0.17 39.92 0.04 14.89 18.87 0.17 - - - - 0.17 40.00 0.04 14.89 18.86 0.17 - - - - 0.17 40.08 0.04 14.89 18.86 0.17 - - - - 0.17 40.17 0.04 14.89 18.85 0.17 - - 0.17 40.25 0.04 14.89 18.64 0.17 _ _ 0.17 40.33 0.04 14.89 18.84 0.17 - - - - 0.17 40.42 40.50 0.04 0.04 14.89 14.89 18.83 18.82 0.16 0.16 - _ _ - 0.16 0.16 40.58 0.04 14.89 18.82 0.16 - - - - 0.16 40.67 0.04 14.89 18.81 0.16 - - - - 0.16 40.75 0.04 14.89 18.80 0.16 - - - - 0.16 40.83 0.04 14.89 18.80 0.16 - - - - 0.16 40.92 0.04 14.89 18.79 0.16 - - - - 0.16 41.00 0.04 14.88 18.78 0.16 - - 0.16 41.08 0.04 14.88 18.78 0.16 - 0.16 41.17 0.04 14.88 18.77 0.16 _ _ = 0.16 41.25 0.04 14.88 18.76 0.16 - - - - 0.16 41.33 41.42 0.04 0.04 14.88 14.88 18.76 18.75 0.16 0.16 - _ _ = 0.16 0.16 41.50 0.04 14.88 18.75 0.16 - - - - 0.18 41.58 0.04 14.88 18.74 0.16 - - - - 0.16 41.67 0.04 14.88 18.73 0.16 - - 0.16 1 41.75 0.04 14.88 18.72 0.16 _ _ 0.16 41.83 0.04 14.88 18.72 0.16 - - - - 0.16 41. 42.00 00 0.04 0.04 14.88 14.88 18.71 18.70 0.16 0.16 - _ _ - 0.16 0.16 42.08 0.04 14.88 18.70 0.16 - 0.16 42.17 0.04 14.88 18.69 0.16 - - - - 0.16 42.25 0.04 14.88 18.68 0.16 - - 0.16 42.33 0.04 14.87 18.68 0.16 _ _ 0.16 42.42 0.04 14.87 18.67 0.16 - - - - 0.16 42.50 0.04 14.87 18.66 0.16 - - - - 0.16 1 42.58 0.04 14.87 18.66 0.16 - - 0.16 42.67 0.04 14.87 18.65 0.16 _ _ 0.16 42.75 0.04 14.87 18.64 0.16 . - - - - 0.16 42.83 42.92 0.04 0.04 14.87 14.87 18.64 18.63 0.16 0.16 - _ _ - 0.16 0.16 43.00 0.04 14.87 18.62 0.16 - - - - 0.16 43.08 0.04 14.87 18.62 0.16 - - - - 0.16 43.17 0.04 14.87 18.61 0.16 - - 0.16 43.25 0.04 14.87 18.60 0.16 _ _ 0.16 43.33 0.04 14.87 18.60 0.16 - - - - 0.16 43. 43.50 50 0.04 0.04 14.87 14.87 18.5 18.58 0.16 0.16 - _ _ - 0.16 0.16 43.58 0.04 14.87 18.58 0.16 - - - 0.16 43.67 0.03 14.86 18.57 0.16 - - - - 0.16 43.75 0.03 14.86 18.56 0.16 - - 0.16 43.83 0.03 14.86 18.56 0.16 _ _ 0.16 ' Continues on next page... I I THE KEYS Page 12 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) Ids) (cfs) (cfs) (cfs) (cfs) (cfs) 43.92 0.03 14.86 18.55 0.16 - - 0.16 44.00 0.03 14.86 18.54 _ _ 0.16 0.16 44.08 0.03 14.86 18.54 0.16 - - - - 0.16 44.17 0.03 14.86 18.53 0.16 - - - - 0.16 44.25 0.03 14.86 18.52 0.16 - - 0.16 44.33 0.03 14.86 18.52 _ _ 0.16 0.16 44.42 0.03 14.86 18.51 0.16 - - - - 0.16 44.50 44.58 0.03 0.03 14.86 14.86 18.50 18.50 0.16 - _ _ - 0.16 0.16 0.16 44.67 0.03 14.86 18.49 0.16 - - - - 0.16 44.75 0.03 14.86 18.48 0.15 - - - - 0.15 44.83 0.03 14.86 18.48 0.15 - - 0.15 44.92 0.03 14.86 18.47 _ _ 0.15 0.15 45.00 0.03 14.85 18.46 0.15 - - - - 0.15 45.08 0.03 14.85 18.46 0.15 - - - - 0.15 45.17 0.03 14.85 18.45 0.15 - - 0.15 45.25 0.03 14.85 18.44 _ _ 0.15 0.15 45.33 0.03 14.85 18.44 0.15 - - - - 0.15 45.42 45.50 0.03 0.03 14.85 14.85 18.43 18.42 0.15 - _ _ - 0.15 0.15 0.15 45.58 0.03 14.85 18.42 0.15 - - - - 0.15 45.67 0.03 14.85 18.41 0.15 - - - - 0.15 45.75 0.03 14.85 18.40 0.15 - - 0.15 45.83 0.03 14.85 18.40 _ _ 0.15 0.15 45.92 0.03 14.85 18.39 0.15 - - - - 0.15 46.0 46.08 0.03 0.03 14.85 14.85 18.38 18.38 0.15 - _ _ - 0.15 0.15 0.15 46.17 0.03 14.85 18.37 0.15 0.15 46.25 0.03 14.85 18.36 0.15 - - - - 0.15 46.33 0.03 14.85 18.36 0.15 - - 0.15 46.42 0.03 14.84 18.35 _ _ 0.15 0.15 46.50 0.03 14.84 18.34 0.15 - - - - 0.15 46.58 0.03 14.84 18.34 0.15 - - - - 0.15 1 46.67 0.03 14.84 18.33 0.15 - - 0.15 46.75 0.03 14.84 18.32 _ _ 0.15 0.15 46.83 0.03 14.84 18.32 0.15 - - - - 0.15 46.92 47.00 0.03 0.03 14.84 14.84 18.31 18.30 0.15 - - - - 0.15 - - - - 0.15 0.15 47.08 0.03 14.84 18.30 0.15 - - - 0.15 47.17 0.03 14.84 18.29 0.15 - - - - 0.15 47.25 0.03 14.84 18.28 0.15 - - 0.15 47.33 0.03 14.84 18.28 _ _ 0.15 0.15 47.42 0.03 14.84 18.27 0.15 - - - - 0.15 47.5 0.03 14.84 18.2 0.15 0.15 47.58 0.03 14.84 18.26 - _ _ - 0.15 0.15 47.67 0.03 14.84 18.25 0.15 - 0.15 47.75 0.03 14.83 18.25 0.15 - - - - 0.15 47.83 0.03 14.83 18.24 0.15 - - 0.15 47.92 0.03 14.83 18.23 _ _ 0.15 0.15 I Continues on next page... I I THE KEYS Page 13 Hydrograph Discharge Table Time Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 48.00 0.03 14.83 18.23 0.15 - - 0.15 48.08 0.03 14.83 18.22 _ _ 0.15 0.15 48.17 0.03 14.83 18.21 0.15 - - - - 0.15 48.25 0.03 14.83 18.21 0.15 - - - - 0.15 48.33 0.03 14.83 18.20 0.15 - - 0.15 48.42 0.03 14.83 18.19 _ _ 0.15 0.15 48.50 0.03 14.83 18.19 0.15 - - - - 0.15 48.58 48.67 0.03 0.03 14.83 14.83 18.18 18.18 0.15 - _ _ - 0.15 0.15 0.15 48.75 0.03 14.83 18.17 0.15 - - - - 0.15 48.83 0.03 14.83 18.16 0.14 - - - 0.14 48.92 0.03 14.83 18.16 0.14 - - 0.14 49.00 0.03 14.83 18.15 _ _ 0.14 0.14 49.08 0.03 14.83 18.14 0.14 - - - - 0.14 49.17 0.03 14.82 18.14 0.14 - - 0.14 1 49.25 0.03 14.82 18.13 0.14 - 0.14 49.33 0.03 14.82 18,12 _ _ = 0.14 0.14 49.42 0.03 14.82 18.12 0.14 - - - - 0.14 49.50 49.58 0.03 0.03 14.82 14,82 18.11 18.11 0.14 - _ _ - 0.14 0.14 0.14 49.67 0.03 14.82 18.10 0.14 - - - - 0.14 49.75 0.03 14.82 18.09 0.14 - - - - 0.14 49.83 0.03 14.82 18.09 0.14 - - 0.14 49.92 0.03 14.82 18.08 _ _ 0.14 0.14 50.00 0.03 14.82 18.07 0.14 - - - - 0.14 50. 50.17 17 0.03 0.03 14.82 14.82 18.0 18.06 0.14 - _ _ - 0.14 0.14 0.14 50.25 0.03 14.82 18.05 0.14 - - - 0.14 50.33 0.03 14.82 18.05 0.14 - - - - 0.14 50.42 0.03 14.82 18.04 0.14 - - 0.14 50.50 0.03 14.82 18.04 _ _ 0.14 0.14 50.58 0.03 14.82 18.03 0.14 - - - - 0.14 50.67 0.03 14.81 18.02 0.14 - - - - 0.14 50.75 0.03 14.81 18.02 0.14 - 0.14 50.83 0.03 14.81 18.01 _ _ 0.14 - 0.14 50.92 0.03 14.81 18.00 0.14 - - - -- 0.14 51.00 51.08 0.03 0.03 14.81 14.81 18.00 17.99 0.14 - _ _ - 0.14 0.14 0.14 51.17 0.03 14.81 17.98 0.14 - - - - 0.14 51.25 0.03 14.81 17.98 0.14 - - - - 0.14 51.33 0.03 14.81 17.97 0.14 - - 0.14 51.42 0.03 14.81 17.96 _ _ 0.14 0.14 51.50 0.03 14.81 17.96 0.14 - - - - 0.14 51. 51.67 67 0.03 0.03 14.81 14.81 17.9 17.94 0.14 - _ _ - 0.14 0.14 0.14 51.75 0.03 14.81 17.94 0.14 - - - 0.14 51.83 0.03 14.81 17.93 0.14 - - - - 0.14 51.92 0.03 14.81 17.93 0.14 - - 0.14 52.00 0.03 14.81 17.92 _ _ 0.14 0.14 I Continues on next page... THE KEYS page 14 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 52.08 0.03 14.80 17.91 0.14 - - 0.14 52.17 0.03 14.80 17.91 0.14 _ _ 0.14 52.25 0.03 14.80 17.90 0.14 - - - - 0.14 52. 0.03 14.80 17.89 0.14 0.14 52.42 42 0.03 14:80 17.89 0.14 - _ _ - 0.14 52.50 0.03 14.80 17.88 0.14 0.14 52.58 0.03 14.80 17.87 0.14 - - - - 0.14 52.67 52.75 0.03 0.03 14.80 14.80 17.87 17.86 0.14 0.14 - _ _ - 0.14 0.14 52.83 0.03 14.80 17.85 0.14 - - - - 0.14 52.92 0.03 14.80 17.85 0.14 - - - - 0.14 53.00 0.03 14.80 17.84 0.14 - - 0.14 53.08 0.03 14.80 17.84 0.14 _ _ 0.14 53.17 0.03 14.80 17.83 0.14 - - - - 0.14 0.03 14.80 17.82 0.14 0.14 ' 53.33 53.33 0.03 14.80 17.82 0.14 - _ _ - 0.14 53.42 0.03 14.80 17.81 0.14 0.14 53.50 0.03 14.79 17.80 0.14 - - - - 0.14 53.58 0.03 14.79 17.80 0.14 - - 0.14 ' 53.67 0.03 14.79 17.79 0.14 _ _ 0.14 53.75 0.03 14.79 17.78 0.14 - - - - 0.14 53.83 0.03 14.79 17.78 0.14 - - - - 0.14 53.92 0.03 14.79 17.77 0.14 - - 0.14 ' 54.00 0.02 14.79 17.77 0.14 _ _ 0.14 54.08 0.02 14.79 17.76 0.14 - - - - 0.14 ' 4. 54.25 25 0.02 0.02 14.79 14.79 17.75 17.75 0.14 0.14 - _ _ - 0.14 0.14 54.33 0.02 14.79 17.74 0.14 - - - 0.14 54.42 0.02 14.79 17.73 0.14 - - - - 0.14 54.50 0.02 14.79 17.73 0.14 - 0.14 54.58 0.02 14.79 17.72 0.14 _ _ _ 0.14 54.67 0.02 14.79 17.71 0.14 - - - - 0.14 54.75 0.02 14.79 17.71 0.14 - - - - 0.14 54.83 0.02 14.79 17.70 0.14 - - 0.14 54.92 0.02 14.79 17.70 0.14 _ _ 0.14 55.00 0.02 14.78 17.69 0.14. - - - - 0.14 55.08 55.17 0.02 0.02 14.78 14.78 17.68 17.68 0.14 0.14 - _ _ - 0.14 0.14 55.25 0.02 14.78 17.67 0.14 - - - - 0.14 55.33 0.02 14.78 17.66 0.14 - - - - 0.14 55.42 0.02 14.78 17.66 0.14 - - - - 0.14 55.50 0.02 14.78 17.65 0.14 - - - - 0.14 55.58 0.02 14.78 17.64 0.14 - - - - 0.14 55.67 55.75 0.02 0.02 14.78 14.78 17.64 17.63 0.14 0.14 - - - - 0.14 - - - 0.14 55.83 0.02 14.78 17.63 0.13 _ - - 0.13 55.92 0.02 14.78 17.62 0.13 - - - - 0.13 56.00 0.02 14.78 17.61 0.13 - - 0.13 ' 56.08 0.02 14.78 17.61 0.13 _ _ 0.13 Continues on next page... THE KEYS Pegs 15 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) Ids) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 56.17 0.02 14.78 17.60 0.13 - - 0.13 56.25 0.02 14.78 17.59 _ _ 0.13 0.13 56.33 0.02 14.78 17.59 0.13 - - - - 0.13 56.42 0.02 14.78 17.58 0.13 - - - - 0.13 56.50 0.02 14.77 17.58 0.13 - - 0.13 56.58 0.02 14.77 17.57 _ _ 0.13 0.13 56.67 0.02 14.77 17.56 0.13 - - - - 0.13 56.75 56.83 0.02 0.02 14.77 14.77 17.56 17.55 0.13 - - - - 0.13 - - 0.13 56.92 0.02 14.77 17.54 - - 0.13 - - - - 0.13 0.13 57.00 0.02 14.77 17.54 0.13 - - - - 0.13 57.08 0.02 14.77 17.53 0.13 - - 0.13 57.17 0.02 14.77 17.52 _ _ 0.13 0.13 57.25 0.02 14.77 17.52 0.13 - - - - 0.13 57.33 0.02 14.77 17.51 0.13 - 0.13 57.42 0.02 14.77 17.51 0.13 - - 0.13 57.50 0.02 14.77 17.50 _ _ 0.13 0.13 57.58 0.02 14.77 17.49 0.13 - - - - 0.13 ' 57.67 57.75 0.02 0.02 14.77 14.77 17.49 17.48 0.13 - 0.13 - 0.13 57.83 0.02 14.77 17.47 - - 0.13 - - - - 0.13 0.13 57.92 0.02 14.77 17.47 0.13 - - - - 0.13 58.00 0.02 14.76 17.46 0.13 - - 0.13 58.08 0.02 14.76 17.46 _ _ 0.13 0.13 58.17 0.02 14.76 17.45 0.13 - - - - 0.13 58. 58.33 33 0.02 0.02 14.76 14.76 17.44 17.44 0.13 - _ _ - 0.13 0.13 0.13 58.42 0.02 14.76 17.43 0.13 - - - 0.13 58.50 0.02 14.76 17.42 0.13 - - - - 0.13 56.58 0.02 14.76 17.42 0.13 - - 0.13 58.67 0.02 14.76 17.41 _ _ 0.13 0.13 58.75 0.02 14.76 17.41 0.13 - - - - 0.13 58.83 0.02 14.76 17.40 0.13 - - - 0.13 1 58.92 0.02 14.76 17.39 0.13 - - 0.13 59.00 0.02 14.76 17.39 _ _ 0.13 0.13 59.08 0.02 14.76 17.38 0.13 - - - - 0.13 59.17 59.25 0.02 0.02 14.76 14.76 17.37 17.37 0.13 = _ _ - 0.13 0.13 59.33 0.02 14.76 17.36 0.13 - - - - 0.13 0.13 59.42 0.02 14.76 17.35 0.13 - - - - 0.13 59.50 0.02 14.75 17.35 0.13 - 0.13 59.58 0.02 14.75 17.34 = _ _ 0.13 0.13 59.67 0.02 14.75 17.33 0.13 - - - -- 0.13 59. 59.83 83 0.02 0.02 14.75 14.75 17.3 17.32 0.13 - _ _ 0.13 0.13 0.13 59.92 0.02 14.75 17.32 _ 0.13 - - - - 0.13 60.00 0.02 14.75 17.31 0.13 - - - - 0.13 60.08 0.02 14.75 17.30 0.13 - - 0.13 60.17 0.02 14.75 17.30 _ _ 0.13 0.13 Continues on next page... r 11 I I I 11 I I I THE KEYS Hydrograph Discharge Table Page 16 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 60.25 0.02 14.75 17.29 0.13 - - - - 0.13 60.33 0.02 14.75 17.28 0.13 - - - - 0.13 60.42 0.02 14.75 17.28 0.13 - - - - 0.13 60.50 0.02 14.75 17.27 0.13 - - - - 0.13 60.58 0.02 14.75 17.26 0.13 - - - - 0.13 60.67 0.02 14.75 17.26 0.13 - - - - 0.13 60.75 0.02 14.75 17.25 0.13 - - - - 0.13 60.83 0.02 14.75 17.25 0.13 - - - - 0.13 60.92 0.02 14.75 17.24 0.13 - - - - 0.13 61.00 0.02 14.74 17.23 0.13 - - - - 0.13 61.08 0.02 14.74 17.23 0.13 - - - - 0.13 61.17 0.02 14.74 17.22 0.13 - - - - 0.13 61.25 0.02 14.74 17.21 0.13 - - - - 0.13 61.33 0.02 14.74 17.21 0.13 - - - - 0.13 61.42 0.02 14.74 17.20 0.13 - - - - 0.13 61.50 0.02 14.74 17.19 0.13 - - - - 0.13 61.58 0.02 14.74 17.19 0.13 - - - - 0.13 61.67 0.02 14.74 17.18 0.13 - - - - 0.13 61.75 0.02 14.74 17.18 0.13 - - - - 0.13 61.83 0.02 14.74 17.17 0.12 - - - - 0.12 61.92 0.02 14.74 17.16 0.12 - - - - 0.12 62.00 0.02 14.74 17.16 0.12 - - - - 0.12 62.08 0.02 14.74 17.15 0.12 - - - - 0.12 62.17 0.02 14.74 17.14 0.12 - - - - 0.12 62.25 0.02 14.74 17.14 0.12 - - - - 0.12 62.33 0.02 14.74 17.13 0.12 - - - - 0.12 62.42 0.02 14.74 17.13 0.12 - - - - 0.12 62.50 0.02 14.74 17.12 0.12 - - - - 0.12 62.58 0.02 14.73 17.11 0.12 - - - - 0.12 62.67 0.02 14.73 17.11 0.12 - - - - 0.12 62.75 0.02 14.73 17.10 0.12 - - - - 0.12 62.83 0.02 14.73 17.10 0.12 - - - - 0.12 62.92 0.02 14.73 17.09 0.12 - - - - 0.12 63.00 0.02 14.73 17.08 0.12 - - - - 0.12 63.08 0.02 14.73 17.08 0.12 - - - - 0.12 63.17 0.02 14.73 17.07 0.12 - - - - 0.12 63.25 0.02 14.73 17.06 0.12 - - - - 0.12 63.33 0.02 14.73 17.06 0.12 - - - - 0.12 63.42 0.02 14.73 17.05 0.12 - - - - 0.12 63.50 0.02 14.73 17.05 0.12 - - - - 0.12 63.58 0.02 14.73 17.04 0.12 - - - - 0.12 63.67 0.02 14.73 17.03 0.12 - - - - 0.12 63.75 0.02 14.73 17.03 0.12 - - - - 0.12 63.83 0.02 14.73 17.02 0.12 - - - - 0.12 63.92 0.02 14.73 17.02 0.12 - - - - 0.12 64.00 0.02 14.73 17.01 0.12 - - - - 0.12 64.08 0.02 14.73 17.00 0.12 - - - - 0.12 64.17 0.02 14.72 17.00 0.12 - - - - 0.12 64.25 0.02 14.72 16.99 0.12 - - - - 0.12 Continues on next page... THE KEYS Hydrograph Discharge Table Page 17 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 64.33 0.02 14.72 16.98 0.12 - - - - 0.12 64.42 0.02 14.72 16.98 0.12 - - - - 0.12 64.50 0.02 14.72 16.97 0.12 - - - - 0.12 64.58 0.02 14.72 16.97 0.12 - - - - 0.12 64.67 0.02 14.72 16.96 0.12 - - - - 0.12 64.75 0.02 14.72 16.95 0.12 - - - - 0.12 64.83 0.02 14.72 16.95 0.12 - - - - 0.12 64.92 0.02 14.72 16.94 0.12 - - - - 0.12 65.00 0.02 14.72 16.94 0.12 - - - - 0.12 65.08 0.02 14.72 16.93 0.12 - - - - 0.12 65.17 0.02 14.72 16.92 0.12 - - - - 0.12 65.25 0.02 14.72 16.92 0.12 - - - - 0.12 65.33 0.02 14.72 16.91 0.12 - - - - 0.12 65.42 0.02 14.72 16.91 0.12 - - - - 0.12 65.50 0.02 14.72 16.90 0.12 - - - - 0.12 65.58 0.02 14.72 16.89 0.12 - - - - 0.12 65.67 0.02 14.72 16.89 0.12 - - - - 0.12 65.75 0.02 14.71 16.88 0.12 - - - 0.12 65.83 0.02 14.71 16.88 0.12 - - - - 0.12 65.92 0.02 14.71 16.87 0.12 - - - - 0.12 66.00 0.02 14.71 16.86 0.12 - - - - 0.12 66.08 0.02 14.71 16.86 0.12 - - - - 0.12 66.17 0.02 14.71 16.85 0.12 - - - - 0.12 66.25 0.02 14.71 16.85 0.12 - - - - 0.12 66.33 0.02 14.71 16.84 0.12 - - - - 0.12 66.42 0.02 14.71 16.84 0.12 - - - - 0.12 66.50 0.02 14.71 16.83 0.12 - - - - 0.12 66.58 0.02 14.71 16.82 0.12 - - - - 0.12 66.67 0.02 14.71 16.82 0.12 - - - - 0.12 66.75 0.02 14.71 16.81 0.12 - - - - 0.12 66.83 0.02 14.71 16.81 0.12 - - - - 0.12 66.92 0.02 14.71 16.80 0.11 - - - - 0.11 67.00 0.02 14.71 16.79 0.11 - - - - 0.11 67.08 0.02 14.71 16.79 0.11 - - - - 0.11 67.17 0.02 14.71 16.78 0.11 - - - - 0.11 67.25 0.02 14.71 16.78 0.11 - - - - 0.11 67.33 0.01 14.71 16.77 0.11 - - - - 0.11 67.42 0.01 14.70 16.76 0.11 - - - - 0.11 67.50 0.01 14.70 16.76 0.11 - - - - 0.11 67.58 0.01 14.70 16.75 0.11 - - - - 0.11 67.67 0.01 14.70 16.75 0.11 - - - - 0.11 67.75 0.01 14.70 16.74 0.11 - - - - 0.11 67.83 0.01 14.70 16.74 0.11 - - - - 0.11 67.92 0.01 14.70 16.73 0.11 - - - - 0.11 68.00 0.01 14.70 16.72 0.11 - - - - 0.11 68.08 0.01 14.70 16.72 0.11 - - - - 0.11 68.17 0.01 14.70 16.71 0.11 -. - - - 0.11 68.25 0.01 14.70 16.71 0.11 - - - - 0.11 68.33 0.01 14.70 16.70 0.11 - - - - 0.11 Continues on next page... I THE KEYS Page 18 ' Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (Cfs) (cfs) (cfs) (Cfs) 68.42 68.50 0.01 0.01 14.70 14.70 16.69 16.69 0.11 - _ 0.11 _ - 0.11 0.11 68.58 0.01 14.70 16.68 0.11 - - - - 0.11 68.67 0.01 14.70 16.68 0.11 - - - - 0.11 68.75 0.01 14.70 16.67 0.11 - - 0.11 68.83 0.01 14.70 16.66 _ 0.11 _ 0.11 68.92 0.01 14.70 16.66 0.11 - - - - 0.11 69.0 0.01 14. 