Loading...
HomeMy WebLinkAboutSW8080607_HISTORICAL FILE_20090720PERMIT NO DOC TYPE DOC DATE STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS SW8 OYO�001 ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION 2ooq 01 2c) YYYYMMDD J F" NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Governor Director July 20, 2009 Woody Clookie, President St James Fire Department, Inc 3628 St James Drive SE Southport, NC 28461 Subject State Stormwater Permit No SW8 080607 St James Fire Station High Density Commercial Infiltration Basin Project Brunswick County Dear Mr Clookie Dee Freeman Secretary The Wilmington Regional Office received a complete State Stormwater Management Permit Application for St James Fire Station on July 16, 2009 Staff review of the plans and specifications has determined that the protect, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2006-246 and Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 080607 dated July 20, 2009, for the construction of the subject protect This permit shall be effective from the date of issuance until July 2, 2018, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adtudicatory hearing upon written request within sixty (60) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Kelly Johnson, or me at (910) 796-7215 Si rely, (Georgett cott 0 Stormwater Supervisor Division of Water Quality GDS/KPJ S\WQS\STORMWATER\PERMIT\080607MOD tul09 cc John Beroset, Coastal Land Design Brunswick County Building Inspections Jeff Phillips, Brunswick County Engineering Wilmington Regional Office Central Files Wilmington Regional Office 127 Cardinal Drive Extension Wilmington North Carolina 28405 One Phone 910 796 72151 FAX 910 350 20041 Customer Service 1 877-623 6748 NOIthCarolina Internet wvrw ncwalerquality, org JVaturatly An Equal Opportunity 1 Affirmative Action Employer State Stormwater Management Systems Permit No SW8 080607 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Woody Clookie & St James Fire Department, Inc St James Fire Station 3628 St James Drive SE, Southport, Brunswick County FOR THE construction, operation and maintenance of two infiltration basin(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until July 2, 2018, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 18 on page 3 of this permit The stormwater controls have been designed to handle the runoff from a total of 68,324 square feet of impervious area Infiltration basins 1 and 2 have been designed to handle 14,208 and 54,116 square feet of impervious area, respectively 3 Infiltration basin 2 must be operated with a 30 foot vegetated filter 4 The tract will be limited to the amount of built -upon area indicated in Section 18 on page 3 of this permit, and as shown on the approved plans 5 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 8 State Stormwater Management Systems Permit No SW8 080607 7 The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters 8 The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition Basin 1 Basin 2 a Drainage Area, acres 056 235 Onsite, ft 24,490 102,491 Offsite, ft none none b Total Impervious Surfaces, ft 14,208 54,116 c Design Storm, inches 30 1 5 d Basin Depth, ft 40 1 75 e Bottom Elevation, FMSL 260 2475 f Bottom Surface Area, ftz 251 3,404 Bypass Weir Elevation, FMSL 300 265 h Permitted Storage Volume, ft 3,515 7,185 1 Type of Sod Fine Sand Fine Sand Expected Infiltration Rate, in/hr 100 100 k Seasonal High Water Table, FMSL 235 220 1 Time to Draw Down, days 070 010 m Receiving Stream/River Basin Beaverdam Creek / Cape Fear n Stream Index Number 18-88-9-1- 0 5 o Classification of Water Body SC, Sw, HQW II SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowms and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter g A clear access path to the bypass structure must be available at all times 4 Records of maintenance activities must be kept for each permitted BMP The reports will indicate the date, activity, name of person performing the work and what actions were taken Page 3 of 8 State Stormwater Management Systems Permit No SW8 080607 5 The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection 6 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 7 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 8 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 9 Access to the stormwater facilities shall be maintained via appropriate easements at all times 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 11 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 12 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction 13 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made Page 4 of 8 State Stormwater Management Systems Permit No SW8 080607 III GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form to the Division of Water Quality, signed by both parties, and accompanied by the appropriate documentation as listed on page 2 of the form The approval of this request will be considered on its merits and may or may not be approved 2 The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 3 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 4 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 5 In the event that the facilities fad to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 6 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 7 The permit issued shall continue in force and effect until revoked or terminated The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 8 Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 9 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 10 The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H 1000, and NCGS 143-215 1 et al 11 The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes 12 The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit The renewal request must include the appropriate documentation and the processing fee Page 5 of 8 State Stormwater Management Systems Permit No SW8 080607 Permit issued this the 20th day of July 2009 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No SW8 080607 St James Fire Station Stormwater Permit