Loading...
HomeMy WebLinkAboutSW8060338_HISTORICAL FILE_20060804STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 U1o0338 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 200�.o C)g(5 -} YYYYMMDD Michaal F Easley Governor William G Ross Jr Sccretaq North Carolina Department of Environment and Natural Resources Alan W Klimek P E Director Dn ision of Water Quality August 4,2006 Mr Sheldon Tucker MAS Properties, LLC 131 Ocean Blvd West Holden Beach, NC 28462 Subject Stormwater Permit No SW8 060338 Ocean Isle Palms General Permit -Clear and Grade Brunswick County Dear Mr Tucker In accordance with your application to be covered under the State Stormwater General Permit for Clearing and Grading a Proposed Site, received on May 2, 2006, we are forwarding herewith the subject Certificate of Coverage Number 060338 to clear and grade a proposed development site where the final design is not yet known and the developer has not requested the application be placed on hold, under the subject General Permit This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 1 and Title 15A NCAC 2H 1000, the stormwater management rules Please take notice that this Certificate of Coverage is not transferable except after notice to the Division of Water Quality (DWQ) The DWQ may require modification or revocation and re - issuance of the Certificate of Coverage This permit does not affect the legal requirement to obtain other permits which may be required by the Division of Water Quality the Division of Land Resources, Coastal Area Management Act, or any other Federal, State, or Local agency, law, rule, or ordinance If you need a copy of the General Permit, or have any questions concerning this permit, or need additional information this matter, please contact either Gary Beecher or me at (910) 796-7215 Singly! Edward Beck Regional Supervisor Surface Water Protection Section EB/gb S \WQS\STORMWAT\PERMIT\060338 Aug06 cc Jessica Winterwerp (Cape Fear Engineering) Brunswick County Building Inspections Gary Beecher (DWQ) Wilmington Regional Office Central Files N''o��`tthCarolma �vWura/!y North Carolina Division of Water Quality 127 Cardinal Drive Fxtension Wilmington NC 28405 Phone (910) 796 7215 Customer Service Wilmington Regional Office Internet wwa nc%+aterouahty ore Pax (910) 350 2004 1 877-623 6748 An Equal Opportunity/Affirmative Action Employer — 50 % Recycled/l0% Post Consumer Paper State Stormwater Management Systems COC# SW8 060338 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT GENERAL PERMIT NO SWG030000 CERTIFICATE OF COVERAGE NO 060338 CLEAR AND GRADE A PROPOSED SITE In compliance with the provisions of North Carolina General Statute 143-215 1, as amended, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and 15A NCAC 2H 1000, the Stormwater rules, Mr Sheldon Tucker MAS Properties, LLC is hereby authorized to clear and grade a proposed development site located at Ocean Isle Palms 1338 Ocean Isle Beach Road Ocean Isle Brunswick County to receiving waters designated as Intercoastal Waterway, class SA HQW waters in the Lumber River Basin, in accordance with the provisions of the General Permit for Clearing and Grading, No SWG030000, and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Wafer Quality and considered a part of this permit for the subject project This Certificate of Coverage shall become effective August 4, 2006 Signed thn s the 4th day of August 2006 i Division of Water Quality ----- By Authority of the Environmental Management Commission Page 2 of 3 State Stormwater Management Systems Permit No SW8 a. D 33X DIVISION OF WATER QUALITY / WATER QUALITY SECTION STATE STORMWATER NOTICE OF INTENT GENERAL PERMIT TO CLEAR AND GRADE A PROPOSED DEVELOPMENT SITE State Stormwater Management Application Notice of Intent for coverage under the General Stormwater Management Permit to Clear and Grade a proposed development site For the clearing and grading only of a proposed development site where the final design is not known, and the developer has not requested that the application be placed on administrative hold (Please print or type) 1 Mailing address of owner/developer (The address to which all permit correspondence will be mailed) Name Street Address City Telephone No MAS Properties, L L C 131 Ocean Blvd West Holden Beach 910 612 4899 FAX 2 Location of proposed project State NC ZIP 28462 Project Name Ocean Isle Palms Contact Person Sheldon Tucker Street Address 1338 Ocean Isle Beach Road City Ocean Isle State NC County Brunswick Telephone No 910 612 4899 FAX ZIP 28469 3 Physical Location Information Please describe how to get to the project, using street names state road numbers, and the distance and direction from the nearest major intersection USHWY 14 South Take a left on SR 1164 (Ocean Isle Beach Road)go about 5 miles and site is on the left 4 What is the name of the receiving stream Intercoastal Waterway 5 Receiving Stream Classification SA, HQW 6 This Certificate of Coverage is being submitted as a result of ® New or proposed project ❑ Modification to an existing project Existing COC or Permit Number Date project is scheduled to begin construction At the time final plans are completed (-3 months) 7 What is the total project area above mean high water? 111 51 Acres 8 Will wet detention or other ponds be constructed at this site? ® YES ❑ NO (Final design has not been completed and ponds may be added in future) 9 Please list all proposed piping, ditches and drainage alterations to be constructed as part of this project (attach an additional sheet if needed) Final construction drawings do not exist at this time Page 1 of 2 State Stormwater Management Systems Permit No SW8 060.33t As a result, all piping, ditching and drainage alterations have not been designed See attached S&E drawing for current protect layout and stormwater / S&E considerations 10 Is the project within 575' of the Mean High Water line of class ORW waters ❑ YES ® NO 11 Are there any wetlands on the site? ® YES ❑ NO 12 Please list all other Best Management Practices employed at this site (see attached) 13 Certification North Carolina General Statute 143-215 6 b (i) provides that Any person who knowingly makes any false statement representation or certification in any application record report plan or other document filed or required to be maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article or who falsifies tampers with or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article shall be guilty of a misdemeanor punishable by a fine not the exceed $10 000 or by imprisonment not to exceed six months or by both (18 U S C Section 1001 provides a punishment by a fine of not more than $10 000 or imprisonment of not more than 5 years or both for a similar offense ) I hereby request coverage under the referenced General Permit I understand that coverage under this permit will constitute the permit requirement for the project and is enforceable in the same manner as an individual permit 1 certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief such information is true, complete and accurate Printed name of person signing ) 6" T%JC-Ved-- Title Met b r/ Mana e (Signature of Applicant) (Da a signed) A check or money order must accompany this Notice of Intent for $420 00 made payable to NCDENR This application will be returned unless all of the following items are submitted ® This completed form ® Two sets of site and grading plans ® A check for $420 00 ® A USGS map with the project clearly located on it Mail the entire package to NCDENR Division of Water Quality Water Quality Section — Stormwater 127 Cardinal Drive Extension Wilmington, NC 28405 Note The submission of this document does not guarantee the issuance of a Certificate of Coverage under the General Permit Page 2 of 2 TOP01 map printed on 12/19/06 from "Untitled.tpo" 78027'00" W WGS84 78026''00" W 31 100 �• 5 ` 'i� ' Y. ps Yr� .i M' I L'���y--t`l. \•� 1 V OISr_ ` 'nd9 i]uo s v1 JI • Sr _,'.' - Y c - ., `-�.J�, ` •{L G O O _ - _ , ft1 f 1 ,` t ✓ ±'r . 