16.65 0.11 0.11 69.08 0.01 14.6969 16.65 - _ 0.11 _ - 0.11 69.17 0.01 14.69 16.64 0.11 - - 0.11 69.25 0.01 14.69 16.63 0.11 - - - - 0.11 69.33 0.01 14.69 16.63 0.11 - - 0.11 69.42 0.01 14.69 16.62 _ 0.11 _ 0.11 69.50. 0.01 14.69 16.62 0.11 - - - - 0.11 69.58 0.01 14.69 16.61 0.11 - - - - 0.11 69.67 0.01 14.69 16.60 0.11 - - 0.11 69.75 0.01 14.69 16.60 _ 0.11 _ 0.11 69.83 0.01 14.69 16.59 0.11 - - - - 0.11 69.92 70.00 0.01 0.01 14.69 14.69 16.59 16.58 0.11 - _ 0.11 _ - 0.11 0.11 70.08 0.01 14.69 16.57 0.11 - - - - 0.11 70.17 0.01 14.69 16.57 0.11 - - - - 0.11 70.25 0.01 14.69 16.56 0.11 - - 0.11 70.33 0.01 14.69 16.56 _ 0.11 _ 0.11 70.42 0.01 14.69 16.55 0.11 - - - - 0.11 70.50 0.01 14.69 16.54 0.11 - - - 011 70.58 0.01 14.69 16.54 0.11 - - 0.11 70.67 0.01 14.69 16.53 _ 0.11 _ 0.11 70.75 0.01 14.69 16.53 0.11 - - - - 0.11 70.83 70.92 0.01 0.01 14.68 14.68 16.52 16.51 0.11 - _ 0.11 _ - 0.11 71.00 0.01 14.68 16.51 0.11 - - 0.11 - - 0.11 71.08 0.01 14.68 16.50 0.11 - - - 0.11 71.17 0.01 14.68 16.50 0.11 - 0.11 71.25 0.01 14.68 16.49 _ 0.11 - - 011 71.33 0.01 14.68 16.49 0.11 - - - - 011 71. 0.01 14.68 16.4 0.11 0.11 71.50 50 0.01 14.68 16.47 - 0.11 - 0.11 71.58 0.01 14.68 16.47 0.11 - - - 0.11 71.67 0.01 14.68 16.46 0.11 - - - - 0.11 71.75 0.01 14.68 16.46 0.11 - - 011 71.83 0.01 14.68 16.45 _ 0.11 _ 0.11 71.92 0.01 14.68 16.44 0.11 - - - - 0.11 72.00 0.01 14.68 16.44 0.11 - - - - 0.11 72.08 0.01 14.68 16.43 0.11 - - 0.11 72.17 0.01 14.68 16.43 _ 0.11 _ 0.11 72.25 0.01 14.68 16.42 0.11 - - - - 0.11 '72,33 72.42 0,01 0.01 14,68 14.68 16.41 16.41 0.11 - 0.11 _ _ - 0.11 0.11 Continues on next page... I I I I I I 1 i THE KEYS Hydrograph Discharge Table Pepe 19 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) Ids) (ft) (cfs) (Cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 72.50 0.01 14.67 16.40 0.11 - - - - 0.11 72.58 0.01 14.67 16.40 0.11 0.11 72.67 0.01 14.67 16.39 0.11 - - - - 0.11 72.75 0.01 14.67 16.39 0.11 - - - - 0.11 72.83 0.01 14.67 16.38 0.11 - - - - 0.11 72.92 0.01 14.67 16.37 0.10 - - - - 0.10 73.00 0.01 14.67 16.37 0.10 - - - - 0.10 73.08 0.01 14.67 16.36 0.10 - - - - 0.10 73.17 0.01 14.67 16.36 0.10 - - - - 0.10 73.25 0.01 14.67 16.35 0.10 - - - - 0.10 73.33 0.01 14.67 16.34 0.10 - - - - 0.10 73.42 0.01 14.67 16.34 0.10 - - - - 0.10 73.50 0.01 14.67 16.33 0.10 - - - - 0.10 73.58 0.01 14.67 16.33 0.10 - - - - 0.10 73.67 0.01 14.67 16.32 0.10 - - - - 0.10 73.75 0.01 14.67 16.32 0.10 - - - - 0.10 73.83 0.01 14.67 16.31 0.10 - - - - 0.10 73.92 0.01 14.67 16.30 0.10 - - - - 0.10 74.00 0.01 14.67 16.30 0.10 - - - - 0.10 74.08 0.01 14.67 16.29 0.10 - - - - 0.10 74.17 0.01 14.67 16.29 0.10 - - - - 0.10 74.25 0.01 14.66 16.28 0.10 - - - - 0.10 74.33 0.01 14.66 16.28 0.10 - - - - 0.10 74.42 0.01 14.66 16.27 0.10 - - - - 0.10 74.50 0.01 14.66 16.26 0.10 - - - - 0.10 74.58 0.01 14.66 16.26 0.10 - - - - 0.10 74.67 0.01 14.66 16.25 0.10 - - - - 0.10 74.75 0.01 14.66 16.25 0.10 - - - - 0.10 74.83 0.01 14.66 16.24 0.10 - - - - 0.10 74.92 0.01 14.66 16.23 0.10 - - - - 0.10 75.00 0.01 14.66 16.23 0.10 - - - - 0.10 75.08 0.01 14.66 16.22 0.10 - - - - 0.10 75.17 0.01 14.66 16.22 0.10 - - - - 0.10 75.25 0.01 14.66 16.21 0.10 - - - - 0.10 75.33 0.01 14.66 16.21 0.10 - - - - 0.10 75.42 0.01 14.66 16.20 0.10 - - - - 0.10 75.50 0.01 14.66 16.19 0.10 - - - - 0.10 75.58 0.01 14.66 16.19 0.10 - - - - 0.10 75.67 0.01 14.66 16.18 0.10 - - - - 0.10 75.75 0.01 14.66 16.18 0.10 - - - - 0.10 75.83 0.01 14.66 16.17 0.10 - - - - 0.10 75.92 0.01 14.66 16.17 0.10 - - - - 0.10 76.00 0.01 14.65 16.16 0.10 - - - - 0.10 76.08 0.01 14.65 16.15 0.10 - - - - 0.10 76.17 0.01 14.65 16.15 0.10 - - - - 0.10 76.25 0.01 14.65 16.14 0.10 - - - - 0.10 76.33 0.01 14.65 16.14 0.10 - - - - 0.10 76.42 0.01 14.65 16.13 0.10 - - - - 0.10 76.50 0.01 14.65 16.13 0.10 - - - - 0.10 Continues on next page... I I 1 I rl I I 1 I 1 11 THE KEYS Page 20 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (Cfs) (Cfs) (cfs) (cfs) (cfs) (cfs) 76.58 0.01 14.65 16.12 0.10 - - - - 0.10 76.67 0.01 14.65 16.11 0.10 - - - - 0.10 76.75 0.01 14.65 16.11 0.10 - - - - 0.10 76.83 0.01 14.65 16.10 0.10 - - - - 0.10 76.92 0.01 14.65 16.10 0.10 - - - - 0.10 77.00 0.01 14.65 16.09 0.10 - - - - 0.10 77.08 0.01 14.65 16.09 0.10 - - - - 0.10 77.17 0.01 14.65 16.08 0.10 - - - - 0.10 77.25 0.01 14.65 16.07 0.10 - - - - 0.10 77.33 0.01 14.65 16.07 0.10 - - - - 0.10 77.42 0.01 14.65 16.06 0.10 - - - - 0.10 77.50 0.01 14.65 16.06 0.10 - - - - 0.10 77.58 0.01 14.65 16.05 0.10 - - - - 0.10 77.67 0.01 14.65 16.05 0.10 - - - - 0.10 77.75 0.01 14.65 16.04 0.10 - - - - 0.10 77.83 0.01 14.64 16.03 0.10 - - - - 0.10 77.92 0.01 14.64 16.03 0.10 - - - - 0.10 78.00 0.01 14.64 16.02 0.10 - - - - 0.10 78.08 0.01 14.64 16.02 0.10 - - - - 0.10 78.17 0.01 14.64 16.01 0.10 - - - - 0.10 78.25 0.01 14.64 16.01 0.10 - - - - 0.10 78.33 0.01 14.64 16.00 0.10 - - - - 0.10 78.42 0.01 14.64 15.99 0.10 - - - - 0.10 78.50 0.01 14.64 15.99 0.10 - - - - 0.10 78.58 0.01 14.64 15.98 0.10 - - - - 0.10 78.67 0.01 14.64 15.98 0.10 - - - - 0.10 78.75 0.01 14.64 15.97 0.10 - - - - 0.10 78.83 0.00 14.64 15.97 0.10 - - - - 0.10 78.92 0.00 14.64 15.96 0.10 - - - - 0.10 79.00 0.00 14.64 15.95 0.10 - - - - 0.10 79.08 0.00 14.64 15.95 0.10 - - - - 0.10 79.17 0.00 14.64 15.94 0.10 - - - - 0.10 79.25 0.00 14.64 15.94 0.10 - - - - 0.10 79.33 0.00 14.64 15.93 0.10 0.10 79.42 0.00 14.64 15.92 0.10 - - - - 0.10 79.50 0.00 14.64 15.92 0.10 - - - - 0.10 79.58 0.00 14.64 15.91 0.10 - - - - 0.10 79.67 0.00 14.63 15.91 0.09 - - - - 0.09 79.75 0.00 14.63 15.90 0.09 - - - 0.09 79.83 0.00 14.63 15.90 0.09 - - - - 0.09 79.92 0.00 14.63 15.89 0.09 - - - - 0.09 80.00 0.00 14.63 15.88 0.09 - - - - 0.09 80.08 0.00 14.63 15.88 0.09 - - - - 0.09 80.17 0.00 14.63 15.87 0.09 - - - - 0.09 80.25 0.00 14.63 15.87 0.09 - - - - 0.09 80.33 0.00 14.63 15.86 0.09 - - - - 0.09 80.42 0.00 14.63 15.85 0.09 - - - - 0.09 80.50 0.00 14.63 15.85 0.09 - - - - 0_09 80.58 0.00 14.63 15.84 0.09 - - - - 0.09 Continues on next page... I I THE,KEYS pap 21 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs). (cfs) (cfs) 80.67 0.00 14.63 15.84 0.09 - - 0.09 80.75 0.00 14.63 15.83 _ 0.09 _ 0.09 80.83 0.00 14.63 15.83 0.09 - - - - 0.09 80.92 0.00 14.63 15.82 0.09 - - - - 0.09 81.00 0.00 14.63 15.81 0.09 - 0.09 81.08 0.00 14.63 15.81 _ 0.09 _ _ 0.09 81.17 0.00 14.63 15.80 0.09 - - - - 0.09 81.25 81.33 0.00 0.00 14.63 14.63 15.80 15.79 0.09 - _ 0.09 _ - 0.09 0.09 81.42 0.00 14.63 15.79 0.09 - - - - 0.09 81.50 0.00 14.62 15.78 0.09 - - - - 0.09 81.58 0.00 14.62 15.77 0.09 - - 0.09 ' 81.67 0.00 14.62 15.77 _ 0.09 _ 0.09 81.75 0.00 14.62 15.76 0.09 - - - - 0.09 81.92 0.00 14.62 15.75 0.09 0.09 81.92 0.00 14.62 15.75 - _ 0.09 _ - 0.09 82.00 0.00 14.62 15.74 0.09 0.09 82.08 0.00 14.62 15.74 0.09 - - - - 0.09 . 82.17 0.00 14.62 15.73 0.09 - - 0.09 82.25 0.00 14.62 15.73 _ 0.09 _ 0.09 82.33 0.00 14.62 15.72 0.09 - - - - 0.09 82.42 0.00 14.62 15.72 0.09 - - - - 0.09 82.50 0.00 14.62 15.71 0.09 - - 0.09 82.58 0.00 14.62 15.70 _ 0.09 _ 0.09 82.67 0.00 14.62 15.70 0.09 - - - - 0.09 82. 82.83 83 0.00 0.00 14.62 14.62 15.69 15.69 0.09 - _ 0.09 _ - 0.09 0.09 82.92 0.00 14.62 15.68 0.09 0.09 83.00 0.00 14.62 15.68 0.09 - - - - 0.09 83.08 0.00 14.62 15.67 0.09 - - 0.09 ' 83.17 0.00 14.62 15.66 _ 0.09 _ 0.09 83.25 0.00 14.62 15.66 0.09 - - - - 0.09 83.33 0.00 14.61 15.65 0.09 - - - - 0.09 ' 83.42 0.00 14.61 15.65 0.09 - 0.09 83.50 0.00 14.61 15.64 _ _ 0.09 _ 0.09 83.58 0.00 14.61 15.64 0.09 - - - - 0.09 ' 83.67 83.75 0.00 0.00 14.61 14.61 15.63 15.63 0.09 - _ 0.09 _ - 0.09 0.09 83.83 0.00 14.61 15.62 0.09 - - - - 0.09 83.92 0.00 14.61 15.61 0.09 - - - - 0.09 84.00 0.00 14.61 15.61 0.09 - - 0.09 84.08 0.00 14.61 15.60 _ 0.09 _ 0.09 84.17 0.00 14.61 15.60 0.09 - - - - 0.09 84. 84.33 33 0.00 0.00 14.61 14.61 15.59 15.59 0.09 - _ 0.09 _ - 0.09 0.09 84.42 0.00 14.61 15.58 0.09 - - - 0.09 84.50 0.00 14.61 15.57 0.09 - - - - 0.09 . 84.58 0.00 14.61 15.57 0.09 - - 0.09 84.67 0.00 14.61 15.56 _ 0.09 _ 0.09 Continues on next page... I ' THE KEYS Page 22 Hydrograph Discharge Table Time Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (Cfs) 84.75 0.00 14.61 15.56 0.09 - - 0.09 84.83 0.00 14.61 15.55 _ _ 0.09 0.09 84.92 0.00 14.61 15.55 0.09 - - - - 0.09 85.00 0.00 14.61 15.54 0.09 - - - - 0.09 85.08 0.00 14.61 15.54 0.09 - - 0.09 85.17 0.00 14.61 15.53 _ _ 0.09 0.09 85.25 0.00 14.60 15.52 0.09 - - - - 0.09 85.33 85.42 0.00 0.00 14.60 14.60 15.52 15.51 0.09 - _ _ - 0.09 0.09 0.09 85.50 0.00 14.60 15.51 0.09 - - - - 0.09 85.58 0.00 14.60 15.50 0.09 - - - - 0.09 85.67 0.00 14.60 15.50 0.09 - - 0.09 85.75 0.00 14.60 15.49 _ _ 0.09 0.09 85.83 0.00 14.60 15.49 0.09 - - - - 0.09 8. 0.00 14.60 15.48 0.09 0.09 86.00 00 0.00 14.60 15.47 - _ _ - 0.09 0.09 86.08 0.00 14.60 15.47 0.09 - 0.09 86.17 0.00 14.60 15.46 0.09 - - - - 0.09 86.25 0.00 14.60 15.46 0.09 - - 0.09 ' 86.33 0.00 14.60 15.45 _ _ 0.09 0.09 86.42. 0.00 14.60 15.45 0.09 - - - - 0.09 86.50 0.00 14.60 15.44 0.09 - - - - 0.09 '86.58 0.00 14.60 15.44 0.09 - - 0.09 86.67 0.00 14.60 15.43 _ _ 0.09 0.09 86.75 0.00 14.60 15.42 0.09 - - - - 0.09 '86.83 86.92 0.00 0.00 14.60 14.60 15.42 15.41 0.09 - _ _ - 0.09 0.09 0.09 87.00 0.00 14.60 15.41 0.09 - - - - 0.09 87.08 0.00 14.60 15.40 0.09 - - - - 0.09 87.17 0.00 14.59 15.40 0.09 - - 0.09 87.25 0.00 14.59 15.39 _ _ 0.09 0.09 87.33 0.00 14.59 15.39 0.09 - - - - 0.09 87. 0.00 14.59 15.38 0.09 0.09 87.50 50 0.00 14.59 15.37 - _ _ - 0.09 0.09 87.58 0.00 14.59 15.37 0.09 0.09 87.67 0.00 14.59 15.36 0.09 - - - = 0.09 87.75 87.83 0.00 0.00 14.59 14.59 15.36 15.35 0.09 - _ _ - 0.09 0.09 87.92 0.00 14.59 15.35 0.09 - - - - 0.09 0.09 88.00 0.00 14.59 15.34 0.09 - - - - 0.09 '88.08 0.00 14.59 15.34 0.09 - - 0.09 88.17 0.00 14.59 15.33 _ _ 0.09 0.09 88.25 0.00 14.59 15.33 0.09 - - - - 0.09 88.33 88.42 0.00 0.00 14.59 14.59 15.32 15.32 0.09 - _ _ - 0.08 0.09 0.08 88.50 0.00 14.59 15.31 0.08 - - - - 0.08 88.58 0.00 14.59 15.30 0.08 - - - - 0.08 0.00 14.59 15.30 0.08 - - 0.08 '88.67 88.75 0.00 14.59 15.29 _ _ 0.08 0.08 Continues on next page... THE KEYS Hydrograph Discharge Table Pape 23 ' Time ' Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hm) (Cfs) (ft) (Cfs) (cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) 88.83 0.00 14.59 15.29 0.08 - - 0.08 88.92 0.00 14.59 15.28 _ _ 0.08 0.08 89.00 0.00 14.59 15.28 0.08 - - - - 0.08 89.08 0.00 14.58 15.27 0.08 0.08 89.17 0.00 14.58 15.27 0.08 - - 0.08 89.25 0.00 14.58 15.26 _ _ 0.08 0.08 89.33 0.00 14.58 15.26 0.08 - - - - 0.08 ' 89.42 89.50 0.00 0.00 14.58 14.58 15.25 15.25 0.08 - _ _ - 0.08 0.08 0.08 89.58 0.00 14.58 15.24 0.08 - - - - 0.08 89.67 0.00 14.58 15.23 0.08 - - - - 0.08 89.75 0.00 14.58 15.23 0.08 - - 0.08 ' 89.83 0.00 14.58 15.22 _ _ 0.08 0.08 89.92 0.00 14.58 15.22 0.08 - - - - 0.08 90.00 0.00 14.58 15.21 0.08 - - - - 0.08 90.08 0.00 14.58 15.21 0.08 - 0.08 90.17 0.00 14.58 15.20 _ _ = 0.08 0.08 90.25 0.00 14.58 15.20 0.08 - - - - 0.08 90.33 90.42 0.00 0.00 14.58 14.58 15.19 15.19 0.08 - _ _ - 0.08 0.08 0.08 90.50 0.00 14.58 15.18 0.08 - - - - 0.08 90.58 0.00 14.58 15.17 0.08 - - - - 0.08 90.67 0.00 14.58 15.17 0.08 - - 0.08 90.75 0.00 14.58 15.16 _ _ 0.08 0.08 90.83 0.00 14.58 15.16 0.08 - - - - 0.08 ' 9. 91.00 00 0.00 0.00 14.58 14.58 15.15 15.15 0.08 - _ _ - 0.08 0.08 0.08 91.08 0.00 14.57 15.14 0.08 - 0.08 91.17 0.00 14.57 15.14 0.08 - - - - 0.08 91.25 0.00 14.57 15.13 0.08 - - 0.08 91.33 0.00 14.57 15.13 _ _ 0.08 0.08 91.42 0.00 14.57 15.12 0.08 - - - - 0.08 91.50 0.00 14.57 15.11 0.08 - - - - 0.08 ' 91.58 0.00 14.57 15.11 0.08 - - 0.08 91.67 0.00 14.57 15.10 _ _ 0.08 0.08 91.75 0.00 14.57 15.10 0.08 - - - - 0.08 '91.83 91.92 0.00 0.00 14.57 14.57 15.09 15.09 0.08 - _ _ - 0.08 0.08 0.08 92.00 0.00 14.57 15.08 0.08 - - - - 0.08 92.08 0.00 14.57 15.08 0.08 - - - - 0.08 0.00 14.57 15.07 0.08 - - 0.08 '92.17 92.25 0.00 14.57 15.07 _ _ 0.08 0.08 92.33 0.00 14.57 15.06 0.08 - - - - 0.08 92. 0.00 14.57 15.05 0.08 0.08 92.50 50 0.00 14.57 15.05 - _ _ - 0.08 0.08 92.58 0.00 14.57 15.04 0.08 - - 0.08 92.67 0.00 14.57 15.04 0.08 - - - - 0.08 0.00 14.57 15.03 0.08 - - 0.08 '92.75 92.83 0.00 14.57 15.03 _ _ 0.08 0.08 Continues on next page... C 1 I r THE. KEYS Page 24 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C WeirA Weir B Weir C Outflow, (hrs) (Cfs) (ft) (cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) 92.92 0.00 14.57 15.02 0.08 - - - - 0.08 93.00 0.00 14.57 15.02 0.08 - - - - 0.08 93.08 0.00 14.57 15.01 0.08 - - - - 0.08 93.17 0.00 14.56 15.01 0.08 - - - - 0.08 93.25 0.00 14.56 15.00 0.08 - - - - 0.08 93.33 0.00 14.56 15.00 0.08 - - - - 0.08 93.42 0.00 14.56 14.99 0.08 - - - - 0.08 93.50 0.00 14.56 14.98 0.08 - - - - 0.08 93.58 0.00 14.56 14.98 0.08 - - - - 0.08 93.67 0.00 14.56 14.97 0.08 - - - - 0.08 93.75 0.00 14.56 14.97 0.08 - - - - 0.08 93.83 0.00 14.56 14.96 0.08 - - - - 0.08 93.92 0.00 14.56 14.96 0.08 - - - - 0,08 94.00 0.00 14.56 14.95 0.08 - - - - 0.08 94.08 0.00 14.56 14.95 0.08 - - - - 0.08 94.17 0.00 14.56 14.94 0.08 - - - - 0.08 94.25 0.00 14.56 14.94 0.08 - - - - 0.08 94.33 0.00 14.56 14.93 0.08 - - - - 0.08 94.42 0.00 14.56 14.93 0.08 - - - - 0.08 94.50 0.00 14.56 14.92 0.08 - - - - 0.08 94.58 0.00 14.56 14.92 0.08 - - - - 0.08 94.67 0.00 14.56 14.91 0.08 - - - - 0.08 94.75 0.00 14.56 14.91 0.08 - - - - 0,08 94.83 0.00 14.56 14.90 0.08 - - - - 0.08 94.92 0.00 14.56 14.89 0.08 - - - - 0.08 95.00 0.00 14.56 14.89 0.08 - - - - 0.08 95.08 0.00 14.56 14.88 0.08 - - - - 0.08 95.17 0.00 14.56 14.88 0.08 - - - - 0.08 95.25 0.00 14.56 14.87 0.08 - - - - 0.08 95.33 0.00 14.55 14.87 0.08 - - - - 0.08 95.42 0.00 14.55 14.86 0.08 - - - - 0.08 95.50 0.00 14.55 14.86 0.08 - - - - 0.08 95.58 0.00 14.55 14.85 0.08 - - - - 0.08 95.67 0.00 14.55 14.85 0.08 - - - - 0.08 95.75 0.00 14.55 14.84 0.08 - - - - 0.08 95.83 0.00 14.55 14.84 0.08 - - - - 0.08 95.92 0.00 14.55 14.83 0.08 - - - - 0.08 96.00 0.00 14.55 14.83 0.08 - - - - 0.08 96.08 0.00 14.55 14.82 0.08 - - - - 0.08 96.17 0.00 14.55 14.82 0.08 - - - - 0.08 96.25 0.00 14.55 14.81 0.08 - - - - 0.08 96.33 0.00 14.55 14.81 0.08 - - - - 0.08 96.42 0.00 14.55 14.80 0.08 - - - - 0.08 96.50 0.00 14.55 14.80 0.08 - - - - 0.08 96.58 0.00 14.55 14.79 0.08 - - - - 0.08 96.67 0.00 14.55 14.79 0.08 - - - - 0.08 96.75 0.00 14.55 14.78 0.08 - - - - 0.08 96.83 0.00 14.55 14.78 0.08 - - - - 0.08 96.92 0.00 14.55 14.77 0.07 - - - - 0.07 Continues on next page... I p I I 1 THE KEYS Page 25 Hydrograph Discharge Table Time Inflow Elevation Culv. A Culy. B CuIv. