Loading...
HomeMy WebLinkAboutSW8100306_APPROVED PLANS_20100401STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 1 b 03010 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2.p I p OL}yi YYYYMMDD PEND ER PROGRES Erosion & Sediment Control and Water Quality Plan Plans and Profiles LOCATED IN BURGAW TOWNSHIP PENDER COUNTY, NORTH CAROLINA DATE.' MARCH 2O10 SCALE: 1 "= 50' OWNER / DEVELOPER: Pender Progress Corporation P.O. Box 959 Burgaw, NC 28425 PROPOSED DISTURBANCE (THIS PLAN) 6.65 Acres (Total) LEGEND ❑ IRON IN EXIST. CONC. MON. �-.- -- EXISTING SANITARY CE CONSTRUCTION ENTRANCE , ,^,u (TYPICAL) SEWER & MANHOLE - - - EXIS77NG WATERLINE Ef P. = EXISTING IRON PIPE LIMITS OF DISTURBANCE (PROPOSED) E.I.R. = EXISTING IRON REBAR EC.M. = EXISTING CONCRETE MONUMENT SF - X - SILT FENCE (NEW) I.S. = IRON SET (TYPICAL) H W/V = WATER VALVE W/M = WATER METER o F/H = FIRE HYDRANT OP OUTLET PROTECTION (TYPICAL) jx P/P = POWER POLE C. P. = COMPUTED POINT 0\H = OVERHEAD POWER LINE INV. = INVERT STORM WATER FLOW G\W = GUY WIRE C\O = SEWER CLEAN OUT +49.0 INDICATES SPOT ELEVATION NOTE: SEE SHEET 6 FOR CONSTRUCTION DETAILS GENERAL NOTES: 1. This map is not for conveyance, recordation, or soles. 2. No portion of this property is located within a 100 year flood hazard area according to Flood Insurance Rate Map #3720322800J effective date February 16, 2007 3. This property is zoned Pender County Incorporated 4. Water service to be Town of Burgow (public). 5. Sewer service to be Town of Burgow (public). 6. Surveyed November 2009 7. Area computed by coordinate method. 8. All distances are horizontal. 9. For reference see as noted. 10. No utilities have been marked. Only Utilities found are as shown. WATER SYSTEM PENDER PROGRESS INDUSTRIAL PARK PIPE SUMMARY, 8' PVC WATER MAIN 945 LF 8' DIP WATER MAIN 170 LF TOTAL WATER 1,115 LF 8' WATER MAIN TOTAL PLANNED EROSION AND SEDIMENT CONTROL PRACTICES - 1. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE Practice 6.06 CE Shall be installed at the entrances of the proposed project in and from Worth Beverage Drive as shown. Drainage is away from the rood and sedimentation will be controlled with atownstreom practices. During wet weather it may be necessary to wash truck tires at these locations. 2. LAND GRADING Practice 6.02 Grading should be limited to areas as shown on the Plans. Cut and fill slopes shall be 3'.1 or flatter except where specifically indicated. Care shall be taken during land grading activities not to damage existing trees that are not required to be removed. 3, SEDIMENT FENCE Practice 6.62 Sediment fencing should be installed as shown on the Plan, first, to delineate and protect low areas, and around any X-X-X temporary stockpile areas as necessary to prevent any graded interior areas from eroding onto adjacent lands or roadway, or into inlets. 4. OUTLET STABILIZATION Practice 6.41 OP Riprop aprons will be located at the downstream end of all discharge pipes to prevent scour. 5. CONSTRUCTION ROAD STABILIZATION Practice 6.80 Upon reaching final grade and after utilities have been installed, roadways and parking areas are to be stabilized by placing sub -base course of approved 8" ABC stone, as shown in the typical cross-section detail on the Pion, to reduce erosion and dust during the remainder of building construction. 6. SEDIMENT BASIN SB Practice 6,61 O The Sediment Basins are to be constructed (see Construction Schedule) as the primary Practice to prevent sediment from leaving the site. Detailed design and spillway configurations are specified in the details as shown on this Plan and the Narrative. The PVC outlet is to be blocked during sedimentation function (or not installed) until entire watershed is permanently stabilized and pond is converted to permanent stormwater management detention / retention function. The Contractor may choose to install the oriface during sedimentation function, ONLY if he screens the end 57 stone, and protects the inlet with # Additional temporary measures such as temporary ditches and diversions may be utilized prior to storm sewer construction '1 to ensure disturbed area runoff is directed to sediment basins. i / Q 4 r _ / 5 I � / I i y/ kl gyp° ,o"Do }ra O�C�ry�, ryya Rary�i ��hryti b O 0 0 moo. 0/ A sS FAPROJECT FOLDERS\12207-Pender Progress Project\Engineering\12207-bose.dwg Layout (Cover-1) 95, , �S NOTE WELL, ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 21 CALENDAR DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. ANY SLOPES TO BE STABILIZED AFTER 21 CM.ENDAR DAYS. DETAILS SHOWN ARE TYPICAL CF INSTALLADONS REQUIRE)by BRUNSWK COUNTY. THIS SHEET DOES NOT PURPORT TO SHOW ALL REOARED LONSTRUOTCN DETAILS, BUT RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPOIWLE FOR ADHERING TO ALL COUNTY AND STATE CODES AND CONSTRUCTION STANDARM xfarmed a vte. No warrant No eotech set tesitn has been Y 1.9 9 P re mods tot eith ity le subgrade, and be th.A por.iby reWirod replacement with table material shall De the reeponsibillty of the contractor. M 2 "SANITARY SEWER SYSTEM - PENDER PROGRESS IND_USTRIA_L PARK PI_P_E and MANHOLE SUMMARY, -------------- MH RIM INVERT ➢IA LENGTH SLOPE MH RIM INVERT #- EL IN FT % # EL EL -EL- El 52,92 42.90 8 271.00 0.42 2 53,20 44.03 2 53,20 44.13 8 396.00 0.41 3 53,50 45. 77 3 53.50 45.87 8 231.00 0, 42 4 53,50 46.83 TOTAL SEWER STFL' 8' SEWER MAIN TOTAL CONSTRUCTION SCHEDULE SUMMARY: STEP 1-Installation of Construction Entrance, Sediment Fence, Sediment Basin, along with grading and stabilization of lots and road. See Construction Schedule on Sheet 6 for additional information. 50' 0e 50' 100' SCALE 1N FEET: I "= 50' NOTE WELL: 1. All storm water runoff from built upon areas (i.e. impervious surfaces & roof drainage) to be directed to the storm sewer collection system i.e. storm inlets or and foreba b swales ( P Ys) Y overland flow,odditional grading, or landscaping inlets. "NOTE: --- THIS PLAN TO BE UTILIZED AND REVIEWED ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN, / NOTES FOR WATER SUPPLY AND INSTALLATION 1. ALL WATER MAINS TO BE SDR21 PVC PIPE WITH PUSH ON JOINTS, SEE SPECIFICATIONS FOR ADDITIONAL MATERIALS REQUIRED. 2. 3' MINIMUM COVER ON ALL WATER MAINS. 3. LOCATE ALL METER SETTINGS 5' FROM LOT LINE UNLESS OTERWISE NOTED, 4. ALL COMMERCIAL WATER SERVICE LINES TO TO BE 2" UNLESS OTHERWISE NOTED. 5. FIRE HYDRANTS SHALL BE INSTALLED IN ACCORDANCE WITH TOWN DETAIL. 6. BLOW OFF ASSEMBLIES SHALL BE IN ACCORDANCE WITH TOWN DETAIL. 7. ALL BENDS AND TEES SHALL BE ADEQUATELY BLOCKED (SEE TOWN DETAIL), 8. ALL CONNECTIONS TO EXISTING WATER LINE AND BORES TO BE DONE ACCORDING TO TOWN OF BURGAW SPECIFICATIONS. 9. ALL MAINS SHALL BE ADEQUATELY FLUSHED, PRESSURE TESTED, AND DISINFECTED IN ACCORDACE WITH THE SPECIFICATIONS. 10, ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE ENGINEER, THE TOWN OF BURGAW AND THE N.C. DEPT. OF ENVIRONMENTAL HEALTH AND NATURAL RESOURCES. A PRE -CONSTRUCTION CONFERENCE IS REQUIRED. CONTACT: DOUG RISEDEN TOWN OF BURGAW (910) 259-2901. 11, ALL WATER SYSTEM WORK SHALL BE DONE TO THE TOWN OF BURGAW DETAILS AND SPECIFICATIONS. DOTE WELL: ROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION NO SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE OF 'ORTH CAROLINA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, ATEST EDITION. PRACTICE NUMBERS REFER TO THIS MANUAL. be SITE �I :ATION MAP NOT TO SCALE / MORE GENERAL NOTES: CURVE RADIUS ARC L. CHORD L. CHORD BEARING TANGENT Cl 35.00' 41.10' 38.78' S 3621'55" E 23.29' 1. ALL CONSTRUCTION TO CONFORM TO THE TOWN OF BURGAW STANDARDS C2 1 66.00' 1 218.72' 1 IJI.51- S 8220'28" w 1 763.85- APPLICABLE STATE & LOCAL CODES. 2. CONTRACTOR TO COORDINATE ANY REQUIRED TRAFFIC CONTROL WITH NCDOT AND PENDER COUNTY . CONTRACTOR RESPONSIBLE FOR ANY ADDITIONAL REQUIRED PERMITS. 3. CARE SHALL BE TAKEN DURING FINAL GRADING TO ENSURE POSITIVE DRAINAGE TO RECEIVING STRUCTURES. ALL STORM WATER RUNOFF FROM BUILT UPON AREAS (i.e. IMPERVIOUS SURFACES and ROOF DRAINAGE) TO BE DIRECTED TO STORM SEWER COLLECTION SYSTEM (i.e. STORM INLETS 2 OR PONDS) BY SWALES, OVERLAND FLOW, ADDITIONAL GRADING, OR LANDSCAPING INLETS. ' 4. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ANY RELOCATIONS, RE -ALIGNMENTS, DISCONNECTIONS OR CONNECTIONS OF EXISTING UTILITIES WITH APPLICABLE AUTHORITIES. 5. CLEARING AND GRUBBING OF SITE TO INCLUDE REMOVAL OF EXISTING CURB, ASPHALT, INLETS, AND ANY OTHER STRUCTURES INCLUDING TREES, STUMPS AND DEBRIS EXISTING ON SITE. TREES NOT REQUIRED TO BE CLEARED FOR CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE DIRECTED. 6. MINIMUM SEPARATION SHALL BE MAINTAINED AS FOLLOWS: a. HORIZONTAL CLEARANCE OF 10 FEET BETWEEN SANITARY SEWER AND WATER MAINS. i b. WHERE VERTICAL CLEARANCE IS LESS THAN 18" BETWEEN SANITARY N SEWER AND WATER OR WHERE SEWER LINE CROSSES ABOVE WATER °To>4 MAIN, BOTH PIPES SHALL BE DUCTILE IRON PIPE FOR A MINIMUM s P OF 10' EITHER SIDE OF CROSSING. \ S2aSo. c. WHERE VERTICAL CLEARANCE IS LESS THAN 24" BETWEEN SANITARY SEWER AND STORM DRAIN, SANITARY SEWER SHALL BE DUCTILE IRON ' PIPE FOR A MINIMUM OF 10' EITHER SIDE OF CROSSING. ' \d. WHERE VERTICAL CLEARANCE IS LESS THAN 72" BETWEEN WATER � a \ \ \ _, MAIN AND STORM DRAIN, WATER MAIN SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10' EITHER SIDE OF CROSSING. \ \ \ \ \ I 7. SEE DETAIL SHEETS FOR TYPICAL UTILITIES HOOKUPS. 8. ALL SANITARY SEWER MAINS TO BE 8" UNLESS OTHERWISE INDICATED. \ \ 9. ALL WATER MAINS TO BE 8" UNLESS OTHERWISE INDICATED. 5�' 10. TWO VALVES ARE REQUIRED AT "T" INTERSECTIONS AND ONE VALVE ON THE WATER LINE TO FIRE HYDRANTS. I 11. A BLOW -OFF VALVE 15 REQUIRED AT THE TERMINUS OF ALL "DEAD END" WATER LINES. STANDARD NOTES: \\ \ \ 1. Information concerning underground utilities was obtained from available records. It shall be the responsibility of the I Contractor to determine the exact elevations and locations of all existing utilities at all crossings prior to commencing trench excavation. If actual clearances are less than indicated on Plan, the Contractor shall contact the Design Engineer before proceeding with construction. Any condition discovered or existing that would necessitate / a modification of these plans shall be brought to the attention of the Design Engineer before proceeding with construction. 2. NO CONSTRUCTION IS TO BEGIN BEFORE LOCATION OF EXISTING O� UTILITIES HAS BEEN DETERMINED. CALL NC ONE -CALL" AT LEAST 48 HOURS BEFORE COMMENCING CONSTRUCTION. QP % O J. All trees which are not required to be cleared for constuction shall be preserved wherever possible unless O otherwise directed. 