No SW8 080607 Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Protect Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the protect construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No SW8 080607 Certification Requirements 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drams to the system 4 All roof drams are located such that the runoff is directed into the system 5 The bypass structure weir elevation is per the approved plan 6 The bypass structure is located per the approved plans 7 A Trash Rack is provided on the bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 All required design depths are provided 13 All required parts of the system are provided 14 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Brunswick County Building Inspections Page 8 of 8 k _ DWQ USE ONLY a Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FOI M This form may be photocopied for use as an original 0 4 2009 By I GENERAL INFORMATION 1 Applicants name (specify the name of the corporation, individual, etc who owns the project) St Tames Fire Department, Inc 2 Print Owner/Signmg Official's name and title (person legally responsible for facility and compliance) Woody Clookie, President of St Tames Fire Department, Inc 3 Mailing Address for person listed in item 2 above City Southport State NC Zip 28461 Phone (910 ) 253 - 9990 Fax (910 ) 253 - 9991 Email beroset@atmc net 4 Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc ) 5 Location of Project (street address) City Southport County NC Zip 28461 6 Directions to project (from nearest major mtersection) Approximately 14 miles South along St Tames Drive SE from the intersection of N C Highway 211 and St Tames Drive SE Project is located on the West side of St Tames Drive SE 7 Latitude 330 56' 35" N Longitude 78' 05' 39' W of project 8 Contact person who can answer questions about the project Name John Beroset Telephone Number (910 ) 231- 8905 Email beroset@atmc net II PERMIT INFORMATION 1 Specify whether project is (check one) ❑New ❑Renewal ®Modification Form S WU-101 Version 09 25 08 Page 1 of 4 Y 2 If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit numberSW8 080607 and its issue date (if known)07/02/2008 3 Specify the type of project (check one) ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4 Additional Project Requirements (check applicable blanks, information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748) ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Industrial Stormwater III PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project Stormwater is treated by two (2) mfdtrahon basins Please refer to the project information section on page 2a, that is included with this application, for the overall site impervious Infiltration basins #1 and #2 correspond to drainage basins #1 and #2, respectively 2 Stormwater runoff from this project drains to the Cape Fear River basin 3 Total Property Area 4 018 acres 4 Total Coastal Wetlands Area 0 acres 5 Total Property Area (3) - Total Coastal Wetlands Area (4) = Total Project Area** 4 018 acres 6 (Total Impervious Area / Total Project Area) X 100 = Project Built Upon Area (BUA) 40 66 % 7 How many drainage areas does the project have?2 8 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below For high density projects, complete the table with one drainage area for each engineered stormwater device Basin Information L Drainage Areal i Drainage Area 2 Receiving Stream Name Beaverdam Creek Beaverdam Creek Stream Class & Index No SC,Sw,HQW 18-88-9-1-(0 5) SC,Sw,HQW 18-88-9-1-(0 5) Total Drainage Area (so 24,490 102,491 On -site Drainage Area (so 24,490 102,491 Off -site Drainage Area (so -0- -0- Existing Impervious* Area (so 14,208 54,116 Proposed Impervious*Area (so -0- -0- % Impervious* Area (total) 58 02% 52 80% Impervious* Surface Area Diamage Areal Drainage Area 2' On -site Buildings (so -0- 11,188 On -site Streets (so -0- -0- On-site Parking (so 14,208 42,928 On -site Sidewalks (so -0- -0- Other on -site (so -0- -0- Off-site (so -0- -0- Total (so 14,208 54,116 * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc **Total project area shall be calculated to exclude Coastal Wetlands from use when calculating the built upon area percentage calculation This is the area used to calculate overall percent project built upon area (BLIA) Form SWU-101 Version 09 25 08 Page 2 of Table III 9 Supplement of Form SWU-101 Version 03 27 08 on Page 2 of 4 Basin Information Overall Property Boundary Receiving Stream Name Beaverdam Creek Stream Class & Index No SC,Sw,HQW 18-88-9-1-(0 5) Total Drainage Area (sf) 175,035 On -Site Drainage Area (so 175,035 Off -Site Drainage Area (s -0- Existing Impervious Area* (so 71,163 Proposed Impervious Area* (sf) -0- % Impervious Area (total) 40 66 % Impervious* Surface Area Overall Property Boundary On -site Buildings (sf) 11,188 On -site Streets s -0- On-site Parkin(sf) 58,679 On -site Sidewalks (so 1,296 Other on -site s -0- Off site -0- Total (sf) 71,163 * Impervious area is defined as the built upon area including but not limited to buildings, roads parking areas sidewalks gravel areas etc Form SWU-101 Version 03 27 08 Page 2a of 9 How was the off -site impervious area listed above derived?There is no off -site impervious for either basin Projects in Union County Contact the DWQ Central Office staff to check to see tfyou project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following property restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment Forms can be downloaded from http //h2o enr state nc us/su/bmp forms him - deed restrictions Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot V SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project Contact the Stormwater Permitting Unit at (919) 807-6300 for the status and availability of these forms Forms can be downloaded from http //h2o enr state nL us/su/bmp forms htm Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Form SW401-Cistern Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Cistern Supplement Form SWU-101 Version 09 25 08 Page 3 of 4 VI SUBMIT-IAI