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 97.00 0.00 14.55 14.77 0.07 - - - - 0.07 97.08 0.00 14.55 14.76 0.07 - - - - 0.07 97.17 0.00 14.55 14.76 0.07 - - - - 0.07 97.25 0.00 14.55 14.75 0.07 - - - - 0.07 97.33 0.00 14.55 14.75 0.07 - - - - 0.07 97.42 0.00 14.55 14.74 0.07 - - - - 0.07 97.50 0.00 14.54 14.74 0.07 - - - - 0.07 97.58 0.00 14.54 14.73 0.07 - - - - 0.07 97.67 0.00 14.54 14.73 0.07 - - - - 0.07 97.75 0.00 14.54 14.72 0.07 - - - - 0.07 97.83 0.00 14.54 14.72 0.07 - - - - 0.07 97.92 0.00 14.54 14.71 0.07 - - - - 0.07 98.00 0.00 14.54 14.71 0.07 - - - - 0.07 98.08 0.00 14.54 14.70 0.07 - - - - 0.07 98.17 0.00 14.54 14.70 0.07 - - - - 0.07 98.25 0.00 14.54 14.69 0.07 - - - - 0.07 98.33 0.00 14.54 14.69 0.07 - - - - 0.07 98.42 0.00 14.54 14.68 0.07 - - - - 0.07 98.50 0.00 14.54 14.68 0.07 - - - - 0.07 98.58 0.00 14.54 14.67 0.07 - - - - 0.07 98.67 0.00 14.54 14.67 0.07 - - - - 0.07 98.75 0.00 14.54 14.66 0.07 - - - - 0.07 98.83 0.00 14.54 14.66 0.07 - - - - 0.07 98.92 0.00 14.54 14.65 0.07 - - - - 0.07 99.00 0.00 14.54 14.65 0.07 - - - - 0.07 99.08 0.00 14.54 14.64 0.07 - - - - 0.07 99.17 0.00 14.54 14.64 0.07 - - - - 0.07 99.25 0.00 14.54 14.63 0.07 - - - - 0.07 99.33 0.00 14.54 14.63 0.07 - - - - 0.07 99.42 0.00 14.54 14.62 0.07 - - - - 0.07 99.50 0.00 14.54 14.62 0.07 - - - - 0.07 99.58 0.00 14.54 14.61 0.07 - - - - 0.07 99.67 0.00 14.54 14.61 0.07 - - - - 0.07 99.75 0.00 14.53 14.60 0.07 - - - - 0.07 99.83 0.00 14.53 14.60 0.07 - - - - 0.07 99.92 0.00 14.53 14.59 0.07. - - - - 0.07 100.00 0.00 14.53 14.59 0.07 - - - - 0.07 100.08 0.00 14.53 14.58 0.07 - - - - 0.07 100.17 0.00 14.53 14.58 0.07 - - - - 0.07 100.25 0.00 14.53 14.57 0.07 - - - - 0.07 100.33 0.00 14.53 14.57 0.07 - - - - 0.07 100.42 0.00 14.53 14.56 0.07 - - - - 0.07 100.50 0.00 14.53 14.56 0.07 - - - - 0.07 100.58 0.00 14.53 14.55 0.07 - - - - 0.07 100.67 0.00 14.53 14.55 0.07 - - - - 0.07 100.75 0.00 14.53 14.54 0.07 - - - - 0.07 100.83 0.00 14.53 14.54 0.07 - - - - 0.07 100.92 0.00 14.53 14.54 0.07 - - - - 0.07 101.00 0.00 14.53 14.53 0.07 - - - - 0.07 Continues on next page... I THE KEYS Hydrograph Discharge Table Page 26 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) 101.08 0.00 14.53 14.53 0.07 - - - - 0.07 101.17 0.00 14.53 14.52 0.07 - - - - 0.07 101.25 0.00 14.53 14.52 0.07 - - - - 0.07 101.33 0.00 14.53 14.51 0.07 - - - - 0.07 101.42 0.00 14.53 14.51 0.07 - - - - 0.07 101.50 0.00 14.53 14.50 0.07 - - - - 0.07 101.58 0.00 14.53 14.50 0.07 - - - - 0.07 101.67 0.00 14.53 14.49 0.07 - - - - 0.07 101.75 0.00 14.53 14.49 0.07 - - - - 0.07 101.83 0.00 14.53 14.48 0.07 - - - - 0.07 101.92 0.00 14.53 14.48 0.07 - - - - 0.07 102.00 0.00 14.53 14.47 0.07 - - - - 0.07 102.08 0.00 14.53 14.47 0.07 - - - - 0.07 102.17 0.00 14.52 14.46 0.07 - - - - 0.07 102.25 0.00 14.52 14.46 0.07 - - - - 0.07 102.33 0.00 14.52 14.45 0.07 - - - - 0.07 102.42 0.00 14.52 14.45 0.07 - - - - 0.07 102.50 0.00 14.52 14.45 0.07 - - - - 0.07 102.58 0.00 14.52 14.44 0.07 - - - - 0.07 102.67 0.00 14.52 14.44 0.07 - - - - 0.07 102.75 0.00 14.52 14.43 0.07 - - - - 0.07 102.83 0.00 14.52 14.43 0.07 - - - - 0.07 102.92 0.00 14.52 14.42 0.07 - - - - 0.07 103.00 0.00 14.52 14.42 0.07 - - - - 0.07 103.08 0.00 14.52 14.41 0.07 - - - - 0.07 103.17 0.00 14.52 14.41 0.07 - - - - 0.07 103.25 0.00 14.52 14.40 0.07 - - - - 0.07 103.33 0.00 14.52 14.40 0.07 - - - - 0.07 103.42 0.00 14.52 14.39 0.07 - - - - 0.07 103.50 0.00 14.52 14.39 0.07 - - - - 0.07 103.58 0.00 14.52 14.38 0.07 - - - - 0.07 103.67 0.00 14.52 14.38 0.07 - - - - 0.07 103.75 0.00 14.52 14.37 0.07 - - - - 0.07 103.83 0.00 14.52 14.37 0.07 - - - - 0.07 103.92 0.00 14.52 14.37 0.07 - - - - 0.07 104.00 0.00 14.52 14.36 0.07 - - - - 0.07 104.08 0.00 14.52 14.36 0.07 - - - - 0.07 104.17 0.00 14.52 14.35 0.07 - - - - 0.07 104.25 0.00 14.52 14.35 0.07 - - - - 0.07 104.33 0.00 14.52 14.34 0.07 - - - - 0.07 104.42 0.00 14.52 14.34 0.07 - - - - 0.07 104.50 0.00 14.52 14.33 0.07 - - - - 0.07 104.58 0.00 14.51 14.33 0.07 - - - - 0.07 104.67 0.00 14.51 14.32 0.06 - - - - 0.06 104.75 0.00 14.51 14.32 0.06 - - - - 0.06 104.83 0.00 14.51 14.31 0.06 - - - - 0.06 104.92 0.00 14.51 14.31 0.06 - - - - 0.06 105.00 0.00 14.51 14.30 0.06 - - - - 0.06 105.08 0.00 14.51 14.30 0.06 - - - - 0.06 Continues on next page... THE KEYS Page V Hydrograph Discharge Table ' Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) Ids) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 105.17 0.00 14.51 14.29 0.06 - - 0.06 ' 105.25 0.00 14.51 14.29 _ _ 0.06 0.06 105.33 0.00 14.51 , 14.29 0.06 - - - - 0.06 105.42 0.00 14.51 14.28 0.06 - - - - 0.06 ' 105.50 0.00 14.51 14.28 0.06 - - 0.06 105.58 0.00 14.51 14.27 _ _ 0.06 0.06 105.67 0.00 14.51 14.27 0.06 - - - - 0,06 ' 105.75 105.83 0.00 0.00 14.51 14.51 14.26 14.26 0.06 - _ _ - 0.06 0.06 0.06 105.92 0.00 14.51 14.25 0.06 - - - - 0.06 106.00 0.00 14.51 14.25 0.06 - - - - 0.06 106.08 0.00 14.51 14.24 0.06 - - 0.06 106.17 0.00 14.51 14.24 _ _ 0.06 0.06 106.25 0.00 14.51 14.24 0.06 - - - - 0.06 106.33 0.00 14.51 14.23 0.06 - - - - 0.06 ' 106.42 0.00 14.51 14.23 0.06 - 0.06 106.50 0.00 14.51 14.22 _ _ = 0.06 0.06 106.58 0.00 14.51 14.22 0.06 - - - - 0.06 106.67 106.75 0.00 0.00 14.51 14.51 14.21 14.21 0.06 - _ _ - 0.06 0.06 0.06 106.83 0.00 14.51 14.21 0.06 - - - - 0.06 106.92 0.00 14.51 14.20 0.06 - - - - 0.06 107.00 0.00 14.51 14.20 0.06 - 0.06 107.08 0.00 14.51 14.19 _ _ - 0.06 0.06 107.17 0.00 14.51 14.19 0.06 - - - - 0.06 107. 107.33 33 0.00 0.00 14.50 14.50 14.18 14.18 0.06 - _ _ - 0.06 006 0..06 107.42 0.00 14.50 14.17 0.06 - 0.06 107.50 0.00 14.50 14.17 0.06 - - - - 0,06 107.58 0.00 14.50 14.17 0.06 - - 0.08 107.67 0.00 14.50 14.16 _ _ 0.06 0.06 107.75 0.00 14.50 14.16 0.06 - - - - 0.06 107.83 0.00 14.50 14.15 0.06 - - - - 0.06 107.92 0.00 14.50 14.15 0.06 - - 0.06 108.00 0.00 14.50 14.15 _ _ 0.06 0.06 108.08 0.00 14.50 14.14 0.06 - - - - 0.06 '108.17 108.25 0.00 0.00 14.50 14.50 14.14 14.13 0.06 - _ _ - 0.06 0.06 0.06 108.33 0.00 14.50 14.13 0.06 - - - - 0.06 108.42 0.00 14.50 14.12 0.06 - - - - 0.06 108.50 0.00 14.50 14.12 0.06 - - 0.06 108.58 0.00 14.50 14.12 _ _ 0.06 0.06 108.67 0.00 14.50 14.11 0.06 - - - - 0.06 108. 0.00 14.50 14.11 0.06 0.06 108.83 83 0.00 14.50 14.10 - _ _ - 0.06 0.06 108.92 0.00 14.50 14.10 0.06 - - - 0.06 109.00 0.00 14.50 14.10 0.06 - - - - 0.06 0.00 14.50 14.09 0.06 - - 0.06 '109.08 109.17 0.00 14.50 14.09 _ _ 0.06 0.06 Continues on next page... ' THE KEYS Pigs 28 Hydrograph Discharge Table ' Time Inflow Elevation Culv. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (cfs) (cfs) (cfs) (cfs) (Cfs) (cfs) (cfs) 109.25 0.00 14.50 14.08 0.06 - - 0.06 ' 109.33 0.00 14.50 14.08 _ _ 0.06 0.06 109.42 0.00 14.50 14.08 0.06 - - - - 0.06 109.50 0.00 14.50 14.07 0.06 - - - - 0.06 ' 109.58 0.00 14.50 14.07 0.06 - - 0.06 109.67 0.00 14.50 14.06 _ _ 0.06 0.06 109.75 0.00 14.50 14.06 0.06 - - - - 0.06 ' 109.83 109.92 0,00 0.00 14.50 14.50 14.06 14.05 0.05 - _ _ - 0.05 0.05 0.05 110.00 0.00 14.50 14.05 0.05 - - - - 0.05 110.08 0.00 14.49 14.04 0.05 - - - - 0.05 110.17 0.00 14.49 14.04 0.05 - - 0.05 110.25 0.00 14.49 14.04 _ _ 0.05 0.05 110.33 0.00 14.49 14.03 0.05 - - - - 0.05 110.42 0.00 14.49 14.03 0.05 - - - - 0.05 ' 110.50 0.00 14.49 14.02 0.05 - - 0.05 110.58 0.00 14.49 14.02 _ _ 0.05 0.05 110.67 0.00 14.49 14.02 0.05 - - - = 0.05 110.75 0.00 14.49 14.01 0.05 - - 0.05 110.83 0.00 14.49 14.01 _ _ 0.05 0.05 110.92 0.00 14.49 14.01 0.05 - - - - 0.05 111.00 0.00 14.49 14.00 0.05 - - - - 0.05 111.08 0.00 14.49 14.00 0.05 - - 0.05 111.17 0.00 14.49 13.99 _ _ 0.05 0.05 111.25 0.00 14.49 13.99 0.05 - - - - 0.05 111.42 0.00 14.49 13.98 0.05 0.05 111.42 0.00 14.49 13.98 - _ _ - 0.05 0.05 111.50 0.00 14.49 13.98 0.05 0.05 111.58 0.00 14.49 13.97 0.05 - - - - 0.05 111.67 0.00 14.49 13.97 0.05 - - 0.05 111.75 0.00 14.49 13.97 _ _ 0.05 0.05 111.83 0.00 14.49 13.96 0.05 - - - - 0.05 111.92 0.00 14.49 13.96 0.05 - - - - 0.05 ' 112.00 0.00 14.49 13.96 0.05 - 0.05 112.08 0.00 14.49 13.95 _ _ _ 0.05 0.05 112.17 0.00 14.49 13.95 0.05 . - - - - 0.05 ' 112.25 112.33 0.00 0.00 14.49 14.49 13.95 13.94 0.05 - _ _ - 0.05 0.05 0.05 112.42 0.00 14.49 13.94 0.05 - - - - 0.05 112.50 0.00 14.49 13.93 0.05 - - - - 0.05 112.58 0.00 14.49 13.93 0.05 - - 0.05 ' 112.67 0.00 14.49 13.93 _ _ 0.05 0.05 112.75 0.00 14.49 13.92 0.05 - - - - 0.05 112. 0.00 14.49 13.92 0.05 0.05 112.92 92 0.00 14.49 13.92 - _ _ - 0.05 0.05 113.00 0.00 14.49 13.91 0.05 0.05 113.08 0.00 14.49 13.91 0.05 - - - - 0.05 0.00 14.49 13.91 0.05 - 0.05 '113.17 113.25 0.00 14.49 13.90 _ _ 0.05 _ 0.05 ConBnues on next page... THE KEYS ' Hydrograph Discharge Table Page 29 Time Inflow Elevation Culy. A Culy. B Culy. C WeirA Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 113.33 0.00 14.48 13.90 0.05 - - 0.05 113.42 0.00 14.48 13.90 _ _ 0.05 0.05 113.50 0.00 14.48 13.89 0.05 - - - - 0.05 113.58 0.00 14.48 13.89 0.05 - - - - 0.05 ' 113.67 0.00 14.48 13.88 0.05 - 0.05 113.75 0.00 14.48 13.88 _ _ 0.05 _ 0.05 113.83 0.00 14.48 13.88 0.05 - - - - 0.05 ' 113. 114.00 00 0.00 0.00 14.48 14.48 13.87 13.87 0.05 - _ _ - 0.05 0.05 0.05 114.08 0.00 14.48 13.87 0.05 - - - 0.05 114.17 0.00 14.48 13.86 0.05 - - - - 0.05 114.25 0.00 14.48 13.86 0.05 - - 0.05 114.33 0.00 14.48 13.86 _ _ 0.05 0.05 114.42 0.00 14.48 13.85 0.05 - - - - 0.05 114.50 0.00 14.48 13.85 0.05 - - - - 0.05 ' 114.58 0.00 14.48 13.85 0.05 0.05 114.67 0.00 14.48 13.84 _ _ = 0.05 _ 0.05 114.75 0.00 14.48 13.84 0.05 - - - - 0.05 114.83 114.92 0.00 0.00 14.48 14.48 13.84 13.83 0.05 - _ _ - 0.05 0.05 0.05 115.00 0.00 14.48 13.83 0.05 - - - - 0.05 115.08 0.00 14.48 13.83 0.05 - - - - 0.05 115.17 0.00 14.48 13.82 0.05 - - 0.05 115.25 0.00 14.48 13.82 _ _ 0.05 0.05 115.33 0.00 14.48 13.82 0.05 - - - - 0.05 115.42 0.00 14.48 13.81 0.05 - - 0.05 ' 115.50 0.00 14.48 13.81 0.05 - - 0.05 115.58 0.00 14.48 13.81 _ _ 0.05 0.05 115.67 0.00 14.48 13.80 0.05 - - - - 0.05 115.75 115.83 0.00 0.00 14.48 14.48 13.80 13.80 0.05 - _ _ - 0.05 0.05 0.05 115.92 0.00 14.48 13.79 0.05 - - - - 0.05 116.00 0.00 14.48 13.79 0.04 - - - - 0.04 116.08 0.00 14.48 13.79 0.04 - - 0.04 116.17 0.00 14.48 13.78 _ _ 0.04 0.04 116.25 0.00 14.48 13.78 0.04 - - - - 0.04 ' 116.33 116.42 0.00 0.00 14.48 14.48 13.78 13.77 0.04 - _ _ - 0.04 0.04 0.04 116.50 0.00 14.48 13.77 0.04 - - - - 0.04 116.58 0.00 14.48 13.77 0.04 - - - - 0.04 116.67 0.00 14.48 13.76 0.04 - - 0.04 116.75 0.00 14.48 13.76 _ _ 0.04 0.04 116.83 0.00 14.47 13.76 0.04 - - - - 0.04 116.92 0.00 14.47 13.76 0.04 - 0.04 '117.00 0.00 14.47 13.75 0.04 - - 0.04 117.08 0.00 14.47 13.75 _ _ 0.04 - 0.04 117.17 0.00 14.47 13.75 0.04 - - - - p 04 '117.25 117.33 0.00 0.00 14.47 14.47 13.74 13.74 0.04 - _ _ - 0.04 0.04 0.04 Continues on next page... F �I [J 11 THE KEYS Peg@ 30 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (Cfs) (cfs) (cfs) 117.42 0.00 14.47 13.74 0.04 - - - - 0.04 117.50 0.00 14.47 13.73 0.04 - - - - 0.04 117.58 0.00 14.47 13.73 0.04 - - - - 0.04 117.67 0.00 14.47 13.73 0.04 - - - - 0.04 117.75 0.00 14.47 13.72 0.04 - - - - 0.04 117.83 0.00 14.47 13.72 0.04 - - - - 0.04 117.92 0.00 14.47 13.72 0.04 - - - - 0.04 118.00 0.00 14.47 13.71 0.04 - - - - 0.04 118.08 0.00 14.47 13.71 0.04 - - - - 0.04 118.17 0.00 14.47 13.71 0.04 - - - - 0.04 118.25 0.00 14.47 13.71 0.04 - - - - 0.04 118.33 0.00 14.47 13.70 0.04 - - - - 0.04 118.42 0.00 14.47 13.70 0.04 - - - - 0.04 118.50 0.00 14.47 13.70 0.04 - - - - 0.04 118.58 0.00 14.47 13.69 0.04 - - - - 0.04 118.67 0.00 14.47 13.69 0.04 - - - - 0.04 118.75 0.00 14.47 13.69 0.04 - - - - 0.04 118.83 0.00 14.47 13.69 0.04 - - - - 0.04 118.92 0.00 14.47 13.68 0.04 - - - - 0.04 119.00 0.00 14.47 13.68 0.04 - - - - 0,04 119.08 0.00 14.47 13.68 0.04 - - - - 0.04 119.17 0.00 14.47 13.67 0.04 - - - - 0.04 119.25 0.00 14.47 13.67 0.04 - - - - 0.04 119.33 0.00 14.47 13.67 0.04 - - - - 0.04 119.42 0.00 14.47 13.66 0.04 - - - - 0.04 119.50 0.00 14.47 13.66 0.04 - - - - 0.04 119.58 0.00 14.47 13.66 0.04 - - - - 0.04 119.67 0.00 14.47 13.66 0.04 - - - - 0.04 119.75 0,00 14.47 13.65 0.04 - - - - 0,04 119.83 0.00 14.47 13.65 0.04 - - - - 0.04 119.92 0.00 14.47 13.65 0.04 - - - - 0.04 120.00 0.00 14.47 13.64 0.04 - - - - 0.04 End t Reservoir Report Page 1 Reservoir No. 1 THE KEYS ' Culvert / Orifice Structures Weir Structures [A] [B] [C] [A] [B] [C] ' Rise (in) = 36.0 3.3 0.0 Crest Len (ft) - 12.6 0.0 0.0 Span (in) = 36.0 3.3 0.0 Crest El. (ft) = 16.90 0.00 0.00 No. Barrels = 1 1 0 Weir Coeff. = 3.00 3.00 3.00 ' Invert El. (ft) = 14.00 14.40 0.00 Eqn. Exp. = 1.50 1.50 1.50 Length (ft) = 292.0 1.0 0.0 Multistage = Yes No No Slope (%) = 0.40 1.00 0.00 N-Value = .023 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 ' Mufti -Stage = - Yes No Tailwater Elevation = 14.00 It Nob: All outllo h been enelyied under Inlet" eudet mnW, Stage / Storage / Discharge Table ' Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cuft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 0.0 00 14.00 0.00 0.00 - 0.00 - - 0.00 0.0 01 14.04 3.94 0.00 0.00 0.00 0.1 02 14.08 5.58 0.00 - 0.00 - - 0.00 0.1 03 0.2 04 14.1.8 14.16 7.89 0.00 0.00 - 0.00 0.00 - - 0.00 0.00 0.2 06 14.19 8.82 0.00 0.00 0.00 0.2 07 14.23 9.66 0.00 - 0.00 - - 0.00 0.3 08 14.27 10.43 0.00 0,00 - - 0.00 0.3 09 14.31 11.16 0.00 _ 0.00 0.00 0.4 10 14.35 11.83 0.00 - 0.00 - - 0.00 0.4 11 14.39 12.47 0.00 - 0.00 - - 0.00 ' 0.4 40 14.39 12.49 0.00 - 0.00 - 0.00 0.4 68 14.39 12.50 0.00 0.00 _ 0.00 0.4 97 14.39 12.52 0.00 - 0.00 - - 0.00 ' 0.4 125 0.4 154 14.39 14.40 12.54 12.55 0.00 0.00 _ 0.00 0.00 - - 0.00 0.00 0.4 183 14.40 12.57 0.00 - 0.00 - - 0.00 0.4 211 14.40 12.58 0.00 - 0.00 - - 0.00 0.4 240 14.40 12.60 0.00 0.00 0.00 0.4 268 14.40 12.62 0.00 _ 0.00 _ _ 0.00 0.4 297 14.40 12.63 0.00 - 0.00 - - 0.00 ' 0.5 3,857 0.5 7,418 14.46 14.52 13.55 14.40 0.04 0.07 - 0.00 0.00 - - 0.04 0.07 0.6 10,978 14.58 15.21 0.08 0.00 - - 0.08 ' Continues on next page... THE KEYS paM 2 Stage / Storage / Discharge Table ' Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cuft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 0.6 14,538 14.64 15.98 0.10 - 0.00 0.10 ' 0.7 18,099 14.70 16.71 0.11 _ _ 0.00 0.11 0.8 21,659 14.76 17.41 0.13 - 0.00 - - 0.13 0.8 25,219 14.82 18.08 0.14 - 0.00 - - 0.14 ' 0.9 28,779 14.88 18.73 0.16 0.00 - 0.16 0.9 32,340 14.94 19.36 0.18 _ _ 0.00 0.18 1.0 35,900 15.00 19.97 0.19 - 0.00 - - 0.19 ' 1.1 1.2 42,396 48,892 15.10 15.20 20.95 21.58 0.21 0.23 - 0.00 _ - 0.00 0.21 0.23 1.3 55,388 15.30 27.44 0.24 0.00. - - 0.24 1.4 61,884 15.40 28:48 0.26 - 0.00 - - 0.26 1.5 68,381 15.50 29.48 0.27 - 0.00 - 0.27 1.6 74,877 15.60 30.44 0.29 _ 0.00 0.29 1.7 