4J 4. Contractor shall adjust all manholes, valve and curb boxes to the final grade upon completion of oil construction. Any boxes h°^ IO damaged or otherwise disturbed by the Contractor shall be O-n repaired at the expense of the Contractor. -n j.5. The Contractor is responsible for controlling dust and erosion during construction at his expense. Parking areas sholl be CD� watered to control dust when ordered by the Engineer. �\ C G O 6. No geotechnicol testing has been performed on site. No �„O'10 h tK /TV warranty is made for suitability of subgrade, and undercut and any required replacement with suitable material shall be the INDEX TO DRAWINGS SHEET No. DESCRIPTION DRAWING No- 1 OF 6 COVER SHEET and GENERAL NOTES 12207-1 2 OF 6 SITE PLAN 12207-2 3 OF 6 PROFILES and DETAILS 12207-3 4 OF 6 PROFILES and DETAILS 12207-4 5 OF 6 POND i NOTES & DETAILS 12207-5 6 OF 6 EROSION CONTROL/STORM WATER NOTES & DETAILS 72207-6 10 3 O �� PO P01x UJ I� responsibility of the contractor. Q� (3lb aQ 7h D Contractor responsible for geotechnicol testing as necessary. m7. Extreme care shall be taken to ensure minimum separations at all utility crossings. Q OpQ��O. 8. Contractor to ensure that pavement is placed so as to drain positively to the curb outlets and catch basins. All roof QG drain downspouts to be directed to the storm sewer system. QP 9. No encumbrances in R/W except as shown. !/J(,J/ All} I 10. This plan is for site grading, roadwork, Ap� di& bing activities and erosion contr I 11. Affected Non -Municipal Utili es d with plans and other pertinent i Wutni�T�D coordinate appropriate schedulin%*Qh"* IIM11 um this should include AT&T and loc�q�o elcgmpa �� ``) 12. Contractor and Builder are responsible for coordinating Finished Floor Elevation of all buildings with the Owner and the Architect. I I -- 13. Building layout and dar v� D _ ff --- BENCHMARK LOCATIONS AND ELEVATIONS LOCATION: ELEVATION 1 TEMPORARY BENCHMARK (MAGNETIC NAIL) CUL-DE-SAC 53.30 REV. NO. REVISIONS DATE Copirlghi 0. Honovv Deers, Sera,.,, P.A., All dghb r os .. Rep odoalm or use of the contents of this document, or addlNons or~kcs to Into dxument, in end. or Part, without written consent of the Land Sermys or Engineer, Is Prohbfted. Defy copies from the slglnW of this document marked with Ne origlnd signature and art ha& sect of Ine surveys s Engbeer, suet be considered to be ,aiM and we caoiee. - HANOVER DESIGN SERVICES, P.A. 6+w p+ 79 LAND SURVEYORS, ENGINEERS & LAND PLANNERS 1123 FLORAL PARKWAY WILMINGTON, N.C. 28403 �j CDs0 PHONE: (910) 343-8002 dh�fsA® hdsilm.com f LICENSE fk C-0597 Cover Sheet and General Notes ii'i1 0,9 2010 Date: PENDER PROGRESS _ 3-,3-10INDUSTRIAL PARK - Seale: 7 = 50 LOCATED IN BURGAW TOWNSHIP PENDER COUNTY, NORTH CAROLINA Drown: DBB TRH- -n r wW fyy, Mpn9 y ,$ xl*� T^�1sWu V i3 g' PIZIt rnL 1 ' n..'rl i Checked DSH Project No: 12207-1 UI e Sheet Na: 1O1 f: r LEGEND 0 IRON IN EXIST. CONC. MON. - EXISTING SANITARY C+E CONSTRUCTION ENTRANCE (TYPICAL) ' 0°0, SEWER & MANHOLE — EXISTING WATERLINE E.I.P. = EXISTING IRON PIPE ® LIMITS OF DISTURBANCE (PROPOSED) EI R = EXISTING IRON REPAIR ECM = EXISTING CONCRETE MONUMENT SF X — SILT FENCE (NEW) !-S. = IRON SET (TYPICAL) r W/V - WATER VALVE W/M - WATER METER OP OUTLET PROTECTION (TYPICAL) U-F/H = FIRE HYDRANT jX P/P = POWER POLE +49.0 INDICATES SPOT ELEVATION C.P. = COMPUTED POINT O\H = OVERHEAD POWER LINE C\O = SEWER CLEAN OUT INV. = INVERT G\W = GUY WIRE STORM WATER FLOW NOTE: SEE SHEET 6 FOR CONSTRUCTION DETAILS C Uj DW z 0 sell Q.000 Cn W W 1< Ljj LU L_L_ PROPOSED 1 8" G.V. 0 1 8" TEE 1-2" BLO W -OFF - ASSEMBLY ASSEMBLY CULVERT C1 — PROPOSED 48LF OF 18" RCP IE(IN) 51.1 IE(OUT) 51.0 (,NOTE.- THIS PLAN 0 T BE UTILIZED IZED AND REVIEWED ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. C SF 0 OF ("—NOTE WELL - ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 21 CALENDAR DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. ANY SLOPES TO BE STABILIZED AFTER 21 CALENDAR DAYS. DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REWIRED BY PONDER COUNTY. THIS SHEET DOES NOT PURPORT TO SHOW ALL REWIRED CONSTRUCTION DETAILS, BUT RATHER SERVES AS A WIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL COUNTY AND STATE CODES AND CONSTRUCTION STANDARDS No geot.ohMmi testlng has been performed an site. No warranty Is made for suitability of subgrade, and undercut and any required re,laaernmt with suitable material shall be the responsibility of the contract'. 0) In ED 61' LIMITS OF w DISTURBANCE o Ln M N - SF / l Lou 'SF R.O.w. LIMITS OF DISTURBANCE J z �� w� I, z am I' SF o r N Qp ' 7 o / o it OVERHEAD POWER LINE 0 5 0o/' 0 i I is is 1 lO let 0), N O Dor- to o6 �b rn CD 2 LSF �^' SF - ".PROPOSED 3 _-. _ 8" PVC PROPOSED WATER LINE 8" SEWER MAIN BENDS &FITTINGS SEE SHEETS 3 & 4 FOR AS NECESSARY. PROFILE INFORMATION SEE PROFILE SHEET R NFORM O EROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE OF NORTH CAROLINA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, ATEST EDITION, PRACTICE NUMBERS REFER TO THIS MANUAL. 6' 6' 1 "PER FT SCOpF 3 1 5 *' 3" 59,5A ASPHALT GRASSED SWALE e+NOTE WELL: PAVEMENT THICKNESS AND SUBGRADE REQUIREMENTS MAYBE INCREASED PER RECOMMENDA77ON OF GEOTECHNICAL CONSULTANT 1 CONTRACTOR RESPONSIBLE FOR COMPACTION TESTING. 70' 6' 6' 12 1 PER FT. AS SHOWN C z 12- w w .« g" ABC WELL COMPACTED c1 BASE COURSE SUB -SOIL GRASSED SWALE 14' WIDE SWALE STREET SECTION PER PLAN ACCESS ROAD NOT TO SCALE GUTTER FLOW BEHIND DOWN SLOPE !BLAND PROPOSED DISTURBANCE (THIS PLAN) 7.0' 30' 30' (TYPICAL) _ 6 W 18' 6.65 Acres (Total) SF --- " 5 o�.() _ ,RON GRADE AS SHOWN 0.5' Curbing - ���' ' L \F (TYPICAL) 4"GONG. SPACE CL 7.5" of 59. SA MPONEt1C -- , Zg1 g1' 10 _ I SF SIDEWALK I (TYPICAL) � ASPHALT SF DISTURBANCE 9LIMITS OF 6GRASSED 40,8 DIS URBANCE SF - TYPE 'A" 8 ABC BASE COURSE ISLAND AREA CURB NOTE WEu TYPICAL PARKING BAY SECTION PAVEMENT THICKAESS MD SUSIGRAX REQUIREMENTS MAYBE INCREASED PER RECOMMENOA770M OF GEOTECHNICAL l \ NON -TRUCK TRAFFIC AREA 0 cowstxTmT NOT TO SCALE CONTRACTOR RESPONSIBLE FOR COMPAC71ON TESTING 528 g0' WILLIAM MCLEAN SF N o46 STOCKPILE BOOK 764 PAGE 203 O i f AREA TAX PARCEL No, 3228-88-1880-0000 S �l E: SEE BUILDING PL _ - y NOTE; SIDE SLOPES NOT TO EXCEED 3:1 U ILIITIES HOOKUPS. SEE SHEET 6 FOR SEEDING SPECIFICATIONS AND STABILIZATION PRACTICES. LIMITS OF DISTURBANCE 53 \ LIMITS OF i 55 DISTURBANCE _ I;I CLEANOUT FRAME 1, COVER Co II II 6� STANDARD CLEANOUT N.T.S. o o5F o G� a to SF � I PROPOSED o / 6.5' CONCRETE �\ SIDEWALK 11 III O V" + 1++0 I o + -, FUTURE \% 5.2+ + DEVELOPMENT + 200n 20000, • PROPERTY OWNER UD ' PENDER PROGRESS CORP. v PROPOSED I \/ 6.5' CONCRETE !- `♦ SIDEWALK O CD CD 7 1 V 0-) f- o (" 00 Lli U v� 0) in�o Q W zo g D<LC) P o I j 0 NOTE WELL — i�l + 55 CONTRACTOR TO (n W Q \ 56 00 EXERCISE CARE U Z�}- WHEN FINE GRADING :. 0; ANDARAMPHTO CONFORM L X O 0 [� + 25b' 3.9 + TO ADA STANDARDS. ; w N _ I'� J O T CO W O vi + PROPOSED 6.5' CONCRETEftf m hII— � pv�SIDEWALK �—//LLJ J LL O Q LLW + + NOTE: SEE BUILDING PLANS x z LIJ m 4 FOR UTILITIES HOOKUPS.I W U In to (BUILDING PLANS BY OTHERS) `RPZ/BFP MAY BE LOCATED I ! INSIDE BUILDINGCL (PROPOSED) i\ PLACE METERS AT R!W LIFE -- TRUCK TRAFFIC U X 0 Be DUCTILEEIRON AREA, SEE DETAIL SF ~ Q 6" SEWER m FIRE SERVICE LINE '�, FOR PAVEMENT NOTE WELL:I- SERVICE -OUTS + & 1" WATER LINE SECTION. ALL ROOF DRAINAGE - X ! X AS NECESSARY; - , BENDS &FITTINGS AST. NECESSARY. (TYPICAL) 6" SEWER SERVICE TO BE DIRECTED INTO - - L� 55 (TYPICAL) CLEAN -OUTS AS NECESSARY n STORM SWALE SYSTEM. 230'` + + + 200' + 200' + 30.1 ' �SS.St L�r1 AC 535+ ',.. +55.0 56.5+ ,0 ,. !. 'N 56 T'FIREMAIN LIMITS OF C n _C; PREVEL°oa DISTURBANCE B' FIRE MAIN CULVERT C3 BACKFLOW PREVENITOR V I 55 PROP. 87LF OF 18" RCP W O p .IE(IN) 51 2 w 56 ED E(OUT) 51.0 ' m ur)55 y3 -"I �' 8R DUPOP�STILE IRON FIRE SERVICE LINE WU my IP ") r `� 5` PROPOSED WATER (FUTURE CONNECTION) ww BENDS & FITTINGS AS 5Q METER RPP N Y ,,{y- IP 1" WATER LINE O METER LLw NECESSARY. - _ ' FP a +' (FUTURE CONNECTION) BFP BFP mm (TYPICAL) O*V9 , L 2.0+ 52 1-2"RBLOWVOFF -; +53 ;_. i ASSEMBLY 1 O _,ES S'R1W - CULVCKI CZ IP PROPOSED 48LF OF 18"-.RCP PROPOSED E(IN) 5 FIRE HYDRANT IE(OUT) 51.0 ASSEMBLY 1-8" TEE PROPOSED \ CULVERTC4 1-8" TEE PROPERTY OWNER` (USE CLASS IVPIPE) C & F EXCHANGE ' PROPOSED 48LF OF 18 RCP 0 LOT 3 LIMITS OF IOUT 51 DISTURBANCE IE(OUT) 51.5 STANDARD EXPANSION JOINT SIDEWALK AT 30' INTERVALS(TYP) DETAIL NTS �P _Li i P� 1P _tiA-L �Q A. Q T-ti 1" SCORE(TYP) :.0 e ,t A i t$i gNgNN \i � P 4"THICK 5' or 8' WIDE r 1 6" ABC 8' BRICK TYPICAL DETAIL MONUMENT CASTING and BASE 41 .63' N 19'59'31" E 660.06' N 19 59'31" E PROPOSED SF i (PROPOSED) 8 PVC PROPOSED WATER LINE 1 o TRUCK TRAFFIC 8° SEWER MAIN - BENDS &FITTINGS — AREA, SEE DETAIL SEE SHEET 3 FOR AS NECESSARY. FOR PAVEMENT PROFILE INFORMATION SECTION. (TYPICAL) 30, 0' 30' 60' SCALE IN FEET, 1"= 30' SITE PLAN PENDER PROGRESS INDUSTRIAL PARK LOCATED IN BURGAW TOWNSHIP NOTE WELL: 1. All storm water runoff from built upon areas (i.e. impervious surfaces & roof drainage) to be directed to the storm sewer collection system (i.e. storm inlets or pond forebays) by swales, overland flow,additional grading, or landscaping inlets. REV. NO. REVISIONS DATE Cols"t 0. Honovr Design SAIMceA P.A. All r4fits reserved. Ri moducfion or use of the Contents of this document, on addlf ans or deletions to this dacumenf, h whole — poH, Mthmt written consent of the Land Surveyor or Engineer, is prohibited. Only copies tram me m&d of this Cocemenk marked with the m9lnal signature and arigdal seal of the Surveyor w- Engineer, snail be sonedwed to be wrd and bua cases. 4" WYE I � O BRICK \ MORTAR EXTENSION OR STACK FINISHED GRADE CASTING PLAN VIEW FLANGE N.T.s. CASTINGe e CONCRETCOLLAR MORTAR OVER MNGE STANDARD BRICK MORTAR :.� NOTE, IS WAUATION RFDIIIRfD WHEN VALVE BOXES ANO CIFMONS ARE WATER VALVE BOX CITENSION UMMD IN PRESp1T W UK PAVED IRFAS. PRIOR TO SETTING AND CASTING CENTERED MR VALVE NUT. ctsTlrs, xLw INSTALIATKK1i Wu REQUIRE95S COMPACTION OF 9nvER CLEWatP CASTING CEMERED MR STACK, WKnU_ W 6' BrTS. CLEANOUT OR VALVE IN PAVED AREA N.T.S. WHERE REVERSE CROWN IS REOUIRED GUTTER SHALL 1" R SLOPE AWAY AS SHOWN • MOST APPLICATIONS 1 1/4" R IN PARKING LOT \ STANDARD CURB SECTION .� "AA II TITS s0T-01 k Dale: 1SY. ?�1Q 3-3-10 PENDER COUNTY, NORTH CAROLINA OWNER: PENDER PROGRESS CORPORATION P.O. Box 959 Burgaw, NC 28425 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 1123 FLORAL PARKWAY WILM WILMINGTON, N.C. 28403 PHONE: (910) 343-8002 LICENSE # C-0597 Scale: i"= 30' Drawn: 088 Cnecked: DSH Project No: 12207-2 Sheet No: 2 Of: 6 I F:\PROJECT FOLDERS\12207-Pender Progress Project\Engineering\l2207- base. dwg Layout (Site-2) In /�,� PROP SED NOTE: SEE BUILDING PLANS \\ 6.5' C NCRETE FOR UTILITIES HOOKUPS., (PROPOSED) F n p SIDEWALK (BUILDING PLANS BY OTHERS ) TRUCK TRAFFIC NET1G _ PROPOSED MPG �I U q 8" DUCTILE IRON AREA, SEE DETAIL a 6" SEWER (6 FIRE SERVICE LINE r FOR PAVEMENT NOTE WELL: 40�8 O ii�'.