RLQUIRLMLNI'S Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below 1 he complete application package should be submitted to the appropriate DWQ Office (Appropriate office may be found by loc iting proli-0 on the IntcracUve online map at hup //h2o enr slate nc us/su/nisi nI Ips Iltm) Please Indicate that you have provided the tollo%%rill; required Information b% InItlalnlg In the spue provided nc\1 to each item hvtlals • U+t�nta! and our cope/ of the $toimn �h 1 Managunuri I'ci nut Application I on» J�-- Ungnad mid on, copq of the Deed RcStrietiorn & Prolecln e Covenants I m n1 (tf tupineda%ptl Pail ivabom) Uri�mal of the applicable Supplement I of nI(s) and OA\1 agrcunent(s) for each B\IP J14Z. • I'e unit application processntf; lee of b50i (C\press $4,000 for I ID $2 000 for LD) payahk to NCI)LNR sf�• • (altldltlOIIS & dclailed narrative description of slonn%%atet trc itmutt/management J(liC, • Copv of nnv ipplic iblt sods ry,ort • I %%o u,pics OI plans and spett6calioM (se Ilcd slj;ned dr %hied), lneluding - Development/Project name - engineer and firm Lcgu d - North arro%% Se a k - Revision number & date - Mr an high %% tier hilt - Dune nsnmt d prolit It%/Inoµv I boundalt - I oe ahon map a lilt nano d strr ON Or NCSR nunihe rs 011g111a1 contours propose d e ontours spot a Icvatiuns 11111%fit'd floor 1 levafioils - DOMIS of roads dnunagc IL lttlrc% Lotlecln,n s%steois And stor neater control nuauucs 1Vc If Inds delnicaled or a note on plans that none evst - 1:\Isting drainage (ine ludnig oft -site) drainage cisenlenls pipe sizes runott C.rludalluns - Drauiagc ircas dehmatcd - Ve gc0th d bultcn (%%here reslurred) VII ACCNTAUTIIORIZA910N If you 1%ish to clesignele aulhmlt\ to ano(hu uuln idual Or firm so that fill % nia% provide mloinialion un your behalf (sue h as additional information nqm sts) life ase eoniplt it This scchon (c\ &corning ( ngnur I or hi 111) Dcsignaled agutt (indrvldual or firm) Coastal I and Design, Pf.I.0 flailing Address P O Bo\ 1172 Cit\ Wilmington State NC 71p28402 I'honc (910 ) 254 - 9-144 1 av (910 1 154 - 051t^_ Linad net Vill APPI )CAN I'S Cl ItMICATION 1, (punt of type nano of Person lrhd III CI ❑oral Infininahan dart 2) I \4a dij Cloodrt Ibt,ident ccrtity th it the mlot matron included on tills pernut applic ition tot nI Is to the best of 111% Kilo%%ledge correct and that the. project %%dl be %onstruUc.d nt conform incc. i%ilh the ipproved plans that the required cleul resti ie lions and I,ro1CttivC Lewin vlts %%ill be rexorded, and that the propOsed projccl comph%s %%ith lht respnronlults of 15A \CAC 211 1000 Sigmlu rc w I orm 1,WU 101 Version 09 25 08 face 4 of 4 D,te (0/2/04 coastal Land Design. PLLC Cn d Lngmeenne / I andscipe Architecture / Construction Mattag�ment P 0 Box 1172 Phonc 910 254 9333 W tlrnmeton, NC 28402 lax 910-254 0502 July 29, 2009 NCDENR — Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Arm Linda Lewis Re St James Fire Station Designer's Certification (SW8 080607-Modification) Dear Ms Lewis The St James Fire Station expansion project is complete Please see the attached Designer's Certification included with this response Thank you, Jay Carmine, PE M. JUL 3 12009 200 12 Ltr to Linda Designers Certification doc Page 1 of 1 Johnson, Kelly From Coastal Land Design [ckibler@coastallanddesign net] Sent Thursday, July 16, 2009 2 39 PM To Johnson, Kelly Subject st fames fire station SW8 080607 Attachments Document pdf Please open the attached document This document was digitally sent to you using an HP Digital Sending device Fax Transmittal To Kelly Johnson Fax (910) 350 - 2004 rrom Jay Carmine CC rile Re St Tames Fire Station RFI (SW 8 080607) Pa. -es 2 (Including This Sheet) Date 16-July-2009 Job 9 200-12 1F YOU DO NOT RECEIVF 1111S DOCUMENT CLEARLY Pt EASE CALL (910) 254 9333 ❑ This is your ongmal ❑ Origm.tl to k marled Dear Ms Johnson, We have modified the table under the Infiltration Basin 92 Capacity per your request for additional mtormatton dated July 13, 2009, to ietlect the surface area and storage, volumes for cle,vatton 26 50 The respective volume is 7 185ef and the surface area 1s 4,722sf Please feel free to contact me should you have any questions or concerns Thank you for discussing this project with me over the phone Carmine, P E Infiltration Basin #2 Capacity F FC`IT TVEDJUL ] 6 2009g Contour 6levntton Contour Area Increment Volume AuumulaUsa Volume(',) [fins]] [so [cf] cf [II] 2475 3 404 0 0 000 2500 3 SRO 873 873 0 2� 2600 4 322 3 9:, 1 4 824 1 25 26 56 J 711 1 261 7 185 1 7h 2700 3 121 2 461 9 :146 ? 25 ',tor ree Volum( ( h trict(rlltl(i \Lnuurm l reativun Volunu Vann Hught of Stura_L Volume 11%ol Lks eon of Slorag, Volume Esol EI(nation of OsLrOou Essur Tom1\ olum( Pros ukd V"., Told \olunm Pros nkd V".,. Area at Storage Volume SAao, E.fdtranon Rnt( R L.fdtnumn Rule through Bottom Q\ 1 um to E.6ltranon Min Volume T 6729 (cI] [ft] [fins]] [rms]] [el] 1 rc m] [so [tmlirl Ids] [days] 165 2640 2650 7185 194 4 722 10 00 079 0 10 As per NMNR Given TablL Iut1rpolatt0n Ls of = ([9ot0111 b I(s auun)+ l Is of Given Tible Interpolation V,,,,, [ n. m] = V,,,,,[ctj" 121n./tI - 4� :i Wsb lc 1 abli. huLrpolauon R Irom Sods I(st NCDI NR \laumum = IOutPrn A611,11 = 29 SmPor Q. _ (A,,, .