81,373 15.70 31.38 0.30 - 0.00 - - 0.30 1.8 87,869 15.80 32.29 0.31 - 0.00 - - 0.31 ' 1.9 94,365 15.90 33.17 0.32 - 0.00 0.32 2.0 100,861 16.00 34.04 0.34 _ = 0.00 0.34 2.1 1013,093 16.10 34.88 0.35 - 0.00 - - 0.35 2.2 2.3 115,325 122,558 16.20 16.30 35.70 36.50 0.36 0.37 _ 0.00 _ - 0.00 0.36 0.37 2.4 129,790 16.40 37.28 0.38 - 0.00 - - 0.38 2.5 137,022 16.50 38.05 0.39 - 0.00 - - 0.39 2.6 144,254 16.60 38.81 0.40 - 0.00 0.40 ' 2.7 151,486 16.70 39.55 0.41 _ _ 0.00 0.41 2.8 158,719 16.80 40.27 0.42 - 0.00 - - 0.42 2.9 165,951 16.90 40.98 0.43 - 0.00 - - 0.43 ' 3.0 173,183 17.00 41.68 0.44 1.19 1.63 3.1 181,287 17.10 43.05 0.44 3.37 3.82 3.2 189,390 17.20 44.37 0.45 - 6.20 - - 6.65 3.3 197,494 17.30 45.66 0.46 - 9.54 10.00 ' 3.4 205,597 17.40 46.91 0.47 _ _ 13.33 13.80 3.5 213,701 17.50 48.13 0.48 - 17.53 - - 18.00 3.6 221,805 17.60 49.32 0.46 - 22.09 - - 22.55 3.7 229,908 17.70 50.48 0.44 - 26.98 - - 27.42 3.8 238,012 17.80 51.61 0.44 32.20 32.64 3.9 246,115 17.90 52.72 0.40 - 37.71 - - 38.11 ' 4.0 254,219 18.00 53.81 0.34 - 43.51 - - 43.84 ate. SU1Eo� M State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. Division of Water Quality Jonathan B. Howes Governor Water Quality Section Secretary July 3, 1997 Mr. Dan Dawson Dawson Engineering 3177 Wrightsville Avenue Wilmington, NC 28403 Subject: ADDITIONAL INFORMATION Kure Dunes Phase IV Stormwater Project No. Sw8 961234 New Hanover County Dear Mr. Dawson: In order to judge the effect of the runoff from the Kure Dunes pond on the downstream Keys pond, please provide calculations and a written summation of the functioning of the Keys pond in response to the 1" storm. The calculations submitted have a lot of hydrographs included, but no explanation of their derivation, assumptions, conclusions, etc. Please provide this information by August 3, 1997. If you have any questions, please do not hesitate to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\961234.JUL cc: Linda Lewis Central Files 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer � STATE o� e ram, State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. Division of Water Quality Jonathan B. Howes Governor Water Quality Section Secretary May 16, 1997 Mr. Dan Dawson, P.E. Dawson Engineering 3177 Wrightsville Avenue Wilmington, NC 28403 Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 961234 Kure Dunes Phase IV New Hanover County Dear Mr. Dawson: The Wilmington Regional Office received a Stormwater Management Permit Application for Kure Dunes Phase IV on May 6, 1997. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: The State does not currently have design guidelines for ponds in series. Either the Phase IV pond must bypass the Keys' pond, or the Keys' pond must be enlarged in both surface area and volume to meet current design criteria. The Key's is not obligated to take the Phase IV runoff unless an agreement exists between the two owners. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 16, 1997, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\961234.MAY cc: Linda Lewis Central Files 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affrraative Action Employer State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr. Division of Water Quality Jonathan B. Howes Governor Water Quality Section Secretary May 16, 1997 Mr. Dan Dawson, P.E. Dawson Engineering 3177 Wrightsville Avenue Wilmington, NC 28403 Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 961234 Kure Dunes Phase IV New Hanover County Dear Mr. Dawson: The Wilmington Regional Office received a Stormwater Management Permit Application for Kure Dunes Phase IV on May 6, 1997. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: The State does not currently have design guidelines for ponds in series. Either the Phase IV pond must bypass the Keys' pond, or the Keys' pond must be enlarged in both surface area and volume to meet current design criteria. The Key's is not obligated to take the Phase IV runoff unless an agreement exists between the two owners. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 16, 1997, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\961234.MAY cc: Linda Lewis Central Files 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affrraative Action Employer Engines: ng Land Planning Surveying May 5, 1997 Ms. Linda Lewis N.C. Department of Environment, Health, and Natural Resources Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Stormwater Control Permit for Kure Dunes, Phase IV New Hanover County Project No. 9611 Dear Ms. Lewis: DAWSON ENGINEERING 3177 Wrightsville Avenue Wilmington, NC 28403 (910) 762-4200 RECEIVED MAY 0 6 1997 BY:'SWSC((u123+ As a follow-up to the letter I sent to you on February 24, 1997, I am providing you with the following additional information: Referring to item No. 2 of your January 16, 1997 letter, the Kure Beach Associates currently do not know how they will develop Kure Dunes Phase IV. Kure Beach Associates request NCDWQ approval of the requested permit for the site assuming that the site is 44.0% impervious. If the plans are changed after obtaining the permit, a modification will be submitted. Upon approval, Kure Beach Associates would like to construct only the pond and the piped system from the pond outlet to the drop inlet at the intersection of Anchor Way and Sloop Pointe Lane as shown on sheet C-6. Referring to item No. 3, the proposed contours, road high and low point elevations are noted on the plans. Referring to item No. 4, a note has been placed on the plans stating that no wetlands exist on site. Referring to item No. 5, calculations are being provided for the Phase IV pond as well as the total area draining into the Keys pond. Calculations for the recharge trench are also being provided. See Attachment No. 1 at the end of the calculations. Referring to item No. 6, a dimensioned, typical unit footprint with a driveway is shown on sheet C-I of the plans. Referring to item No. 7, a note has been placed on the plans stating that all roof drains must be directed into the street or directed such that the runoff is directed to the pond or recharge trench. Referring to item No. 8, two sets of revised plans, C-1 thru C-7, and calculations are being provided. • C-1 "Drainage Plan" dated 10/9/97 revised 4/28/97 • C-2 "Kure Dunes Lane Plan/Profile", dated 4/28/97 • C-3 "Anchor Way Plan/Profile", dated 4/28/97 • C-4 "SandMan Drive Plan/Profile", dated 4/28/97 • C-5 "Miscellaneous Details", dated 4/28/97 • C-6 "Construction Option", dated 4/28/97 • C-7 "Overall Layout of Kure Dunes", dated 4/28/97 Referring to item No. 9, an overall plan of the Kure Dunes development is provided. Referring to item No. 10, the 90% TSS chart was used to determine the required surface area of the pond. Referring to item No. 11, the 1.5-inch runoff volume for the detention pond has been changed to a 1-inch runoff volume. In addition, calculations are provided for the recharge trench located at station 8+10 on Kure Dune Lane. Soils information previously submitted for the Phase II Kure Dunes Project was used. This information is attached to the calculations. The closest soil boring was "P", which had a ground elevation of 23.4 and an apparent high seasonal ground water elevation of 18.6. The location of where the recharge trench is up slope of the boring. The ground elevation of the recharge trench is approximately elevation 27. Groundwater will be significantly lower than the bottom of the recharge trench elevation of 21.50. A revised permit is also provided which reflects changes which were made when the roads were designed. Thank you for your consideration of this request. If you need additional information please call. Very truly yours, DAWSON ENGINEERING Mark N. Hargrove, P.E. cc: Joe Heame w/ enclosures STORMWATER CALCULATIONS FOR KURE DUNES PHASE IV KURE BEACH, NC D E C E I V E MAY 0 61997 D E M ��11 PROJ k PREPARED BY BY DAWSON ENGINEERING 3177 WRIGHTSVILLE AVENUE WILMINGTON, N.C. 28403 (910) 762-4200 APRIL 28, 1997 btu �y4-...FHG NGQ; •JQZ '{//C ..•' *Cj DAWSON ENGINEERING Engineering 3177 Wrightsville Avenue Land Planning Wilmington, NC 28403 Surveying (910) 762-4200 TOTAL AREA DRAINING TO POND: = 344,133 SF = 7.90 ACRES (SEE SHEET DP-1, DRAINAGE PLAN) TOTAL PROPOSED IMPERVIOUS SURFACE AREA DRAINING TO POND: ROADS = 39,099 SF ✓ 4� 38 TOWNHOUSE UNITS = 67,032 SF 1 QUADRAPLEX UNIT = 6,048 SF✓ 41 L QUNOI; 42 DRIVEWAYS = 25,200 SF RECREATION AREA = 7,848 SF ✓ 2-2/3 LOTS 0, 4.534 SF/LOT FROM PHASE III = 12.091 SF = 151,272 SF = 3.47 ACRES (SEE DP-1) REQUIRED STORAGE FOR 1-INCH OF RUNOFF FOR POND: (use Schueler Method) = 0.05 + 0.009 (I) = 0.05 + 0.009(44.0) = 0.446 = (1")(0.446)(1/12)(7.90)(43,560) = 12,790 CF (13,456 CF PROVIDED - SEE NEXT PAGE) REQUIRED STORAGE FOR FOREBAY: 20% OF FIRST 1-INCH RUNOFF = (0.2)(12,790) = 2,558 CF (2,717 CF PROVIDED - SEE NEXT PAGE) PERCENT IMPERVIOUS DRAINAGE AREA FOR POND: = 151,272 SF / 344,130 SF = 44.0 % POND DEPTH SA/DA % (FI) 4.5 3.42 POND SURFACE AREA (MIN.) (SF) IF POND DEPTH = 4.5 FT, MINIMUM SURFACE AREA = 11,769 SF USED 90% TSS CHART TO SIZE POND 11,769 AREA @ ELEVATION 17.75 = 12,970 SF > 11,769 SF (SEE SHEET DP-1) PROJECT: KURE DUNES, PHASE IV SUBJECT: POND CALCULATIONS JOB NO.: 9611 PREPARED BY: DATE: CHECKED BY: DATE: PAGE NO OF Engineering Land Planning Surveying DAWSON ENGINEERING 3177 Wrightsville Avenue Wilmington, NC 28403 (910) 762-4200 STAGE - AREA - STORAGE FOR 1-INCH RUNOFF (SEE SHEET C-1) ELEV. AREA STORAGE TOT. STORAGE (F7) (SF) (CF) (CF) NORMAL 17.75 12970 0 POOL 3351 18.00 13840 3351 10105 1"RUNOFF 18.70 15030 13456 STAGE - AREA - STORAGE FOR FOREBAY (SEE SHEET C-1) ELEV. AREA STORAGE TOT. STORAGE (F7) (SF) (CF) (CF) FOREBAYINV 15.00 519 0 294 15.50 657 294 367 16.00 809 661 446 16.50 975 1107 523 17.00 1116 1630 669 17.50 1559 2299 418 BERM ELEV 17.75 1782 2717 PROJECT: KURE DUNES, PHASE IV SUBJECT: POND CALCULATIONS JOB NO.: 9611 PREPARED BY: DATE: CHECKED BY: DATE: PAGE NO OF DAWSON ENGINEERING Engineering Land Planning Surveying 3177 Wrightsville Avenue Wilmington, NC 28403 (910) 7624200 POND RELEASE TIME FOR CONTROL PIPE: ELEV. EFF. STORAGE VOL. RELEASED OUTFLOW RATE RELEASE TIME (F7) (CF) (CF) (CFS) (HOURS) 18.70 15,030 4,332 0.102 11.8 18.50 10,698 3,673 0.091 11.2 18.25 7,025 3,674 0.074 13.7 18.00 3,351 3,351 0.053 17.7 17.75 - TOTAL HOURS 54.4 DAYS 2.3 CONTROL PIPE: 2 INCH USED ORIFICE EQUATION TO DETERMINE OUTFLOW RATE Q = Cd'A`(2gh)A1/2 PROJECT: KURE DUNES, PHASE IV SUBJECT: POND CALCULATIONS JOB NO.: 9611 PREPARED BY: DATE: CHECKED BY: DATE: PAGE NO OF Engineering Land Planning Surveying RECHARGE TRENCH STA ± 8+10, KURE DUNES LANE DRAINAGE AREA = 36,833 SF = 0.846 AC IMPERVIOUS AREA = 17,746 SF = 0.407 AC % IMP = (17,746/36,833) = 48.2% DAWSON ENGINEERING 3177 Wrightsville Avenue Wilmington, NC 28403 (910)762-4200 REQUIRED STORAGE FOR 1-INCH OF RUNOFF FOR DRAINAGE AREA: (use Schueler Method) = 0.05 + 0.009 (I) = 0.05 + 0.009(48.2) = 0.484 = (1")(0.484)(1/12)(.846)(43,560) = 1,486 CF USE 2.75'x 10.0' RECHARGE TRENCH W/ 2 - 12" PERFORATED PIPES STORAGE VOLUME PER FOOT = PI(DA2)/4 = (PI)(l)/4 = 0.79 SF x 2 = 1.58 SF 5 STONE VOLUME = (2.75 x 10.0)- 1.58 = 25.92 SF STORAGE = (25.92 SF x 0.4(VOIDS)) + 1.58 SF = 11.95 CF/FT ✓ L = STORAGE/(I 1.95 CF/FT) L = 1,486 CF/11.95 CF/FT = 124 LF NEEDED --( SEE PLANS SHEET C-2) NOTE: 125 LF OF TWIN 12" PERFORATED PIPES IN A 10' WIDE TRENCH IS PROVIDED CHECK INFILTRATION RATE: INFILTRATE WITHIN 5 DAYS 1,486/(5 DAYS)(24 HRS) = 12.38 CF/HR OR 93 GAUHR FROM SOILS REPORT, MINIMUM INFILTRATION RATE WAS 5.5 GAUHR. USE FACTOR OF SAFETY OF 2 = 2.75 GAL/HR/SF AS SYSTEM RATE AVAILABLE RATE = 10' x 125' x 2.75 GAUHR/SF = 3,438 GAUHR THEREFORE, SYSTEM RATE EXCEEDS REQUIRED EXFLLTRATION PROJECT: KURE DUNES, PHASE IV SUBJECT: POND CALCULATIONS JOB NO.: 9611 PREPARED BY: DATE: CHECKED BY: DATE: PAGE NO OF Legend Runoff Combined Chahnel Reach Pond Route Proj. file: TOTAL.GPW OF file: WILM.IDF 7 hydrographs 04-23-1997 Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (acft) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 23.8 5 755 3.79 10 — THE KEYS 2 SCS Runoff 11.5 5 755 1.84 10 — PHASE 4- KURE 3 Reservoir 1.5 5 925 0.95 10 2 18.85 54551 KURE DUNES 4 Combine 23.8 5 755 4.74 10 1+3 COMBINED 5 SCS Runoff 13.5 5 760 2.41 10 — — KB VILLAGE 6 Combine 37.1 5 755 7.15 10 4+5 — COMBINED& KBV 7 Reservoir 10.3 5 815 4.55 10 6 P 16.16 134808 THE KEYS Proj. file: TOTAL.GPW OF file: WILM.IDF Run date: 04-23-1997 Hydrograph Report Hyd. No. 1 THE KEYS Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 15.66 ac _ .4 = LAG = 7.00 in = 24 hrs Hydrograph Discharge Table Peak discharge Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Page 1 = 23.79 cfs = 5 min = 63 = 500 ft = 46.3 min = Type III = 484 Total Volume = 164,901 cult, 3.786 acft Time -- Outflow Time -- Outflow Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) (hrs cfs) (hrs cfs) 10.83 0.51 13.50 6.42 -16.17 2.39 18.83 1.26 10.92 0.59 13.58 5.86 16.25 2.32 18.92 1.25 11.00 0.67 13.67 5.48 16.33 2.26 19.00 1.24 11.08 0.77 13.75 5.21 16.42 2.20 19.08 1.23 11.17 0.87 13.83 4.99 16.50 2.14 19.17 1.22 11.25 0.98 13.92 4.80 16.58 2.09 19.25 1.21 11.33 1.11 14.00 4.63 16.67 2.04 19.33 1.20 11.42 1.26 14.08 4.48 16.75 2.00 19.42 1.19 11.50 1.44 14.17 4.34 16.83 1.96 19.50 1.18 11.58 1.66 14.25 4.21 16.92 1.92 19.58 1.17 11.67 1.99 14.33 4.09 17.00 1.88 19.67 1.16 11.75 2.47 14.42 3.97 17.08 1.85 19.75 1.15 11.83 3.18 14.50 3.87 17.17 1.82 19.83 1.14 11.92 4.23 14.58 3.76 17.25 1.79 19.92 1.13 12.00 6.13 14.67 3.67 17.33 1.76 20.00 1.12 12.08 8.96 14.75 3.58 17.42 1.72 20.08 1.11 12.17 12.16 14.83 3.50 17.50 1.69 20.17 1.10 12.25 15.53 14.92 3.43 17.58 1.66 20.25 1.09 12.33 18.84 15.00 3.35 17.67 1.63 20.33 1.08 12.42 21.84 15.08 3.28 17.75 1.60 20.42 1.07 12.50 23.58 15.17 3.22 17.83 1.57 20.50 1.06 12.58 23.79 << 15.25 3.15 17.92 1.53 20.58 1.05 12.67 23.24 15.33 3.08 18.00 1.50 20.67 1.04 12.75 22.06 15.42 3.01 18.08 1.47 20.75 1.03 12.83 20.39 15.50 2.95 18.17 1.44 20.83 1.02 12.92 18.38 15.58 2.88 18.25 1.41 20.92 1.02 13.00 16.21 15.67 2.81 18.33 1.38 21.00 1.01 13.08 14.03 15.75 2.74 18.42 1.35 21.08 1.00 13.17 11.87 15.83 2.67 18.50 1.33 21.17 0.99 13.25 9.84 15.92 2.60 18.58 1.31 21.25 0.98 13.33 8.25 16.00 2.53 18.67 1.29 21.33 0.97 13.42 7.20 16.08 2.46 18.75 1.27 21.42 0.96 Continues on next page... THE KEYS Hydrograph Discharge Table Time -- Outflow (hrs cfs) 21.50 0.95 21.58 0.94 21.67 0.93 21.75 0.92 21.83 0.91 21.92 0.90 22.00 0.89 22.08 0.89 22.17 0.90 22.25 0.91 22.33 0.92 22.42 0.94 22.50 0.95 22.58 0.94 22.67 0.93 22.75 0.92 22.83 0.90 22.92 0.89 23.00 0.88 23.08 0.86 23.17 0.85 23.25 0.83 23.33 0.81 23.42 0.81 23.50 0.80 23.58 0.79 23.67 0.78 23.75 0.78 23.83 0.77 23.92 0.76 24.00 0.75 24.08 0.73 24.17 0.70 24.25 0.64 24.33 0.58 24.42 0.50 ...End Page 2 Hydrograph Report Hyd. No. 2 PHASE 4 - KURE DUNES Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 7.9 ac 1 % = LAG = 7.00 in = 24 hrs Hydrograph Discharge Table Peak discharge Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Page 1 = 11.54 cfs = 5 min = 62 = 775 ft = 42.7 min = Type III = 484 Total Volume = 80,325 cult, 1.844 acft Time -- Outflow Time -- Outflow Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) (hrs cfs) (hrs cfs) 11.42 0.56 14.08 2.21 -16.75 0.99 19.42 0.59 11.50 0.64 14.17 2.14 16.83 0.97 19.50 0.58 11.58 0.75 14.25 2.08 16.92 0.95 19.58 0.58 11.67 0.90 14.33 2.02 17.00 0.93 19.67 0.57 11.75 1.13 14.42 1.96 17.08 0.92 19.75 0.57 11.83 1.47 14.50 1.91 17.17 0.90 19.83 0.56 11.92 1.98 14.58 1.86 17.25 0.88 19.92 0.56 12.00 2.89 14.67 1.81 17.33 0.87 20.00 0.55 12.08 4.26 14.75 1.77 17.42 0.85 20.08 0.55 12.17 5.82 14.83 1.73 17.50 0.84 20.17 0.55 12.25 7.46 14.92 1.69 17.58 0.82 20.25 0.54 12.33 9.08 15.00 1.66 17.67 0.81 20.33 0.54 12.42 10.55 15.08 1.62 17.75 0.79 20.42 0.53 12.50 11.42 15.17 1.59 17.83 0.77 20.50 0.53 12.58 11.54 << 15.25 1.55 17.92 0.76 20.58 0.52 12.67 11.29 15.33 1.52 18.00 0.74 20.67 0.52 12.75 10.73 15.42 1.49 18.08 0.73 20.75 0.51 12.83 9.93 15.50 1.45 18.17 0.71 20.83 0.51 12.92 8.96 15.58 1.42 18.25 0.70 20.92 0.50 13.00 7.92 15.67 1.39 18.33 0.68 13.08 6.86 15.75 1.35 18.42 0.67 13.17 5.82 15.83 1.32 18.50 0.66 ...End 13.25 4.83 15.92 1.28 18.58 0.65 13.33 4.05 16.00 1.25 18.67 0.64 13.42 3.54 16.08 1.21 18.75 0.63 13.50 3.16 16.17 1.18 18.83 0.62 13.58 2.89 16.25 1.15 18.92 0.62 13.67 . 