4/f r 1 `� I�G -©� 1L}• • 1 � � '•� _1 � � � �'�' O O tip •, I ! J Qjp Y ,,G I t -} �F �• �r • 1•• • J _H If �I�_L C sty"y�_� � ei t " Map created11 ful 0200' (National Geograp` i�,��2003 T/ira E 1 �/21 f 78027'00" W WGS84 78°26'0011 W D S t MN TN NATIONAL. lax MIS imp 8 �120 GEOGRAPHIC MUMS, low u MLI Erkt 12/19, 5 M NC®E R North Carolina Department of Environment and Natural Resources Division of Land Resources James D Simons PG PE Land Quality Section Michael F Easley Governor Director and State Geologist William G Ross Jr , Secretary December 11, 2006 LETTER OF RECEIPT OF REVISED EROSION CONTROL PLAN MAS Properties LLC Sheldon Tucker Member Manager 131 Ocean Blvd West Holden Beach NC 28462 RE Project Name Ocean Isle PalmsrBernIs Project ID Bruns 2007-185 County Brunswick Shallotte SR 1184 River Basin Lumber Submitted By Cape Fear Engineering Inc Date Received by LQS December 8 2006 Plan Type REVISED Dear Mr Tucker This office has received the revised soil erosion and sediment control plan submitted for the project listed above G S 113A 54 1(a) requires that this office approve or disapprove a submitted revised plan within 15 days of receipt of such plan Failure to act by this office within this time period shall be deemed approval of the revised plan Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act The approval of an erosion and sediment control plan is conditioned on the applicants compliance with Federal and State water quality laws regulations and rules If you have questions please do not hesitate to contact this office Your cooperation in this matter is appreciated and we look forward to working with you on this project Sincerely Julie N Darr Land Quality Section cc Jessica Winterwerp E I Cape Fear Engineering Inc LQS —WiRO SWS-WiRO Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 29450 Phone 910 796 7215 Fax 910 '00 2004 f.� November 30. 2006 Coastal Communities, Inc Attn Sheldon Tucker 131 Ocean Blvd West Holden Beach, NC 28462 Brunswick County Planning Department P O Box 249 75 Courthouse Drive N E , Bldg I Bolivia, NC 28422 RE Ocean Isle Palms Phase X & XI PUD File # SE-142 Dear Mr Tucker, This is to confirm that at November 27, 2006 Planning Board Meeting the plans for Ocean Isle Palms Phase X and XI PUD were conditionally approved Please find attached a copy of the Special Exception Permit Please submit a revised plan in accordance with the conditions specified in accordance with the Special Exception Permit The Special Exception Permit has been formatted to meet the standards so as to be recorded by the Brunswick County Register of Deeds Please remember that this Special Exception Permit runs with the property and not the owner A final plat shall be submitted within eighteen (18) months after approval of the preliminary plat, otherwise, the preliminary plat shall become null and void, unless an extension of time is applied for and granted by the Planning Board per Section II-4, Major Subdivision Procedures Section 4 2(A) Prior to recordation of individual lots, site specific survey is to be reviewed by the Planning Department (910-253-2036) and then by Engineering Department (910- 253-2500) for approval There is a $5 00 dollar fee per lot assessed for site specific review of lots If you have any questions please feel free to contact me at 910-253-2036 T lob Land Planner cc Perry Davis, Cape Fear Engineering ° Brunswick County Planning Department P.O Box 249 75 Courthouse Drive N E., Bldg I l - - `°+,z, Bolivia, NC 28422 SPECIAL EXCEPTION PERMIT On the date(s) listed below, the Planning Board of Brunswick County met and held a public hearing to consider the following application Application No SE-142 Applicant Coastal Communities, Inc Project Name Ocean Isle Palms Phase X & XI PUD Property Location Ocean Isle Beach Road (SR 1184) Parcel Number(s) 2280000407 and portions of 22800003 and 24400022 Zoning District R-7500 Surrounding Zoning North R-7500 South Ocean Isle Jurisdiction East RU & R-7500 West R-6000 & Ocean Isle Jurisdiction Proposed Use of Property Planned Unit Development Page 1 of 3 Not to be separated TEH The project was submitted to the Planning Department on September 5, 2006 and appeared before the TRC Committee on October 11, 2006 The project is proposing 110 single family lots and 54 multi -family units on 62 4 acres Including this expansion, the planned unit development will consist of 1,566 single-family units and 463 multi -family units on 829 66 acres creating an overall density of 2 45 units per acre Water is public provided by Brunswick County Sewer is public provided by Brunswick County Water and sewer is to be provided for the entire project The open space requirement is 15% of total acreage (124 44 acres) The developer is proposing 151 3 acres of open space A Traffic Impact Analysis (TIA) was completed for the project According to NCDOT's Average Annual Daily Traffic Counts, there are no known capacity deficiencies on Ocean Isle Beach Road SECTION 1 — FINDINGS Having heard all of the evidence and arguments presented at the hearing, the Planning Board, at its regular meeting, finds and determines that the application is complete, and subject to the conditions imposed below, the following findings are made 1 A written application pursuant to Article 4, Section 4 2 E of the Brunswick County Zoning Ordinance that permits Planned Unit Developments in the R-7500 zoning district was submitted and complete in all respects 2 A public hearing was duly noticed and held on this matter on November 27, 2006 The adjoining property owners were notified by US mad of the hearing 3 The Planned Unit Development for which the Special Exception is sought is in keeping with the statement of intent of the zoning district This is based on sworn testimony and evidence submitted during the hearing which shows the following a The intent of the R-7500 district is basically low density single family residential areas providing other required attributes of a neighborhood b The project does not contain a commercial component 4 The Planned Unit Development for which the Special Exception is sought will not substantially injure the value of adjoining property This is based on sworn testimony and evidence submitted during the hearing which shows the following a The protect contains a 25' peripheral boundary setback and a 15' peripheral buffer The-P—lanned-Untt-Development far-which-the-Speeral-Exeeptton-ts-sought; tf-devebped-as proposed, meets all requirements and conditions of the ordinance This is based on sworn testimony and evidence submitted during the hearing which shows the following a The plan submitted by the applicant was reviewed by the Technical Review Committee and staff and found to meet all requirements and conditions of the ordinance Page 2 of 3 Not to be separated TEH SECTION 1 — CONDITIONS Now, therefore, the application to make use of the above described property for the purpose indicated is hereby approved and granted, subject to all applicable provisions of the Brunswick County Zoning Ordinance, this permit, and the following special conditions which the Planning Board finds to be in the public interest 1 That the development shall proceed in conformity with all plans and design features submitted as part of the special exception application and kept on file by the Brunswick County Planning Department 2 That the development of the parcel(s) shall comply with all regulations as specified in the Brunswick County Zoning Ordinance 3 That if the specified conditions addressed in this special exception are violated, the permit shall be revoked and the use will no longer be allowed Only by reapplying to the Planning Board for another special use permit and receiving their approval can the use be again permitted 4 Correct the provided open space so that it does not include the area in the multi -family section SECTION 3 —VESTED RIGHTS Approval of this permit confers upon the property the right to develop with the type and intensity of use as herein described and as shown on the approved site plan Vested rights are hereby established pursuant Article 1, Section 1 12 of the Brunswick County Zoning Ordinance SECTION 4 SEVERABILITY AND RECORDATION Invalidation of any one or more of these conditions shall not adversely affect the balance of said conditions, which shall remain in full force and effect J Uslie Bell, AICP, HDFP Planning Director STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK I, the undersigned, Notary Public for said State and County certify that J Leslie Bell, personally came before me this day and acknowledged J Leslie Bell as the Planning Director of The County of Brunswick, a political subdivision of the State of North Carolina and that by authority duly given and as the act of the County, the foregoing instrument was signed in its Witness my hand and notarial seal, this the�b+kday of I�} C)Vf VYt�2 i 200 L.) 01EMAqZ 0'6` Connie Marlowe Ctr (JW-e f 5 C : NOT��Yt�. My Commission Expires - U - 0 • J - A (/ BLc • 1¢ �'•Q �NNr, NAP Page 3 of 3 Not to be separated TEH �� � CAPE FEAR 11 Engineering, Inc. 151 Poole Rod Suite lW SeMlle NC 28451 TEL (910)383-1044 FAX (910) 383 1045 www capefearengmeermg com To NCDENP. 