� CE + & 1" WATER LINE SECTION. R.O.W. _._ CLEAN -OUTS BENDS & FITTINGS AS 6" SEWER ALL ROOF DRAINAGE ! w NECESSARY NECESSARY. (TYPICAL) SERVICE (TYPICAL) CLEAN -ours TO BE DIRECTED INTO 55 AS NECESSARY STORM SWALE SYSTEM. ' X/ ///� In Lq -RPZIBPP MAY BE LO TIED 'a LQ In j to vT ;° INSIDE BUILDING 1O iO A�, aaj + + + + PLACE METERS AT RNIl LINE + + 200' + 30.1 ' O O-.� °ate- +55.0 + 56,5+ B-FIREMAIN LLJ LLJ 46 ���zzx,,,///���rrr///��� BACKFLOW A�45 9 e"FlRE MAIN r I I .�N' PREVENTOR OVERHEAD -- ---=A9'� 5 CULVERT C3 9AOKFLTO tt "m PROP. 87LF PREVENroR ,�J/� POWER INE5� 5A OF 18" RCP ` �S 56 54 1' I `-, PROPOSED OOl IE(IN) 51.2 w 8" DUCTILE IRON d 5 3 �I 5 OUT E 5 5 53 ( ) 51.0 wo 3 A FIRE SERVICE LINE PROPOSE 4+00 5A R LLs O 5 5 (FUTURE CONNECTION) PROPOSED WATER rc o BENDS & FITTINGS AS i 8" G V METER ;ny OP rT LO PROPOSED WATER M,M 1-8" G.V. 1-8' TEE i 2 4 I' eFP �i 1" WATER LINE MET �p NECESSARY. 1-2° BLOW OFF 1-2' BLOW -OFF 5 1�, +, (FUTURE CONNECTION) BFP m1 (TYPICAL) ASSEMBLY ASSEMBLY If-t� 53Do 52 I­L� O'b;•+ 39 0' 00 0+30 0 60 0 90 1+20 1+50 1+80 2 10 2 40 2 70 3 00 34130 3 60 3 90 4 20 4 50 4 80 5 10 5+40 5 70 6 00 6 30 6 60 6 90 7 20 39 Eastern Ditch Profile Access Road 48 0 00 0 30 0 60 0 90 1+20 1+50 1+80 2 10 210 2 70 J00 3 3C 0'-6" try MORTAR COLLAR 1 � 0'-8" 0,-6„ 7 1/2" 0'-6" A A B B � O O 2'-7 1/2" 0'-8" 0 6" 2'-7 1 /2" C'-6" 0'-6" 11-61, PLAN SANITARY SEWER MANHOLE NTS RA: TYPE III BARRICADE 1 REFLECTIVED(T EnECTOR01(TYP NTS NOTE: DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REQUIRED BY THE TOWN OF BURGAW. I CONSTRUCTION DETAILS BUT THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL APPLICABLE TOWN AND STATE CODES AND CONSTRUCTION STANDARDS. FAPROJECT FOLDERS\12207-Pender Progress Project\Engineering\12207-base.dwg Layout (Profiles-3) i 2" ASPHALT TYPE "1" EXISTING PAVEMENT / N.C.D.O.T. SPEC. r- EXISTING PAVEMENT 6" COMPACTED MARL BASE (D.O.T. REQUIRES 8") DITCH LINE DITCH LINE PIPE NOTES: • BACKFILL TO BE INSTALLED IN 6" LIFTS MAXIMUM AND COMPACTED TO A MINIMUM DENSITY OF 5% AS D TERMINED BY THE MODIFIED A,A.S.H.T.O, STANDARD METHOD T-99 • CUT - BACKCOMPTO B PREPARED AFTER TRENCH BACKFILLING STANDARD SHOWING METHOD MAKING PAVEMENT REPAIRS WHERE PIPE INSTALLED NTS GENERAL NOTES 1. NO EXCAVATED MAT A P MATERIAL SHALL BE LACED IN ANY STREAM, DITCH R DRAINAGE -WAY. D C O D GE WAY. 2. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES BEFORE ANY CONSTRUCTION BEGINS. 3. THE CONTRACTOR IS RESPONSIBLE FOR TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES WHILE CONSTRUCTION IS IN PROGRESS. 4. THE CONTRACTOR IS RESPONSIBLE FOR STABILIZATION OF ALL DISTURBED AREAS. 5. THE CONTRACTOR IS RESPONSIBLE FOR LAYDOWN & STOCKPILE AREAS (TO ARRANGE AND INSURE COMPLIANCE WITH ALL LOCAL AND STATE REGULATIONS). NOTE WELL: 1. All storm water runoff from built upon areas (i.e. impervious surfaces & roof drainage) to be directed to the storm sewer collection system 0,e. storm inlets or pond forebays) by swales, overland flow,additional grading, or landscaping inlets._ WATER SYSTEM PENDER PROGRESS INDUSTRIAL PARK PIPE SUMMARY! ------- - --------- ---------- S' PVC WATER MAIN 945 LF S' DIP WATER MAIN 170 LF TOTAL VATER______________________________ 1, 115 LF 8' WATER MAIN TOTAL SANITARY SEWER SYSTEM - PENDER PROGRESS INDUSTRIAL PARK PIPE and MANHOLE SUMMARY MH RIM INVERT DIA LENGTH SLOPE MH RIM INVERT # EL EL IN FT 7. # EL EL E1 52.92 42 90 8 271 00 0 42 2 53.20 44.03 2 53. 20 44. 13 8 396 00 0 41 3 53. 50 45. 77 3 53. 50 45, 87 8 231. 00 0. 42 4 53. 50 46. 83 TOTAL SEVER $ELF 8' SEWER MAIN TOTAL REV. NO. REVISIONS DATE CoPTNght 0, Hworer Design Services, P.A., AM rights reserved. Reproductlw or use or Me contents o/ this document, or oddltlws w doletlons to this docvment, k nhoh, e, port, without written consort o/ Me Lwd Surse or Engheer, Is Rrohlblted. Only cooks fmm the origind o/ this doarment, marked with the orlgkd algnoWre and o0gleal seal or the SurveJw.r er Engbeeer, shah be cwsldered to be wkf wd true copies V-0" 0'-0 3/4" MINIMUM AVERAGE WEIGHT 10 LBS. NOTE: CAST IRON EQUIVALENT TO DEWEY BROS. MH-ST-8 RAAAILJnI E_ 0-r= NITS cISTING GROUND COMPACTED BACKFILL TO 95% MODIFIED PROCTOR IF UNDER PAVEMENT m a it COMPACTED BACKFILL TO 90% MODIFIED PROCTOR SLOPE WALLS TO ANGLE OF REPOSE OF SOIL OR AS APPROVED BY THE ENGINEER 6" COMPACTED PIPE EMBEDMENT TO 90% MODIFIED PROCTOR � 8 8 COMPACTED GRANULAR MATERIAL STANDARD PIPE L-� TRENCH DETAIL NTS PIPE WIDTH +24" TRENCH BOTTOM STANDARD MANHOLE COVER PRECAST CONCRETE GRADE RINGS VARIES GROUT 12" MAX. MANHOLE STEPS AS SPECIFIED ECCENTRIC PRECAST CONE PRECAST MANHOLE PRECAST MANHOLE RING EXTENSION NTS GENERAL NOTES C LOCATION OF WHEELCHAIR RAMPS: L IN ACCORDANCE M1TH ME RATIFIED HOUSE BILL 1296, ALL STREET CURBS IN NORTH CAROLINA BEING CONSTRUCTED OR RECONSTUCTED FOR MAINTENANCE PROCEDURES, TRAFFIC OPERATIONS, REPAIR$, CORRECTION OF UTILITIES OR ALTERED FOR ANY REASON AFTER SEPTEMBER 1973 SHALL PROMM VMEELCHIR RAMPS FOR THE PHYSICALLY HANDICAPPED AT ALL INTERSECTIONS WHERE BOTH CURB AND GUTTER AND SIDEWALKS ARE PRONGED AND AT OTHER MAJOR POINTS OF PEDESTRIAN FLOW. 2. WHEELCHAIR RAMPS SHOULD BE LOCATED AS INDICATED IN DETAIL DRAWINGS, HOWEVER EXISTING LIGHT POLES, nRE HYDRANTS, DROP INLETS, ETC. MAY AFFECT PLACEMENT. II. CONSTRUCTION NOTES 1. NO SLOPE SHALL EXCEED 1'-1' (12:1) ON ME RAMP OR SIDEWALK. 2. IN NO CASE SHALL ME WDM OF WEELCHAIR RAMPS BE LESS THAN 40' (S-4'). WOMS MAY EXCEED 40- IF NECESSARY. 3. USE CLASS 'A' CONCRETE WM THE SURFACE HAYING A ROUGH, NON-SKID TYPE 'INI5R, 4. 1/2' EXPANSION JOINT WILL BE REQUIRED WERE ME CONCRETE WHEELCHAIR RAMP JOINS ANY RIGID PAVEMENT OR STRUCTURE. 5. CONSTRUCTION MEM00S SHALL CONFORM WM THOSE OF ME GOVERNING BODY WHICH HAS JURISDICTION OF THE PARMCULAL STREET. 111. ADDITIONAL NOTES: 1. THE INSIDE PEDESTRIAN CROSSWALK LINES SHALL BE ESTABLISHED BY BISECTING ME INTERSECTO1 RADI WHERE MARKED (SEE NOTE 6). 2. ME WHEELCHAIR RAMP SHALL BE LOCATED SO THAT THE BEGINNING OF ME WHEEL CHAIR RAMP WLL BE TWO FEET FROM THE INSIDE PEDESTRIAN CROSSWALK LINE. 3. ME WIDTH OF ME PEDESTRIAN CROSWAIX SHALL BE 10 FEET UNLESS A GREATER WIDTH IS REWIRED TO ACCOMMODATE ME PEDESTRIAN TRAFFIC. 4. STOP BARS SHALL BE USED WHERE IT IS IMPORTANT TO INDICATE THE POINT BEHIND MICH VEHICLES ARE REQUIRED TO STOP IN CObIPUANCE WM A TRAFFIC SIGNAL. STOP SIGN, OR OTHER LEGAL REQUIREMENTS, S. PARKING SHALL BE WMINAMI) A MINIMUM OF 20 FEET BACK OF PEDESTRIAN CROSSWALK, 6. ALL PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WM ME LATEST EDITION OF ME MANUAL OF UNIFORM TRAFRC CONTROL DEVICES PUSUSHED BY ME FEDERAL HIGHWAY ADMINISTRATION. THIS IS AVAILABLE FROM ME SUPERINTENDENT OF DOCUMENTS, Us GOVERNMENT PRINTING OFFICE, WASHINGTON. O.C. 2 02. IIL GUIDELINES FOR WHEELCHAIR RAMPS 1/2" EXPANSION JOINT 1/2" EXPANSION JOINT B STRIPMa F CURB 10'-0" 0 0 MIN EXCEED 12:1 PED-X-ING PLAN VIEW WHEELCHAIR RAMP GUIDELINES FOR WHEELCHAIR RAMPS AND DEPRESSED CURBS(B) NTS SIDEWALK 4'-0" 3'-4" 4"-0" SCORE VAR VAR VAR 2; 1 MAX RAM-NEK JOINT MAT'L OR APPROVED EQUAL (TYPICAL) J 2'-0„ MIN. 0 a \ rn w a > J a 5" MIN. A' w 0'-6 MIN. to TD. MANHOLE COVER, MANHOLE STEPS AS SPECIFIED PRECAST MANHOLE SECTION, A.S.T.M. C 478 0 -6 MIN. MONOLITHIC CONCRETE BASE, 48 J 3000 PSI CONCRETE CRUSHED STONE f 6" MIN. 6" MIN. PRECAST MANHOLE NTS PROFILES PENDER PROGRESSn9 INDUSTRIAL PARK 2010 3-3-90 Sods: 1"-- 3D' VER7.: ,"- 3" LOCATED IN BURGAW TOWNSHIP PENDER Ci7IlN Fx ,,, .NOR,f(H CAROLINA Drawn: ' DBS Checked: DSH Project No: 72207-3 HANOVER DESIGN SERVICES, P.A. 3 LAND SURVEYORS, ENG/NEERS & LAND PLANNERS 1123 FLORAL PARKWAY WLMINGTON, N,C. 28403 m.COm LICENSE C3597 Of.e��i� PHONE: � 910)4- 8002 30' 0' 30' 60' O oTPROPOSED 0 SCALE IN FEET: I"= JO' 1-8" G.V. Q W 1-8" TEE VAPoES 7�,'_INNNRI - - - - 1 2" BLOW -OFF o v ASSEMBLY - - EXISTING OVERHEAD WORTH BEVERAGE DRIVE o R.O.W. o � � j Uo n 8" PVC POWER WATER LINE LINE EX 3HP Ex OHP - - p W V 1 5-�.�--- -�---_. - --__ .__..-- ------ r - _../ --x5 y__ - -_ L�, EXISTING EX' Q S 70"00'29" E ,' 2816,40' PROPOSED F/H P/P 8 SEWER MAIN 24 Db' 8" SEWER MAIN k (/`'� s PROPERTY OWNER 30' UTILITY EASEMENT O 6 M.C. 45 PG. 46 C & F EXCHANGE LOT 3 _ EXISTING ,, SANITARY D WORTH- --BEVERAGE DRIVE - - - _- - - -- 1 LOC U ILITIE - - CONTR CTOR r ADJU T TION EXERCISE ME- AUT N. - - ALL --SE- TO FINA ER --MA GRAD HOLE RMS._. ..57 + 57 CON RACT FOFMULT/PLE 1 V 1 Y rYPlca o W (D DEP - AN ATIO OF ALLEXIS fNG ES 1 THE ARE PRIO TOTRU TION. EXISTINGGRAD Q V) 54 w - C NNECT 0-EXISTING ' MAIN L INA NOTE WELL: CULVERT MULTIP- ------- - --� MAIN - fN -- UTILITES SHO N - GRAPHICALLY- -- --- --- _- - T -- ° IN-P-RO- ILE: -0 IATIONS NOTED AS N:----3r'INC yam- - 4$ L Of'I8t RCP - 51 51AND MAINTAIN 36' C VER A D USE IP AT CROSSINGS WHEN REQUIRED, "- / _. BEGIN NEW --- - - ---- BENDS-& FITTING AS - _. _-- SEE--COER -SHET -NOT S. --- PROPOSED ._. PVC- 5" WATER .-... - -- INV. 51-.0(OUT- - -- - NECESSARY. 48 4 8 APPROXIMATE xistln9 rmit NOTE WELL: SEWER IPE SI ( ED 8" HROUG 12" ) - _- --__ -. -- BENDS FITTING & AS PROPOSED _ - LO ATION- - DEH Sera] - No. 06 2039 -- -- - - -- -SHALL E CLASS 150;-- OR18. ------- --- - - ---NECES ARY. 8"TE 8" TEE _ OF EXISTING CONFORMING T AWWA C900 NOTE WELL: 8" WATER MAI - - REQUIREMENTS. -CIFICAT - " C 900 VC OR DIP IS 0 BE ---- "-- _--"- CONTRACTOR - CONNECT TO E ISTING SEE_-SP ONS FO ADDITIONAL USED F R"ANY- SEWERSWITH A TO -RP D VERIFY- SEWS MANH LE #1 PIPE )S, CL-SSES-A D_SCHEDULES. - DEPTH REATE THAN 2' (TYPICAL). D 45 45 DE H AND (TYP ICA LOC TION-----_- _.II r _ - -- 2 1 LF f -8_'- 90Q 0 42 a -- -- -- -- - - - - -- -_._- -o ___ -._ - ___._ THESE MINIMU -SLO ES ARE: 42 00 NOTE LL• IT IS T CONTRACTOR'S 0.60% FOR "DIAM TER PI RE 3431.32 42 v RESPONSIBILETY TO ENSURE THAT HE 0,40% FOR DIAM ER PI RE -{ MINIMUM SEW R SLOPES SPECIFIED BY 0 28% FOR -1 "DIAME ER PI E _ -- 0+56 33 - STATER UL TIONS ARE -A HIEVE . -- 0 22% FOR 1 'DIAME ER PIF E ---- -- W p m W r r r ap r to MJ r M u] N M1 N M 39 0 00 0 30 0 60 0 90 1+20 1+50 1+80 2410 2N 40 2 70 3 00 310 3160 39 NOTES FOR WATER SUPPLY AND INSTALLATION i. ALL WATER MAINS TO BE SDR21 PVC PIPE WITH PUSH ON JOINTS. SEE SPECIFICATIONS FOR ADDITIONAL MATERIALS REQUIRED. 2. 3' MINIMUM COVER ON ALL WATER MAINS. 3. LOCATE ALL METER SETTINGS 5' FROM LOT LINE UNLESS OTERWISE NOTED. A, ALL COMMERCIAL WATER SERVICE LINES TO TO BE 2' UNLESS OTHERWISE NOTED, 5. FIRE HYDRANTS SHALL BE INSTALLED IN ACCORDANCE WITH TOWN DETAIL. 6. BLOW OFF ASSEMBLIES SHALL BE IN ACCORDANCE WITH TOWN DETAIL. 7. ALL BENDS AND TEES SHALL BE ADEQUATELY BLOCKED (SEE TOWN DETAIL). 8. ALL CONNECTIONS TO EXISTING WATER LINE AND BORES TO BE DONE ACCORDING TO TOWN OF BURGAW SPECIFICATIONS. 9. ALL MAINS SHALL BE ADEQUATELY FLUSHED, PRESSURE TESTED, AND DISINFECTED IN ACCORDACE WITH THE SPECIFICATIONS. 10, ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE ENGINEER, THE TOWN OF BURGAW AND THE N.C. DEPT. OF ENVIRONMENTAL HEALTH AND NATURAL RESOURCES. A PRE -CONSTRUCTION CONFERENCE IS REQUIRED. CONTACT: DOUG RISEDEN TOWN OF BURGAW (910) 259-2901. 