2.70 16.33 1.12 19.00 0.61 13.75 2.56 16.42 1.09 19.08 0.61 13.83 2.46 16.50 1.06 19.17 0.60 13.92 2.37 16.58 1.03 19.25 0.60 14.00 2.28 16.67 1.01 19.33 0.59 Hydrograph Report Hyd. No. 3 KURE DUNES Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 2 Max. Elevation = 18.85 ft Peak discharge Time interval Reservoir name Max. Storage Page 1 = 1.50 cfs = 5 min = PHASE 4 - KURE = 54,551 cuft smrage mamacroo memos us . Total Volume = 41,441 cuft, 0.951 acft Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A WeirEl Weir C Outflow (hrs) (cfs) (ft) Ids) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 14.58 1.86 18.75 3.76 0.10 - 0.42 - - 0.52 14.67 1.81 18.78 3.77 0.10 - 0.61 - - 0.71 14.75 1.77 18.80 3.79 0.10 - 0.76 - - 0.87 14.83 1.73 18.82 3.80 0.10 - 0.98 - - 1.09 14.92 1.69 18.83 3.81 0.10 - 1.14 - - 1.24 15.00 1.66 18.83 3.81 0.11 - 1.24 - - 1.35 15.08 1.62 18.84 3.82 0.11 - 1.32 - - 1.42 15.17 1.59 18.84 3.82 0.11 - 1.36 - - 1.47 15.25 1.55 18.85 3.82 0.11 - 1.39 - - 1.49 15.33 1.52 18.85 3.82 0.11 - 1.40 - - 1.50 15.42 1.49 18.85 << 3.82 0.11 - 1.40 - - 1.50 << 15.50 1.45 18.85 3.82 0.11 - 1.39 - - 1.50 15.58 1.42 18.84 3.82 0.11 - 1.38 - - 1.48 15.67 1.39 18.84 3.82 0.11 - 1.36 - - 1.46 15.75 1.35 18.84 3.82 0.11 - 1.33 - - 1.44 15.83 1.32 18.84 3.82 0.11 - 1.31 - - 1.41 15.92 1.28 18.84 3.81 0.11 - 1.28 - - 1.39 16.00 1.25 18.84 3.81 0.11 - 1.25 - - 1.36 16.08 1.21 18.83 3.81 0.10 - 1.22 - - 1.33 16.17 1.18 18.83 3.81 0.10 - 1.19 - - 1.29 16.25 1.15 18.83 3.81 0.10 - 1.16 - - 1.26 16.33 1.12 18.83 3.81 0.10 - 1.12 - - 1.23 16.42 1.09 18.82 3.80 0.10 - 1.09 - - 1.20 16.50 1.06 18.82 3.80 0.10 - 1.06 - - 1.17 16.58 1.03 18.82 3.80 0.10 - 1.03 - - 1.14 16.67 1.01 18.82 3.80 0.10 - 1.00 - - 1.11 16.75 0.99 18.82 3.80 0.10 - 0.98 - - 1.08 16.83 0.97 18.81 3.80 0.10 - 0.95 - - 1.05 16.92 0.95 18.81 3.80 0.10 - 0.93 - - 1.03 17.00 0.93 18.81 3.79 0.10 - 0.90 - - 1.01 17.08 0.92 18.81 3.79 0.10 - 0.88 - - 0.99 17.17 0.90 18.81 3.79 0.10 - 0.86 - - 0.97 17.25 0.88 18.81 3.79 0.10 - 0.84 - - 0.95 17.33 0.87 18.80 3.79 0.10 - 0.83 - - 0.93 17.42 0.85 18.80 3.79 0.10 - 0.81 - - 0.91 17.50 0.84 18.80 3.79 0.10 - 0.79 - - 0.90 Continues on next page... KURE DUNES Hydrograph Discharge Table Page 2 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (Cfs) (ft) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) (Cfs) 17.58 0.82 18.80 3.79 0.10 - 0.78 - - 0.88 17.67 0.81 18.80 3.79 0.10 - 0.76 - - 0.86 17.75 0.79 18.80 3.79 0.10 - 0.75 - - 0.85 17.83 0.77 18.80 3.79 0.10 - 0.74 - - 0.84 17.92 0.76 18.80 3.78 0.10 - 0.73 - - 0.83 18.00 0.74 18.79 3.78 0.10 - 0.72 - - 0.82 18.08 0.73 18.79 3.78 0.10 - 0.71 - - 0.81 18.17 0.71 18.79 3.78 0.10 - 0.69 - - 0,80 18.25 0.70 18.79 3.78 0.10 - 0.68 - - 0.78 18.33 0.68 18.79 3.78 0.10 - 0.67 - - 0.77 18.42 0.67 18.79 3.78 0.10 - 0.65 - - 0.76 18.50 0.66 18.78 3.78 0.10 - 0.64 - - 0.74 18.58 0.65 18.78 3.78 0.10 - 0.63 - - 0.73 18.67 0.64 18.78 3.77 0.10 - 0.61 - - 0.72 18.75 0.63 18.78 3.77 0.10 - 0.60 - - 0.71 18.83 0.62 18.78 3.77 0.10 - 0.59 - - 0.69 18.92 0.62 18.78 3.77 0.10 - 0.58 - - 0.68 19.00 0.61 18.78 3.77 0.10 - 0.57 - - 0.67 19.08 0.61 18.77 3.77 0.10 - 0.56 - - 0.66 19.17 0.60 18.77 3.77 0.10 - 0.55 - - 0.66 19.25 0.60 18.77 3.77 0.10 - 0.55 - - 0.65 19.33 0.59 18.77 3.77 0.10 - 0.54 - - 0.64 19.42 0.59 18.77 3.77 0.10 - 0.53 - - 0.63 19.50 0.58 18.77 3.77 0.10 - 0.52 - - 0.63 19.58 0.58 18.77 3.76 0.10 - 0.52 - - 0.62 19.67 0.57 18.77 3.76 0.10 - 0.51 - - 0.61 19.75 0.57 18.77 3.76 0.10 - 0.51 - - 0.61 19.83 0.56 18.77 3.76 0.10 - 0.50 - - 0.60 19.92 0.56 18.77 3.76 0.10 - 0.49 - - 0.60 20.00 0.55 18.76 3.76 0.10 - 0.49 - - 0.59 20.08 0.55 18.76 3.76 0.10 - 0.48 - - 0.58 20.17 0.55 18.76 3.76 0.10 - 0.48 - - 0.58 20.25 0.54 18.76 3.76 0.10 - 0.47 - - 0.57 20.33 0.54 18.76 3.76 0.10 - 0.47 - - 0.57 20.42 0.53 18.76 3.76 0.10 - 0.46 - - 0.56 20.50 0.53 18.76 3.76 0.10 - 0.46 - - 0.56 20.58 0.52 18.76 3.76 0.10 - 0.45 - - 0.55 20.67 0.52 18.76 3.76 0.10 - 0.45 - - 0.55 20.75 0.51 18.76 3.76 0.10 - 0.44 - - 0.54 20.83 0.51 18.76 3.76 0.10 - 0.44 - - 0.54 20.92 0.50 18.76 3.76 0.10 - 0.43 - - 0.53 21.00 0.50 18.76 3.76 0.10 - 0.43 - - 0.53 21.08 0.49 18.76 3.76 0.10 - 0.42 - - 0.52 21.17 0.49 18.76 3.76 0.10 - 0.42 - - 0.52 21.25 0.48 18.75 3.76 0.10 - 0.41 - - 0.51 21.33 0.48 18.75 3.75 0.10 - 0.41 - - 0.51 21.42 0.47 18.75 3.75 0.10 - 0.40 - - 0.50 .End Reservoir Report Reservoir No. 2 PHASE 4 - KURE DUNES Culvert / Orifice Structures Weir Structures Page 1 [A] [B] [C] [A] [B] [C] Rise (in) = 15.0 2.0 0.0 Crest Len (ft) = 8.0 10.0 0.0 Span (in) = 15.0 2.0 0.0 Crest El. (ft) = 18.70 21.50 0.00 No. Barrels = 1 1 0 Weir Coeff. = 3.00 3.00 3.00 Invert El. (ft) = 16.22 17.75 0.00 Eqn. Exp. = 1.50 1.50 1.50 Length (ft) = 725.0 1.0 0.0 Multistage = Yes Yes No Slope (%) = 0.30 1.00 0.00 N-Value = • .013 .013 .013 Crif. Coeff. = 0.60 0.60 0.60 Multistage = - Yes No Tailwater Elevation = 16.11 ft Note: All outflows have Caen enalWed under inlet and outlet wntrol. - Stage / Storage / Discharge Table Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cuft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 0.0 00 13.25 0.00 0.00 - 0.00 0.00 - 0.00 0.1 444 13.32 0.00 0.00 - 0.00 0.00 - 0.00 0.2 887 13.40 0.00 0.00 - 0.00 0.00 - 0.00 0.2 1,331 13.48 0.00 0.00 - 0.00 0.00 - 0.00 0.3 1,775 13.55 0.00 0.00 - 0.00 0.00 - 0.00 0.4 2,219 13.63 0.00 0.00 - 0.00 0.00 - 0.00 0.4 2,662 13.70 0.00 0.00 - 0.00 0.00 - 0.00 0.5 3.106 13.77 0.00 0.00 - 0.00 0.00 - 0.00 0.6 3,550 13.85 0.00 0.00 - 0.00 0.00 - 0.00 0.7 3,993 13.93 0.00 0.00 - 0.00 0.00 - 0.00 0.8 4,437 14.00 0.00 0.00 - 0.00 0.00 - 0.00 0.9 5,137 14.10 0.00 0.00 - 0.00 0.00 - 0.00 0.9 5,837 14.20 0.00 0.00 - 0.00 0.00 - 0.00 1.0 6,537 14.30 0.00 0.00 - 0.00 0.00 - 0.00 1.1 7,237 14.40 0.00 0.00 - 0.00 0.00 - 0.00 1.3 7,937 14.50 0.00 0.00 - 0.00 0.00 - 0.00 1.4 8,636 14.60 0.00 0.00 - 0.00 0.00 - 0.00 1.5 9,336 14.70 0.00 0.00 - 0.00 0.00 - 0.00 1.5 10,036 14.80 0.00 0.00 - 0.00 0.00 - 0.00 1.6 10,736 14.90 0.00 0.00 - 0.00 0.00 - 0.00 1.8 11,436 15.00 0.00 0.00 - 0.00 0.00 - 0.00 1.9 12,269 15.10 0.00 0.00 - 0.00 0.00 - 0.00 2.0 13,103 15.20 0.00 0.00 - 0.00 0.00 - 0.00 2.0 13,936 15.30 0.00 0.00 - 0.00 0.00 - 0.00 Continues on next page... PHASE 4- KURE DUNES Stage / Storage / Discharge Table Page 2 Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cuft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 2.2 14,769 15.40 0.00 0.00 - 0.00 0.00 - 0.00 2.3 15,603 15.50 0.00 0.00 - 0.00 0.00 - 0.00 2.3 16,436 15.60 0.00 0.00 - 0.00 0.00 - 0.00 2.5 17,269 15.70 0.00 0.00 - 0.00 0.00 - 0.00 2.5 18,102 15.80 0.00 0.00 - 0.00 0.00 - 0.00 2.6 18,936 15.90 0.00 0.00 - 0.00 0.00 - 0.00 2.8 19,769 16.00 0.00 0.00 - 0.00 0.00 - 0.00 2.8 20,747 16.10 0.00 0.00 - 0.00 0.00 - 0.00 3.0 21,724 16.20 0.00 0.00 - 0.00 0.00 - 0.00 3.0 22,702 16.30 1.01 0.00 - 0.00 0.00 - 0.00 3.2 23,679 16.40 1.24 0.00 - 0.00 0.00 - 0.00 3.3 24,657 16.50 1.44 0.00 - 0.00 0.00 - 0.00 3.3 25,634 16.60 1.62 0.00 - 0.00 0.00 - 0.00 3.4 26,612 16.70 1.77 0.00 - 0.00 0.00 - 0.00 3.5 27,589 16.80 1.92 0.00 - 0.00 0.00 - 0.00 3.6 28,567 16.90 2.05 0.00 - 0.00 0.00 - 0.00 3.8 29,544 17.00 2.18 0.00 - 0.00 0.00 - 0.00 3.8 30,131 17.05 2.24 0.00 - 0.00 0.00 - 0.00 3.8 30,719 17.10 2.30 0.00 - 0.00 0.00 - 0.00 3.9 31,306 17.15 2.35 0.00 - 0.00 0.00 - 0.00 4.0 31,893 17.20 2.41 0.00 - 0.00 0.00 - 0.00 4.0 32,481 17.25 2.47 0.00 - 0.00 0.00 - 0.00 4.1 33,068 17.30 2.52 0.00 - 0.00 0.00 - 0.00 4.1 33,655 17.35 2.57 0.00 - 0.00 0.00 - 0.00 4.2 34,242 17.40 2.62 0.00 - 0.00 0.00 - 0.00 4.2 34,830 17.45 2.67 0.00 - 0.00 0.00 - 0.00 4.3 35,417 17.50 2.72 0.00 - 0.00 0.00 - 0.00 4.3 36,087 17.55 2.77 0.00 - 0.00 0.00 - 0.00 4.3 36,757 17.60 2.82 0.00 - 0.00 0.00 - 0.00 4.4 37,428 17.65 2.87 0.00 - 0.00 0.00 - 0.00 4.5 38,098 17.70 2.91 0.00 - 0.00 0.00 - 0.00 4.5 38,768 17.75 2.96 0.00 - 0.00 0.00 - 0.00 4.6 39,438 17.80 3.00 0.01 - 0.00 0.00 - 0.01 4.6 40,108 17.85 3.05 0.02 - 0.00 0.00 - 0.02 4.7 40,779 17.90 3.09 0.03 - 0.00 0.00 - 0.03 4.7 41,449 17.95 3.13 0.04 - 0.00 0.00 - 0.04 4.8 42,119 18.00 3.17 0.04 - 0.00 0.00 - 0.04 4.8 43,588 18.10 3.26 0.05 - 0.00 0.00 - 0.05 4.9 45,058 18.20 3.34 0.06 - 0.00 0.00 - 0.06 5.1 46,527 18.30 3.42 0.07 - 0.00 0.00 - 0.07 5.2 47,997 18.40 3.49 0.08 - 0.00 0.00 - 0.08 5.3 49,466 18.50 3.57 0.09 - 0.00 0.00 - 0.09 5.3 50,935 18.60 3.64 0.09 - 0.00 0.00 - 0.09 5.4 52,405 18.70 3.72 0.10 - 0.00 0.00 - 0.10 5.5 53,874 18.80 3.79 0.10 - 0.76 0.00 - 0.86 5.6 55,344 18.90 3.86 0.11 - 2.15 0.00 - 2.26 5.8 56,813 19.00 3.93 0.11 - 3.94 0.00 - 3.93 5.8 58,456 19.10 3.99 0.00 - 6.07 0.00 - 3.99 5.9 60,099 19.20 4.06 0.00 - 8.49 0.00 - 4.06 Continues on next page... PHASE 4- KURE DUNES Page 3 Stage / Storage / Discharge Table Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cuft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 6.1 61,742 19.30 4.12 0.00 - 11.15 0.00 - 4.12 6.2 63,385 19.40 4.19 0.00 - 14.06 0.00 - 4.19 6.3 65,028 19.50 4.25 0.00 - 17.17 0.00 - 4.25 6.3 66,671 19.60 4.31 0.00 - 20.49 0.00 - 4.31 6.4 68,314 19.70 4.38 0.00 - 24.00 0.00 - 4.38 6.5 69,957 19.80 4.44 0.00 - 27.69 0.00 - 4.44 6.6 71,600 19.90 4.50 0.00 - 31.55 0.00 - 4.50 6.8 73,243 20.00 4.55 0.00 - 35.57 0.00 - 4.55 6.8 75,143 20.10 4.61 0.00 - 39.76 0.00 - 4.61 6.9 77,043 20.20 4.67 0.00 - 44.09 0.00 - 4.67 7.1 78,942 20.30 4.73 0.00 - 48.57 0.00 - 4.73 7.2 80,842 20.40 4.78 0.00 - 53.20 0.00 - 4.78 7.3 82,742 20.50 4.84 0.00 - 57.96 0.00 - 4.84 7.3 84,642 20.60 4.89 0.00 - 62.86 0.00 - 4.89 7.4 86,542 20.70 4.95 0.00 - 67.88 0.00 - 4.95 7.5 88,441 20.80 5.00 0.00 - 73.04 0.00 - 5.00 7.6 90,341 20.90 5.05 0.00 - 78.32 0.00 - 5.05 7.8 92,241 21.00 5.11 0.00 - 83.71 0.00 - 5.11 7.8 93,313 21.05 5.13 0.00 - 86.46 0.00 - 5.13 7.8 94,386 21.10 5.16 0.00 - 89.23 0.00 - 5.16 7.9 95,458 21.15 5.18 0.00 - 92.04 0.00 - 5.18 8.0 96,530 21.20 5.21 0.00 - 94.87 0.00 - 5.21 8.0 97,602 21.25 5.24 0.00 - 97.73 0.00 - 5.24 8.1 98,675 21.30 5.26 0.00 - 100.62 0.00 - 5.26 8.1 99,747 21.35 5.29 0.00 - 103.53 0.00 - 5.29 8.2 100,819 21.40 5.31 0.00 - 106.48 0.00 - 5.31 8.2 101,892 21.45 5.34 0.00 - 109.45 0.00 - 5.34 8.3 102,964 21.50 5.36 0.00 - 112.45 0.00 - 5.36 Hydrograph Report Hyd. No. 4 COMBINED Hydrograph type = Combine Storm frequency = 10 yrs 1 st inflow hyd. No. = 1 Page 1 Peak discharge = 23.79 cfs Time interval = 5 min 2nd inflow hyd. No. = 3 Total Volume = 206,342 cult, 4.737 acft Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 10.83 0.51 0.00 0.51 10.92 0.59 0.00 0.59 11.00 0.67 0.00 0.67 11.08 0.77 0.00 0.77 11.17 0.87 0.00 0.87 11.25 0.98 0.00 - 0.98 11.33 1.11 0.00 1.11 11.42 1.26 0.00 1.26 11.50 1.44 0.00 1.44 11.58 1.66 0.00 1.66 11.67 1.99 0.00 1.99 11.75 2.47 0.00 2.47 11.83 3.18 0.00 3.18 11.92 4.23 0.00 4.23 12.00 6.13 0.00 6.13 12.08 8.96 0.00 8.96 12.17 12.16 0.00 12.16 12.25 15.53 0.00 15.53 12.33 18.84 0.00 18.84 12.42 21.84 0.00 21.84 12.50 23.58 0.00 23.58 12.58 23.79 << 0.00 23.79 << 12.67 23.24 0.00 23.24 12.75 22.06 0.00 22.06 12.83 20.39 0.00 20.39 12.92 18.38 0.00 18.38 13.00 16.21 0.00 16.21 13.08 14.03 0.00 14.03 13.17 11.87 0.02 11.89 13.25 9.84 0.03 9.87 13.33 8.25 0.04 8.29 13.42 7.20 0.05 7.26 13.50 6.42 0.06 6.48 13.58 5.86 0.07 5.93 13.67 5.48 0.07 5.55 13.75 5.21 0.07 5.28 Continues on next page... COMBINED Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 13.83 4.99 0.08 5.07 13.92 4.80 0.08 4.88 14.00 4.63 0.08 4.72 14.08 4.48 0.09 4.57 14.17 4.34 0.09 4.43 14.25 4.21 0.09 4.31 14.33 4.09 0.09 4.19 14.42 3.97 0.10 4.07 14.50 3.87 0.29 4.15 14.58 3.76 0.52 4.28 14.67 3.67 0.71 4.38 14.75 3.58 0.87 4.45 14.83 3.50 1.09 4.59 14.92 3.43 1.24 4.67 15.00 3.35 1.35 4.70 15.08 3.28 1.42 4.70 15.17 3.22 1.47 4.68 15.25 3.15 1.49 4.64 15.33 3.08 1.50 4.59 15.42 3.01 1.50 << 4.52 15.50 2.95 1.50 4.44 15.58 2.88 1.48 4.36 15.67 2.81 1.46 4.27 15.75 2.74 1.44 4.18 15.83 2.67 1.41 4.08 15.92 2.60 1.39 3.98 16.00 2.53 1.36 3.88 16.08 2.46 1.33 3.78 16.17 2.39 1.29 3.68 16.25 2.32 1.26 3.58 16.33 2.26 1.23 3.49 16.42 2.20 1.20 3.39 16.50 2.14 1.17 3.30 16.58 2.09 1.14 3.22 16.67 2.04 1.11 3.15 16.75 2.00 1.08 3.08 16.83 1.96 1.05 3.01 16.92 1.92 1.03 2.95 17.00 1.88 1.01 2.89 17.08 1.85 0.99 2.84 17.17 1.82 0.97 2.79 17.25 1.79 0.95 2.74 17.33 1.76 0.93 2.69 17.42 1.72 0.91 2.64 17.50 1.69 0.90 2.59 17.58 1.66 0.88 2.54 17.67 1.63 0.86 2.49 17.75 1.60 0.85 2.45 17.83 1.57 0.84 2.41 Continues on next page... Page 2 COMBINED Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 17.92 1.53 0.83 2.37 18.00 1.50 0.82 2.32 18.08 1.47 0.81 2.28 18.17 1.44 0.80 2.23 18.25 1.41 0.78 2.19 18.33 1.38 0.77 2.15 18.42 1.35 0.76 2.11 18.50 1.33 0.74 2.07 18.58 1.31 0.73 2.04 18.67 1.29 0.72 2.01 18.75 