127 Cardinal Drive Wilmington, NC 25405 Attn Gary Beecher Transmittal Date August 3, 2006 File 809-01 "36" 5ubject Ocean Isle Palms 5tormwater Project No 5W8 060338 ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ 5ent via Mad ❑ Sent via Courier Quantity Drawing No Description 2 Cop(es Clearing and Grubbing Plans REMARKS Per your letter dated July 11 2006 please find the requested additional information CC File Cape Fe ar EEngi�/e�ring1'IIn-c•^-("�j�f,. Signed 1 W W� � U1lA" 1 Jessica Winterwerp El AUG � 3 2006 North Carolina James D Simons, PG PE Director and State Geologist NCDENR Department of Environment and Natural Resources Division of Land Resources Land Quality Section July 26 2006 LETTER OF RECEIPT OF EROSION CONTROL PLAN MAS Properties LLC Mr Sheldon Tucker, Member/Manager 131 Ocean Blvd West Holden Beach NC 28462 RE Project Name Ocean Isle Palms Phase 1 Project ID Bruns-2007-003 County Brunswick, Ocean Isle Beach, SR 1184 at Georgetown Road River Basin Lumber Submitted By Cape Fear Engineering Date Received by LQS July 25 2006 Plan Type MODIFIED Dear Mr Tucker " Y jut 2 7 ?006 Michael F Easley, Governor William G Ross Jr, Secretary This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G S 113A-57 (4)) The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G S 113A-54(d) (4)) The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules If you have questions please do not hesitate to contact this office Your cooperation in this matter is appreciated and we look forward to working with you on this protect Sincerely Schuyler Snowdon Env Tech V Land Quality Section cc Jessica WintegryNverp El Cape Fear Engineering Inc LQS-WiRO ySWS WiRO,"� Wilmington Regional Office 127 Cardinal Drive Ext , Wilmington, North Carolina 28405 3845 • Phone 910 796 7215 / FAX 910 350 2004 W ATFR 41¢hael F Easley Governor 19 � —i July 11, 2006 Mr Sheldon Tucker MAS Properties, LLC 131 Ocean Blvd West Holden Beach, NC 28462 Subject Request for Additional Information Stormwater Project No SW8 060338 Ocean Isle Palms Brunswick County Dear Mr Tucker William G Ross Jr secretary North Carolina Department of Environment and Natural Resources Alan W Klimek P E Director Division of Water Quality The Wilmington Regional Office received a Stormwater Management Permit Application for Ocean Isle Palms on May 2, 2006 A preliminary review of that information has determined that the application is not complete The following information is needed to continue the stormwater review (1) Fhe plans contain too much intoi motion for a clear & grade pci mit Plcasc and in a new sct of plans ~how mg onI% the project trite w It boundary, wetland delineation, topogi aphic information, and any erosion conti o1 dcviccs that w dl be used den Ing the clearing and gi aduig process 1 he lots and roads miN he shown hoiic%cr, thc) Should not be numbcicd or named on the plans I hank You Please note that this request for additional information is in response to a preliminary review The requested information should be received by this Office prior to August 11, 2006, or the application will be returned as incomplete The return of a project will necessitate re -submittal of all required items, including the application fee If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter The request must indicate the date by which you expect to submit the required information The Division is allowed 90 days from the receipt of a completed application to issue the permit The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215 1 and is subject to enforcement action pursuant to NCGS 143-215 6A Please reference the State assigned project number on all correspondence Any original documents that need to be revised have been sent to the engineer or agent All original documents must be returned or new originals must be provided Copies are not acceptable If you have any questions concerning this matter please feel free to call me at (910) 796-7215 Sincerely, �._ Gazy e�cher Environmental Technician EB/ghb S\WQS\STORMWATER\ADDINFO\2006\060338 Ju106 cc Jessica Winterwerp (Cape Fear Engineering) ` VCarolina umlly North Carolina Division of Water Quality 127 Cardinal Drne Extension Wilmington NC 28405 Phone (910) 796 7215 Customer Service Wilmington Regional Office Internet wwe ncwaterouihp ore Fax (910) 350 2004 1 877 623 6748 An Equal Opportunity/Affirmative Acton Employer— 50% Recycled/10% Post Consumer Paper NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D Simons, PG, PE Land Quality Section Michael F Easley Governor Director and State Geologist William G Ross Jr, Secretary July 6 2006 LETTER OF RECEIPT OF EROSION CONTROL PLAN MAS Properties, LLC Mr Sheldon Tucker Member/Manager lRJ.v T' 131 Ocean Blvd West " Holden Beach, NC 28462 JUL p 7 lOC,6 RE Protect Name Ocean Isle Palms Phase 1 I z Project ID Bruns2007003 --- County Brunswick Ocean Isle Beach SR 1184 between Georgetown Rd & NC 179 River Basin Lumber Submitted By Cape Fear Engineering Date Received by LQS July 5 2006 Plan Type NEW Dear Mr Tucker This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G S 113A-57 (4)) The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G S 113A-54(d) (4)) The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan Commencement or continuation of a land disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act We have performed a preliminary review of your submitted plan and have determined that additional information will be necessary before a final review can be completed Enclosed is a checklist of items that must be submitted before we can complete the review process Failure to provide the additional information may result in disapproval of your plan The approval of an erosion and sediment control plan is conditioned on the applicants compliance with Federal and State water quality laws regulations and rules If you have questions please do not hesitate to contact this office Your cooperation in this matter is appreciated and we look forward to working with you on this project Sincerely4� Daniel Sams PE Land Quality Section cc Jessica Winterwerp El Cape Fear Engineering Inc LQS WiRO SWS WiRO Wilmington Regional Office 127 Cardinal Drive Ext Wilmington North Carolina 28405 3845 Phone 910 796 7215 / FAX 910 350 2004 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES LAND QUALITY SECTION EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST PROJECT NAME Ocean Isle Palms Phase 1 DATE 7/512006 PROJECT NO Bruns-2007-003 COUNTY Brunswick To expedite the approval process a cursory review of your submitted Erosion and Sediment Control Plan application has been made and has shown the need for additional information as specified below To meet our review schedule, any additional information should be received by this office no later than July 25, 2006 Failure to meet this schedule may result in disapproval of your plan The following items shall be incorporated with respect to specific site conditions in an erosion and sediment control plan LOCATION INFORMATION Project location (roads streets landmarks) North arrow and scale GENERAL SITE FEATURES (Plan elements) Legend North arrow scale etc Property lines Existing contours (topographic lines) Proposed contours Limits of disturbed area (provide acreage total delineate limits and label) Planned and existing building locations and elevations Planned & existing road locations & elevations .Lot and/or building numbers Geologic features rock outcrops seeps springs wetland and their limits streams lakes ponds dams etc Easements and drainageways Profiles of streets utilities ditchlines etc Stockpiled topsoil or subsoil locations If the same person conducts the land -disturbing activity & any related borrow or waste activity the related borrow or waste activity shall constitute pad of the land -disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971 or is a landfill regulated by the Division of Waste Management If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person they shall be considered separate land -disturbing activities and must be permitted either thru the Sedimentation Pollution Control Act as a one -use borrow site orihrough the Mining Act Required Army Corps 404 permit and Water Quality 401 certification to g stream disturbances over 150 linear feet) EROSION CONTROL MEASURES (on plan) Legend Location of temporary measures Location of permanent measures Construction drawings and details for temporary and permanent measures Maintenance requirements of measures Contact person responsible for maintenance SITE DRAINAGE FEATURES Existing and planned drainage patterns (include off site areas that