11. ALL WATER SYSTEM WORK SHALL BE DONE TO THE TOWN OF BURGAW DETAILS AND SPECIFICATIONS, SINGLE METER BOX 1" LINE LIJ SINGLE SERVICE z J Z Q DOUBLE METER BOX 1" LINE USE FORD DBL-GULF BOXES DOUBLE SERVICE McDONALD U MODEL 3795-22, OR EQUIVALENT WITH SS STIFFENERS McDONALD MODEL 6133T PLAN VIEW EXISTING GRADE 1 PAVED AREA FINISHED GRADE' ASPHALT PER NCGOT SPECIFICATIONS 3'-0" MIN. METER BOX UNPAVED AREA PRECAST CONCRETE COLLAR FINISH GRADE .VE Box WIUD MARKED "RATER' GATE VALVE VALVE 3 DETAIL "Ts PLACE BRICK -PAVERS UNDER ALL CORNERS LINE BOTTOM W/ #57 CRUSHED STONE COUNTY STANDARD PLASTIC W/ METAL LID w z J r H w 0 a NOTE: SERVICE SADDLES ON PVC MAINS i- SHALL BE WIDE BAND I I- - I I11 BRASS BODY -SADDLE I -I McDONALD 3801 OR EQUIVALENT. NOTE: PE TUBING, SDR 9 ASTM D2737 STOP, 3/4" EL 4753 SERVICE (SIZE AS SPECIFIED) z STOP, MODEL WITH SS 2 OR FF g EQUIVALENT WITH SS STIFFENERS METER CORPORATION STOP McDONALD MODEL 6133T BOX McDONALD MODEL c0 4701-22 OR EQUIVALENT WITH SS STIFFENERS McDONALD MODEL 6133T III3/4" SERVICE ANGLE STOP: -III III I1 III- - - SERVICE STOP SHALL HAVE WATER THREADED FITTING FOR MAIN - - - CONNECTION TO COMPRESSION ADAPTER AND SHALL BE McDONALD MODEL 4604 NOTE: OR APPROVED EQUIVALENT, 3" SAND BED NO JOINT SHALL BE 30` ALL AROUND LINE INSTALLED BETWEEN THE MAIN SERVICE BEDDING TAP AND THE METER AS SPECIFIED STOP. SINGLE SERVICE SECTION VIEW TYPICAL WATER SERVICE CONNECTION N.T.S. FULL 18' JOINT 6" PIPE HYDRANT SEE THRUST BLOCK DETAIL FOR RODDING RODDING @a " 2- ' e TO MAIN TIE BOLTS HYDRANT LUGS RETAINER CLAMP JOINT RESTRAINT HYDRANT TO 1ST FULL JOINT OF PIPE SEE THRUST BLOCK HYDRANT DETAIL FOR NODDING w aO" " IWTIF I- OLTS JOINT RESTRAINT HYDRANT TO MAIN TEE GUIDELINES FOR HYDRANT JOINT RESTRAINT NTS - - C:)57 57 57 + PROPOSED CD+ PR DOSED _ GRADE _ Tn ..GRADE EXISTING GRADE 0-- -- -_ -- EXIS ING GADE- 54 - - 54 - - 54 N S G�L ART- FI N N It - iN EC SSARY. -- . ,. 51 r7 51 ENDS 51 __.. _-NECESS RY. �0- ---- / - - - II / - -- - PROPO 8"-TE ED- -- _. PRO _--- OSED 5 -_-- LF --- I P --- POSED -- PROP OF 8"- SED-5 1P WA. F - R 0'-8 17//4$ 0'-0 11/16" �0'-0 11/16" N V-2 1/4" V-7 1/4" o O'-ll 7/8" �q❑O❑ 0 0'-6 11 16' 000R O'-D 1/2" o'-0 1/8° BOX O'-0 1/8" PLAN 0'-0 3/4" 0'-6 11/16"DIA. < '/ \ 0'-0 1/2, 0_D-0 t/ I5000--c' '-D s/1s" o' o_', o o'_a 3/4" 0-0/2�U-U 1/2 SECTION „A -A" G'_10" 0'-6 1/2" DIA.1-6 1/4" GREY WVC 6HD CASTIRON OR EQUAL SECTION "A-A"HEAVY DUTY '-8 1/4" MINIMUM WEIGHTS 7 3/ 8 BOOX 140 LBS. EXTENSION -11 7/8 EXTENSION 40 LBS. VALVE BOX LID WATER VALVE CASTING NTS NITS NOTES: 1-DO NOT TAP MANHOLE AT JOINT. 2-BREAK OUT MINIMUM AMOUNT OF MANHOLE WALL TO ALLOW NEW PIPE TO ENTER. 3-CONCRETE TO BE BROKEN FROM INSIDE OF MANHOLE, IF POSSIBLE. 4-PLACE COLLAR AROUND NEW PIPE, COLLAR TO BE BUILT RESTING ON UNDISTURBED SOIL. 5-REPAIR CONCRETE WITH NON -SHRINK CEMENT. 6-SEE SD 14-11 FOR PRE -CAST MANHOLE DETAIL. 0'-4" 0'-4" -6" STANDARD TAPPING VIEW A DETAIL PRE -CAST NTS / C_ I M1sIN" G q Gril 6MC(SQ)CA SENDSD(SQ) PUN qT FIT PLAN AND ELEVATION SSr AN HOR PLAN PLUGS TEES 45- 100 8, m L I I - SECTION C-C D(SQ) BENDS AND TEES "orzi •u nSs, Twos ma Sobs .e K . M,ee, mu owm 45' VERTICAL BENDS eo" . a... 6" GATE VALVE SEE TOWN THRUST BLOCK CRUSHED BOX DETAIL FOR RODDING AND ROCK O DRAIN N 1' r 0 TEE OR CROSS THRUST j PLAN BLOCK R PAY LIMIT FOR HYDRANT INSTALLATIOIN HYDRANT COLOR AND VARIES TYPE AS SPECIFIED 1.0' PER THE TOWN (TYPICAL OF BURGAW be HYDRANT ov BARREL o VALVE CRUSHED z BOX ROCK PIPE BENDING DRAIN p AS SPECIFIED M GATE 11 VALVE I UNDISTURBED TEE CROSS EARTH (TYP.) ] WITH BLOCKING I SEE TOWN THRUST BLOCK DETAIL FOR ROODING CONCRETE THRUST CONCRETE BASE BLOCK 18"x18"x6" MIN. 20"x2O"x4' MIN. ELEVATION VALVE BLOCKING N.T.S. HYDRANT INSTALLATION NTS PIPE DIA. BE DS BENDS 2BENos TEES B A A B A A 0 S 8'5" 124" &PLUOS45'.VERT.A 8" 10 5 10" 3" 8" 5 126 12" 8' 9" 8 6" 8 12 84 12"14" 1.8 STANDARD THRUST BLOCKING N,T,S. PIPE ZONE 6" O.D. 6" MIN MIN FINAL BACKFILL- CLASS ¢ 2, OR 3 PIPE SIZE AS INDICATED ON THE PLANS O.D. 90 CLASS \ / 1 OR2 \ i- - -� STABLE FOUNDATION DUCTILE IRON and RC PIPE MATERIAL PIPE ZONE 6" O.D. 6" MIN MIN FINAL BACKFILL- PIPE SIZE AS INDICATED q3" ON THE PLANS INITIAL BACKFILL O CLASS 1 O.D. O g ^\ \ ^\ STABLE N.T.S. PVC PIPE FOUNDATION PIPE BEDDING DETAILS MATERIAL CULVERT 2 CULVERT 4 (O _ 5700 57 57 O- - - + -- - -_ C\1 It - EXISTING GRADE - PROPOSED EXISTING GRADE PROPOSED _ -- -Q. GRADE-- -- - - -- - /] _ _.. GR DE. 54 54 54 NPIPE 48LF F f8LF OF 18' RCP Q 2.297 � -2.297 SE C ASS 1VS 51 51 51 C . In to Of PROPERTY � UNE LANDSCAPE TIMBER LANDSCAPE TIMBER z C.1. BOX & COVER C.I. BOX & COVER N �45'ELBOW Z //� MAXIMUM 45' LONG 7 �LATERALSE TOP AS REQUIRED WEREACH OPTIMUM DEPTH \ 1 1LNIPPLE & GLUED CAP VARIABLE SLOPE ANGLE 45'ELBOW 1.5% MINIMUM AS 78"NIPPLE & 45- REQD. LATERAL _ GLUED CAP MAXIMUM 45' LONG BEDDING AS SWEEP BENDS AS SPECIFIED � REQUIRED SEWER f FAR SIDE LATERAL MAIN NEAR SIDE LATERAL NOTE: USE WYE FITTINGS AT SERVICE STANDARD SERVICE CONNECTION TO SANITARY SEWER N.T.S. ARKED: SANITARY SEWER OR STORM DRAIN AS REQUIRED TOP OF COVER STANDARD MANHOLE A D A RING AND COVER 7/8" OTTOM OF COVER NITS 5/8" PLAN 2'-1" 1'-11 3/4" NOTE: 1'-11 1/2" RING AND COVER CONTACT SURFACES SHALL BE 0'-2 1/8" 0'-3 1/8" MACHINED TO INSURE V-1" 0'-7 1/2" EVEN BEARING OF COVER AND RING. V-8 3/8", 0'-0 1/2" MINIMUM_ WEIGHTS 0'-4 1/8" 0'-4 1/8" RING 261 LBS. V-9 5/8" 0'-5 1/2" COVER 120 LBS. 0'-5 1/2" V-10 1/4" SECTION "A -A" 2'-9 1/4" SANITARY SEWER ALTERNATE STORM DRAIN TOP OF COVER IRED STANDARD MANHOLE F- A RING AND COVER A NTS OTTOM OF COVER 1/2° NOTE: PLAN RING & COVER CONTACT SURFACES SHALL BE MACHINED SO AS TO V-11 3/4" INSURE EVEN BEARING 0'-1'• 2'-1 1 4" l'- 11 1/2" OF COVER ON RING 0'-2 3/4" 00'_jl 1/2,• 0'-2 1/8" MINIMUM WEIGHTS: 0'-4 3/4" 0'-7 1/2" RING 1 COVER120 BLBS, O'-O 1/2" V-10 1/4" 0'-0 1/2" 2'-0 1/2" 2'-9 1/4" SECTION "A -A" DEWEY BROS NO MH-RCR-2001 1Q 4700 SERIES 2"CORP. 2"MJXMJ STOP - IRON PIPE VALVE BOX GATE VALVE WITH 2"SQUARE THREADED INLET WITH IP COMPRESSION NUT, OPENS OUTLET RIGHT NOTE: MJ PLUG TO BE RESTRAINED RESTRAINT JOINT GLAND SEE VALVE BOX BODY WITH DUCTILE IRON CASTING BASE SCREWS, BREAK -AWAY HEAC DETAILS, ABOVE TO ENSURE PROPER TORQUE 8"MJ CAP TAPPED 2" PVC OR DIP PIPE 2"PVC CL200 CONC.BLOCKING STD.8"MJ GASKET 18 LONG MAX. 2"DIA. 8" TO 2" WATERLINE SCHD.40 PLAINS ENDE CONNECTION ASSEMBLY WITH TAPPED SD 427 NTS CAST IRON FRAME & VARIES FOR WOODS OR COVER, TOP TO BE FLUSH PAVED BOTHER OTHER AREAS OUT OF WITH STREETS, WALKS, OR TRAFFIC. TOP TO BE AS RESIDENTIAL AREAS. 3 8" CEMENT NOTED ON PLANS. ON / UNPAVED ROADS PROVIDE MORTAR g COVER OVER LID, AND SET LABELED CONCRETE MONUMENT, NEAREST R/W LIMIT. FRAME &COVER CONCRETE COLLAR ::A /��i n /n/ \✓/\ n/ / 12"MAX. Sp 24" MIN. w o a' CONCRETE SPACERS FOR ADJUSTMENT TO GRADE z w U w MH STEP ? REINFORCING g PRECAST ECCENTRIC TOP U w � o a a' PRE -CAST MANHOLE K 0 SECTIONS -� 5" MIN, WALL THICKNESS 4� FOR 4' DIA, BARREL Maz 48" DIAMETER STD. 6" MIN. WALL THICKNESS :m0 5 FOR 5' DIA. BARREL o F- (TYP) MANHOLE IN ACCORDANCE iv1 "I w WITH ASTM C 478 aN BITUMASTIC JOINT SEALANT AS APPROVED BY THE ENGINEER GROUTED INSIDE AND OUT WITH APPROVED N NON -SHRINKING GROUT PIPE 1" PER G o z � DIAMETER FOOT z OOTE a 4. . 3/4 DIA. LARGEST 3"MIN. PIPE MINIMUM 8" STONE BEDDING FOUNDATION 6" EXTENDED LIP MONOLITHICALLY CAST T BASE SECTION ( EXTENDED BASE NOT iO REQUIRED FOR MANHOLES < 8' DEEP) RUBBER GASKET 48" DIAMETER N.T.S. STANDARD MANHOLE NOTE WELL: 1. All storm water runoff from built upon areas (i.e. impervious surfaces & roof drainage) to be directed to the storm sewer collection system i.e. storm inlets or and foreba b swales ( P Ys) Y overland flow,additional grading, or landscaping inlets. REV. NO. I REVISIONS I DATE COP7ryll t"% Hanover Dingo 5ervicee RA„ Aft rights reserve .. Roeroductbn or use of the contents of this document, or odditb s or deletions to this documen f, whole or Poll, Hthout eritten consent of the Land Surveyor ar EngMeer, 1s Proh&bxi, Only cables horn the origMai of this document, marked with the original signature and original seal of the Sursa nr or Engtobo, shah be considered to be wIM old tme oca" 48 IN PAVED AREAS USE 0 2-CURB STOP WITH 2"PVC PLUG MONUMENT CASING METER BOX -lll� 2"LONG G 119" IP MONUMENT BOX IF COUPLING IN PAVEMENT STORED IN , 4PIPE 45'ELBOW 24"LO4"LONG STONE 21P BRASS PIPE 0 Un AND FITTINGS J STONE 2"PVC CL200 CONCRETE BLOCKING 2"CORPORATION STOP - AWWA THREADED OUTLET 2" BLOW OFF DETAIL "rs WITH IP COMPRESSION SO 4.08 INLET. (8)/I4 REBAR 3000 PSI CONCRETE THRUST COLLAR THREADED GALVANIZED STEEL SEE "TIE ROD SCHEDULE" FOR 4 EACH WAY / QUANTITY AND SIZE OF TIE ROD. �r M,J.CAP OR OTHER - - - - M,J.FITTING e DIP e O D L* - _ •_ 311 -^ �s--e--s - I I I I D W� AND BRASS NIPPLEP THRUST RING FOR 2"LINE EXTENSION THRUST COLLAR SHALL BE FORMED USING 1/2"EXTERIOR PLYWOOD AS PER COLLAR DIMENSIONS SHOWN, TIE ROD SCHEDULE COLLAR DIMENSIONS PIPE DIAM. QUAN SIZE SIZE LINE MIN.W MIND PLATE DIAM 4" 2 5/8" 4" 6" L+8" L+2" 6" 2 3/4" 6" 9" L+9" L+3" 8" 2 3/4" 8" 12" L+9" L+3" 12" 4 3/4" 12" 18" L+9" L+3" 16" 4 7/8" 16" 18" L+9" L+3" 20" 4 1" 20" 20" L+9" L+3" 24" 4 1-1/4" 24" 24" L+10" L+4" 30" 4 1-1/2' 30" 24" L+11" L+5" • CONTRACTOR TO VERIFY DISTANCE WITH COLLAR SUPPLIERS. THRUST COLLAR NITS FINISH GRADE THRUST COLLAR MIN. COVER 3.5 DIP DIP SEE COUNTY THRUST 3/4" THREADED STEEL COLLAR DETAIL BELOW ,t RODS (TYP.) 3" 3„ SEE COUNTY THRUST 3" 3" COLLAR DETAIL BELOW AND FOR RODDING CONCRETE THRUST BLOCK (TYP.) ROD REQUIREMENTS GENERAL NOTES: AS PER TOWN OF LELAND 1. ONCE INSTALLED AND TIGHT, THE STEEL RODS AND BOLTS SHALL BE COATED WITH TWO COATS OF BITUMINOUS BASE PAINT. 2. CONCRETE SHALL NOT CONTACT BOLTS OR ENDS OF MECHANICAL JOINT BENDS, 3. TYPICAL MIN. CLEARANCE BETWEEN CONCRETE AND END OF BOLT MUST BE 3". 4 APPROVED NSTANDARD BBE USED IN THIS LEND NTS rl FNsEROS S USC APPROVED REDUCED '' II COVER SPRESSURE ZONE (RPZ) BACKFLOW 12" H'� ASSEMBLY PREVENTER IOUPUN'EDG DRESSER FU at ADAPTERJI- - - COUPUNG I FINISHED GRADE --SLOPE TO SUMP :t y, FINISHED GRADE SUMP, No.57 CONC.BLOCK WASHED STONE SUPPORT '\ FILL W1 GROUT \ \ 3 USC APPROVED �. RPZ BACKFLOW PREWNTERS REWIRED FOR ALL SERVICES OVER I" DIAMETER, (VOTE: USC APPROVED BACKFLOW DETAIL - BACKFLOW PREVENTER PREVENTERs REQUIRED ON ANY sERv',cE LINES OVER i" DIAMETER. N T.S. USE IJSC .APPROVED MODEL. 'j\,FEBCO MODEL 860 MASTER SERIES RPZ ?-` APPROVED EQUIVALENTS PROFILES 190'� Data-3-)0 PENDER PROGRESS INDUSTRIAL PARK LOCATED IN BURGAW TOWNSHIP 8 gc5-cS rr Pa &Lk`,I�t�z „ W �Or10= PENDER COUNTY, NOR OWNER: PENDER PROGRESS CORPORATION P.O. Box 959 Burgow, NC 28425 'GtNc°� HANOVER DESIGN SERVICES P.A. • o < 'fib' , "g'~ LAND SURVEYORS, ENGINEERS & LAND PLANNERS "?y0' 1123 FLORAL PARKWAY WILMINGTON, N,C. 28403 r �'CtJ PHONE: (910) 343-8002 S@hdsilrn.com LICENSE # C-0597 Scale: HORZ: 1"= 30' VERT.: 1 "= 3' Drawn: DBE Checked DSH Protect No: 12207-4 Sheet No: 4 Of: 6 FAPROJECT FOLDERS\12207-Pender Progress Project\Engineering\12207- base. dwg Layout (Profiles-4) 0 o 11 VARIES 70e MINIMUM (D EOP WORTH BEVERAGE DRIVE OHP OHP OHP SF I1 SF - _ - OHP - OHP 20' 0' 20' 40' - OHP ,p � SCALE 1"= 40' Jv @MAGNETIC NAIL \ CJ TBM 53.30 IF XI t _V O O 3:1 Side Sloe yplc0l I' 1501 /. 