*R) — (12m/11 3 600seedn) T = ( Vmm I Q. ) - 86 400su/(Im v l'tt I'tlf� r f ;. � CY �✓� T „ 7Ij6�O� i���� R11 cp�a\�� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor July 13 2009 Woody Clookie, President St James Fire Department, Inc 3628 St James Drive SE Southport, NC 28461 Division of Water Quality Coleen H Sullins Director Subject Request for Additional Information Stormwater Project No SW8 080607 St James Fire Station Brunswick County Dear Mr Clookle Dee Freeman Secretary The Wilmington Regional Office received a State Stormwater Management Permit Application for the project located at 3628 St James Dr SE on June 4, 2009 The Division of Water Quality has conducted a preliminary review of that information and determined that the application is not complete The following information is needed to continue the stormwater review 1 Table of elevations The table of elevations for Basin #2 (which is shown on the page labeled as the "infiltration Basin #2 Capacity" in the calculations contains a table of elevations for 24 75, 25 00, 26 00, and 27 00 fmsl Because the storage elevation is at 26 5 fmsl, please add 26 5 to the table and show the respective volume (7,185ft') and surface area (4,722ft2) Please note that this request for additional information is in response to a preliminary review The requested information should be received in this Office prior to August 13, 2009, or the application will be returned as incomplete The return of a project will necessitate resubmittal of all required items, including the application fee If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter The request must indicate the date by which you expect to submit the required information The Division is allowed 90 days from the receipt of a completed application to issue the permit The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215 1 and is subject to enforcement action pursuant to NCGS 143-215 6A Please reference the State assigned project number on all correspondence Any original documents that need to be revised have been sent to the engineer or agent All original documents must be returned or new originals must be provided Copies are not acceptable Wilmington Regional Office 127 Cardinal Drive Extension Wilmington North Carolina 28405 Phone 910 796 72151 FAX 910 350 20041 Customer Service 1 877-623-6748 Internet w nmaterquahty org An Equal Opportunity 1 Affirmative Action Employer NorthCarohna Naturally SW8 080607MOD July 13, 2009 If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at kelly p Johnson@ncdenr gov Sine ely, elly ohnson Environmental Engineer GS/KJ S\WQS\STORMWATER\ADDINFO\2009\080607MOD jun09 CC John Beroset, Coastal Land Design Stormwater Permitting, WiRO files Page 2 of 2 Coastal Land Design, PLLC. P 0 Box 1172 Wilmington, NC 28402 Phone 910 254 9333 Fax 910 254 0502 To NCDENR—Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 350 — 2004 Arm frinda Lewis ❑ As Requested ❑ Sent via Mail ❑ For Your Files ❑ Sent via Courier RECD i U N 4 2009 Transmittal June St James Fire Station — Modification S W 8 080607 ❑ For Distribution ® For your Review / Action / Approval Quantity Drawing No Description I Copy NCDENR comment letter regarding the Designer's Certification I Check# 3795 In the Amount of $505 00 for the standard review fee 1 Copy Documentation listing Woody Clookie as President of St James Fire Department, Inc 1 Original Stormwater Management Permit Application Form I Copy Stormwater Management Permit Application Form I Original Infiltration Basin #I Operation and Maintenance Agreement 1 Original Infiltration Basin #2 Operation and Maintenance Agreement 1 Original Filter Strip, Restored Riparian Buffer, and Level Spreader Operation and Maintenance Agreement 1 Original Infiltration Basm #I Supplement 1 Original Infiltration Basin 92 Supplement 1 Original Level Spreader, Filter Strip, and Restored Riparian Buffer Supplement 1 Copy Stormwater Design Narrative 1 Copy Stormwater Design Calculations 1 Copy ECS Carolina, LLP Soil Investigation for Infiltration Basin #1 (Sod Boring #5) 1 Copy ECS Carolina, LLP Soil Investigation for Infiltration Basin #2 (Soil Boring #4) 2 Copies Stormwater Management Plan REMARKS If you have any questions or concerns regarding this submittal, please contact this office Thank you CC File 10 jUN 0 4 2009 Cy astaftj>_st£n, P L L C PE 200 12 Transmittal NCDENR 04 June-2009 doc ST JAM£S FIRE DEPARTMENT (910) 253-9990 June 20,2008 NCDENR Gentlemen 3628 ST JAMES DR SOVTHPORT NC 28461 FAX (910) 253-9991 The purpose of this letter is to certify that Mr Woodrow F Clookie was elected as president of the St James Volunteer Fire Department Board of Directors Mr Clookie was elected at the regular Board of Directors meeting on January 8, 2008 1 have enclosed a copy of the minutes If there is any additional information you need please call or fax the St James Fire Department at the above numbers Sincerely, Dr John Schroeder Secre ary, Board of Directors St James Volunteer Fire Department I' jVED JUN 0 4 2009 BY North Carolina Brunswick County I Jill S Melton, Notary Public for Brunswick County, North Carolina, certify that Dr John M Schroeder personally came before me this day and acknowledged that he is Secretary of St James Fire Department, Inc, a corporation, and that he, as secretary, being authorized to do so, executed the foregoing on behalf of the corporation Witness my hand and official seal, this the 20th day of June, 2008 oI AR y r �•� mm Exp Co , dPG� Au By S ICK r St James Fire Department, Inc Board of Directors Meeting, Tuesday, January 8, 2008 Vice President, Woody Clookie called the meeting to order at 2 30 Present Beig, Clookie, Gear, Lesher, Maguire, Nejes, Schroeder, Schulz, and Young Absent Donnelly New Officer Nominations The nominating committee's slate of officers for 2008 was presented Nominations were closed and the slate was approved unanimously President Woody Clookic Vice President John Young Treasurer Jim Gear Secretary John Schroeder Mmutes The minutes of December 13 Board Meeting were approved Commumcations Two notes of appreciation for recent EMS calls were read Public Comment None Financial Reports The Treasurers report was approved _Operations Report Lesher presented the operations report (attached) It was moved by Schultz and seconded that we become Participating Partners with Blue Cross and Blue Slueld of North Carolina (This allows BC&BS of NC to pay the Department directly for ambulance services Motion passed The Town of St James will host the Official St James Fire Department Web Site The POA will have links to the official site This will eliminate confusion caused by partial information on both sites Presidents Report None Issues to be discussed under New Business Committee Reports We will sign a Service Contract with Al Fulford Heating and A/C to service the Fire Department's two heat pumps and two gas heaters Old Business Gear presented several changes to the proposed budget The