drain through project) Method of determination of and calculations for Acreage of land being disturbed Size and location of culverts and sewers Soil information type special characteristics Soil information below culvert storm outlets Name and classification of receiving water course (only where stormwater discharges are to occur) Comments See attached page STORMWATER CALCULATIONS Pre construction runoff calculations for each outlet from the site (at peak discharge points) Design calculations for peak discharges of runoff (mouthing the construction phase & the final runoff coefficients of the site) Design talcs of culverts and storm sewers _X_ Discharge and velocity calculations for open channel and ditch flows (easement & nghtof ways) Design talcs of cross secbons and method of stabilization of existing and planned channels (include temporary linings) Design talcs and construction details of energy dissipators below culvert and storm sewer outlets (diameters & apron dimensions) Design talcs and dimension of sediment basins Surface area and settling efficiency information for proposed sediment traps and/or basins VEGETATIVE STABILIZATION Area & acreage to be vegetatively stabilized Method of sod preparation Seed type & rates (temporary & permanent) Fertilizer type and rates Mulch type and rates NOTE Plan should include provisions for groundcover on exposed slopes within 21 calendar days following completion of any phase of grading permanent groundcover for all disturbed areas within 15 working days or 30 calendar days (whichever is shorter) following completion of construction or development FINANCIAL RESPONSIBILITY/OWNERSHIP FORM Completed signed & notarized FR/O Form Accurate applicabon fee ($5000 per acre rounded up the next acre with no ceiling amount) Certificate of assumed name if the owner is a partnership Name of Registered Agent (if applicable) Copy of the most current Deed for the site NOTE For the Express Permitting Option inquire at the local Regional Office for availability NARRATIVE AND CONSTRUCTION SEQUENCE Narrative describing the nature and purpose of the construction activity Construction sequence related to erosion and sediment control(mcludmg installation of critical measures prior to the initiation of the land disturbing activity & removal of measures after areas they serve are permanently stabilized) Bid specifications related only to erosion control Continuation of Erosion and Sedimentation Control Plan Preliminary Review Checklist Project Name Ocean Isle Palms Phase 1 Project Number Bruns-2007-003 The proposed temporary roadway ditches are shown dug too deep to have acceptable side slopes and still include spoil areas that remain within the street right-of-way The not -to -scale section is too vague to be considered approvable Provide a revised roadway ditch section that addresses the proposed ditch slopes with consideration of NCGS 113A-57 Mandatory Standard number 2 "The angle for graded slopes and fills shall be no greater than the angle which can be retained by vegetative cover or other adequate erosion -control devices or structures In any event, slopes left exposed will, within 21 calendar days of completion of any phase of grading be planted or otherwise provided with ground cover, devices, or structures sufficient to restrain erosion " This means that any slope steeper than 2 horizontal to 1 vertical must include instruction as to the method of groundcover establishment after the 21s' day after grading 2 Please include a permanent roadway ditch section with the permanent side slopes proposed 3 Please provide stormwater runoff calculations for the proposed ditches in the street right-of-ways 4 The Financial Responsibility/Ownership Form is an obsolete draft Please use the enclosed updated Form on all future applications We do not guarantee approval of applications that include the obsolete Form Wilmington Regional Office 127 Cardinal Drive Extension Wilmington NC 28405 Phone 910-395-3900 Fax 910-350-2004 18 06 03 30p Brunswick County Planning 9102532437 p 2 Brunswick County Planning P 0 Box 249 75 Courthouse Drive N E , Bldg I Bolivia, North Carolina 28422 VIA FAX May 18, 2006 Cape Fear Engineering Attn Perry Davis 161 Poole Road Suite 100 Belville, NC 28451 RE Ocean isle Palms Expansion — North Tract PUD File # SE-121 Dear Mr Davis, This is to confirm that at May 8, 2006 Planning Board Meeting the plans for Ocean Isle Palms Expansion — North Tract PUD were conditionally approved Please find attached a copy of the Special Exception Permit A final plat shall be submitted within eighteen (18) months after approval of the preliminary plat, otherwise, the preliminary plat shall become null and void, unless an extension of time is applied for and granted by the Planning Board per Section 11-4, Major Subdivision Procedures Section 4 2(A) Prior to recordation of individual lots, site specific survey is to be reviewed by the Planning Department (910-253-2036) and then by Engineering Department (910- 253-2500) for approval There is a $5 00 dollar fee per lot assessed for site specific review of lots If you have any questions please feel free to contact me at 910-253-2036 Congratulations, Tracy obgood Land Planner cc Sheldon Tucker TELEPHONE (910) 253-2026 • (800) 621-0609 • FAX (910) 253.2487 le 06 03 30P Brunswick County Planning 9102532437 P 3 ID Brunswick County Planning PO Box 249 75 Courthouse Drive N E , Bldg I Bolivia, North Carolina 28422 BRUNSWICK COUNTY, NORTH CAROLINA SPECIAL EXCEPTION PERMIT On the date(s) listed below, the Planning Board of Brunswick County met and held a public hearing to consider the following application Application No. SE-121 Applicant MAS Properties Project Name Ocean Isle Palms Expansion — North Tract Property Location Ocean Isle Beach Road (SR 1184) Parcel Number(s). 2280001005, 22800010, and a portion of 228000408 Zoning District R-7500 Surrounding Zoning North R-7500 South R-7500 and RU East R-7500 and RU West R-7500 Proposed Use of Property Planned Unit Development The project was submitted to the Planning Department on February 6, 2006 and appeared before the TRC Committee on March 15, 2006 The project is proposing 605 units on 277 39 acres, resulting in a total of 1456 single-famdy'lots and 409 multi -family units on a gross site of 764 9 acres, creating an overall density of 2 44 units per acre Water is public provided by Brunswick County Sewer is private provided by Ocean Ridge Properties Water and sewer is to be provided for the entire project The open space requirement is 15% of total acreage (114 74 acres) The developer is proposing 157 22 acres of open space SECTION 1 — FINDINGS Having heard all of the evidence and arguments presented at the hearing, the Planning Board, at its regular meeting, finds and determines that the application is complete, and subject to the conditions imposed in Section 2, the following findings are made Page ) of 3 NOT TO BE SEPERATED TELEPHONE (910) 25&2025 • (800162ltM • FAX (910) 253.2437 Nay 18 06 03:30p Brunswick County Planning 9102532437 p.4 1 A written application pursuant to Article 4, A of the Brunswick County Zoning Ordinance that permits Planned Unit Developments in the R-7500 zoning district was submitted and complete in all respects 2 A public hearing was duly noticed and held in this matter on May 8, 2006 The adjoining property owners were notified by US mad of the hearing 3 The Planned Unit Development for which the Special Exception is sought is in keeping with the statement of intent of the zoning district This is based on sworn testimony and evidence submitted during the hearing which shows the following a The intent of R-7500 is low density residential and the proposed use provides for low density residential with large areas of open space and significant buffers b Low density development is similar to the surrounding area 4 The Planned Unit Development for which the Special Exception is sought will not substantially injure the value of adjoining property This is based on sworn testimony and evidence submitted during the hearing which shows the following a The abutting properties are zoned R-7500 and RU, which are low density residential zones allowing for similar use as the subject property 5 The Planned Unit Development for which the Special Exception is sought, if developed as proposed, meets all requirements and conditions of the ordinance This is based on sworn testimony and evidence submitted during the hearing which shows the following a The site plan submitted by the applicant was reviewed by the Technical Review Committee and found to meet all requirements