10'Vegetotive 10:1 Side Sloe Shelf 10:1 Side Slope - - SF \ \ Tymicnl _ \ �('y S F ume= SOD-cf� =4.52 Use 4.572. r O O POND CROSS SECTION DETAIL NOT TO SCALE 1 SLOPE 51.0 -50.0 51,5 49.0-- - 48.0 47.0 3:1 SLOPE --- 10' VEGETATIVE 46.0- SHELF (10:1 SLOPE) 45.0 FROM ELEV. 50.5-51.5 44.0 43.0 42.0- 41 NOTE: THIS PLAN TO BE UTILIZED AND REVIEWED ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. NOTE WELLI :ROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION IND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE OF WORTH CAROLINA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES -ATEST EDITION. PRACTICE NUMBERS REFER TO THIS MANUAL. e NOTE WELL, ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 21 CALENDAR DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS, ANY SLOPES TO BE STABILIZED AFTER 21 CALENDAR DAYS. DETAILS SHOWN ARE TYPICAL OF INSTAU_APONS REWIRED BY FENDER COUNTY. THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED CONSIRUCDON DETAILS, BUT RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL COUNTY AND STATE CODES AND CONSTRUCTION STANDARDS No geotechncal testing has been performed on site No woromy s made for suitability of subgrode and undercut and any required of revlucemIncennttroctar . sultvble material shoe be the responsibility cam +54.1 +53.1 STATE STORAGE ELEVATION = 52.0 WEIR CUTS = 52.0 p�t`bTFMAL WS L= 1.0 50.0 50.0 FOREBAY 9.0 3:1 SLOPE 48.0 48.0 47.0 47.0 46.0 46.0 45.0 45.0 44.0 44.0- SEDIMENT 43.0 43.0 MOVAL= 41.0 -42.0 42.0 41.0 41.0- POND 40.0 40, BOTTOM 40.0 IF:\PROJECT FOLDERS\12207-Pender Progress Project\Engineering\12207-bose.dwg Layout (DWQ-5) 5 38.0- 37. MAIN POND SEDIMENT REMOVAL36.0 r IS +54.1 5 .8+ A PORTABLE PUMP TO BE USED TO DRAIN POND IN AN EMERGENCY. u 3: 1 SLOPE POND ACCESS y oGv "a / Q BORING LOCATION GROUND EL- 52.02 DEPTH DOWN TO SHWT - 8"-7" - - SHWT EL= 51.4 NOTE WELL: STORM WATER SF I POND IS TO BE LOCATED O WITHIN DEDICATED COMMON AREA. COVER OVER PIPE @ PIPE ONLY. SEE PLAN VIEW 3: 1 SLOPE 52.0 1 may. 1 51.5 7.0 6.0 -45.0 10' VEGETATIVE -44.0 SHELF (10:1 SLOPE) 0 FROM ELEV. 50.5-51.5 EXISTING GROUND AQUATIC VEGETATION AQUATIC VEGETATION ZONE: FROM EL= 50.5 TO EL= 51,5 SUITABLE SPECIES FOR PLANTING IN THIS ZONE ARE AS FOLLOWS: - SAGITTARIA LATIFOUA (COMMON ARROWHEAD) - SAGITTARIA LANCIFOLIA (DUCK POTATO) - SAURURUS CERNUUS (LIZARDTAIL) - PELTANDRA VIRGINICA (ARROW ARUM) IF ONE OR MORE OF THE SUGGESTED SPECIES IS UNAVAILABLE, APPROPRIATE WETLANDS VEGETATION COMMON TO THE COASTAL CAROLINA REGION MAY BE SUBSTITUTED. PENDER PROGRESS - Pond 1 STAGE -STORAGE TABLES: MAIN BODY OF POND - BUILD -OUT CONDITION Above WSEL INCR. INCR. INCR. ELEV, AREA VOL STORAGE STORAGE (ft) (sf)--(cf)(cf) (ac-ft) 51.0 22,000 - 52. 0 29,500 25,750 25,750 0.59 52.50 31,600 15,275 41,025 0.94 53. 0 33, 700 15, 800 56,825 1, 30 54. 0 38, 000 35, 850 92,675 2. 13 STATE STORAGE VOLUME @ ELEV 52.0 25,750 0. 59 STATE STORAGE VOLUME = 25,750 of w 0 EMBANKMENT 100-YEAR WSEL= 53.23 EMERGENCY SPILLWAY EL = 53,0 3 ro CD 1-YEAR WSEL- 52,19 10-YEAR WSEL- 53.04 1� d0i Z (D 6p TOP OF BOX - 52.5 II TAU STATE STORAGE ELEVATION = 52.0 WEIR CUTS = 52.0 '- xl- N1111117 to v L.1� II X NORMAL WSEL- 51.0 INVERT OUT= 57.0 24"RCP 40 LF . 1 PIPE iD' WIDE, 10:1 AVlul F F0MANENT PO�f-DEPTH i.3 VEGETATED SB SHELF OS El.= 50.5 to 51.5 Vegetation Zone fl � //Aquatic „ 315.0 V MINIMUM EL_ 38.0) (BOTTOM % POND 60TTOM MAY BE'// OVEREXCAVATED FOR EMBANKMENT / .,/;,/�% EMBANKMENT SECTION POND No.1 SEDIMENT STORAGE WELDED ROB .• LI,-4 GRATES,TRASH GALVANIZED rl� alwis�les. ���e ■�q��■ ■��Gi- - NOT TO SCALE CENTERED '�1 WIER CUT 6 WELDED Ci .1 EIR Oe ACH BO ,55(l�ll�I�IL3I� r ■BIT/®' i,' ' s ' ': J�l i�a�/lvl'!91C1Pi�a� for control orifice fic, con EL- ePLAN VIEW TAM41N or equvoleat SECTION VIEW M (POND NOT TO SCALE Z Z= H� (n - X� LIJ w 0 Q STONE o d50=3" no (V THICK) N F N X e50.8 w� NOTE WELL: ALL STORM WATER PONDS ARE TO BE LOCATED WITHIN DEDICATED COMMON AREAS. NOTE:SEE SHEET 6 FOR ADDITIONAL DETAILS AND SPECIFICATIONS. NOTE: NO WETLANDS ON SITE. VEGETATION 20' 0' 20' 40' SCALE 1N FEET: 1'-- 20' NOTE WELL: 1. All storm water runoff from built upon areas (i.e. impervious surfaces & roof drainage) to be directed to the storm sewer collection system (i.e. storm inlets or pond foreboys) by swales, overland flow additional grading, or landscaping inlets. REV, NO. REVISIONS DATE CapArtght 0, Hanover Design Services, P.A. All rights reserved. Repradvctlon or use of the contents of this document, or addlllens or deletions to this document, in whole or Part, without written consent of Me Land Surely r or, Engineer, is probbited. Only cables Xarn the original of this document, morked with the angthal signature and coglnul seal of the Surveyor or Engi ssI shag be considered to be valid and true copies. NOTE: NO WETLANDS ON SIZE. ABOVE WSEL 5'min. 12'min SEE PLAN ALL SLOPES o 3: 1 MAXIMUM w o FES Forebay volume WSEL 20% of required LJ OUTLET =51.0 storage, typical II PIPE 1.0' OUTLET ° o ,Lo REMOVE PROTECTION 4'min. SED.=41,0 AS ON PLANS Qe �o a 5 Fore ay Bottom Elev.=40.0 FOREBAY SECTION DETAIL NOT TO SCALE FENDER PROGRESS, Wet detention / retention pond POND No. 1 Additional Calculation Summary Far NCDENR / DUO WATER QUALITY CONSIDERATIONS - Impervious area calculations: See Project Data Sheet TOTAL IMPERVIOUS = 151,685 sf TOTAL AREA DRAINING TO POND = 6.63 acres = 288,921 sf 6.63 ac. total - 3.48 ac. Impervious = 3.15 ac. green SA REQUIRED, 151,685 / 288,921 - 0.525, or 52. 5% At 4.5' average depth, 90% TSS removal, from chart - SA/DA Factor = 4.2 6.63 x 0.01 x 4,2 = 12, 150 sf SA REQUIRED At Elev. = 51,0 22,000 sf SA PROVIDED VOLUME REQUIRED, R=C(P)(Pj)(Rv)/l23(A) SEE PAGES A.1 and A.2, 'Controlling Urban RunoFFi A Practical Manua( for Planning and Designing Urban BMPs' ( P) = 1. 5- (Pj) 0 9 (Rv)- 0.05 + 0.9(151,685/288,921) = 0,522 (A)= 288,921 R= [(1. 5) (0, 522) /12] (288, 921) = 0,433 acre-feet = 18,870 cf REQUIRED STORAGE At Elev. = 52, 0 = 25, 750 cf PROVIDED STORAGE DRAWDOWNI Average head from storage elevation to orifice - 52. 0-5L 0 / 3 = 0. 33 3' PVC drain to draw -down pond Qi;oY1cled. storage volume) Orifice equation, Q = CA(2gh)^;1 Q = 0. 6(, 0491)(64.4 X 0. 33)^1/2 = 0. 0136 cFs T = 190,000 sec. = 2. 2 days OKAY FOREBAY REQUIREMENTS - Approximate required capacity = 99, 500 X 20% = 19, 900 cf Provided capacity = 19, 650 cf OKAY NOTE: NO WETLANDS ON SITE. PEAK DISCHARGE SUMMARY - Q(1) pre -developed = 2.98 cfs Q(10) pre -developed = 10.36 cfs Q(100) pre -developed = 18.23 cfs Q(1> post -developed = 0.76 cfs @ WSEL = 5a 19 Q(10> post -developed = 6.42 cfs @ WSEL = 53,04 Q(100>post-developed = 26.43 cfs @ WSEL = 53.23 SEDIMENTATION POND CONSIDERATIONS - Storage required = 6.63 X 1800 = 11, 934 cf Storage provided = 45,400 cf ' STATE WATER QUALITY POND CONSIDERATIONS - Surface Area required = 12,150 sf Surface Area provided = 22,000 sf @ WSEL 5L 0 Storage Volume required = 18,870 cf Storage Volume provided = 25,750 cf @ WSEL 52.0 Storage Volume Drawdown Time = 2.2 days NOTE: DELINEATED 404 WETLANDS LINE HAS BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS. SEE ACTION ID: 2007-1459. 2/3/2010 BY THE LAND MANAGEMENT GROUP, INC. NO WETLANDS ON THIS SITE. Erosion & Sediment Control and Water Quality Plan, Pond Details oate: PENDER PROGRESS 3-3-10 Scale: Pond 1 INDUSTRIAL PARK 7"= 20' LOCATED IN BURGAW TOWNSHIP PENDER COUNTY, NORA , OLINA Drawn: ✓ 9� DBB Checked: OWNER: FENDER PROGRESS CORPORr>�'QN Q DSH 'b*� c$id,°t,.r , `'<, `' P.O. Box 959 .9 r '\,. <1Qj'Q Project No: '^v" � Burgow, Buf aw, NC 28425 SEA � ° 20007 ms 01M_ a��� \ HANOVER DESIGN SERVICES, P.A. [?ti,„w SURVEYORS, PLANNERS LAND ENGINEERS & LAND 1123 FLORAL PARKWAY Lf-6 WILMING�PHONE: TON, C, 28403 02dhollis Q hdsilm.Corn LICENSE # C-0597 COMPACTED FILL OR --\ GRAVEL. EXTENSION RI AND WIRE INTO TH N FABRIC N TRENCH E NOTE: SEE NARRATIVE FOR MORE DETAIL. ISOMETRIC VIEW La I RCP W 0- 18"-36" Rcps-10' 48" & 5 4"' Rc s-1' P 54 I P IP O ( 00 OUTLET PROTECTION and 8'SPACINO SEE NARRATIVE FILTER FABRIC BACKRLL MINIMUM S" THICK LAYER OF GRAVEL V-TRENCH WIRE Ft FI EXTENSION OF FABRIC AND WIRE C INTO THE TRENCH Ft I / r\�r z 14"MINIMUM 5�///, `mSECTION SEDIMENT FEN CE SILT FENCE) NTS PRACTICE 662 4"MINIMUM OSECTION SF RCP DIAMETER La W d50 I dMAX APRON REQ.STONE ALL 18" 10' 10' 3" 6" 1 approx. 4cy ALL 24" 15' 15' 3"1 6" 1' approx. Icy ALL 30" 15' 15' 3" 6" 1' approx. 7cy ALL 36" 30' 15' 3" 6" 1' approx. 14cy ALL 48" 20' 20' 3" 6" i' approx. 13cy ALL 54' 1 20' 1 20'1 3" 6' 1' I approx. 13cy ROCK STABILIZING APRON La W 5 d 0 dMAX APRON RE .STONE Q CFN TWIN 36" 10' 15' 3" 6" 1' approx. 6cy CFN TWIN 24" 10' 15' 3" 6" 1 approx. 6c PP Y CFN TWIN 18" 10' 15' 3" 6" 1' a rox. 6c pp y ROCK STABILIZATION APRON NOT TO SCALE PUBLIC ROAD S rp �'p ,r 9L V O, CE - O O O�y P G11 � -&-,( T 6" MINIMUM p� 0y THICKNESS -- p�, O 2"-3" COARSE AGGREGATE �7 ' NOTE: SEE NARRATIVE 12'MINIMUM FOR MORE DETAIL. ENTRANCE/EXIT DETAIL N.T.S. NOTE WELL: 1) OUTLET PROTECTION & ROCK STABILIZATION APRONS REQUIRED AS SHOWN ON PLAN. r t'On Entrance/Exit Temoorary Gravel Coast uc # Specification 6.06 - Construction Specifications 0 1. Clear the entrance and exit area of all vegetation, roots and other objectionable material and properly grade It. 2. Place the gravel to the specific grade and dimensions shown on the plans end smooth it. 3, Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextile Fabrics because they improve stabllity of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad In a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2-Inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked ontopublic roadways. CONSTRUCTION SCHEDULE - 1. Obtain approval of Plan and any necessory permits, and hold o pre -construction conference prior to commencing any work. 2. Flag work limits and stake -out primary measures, for preliminary clearing and grabbing. Install silt fencing entirely along the line as shown. 3. Install Gravel Construction Entrance. 4. Install Sediment Basin as shown on Plan while clearing and grubbing site. Sediment Basin to be constructed prior to major grading or building. (See Construction Summary on Sheet 1). 5. Maintain Sediment Basin on shown on Plan while clearing and grubbing site. 6. Immediately stabilize all non construction areas. (See seeding specifications.) 7. Construct any other sediment control Practices shown, prior to rough grading roadways, stockpiling material and topsoil as necessary. S. All erosion and sediment. control Practices are to be Inspected weekly and after any rainfall, and repaired as necessary. 