budget is in its final stages of preparation The meeting was unexpectedly forced to adjourn when the fire call pagers went off requesting mutual aid for a structure fire Respectfully Submitted M MaLp ECS CAROLINAS, LLP cwROLiNws Geotechmcal • Construction Materials • Environmental • Facilities May 12, 2008 Mr Jay Carmine, P E Coastal Land Design, PLLC�� PO Box1172 JUN 0 4 2009 Wilmington, North Carolina 28402 i -Re Addittonal Infiltration Testing BY Saint James Fire Department Expansion Southport, North Carolina ECS Project No-22 13942B Dear Mr Carmine, s ECS Carolinas, LLP (ECS) recently conducted an additional infiltration test for the proposed linfiltration area at the above site located off of Saint James Drive in Southport, North Carolina This letter, with attachments, is the report of our evaluation Field Testing I - I On May 12, 2008 ECS met with Mr Jay Carmine with Coastal Land Design on site in order to provide the requested additional test location ECS then conducted an exploration of the subsurface soil and' ground water conditions at the requested location shown on the attached Site Diagram The purpose of this exploration was to obtain subsurface information of the suitability of the soils for the proposed infiltration area We explored the subsurface soil conditions by advancing one hand auger bormg into the existing ground' surface at the requested boring location. We visually classified the subsurface soils and obtained, r, representative samples of each soil type encountered We also recorded the seasonal high ground water level (SHWL) observed at the time of the hand auger bormg The attached Infiltration Evaluation Form provides a summary of the subsurface conditions encountered at each hand auger boring location i ` ` F The SHWL was estimated at the boring location below the existing grade elevation Below is a summary of our findings Location- SHWL 3 5 .90 inches - Utilizing a`compact constant head permeameter, we have conducted an infiltration test near the han&auger boring to estimate the infiltration rate for the subsurface soils The infiltration tests are typically conducted at two feet above the SHWL 7211 Ogden Business Park • Suite 201 • Wilmington, NC 28411 • (910) 686-9114 • Fax (910) 686-9666 • www ecshnnted coin C Asheville, NC Charlotte NC Greensboro NC Greenville SC Raleigh, NC Swansbow NC • Wibnington, NC + testing services only i Infiltmhon Evaluation Stunt James Fire Department Expansion Southport, North Carolina ECS Project No 2213942B Field Test Results Below is a summary of the infiltration test results Location Description Depth hiches/bour Inches/minute _ 5 Tan fine SAND 66 inches 243 0 40 hifiltration rates and SHWL may vary within the proposed site due to changes in elevation and subsurface conditions If you have any questions regarding this report, please contact us at (910) 686-9114 Respectfully, ECS CAROLINAS, LLP K Brooks Wall StaffGeologist Attachments Site Diagram Infiltration Evaluation Walid M Sobh, P E Principal Engineer NC License No 22983 u PROPOSED PARMG IDr 1 \ l AA FY f • ' ,/yi ST JAMES PLANTATION CHAPEL SITE DZ 1192, PG 468 s • t t,,,� y V(' + +� t y MC V, PG 329 / , � •fP.A� Y'a '� FJO FIRE eu • ii E�2:eE�i=i• �i:�. J.t 4 TEST LOCATION St James Plantation Fire Department Wilmington, NC / BRUN WE DB ECS Project No 22-13942B May 12, 2008 1 Bw G m Additional Infiltration Evaluation Saint James Fire Department Expansion Southport, North Carolina ECS Project No 22 13942B May 12, 2008 Location Denth Soil Description 5 0-10" Grey /white fine SAND 10"48" Tan fine SAND 48"-60" Orange fine SAND 60"-108" Tan fine SAND Seasonal High Water Table was estimated to be at 90 inches below the existing ,grade elevation Infiltration Rate 0 40 inches per minute (24 3 inches per hour) Test was conducted at 66 inches below existing grade elevation Stormwater Design For St. James Fire Station SW8 080607 - Modification Brunswick County North Carolina m Prepared by JUN 0 4 2009 Coastal sand Design, PLLC Civil Engtneenng / Landscape Archtteetmre / Constntchon Management P 0 Box 1172 Plione 910-254-9333 Wilmington, NC 28402 Fax 910 254-0502 Prepared for A St James Fire Department, Inc 3628 St James Drive SE Southport, NC 28461 May 29, 2009 E A L r ; ��09 1 c�G! NEB4,\\��� PN#i111lP0 \\\\ Narrative Brief Update This project is being submitted for a modification at the duectton of Linda Lewis (NCDENR) There were some modifications to the shape of the infiltration basins that had to be made in older to satisfy some spatial and hydraulic concerns that were not present at the time of design due to an unknown survey error that did not come to light until this project was under construction These modifications were shown in the Designer's Certification for this project (SW8 080607) These noted changes, however, were determined to be too signficant to allow the ceinfication to suffice without a submittal of the modified plans applications, and calculations Please iefer to the Designer s Certification for this project on file with the State when referencing this project At this point, all impervious has been constructed and the project is complete — minus the necessary modifications to the shape of the infiltration basins that will result from this submittal A brief synopsis of the changes to the infiltration basins ai e shown below 1) Infiltration Basin #1 (ROW was actually 6 wider in the field) a Length was truncated by approximately 6' (to 60' from 66') b The depth of the basin was increased by P (to 26 0' from 27 0 ) c The foi ebay-main basin sepal ation will be changed to i ip-i ap from earthen matet ial 2) Infiltration Basin #2 (Hydraulic outlet was about 6" higher in the field) a The bypass weir (temporary pool) elevation was raised by 6' (to 26 50' from 26 0') b The level spreader lip elevation was raised by 6" (to 26 25' from 25 75') c the vegetated filter outlet elevation was raised by 6" (to 25 75' from 25 25') d A 6"xl8" flat channel was consn ucted at the `front' of the level spreader e An 8" roof dram leader was outlets to the Swale (piped instead of sheet flow) f The