and conditions of the ordinance SECTION 2 — CONDITIONS, Now, therefore, the application to make use of the above described property for the purpose indicated is hereby approved and granted, subject to all applicable provisions of the Brunswick County Zoning Ordinance, Section 3 of this permit, and the following special conditions which the Planning Board finds to be in the public interest 1 That the development shall proceed in conformity with all plans and design features submitted as part of the special exception application and kept on file by the Brunswick County Planning Department 2 That the development of the parcel(s) shall comply with all regulations as specified in the Brunswick County Zoning Ordinance 3 That if the specified conditions addressed in this special exception are violated, the permit shall be revoked and the use will no longer be allowed Only by reapplying to the Planning Board for another special use permit and receiving their approval can the use be again permitted 4 The applicant shall clarify and correct the required and provided open space, breaking it down into upland and wetland for the project as a whole Page 2 of 3 NOT TO BE SEPERATED Nets 18 06 03.30p Brunswick County Planning 9102532437 p 5 5 The applicant shall show how the open space will be assured and accessible via walking trails, etc in the expansion area 6 The hammerhead located near lot 42 shall be 120' in length and have a minimum right-of-way of 35', with a minimum of 20' of pavement, unless future ordinances allow them to be reduced SECTION 3 —VESTED RIGHTS Approval of this permit confers upon the property the right to develop with the type and intensity of use as herein described and as shown on the approved site plan Vested rights are hereby established pursuant to Article 1, Sechon 1 12 of the Brunswick County Zoning Ordinance SECTION 4 SEVERABILITY AND RECORDATION invalidation of any one or more of these conditions shall not adversely affect the balance of said conditions, which shall remain in full force and effect L slie Bell, Planning Director Page 3 of 3 NOT TO BE SEPERATED Project No SW8 O/ 4 33?S oFW^TFq Project Name Y1is.. .'? .Zo _ �aD.,. ✓ o`' cc %LD,c,cJ /dnm�. County y y Dear The Wilmington Regional Office of the�Division of Water Quality received your stormwater application and $420 00 fee on S .2 -0 Co Your project will be reviewed within 75 days of receipt, and you will be notified if additional information is needed Please be advised that the construction of built -upon area may not commence until the stormwater permit is issued If you have -any questions, please contact any member of the stormwater review staff in the Wilmington Regional Office at (910) 796-7215 Date Sent S /Q ✓e)lo Patricia Collins NC DENR FAY'ETTtVILLE Surface Water Protection Sectioi 127 Cardinal Drive McHAX 2?6 'Wilmington, NC 28405 w�7 (Q�,/ NG OA ❑ INSUFFICIENT ADDRESS ^ c ❑ TTEMPTED NOT KNOWN ❑ OTHER 0 SUCH NUMBER/ STREET ❑ $ NOT DELIVERABLE AS ADDRESSED UNABLE TO FORWARD CAPE FEAR Engineering, Inc. 151 Poole Rod Swte 100 Belmlle NC 28451 TEL (910) 383 1044 FA% (910) 383 1045 www capefearengmeermg com To INCDENR 127 Cardinal Drive Extension Wilmington, NC 28405 Attn I Linda Lewis ❑ As Requested ❑ For Your Files ❑ Sent via Mail ❑ Sent via Courier 3$ obo GQ,C Transmittal Date 05-02-06 File 809-01 Subject Ocean Isle Palms ❑ For Distribution ® For your Review / Action / Approval Quantity Drawing No Description 1 USGS map 2 Original and Copy of Notice of Stormwater Intent 2 Sets Clearing and Grubbing Plans Check, SW Submittal Fee ($420 00) ff REMARKS Please feel free to contact the office if have any questions or need more information CC Thank You Jessica File (809-01) MAY 0 2 M6 Cape FS�FEngineenng Inc PTM80901�dmin\STORMWATEMtrans DENR_5206do \NATc9 � -i Apn124 2006 Mr Sheldon Tucker Member/Manager MAS Properties, LLC 131 Ocean Blvd West Holden Beach. NC 28462 Michael F Easley GoNernor William G Ross Jr Secretary North Carolina Depanmcnt of FriwonnaLm and Natural Resources Subject Request for State Stormwater Management Permit Application Ocean Isle Palms Stormwater Project No SW8060338 Brunswick County Dear Mr Tucker Alan W Klimek P L Director Division Of Water Quahp On March 8, 2006, the Wilmington Regional Office received a copy of an Erosion Control Plan for the subject project The North Carolina Administrative Code requires any project that must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major permit to apply for and receive a Stormwater Management Permit by the Division of Water Quality Any construction on the subject site prior to receipt of the required permit will constitute a violation of 15A NCAC 2H 1000 and may result in appropriate enforcement action by this Office Either a Stormwater Permit Application Package including 2 sets of plans, completed application form fee, and supporting documentation or a written response regarding the status of this project and the expected submittal date must be received in this Office no later than May 24 2006 Failure to respond to this request may result in the initiation of enforcement action and construction may experience a subsequent delay The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT be considered the Coastal Stormwater Management Permit which will be signed by the Water Quality Supervisor Please reference the Project Number above on all correspondence If you have any questions, please call me at (910)-796-7215 Sincerely �4/l�j'7CtiC�v Linda Lewis Environmental Engineer II ENB/arl S\WQS\STORMWAT\STORMSUB\060338mar 06 cc Brunswick County Building Inspections Jessica Winterwerp, El Cape Fear Engineering Inc Wilmington Regional Office File Central Files Doug Huggett NonhCarohna ,'Naturally North Carolina Division of Water QuahtJ 127 Cardinal Drive Extension Phone (910) 796 7215 Customer SLINICe 1 877 623 6748 Wilmington Regional Office Wilmington NC 28405 Fax (910) 350 2004 Internet www ncwaternuahty ore An Equal Opportunity/Affirmative Action Employer — 50 % Recycled110% Post Consumer Paper North Carolina James D Simons PG, PE Director and State Geologist , NCDENR Department of Environment and Natural Resources Division of Land Resources Land Quality Section March 24 2006 Michael F Easley Governor William G Ross Jr, Secretary LETTER OF RECEIPT OF REVISED EROSION CONTROL PLAN MAS Properties LLC Mr Sheldon Tucker Mbr/Mgr 131 Ocean Blvd West Holden Beach NC 28462 RE Project Name Ocean Isle Palms Project ID Bruns-2006-301 County Brunswick River Basin Cape Fear Submitted By Cape Fear Engineering Date Received by LQS March 23 2006 Plan Type REVISED Dear Mr Tucker This office has received the revised soil erosion and sediment control plan submitted for the project listed above G S 113A-54 1(a) requires that this office approve or disapprove a submitted revised plan within 15 days of receipt of such plan Failure to act by this office within this time period shall be deemed approval of the revised plan Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act The approval of an erosion and sediment control plan is conditioned on the applicants compliance with Federal and State water quality laws regulations and rules If you have questions please do not hesitate to contact this office Your cooperation in this matter is appreciated and we look forward to working with you on this project Sincerely ,;4re,4tLl,� Todd C Walton Land Quality Section cc Jessica Winterwerp El Cape Fear Engineering Inc LQS —WiRO SWSWiRO Wilmington Regional Office 127 Cardinal Drive Extension Wilnungton, NC 28450 Phone 910-796-7215 Fax 910-350-2004 Li?