9. After site stabilization, temporary measures are to be removed and the Sediment Basin cleaned to its original desi gn n contours, if necessary. . 2) SLOPE IS FLAT (0%) FOR A MINIMUM OF 2LF 2' MIN. BOTTOM WIDTH. 0 - Rock to top of pipe 0 both sides O -:' / SLOPE w EMBANKMENT O See Narrative for additional details 2'min. NOTE. FILTER FABRIC IS TO BE PLACED UNDER ALL STONE INLET AND OUTLET PROTECTION. USE NICOLON MIRAFI 60OX POLYPROPYLENE, OR EQUIVALENT Qif1G \/If=\AI PLANNED EROSION AND SEDIMENT CONTROL PRACTICES - 1. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE Practice 6,06 CE project in andreShall be installed at the entrance of th O from Worth Beverage Drive as show e proposed p g n. Drainage is away from the road and sedimentation will be controlled with downstream practices. During wet weather it may be necessary to wash truck tires at these locations. 2. G LAND GRADING Practice 6,02 Grading should be limited to areas as shown on the Plans. Cut and fill slopes shall be 3;1 or flatter 'except where specifically indicated. Care shall be taken during land grading activities not to damage existing trees that are not required to be removed. 3. SEDIMENT FENCE Practice 6.62 SF O Installed as shown on the Pion Sediment fencing should be s , first, to delineate and protect low areas, and around any X-X-X r o prevent an graded temporary stockpile areas as necessary t p y interior areas from eroding onto adjacent lands or roadway, or into Inlets. 4. OUTLET STABILIZATION Practice 6.41 OP Riprop aprons will be located at the downstream and of all discharge pipes to prevent scour. 5. CONSTRUCTION ROAD STABILIZATION Practice 6.80 Upon reaching final grade and after utilities have been installed, roadways and parking areas are to be stabilized by placing sub -base course of approved e" ABC stone, as shown in the typical cross-section detail on the Plan, to reduce erosion and dust during the remainder of building construction. 6. SEDIMENT BASIN SB Practice 661 The Sediment Basins. are to be constructed (see Construction Schedule) as the primary Practice to prevent sediment from leaving the site. Detailed design and spillway configurations are specified in the details as shown on this Pion and the Narrative. The PVC outlet is to be blocked during sedimentation function (or not installed) until entire watershed is permanently stabilized and pond is converted to permanent stormwater management detention / retention function. The Contractor may choose to Install the oriface during sedimentation function, ONLY if he screens the end and protects the inlet with #57 stone. Additional temporary measures such as temporary ditches and diversions may be utilized prior to storm sewer construction to ensure disturbed area runoff is directed to sediment basins. MAINTENANCE PLAN - 1. All measures to be inspected weekly and after any rainfall event and needed repairs made immediately. 2. Sediment Basin to be cleaned out when the level of seament reaches as shown on individual pond plans. 3. Sediment to be removed from behind the any Silt Fenceand inlet protection devices when it becomes 0.5 deep. Fenmg and inlet protection to be repaired as needed to malntan a barrier. 4, All seeded areas shall be fertilized, mulched, and re-seeeea as necessary, according to specifications provided, to maintain a suitable vegetative cover. S. Construction entrances to be maintained In a condition to prevent mud or sediment from leaving the construction site. Persdic topdressing with 2'stone may be required. Remove all ot,ectionable material spilled, washed, or tracked onto public roadways immediately. VEGETATIVE PLAN - 1. Permanent vegetation to be established in accordance won "North Carolina Erosion and Sediment Control Planning axe Design Manual", Section 6.11, latest version. COVER SHEET FOR CONSTRUCTION PHASE SEQUENCE. Construction Road Stabilization Specification # 6.80 - Construction Specifications L Clear roadbed and parking areas of all vegetation, roots and other objectionable material. 2. Ensure that road construction follows the natural contours of the terrain if it Is possible. 3. Locate parking areas on naturally flat areas if they are avallable. Keep grades sufficient for drainage but generally not more than 2 to 37.. 4, Provide surface drainage, and divert excess runoff to stable areas by using water bars or turnouts (References, Runoff Control Measures). 5. Keep cuts and flits at 2,1 or flatter for safety and stability and to facilitate establishment of vegetation end maintenance. 6. Spread a 6-Inch course of 'ABC' crushed stone evenly over the full width of the road and smooth to avoid depressions. 7. Where Y seepage e areas or seasonally wet areas must be crossed Install P subsurface drains or eotextile fabric cloth before placing the crushed stone 9 P 9 (Practice 6.81 Subsurface Dr In). 8, Vegetate all roadside ditches, cuts, £Ills and other disturbed areas or otherwise appropriately tabilize as soon as radio Is complete (References, s grading P Surface Stabilization). 9. Provide appropriate sediment control measures to prevent off -site sedimentation. Maintenance Inspect construction roads and parking areas periodically for condition of surface. Topdress with new gravel as needed. Check road ditches and other seeded areas for erosion and sedimentation after runoff -producing rains. Maintain oil vegetation In a healthy, vigorous condition. Sediment -producing areas should be treated Immediately, Sediment Fence (Silt Fence) 0 S � Specification 6.62 - Construction Specifications MATERIALS 1.Use a synthetic filter fabric or a pervious sheet of polypropylene, nylon, polyester, or polyethylene yarn, which Is certified by the manufacturer or supplier as conforming to the requirements shown In Table 6.621D. Synthetic filter fabric should contain ultraviolet ray Inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction Life at a temperature r n f F. range Oto 120 9 2. Ensure that pasts for sediment fences are either 4-Inch diameter pine, 2-inch diameter oak, or 1,33 (b/linear ft steel with a minimum length of 4 ft. Make sure that steel posts have projectionsto faci litate fastening the fabric. 3, For reinforcement of standard strength fitter Fabric use wire fence with a minimum 14 gauge and n maximum mesh spacing of 6 Inches. Table 6.62b Specifications For Sediment Fence Fabric Physical Property Requirements Filtering Efficiency - 85% (mm) Tensile Strength at Standard Strength- 30 LID/Lin In (min) Extra Strength- 50 lb/Lin in (mm) Slurry Flow Rate - 0.3 gal/sq ft/min (min) CONSTRUCTION 1.Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2.Ensure that the height of the sediment fence does not exceed 18 inches above the ground surface. (Higher fences may Impound volumes of water sufficient to cause failure of the structure.) 3.Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When Joints are necessary, securely fasten the filter cloth only at a support post with overlap to the next post. 4.Support standard strength filter fabric by wire mesh fastened securely to the up slope side of the posts using heavy duty wire staples at least I Inch long, or tie wires. Extend the wire mesh support to the bottom of the trench. 5.When a wire mesh support fence Is used s posts a maximum of 8 ft apart. PP space P P Support posts should be driven securely Into the ground to a minimum of 18 inches, 6.Extra strength filter fabric with 6ft post spacing does not require wire mesh support fence. Staple or wire the filter fabric directly to posts. 7.Excavate a trench approximately 4 Inches wide end 8 inches deep along the proposed line of posts end upslope from the barrier (figure 6.62a). 8.Backfitt the trench with compacted salt or gravel placed over the filter fabric, 9.Da not attach filter fabric to existing trees. Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs Immediately. Should the fabric of a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Replace burlap every 60 days. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize It after the contributing drainage area has been property stab l l zed. MORE GENERAL NOTES: 1. ALL CONSTRUCTION TO APPLICABLE STATE AND LOCAL CODES. 2. CONTRACTOR TO COORDINATE ANY REQUIRED TRAFFIC CONTROL WITH NCDOT. 3. CARE SHALL BE TAKEN DURING FINAL GRADING TO ENSURE POSITIVE DRAINAGE TO DRAINAGE SWALES AND RECEIVING STRUCTURES. 4, CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ANY RELOCATIONS, RE -ALIGNMENTS, DISCONNECTIONS OR CONNECTIONS OF EXISTING UTILITIES WITH APPLICABLE AUTHORITIES, AND ANY REQUIRED PERMITS. CLEARING AN GRUBBING OF SITE TO INCLUDE REMOVAL OF XI TIN 5 (LEA G D E S G CURB, ASPHALT, INLETS, AND ANY OTHER STRUCTURES INCLUDING TREES, STUMPS AND DEBRIS EXISTING ON SITE. TREES NOT REQUIRED TO BE CLEARED FOR CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE DIRECTED. Permanent Seeding Specifications # 6.11 - Specifications Seedbed Requirements Establishment of vegetation should not be attempted on sites that are unsuitable due to Inappropr l ate soil texture (Table 6. lea), poor dra Inge, concentrated overlord flow, or steepness of slope until measures have been taken to correct these problems. To mninta in a good stand of vegetat ton, the soil must meet certnln minimum requirements as a growth medium. The existing soft should have these criteria, - Enough fine-grained (silt and cloy) material to maintain adequate moisture and nutrient supply (available water capacity of at least .05 inches water to I inch of salt). - Sur I cI ent ore s t m ace o perm It root enetrntion. P P P P - Sur I cI ent depth of soli to rove de an adequate p p equa a root zone. The depth to rock or Impermeable layers such as hardpons should be 12 Inches or more, except on slopes steeper than 2,1 where the addition of soli Is nofeasible. t P P - A favorable PH range for plant growth, usual Ly 6.0- . 