bottom of the basin will be i aised by 9 (to 24 75 fi oin 24 0 ) rhese aforementioned modifications, in conjunction with the previously approved permitting variances by the State for this project, allow the infiltration basins to remain complaint with the State's design criteria The original narrative has been included with this project to offer supplemental information for the design approach that was originally taken and to give background information on the pre -sub rattal agreements that were between the State and St James Fire Department, Inc for this project Only the infiltration basin shapes have been modified None of the drainage basins, site design, or basin hydrology has been altered and remains as previously permitted The only calculation procedural change was the use of the NOAA Atlas-14 to determine the pre development and post influent discharges rather than the values listed in the Brunswick County stormwater manual Protect Overview The St James Fire Station is located in St James Plantation in Southport, NC Please refer to the vicinity map on plan set The St James Fire Station was built in the late 90's and because the ouginal tract of development was less than one acre, it did not have to apply for NCDENR stormwater or erosion control permits The fire station was not originally designed with any expectations of future expansion, however, with the growth of the St James Plantation development, an expansion is now required to keep tip with the potential demand from the development This stormwatei management plan is designed to treat the proposed expansion as well as the existing impervious on site y The emsnng file station is 7,108sf, the existing pai king lot is 12 294sf, and the portion of the private drive on the property is 421sf The existing private drive and the parking lot underneath the proposed building - will be iemoved with the expansion Tine expansion is for the addition of 4 080sf of budding and 31 723sf of pm king lot The total amount of impel vious for this stot mwater project is 71,163sf and will be neated by two (2) infiltration basins Due to the maximum driveway slope and rate of vertical curvature limits for fire engines, a small portion of each driveway is not feasible to be captured by the infiltration basins The portion of the untreated existing driveway is 450sf and the untreated portion of the proposed driveway is 1,093sf Both will be collected by the existing curb and gutter along St James Drive SE This was discussed at the pre -submittal meeting for this project and was it was agreed that the small amount of impervious that cannot be caught, due to these constraints, was acceptable There is also an existing sidewalk loop on the property that is not feasible to be treated by conventional stormwater measures The untreated existing sidewalk impervious surface is 1,296sf and will be filtered by the existing 30' buffer along St James Drive SE Thus, the total amount of untreated impervious from this site is 2,839sf (450sf of existing parking, 1,093sf of proposed parking, and 1,296sf of existing sidewalk) The rest of the impervious on the property will be treated by the infiltration basins that are designed to not only meet NCDENR's stormwater requirements but to also allow the site to meet Brunswick County's post -development discharge requirements Site Descuption The topography of the St James Fire Station expansion pioject is wooded and has an overall slope of approximately 1 5% The property has a grade Meal, at approximately the north side of the existing building and directs runoff to either flow north over the emsting driveway or south through the proposed parking lot addition The entire property ultimately chains into the Beaverdanl Creek, a waterway classified as SC, Sw, HQW The elevations on this project range from 25 feet MSL to 32 feet MSL and according to the Soil Survey of Brunswick County, North Carolina, the underlying sods are Wanda fine sands This soil is rapidly draining and has a sod hydrologic group of A The seasonal high water table and the infiltration rate of the soils underneath the proposed infiltration basins were analyzed by ECS, Carolinas and confirmed by Vincent Lewis of NCDENR Please refer to the soils reports shown included with this stormwater management plan application As per the direction of NCDENR, an infiltration rate of 10 Om/hr was used in the design of both infiltration basins rather than the higher rates as determined from the site specific soil testing There are no wetlands on this property Stormwater Treatment System Infiltration basm-I is designed to treat the northern portion of the site and will treat 14,208sf of the existing parking lot The exfiltration rate for this area is 24 31n/lir according to sod boring 95 as performed by the soil investigation, however, an exfiltration rate of 10 Oin/hr was used in this design Stormwater will be collected by a trench drain at the lowest feasible part of the existing driveway/parking lot The rim elevation for the trench dram is 30 00fmsl which is also the elevation of the temporary pool Thus, excess stormwater above the design storm event will flow across the trench dram rim, and will be bypassed from the infiltration basin As per the pre -submittal meeting for this project, this infiltration basin is designed to treat the first 3 0" of runoff, rather than the first 1 5', in lieu of a vegetated filter on the bypass because of its spatial constraints and the fact that it is only treating stormwater from existing impervious Stormwater will be pretreated by a small forebay connected to the infiltration basin Bypassed stormwater will be discharged by sheet flow into the existing curb and gutter for St James Drive SE Infiltration basin-2 is designed to treat the remainder of the existing impervious area and the proposed impervious for the fii a station expansion (54,116st) The exfiltration rate for this area is 29 51n/hr according to soil boring #4 as performed by the soil investigation, however, an exfiltration rate of 10 Om/hr was used in this design Stormwater will be collected by a