�A r NCDENR North Carolina Department of Environment and Natural Division of Land Resources James D Simons, PG PE Director and State Geologist Land Quality Section March 7 2006 MAR 0 82006 Michael F Easley, William G Ross Jr, Secretary LETTER OF RECEIPT OF EROSION CONTROL PLAN MAS Properties LLC Mr Sheldon Tucker Mbr/Mgr 131 Ocean Blvd West Holden Beach, NC 28462 RE Protect Name Ocean Isle Palms Protect ID Bruns-2006-301 County Brunswick River Basin Cape Fear Submitted By Cape Fear Engineering Date Received by LQS March 6 2006 Plan Type NEW Dear Mr Tucker This office has received a soil erosion and sediment control plan for the protect listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G S 113A-57 (4)) The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G S 113A-54(d) (4)) The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act The approval of an erosion and sediment control plan is conditioned on the applicants compliance with Federal and State water quality laws, regulations and rules If you have questions please do not hesitate to contact this office Your cooperation in this matter is appreciated and we look forward to working with you on this protect Sincerely, Todd C Walton Land Quality Section cc Jessica Winterwerp El, Cape Fear Engineering Inc LQS WiRO SWS-WiRO Wilmington Regional Office 127 Cardinal Drive Ext Wilmington North Carolina 28405 3845 • Phone 910 796 7215 / FAX 910 350 2004 Jan 24 06 09.20a Brunswick County Planning 9102532437. p 2 Brunswick County Planning P O Box 249 75 Courthouse Drive N E , Bldg I Bolivia, North Carolina 28422 VIA FAX January 24, 2006 MAS Properties Attn Sheldon Tucker 131 Ocean Boulevard West Holden Beach, NC 28462 RE: Ocean Isle Beach Golf Course PUD File # SE-116 Dear Mr Tucker, This is to confirm that at January 23, 2006 Planning Board Meeting the plans for Ocean Isle Beach Golf Course PUD were conditionally approved contingent upon meeting the following requirements specified as follows and resubmitting a final revised masterplan to the Brunswick County Planning Department ➢ Add the following note to the plan, "Protect shall be built with the traffic improvements called for in the traffic impact analysis " A final plat shall be submitted within eighteen (18) months after approval of the preliminary plat, otherwise, the preliminary plat shall become null and void, unless an extension of time is applied for and granted by the Planning Board per Section II-4, Major Subdivision Procedures Section 4 2(A) All infrastructure improvements shall be installed and inspected prior to final plats being recorded unless a financial guarantee agreement has been signed Prior to recordation of individual lots site specific survey is to be reviewed by the Planning Department (910-253-2036) and then by Engineering Department (910- 253-2500) for approval There is a $5 00 dollar fee per lot assessed for site specific review of lots If you have any questions please feel free to contact me at 910-253-2036 Congratulations, lacobgood Land Planner TELEPHONE (910) 253-2025 • (800) 621-0609 • FAX (910) 263-2437 NOIE x sv� n'ia� e WNBPEL OYnLLLLCfRW EEIIEE&IS1AE YDp NICL110E0f l waua�r 1 OWNER MILLS LAND & TIMBER LLC AND ANDREW LAND & TIMBER LLC 131 OCEAN BLVD WEST HOLDEN BEACH NO 28462 (910) 8424939 OVERALL SITE PLAN OCEAN ISLE PALMS PLANNED UNIT DEVELOPMENT — MASTER PLAN BRU N S WICK C OU N TY NORTH CAR OLI N A MOWN OCEAN ISLE PALMS CAPE FEAR Engineering, Inc :--- :.....s VICINITY MAP ooaN. Dd., .,ar xr • w...r.u.. pm.�wc CAPE FEAR Engineering, Inc �r w..r \f �C 7'F.— •:'r ate- a1 rl !� HadenStanzlale �r�ax _____-- -\ \� OCEAN ISLE PALMS UTILITY LEGEND OWNER MILLS LAND & TIMBER, LLC AND ANDREW LAND & TIMBER, LLC 131 OCEAN BLVD WEST — mvmrv..wdr HOLDEN BEACH NC 28462 (91 O) 842-4939 N AM DAM E MY 2A T007 PRELIMINARY UTILITY PLAN C: � wwr OCEAN ISLE PALMS I I� III��� C w rDD m aaw PHASE XII PLANNED UNIT DEVELOPMENT -MASTER PLAN rtam .. m ax¢rrwt um ..,•„ ec asn t.a.�-A BRUNSWICK COUNTY NORTH CAROL N A arYr .NxnY AND NO ,svaovu Y � / VICINITY MAP > CUL—DE—SAC PLAN , aD¢nIl nor6. � u Avr r r mxa.r , c r. F.., mmmrra , rr «,rmrran 1..A_rmm ma,m. mti .m«rxv rwm n�-mna Ox x4 A...nr Am.rLe! rga.nnb I,ylvY M.r MN Tw TPM r nmlv.m swop r W «� A L.e1 .aY� ° Wn qrt Onn„malty llmmM. ,mAY �Av� rnw �w�w m`wtl�� M �. d mr `<r,. —s siimm�x xmw mvxuw�a Ye— a M—.,mYImMW M «IC RTmml N S A N4 yn M u.ev« Y tl wwf M AmMA «^b W'm.a ti rR, rxmC nunvvre DAn PNaPD4D WYMND QiBAfJ6 m -r ff Wroe,nu nwm, uL - a C�Wr - 6 nA ICnM WUmA SrAh FMrx L¢C usauuw mrn.lm A.. w�a+ qm, e.eyle..w u.«um. CAPE FEAR Engineering, Inc ROAD SECTION I ZONED CO-RU II I I I I ,,,, I is.T w rmo wr c eTw I w ,•• .c w, I w I r''OiMra"r"i� I NI'A i - TYPICAL THREE—WAY INTERSECTION \\ \\ F Jax o ZONED CD-RU I WF GYUII[ M'IUM1TRi! \ r\��\ �m_rm ZONED OO-RU �l�� wF a 141.L] I gi OWNER. MILLS LAND A&OTIMBER, LLC ANDREW LAND & TIMBER, LLC 131 OCEAN BLVD WEST HOLDEN BEACH NC 28462 (910) 8424939 PRELIMINARY SITE PLAN OCEAN ISLE PALMS HadenStanzlale PHASE XII PLANNED UNIT DEVELOPMENT —MASTER PLAN ��xwx�x 9 R U N 5 WICK COUNTY NORTH CAR0LI N A L"Cf{n2" LIME] OCEAN ISLE PALMS RNY➢ DAIS JAY t% 2D51 SDALE , _,L C� I �m m 1 _ _ ,nm.rt rtnAim C w' rW 10Y .Np r smi� An is caxcwmu uio s+Au az uw ran n]InnALr Aw ruo AFPRDVAL nmsasa artr ® xu xa 1 - e VICINITY MAP 1 Win-; ♦'J ,,.,.,.,..w•.,L,-^ ♦ wr.{ m r _i,, m m�wa ¢memmi xvns � Mwh-�'T.bYMq.�YF6VRNi-•nY Mry m, w..mnn, b -ate w w M anW M xSM ,bas„ a Jnj,�a btlr.,nSa osawEx: CAPE FEAR Engineering, Inc --------------- \ \ , ,-ZONED ar �-_ Ru _ _ r A� _ OWNER MILLS LAND & TIMBER, LLC AND ANDREW LAND & TIMBER, LLC 131 OCEAN BLVD WEST HOLDEN BEACH NO 28482 (910) 6424939 PREUMINARY STORM WATER OCEAN ISLE PALMS HadenStanzlale PHASE XII .. PLANNED UNIT DEVELOPMENT —MASTER PLAN M�Wb--CIbML B RUN SW CH COUNTY NORTH CAROL N A �� �� �u ss REAM0 DAM MILT R0. .7 scue. � -iar �= nw M9m 0.N! 6 fM� . I 91.YL E =D ra r=Axr um wo ,wvRovAt wwas¢ b3Y — Ll G la OCEAN ISLE PALMS SIUXMWAIM MM NU WN• K�Iv1A>iV! �L / / r / / m0 �m0 �m0 Omm Om® o 0m0 0m0 u�ua°Lim�;� Q . mmm� � �^.� x. ���.- °'mp® vmxlnii ma"ic ,Rws mwmx.m, .._W ncvms,rt,lry mi_.,v 777 .o ,m T. ja CAPE FEAR Engineering Inc MAS PROPERTIES LLC A PORTION OF DEED BOOK 365 PAGE SHALLOTTE TOWNSHIP BRUNSWICK COUNTY NORTH CAROUNA 609701 1 OF 6 Wtl L.BL lI WpiJx12 L3Dtld-I0 WB�JM9 Z35tlIW iA &A Y8 d i i i i /I / / / / �/ �/'1 KiWi[Im/.1O NOW+rN ��w Mw V \i Mu mom mx� wiG \ uacc,ncxo \ wrz xmw,o, \ vurz urx. m f, , = i� �- rmY riw o �m �o 000 0�0 Om0 0�0 w„w cu.«ow px,m xia IEAEA4 01...1mm �IOmma.ra,wrxN F� =rwf� CAPE FEAR Engineering, Inc MAS PROPERTIES LLC A PORTION OF SHALLOTTE TOWNSHIP BRUNSWICK COUNTY NORTH CAROLINA MH Llt W t2 L3 d-tOGD WM-3 d[OBCB WB a r- �l [I r� d `.-71.20-017 / _ _ _ C W KK 6 rNi 0e w Ms Mr ��rPat u HviOt ..mt.r m sanw «, v rr M WIPt1O0 w MI wr[ M 1 � t�l� ¢ � OWH M rµu� w_M .s190rmCs rO0 J - - � ✓ +� rmn _L� t�r4•� -(! p _ / -J \ VM�Im O \\ YY¢CiNm 1 � � rl Ji lk z = � �\ \ \ ry — 1 Gl ,ernln.ra,ww �< rmrW wNu r�=l-- <I mm0 om� 0�0 000 �00 omo m ODD — m N IIM FIOIMgClltl 1U8 �� oiatouw�m CAPE FEAR Engineering, Inc �.a.-ice...-..� >m WETLAND MAP FOR MAS PROPERTIES LLC A PORTION OF DEED BOOK 365 PAGE 1 SHALLOTTE TOWNSHIP BRUNSWICK COUNTY NORTH CAROLINA sry slat tt eootYvc t ova -to me mmoTas>Ma m sw'we a uv¢ .cem� v ,K nvu ,.om Ae.v omv. ++�o.v .mom rm ova "m"°'.e �..� 771 wwmx+m v+a °EF"imo CAPE FEAR Engineering, Inc MAS PROPERTIES LLC A PORTION OF DEED BOOK 365 PAGE 1 SHALLOTTE TOWNSHIP BRUNSWICK COUNTY NORTH CAROLINA Wr11AV➢11E Lwe K a TAxM n xE n• umm R MXE YIDIr P E R NM'MXE mr11 N Y1A1'E AIAL TA xueEere zm xuvrsre ma n xuX,re „na re T11 E nz Tn n, E vr¢E nD ,IXe ,m➢r T1 NIPEVIrE y m, YE IQIA i1E NI MXE Y,]A N IY,11lE Er TN E M U A.W AWN m xao➢rw amm TS O w S Tu wRrw rrmrw num R NITX •mrw Rma TIT IT,S4rw EWIM TN xnmrw Tn xll wrrw mITS TW N SIWYW IAS. P 1„eMW M }II NI,b!]f Tf rWPW 1 n, Nmemw I,Rx Ty MI,g9TW WA TM W EENN T9 x 1 wY .31 mm T YNVYw uqa T x+rM.Pw n x nww nna SSW 1611, WIADAYM' NA, MAN AS SS TIES QAiPIIS MR T TMCOOvE COPY M TIES MAI TONTINE 4 Sl ILL Or VETLM➢S SNAB.ATED MSWIT TO SECTE,, ,W R M =AM VRTIX ACT K DET[IMO.TD EY M V,m151C® M nOS DATE XUS T16,2 M N CIYKi TM THE LAV M Wt wuMS REELS 704 TMIS DCTERM MATIOM Of 5£CTIDM ,w JMISWCTEM MAY BE RELIED lPoN M VAiTIM �OE MET TO TAXED SS, WDS1, SEARS R OEMi6O�EEAS^ wIt.AMO�ML1�O:Aum ILEMNL SE m,,mY CSIMIIL TITLE DATE ILSKE A[ilID, 10 M TWXttE PAYIEIN➢ER PRO M AYO DNSAWL N:PA ME LOSE➢ V FOR WCATM,O AMDS M TXIS 14110 Ci MY n1E AAMU& }➢ PoUTEVI M XOK VAS 16EO POSITIO'E VERE IMrEREMEALLY DIUSECTE➢ VITM JAN . AMIV D P M Mill. CNIOLIMA Call SURVEY 0E➢5) BY IISq➢ TK POST-PPOIFSSPY PRQ/M W M Ila) pYS SRTVME Wj PRIIDEt M KCS BAN LCA4D T CASRL 1YM. M VDIm!