5. - Freedom from large roots, branches, stones, large clods of earth, or trash of any kind, Clods and stones may be left on slopes steeper than 3,1 if they are to be hydroseeded. If any of the above criteria are not met -I. e., If the existing soli Is too coarse, dense, shallow or acidic to foster vegetation-speclat amendments are required. The soil conditioners described below may be benef total or, preferably, topsoil may be applied In accordance with Practice 6,04, Topsof(ing. Solt Conditioners In order to im rove the structure or drain h r rl n e o n note sties of n soli the P 9 Followingmaterial may be added. These amendments h Y should ld only be necessary where soils have limitations that make them poor for plant growth or for fine turf establishment (see Chapter 3, Vegetative Cons i deratlons). Peat -Appropriate types are sphagnum moss peat, hypnum moss peat, reedsedge peat, or peat humus, all from fresh -water sources. Peat should be shredded and conditioned In storage piles for at least 6 months after excavation. Sand -clean and free of toxic materials Vermiculite-horticulturaL grade and free of toxic substances. Rotted manure-stebl r cattle e o ca t e manure not containing undue amounts of straw or other bedding materials. Thoroughly rotted sawdust- free of stones and debris. Add 6 lb. Of nitrogen to each cubic yard. Sludge -Treated sewage and in , industrial sludges are available In various forms 9 9 9 these should be used only in accordance with local, State and Federal regulations. Species Selection Use the key to Permanent Seeding Mixtures (Table G. llb) to select the most appropriate seeding mixture based on the general site and maintenance factors. A Listing of species, Including scientific names end characteristics, is given in Appendix 8.02. Seedbed Preparation Install necessary mechanical erosion and sedimentation control practices before seeding, end complete grading according to the approved plan. Lime end fertilizer needs should be determined by soli tests. Solt testing is performed free of charge by the North Carolina Deportment of Agr IcuI ture soli testing laboratory. Directions, sample cartons, and information sheets are avaI Lab le through county agr Icu LturaI extents l on off Ices or From NCDA. Because the NC➢A soil testing lab requires 1-6 weeks for sample turn -around, sampling must be planned well In advance of final grading. Testing is also done by commercial laboratories, When soli test are not available, follow rates suggested on the IndIv Idual specification sheet for the seeding mix chosen (Tables 6. tic through 6, 110. Applications rates usually fall into the Following ranges; - Ground agricultural limestone Light -textured, sandy soils; 1-1 1/2 tons/acre Heavy textured, clayey soils 2-3 tons/acre - Fertilizer, Grasses 800-1200 kb/acre of 10-10-10 (or the equivalent) Grass -legume mixtures, 800-1200 lb/acre of 5-10-10 (or the equlva Lent) Apply time and fertilizer evenly and incorporate Into the top 4-6 inches of soil b disking or other it I k o e su ab a means, Operate machineryon the contour. Y 9 P When usinga h droseeder apply time nail Fertilizer r t r f f y pp y e o a rough, loose surface. Roughen surfaces according to Practice 6.03, Surface Roughening. Complete seedbed preparation by breaking up Large clods and raking into a smooth, uniform surface (slope less than 3k ll Fill in or level depressions than can collect water. Broadcast seed Into a freshly loosened seedbed that has not been sealed by rainfall. j ' Table 6. Its - Seeding No. 4CP for, Well -Drained Sandy Loans to Dry Sands, Coastal Plain; Low to Medium -Care Lawns Seeding mixture Species - Centipedegrnss - Rate - 10-20 lb/acre (seed) or 33 bu/acre (spr Igs) Seeding dates - Her. - June, (Sprigging can be done through July where water Is avallable for Irrigation.) Solt amendments - Apply line and fertilizer according to soil test, or apply 300 lb/acre 10-10-10, Sprigging - Plant sprigs in furrows with a tractor -drown transplanter, or broadcast by hand. Furrows should be 4-6 Inches deep and 2ft apart. Place sprigs about 2 ft. apart In the row with one end at or above ground Level (Figure 6. 11d). Broadcast at rates shown above, and press sprigs into the top 1 1/2 inches of soli wl th a ill sk set stra l ght so that spr Igs are not brought back toward the surface. Mulch - ➢o not mulch Maintenance - Fertilize very sparingly- 20 kb/acre nitrogen In spring with no phosphorus. Cent ipedegrnss cannot tolerate high pH or excess fertI I zer. Table 6. 11t - Seeding No. 5CP for, Welt -Drained Sandy Loans to Dry Sands; Low Maintenance Seeding mixture Species Rate (lb/acre) Pensacola Bahlagrass 50 Sericea lespedeza 30 Common Bermudagrass 10 German millet 10 Seeding notes 1. Where a neat appearance Is desired, omit sericea 2. Use common Bermudagrass only on Isolated sites where it cannot become a pest. Bermudagrass may be replaced with 5 lb/acre centipedgrass. Seeding dates - Apr. 1 - July 15 Solt amendments - Apply time and fertilizer according to soil tests, or apply 3,000 lb/acre ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer, Mulch Apply 4,000 lb/acre grain straw or equivalent cover of another suitable Mulch. Anchor by tacking with asphalt, roving and netting or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance - Refertitize the following Apr. with 50 lb/acre nitrogen. Repeat as growth requires, May be moved only once a year. Where a neat appearance Is desired, omit sericea and now as often as needed. Table 6. llv - Seeding No, 7CP for, Grass -lined Channels; Coastal Plain Seeding Mixture Species - Common Bermudagrass - Rate - 40-80 (1/2 lb/1,000 ft ) Seeding dates - Coastal Plain; Apr - July Solt amendments - Apply Line and fertilizer according to soft tests, or apply 3,000 lb/acre ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch - Use jute, excelsior matting, or other effective channel lining material to cover the bottom of channels and ditches. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary Lint ngs, apply 4,000 lb/acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must be allowed to wash down slopes where they can clog drainage devices. Maintenance -A minimum of 3 weeks is required for establishment. Inspect and repair mulch frequently. Refertilize the following Apr, with 50 Ib/acre nitrogen. \Refer to Appendix 8.02 for botanical names NOTE: THIS PLAN TO BE UTILIZED AND REVIEWED ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. NOTE ll ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 21 CALENDAR DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. ANY SLOPES T❑ BE STABILIZED AFTER 21 CALENDAR DAYS. DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REQUIRED BY ONSLOW COUNTY. THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED CONSTRUCTION DETAILS, BUT RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL COUNTY AND STATE CODES AND CONSTRUCTION STANDARDS. No geotechnical testing has been performed on site. No warranty is made for suitability of subgrade, and undercut and any required replacement with suitable material shall be the responsibility of the contractor. , Temporary Seedino Specification # 6.10 - Specifications Complete grad Ing before preparing seedbeds and install all necessary erosion control practices, such as dikes, waterways and basins, Minimize steep slopes because they make seedbed preparation difficult and increase the gruel on hazard. If soils become compacted during grading, loosen them to a depth of 6-8 Inches using a ripper, harrow, or chisel plow. Seedbed Preparation Good seedbed preparation is essential to successful plant establishment. A good seedbed is well-pu lverized, loose and uniform. Where hydroseeding methods ore used, the surface may be left with a more Irregu Lar surface of large clods and stones. A according to soft test recommendations, If the H (acidit ) Lining l time c e P 9 P Y 9 Apply t known,an n licatlon of round n rl cu lturaI limestone at the of the soli Is no PP 9 g rate of 1 to 1 1/2 tons/acre on coarse -textured sods and 2-3 tons/acres on fine -textured sells Is usually sufficient. Apply limestone uniformly and with H of 6 or higher incorporate Into the to 4 6 Inches of soft. Soils , a P P 9 need not be limed. Fertilizer- Base application rates on salt tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-L, 000 lb./acre. Both fertilizer and Lime should be Incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application, Surface roughening- If recent tillage operations have resulted in a loose surface, additional roughening may not be required except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen It seeding b disking, raking, or ther suitable methods justpriorto s o J 9 Y 9• 9 Groove or furrow slopes steeper than 3,1 on the contour before seeding (Practice 6103, Surface Roughening). Plant Selection Select an appropriate species or species mixture from Table 6, 10o, for seeding In late winter and early spring, Table 6. 101a for summer, and Table 6. 10c for fa l I. Seeding 1 seed using a cyclone seeder (broadcast) drill cuiti acker seeder Event a e Y PP Y 9 Y P t Broadcast seedin or h droseeder. Use seeding rates given n Table 6, 10a-6 IOc B Y 9 9 9 and hyroseeding are appropriate for steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in a uniform distribution. Small rains should be planted no more than 1 achieving 9 inch deep, and grasses nail ra es legumes no more than 1/2 Inch. Broadcast seed must g be covered by raking or chain dragging, and then lightly firmed with a roller or cult (packer. Hydroseeded mixtures should Include a wood fiber (cellulose) mulch. MU(china The use of appropriate mulch will help ensure establishment under normal conditions and is essential to seeding success under harsh site condition (Practice 6. 14, Mulching). Harsh site conditions Include: -seeding In fall for winter cover (wood fiber mulches are not considered adequate for this use), -slopes steeper than 311, -excessively hot or dry weather, -adverse solls(sha(Low, rocky, or high in clay or sand), and -areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as In channels, anchor mulch with netting (Practice 6. 14, Mulching). Table 6. 10a - Temporary Seeding Recommendation for Late Winter and Early Spring See ding n mixture Species- Rye(grnin), Annual lespedeza (Kobe In Piedmont and Coastal Plain Rate (kb/acre)- 120 Omit annual Lespedeza when duration of temporary cover Is not to extend beyond June Seeding dates -Coastal Plain - Dec. 1 - Apr, 15, Sell amendments- Follow recommendet Ions of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Anchor tr w b tacking with asphalt, netting Mulch A l a 0001b/acre straw. s a PP YY 9 P 9 A k with blades set nears straight can be used or a mulch anchoring tool, disk a s 9 Y 9 as a mulch anchoring tool. Maintenance - Refertilize If growth is not fully adequate. Reseed, refertilize and mulch Immediately following erosion or other damage. Table 6. lOb - Temporary Seeding Recommendatl ons for Summer Seeding mixture Species -German millet Rate(lb/acre)- 40 Seeding dotes -Coastal Plain- Apr. 15-Aug. 15 Solt amendments -Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 tb/acre 10-10-10 fertilizer. Mulch -Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring toot, A disk with blades set nearly straight can be used as a mulch anchoring tool. Ma l ntenance-Refertl Llze If growth Is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6. 