pretreatment swale that discharges stormwater into the infiltration basin A weir is designed in the channel and set at an elevation of 26 50finsl to dnect stormwater into the infiltration basin That elevation is also the elevation of the temporary pool Thus excess stormwater above the design storm event will flow over the weir in the channel and will be bypassed from the infiltration basin The bypassed stormwater will then be directed to an 82' long level spreader which is designed to treat runoff from the 10 year storm event After then level spreader, runoff ivll then be directed through a 30 vegetated filter Stormwater will then be ultimately discharged b) sheet float into the existing curb and guttei for St James Drive SE `a Stormwater Design Calculations For St. James Fire Station SW8 080607 - Modification Brunswick County %ko, � ifft t'viHz 15 North Carolina JUN 0 4 2009 m Prepared by Coastal Land Design, PLLC Civil Fngmeenng / Landscape Architecture / Construction Manggement P O Bo, 1172 Plione 910-254-9333 Wilmington, NC 25402 Fax 910-254-0502 Prepared for St James Fire Department, Inc 3628 St James Drive SE%8516 ! Southport, NC 28461 EAL 3 3 1 � May 29, 2009 RI Drama2e Area #1 Characteristics Item Area Im(ler%t us Rational Area x Imp Area x C name] ION Isfl Isq lEmsting Buildings 11 0 100 0 9a 0 00 E�istine Parking Lot 14 208 100 095 14 208 13 497 6 IE\isttiig Roads 0 100 095 0 00 E\istin Side% alk 0 100 09) 0 00 Pra osed Buildings 0 100 0 90 0 0 0 Proposed P irking Lot 0 100 095 0 0 0 Yro osed Roads 0 100 0 9a 0 00 Pro osed Suleisall, 0 100 0 9� 0 00 Offsnc 0 100 0 92e 0 0 0 Pen ious Space 10 282 0 0 15 0 t 542 3 Total 24 490 14 208 15 039 90 Area Weighted Impervious = E( Area \ Imp ) / E( Drainage Areas ) Area Weighted Impervious= 14208sf/24490sf Area Weighted Impervious = 58 02°/u Rs = 0 05 + 0 009*(%Imp) Rv = 0 05+0 009*(58 02%) Rs = 0 572 As per NCDENR Pre submittal meeting, P = 3 Oin/hr for No Vegetated Filter Min treatment Volume Vmm= P*Rv*Ad Min Treatment Volume Vona = 3 Oin/12in/ft)*(0 572)*(24490sf) Min Treatment Volume Vann = 1 3 503 Ica Pre -Development Discharge Calculations Site Chnractenstics Runoff Coefficient, Cp,e Hydraulic Length, I pre Eles ation Change Hp,e Drainage Basin Area. A Time of Conc Multiplier Kp,e Time of Concentration Tcpre 1 yr Intensiq, Ip,e, 1 yr Flow, Qprepczk. In] [ft] [acres] [nun] [m/hr] [cfs] 015 250 200 0 562 200 7 54 047 Post -Development Dischirge Calculations Site Chit actenstics Runoff Coefficient Cp,,,, H\dmulte Length Lp°a, Elesation Change HP.', Drainage Basin Area A Time of Colic Multiplicr Kp°„ Time of Concentration Tcp°„ 1 rr Intensnv Ip°a, I N r Floii Qp°,„. peu , [ft] [ft] [acres] [min] [in/hr] [CfS] 061 250 200 0 )62 107 98 2 08 Cpre= 0 15 (Wando fine sands Woods Good Stand SHG=A) Green Craven Green Kpre = Overland Sheet Flow Tep,e = (Kpre / 128) * (L,., / I 1pre)o 385 5mm minimum I, , = 154 3 / (Tep,e + 20 8) from NOAA Atlas 14 Qpre peak,i=Cpre*lpre *A*(43 560sf/ac — 43200see in/hr ft) C,t=(%Imp)*095—(1 %Inip)*01:l See This Worksheet See rhis Worksheet See flits Worksheet K,,, = (%Imp)*0 40 + (I %Imp)*20 Tc,.,, _ (Kp°„ / 128) * (Lp°, 3 / Hp°a )o s5 5mm minimum I,, i = 154 3 / (Tcp°„ r 20 8) from NOAA Atlas 14 Qp°„,, pegk i = Cp°r,*Ip°„ , *A*(13 560sf/ac — 43 200sec uift Ill Infiltration Basin #1 Capacity Contour Elesahon Contour Area Increment Volume Accumulatne Volume (S) Stage (Z) [foul] (so Ica [cq [ft] 2600 2S1 0 0 000 2700 358 358 100 2800 824 645 1,003 200 2900 1,237 1 031 2033 300 _ 3000 1 727 1 482 3 515 400 Stor ree Volume Chirncteristics Minimum Treahnent Volume, Vmm I [eight of Storage Volume, H%ol EleNauon of Storage Volume Bel Elevation of Overflow Eoetr Total Volume Pros tded VPMV Total Volume Pros tded VPMV Area at Storage Volume SAprov Eafiltration Rate R E\filtranon Rate through Bottom Q\ Time to E\filtratton Min Volume , T 3,503 [cf] [ft] [fins[] [finsl] [cf] [ac m] [so [m/hr] [cfs] [days] 399 2999 3000 3 a15 097 1 727 1000 006 070 G is en Table Ina,rpolatton Cvol = (Bottom Elevation)+ Hvol Given Table Interpolation V pm [ac m] = V prov[cf] * 121r/ft — 43 560sf/ac Table Interpolation R from Soils Test, NCDENR Maximum = l0tn/hr, Actuil = 24 31n/hr Qx _ (Ab.a..*R) — (121n/ft*3 600sec/hr) T = ( Vann / Qx ) — 86 400sec/daN Dralna2e Area #2 Characteristics Item Area Impern ious (Im) Rational C Area a Imp Area C name s % s[Sfl IE\tstinS Buildings 7108 100 095 0 00 JENisting Parking Lot l2 294 100 095 14 208 13,4976 lExistma Roads 0 100 095 0 00 lExisting Sidewalk 0 100 095 0 00 Pro osed Buildings 4 080 100 095 0 00 ]Proposed Parking Lot 30 634 100 095 0 0 0 Pio osed Roads 0 100 095 0 00 Pro osed Sidewalk 0 100 0 9� 0 00 Offsite 0 100 0 95 0 00 Pervious Space 48 375 0 0 15 0 1 5423 Total F-10-24-917 14208 15 039 90 Area Weighted Impervious = E( Area x Imp ) / E( Drainage Areas ) Area Weighted Impervious= 54116sf/ 102491sf Area Weighted Impervious = FT2 80% Rv= 005+0009*(%Imp) Rv= 0 05+ 0 009*(�2 8%) Rv= 0:12i Min Treatment Volume Vmm= P*Rv*Ad Min Treatment Volume Vmm= (I 5in/12in/ft)*(0572)*(102491st) Min Treatment Volume Vann= 6 729 [cf] Pre -Development Discharge Calculations Site Characteristics Runoff Coefficient Cpre Hydraulic Length, Lire elevation Change, Hpr, Drainage Basin Area A rune of Cone Multiplier Kpr, l imeof Concentration leer, I yr Intensity Ipr, , 1 yr now Qp„,, 1 [ft] [fill [acres] [inin] [m/hr] [efs] 0 15 400 � 00 2 353 200 9 26 187 Post -Development Discharge Calculations Site Ch rricterisucs Runoff Coefficient Cost I is draulic Length L,p„ Lies ation Change H,n„ Drainage Basin Area A Time of Cone Multiplier Kpos, I ime of Concentration 7cpo„ I s r Intensity 1pos, i I N r I lop Qpaeun,e k1 [ft] [ft] [acres] [nun] [ui/hr] [efs] 0 �7 400 5 00 2 353 1 16 98 812 Cpre = 0 15 (Wando fine sands Woods -Good Stand, SHG=A) Given Given Given Kpre = Overland Sheet floss Tcpr, _ (Kpre / 128) * (L,rei / Hpre)° 385 nm1n minimum Ipr, i = 154 3 / (Tcpr, + 20 8) from NOAA Atlas 14 Qpre,„�,) = C,re*Ipr, i*A*(43,560sf/ac — 43 200sec in/hr ft) C,,=(%Intp)*09)—(I %Imp)*015 Scc This Worksheet See This Worksheet See This Worksheet