➢Tp1. NG OAT N-EF,➢]S,D R LIL{' TT D FROM VAS LOTL. ? IS LCX w XMOKIS T OUDC M SIN' ILL POSITION I COLLECTED TE zlr LEAST zo 1MRFE ➢DEMS®AD AIS TI TTHE CRLarzO. AT DID S SCWN➢ SYNCIRRM REA➢➢ES VIiX M SASE STAiIM M M�MT �SIMACY RW THE ➢YfMEMIALLY CMRECTED DATA IS LEGEND- 0 K1x1SET iD YES. ➢T onLNTR L wen�loE aPENvuTEA6 RM' 41AlALYTWVE.T WliE1LL NOTE& I Rvolo v wm➢TEM. %m.MEE NMKIEW.ION➢Mq DEDIKIEw Ia¢®DOMIm PAMeu oEmKMtm PAoe nq➢MM,AIM M,vMESE oEmpADMA ISS" oEm•ooK+mzwoemoEmaoacm wm tm EEm MC,IY2 PMCm➢V➢E➢MMSw@,q YVG gI, 1E EWGgIiv P.Wf4VAM P/Z. .I, IW E➢MM➢CO W1G.gRif E. P/@[E1 YIP fIIDR.i f➢. vKM,M WPG.SEE!fM wa[r S KRREIf£WME WFOM KV YMMNR4lEip1'S AUNxnr xA➢Ta vLNuwmmoRrmYTOADEMOYM , ALLDSdKgMDMCM@MR.VM0.Ea q A, Au wEvwo TR wme uE TEn ro re loverEDA,T M SENL L"ISO CAPE FEAR Engineering, Inc M— AMB •wAMIWiDm�Cm MAm 1 AMA mO vxaEer �_DI CS' JICA xWa 1 CXEIX KE SIWIS KESNF I.JI# RgKD AS, DAM DATE YY% Op�WdNETNOS•V WETLAND MAP FOR MAS PROPERTIES, LLC A PORTION OF DEED BOOK 365, PAGE 1 SHALLOTTE TOWNSHIP BRUNSWICK CpUNTY NORTH CAROLINA 809-01 1 5 OF 6 MSAt wn ,v¢N ua.,-uwwr „�RNy flni aa]m o90 im�a¢n ate'"" ¢rt¢ yEtl RM4 n10 ifR4 LAAbMFA ® /REM PtllL 61¢ ]11f.LL METNN NE R11M uo U. 141 .WEAS WYdS tlM 1901/�lm X£1V1O9 FtlIR%¢Iml Nid MEb txT@ltl MFA] @I¢m 160UTm YWi.49 �QQa. nLLm raM]¢]mmrtMov m.wl.om,mm. tmm@� ..Nlm ma m MEAn Wm ot¢ e , mwm MFA@ t@ew ov Man fommm zm .ally- N:.R.]m IW39 03¢ FFFf IRI]]l O.G ypyfq. �E¢m SmNM 6f @ m v MMt] nLLM L6 Im,ma reiwrBlfmlW IIm¢R OS mYB 0,1 NET affi9 m dR¢Aa mmnl a HOLES MEW v¢tnm m ® ® m® MEW wn@ nm mead] xq ® ® ®® as a�veex.er aw W. MF1Z/ mum ,oawxa MEM¢ w]If MFAm ¢91m N:noftwniuE,®rom.afw T01em Od5 MEN¢t Q@ yLVi OD ro MU) nm YFIL mme.m M . m McMe v�e¢a@ ,REM] vxa an na a MFAV 9117a91 131 Ir m mMT 6m m m m yy UN NEV. p mlp ¢R,P¢s Txl TI¢ f C¢��FGeI D 6 x vAFA¢[,OMfd A MY�9ro 6Z®E�YI MS My�m rnrt" n w.. mm�n�"an Iwl'rm NN.A�,K .e,l.m LLnE.,®+ it+lae 5�k Y r m m CAPE FEAR Engineering, Inc A V Tic mm mR�m.w..a.,Ra,.mA, m WETLAND MAP FOR MAS PROPERTIES LLC A PORTION OF wl- DEED BOOK 365 PAGE 1 ro '% SHALLO7TE TOWNSHIPWI BRUNSCK COUNTY NORTH CAROLINA 809-01 6 OF 6 MBl51lLPo LX Lid-toeoeexww Tasaxd WVC6m d f — I r 7` �— r � I 14 L WETLANDS = 30 878 ACRES D UPLANDS = 242 882 ACRES DR,Pmc �� TOTAL = 273 760 ACRES — a MAP m'a (NOTE W-3 W-7 & W-8 ARE ISOLATED WETLANDS) I LOCATION1 1 / li IPF (1 '-1mIJAO01/; UL- anve �MJ.,TR, -LlfIJN N1WMWN ETAL" �� T)ou �w�naoml➢L�m� Tahedesme,M,.Pretml.P�••�b°dmYY.azaY I 1 � ( � IoramhvaGtYLT®W@A41�mY,wa bZ I WNIimDdbetlmHmv.tmm®aIPY '''00O>> c$ _� 1a; m°mlPequ•.dmlledlessh.dmaah Yh.afampaYLedg G$ I 1 IzmPF (1 ry�q,�hMJmhmM9mlma0lPlhmtlo°�llemtltl�m u &b N4 DL- R 1?1 .-trnl Y. bl8w�maMmm ° TN�z100=PAUID1I L13a �� TyA� a rLvv( -OE1rN➢JIUTAMSOFI. BAL- YJ" R o®eaacuuvAaam Q C -.S T� 6y ' 1 - LJm nLNG ItOLA WFfAN I:a TMfIIW0.11JRJ 3+�Ly1",e� ' -O3IAIIDIrDlPW6.uc- 11 ,.« _ IPF (I- T) I `;e8��€ p%r,oENmvAtWl°36 vureoaLzvACEsID ` I TNSSJmLDO IPF (1' L,ma APE � b®WOI(19ll vncElDa g i �F��:� L I v ytt.�3lttpoolD " a pJ>P I�.�] u ➢ �� ���' t , ( v�EOEo'oam'�a v;A¢e,s ' eltT.bn / ` Ur rFo nuzxomDrn IPF (1'1% ,h RB z ' u wa '^' ➢�/ uan m m - _ 5..� __ _ — --_ IPF (2" Ti= ,�• - 5$}� yy3 Lr ° uA �' Lr L'T, rr llA/� O9HI WILLL.M`UN- I 1 Si' TMS nBWDID " U Lr ,Cy t � �➢�• L Lrr 1 Tll l` 1 4 L-L O'° xO VVJJ IPF (2" OT) GbCty I I a toil M tt �s 1 R SXibv � � �qTg L Lam rrm `a. q�A LIM 1 � Ae• sm urn r9 �➢cW,^ ` T F IPF (2 D®NIORNK aAL£DO^, ' Mmw m°rvm°�i ,lM IM _1� L TMS]IDOMW°d �Y o� (j j TINf3IDL1%IDL N]f u V mPQ o 8 Y g / Es a" ., % 'LIJDSD RP.BTwL:Y[ONe o` �""" EABElM'TII'B 11 r SEE PUT PIT ]JI YCERIE,Y THAT THIB TBARERURYEY m SECi L G i $ g AH gJp$I41O PARCFI. OP PiCOHU RICH SEE PLAT CP - COMPIIIFD POINT NO BOUNDARY CTIANOEB WHATBOMM CMF - CONCRETE MONUMENT iWND MIS- CONCRETE MONUMENT SET 9 WC]S,/fIIDS BOUNDARY LOCATED RRITIATRDffi,>Z < n IPF - IRON PIPE FOUND 1'RaX OP8 R'DTI AH ACCUPACY OP BBBSR[ET� PS - IRON PIPE SET Dsz— r OF - R M FOUND a NO TrC SEARCH PBRPORMED BY TTfle OFFICE a y REIS - RESM SET I �- o r" NA' o s Y1lWYSOL EUL W 3N] Tl as ,0A5 K 3]3 s CORPS CERTIFICATION t� _� k CI This certifies that this copy of this plat accurately m131K s Ir35b. Iae3➢r DrAO s Ir3D ost I- s Irrr depicts the boundary of the lunsd¢hon of Section 404 of the Clean Water Act, pursuant to the 1987 Corps of Engineers Wetlands Delineation Manual os datermined by the undersigned on this date Unless = there is a change in the law of our published mgu- lotions this determination of Section 404 funsdwbon & a may be relied upon for a penod of five years from U s Army Conn W cim . olfawl - oa eul N ITM to`Ai3 R UTN OF Awenr nuNIURA - BRIMNIICN 4wDMr I CIRTIIY lHIT lNf9 LIP IIN DRAIN DNDNR ri 1 u/r DAND INI6 O=OPP6R1aW� IDN 1RDAr DdfDRRDdOrif'N OLO� W I10e W Tla 4 PJDSP As IrILLar3 1 rear rRa mwxDARres Nm soRraTND ARN DLueur INDSArrD As nRArx PROY DNND DASOAIPlIOM RSWDDND IN Of3]I NaOA$ ! pan AN IaLA=e rNIT !Nl FATro 01 PRSLPDM L9 CA4VLTND ID iND THAT T164 YI➢ IL9 PRdPlR6D M 14tlRDAACN IITB 0.D r-eD-",f Al' i J00 0 300 600 900 rITNABN ri NIND IR, OPPIWAL NNAL GRAPHIC SCALE - FEET DArt 0"712OOS �L \ 1 N a RIDBrRITIOM NDNDNR -L=I= cci L-1 erJmR a 7J30i ascwcE INN, L-3 s I3le L-3 s imolw mrlew aw in, 'A°'v3 L-e s a: L-a NMIe3,i MW f33Iv ]I L-o s N 1In. NOTES r AVNRNM'6 PLt NMRLND NAP Ol DIIISIDN OP RNNLLDI J GAUS'N 6rA ArrRlNrND MJAN 9 DALr WED IY/r8/1DAJ IIID RSLDADND IN PLT 1 RNPNRdI.Sr PLT NM'RLND •rx" PLr or RaDRyr ANA9IDN r JD NMDB AIOR AS WAyerR LIC fir lNIA Ol1R'R OIrfD roAr A TWS PROPNFTY W LOCITND IN NONN C r8IC8 M r IN A IfND PLNR I NO =Ftr a DRa0N0.r NITL RENN O83NRrm 033 !en pswoai Dr I Robert A Warner certify that this plat was drawn under my supervision that the ratio of precision as calculated is 1 10000 that this plat was prepored in ongnal signature O reglst bon anumber Band seals news 27h day of SEPTEMBER AD 2005 RegLstrabon Number L-4201 ^ W, fustwe rm a"I "aaE $ oe z,a➢ rc ,ow Jo1N CPYE 116 3..00W7 5 � it ass L-3 D „µem II/f o , IwullW]o1 11 116 33Y0aW102 unAaw wenN+o u-1 ra Aces w-I IAr Ao1E9 1F3 1 W KAS w-3 0 fa MR6 V-] so KYLLS w-3 047 u-a SM Mer9 ACRES w-A 3M Aol6 u-] Lar ACRES w-e ACRES U-a SS.M MIAS im w-a 1A1 ARAM w-r 30 ACR6 iOrK - e3ya =AL - a.M LOCATION MAP CIDINR PION ly6 2 R! /L00I A to 16. Iit 14 00 a � m LL L �o mo — cl 0 n 0 in a 0 g z C) cr 9� i t Z STAM O<NPPM GNpPH - ClAu"M V dw/NSM w I QRTrY r T TIE MW oT RAT W YMOI M CFATFlaATON M IiiaaD YEErs ALL WAIURRY eEOVWEMENT] M KC m1W5--my a 2006. RENEW on a WETLANDS = 30 878 ACRES UPLANDS = 242 882_ACRES GRAPHIC SCALE TOTAL = 273 760 ACRES (NOTE W-3, W 7 & W-8 ARE ISOLATED WETLANDS) a a ) ue mn -CLSIIAND1100INLS LLC- DEE BOOK 1902 PALE705 TM527B00=01 JOD zbD / P�69 -C6 LANDHOLDINGS, LJ40 �E 701 DEED BOOK1902 PALE ]03 \ 6e0 PLATBOOKL PALE 310 N6 TMS 2280=2 IPF 1 ( IPF (T11h � w WI S3 16U U40 834T 49 16 ur J 229031Ancs IPF (2 04}3D L22 ihry L30 /Run e( -oo. BrvncM1 - lBe We OIB GOLF COURSE, INC - PLAT BOOKI4 PAGE 59 DEED BOOK M5-001 TM5]]11000011 ll2 31 t 0 LEGEND CP - COMPUTED POINT CMF - CONCRETE MONUMENT FOUND CMS - CONCRETE MONUMENT SET IPF - IRON PIPE FOUND IPS - IRON PIPE SET RBF - REBAR FOUND REIS - REBAR SET DEED BOOKIM PAGE 1139 PLAT BOOK 25 PACEd4 9 TMS 228D0010 - DAND NALES ETAL - DEED BOOK1195 PAGE DO TM X?80=006 LB tMu L21 /flan vl Coon Brunch -The Llne D LOCATION MAP 17 =`r, Y h [ 1 I II11\t1 [ 3 GLENNWILLS&L PA ETAL- -S 1100KIOUSLLC- CORPS CPJl31BCABON DEE TBO 9E64 PALE 68] IPF (1 T)DEEP BOOK1563PAGE 1136 �P TM52290001402 TM512900D1403 ILa ttmfiu dm tlue copy ofem Cl.,, e, A d Vx .ft etoy 1997 o .g 1m�Wrcu®or Lnm4a orlha lm wtla Aaoj;&W bytle7 bZ m �^ ` can Pf 'la®rrxe wbuboae Dclmmtlm MmW, ohwmabd M 186 L12W au mdan�eQmLhu dYe Udeo thmeu 6cEePB6mLBe Lw of oerpduhed }L � IPF (1 Mgdmas.IBabev®o.c000rsecnm4apmtllmmmryxmLedUPW g fir• offive yem fr®8rn dek y /E _023r.Vpyo 6772 N6T B2 v� -GLENN W UlAM50N ETA. OG Lr 60 - " F 19 L12J6 YaL DEED BOOK 1564 PALE iW 0 c C Z`ss L �9 �ryo 150L9 WFIIAN 0240 ri TM53290001402 3� 9qqEE^ w-e IPF (1 T) F/��}� DEED SOOKI9A PALE 1139 g PLAT BOOK 25 PACEM n N 1M522110001005 90NALD LEE TKIPP- ��(u oQ DEED BOOK 900014186 PAG301E M5 \T Li19r �L1M0 m TM522 a 11100 I LISSS r L1r30 • _ _ _ �{ /SO(A�ED WETLAND ucso IPF (2 Tl yy o 1060 L1129 1 tl - O DELL WILLIAMSON - O615Aae L11w DEED BOOK 1168 PAGE 0009 ,/a,15 1 }r CG✓j' 0 5613y115 I TM52290D012 L1000 L102 .960 L960 L1140 ` 71117 L940 IE/Ji D r D O a us Lrr6r� IPF (2 OT) \ 3� S R ns urea a d 1o117i eL 'G'6f4' I Q 5 �� Ln90 O 12 er 561pg 15 / 9031 6L Nl 0. `jF Q L y I �q I ti E_ T m EF � wa W r Od NOTESI%ISPROPERTY IS SUBJECT TO ALL EASEMENTS ANDRESTRICTIONS OF RECORD 2 IV�--11EREBY CERTIFY THAT THIS IS A RESURVEY OF AN BXISTINO PARCEL OF RECORD WITH NO BOUNDARY CHANGES WHATSOEVER 3 WETLANDS BOUNDARY LOCATED WrrH A TRIMBLE mPRO-X QPS WITH AN ACCURACY OF BUBMSTE'r— ^' 4 NO TITLE SEARCH PERFORMED BY THIS OFFICE LINE TABLE LINE TABLE LINE TABLE LINE TABLE LINE TABLE LINE TABLE LINE TABLE LINE TABLE LINE TABLE I INE TABLE ]mis 2J2NOIH eeBnwa S1tgS 2.entoB'x awrtwo 31198 uwarx 2uwN une LLR9OIH e,ajLa ]Jlve umorx eenama ulva La2lorx eenawa 2J216 L.enmx aen9ma uwc R.ewnx elwLma LIN0 2.]B+mx eawxRwo LINE ELMLTH eenal]ro LI SImR uel gem L314 131 13- 313] L437 L430 2936 1987 LMO L561 945 15]I S. 7222 L606 uea L.I. 29 ]s uosl n29 LIIBB 1]]B LR s2000 III IS LI92 LI03 20 25 4990 01. 1.4B LUB I5,1] LSBT 1388 Lfi0{ L.85 fii 51 J021 LBOJ LSCB 12{0 2.1. 5 LB]0 LB31 4216 ]J 31 L1D53 J]5] LIt>fi e189 ) a L1014 1108 LII]] 5868 MBfO ] L10{ 1)4] I LNO 1J BO B83 LBBfi )JO ♦ IBD9 159] L9R 1]0) LIOSs 10)5 LIDB 40N 43230 LI95 ]{9 L}IB L319 1543 240J LHt Lµ2 1260 LM4 065 23U 1421 s) L07 12115 .1. 