10c - Temporary Seeding Recommendation for Fall Seeding mixture Species-Rye(grain) Rate(lb/acre) - 120 Seeding dates - Coastal Plain and Piedmont -Aug 15 - Dec. 30 Solt amendments - Follow soil tests or apply 2,000 Lb./acre ground agricutturel Limestone end 1,000 lb/acre 10-10-10 fertilizer. Mulch- Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring took, A disk with bindes set nearly straight can be used as a mulch anchoring tool. Maintenance- Repair and refertillze damaged areas immediately. Topdress with 50 Us/acre of nitrogen in March, If It Is necessary to extend temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) Land Grnding Specification # 6.02 - Construction Specifications 1-Construct and maintain all erosion and sedimentation control practices and measures in accordance with the approved sedimentation control plan and construction schedule. 2.Remove good topsoil from areas to be graded and filled, and preserve it for use in finishing the grading of aLL critical areas. 3.Scarlfy areas to be topsoiled to a minimum depth of 2 Inches before placing topsoil (Practice 6. 04, Topsolling). 4. Clear and grub areas to be filled to remove trees, vegetation, roots, or other objectlonob le materlat that would affect the planned stabllity of the flit. 5.Ensure that flit materlal Is free of brush, rubbish, rocks, logs, stumps, building debris, and other materials Inappropriate for constructing stable fi Iis. 6.Place all fill In layers not to exceed 9 Inches in thickness, and compact the layers as required to reduce erosion, slippage, settlement, or other related problems. 7.Do not Incorporate frozen material or soft, mucky, or highly compressible materials Into flit slopes. S.Do not place fill on a frozen foundation, due to possible subsidence and slippage. 9.Keep diversions and other water conveyance measures free of sediment dur Ing all phases of development. 1O.Handle seeps or springs encountered during construction In accordance with approved methods (Practice 6. 81, Subsurface Brain). 11. Permanently stabilize oil graded areas Immediately after final grading is completed on each area In the grading plan. Apply temporary stabilization measures on all graded areas when work is to be interrupted or delayed for 30 working days or longer. 12. Ensure that topsoil stockpiles, borrow areas, end spoil areas are adequately protected from erosion with temporary and final stabilization measures, Including sediment fencing and temporary seeding as necessary. Maintenance Periodically check all graded areas end the supporting erosion and sedimentation control practices, especla Ity after heavy rainfalls. Promptly remove all sediment from diversions and other water -disposal practices. If washouts or breaks occur, repair them Immediately. Prompt maintenance of small eroded areas before they become significant gullies is an essential part of an effective erosion and sedimentation control plan. NOTE WELL: EROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE OF NORTH CAROLINA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, LATEST EDITION. PRACTICE NUMBERS REFER TO THIS MANUAL. lill REV. NO. REVISIONS DATE Copyright 0, Hanowr Ifs lgn Soyces, P.A, All rights reserrod Rsproductlon or use of the contents of this d.c.t, or additions or delewons to Nis document, h while a part, without written consent of the Land Sur wyer or o giresn is prohibited. Only cables Iran the urigind of this document, mowed with the origind slynafure pad orlgMd seal of the Surve or Engmeen shill be awskered to be wVV and five coxes. SBA $ediment Basin Specifications # 6,61 -Construction Specifications 1. Site preparations -Clear, grub and strip topsalI from areas under the embankment to remove trees, vegetation, roots and other objectionable material. Delay clearing the pool area until the dam is complete and then remove brush, trees and other objectionable materials to facl ll tate sed lment cleanout. Stockpile all topsoil or soli containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below the basin as needed. 2.Cut-off trench -Excavate a cut-off trench along the centerline of the earth fl 11 embankment, C e trench the h to stable soil material but in no case make it e c Less than 2 ft. deep, The cut- ff trench must extend Into both abutments to at 0 least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compact Ion equipment but In no case Less than 2 Ft. Make side slopes of the trench no steeper than 1,1. Compaction P P P requirements are the same as those for the embankment, Keep the trench dry during backfitling and compaction operations. 3. Embankment -Take fill material from the approved areas shown on the plans. It should be clean mineral soil, free of roots, woody vegetation, rocks and other objectionable material. Scarify areas on which FILL is be placed before placing FILL. The fill material must contain sufficient moisture so it can be formed by hand Into a ball without crumbling. If water con be squeezed out of the ball, It '.. Is too wet for proper compaction. Place fill materlal in 6 to 8-Inch continuous (layers over the entire length of the fill area and then compact it. Compaction may be obtained by routing the construction hauling equipment over the Fill so that the entire surface of each layer 15 traversed by at least one', wheel or trend track of the heavy equipment, or a compactor may be used. Construct the embankment to on elevation IOX higher than the design height to allow for settling. 4. Conduit spillways -Secure Ly attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on a firm, smooth foundation of impervious salt. Do not use pervious material such as sand, gravel, or crushed stone as bnckflll around the pipe or anti -seep collars. Place the flit material around the pipe spillway in 4-Inch Layers and compact it under and around the pipe to at least the same density as the P P P Y adjacent embankment. t be taken not to raise the pipe from Firm contact � Care must p p with Its foundation when compacting under the pipe haunches. Place a minimum depth of 2ft. of hand -compacted bnckflll over the pipe spillway Y before crossingit with construction equipment. Anchor the riser in lace b place Y concrete or other satisfactory means to prevent flotntfon. In no case should the pipe conduit be Installed by cutting a trench through the dam after the embankment is complete. 5. Emergency spillway -Install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of emergency spillway. 6. Inlets -Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -Laden water to the upper end of the pool area to improve basin trap efficiency (References, Runoff Control Measures and Outlet Protection). 7.Eroslon control -Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and oil other disturbed areas above the crest of the principal spillway Immediately after construction (References, Surface Stabilization). S. Safety -Sediment basins may attract children end can be dangerous. Avoid steep Y Y 9 P side slopes, and fence and mark basins with warning sl gns If trespassing Is likely. Follow oil state and local requirements. Maintenance Check sediment basins after periods of significant runoff. Remove sediment and restore the basin to Its original dimensions when sediment accumulates to one- half the design depth. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs Immediately, Remove all trash and other debris from the riser and pool area. 0001- OP O ❑utlet Stabs llzation Structure Specification # 6.41 - Construction Specifications 1. Ensure that the subgrade for the filter and rlprap follows the required lines and grades shown in the plan. Compact any fill required In the subgrade to the density of the surrounding undisturbed material. Low areas in the subgrade on undisturbed soli may also be fl fled by Increase Ing the rl prop thickness. 2. The rlprap and gravel fitter must conform to the specified grading limits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be property protected from punching or tearing during Installation. Repair any damage by removing the rlprap and placing another piece of filter cloth over the damaged area. All connecting joints should overlap a minimum of t ft. If the damage is extensive, replace the entire filter cloth. 4. Riprnp may be placed by equipment, but take care to avoid damaging the f I t ter. 5. The minimum thickness of the rlprap should be 1.5 times the maximum stone diameter. 6. Riprap may be field stone or rough quarry stone. It should be hard, angular, highly weather -resistant and well graded. 6. Construct the apron an zero grade with no overfaLL at the end. Make the top of the rlprap at the downstream end level with the receiving area or slightly below it. 8. Ensure that the apron is property aligned with the receiving stream and preferably straight throughout its length. If a curve is needed to fit site conditions, place It In the upper section of the apron. 9. Immediately after construction, stabilize all disturbed areas with vegetation (Practice 6. 10, Temporary Seeding, and 6. 11, Permanent Seeding). Maintenance Inspect rlprap outlet structures after heavy rains to see If any erosion around or below the rlprap has taken place or If stones have been dislodged. Immediately make all needed repairs to prevent further damage, I EROSION CONTROL NOTES AND ADDITIONAL DETAILS PENDER PROGRESS INDUSTRIAL PARK LOCATED IN BURGAW TOWNSHIP PENDER COUNTY, NORTH CAROLINA OWNER: PENDER PROGRESS CORPORATION P.O. Box 959 Burgaw, NC 28425 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 1123 FLORAL PARKWAY WILMINGTON, N.C. 28403 -* PHONE: 910 343-8002 LICENSE # C-0597 Dale: 3-3-10 Scale: As Shown Drawn: DBB Checked: DSH Project No: 12207-6 Sheet No: 6 Of: 6 F:\PROJECT FOLDERS\12207-Pender Progress Project\Engineering\122U/-oase.owg Layout (cur-D) Z DRAINAGE AREA MAP: PENDER PROGRESS - Pond 1 DRAINAGE AREAS Area Acreage 1 6.63 acres ---------------------------- TOTAL ACREAGE 6.63 Acres 111=30' 30, 0' 30' 60' SCALE IN FEET: 1 30' NOTE WELL: 1. All storm water runoff from built upon areas (i.e. impervious surfaces & roof drainage) to be directed to the storm sewer collection system (Le. storm inlets or pond forebays) by swales, overland flow,additional grading, or landscaping inlets. REV. NO. REVISIONS DATE Oopfright ®, Honorer Desk;n Service, P.A. All right, rn, d. Reprgductk w use of Me contents of Mb document w gWitkA. w de:etkns to thh, document, h whole w pw4 WRhout wittm consent of the Lw,d Sw ,or or Engineer, Is prohibited. Only oop from the o gkd of this dowrr.t, marked Oth the wighgl dgmturo and orlgbwl zed of the Surveyor or £nghe ,, shall be ccnsldNed to be wild wd true copies. 1RON vs, A> l �) L7 �t I1 f� o.al i I Drainage Area Map PENDER PROGRESS INDUSTRIAL PARK LOCATED IN BURGAW TOWNSHIP PENDER COUNTY, NORTH CAROLINA OWNER: PENDER PROGRESS CORPORATION P.O. Sox 959 Burgow, NC 28425 HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 1123 FLORAL PARKWAY II WILMINGTON, N.C. 28403 l PHONE: (910) 343-8002 F:\PROJECT FOLDERS\12207—Pender Progress Project\Engineering\12207—bose.dwg Layout (NCOENR—DA MAP)