K,,_(%Imp)*040T(I %lntp)*20 Tcpo,t= (Kpost / 128) * (t pos,i / I Ipasi)oias 5111111 nuns n in frost i=1)43/(1c,,,,+ 208) from NOAA Atlas 14 Qpovmpearl=Cpost1post *A*(43 o60sf/ac— 43200sce in/hr ft) Infiltration Basin #2 Capacity Contour Elevation Contour Area Increment Volume Accumulative Volume(S) Stage (Z) [fmsl] [sf] Ica Ica [ft] 24 75 3 404 0 0 000 2500 3 580 873 873 025 2600 4 322 3 951 4 824 1 25 2700 5 I21 4 722 9 546 2 25 Stornec N olume Ch trnctet isties �6 '')t3il,l)22�tx Minimum Treatment Volume Vnun Height of Storage Volume I Is of Elevation of Storage Volume Csol Elevation of Overflow, Esseir Total Volume Provided V". Total Volume Provided V'.' Area at Storage Volume SA'.' Exfiltmtion Rate R E%filtration Rate through Bottom Qx Time to Exfiltration Min Volume T 6729 Ica Gisen [ft] I able Interpolation [fmsl] Es01=(Bottom Elesation)+IlvoI [fmsl] Gisen Ica Table Interpolation [ac m] V,,,,[ac in] = V,,[cq* 12m/ft — 43 560sf/ac [sf] Table Interpolation [ut/hr] Rfrom Soils lest NCDENR Maximum=IOm/hr Actual =295m/hr [cfs] Qx _ (Abo„ om*R) — (121n/ft*3 600sec/hr) [das s] r = ( Vmm / Qx ) — 86 400sec/da5 1 6) 2640 2650 7 185 198 4,722 ]000 079 010 r NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen H Sullins Dee Freeman Governor Director Secretary FAX COVER SHEET Date May 27, 2009 No of Pages 1 �f L To Jay Carmine, P E From Linda Lewis Company Coastal Land Design Water Quality Section Stormwater FAX # 254-0502 (Local) FAX # 910-350-2004 Phone # 910-796-7215 DWQ Stormwater Project Number SW8 080607 Project Name St James Fire Station MESSAGE Jay The Division received the Designer's Certification for the subject project on May 13, 2009 The certification notes a few deviations from the permitted condition For Basin #1, the noted changes will require a permit modification Deepening the basin by 1 foot to make up for a 6 foot reduction in the length of the basin is the kind of change that requires a permit modification to be approved BEFORE construction The permitted bottom elevation may already be as low as it can go based on the SHWT elevation Luckily, there is enough room to lower the bottom of Basin #1 by one foot, however, a permit modification, revised calculations, revised plans and permit application fee are still required to demonstrate that the required storage volume has been provided in the modified basin The items listed for Basin #2 do appear to provide more storage, however, if there had been no changes to Basin #1, a plan revision would have been the correct course of action to document these changes Since the changes to Basin #1 require a modification, the changes to Basin #2 should just be included with that mod In the future, when there are deviations to the permitted elevations that result in changes to the areas or volumes, an as -built survey should be included with the Certification or Modification GDS/arl S\WQS\STORMWATER\ADDINFO\2009\080607 may09 Cc Woody Clookie, St James Fire Department Wilmington Regional Office 127 Cardinal one Extension Wilmington North Carolina 28405 Phone 910 796 7215 \ FAX 910 350 2004 \ Customer service 1-877-623-6748 Internet w rimaterquaftty, org An Equal Opportunity Af rmaave Action Employer None rthCarolina Naturally P. 01 TRANSA(TION REPORT MAY-27-2U09 WED 01 02 PM FOR NCDENR 910 350 2004 SEND DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP MAY-27 01 01 PM 92540502 4'50' 1 FAX TX OK (06) 644 TOTAL ' 411 50S PAGES' 1 N�C��IR North Carolina Department of I nvironment and Natural Resources Division cf Water Quality Beverly Eaves Perdue Coleei H Sullins Dee Freeman Govemw Crector Secretary FAIL COVER SHEET Date May 27, 2009 No of Pages 1 i91 To Jay Carmine, P E From Linda Lewis Company Coastal Land Design Water Quality Section Stormwater FAX # 254.0502 (Local) FAX # 910 360-2004 Phone # 910-796.7216 DWG Stormwater Project Numbei SWI1 080607 Project Name St James Fire Station MESSAGE Jay The Division received the Designet s Certification for the subject project on May 13, 2009 The certification notes a few deviabons from the permitted condition 1 For Basin #11 the noted change s will require a permit modification Deepening the basin by 1 foot to make up or a 6 foot reduction in the length of the basin Is the kind of change that requires a permit modification to be approved BEFORE construction The permitted bottom elevation may already be as low as it can go based on the SHWT elevation Luckily there Is enough room to lower the bottom of Basin #1 by one foot, however, a permit modification revised calculations revised pl ins and permit application fee are still required to demonstrate that the naquirei storage volume has been provided in the modified basin 2 The Items listed for Basin 1 #2 do appear to provide more storage, however if there had been no changes to 3asin #1 a plan revision would have been the cored course of action to document these changes Since the changes to Basin #1 require a modification the changes to Basin #2 should just be included with that mod In the future when them are deviaUcris to the permitted elevations that result in changes to the areas or volumes an as -built survey should be included with the Certification or Modficaton GDS/art S \WQS\STORMWA7 ER\ADDINF012009\080607 may09 Cc Woody Clookte St James °Ire Department vimftmrmrmvoam lvG owinwiiftw NaM GminelBWS ]�J Caro tfla PMna 916)B6Ye161FAY 9163�haINlCubnNearKa 1 9Ira23& V �t tiD,0�"1�Emp� f Coastal Land Design, PLLC P O Box 1172 Wilmington, NC 28402 Phone 910 254 9333 Fax 910 254 0502 To NCDENR-Division of Water Quality 127 Cardinal Drive Extension Wilmington NC 28405 (910) 796 — 7215 Attn iStormwater Secretary) ❑ As Requested ❑ Sent via Mail ❑ For Your Files ❑ Sent via Courier M MAY 19 2609 r(o, Transmittal Na.,� Date May 13 2009 File 200-12 Subject St James Fire Station Designer's Cerhfication (SW8 080607) ❑ For Distribution ® For your Review / Action / Approval Quantity Drawing No Description 1 Copy Designer s Certification for St James Fire Station (SW8 080607) REMARKS CC File CeaSraTLirJ-0 at�di n PLLC No 200-12 Transmittal- NCDENR-DWQ 051309 doc