1.27 0.71 1.98 18.83 1.26 0.69 1.95 18.92 1.25 0.68 1.93 19.00 1.24 0.67 1.91 19.08 1.23 0.66 1.89 19.17 1.22 0.66 1.87 19.25 1.21 0.65 1.85 19.33 1.20 0.64 1.84 19.42 1.19 0.63 1.82 19.50 1.18 0.63 1.80 19.58 1.17 0.62 1.79 19.67 1.16 0.61 1.77 19.75 1.15 0.61 1.76 19.83 1.14 0.60 1.74 19.92 1.13 0.60 1.73 20.00 1.12 0.59 1.71 20.08 1.11 0.58 1.70 20.17 1.10 0.58 1.68 20.25 1.09 0.57 1.67 20.33 1.08 0.57 1.65 20.42 1.07 0.56 1.64 20.50 1.06 0.56 1.62 20.58 1.05 0.55 1.61 20.67 1.04 0.55 1.59 20.75 1.03 0.54 1.58 20.83 1.02 0.54 1.56 20.92 1.02 0.53 1.55 21.00 1.01 0.53 1.53 21.08 1.00 0.52 1.52 21.17 0.99 0.52 1.51 21.25 0.98 0.51 1.49 21.33 0.97 0.51 1.48 21.42 0.96 0.50 1.46 21.50 0.95 0.50 1.45 21.58 0.94 0.50 1.43 21.67 0.93 0.49 1.42 21.75 0.92 0.49 1.40 21.83 0.91 0.48 1.39 21.92 0.90 0.48 1.37 Continues on next page... Page 3 COMBINED Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 22.00 0.89 0.47 1.36 22.08 0.89 0.47 1.36 22.17 0.90 0.46 1.37 22.25 0.91 0.46 1.37 22.33 0.92 0.46 1.38 22.42 0.94 0.46 1.40 22.50 0.95 0.46 1.41 22.58 0.94 0.46 1.40 22.67 0.93 0.46 1.39 22.75 0.92 0.46 1.38 22.83 0.90 0.46 1.36 22.92 0.89 0.46 1.35 23.00 0.88 0.45 1.33 23.08 0.86 0.45 1.31 23.17 0.85 0.45 1.29 23.25 0.83 0.44 1.27 23.33 0.81 0.44 1.25 23.42 0.81 0.43 - 1.24 23.50 0.80 0.43 1.23 23.58 0.79 0.42 1.21 23.67 0.78 0.42 1.20 23.75 0.78 0.41 1.19 23.83 0.77 0.41 1.18 23.92 0.76 0.40 1.17 24.00 0.75 0.40 1.15 24.08 0.73 0.40 1.13 24.17 0.70 0.39 1.09 24.25 0.64 0.38 1.03 24.33 0.58 0.37 0.95 24.42 0.50 0.36 0.86 24.50 0.41 0.34 0.75 24.58 0.33 0.31 0.64 24.67 0.25 0.29 0.54 ...End Page 4 Hydrograph Report Hyd. No. 5 KB VILLAGE Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 10.53 ac _ .3 % = LAG = 7.00 in = 24 hrs Hydrograph Discharge Table Time -- Outflow (hrs cfs) Time -- Outflow (hrs cfs) Page 1 Peak discharge = 13.55 cfs Time interval = 5 min Curve number = 61 Hydraulic length = 500 ft Time of conc. (Tc) = 56.3 min Distribution = Type III Shape factor = 484 Total Volume = 105,123 cult, 2.413 acft Time -- Outflow (hrs cfs) Time -- Outflow (hrs cfs) 11.42 0.56 14.08 3.09 -16.75 1.36 19.42 0.79 11.50 0.65 14.17 2.98 16.83 1.33 19.50 0.78 11.58 0.77 14.25 2.88 16.92 1.30 19.58 0.78 11.67 0.93 14.33 2.79 17.00 1.27 19.67 0.77 11.75 1.17 14.42 2.70 17.08 1.25 19.75 0.77 11.83 1.51 14.50 2.63 17.17 1.23 19.83 0.76 11.92 2.01 14.58 2.56 17.25 1.20 19.92 0.75 12.00 2.89 14.67 2.49 17.33 1.18 20.00 0.75 12.08 4.23 14.75 2.43 17.42 1.16 20.08 0.74 12.17 5.79 14.83 2.37 17.50 1.14 20.17 0.73 12.25 7.48 14.92 2.32 17.58 1.12 20.25 0.73 12.33 9.22 15.00 2.27 17.67 1.10 20.33 0.72 12.42 10.91 15.08 2.22 17.75 1.08 20.42 0.72 12.50 12.41 15.17 2.17 17.83 1.06 20.50 0.71 12.58 13.33 15.25 2.12 17.92 1.04 20.58 0.70 12.67 13.55 << 15.33 2.08 18.00 1.02 20.67 0.70 12.75 13.40 15.42 2.03 18.08 0.99 20.75 0.69 12.83 12.97 15.50 1.99 18.17 0.97 20.83 0.68 12.92 12.29 15.58 1.94 18.25 0.95 20.92 0.68 13.00 11.44 15.67 1.90 18.33 0.94 21.00 0.67 13.08 10.49 15.75 1.86 18.42 0.92 21.08 0.66 13.17 9.49 15.83 1.81 18.50 0.90 21.17 0.66 13.25 8.46 15.92 1.76 18.58 0.88 21.25 0.65 13.33 7.43 16.00 1.72 18.67 0.87 21.33 0.65 13.42 6.41 16.08 1.67 18.75 0.86 21.42 0.64 13.50 5.46 16.17 1.63 18.83 0.85 21.50 0.63 13.58 4.71 16.25 1.58 18.92 0.84 21.58 0.63 13.67 4.21 16.33 1.54 19.00 0.83 21.67 0.62 13.75 3.84 16.42 1.50 19.08 0.82 21.75 0.61 13.83 3.56 16.50 1.46 19.17 0.81 21.83 0.61 13.92 3.36 16.58 1.42 19.25 0.80 21.92 0.60 14.00 3.21 16.67 1.39 19.33 0.80 22.00 0.59 Continues on next page... KB VILLAGE Hydrograph Discharge Table Time -- Outflow (hrs cfs) 22.08 0.60 22.17 0.60 22.25 0.60 22.33 0.60 22.42 0.61 22.50 0.61 22.58 0.62 22.67 0.61 22.75 0.61 22.83 0.60 22.92 0.59 23.00 0.59 23.08 0.58 23.17 0.57 23.25 0.56 23.33 0.56 23.42 0.55 23.50 0.54 23.58 0.53 23.67 0.52 23.75 0.52 23.83 0.51 23.92 0.51 24.00 0.50 Mil Page 2 Hydrograph Report Hyd. No. 6 COMBINED & KBV Hydrograph type = Combine Storm frequency = 10 yrs 1st inflow hyd. No. = 4 Page 1 Peak discharge = 37.12 cfs Time interval = 5 min 2nd inflow hyd. No. = 5 Total Volume = 311,465 cuft, 7.150 acft Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 10.75 0.44 0.12 0.56 10.83 0.51 0.16 0.67 10.92 0.59 0.20 0.79 11.00 0.67 0.24 0.92 11.08 0.77 0.29 1.06 11.17 0.87 0.35 - 1.21 11.25 0.98 0.41 1.39 11.33 1.11 0.48 1.59 11.42 1.26 0.56 1.82 11.50 1.44 0.65 2.09 11.58 1.66 0.77 2.43 11.67 1.99 0.93 2.92 11.75 2.47 1.17 3.63 11.83 3.18 1.51 4.69 11.92 4.23 2.01 6.24 12.00 6.13 2.89 9.02 12.08 8.96 4.23 13.19 12.17 12.16 5.79 17.95 12.25 15.53 7.48 23.01 12.33 18.84 9.22 28.07 12.42 21.84 10.91 32.75 12.50 23.58 12.41 35.99 12.58 23.79 << 13.33 37.12 << 12.67 23.24 13.55 << 36.78 12.75 22.06 13.40 35.46 12.83 20.39 12.97 33.35 12.92 18.38 12.29 30.67 13.00 16.21 11.44 27.65 13.08 14.03 10.49 24.52 13.17 11.89 9.49 21.38 13.25 9.87 8.46 18.34 13.33 8.29 7.43 15.72 13,42 7.26 6.41 13.67 13.50 6.48 5.46 11.94 13.58 5.93 4.71 10.64 13.67 5.55 4.21 9.76 Continues on next page... COMBINED 8 KBV Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 13.75 5.28 3.84 9.12 13.83 5.07 3.56 8.63 13.92 4.88 3.36 8.24 14.00 4.72 3.21 7.93 14.08 4.57 3.09 7.66 14.17 4.43 2.98 7.41 14.25 4.31 2.88 7.18 14.33 4.19 2.79 - 6.97 14.42 4.07 2.70 6.78 14.50 4.15 2.63 6.78 14.58 4.28 2.56 6.84 14.67 4.38 2.49 6.87 14.75 4.45 2.43 6.88 14.83 4.59 2.37 6.96 14.92 4.67 2.32 6.99 15.00 4.70 2.27 6.97 15.08 4.70 2.22 6.92 15.17 4.68 2.17 - 6.85 15.25 4.64 2.12 6.76 15.33 4.59 2.08 6.66 15.42 4.52 2.03 6.55 15.50 4.44 1.99 6.43 15.58 4.36 1.94 6.30 15.67 4.27 1.90 6.17 15.75 4.18 1.86 6.03 15.83 4.08 1.81 5.89 15.92 3.98 1.76 5.75 16.00 3.88 1.72 5.60 16.08 3.78 1.67 5.46 16.17 3.68 1.63 5.31 16.25 3.58 1.58 5.17 16.33 3.49 1.54 5.03 16.42 3.39 1.50 4.89 16.50 3.30 1.46 4.76 16.58 3.22 1.42 4.65 16.67 3.15 1.39 4.54 16.75 3.08 1.36 4.43 16.83 3.01 1.33 4.34 16.92 2.95 1.30 4.25 17.00 2.89 1.27 4.17 17.08 2.84 1.25 4.09 17.17 2.79 1.23 4.01 17.25 2.74 1.20 3.94 17.33 2.69 1.18 3.87 17.42 2.64 1.16 3.80 17.50 2.59 1.14 3.73 17.58 2.54 1.12 3.66 17.67 2.49 1.10 3.59 17.75 2.45 1.08 3.53 Continues on next page... Page 2 COMBINED & KBV Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 17.83 2.41 1.06 3.47 17.92 2.37 1.04 3.40 18.00 2.32 1.02 3.34 18.08 2.28 0.99 3.27 18.17 2.23 0.97 3.21 18.25 2.19 0.95 3.15 18.33 2.15 0.94 3.08 18.42 2.11 0.92 3.03 18.50 2.07 0.90 2.97 18.58 2.04 0.88 2.92 18.67 2.01 0.87 2.88 18.75 1.98 0.86 2.84 18.83 1.95 0.85 2.80 18.92 1.93 0.84 2.77 19.00 1.91 0.83 2.74 19.08 1.89 0.82 2.71 19.17 1.87 0.81 2.68 19.25 1.85 0.80 - 2.66 19.33 1.84 0.80 2.63 19.42 1.82 0.79 2.61 19.50 1.80 0.78 2.59 19.58 1.79 0.78 2.56 19.67 1.77 0.77 2.54 19.75 1.76 0.77 2.52 19.83 1.74 0.76 2.50 19.92 1.73 0.75 2.48 20.00 1.71 0.75 2.46 20.08 1.70 0.74 2.44 20.17 1.68 0.73 2.41 20.25 1.67 0.73 2.39 20.33 1.65 0.72 2.37 20.42 1.64 0.72 2.35 20.50 1.62 0.71 2.33 20.58 1.61 0.70 2.31 20.67 1.59 0.70 2.29 20.75 1.58 0.69 2.27 20.83 1.56 0.68 2.25 20.92 1.55 0.68 2.23 21.00 1.53 0.67 2.21 21.08 1.52 0.66 2.18 21.17 1.51 0.66 2.16 21.25 1.49 0.65 2.14 21.33 1.48 0.65 2.12 21.42 1.46 0.64 2.10 21.50 1.45 0.63 2.08 21.58 1.43 0.63 2.06 21.67 1.42 0.62 2.04 21.75 1.40 0.61 2.02 21.83 1.39 0.61 1.99 Continues on next page... Page 3 COMBINED & KBV Hydrograph Discharge Table Time 1st Inflow + 2nd Inflow = Outflow (hrs) (cfs) (cfs) (cfs) 21.92 1.37 0.60 1.97 22.00 1.36 0.59 1.95 22.08 1.36 0.60 1.96 22.17 1.37 0.60 1.96 22.25 1.37 0.60 1.97 22.33 1.38 0.60 1.99 22.42 1.40 0.61 2.00 22.50 1.41 0.61 2.02 22.58 1.40 0.62 2.02 22.67 1.39 0.61 2.00 22.75 1.38 0.61 1.98 22.83 1.36 0.60 1.96 22.92 1.35 0.59 1.94 23.00 1.33 0.59 1.92 23.08 1.31 0.58 1.89 23.17 1.29 0.57 1.86 23.25 1.27 0.56 1.84 23.33 1.25 0.56 - 1.81 23.42 1.24 0.55 1.79 23.50 1.23 0.54 1.76 23.58 1.21 0.53 1.74 23.67 1.20 0.52 1.73 23.75 1.19 0.52 1.71 23.83 1.18 0.51 1.69 23.92 1.17 0.51 1.68 24.00 1.15 0.50 1.66 24.08 1.13 0.49 1.62 24.17 1.09 0.47 1.56 24.25 1.03 0.45 1.47 24.33 0.95 0.42 1.37 24.42 0.86 0.38 1.23 24.50 0.75 0.33 1.08 24.58 0.64 0.28 0.92 24.67 0.54 0.23 0.77 24.75 0.45 0.19 0.64 24.83 0.37 0.15 0.52 ...End Page 4 Hydrograph Report Hyd. No. 7 THE KEYS Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 6 Max. Elevation = 16.16 ft Storage Indiczgon method used. Hydrograph Discharge Table Peak discharge Time interval Reservoir name Max. Storage Page 1 = 10.31 cfs = 5 min = THE KEYS = 134,808 cuft Total Volume = 198,037 cull, 4.546 acft Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 13.08 24.52 15.98 4.85 0.04 - 42.15 - - 4.89 13.17 21.38 16.05 7.58 0.06 - 46.43 - - 7.64 13.25 18.34 16.10 8.83 0.07 - 49.35 - - 8.91 13.33 15.72 16.13 9.51 0.08 - 51.38 - - 9.58 13.42 13.67 16.15 9.91 0.08 - 52.67 - - 10.00 13.50 11.94 16.16 10.14 0.08 - 53.37 - - 10.22 13.58 10.64 16.16 10.22 0.08 - 53.64 - - 10.31 << 13.67 9.76 16.16 10.22 0.08 - 53.62 - - 10.30 13.75 9.12 16.16 10.15 0.08 - 53.40 - - 10.23 13.83 8.63 16.16 10.04 0.08 - 53.06 - - 10.12 13.92 8.24 16.15 9.90 0.08 - 52.63 - - 9.99 14.00 7.93 16.14 9.75. 0.08 - 52.16 - - 9.83 14.08 7.66 16.13 9.59 0.08 - 51.64 - - 9.67 14.17 7.41 16.12 9.42 0.08 - 51.10 - - 9.50 14.25 7.18 16.12 9.24 0.08 - 50.55 - - 9.32 14.33 6.97 16.11 9.06 0.07 - 49.99 - - 9.14 14.42 6.78 16.10 8.87 0.07 - 49.42 - - 8.94 14.50 6.78 16.09 8.65 0.07 - 48.91 - - 8.72 14.58 6.84 16.08 8.45 0.07 - 48.45 - - 8.52 14.67 6.87 16.08 8.28 0.07 - 48.06 - - 8.35 14.75 6.88 16.07 8.13 0.07 - 47.71 - - 8.19 14.83 6.96 16.06 8.00 0.07 - 47.40 - - 8.06 14.92 6.99 16.06 7.88 0.06 - 47.14 - - 7.95 15.00 6.97 16.06 7.78 0.06 - 46.91 - - 7.85 15.08 6.92 16.05 7.69 0.06 - 46.70 - - 7.75 15.17 6.85 16.05 7.60 0.06 - 46.49 - - 7.66 15.25 6.76 16.05 7.51 0.06 - 46.28 - - 7.58 15.33 6.66 16.04 7.42 0.06 - 46.08 - - 7.49 15.42 6.55 16.04 7.33 0.06 - 45.87 - - 7.39 15.50 6.43 16.04 7.24 0.06 - 45.65 - - 7.30 15.58 6.30 16.03 7.15 0.06 - 45.43 - - 7.20 15.67 6.17 16.03 7.05 0.06 - 45.20 - - 7.10 15.75 6.03 16.02 6.94 0.06 - 44.96 - - 7.00 15.83 5.89 16.02 6.84 0.06 - 44.71 - - 6.89 15.92 5.75 16.02 6.73 0.06 - 44.46 - - 6.78 16.00 5.60 16.01 6.61 0.05 - 44.19 - - 6.67 Continues on next page... THE KEYS Page 2 Hydrograph Discharge Table Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 16.08 5.46 16.01 6.50 0.05 - 43.92 - - 6.55 16.17 5.31 16.00 6.38 0.05 - 43.64 - - 6.43 16.25 5.17 16.00 6.16 0.05 - 43.36 - - 6.21 16.33 5.03 15.99 5.88 0.05 - 43.10 - - 5.93 16.42 4.89 15.99 5.63 0.05 - 42.88 - - 5.68 16.50 4.76 15.99 5.42 0.04 - 42.68 - - 5.46 16.58 4.65 15.98 5.23 0.04 - 42.50 - - 5.27 16.67 4.54 15.98 5.06 0.04 - 42.34 - - 5.10 16.75 4.43 15.98 4.90 0.04 - 42.20 - - 4.94 - 16.83 4.34 15.98 4.76 0.04 - 42.07 - - 4.80 16.92 4.25 15.97 4.63 0.04 - 41.95 - - 4.67 17.00 4.17 15.97 4.51 0.04 - 41.84 - - 4.55 17.08 4.09 15.97 4.41 0.04 - 41.74 - - 4.44 17.17 4.01 15.97 4.31 0.04 - 41.65 - - 4.34 17.25 3.94 15.97 4.21 0.03 - 41.57 - - 4.25 17.33 3.87 15.97 4.13 0.03 - 41.48 - - 4.16 17.42 3.80 15.96 4.04 0.03 - 41.41 - - 4.08 17.50 3.73 15.96 3.96 0.03 - 41.34 - - 4.00 17.58 3.66 15.96 3.89 0.03 - 41.26 - - 3.92 17.67 3.59 15.96 3.81 0.03 - 41.20 - - 3.85 17.75 3.53 15.96 3.74 0.03 - 41.13 - - 3.77 17.83 3.47 15.96 3.67 0.03 - 41.07 - - 3.70 17.92 3.40 15.96 3.60 0.03 - 41.00 - - 3.63 18.00 3.34 15.96 3.54 0.03 - 40.94 - - 3.57 18.08 3.27 15.95 3.47 0.03 - 40.88 - - 3.50 18.17 3.21 15.95 3.41 0.03 - 40.82 - - 3.43 18.25 3.15 15.95 3.34 0.03 - 40.76 - - 3.37 18.33 3.08 15.95 3.28 0.03 - 40.70 - - 3.30 18.42 3.03 15.95 3.21 0.03 - 40.64 - - 3.24 18.50 2.97 15.95 3.15 0.03 - 40.59 - - 3.18 18.58 2.92 15.95 3.09 0.03 - 40.53 - - 3.12 18.67 2.88 15.95 3.04 0.02 - 40.48 - - 3.06 18.75 2.84 15.95 2.99 0.02 - 40.43 - - 3.01 18.83 2.80 15.95 2.94 0.02 - 40.39 - - 2.96 18.92 2.77 15.95 2.89 0.02 - 40.35 - - 2.92 19.00 2.74 15.94 2.85 0.02 - 40.31 - - 2.87 19.08 2.71 15.94 2.81 0.02 - 40.27 - - 2.84 19.17 2.68 15.94 2.78 0.02 - 40.24 - - 2.80 19.25 2.66 15.94 2.74 0.02 - 40.21 - - 2.77 19.33 2.63 15.94 2.71 0.02 - 40.18 - - 2.73 19.42 2.61 15.94 2.68 0.02 - 40.15 - - 2.71 19.50 2.59 15.94 2.66 0.02 - 40.13 - - 2.68 19.58 2.56 15.94 2.63 0.02 - 40.10 - - 2.65 19.67 2.54 15.94 2.61 0.02 - 40.08 - - 2.63 19.75 2.52 15.94 2.58 0.02 - 40.06 - - 2.60 19.83 2.50 15.94 2.56 0.02 - 40.04 - - 2.58 19.92 2.48 15.94 2.54 0.02 - 40.02 - - 2.56 20.00 2.46 15.94 2.51 0.02 - 39.99 - - 2.53 20.08 2.44 15.94 2.49 0.02 - 39.97 - - 2.51 Continues on next page... THE KEYS Hydrograph Discharge Table Page 3 Time Inflow Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Outflow (hrs) (cfs) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 20.17 2.41 15.94 2.47 0.02 - 39.95 - - 2.49 20.25 2.39 15.94 2.45 0.02 - 39.93 - - 2.47 20.33 2.37 15.94 2.43 0.02 - 39.91 - - 2.45 20.42 2.35 15.94 2.41 0.02 - 39.90 - - 2.42 20.50 2.33 15.94 2.38 0.02 - 39.88 - - 2.40 20.58 2.31 15.94 2.36 0.02 - 39.86 - - 2.38 20.67 2.29 15.94 2.34 0.02 - 39.84 - - 2.36 20.75 2.27 15.94 2.32 0.02 - 39.82 - - 2.34 20.83 2.25 15.94 2.30 0.02 - 39.80 - - 2.32 20.92 2.23 15.94 2.28 0.02 - 39.78 - - 2.30 21.00 2.21 15.94 2.26 0.02 - 39.76 - - 2.28 21.08 2.18 15.94 2.24 0.02 - 39.74 - - 2.26 21.17 2.16 15.93 2.22 0.02 - 39.72 - - 2.24 21.25 2.14 15.93 2.20 0.02 - 39.70 - - 2.21 21.33 2.12 15.93 2.18 0.02 - 39.68 - - 2.19 21.42 2.10 15.93 2.15 0.02 - 39.66 - - 2.17 21.50 2.08 15.93 2.13 0.02 - 39.64 - - 2.15 21.58 2.06 15.93 2.11 0.02 - 39.63 - - 2.13 21.67 2.04 15.93 2.09 0.02 - 39.61 - - 2.11 21.75 2.02 15.93 2.07 0.02 - 39.59 - - 2.09 21.83 1.99 15.93 2.05 0.02 - 39.57 - - 2.07 21.92 1.97 15.93 2.03 0.02 - 39.55 - - 2.05 22.00 1.95 15.93 2.01 0.02 - 39.53 - - 2.02 22.08 1.96 15.93 1.99 0.02 - 39.51 - - 2.01 22.17 1.96 15.93 1.98 0.02 - 39.50 - - 2.00 22.25 1.97 15.93 1.97 0.02 - 39.50 - - 1.99 22.33 1.99 15.93 1.97 0.02 - 39.49 - - 1.99 22.42 2.00 15.93 1.97 0.02 - 39.50 - - 1.99 22.50 2.02 15.93 1.98 0.02 - 39.50 - - 2.00 22.58 2.02 15.93 1.99 0.02 - 39.51 - - 2.00 22.67 2.00 15.93 1.99 0.02 - 39.51 - - 2.00 22.75 1.98 15.93 1.99 0.02 - 39.51 - - 2.00 22.83 1.96 15.93 1.98 0.02 - 39.50 - - 1.99 22.92 1.94 15.93 1.97 0.02 - 39.49 - - 1.98 23.00 1.92 15.93 1.95 0.02 - 39.48 - - 1.97 23.08 1.89 15.93 1.94 0.02 - 39.46 - - 1.95 23.17 1.86 15.93 1.92 0.02 - 39.45 - - 1.93 23.25 1.84 15.93 1.90 0.02 - 39.43 - - 1.91 23.33 1.81 15.93 1.87 0.02 - 39.40 - - 1.89 23.42 1.79 15.93 1.85 0.02 - 39.38 - - 1.87 23.50 1.76 15.93 1.83 0.02 - 39.36 - - 1.84 23.58 1.74 15.93 1.81 0.01 - 39.34 - - 1.82 23.67 1.73 15.93 1.78 0.01 - 39.32 - - 1.80 23.75 1.71 15.93 1.76 0.01 - 39.30 - - - 1.78 23.83 1.69 15.93 1.74 0.01 - 39.28 - - 1.76 23.92 . 1.68 15.93 1.72 0.01 - 39.27 - - 1.74 24.00 1.66 15.93 1.71 0.01 - 39.25 - - 1.72 24.08 1.62 15.93 1.69 0.01 - 39.23 - - 1.70 24.17 1.56 15.93 1.66 0.01 - 39.21 - - 1.67 Continues on next page... THE KEYS Hydrograph Discharge Table Time Inflow Elevation (hrs) (cfs) (ft) 24.25 1.47 15.93 24.33 1.37 15.92 24.42 1.23 15.92 24.50 1.08 15.92 24.58 0.92 15.92 24.67 0.77 15.92 24.75 0.64 15.92 24.83 0.52 15.91 24.92 0.42 15.91 25.00 0.33 15.91 25.08 0.25 15.91 25.17 0.19 15.91 End Culy. A Culy. B Culy. C Weir A Weir B Weir C (Cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 1.62 0.01 - 39.17 - - 1.57 0.01 - 39.12 - - 1.49 0.01 - 39.05 - - 1.41 0.01 - 38.97 - - 1.30 0.01 - 38.87 - - 1.18 0.01 - 38.77 - - 1.06 0.01 - 38.65 - - 0.94 0.01 - 38.54 - - 0.82 0.01 - 38.43 - - 0.70 0.01 - 38.32 - - 0.60 0.00 - 38.22 - - 0.50 0.00 - 38.14 - - Page 4 Outflow (cfs) 1.63 1.58 1.51 1.42 1.31 1.19 1.07 0.94 0.82 0.71 0.60 0.50 Reservoir Report Page 1 Reservoir No. 1 THE KEYS Culvert / Orifice Structures Weir Structures [A] [B] [C] [A] [B] [C] Rise (in) = 36.0 2.5 0.0 , Crest Len (ft) = 12.6 0.0 0.0 Span (in) = 36.0 2.5 0.0 Crest El. (ft) = 14.90 0.00 0.00 No. Barrels = 1 1 0 Weir Coeff. = 3.00 3.00 3.00 Invert El. (ft) = 14.00 14.40 0.00 Eqn. Exp. = 1.50 1.50 1.50 Length (ft) = 292.0 1.0 0.0 Multistage = Yes No No Slope (%) = 0.40 1.00 0.00 N-Value = .023 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 Multistage = - No No Tailwater Elevation = 15.90 It Nob: All oudlo have been unalyted under Inlet and outlet wneol - Stage / Storage / Discharge Table Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cuft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 0.0 00 14.00 0.00 0.00 - 0.00 - - 0.00 0.0 2,235 14.04 0.00 0.00 - 0.00 - - 0.00 0.1 4,471 14.08 0.00 0.00 - 0.00 - - 0.00 0.1 6,706 14.12 0.00 0.00 - 0.00 - - 0.00 0.2 8,941 14.16 0.00 0.00 - 0.00 - - 0.00 0.2 11,177 14.20 0.00 0.00 - 0.00 - - 0.00 0.2 13,412 14.24 0.00 0.00 - 0.00 - - 0.00 0.3 15,647 14.28 0.00 0.00 - 0.00 - - 0.00 0.3 17,882 14.32 0.00 0.00 - 0.00 - - 0.00 0.4 20,118 14.36 0.00 0.00 - 0.00 - - 0.00 0.4 22,353 14.40 0.00 0.00 - 0.00 - - 0.00 0.5 25,913 14.46 0.00 0.00 - 0.00 - - 0.00 0.5 29,474 14.52 0.00 0.00 - 0.00 - - 0.00 0.6 33,034 14.58 0.00 0.00 - 0.00 - - 0.00 0.6 36,594 14.64 0.00 0.00 - 0.00 - - 0.00 0.7 40,155 14.70 0.00 0.00 - 0.00 - - 0.00 0.8 43,715 14.76 0.00 0.00 - 0.00 - - 0.00 0.8 47,275 14.82 0.00 0.00 - 0.00 - - 0.00 0.9 50,835 14.88 0.00 0.00 - 0.00 - - 0.00 0.9 54,396 14.94 0.00 0.00 - 0.30 - - 0.00 1.0 57,956 15.00 0.00 0.00 - 1.19 - - 0.00 1.1 64,452 15.10 0.00 0.00 - 3.37 - - 0.00 1.2 70,948 15.20 0.00 0.00 - 6.20 - - 0.00 1.3 77,444 15.30 0.00 0.00 - 9.54 - - 0.00 Continues on next page... THE KEYS Page 2 Stage / Storage / Discharge Table Stage Storage Elevation Culy. A Culy. B Culy. C Weir A Weir B Weir C Discharge (ft) (cuft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 1.4 83,940 15.40 0.00 0.00 - 13.33 - - 0.00 1.5 90,437 15.50 0.00 0.00 - 17.53 - - 0.00 1.6 96,933 15.60 0.00 0.00 - 22.09 - - 0.00 1.7 103,429 15.70 0.00 0.00 - 26.98 - - 0.00 1.8 109.925 15.80 0.00 0.00 - 32.20 - - 0.00 1.9 116,421 15.90 0.04 0.00 - 37.71 - - 0.04 2.0 122,917 16.00 6.32 0.05 - 43.51 - - 6.37 2.1 130,149 16.10 8.93 0.07 - 49.57 - - 9.00 2.2 137,381 16.20 10.94 0.09 - 55.89 - - 11.03 2.3 144,614 16.30 12.63 0.10 - 62.47 - - 12.73 2.4 151,846 16.40 14.12 0.12 - 69.28 - - 14.24 2.5 159,078 16.50 15.47 0.13 - 76.32 - - 15.60 2.6 166,310 16.60 16.71 0.14 - 83.59 - - 16.85 2.7 173,542 16.70 17.86 0.15 - 91.07 - - 18.01 2.8 180,775 16.80 18.95 0.16 - 98.76 - - 19.10 2.9 188,007 16.90 19.97 0.16 - 106.66 - - 20.14 3.0 195.239 17.00 20.95 0.17 - 114.76 - - 21.12 3.1 203,343 17.10 21.88 0.18 - 123.05 - - 22.06 3.2 211,446 17.20 22.77 0.19 - 131.54 - - 22.96 3.3 219,550 17.30 23.63 0.19 - 140.21 - - 23.83 3.4 227,653 17.40 24.46 0.20 - 149.06 - - 24.66 3.5 235,757 17.50 25.26 0.21 - 158.09 - - 25.47 3.6 243,861 17.60 26.04 0.21 - 167.30 - - 26.26 3.7 251,964 17.70 26.80 0.22 - 176.68 - - 27.02 3.8 260,068 17.80 27.53 0.23 - 186.23 - - 27.76 3.9 268,171 17.90 28.25 0.23 - 195.95 - - 28.48 4.0 276,275 18.00 28.94 0.24 - 205.83 - - 29.18 ATTAclm&n,r No , O 7650 MARKET STREET WILMINGTON, NORTH CAROIJNA 28405 ENGINEERING. " OFFICE: 919-686- FAX:. 919.6864666 October 16;1902 r 1 r Henry von -Oesen & 'Associates Post Office:Box`'2087 ...: - Wilmington,.:'North Carolina 28402 Attention Mr Carl Farmer Reference - Hydraulic conduct iJlty Testing ' ' Kure_Dunes.-Phase;II Kure• each;.;'No,-th''Caro llna ;' y lob No::204=.92 ' . Dear. -Mr Farmer ,- 1 Soil '•Tech .Engineering, .Inc has Y.ecently :completed „an. -`evaluetion'of'the'on-site soils for :'storinwater': fifiltr.ation. .fr=om the .:proposed.: Kure Dunes...Phase'`ZI projact;.. .'?he -purpose `of -our evaluation. -.;was"'to 'determine the hyd.raulic`co"nductivity of'.the._existing:soil's at 'the two designated stormwater':discharge ,'areas ` F Y As : requested; our representatives preformed ln`iitT atio to ts',and conduc �d:aubsu fa e': sampling of.; t e .dn ,r z...so> 1 'at the. -� two.:'designat d 'locations' adjacent to' Lat:,T25 and'- Lot 'n2o �t . each. location tfie 'l�ratio,n rater of the existing soll� .at t`a'AGes� n: `depth.' of disrha gP was determined w,th `she 'use of doub e ring ' znfllrrometers 'Tile suL-surfa.c :' so1Is' were ._lnvestica�ed:.with ''a Fa, d_ y• auger _to a !depth of .48;.inches below tha-pr,esant gr..ound surfac .af eac`T.;_; location ,Samples of 'th.e..var_i:aussoli s r..ata :encounters du .ing_out "auger`.:probes' were obtained for ..further` anals,s s' •'.Selec samp1 w re' te. Stvd Zn CUi lab:Dr,a.,orY f or ,grain size analYsis in C. r;.a T1 t.he ';nmerlCan SJCl.ety :.foi Test1ng..:aTld :;Materlals'..(AS.TM) prc- ��ure� "entltlad ASTi7 D-422 Particle Si�e'AnalYsis.Of.,Soil� Based. 'on the resul1ts of ou field and 'kaborata Y t=s`lny 'the on site soils were a'relatively,fr.2e 'draining sand which.'contains :cIay':o:r`silt.;size particles.( f.ines):_Yanging=from 0.8'to 2:0'`percent - '> Groundwater ":was .measured .::each : `locations `.and ranged11 .from' 38 'to inches below the. existing%:surface:n 0ur-'';tests indicated::=that 'the,,J ; existing '.infiltration rate would'ranga from 5. S eto -18..''S :gallons .F? :.hour -per square foot. =0ur tests 'at Lot:.#25 indicated'a-.slower rat=.of. infiltration that. at Lot'#28. 'This condition%could exist because of a higher groundwater..condition.(up-gradient),' the soil_:structure•itself or .the :_density -,`of.' the in-placa_'material ::We suggest _'appropriate •safety factor' be-.appUad to these -infiltration. rates design of,�.a`stormwater, collection'and:''filtration'sy'stem..jrZ .`'•_:•:.,::':'::;_' '* %204al'O .. . .............. . . . ....... Az 'ta. Infiltration Data Kure Dunes - Phase II Kure Beach, North Carolina Job No. 204-92 Test Location Depth Infiltration Rate Lot #25 -20" 5.5 gallons per hour per square foot Lot #28 _26" 18.5 gallons per hours per square foot Depth indicated is measured below the existing ground surface. Infiltration rate is actual rate obtained from field test data. Location: Depth Sieve Size #4 #8 #10 #40 #80 #200 . Percent Moisture: Soil Description: Grain Size Analysis Kure Dunes - Phase II Kure Beach, North Carolina Job No. 204-92 Lot #25 24-48" 99.9 37.3 2.0 0.8 4.5 Lot #28 0-36" Percent Passing, BY Weight 96.8 " 95.8 94.5 63.0 8.5 2.0 Brown/Light Gray Fine to Mediumu SAND 13.0 Black Fine to Medium SAND With Organics Lot #28 36-48" 99.2 63.8 4.4 0.9 21.2 Brown Fine to Medivan SAND Site Evaluation Kure Dimes - Phase II ' Kure Beach. North Carolina Job No. 204-92 October 12, 1992 -> Location Depth Description Lot #25 0-24" Tan/Brown/Gray Fine to Medium SAND 24-48" Brown/Light Gray Fine to Median SAND Groundwater was encountered at 38" below ground surface. Lot #28 _.__ 0-36" Black Fine to Medium SAND with Organics 36-48" Brown Fine to Medium SAND Groundwater was encountered at 48" below ground surface. _ a a K� Spotters I \ /Court I I Lot 23 Lot 24 Iot 25ot 26 Lot 27 Lot 28 i\ [] Denotes location of our testing and investigation ENOINFCRI A Kure Dunes - Phase II v - . Top 24. "Z Al _ � Ems _ 2u.0 =l p• o E k ' 3(o D.I#S Z2.Zo -HOht Rpx _ Wln - s 1rt zu zz-sa o. tix •Z _ ¢3 ELF I J. ;:;p 2Z.21`7-=, O. IZ rno ZZ20 —r—_. IToR 3Z }� 6 = laUi zo.Zo IID L_IL6 ZZ TITO EznT l23 28 �}u7 -ram 24 25Z(e ..:- — CH_IYPE A4 IZ• F7 N� Z4': - - n_ lJNV Ysol"j-14.65 :� .\�. - - - - • I .C, - HENRY VON OESEN AND ASSOCIATES CONSULTING ENGINEERS AND PLANNERS 805 NORTH THIRD ST. DRAWER 2087 �•��_=`_ WILMINGTON, NORTH CAROLINA 28402 �Ik�=-- Oi�1'�dSi1FJ�'2 SEE�tTTZ� u.s. E ku2F T��NFs ' P1iPsr_ _ .�_u__ - EXS�ISTr m5 SOIL CLASSIFICATION REPORT = -- JOB NAME Ll-ucrz vUNrS JOB NO. �OCAT I ON jfA Jt( LTy 0 K oarz (1704 DATE It /1 ';b /Q 2 FIELD OBSERVATION BY P2 OFFICE CLASSIFICATION BY TYPE OF TEST OR SAMPLING TO P (f1a00nJ C) r Ljr-V Z 7 Y Depth Boring No. From To (See footnotes) Soil Description Type (I) Color (2) Grada- ttion (3) Comp- action (4) Compre- ssible (5) Odor (6) Water Content (7) Foreign Content (8) Remar Oy 2". pup '&NAM (1)rzD Lmc; 54*jr? We_ VIZY V a loY s/2 I . SSu Co2" (D2" -12" I to eh/t IoY2/4/1 IoYe/5/t I I I i S,m. PGFRF 22" 85" toYa/2/I T -Y_ 1 SM I )J L W TTTA. ylL_f U S- (go c2 Q V. is, GTO-W U 0 W iMr- or— S Ury µ4--G 9�' u I (i) Sand, silt, clay, loam, muck, gravel, cemented material, peat, humus, lumpy content, gumbo, marl; shell rock, coquina, hardpan or combinations of above - (2) Color: Indicate each change (3) Gradation: Fine, medium, coarse or any combination _ (4) .Compaction: Loose, firm, dense, well compacted y (5) ompL re s ble: Compare with sand, clay, organic material, spongey (6) Odor. Smell each change in strata (7) Water Content: Very dry, dry, slightly moist, very moist, saturated, dripping wet (8) Foreign Content: Scattered or dense pebbles, wood chips, saw dust, limbs, twigs, roots, insects, shells (color), -lumps, clods :..,:.Note: Is surface erosion noticeable? - _.... . What pitch slopes (longitudinal. and transverse). are stable in area. OWNER: KURE BEACH I I I I 11 I,l 1 lj l k'I 6" x 8" R DUCER t:q 8-1 CH GV 1 _ SSMH-1, STA 0 37.20 II RIM = 23.50, 5. 6' LT - INV = 17.70 CONNECT PRO OSED CURBING TO STING C SING l r` I I J 11 f II lj I, I 32 28 24 20 16 12 8 V// PROPOSED STORM MANHOLE RIM = 23.00 INV - 18.03 (S) PI STA = 2+20.10 0'59'56" = 0'59'56" Dc = 0'59'56" Into 0 T = 50.00 0.r o PI ST = 0+63.70 5 R= 5735.51 M Ic = 1'50'55" 51 LF - 24" RCP L = 100.00 U) Do = 1*50,560 1.0 %, INV = 17.541 I Dc = 1'50'56" PROPOSED CATCH BASIN T = 00 5 Q WITH INLET PROTECTION RD CL STA 2+96.78, 19.32 LT R = 3 98.97 114 - 24" RCP T/G = 23.98 L= 9 99 00.3x INV= 20.38 7 LF - 24" RCP PROPOSED MANHOLE 00.3 9" I RD CL STA 1+77.44, 19.65 LT N T/G = 24.00 D 29 LF - 18" R P PROP D CATCH BASIN = INV 19.17� A 00.3 . WITH ET PROTECTION 1 0.45, 12.00 LT jSTA 8-INCH 90' B D T/G 3.28 STA 0+88 99 INV = 1 .40 0 21.34 T _.. w 126 L.F. 8_� 00.47. 8-INCH 45' 1 PROPO ED CATCH BA N STA 1+49.96 13 - 45' BEND WITH I LET PROTECTIO 16.65 RT 1 STA 0+88.99 RD CI TA 1+38.60, 1 .70 RT 14.95 LT T/G = 23.15 INV = 9.60 PROPOSED CATCH BASIN WITH INLET PROTECTION 8-INCH 5' BEND CL STA 99.94, 19.92 RT STA 1+3 .17 T/G = 23.10 I 26.08 RT INV = 19.49 ; 8-IN^H 0' BEND 8-INCH 45' BEND STA 1+3 .67 STA 0+99.95 I 33.47 RT 25.98 RT ( Q 8" x 8" TEE STA 0+99.26 30.70 RT GV 37 '_F - 15" RCP 4 0.3 % o I'+ z n ai O ; ' 37 LF - 18" RCP 0 0.3 % IPROPOSED CATCH BASIN WITH INLET PROTECTION RD CL STA 3+35.42, 19.32 RT T/G = 24.21 INV 20.49 29 LF - 15" RCP 00.3 % _ F. PVC ®� 233 38 s - KUR UNES [5\NE i w w FIRE YDRANT, 6" GV WATER SERA E 8" 8" TEE 8" x " TEE & SEWER SE VICE STA 3+47.59 STA. +64.92 (TYP.) 18.3 RT C. H E CAP = 26.30 2 - 8-INCH GV SSMH 3, STA 5+47.92 24" RCP PROP SED CATCH BASIN RIM = 24.6E, 5.37' LT 0 0.83 % WITH I LET PROTECTION INV = 15.65 RD CL STA 3+34.48, 12.0 RT a TIG = 24.85 -+ INV = 0.58 r STA 3 16.10 KURE DUNES LANE _ B STA 0 00 ANCHOR WAY N SSMH-2, STA 3+14.90 + RIM = 24.44, .61' LT Jo INV = 16.58 O 5 '15"E S79 582.38ft '1 411, �1 ~l Nib ..... 1I { PI STA = 6+25.74 Ic = 9'14'41" Do = 19'05'55" Dc = 1911`17" T = 24.26 R = 300.00 L = 48.41 wH POINT IN ROAD 6 STA +76.07 CL ELEV = 26.57 1+ 55 FT TRANSIT L 85 so v $ 260 L.F. w w ~ EXSSMH-1, STA 8 7.20--� n RIM = 24.44, 4.28' LT INV = 14.00 (FRO SSMH-3) 11 11 EXISTING INV = 11. 5 + (NOTE, EXISTING R ELEV + + IS 23.66 RIM MUS BE RAISED 0.62 FT) C NNECT TO EXISTING 8-INCH TERMAIN _ 8 INCH GV rg'52' 5" N70 2'00'W 40.0 It 190.0Oft t31.ts� "W N87'05 STA = 8+35.84 IPI Ic 17-34'45" Do = 1T43'03 Dc = 17'4723" -`-T=-,OAA- -_ R = 323.37 L = 99.21 W n RECHAF;E TRENCH Go/ SEE DE (AILS ON SHEET C-5 In 'a / z� ZONE -I PROPOSED CATCi BASIN (SEE DETAIL SHEET C-5) WITH INLET PROTECTION to RD CL STA 8+1345. 13.84 LT T/G = 24.03 INV = 21.00 INV = 22.00 (IN% OUT) 24 LF - 15" RCP 0.83 % NOTE: ALL STORMWATER RUNOFF IN EXCESS OF THE 10-YR, 24-HR STORM SHALL RUN ALONG THE CURB INTO THE DRAINAGE SYSTEM IN PHASE II WHICH WILL DIRECT THE STORMWATER TO THE WET POND IN PHASE III. VPROPOSED CATCH BASIN W n-I INLET PROTECTION Re CL Sl-A 8+20.27, 13.84 RT T, G = 23.93 1111 21.20 INrLUDEf1 IN PREVIOUSLY ITTE.' Ph 11 CALCULATIONS 36 32 n rn ;CD VPI SA=7+0 ri < 'a + ;M VPI E = 26.80 Cq :N o N N CURV4 LEN = 100.00 GooIt ' II ;W E ISTING GROUND SURFACE a ,a F w SMH-3 TA 5+4T 92 W w 28 i-1 I STA 0+37.20 � > RIM = 24.44. 2. 1 LT Him 25 EX SMH-1, S A 8+07.20 w 4, 4.28 LT _ = 23.50, 5.56' LT IM = 24. 0.59% 2.2 ` _. - --- 24 -0 9' 15" F Cp O 18" RCP 5" RCP (6 to - ,q WATER I - n N 20 w p 0 N 8" PVC WATER MAIN . M II 278 L.F. 8 PVC 0.4% _. a a. w o_ � a INV= 17. 0 INV = 1 233 L.F. B' PVC 0 0.4% 16 m M VPI STA 1+22 .58 26o ,. VPI EL = 23.34 CURVE L N = 150.)0 INV 15.65 N N I I 04 04 I I I N 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 12 ASSOCIATES KURE BEACH NEW HANOVER CO. NORTH CAROLINA P.O. BOX 22 KURE BEACH, N.C. 28449 (910) 458-4046 PROJECT: PHASE IV KURE DUNES W WK Engineers DICKSON Planners Surveyors 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910) 762- 4200 Raleigh, NC Asheville, NC Columbia, SC Charlotte, NC Atlanta, GA Hickory, NC DRAWN BY: DED CHECKED BY: DIED DATE: 4/28/97 SCALE: 1 "=40' REVISIONS NO, DATE DESCRIPTION BY 1 4/28/97 ISSUED FOR NCDWQ PERMIT ONLY MNH 2 9/15/97 REVISIONS PER NCDWQ MNH 3 12/23/97ISSUED FOR KURE BEACH MNH APPROVAL ONLY 4 1/19/98 REVISIONS PER KURE BEACH MNH ENGINEER'S COMMENTS 5 5/7/98 CHANGED LAYOUT TO SINGLE MNH FAMILY, MODIFIED SEWER & CHANGED 30" RCP TO 24" RCP SHEET TITLE KURE DUNES LANE PLAN/PROFILE PROJECT NO. 9611 SHEET NO. C11=11112 R:\9611\9430\RCP01012.DWG 1 +00 OWNER: PROPOSED STORM DRAINAGE SEE SHEET C-2 I 8" x 8" TEE ' W SCALES: z 1" =40' HOR Q J 1" =4' VIER z 0 32 pAi 24 20 II q J V) a CL 0 O m m PROPOSED STORM DRAINAGE SEE SHEET C-2 169 S.Y. CLASS B RIPRAP INVERT = 17.04 ANCHOR WAY s M M SSM STA 1+55.44 5.71 RT 8-INCH 45' BEND RIM = 25.71 STA 0+27.72 INV = 21.00 18.23 RT 8-INCH 45' BEND STA 0+20.96 24.96 RT I INCH BEND STA 0+20.0.95 5 31.59 RT 1-INCH BACKFLOW PREVENTER ZURN/WILKINS MODEL NO. 975XL W/ ENCLOSURE MANUFACTURED BY BIRCHFIELD ENTERPRISES, INC. MODEL NO. A-30S N I W TOP OF CATCH BASIN = 18.15 2" CONTROL PIPE ORIFICE INVERT = 17.00 OUTLET PIPE INVERT = 16.10 46 LF 15" RCP 56 S.Y. RIPARP PROP ED STORM MANHOL RD CL TA 3+36.60, 141.1 LT RIM = 2.50 INV = 1 .06 60AR150 LF - 24" RCP O 0.3% INV PROPOSED STOR RD CL STA 4+92.2 F SSMH-5, STA 4+00.294.35 RTRIM 23.02 INV 17.75 20 L.F. 8" DIP1.33% WATER SERVICE & SEWER SERVICE (TYP•) ,6a �F HIGH POINT IN 5 STA 6 RD CL ELE ELEV 5 V = 1-INCH WA R METER CIRCULAR Ic = 28'25'37" Do 22*19'36: Dc = 22'28'14 T R = 256.62 L = 127.32 M� L 86 LF 24" RCP \ O 0.3% PROP ED STORM MANHOLE RD CL S 4+08.28, 8.89 RT RIM = 22.09 INV = 15.66 PROPOSED STOR MANHOLE RD CL STA 3+22. 1, 8.42 RT RIM = 23.83 INV = 15.46 FIRE HYDR NT, 6" GV 8" x 6" TE STA. 2+38. C. HOSE CAP = 27.86 VPI 1SIA = Z+Mt) VPI JEL = 27.00 CURIVE LEN=1300.00 20 r.F. 8" O 1. O 0.379. PROPOSED STORM MANHOLE PROPOSED STORM MANHOLE RIM = 20.75 +Y.t 1to9.5 - I RIM = 18.00 / 1 } ; INV = 15.93 Rlt,i 5- INV =`14J9 { w` \ \ PROPOSED STORM MANHOLE 4Nttp i 0i FJU r y 140 LF 15" RCP RIM = 18.50 ^..�-�h;� e�.ll_DIN-.,,,,y���yr� INV = 15.03 t r ,1 59 LF 15" RCP 00.3% r' iR.I -+8 w '•" IttiV t, t - 4r' ',IINY. ROPOSED CATCH BASIN ^ !LINE I YNE / / WITH INLET PROTECTION is f ,1 } / ✓ jj 2 nr? rF:t I. 0, / ( R� MnW' i H. P`' o� RD CL STA 5+43.47 N 701 FO T/G10. 5 LT i 1 P`'a,rrifr'i011p!`.11'H.FI",4N I ' k'r.•`\ / - ,ti' 61_R 1 INV = 162 6.12 \___, % MANHOLE `'1 ��� I } �� ��. i`ll i'' �.P.y•, ! b„ r '•�� elkt� 1-14: 17.78 LT - - 20 L.F. 8" DIP F / 8 LF 15" RCP O 0.3% 20.55 = 15.51 O 0.4% � I N :�� ` _ __ � `�'• ,, CONNECT TO EXISTING CATCH BASIN 2� u�, INVERT = 14.76 _ 1_F Ph71 t t �,�„<,., iE�'' '`i� IN" aJ 1- r 41 L.F. 8" OVC �( V TL - IN .(� 11 a SANI tt 94 le ;e`tlec, 132 L. 8" VG 0 2.46% tN J 1 CLEAN n F P VjE1 C.'.;; ( rr I�0 r ,i 131 LF 18" RCP I ! I! ! "� I f l,FdDcR yr .!IINr. INV. O 0.3% SSMH-6, STA 5+32.95 > G!_4 AN �F 1.17 RT it IrSE JrlrR ', .Fd 8-INCH 11. 5' BEND RIM = 19.72 (AI R ,g't•'Fa, I I I I / 610i< / STA 4+62.1 INV = 14.50 + NC 5 % 'F� I / / , 14c' / 20.68 RT U I 15ti?P 55.. =, F a. 22 LF 18" RCP 8-INCH 11.25' BEND O 0.3% STA 4+13.26 19.05 RT PROPOSED CATCH BASIN WITH INLET PROTECTION I RCULAR RDGCL STTAG2+43.34, 10.�5 RT_ J 0 = 2918 28" INV 16.05 CONNECT TO EXISTING END OF ANCHOR WAY 'p a = 18'43'39" LENGTH EQUALS APPROX. 20 FEET r D = 18'48'43" CONNECT TO EXISTING 8-INCH WATERMAIN T = 80.00 8-INCH GV a,rt pr, R 305.94 t.a.6. 165 x ap L 156.50 02' '40"W 140. 1t NOTE: WATER MAIN TO BE DUCTILE IRON PIPE FROM STA. 4+07 TO STA. 5+50. It 7 32 28 M,I 20 INV = 17.75 "r 8 pVC i R P 16' 16 211 CL A 0+00 ANCHOR WAY = 4" RCP CL A 3+14. 3 KURE DUNES LANE 56 L.F 8" PVC 1.33% ELEV 22.66 INV = 14.50 LO 20 L.F. B" DIP O 0.47 N 41 LF. 8" PVC 40 0.4% 12 12 INV OUT 14.26 IIIV = 12.7 II VPI STA = 5+00 ra II J VPI EL 19.90 n w CURVE LEN = 120.00 ro ¢i LO II _m II 8 8 rn w WW 4 Ui 2+00 Id N N 4+00 N I VA. 1111 8+00 4 KURE BEACH ASSOCIATES KURE BEACH NEW HANOVER CO. NORTH CAROLINA P.O. BOX 22 KURE BEACH, N.C. 28449 (910) 458-4046 PROJECT: PHASE IV KURE DUNES WK Engineers DICKSON Planners Surveyors 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910) 762-4200 Raleigh, NC Asheville, NC Columbia, SC Charlotte, NC Atlanta, GA Hickory, NC DRAWN BY: DIED CHECKED BY: DED DATE: 4/28/97 SCALE: 1 "=40' REVISIONS NO. DATE DESCRIPTION BY 1 4/28/97 ISSUED FOR NCDWQ PERMIT ONLY MNH 2 9/15/97 REVISIONS PER NCDWQ MNH 3 12/23/97ISSUED FOR KURE BEACH MNH APPROVAL ONLY 4 1/19/98 REVISIONS PER KURE BEACH MNH ENGINEER'S COMMENTS 5 5/7/98 CHANGED LAYOUT TO SINGLE MNH FAMILY, REVISED SEWER, AND ADDED 1-INCH BACKFLOW PREVENTER & 1-INCH WATER METER SHEET TITLE ANCHOR WAY PLAN/PROFILE PROJECT NO. 9611 SHEET NO. C-3 R:\9611\9430\RCP01012.DWG 1 +00 1 +00 3+00 I 6+00 OWNER: KURE BEACH -- VPI STA 3+15.7 VPI EL = 27.83 36 36 CURVE L N = 75.0 HI H POINT F EXISTING PAVEMENT STk 3+10. E EV 27.63 32 32 END OF EXISTING PAVEMENT STA 3+37.79. a EX iSTING SU FACE ELEV 27.24 m a 28 28 1.46 0 ---....ea w _ CL STA 1+2 .19 KURE. DUNES LANE _ CL STA 4+94.47 SANDMAN DRIVE 24 24 E V 23.51 Co n + ao N to N Cq 1':+ a?N" J H J 20 20 W J D 0- w D > Y 16 16 12 12 o n 8 N N N j 8 ff 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 KURE BEACH NEW HANOVER CO. NORTH CAROLINA P.O. BOX 22 KURE BEACH, N.C. 28449 (910) 458-4046 PROJECT: PHASE IV KURE DUNES W WK Engineers OICKSON Planners Surveyors 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910) 762-4200 Raleigh, NC Asheville, NC Columbia, SC Charlotte, NC Atlanta, GA Hickory, NC DRAWN BY: DIED CHECKED BY: DED DATE: 4/28/97 SCALE: 1 REVISIONS NO. DATE DESCRIPTION BY 1 4/28/97 ISSUED FOR NCDWQ PERMIT ONLY MNH 2 9/15/97 REVISIONS PER NCDWQ MNH 3 12/23/97ISSUED FOR KURE BEACH MNH APPROVAL ONLY 4 1/19/98 REVISIONS PER KURE BEACH MNH ENGINEERS COMMENTS 5 5/7/98 CHANGED LAYOUT TO SINGLE MNH FAMILY SHEET TITLE ANCHOR WAY EXTENSION PLAN/PROFILE W/ POND DIMENSIONS PROJECT NO. 9611 SHEET NO. C-4 R:\9611\9430\RCP01012.DWG __T_ ___ __. - A�I II II II ---J U SILT BARRIER FENCE SECTION A - A N.T.S. PLAN VIEW La NOTES: La=LENGTH OF APRON d=DEPTH OF RIPRAP 12" TREVIRA SPUNBOUND TYPE S-1115 OR APPROVED EQUAL FILTER FABRIC SECTION A -A N.T.S. 1-INCH STORAGE ELEV. = 18.15 3:1 SIDESLOPE TOP OF BANK ELEV 22.0 CAST IRON FRAME AND GRATE A 1-INCH STORAGE ELEV 18.30 LEVEL ACROSS TOP ELEV 17.25 I- -L 10 FT _ _ NORMAL POOL ELEV 17.00 NORMAL POOL ELEV 17.00 _ _ _ _ _ _ ELEV 16.25 3:1 SIDESLOPE 6:1 SIDESLOPE 3:1 SIDESLOPE BEGINS AT ELEV 16.25 AND ENDS AT ELEV 17.25 FORE BAY BERM ELEV 17.00 TT M LEV 12 50 POND BOTTOM BO 0 E Q NORMAL POOL EL. 17.00 00 15" RCP BOTTOM ELEV 11.00 Q IE 16.10 OUTLET CONTROL PIPE 2" PVC PIPE TYPICAL POND X-SECTION CASTIRON FRAME & COVER ,: a.... N.T.S. PRECASE BOX (24" X 24") ZE' a COVER SHALL BE FLUSH WITH NOTES: GROUT 6" EXTENDED BASE 1. CATCH BASIN BASE SHALL BE PRECAST CONCRETE RINGS MAY BE USED TO BRING FRAME AND COVER UP TO GRADE CONCRETE AND CONFORM TO ASTM C-478. (NOT -TO -EXCEED 12" IN HEIGHT) 2. OUTLET CONTROL PIPE SHALL BE 2 INCH SHC-40 PVC PIPE W/ 45' BEND 3. FRAME & GRATE SHALL BE DEWEY BROS. NO. CH-BN-3A OUTLET CONTROL DETAIL NOTES: N.T.S. 1.MANHOLES SHALL BE PRECAST CONCRETE AND CONFORM TO ASTM C-478. 2.MANHOLE FRAME AND COVER SHALL BE DEWEY BROS. MH-RCR-2001 OR APPROVED EQUAL. e 3.MANHOLE STEPS SHALL BE POLYPROPYLENE ENCAPSULATED STEEL NOT LESS THAN 10-INCHES WIDE 50 FT R/W CONFORMING TO ASTM C-478. 4.PIPE CONNECTIONS SHALL BE RESILIENT _ CONNECTORS CONFORMING TO ASTM C-923. 11' 2' 24' 2' 11 1/2" PER FT 1/4" PER FT 1/4" PER FT 1/2' PER FT SLOPES= 3:1 SLOPES= 3:1 MODIFIED VALLEY CURB 6" ABC & 1-1/2" 1-2 TYPICAL ROAD N.T.S. GROUND SEE PROFILE FOR RIM ELEV. h 2'-8" TO 5'-4" 1'-4" TO 4'-0" VARIES SEE PROFILE 1'-4" TO 5'-4" 6" 6" PRECAST MANHOLE N.T.S. W Z (n J NOTE: FRAME AND GRATE TO BE DEWEY BROS. CH-BN-3A GRILL CATCH BASIN N.T.S. ELEV 22.0 ELEV 17.25 6:1 SIDESLOPE BEGINS AT ELEV 16.25 AND ENDS AT ELEV 17.25 8" 2, 8" 2 -0" MIN. CONTINUOUS CONCRETE COPING 8" 3/4" CEMENT PLASTER TYP. ALL SIDES INLET OUTLET PIPE PIPE ' ..�'.. . "�..'I'. SECTION "A -A" w ef a i � 2.5 PT MIN. 2.0 FT 5.0 FT 2.5 FT VARIES AS DIRECTED BY ENGINEER (10' MAX.) TOP STRAND MIN. #10 GUAGE 12" PERFORATED CAP STAY WIRES MIN. 4.0 FT 1.25 FT FILTER FABRIC WRAP W/ 2' LAP, MIRAFI 140N OR EQUAL #12-1/2 GUAGE RECHARGE TRENCH 3.0 FT + -� LINE WIRES MIN. #12-1/2 GUAGE 12" FABRICATED ALUMINUM TEE N0. 57 WASHED STONE INV ELEV 22.00 12" PERFORATED CORRUGATED ALLUMINUM 0.75 FT PIPE W/ 12" FILTER FABRIC OVERLAP /x SECURE W/ STRAPS j \// 12" FABRICATED ALUMINUM ELBOW /j BOTTOM STRAND MIN. #10 GUAGE\� /\ 10.0 FT /\\ �\ 12" ALUM PIPE T/G ELEV = 24.03 INV 22.00 NOTE: DEEPEST ELEVATION OF TRENCH SHALL RECHARGE TRENCH BE ELEVATION 21.50. PERFOREATED END CAP %\ //\ SEE DETAIL THIS SHEET N.T.S. STEEL OR WOOD POST 7 � �\ � � INV 22.00 NOTES: 1. WIRE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES W/12" STAY SPACING 2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND SHALL BE FASTENED ADEQUATELY TO THE WIRE AS DIRECTED BY THE ENGINEER 3. STEEL POST SHALL BE 5' 0" IN HEIGHT AND BE OF SELF FASTENER ANGLE STEEL TYPE 4, WOOD POSTS SHALL BE A MINIMUM OF 6' IN HEIGHT AND 3" OR MORE IN DIAMETER WIRE FABRIC SHALL BE FASTENED TO WOODEN POST WITH NOT LESS THAN 09 WIRE STAPLES 1-1/2" LONG GROUND H to 0 a 0 0 3 N.T.S. RIC BY PLAN �1 N.T.S. C.. INV 21.00 SECTION A -A e 12" x 12" OPENNING W/ NO. 57 STONE 3/4" DIA. HOLES TYPICAL FULL CIRCLE 8 - 1/2" DIA. HOLES TO MATCH FLANGE ON 12" CAP. USE 3/8" SS BOLTS W/ WASHERS EACH LOCATION D D a �0000 a 00000 \0000/ 0 000, 2" TYP PERFORATED END CAP N.T.S. OWNER: KURE BEACF ASSOCIATES KURE BEACH NEW HANOVER CO. NORTH CAROLINA 637 FORT FISHER BLVD. N. NORTH KURE BEACH, N.C. 28449 (910) 458- 4046 PROJECT: PHASE IV w WK Engineers DICKSON Planners Surveyors 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910) 762-4200 Raleigh, NC Asheville, NC Columbia, SC Charlotte, NC Atlanta, GA Hickory, NC DRAWN BY: DED CHECKED BY: DED DATE: 4/28/97 SCALE. 1 "=40' REVISIONS NO. DATE DESCRIPTION BY 1 4/28/97 ISSUED FOR NCDWQ PERMIT ONLY MNH 2 9/15/97 REVISIONS PER NCDWQ MNH 3 11/3/97 REVISED RECHARGE TRENCH MNH 4 12/23/97ISSUED FOR KURE BEACH MNH APPROVAL 5 5/11/98 REVISED POND X-SECTION ELEVATIONS MNH SHEET TITLE MISCELLANEOUS DETAILS PROJECT NO. 9611 SHEET NO. C-5 R:\9611\9430\PRELPLAN.DWG EXIST. GROUN[. ENNIS CLEANOUT COVER (EEVB001) TOP OF COVER SHALL BE FLUSH WITH GROUND CLEANOUT: 6" X 4' COMBINATION WYE, 4' DIA SCH. 40 STACK, 4' CLEANOUT FITTINGS AND THREADED PVC PLUG. 6" SDR-35 TO SCHEDULE 40 ADAPTER 6" DIA. SCH. 40 PVC PIPE O 1/4" PER FT. 8" - 45 DEG. BEND (SDR-35) — 8" X 6' WYE (SDR-35) NOTE WHERE POSSIBLE, PROVIDE DUAL SEWER SERVICE WHICH INCLUDES 6-INCH PVC SEWER LATERAL, 6" x 4' DOUBLE COMBINATION W/ 4-INCH PLUGS AND 4-INCH PVC CLEANOUT AND PLUG INCLUDING CLEANOUT CASTING BEDDED IN STONE. USE 4-INCH SEWER LATERAL AND FITTINGS FOR A SINGLE SERVICE. SEWER SERVICE LATERAL N.T.S. PLAN BENDS 50' 6" MIN. 2" - 3" COARSE AGGREGATE 12' MIN. TEMPORARY CONSTRUCTION ENTRANCE f EXIT N.T.S. - OR AS DIRECTED Q, WATER METER (YOKE WHEN REQ'D) WATER METER BOX CURB STOP 3/4" CORPORATION STOP POLYETHYLENE SERVICE SEE SPECS. 03 d d � d 1 , d A. 03 d" . e. 4 . SECTION X-X BENDS & TEES 2-2 1/2" HOSE NOZZLES 4 1/2" PUMPER CONNECTION FACE TO CENTER LINE OF STREET OR PARKING LOT WORD "WATER" ON COVER C.I. VALVE BOX GATE VALVE MIN. SIZE 6" TURN RIGHT TO OPEN— 1" CC X CTS - COMP. CORP. STOP NOTE: 1—DUCTILE IRON PIPE TAP INTO B" LINE REQUIRED ON ALL HYDRANT BRANCH LINES 1 5 DUAL WATER SERVICE N.T.S. NOTE: PROVIDE DOUBLE SERVICE WHERE DIRECTED INCLUDING 1-INCH CORPORATION STOP WITH TAPPING SADDLE, 1-INCH YOKE, 2-3/4" CURB STOPS AND TWO METER BOXES. WATER SERVICE DETAIL N.T.S. D � 4 4 n 4 � d 4 1. 7 V is � n 4 X� PLAN TEES 11 ) v to v U p T 1 0 4 2'- 0" STANDARD CURB SECTION TYPE "D" N.T.S. SIZE a BEN B 9A 450 BE BS A 22 A1/2 BEBNDS A TEES B CPLUGSD 6" 16" 10" 9" 10" 6" 8" 10" 12" 10" 21" 8' 22" 13" 12" 13" 8" 10" 13" 16" 112" 29" 10" 26" 17" 14' 17' 10" 13" 16 20 14" 36" 12' 29" 21" 16" 21" 11" 16" 18" 24" 16" 41" 14' 35" 24" 19" 24" 12" 20" 22" 27" 18" 48" 16" 38" 27" 21" 27" 12" 24" 24" 30" 20" 54" NOTE: Based on 1.5 x working pressure of 100 PSI plus AWWA Water Hammer. All bearing surfaces to be carried to undisturbed ground. PLAN & ELEVATION PLUGS STANDARD THRUST BLOCK FOR WATER MAINS N.T.S. HYDRANT /-3/4" GALVANIZED RODS 0 FULL 18' JOINT 6" PIPE 0 r MAIN O HYDRANT TO SECTION OR HYDRANT LUGS HAVE BREAK TIE BOLTS RETAINER CLAMP REMOVABLE BARREL JOINT RESTRAINT BURY LINE FLUSH WITH HYDRANT TO 1ST FULL JOINT OF PIPE I FINISH GRADE W a I >- Or m DRAIN ONCRETE PAD 15"X15"X6" FIRE HYDRANT N.T.S. CASTING 4" BASE 15" JOINT RESTRAINT HYDRANT TO MAIN TEE 3/4" TIE BOLTS HYDRANT JOINT N.T.S. 2" ASPHALT 8" BRICKS CASTING SHALL BE: DEWEY BROS. NO, MH—VA-1 2"0 2" x ' MINIMUM AVERAGE WEIGHT c RING 96 LBS. m .p COVER 40 LBS. CONCRETE b Z 12 .: --1 12 .: 11" TYPICAL DETAIL MONUMENT CASTING AND BASE N.T.S. SEEDING MIXTURE RATE (LB/ACRE) PENSACOLA BAHIAGRASS 50 SERICEA LESPEDEZA 30 COMMON BERMUDAGRASS 10 GERMAN MILLET 10 SEEDING DATES: APRIL 1 - JULY 15 APPLY 4000 LB/ACRE GRAIN STRAW FOR MULCH APPLY 3000 LB/ACRE GROUND AGRICULTURE LIMESTONE APPLY 500 LB ACRE 10-10-10 FERTILIZER BERMUDAGRASS MAY BE REPLACED WITH 5 LB/ACRE CENTIPEDEGRASS PERMANENT SEEDING WINTER AND EARLY SPRING SEEDING MIXTURE RATE (LB/ACRE) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE) 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. SEEDING DATES: DEC 1 - APRIL 15 APPLY 4000 LB/ACRE GRAIN STRAW FOR MULCH APPLY 2000 LB/ACRE GROUND AGRICULTURE LIMESTONE APPLY 750 LB ACRE 10-10-10 FERTILIZER w W z a SUMMER FALL SEEDING MIXTURE RATE (LB/ACRE) SEEDING MIXTURE RATE (LB/ACRE) GERMAN MILLET 40 RYE (GRAIN) 120 SEEDING DATES: APRIL 15 - AUG 15 SEEDING DATES: DEC 1 - APRIL 15 APPLY 4000 LB/ACRE GRAIN STRAW FOR MULCH APPLY 4000 LB/ACRE GRAIN STRAW FOR MULCH APPLY 2000 LB/ACRE GROUND AGRICULTURE LIMESTONE APPLY 2000 LB/ACRE GROUND AGRICULTURE LIMESTONE APPLY 750 LB/ACRE 10-10-10 FERTILIZER APPLY 1000 LB/ACRE 1D-10-10 FERTILIZER TEMPORARY SEEDING OWNER: KURE BEACH ASSOCIATES KURE BEACH NEW HANOVER CO. NORTH CAROLINA 637 FORT FISHER AVENUE NORTH KURE BEACH, N.C. 28409 (910) 458- 4046 PROJECT: PHASE IV KURE DUNES W WK Engineers DICKSON Planners Surveyors 3177 WRIGHTSVILLE AVENUE WILMINGTON, NC 28403 (910) 762-4200 Raleigh, NC Asheville, NC Columbia, SC Charlotte, NC Atlanta, GA Hickory, NC DRAWN BY: DIED CHECKED BY: DIED DATE: 2/18/97 SCALE: 1 "=40' REVISIONS NO. DATE DESCRIPTION BY 1 10/9/96 FINAL DESIGN - NOT RELEASED HSR FOR CONSTRUCTION 2 3/14/97 PER NCDWQ COMMENTS MNH 3 12/23/97 ISSUED FOR KURE BEACH MNH APPROVAL 4 1/19/98 REVISIONS PER KURE BEACH MNH ENGINEER'S COMMENTS 5 5/8/98 ADDED DUAL WATER SERVICE MNH SHEET TITLE MISCELLANEOUS DETAILS PROJECT NO. 9611 SHEET NO. C111111111111115A R:\9611\9430\PRELPLAN.DWG SHEET TITLE MISCELLANEOUS DETAILS PROJECT NO. 9611 SHEET NO. C111111111111115A R:\9611\9430\PRELPLAN.DWG