35N LWJ 41 ]J LI056 is III LIDO 51 )6 1RJ OB 1J$92 LIDB LIBi 158] MB2 W30 $0 ♦9 L40 Re]3 1]16 L566 iB66 L6B8 L600 MtlJ 5J 28 1911 IJ112 3]JB 26.5 L9N L935 M]3 2JB6 L106] 1661 l L1100 ]494 O 16B BB L108 34R] L]21 1]22 NU 2989 LH4 1]]2 1.35 LSBJ I}fiB T6 J] 1170 L6B0 S]40 1 LB1] 1]13 LBb 3$11 L105B L1D5B IS J6 1219 LIIBI ]0 ]) M IL M4x 113. L1B9 L200 1874 1..1 ♦ L324 L324 1643 4 LN5 LH6 L448 1666 I229 L5B9 2398 1 L691 LB9T 1478 M03 3 1Bµ LB15 1909 bffi fi L937 L9]B 2410 1)e5 N u0ba 1493WNOI L1103 160J Ly� L1O61 121J LIIBI I)IB K� n33a 36{W L202 L202 79 b.1 1325 2024 M29 LH0 LPO 1400 1498 5 ] LBB] LBBI SJ 61 IS OJ ♦ LB10 mll BM 3]0{ w L939 L9w 3019 1902 ] LIOBR L1 C83 162J 977 L1185 Llm9 1498 I875 1 L.12210 M52 L30.] L304 b83 15.JJ l]R6 LM] L]30 P34 1]31 ]2]9 L••9 LIM 914 BB{ 932 L5)1 LS]2 L573 TO BI 3551 1 Lfi95 L690 ]I]6 {t ]2 .18 1819 4133 RO RO L941 L94T 2]]8 2]1] LI061 L1O64 2J01 1$12 LIIBI LImO 15b 15M 1]2 O0 mRW LROS LXM 2381 2]01 I.M. 3151 LU1 L45T IOU 1B 13 LS]4 LS)5 3045 ]p 45 LBBJ Lfi9B 1904 2R B0 .20 LBZI IB1$ 25P LOIJ LBH 42P IB BI LIOD. LI00) 1124 ISU WIN LIIPo IIN 1881 189.2 M4 32 L207 LSOB 763 965 U30 L3N I810 3404 L453 L45I 1284 10U I L516 L57J 8)]I 2324 LBBB L)M T430 413.4 L822 LB23 T208 Ifi02 ] LB45 L946 ]3 T8 1619 T L105e LION 1]IB 101] LI191 L11B2 1105 35 ]p LIB L20 IS•4t IJ0.M .10LZO, L210 1..a 1099 L]]T l.U] 43M ]585 LIM LIM 1823 15 ]0 L5]B RIM L702 SORB LBN 2549 L947 3624 LID]D µll LI1b1 ISJD LSJp 1688 LJOT PI] L825 1437 L9w 1859 L10]I 1307 LI194 1103 I21 L22 410 10828 LOU L2@ 300J RSM 034 l]15 1647 13 J1 L437 L4M 2117 2]88 L500 {5B1 BB) 4423 L)W L]BI .1M .2.1 W L026 U2] 2480 335 J LB4B L950 3I33 2169 Lim LIOA 1522 2665 LI195 LIIBB IBM 12I0 l34 LRS 11740 1]RW U14 L215 6680 Ll]] ldb 21 25W L460 L481 2402 1241 L503 ISB4 5J08 1115 L)O6 L]D] 4591 5451 LW L029 Law 32]0 1098 1770 L951 LB52 LBS] 2243 16 R3 P41 L10J4 L10J5 LIO>e RI52 330J ]}OB LI19) LI19B LI1B9 1]]0 1450 I]0) ��{\al bCbJJNi �00•' '{f G_ A �! L26 LZJ 19602 94M µ22 L2m L21J L218 W50 8699 ]9N LM9 LHO U41 2022 124J L462 L453 3145 2169 L585 UN 17 B5 Ip BI 1J08 LJ09 BI 11 891. .31 .2 2606 55M L8N LB55 R60] JR ]I L10P L10JB 18 {0 PM LIM LIRDI 1117 1p 12 W LRB 1]0 L52 )lM SS.IJ 4]02 LT19 LRZO ST 11 U]S M32 Ll4R 1J1] LIM 15.2 10.69 181f 9B L464 L465 L166 LOS I]BB 2210 i0 b) 13M L50J LMB L. w23 i)11 14 J] 34 1J10 L]1t L]12 w3B 9851 49M B33 LB]1 IBM 30 ]9 159] 352] N 5 I L958 L83] L050 IBIS 1960 I061 LI0J9 LIM LIIBI IBIS I{69 ♦IJ LI202 LI$OJ LI2W 2323 I]19 23 )0 ZJO qOo •5: /41/IlllllLll\\ = L5R L]] 1MJ 20 6J2m .21 U22 L32] M ]0 5p 91 L]U LN0 wis M 69 IOU LU6 L469 IB 5] NM ISBO L591 2I J0 Will L]I3 L114 50]4 M ll] 9 IBM L837 IJ 97 25 9] 76 L959 L080 3]]5 1248 LIM3 LIM3 ISM 15 M LISM L12M BH III 35 I NOD 1I.102 LIM .03 24M4916 4D 16 3047 L211 L225 U28 5153 ]OM 52IS LM) LlU LN9 2561 I351 2521 L4]0 L47I IJ ]4 III III L593 I5B3 LSN I)JJ IBU 2090 LJIS LJ10 L]t] 986J e260 6105 5W 1 L. IB]9 L0m J102 1]65 S54J 1 fib L961 L86R L86J ]]0] 29M 1))6 110N L10M LI098 ]86 1441 1855 Is 50 L130) LIROB LISM ISBS 1613 II iS 64 `LF p L1N SD $] µ.7 LRR) L210 1292 M54 UM mN 1069 L472 L4)3 Lt]I 3364 1681 978 I595 LSBfi 2121 MP 4 LTe LJI9 9953 5143 Mu L812 z]ZJ 1042 LB84 L9fi5 ]S i3 Ifiw LIM) L1pM 3080 L12M L1311 IIM 1193 �d i LIM Im LIO) llBJ MOJ L219 l2M UB3 Mt3 ♦ 4 L352 .2 L] I]0] 6P L4)5 L{]0 I918 l597 L528 I619 2696 L]RO U21 3717 BJ0> ,q LM3 18H 2345 UP Y lBfi6 L96J 10 DI 553 L1M9 L10B0 1]]S BO LIRIR L1212 1600 ]]IB II$ r tl P LIM LI09 U83 U]B u31 LR32 4155 N14 LMI 1]M MOO 33 C0 LI)J L418 1597 24w 21 ]J L599 Law M10 3272 x 0 1 LJ22 L]23 5163 SJN LN5 L846 37M 3512 L968 L969 1949 IB 49 L1081 LI091 26M IJM L1314 L1215 IB JB ISU W g N L110 Lill ]0.]I Pea UN UN ])N 7 L LM) NI1 21 ]5 L1]B L. I0b IBDI 1602 3849 IJ49 ] LJ24 VRS U05 49Po LN] L040 1B40 2&29 L970 L9JI 22J6 19 ]] L10B3 LIM4 1]11 IJM Li$IB LI21) 11137 I1J] 4 i L112 L11J 3392 IJ IB LIM PM M41 LISB l]N ISM 3664 LUI 20. R2 29W L603 L604 MOB 51DO LJ20 LJ2J DO 48 6]M LNB Lm 3325 2421 L9)1 L973 29$8 1720 LI095 LIMB 2p 40 2290 L1216 LITm 10.96 mD "Il��yp 2 fl FQ `}\�( I L114 L115 5]M MaJ .17 L2]i LM 6094 2459 LMO LMI a L. L. 3211 2211 L6M L6M $SM IO Z] L]T8 LJ28 ]J 01 52]) LISI L05R IJ10 22]S L974 L913 ISM $134 L109) Lm90 IS DO COpe L132D LI331 1422 32M \S 3b L110 Lill Mtl MM UM N$5 330p LMS LM 21.1 1663 L4N L. 4120 21M LBD) L600 I789 1214 LlM L]Sf Mm MI$ ) III" .4 ISM 202. LB)6 L9J] IBw M16 LIpB9 LII00 2906 1463 L1222 LI213 D64 I61J L1f0 5.2p U41L20 L1.1 LR42 IU 61 1611 LM1 L]6] 1}39 Ie]I L4B6 LUJ 3]R ISJS LBM L610 I]69 239] J L132 L. 57M u0p ]9 YO LB55 L8M IBB2 1095 L978 L979 NN t66B LI101 LIIM 14a ItU LIU4 L1135 19W 3907 3[fl M1Lfll4 1120 L120 Lml II13 BSN U41 .43 IBU I91J um LMI 316• 2298 lUa lUB RI 21 HBS L0il L812 2]5) 1626 L)M V35 9834 6097 J LBs] LBM is 91 230 ] LSBJ LOW 2114 1120 L1103 LI1N low II D9 LI220 L119 1945 NB) L13E L12] N99 • NWSI ]T[O4 u L245 U45 L2U 3JH PN 1]$9 6 $110 30M L{BO L491 22 `A 2.2 L51J L611 2192 1454 L]SB L1]J Ma6 11132 LB19 L060 1.16 16J0 25 L902 L98J ISJ9 1&31 LII05 LIIM ])a 2022 LIZZB L1129 23N 1)9] LIR{ L12! .H11] 2493 N88 U4) L346 2.1. 2018 L]JO L]]I ']]5 S44 JD LIDO L49] IB80 115} LN5 L616 IBH it. ] X L. L731 2220 2317 M01 LNR 1]5] R101 L9N L965 261] 31 ]3 L110) L1108 $SB] IOM L12Jp LI311 22R0 I)0] L120 111) 2193 XI ]• LZ49 LIM 1i21 1.11 L32 U]] 'I all 1211 -4.1 L96 U.1 ISO] LBIJ L618 2216 1111 L)40 L141 'I] 26J0 881 186] Imo 1118 I5J1 LBN Dal 196J TI JI L1f08 1 m L1231 1B6] LI11p 1091 L1211 2C0 L136 LIN 211] 1]M LR51 L253 RS]I 2J •5 ry /5 3403 1090 L498 I91 L498 13m 1]45 L619 1120 1419 19i0 T L742 73 10 L0 Pl LMS L668 318] SSJ3 L. LDB9 1558 12BI L1111 SON L133{ b10 mloall '�' LIf12 1•B) 3]B � LIM ;2M L211 1J fl5 LP6 1]]8 IR DO $2JI 1189 L199 1a 01 La31 JJ 00 )IJ Ju L]w 2142 ZZ 03 LM7 Iffi6 21M 2067 L990. LB91 ILL tDo, - f11] L1111 1411 I]6l_ _ LIJI Lm3 0.4] 1615 LSN 1255 1115 IB IO lA] L501 1)14 12 BZ M21 IS 55 L]U MM LM9 20.J2 L991 30 JI L1115 1359 L123] L12M 1261 I)M 1 l 11 I.I. LM4 Z361 UM L3M L$S) Ilµ IS 1J 141a Lm3 LMS ]9] IB85 L624 Lfi]5 10 J2 2115 L]♦) LJ40 3] 41 5974 lB]0 .71 P $2 34m L98J 21 N 1707 L1110 LIII] 10.31 I]P L13M R4 M M a C� g E- a Wy I311 L]81 2151 PJ3 1742 LM1 I]16 L628 L62) w6I IDM L]49 VSO 280R 2666 mR MB] 1 tR95U94 L➢DS 2410 Nf0 LIIBB ISH T] LI242 LI35 396J LZY 1]6B LIM 9)R L250 I.M LM2 LWS L506 IO SJ ISw L818 .41 4 4 11 LAI TSN LBJS M]4 ll91 N lJ1 L996 L99) 1198 98 LIIM L1120 155) LI243 1623 21M 21M WWIBK LI]) Z6N LRBO 1030 O63 IB5) L50) LYB 1151 I.19 L629 l6M L031 20P 1]19 30.41 L]52 L]M L1N P91 I615 4 J LB]s IBJ6 bOs M I 21 Bfi 1B99 L93B ism21 15M 1111 u13I L112R 19n 1931 M21 11214 L12N L124s 21M 1001 gN LIM b6B L280 1045 { R•U L1J9 19T L363 N]2 Lld' 1J6] L1U 2960 L263 1883 LIM 1108 LMq L510 L]ll RSM 25U 113] Lm2 L6M 18M IS90 LJ55 RR I] 1J20 XOIt IBP LB]8 180$ 1130 Lmm Llml 1.11 2114 Y4 LII23 LIIR4 BS] 1315 a L11U L124) 191 721 21p) LI41 26P LX4 2488 LMJ LM0 I5 J2 I58] Lug 261a L305 bM U. 1981 L8)9 26M LI053 J9N D5 L1125 RS LISU JN LII3 2187 UM 2SM LM9 M.01 J292 L512 LSIJ 1.2l I491 LBJI L633 l6]6 I4 ]J 1328 L]SJ 15B IB51 21 J3 NI LBBO 1B81 2104 ISN LI00.3 LIWI 10N IB BS S51 L1126 LII2] 21W 2.. LIND L135D 1394 I551 yyyyx IS• yy LIu 20{B 2048 LHa 1]85 usaU97 l]0B R)m .1 L391 Ilp$ 1].3 R6M 1651 Rpm L5u 13M 4 L63] t61B 10250] 1 L]59 L]BO 26m Z19] IBB2 lEM a552 4282 LIWS LIm6 1&43 RB 48 L1110 14.3 LI251 2052 F� WWW y 11U 3390 MJI L2a9 LZ)p m85 11)5 LSIS L510 JO JO LBM IBIS ]4 L]Ot 25m N2 LBN 15 54 LIM] BN LII29 LIIM 2]O 3312 LIT51 L1163 IOM 11M L14J µ6 L140 841 LSJI LTY[ T))] 1]0) 1]p1 1412 LSI] I3N 3223 .39 L640 R2]]4 2M 91 Y L]B3 LJ6] I]m ZBm Lam LBm 1133 1159 L10N LICG 1817 1058 LIIBI LIt]3 IOM 258I i{ LI354 LmM B4O 1]2a Llm 2228 12 RB L2)] IOII L]B l]M T]M 12]4 L510 LSI9 IB 03 1112 LBII LN2 f05]M L]N 1105 D LM] 1560 LI010 2237 Ll133 1145 L1356 1]10 L131 4117 LT]4 'X1b LJ9] 2115 L520 M] 102765 L]OS IIM L. 6181 LI011 JI fi1 Lll]4 IB SI L135i IBN LI52 ISW LT]a 1)6J IJM m.3 LSZI I. 1B43 ]9 ]p L]80 11N LNB 2551 L1012 11.6 MIS IJ O4 L13M IR DI LI53 LIS4 7862 3B tl2 L$)8 2114177a Rll• LSM L.1 1. DO1623 163] LSR$ 203] LBN BR 9B ) LJBJ 961 L090 36w LI013 IJM LIIM 1fla0 I L12U II JI 1323 5110 L045 Np5 L)OB 21.1 ..1 1.. 2 L101• 2102 LI137 1042 0260 1115 LIM LIM R6U UaB .7aL277 L2ia L2w 1]5] RSM L401 L403 1.12 -F.M LSN 866 La" L64) 65]8 3)20 ) L]a9 L)]0 23 ]0 i5M L883 L09] II J1 IB ]t L1015 LIMO 6JJ TB.B LIIM LII39 mm 1.•9 L1201 L1RB1 1659 11 D4 p p�vLi. g LIS] 003 L2m 1410 L4M 35 25 Ly0 I)52 HI ]2 L648 MM l]]I 1]9] MN 12P LIOIJ I04 LIIU SJb LI26] I4U E. L+ TI I$ 1499 l4N 314.1. L5P 3167 L649 L850 3)m 1JSJ) L]]2 LTS III 3IP LH95 tom 2441 20P LIMB 193E LI141 1]M LI264 IIM W /.L p Z 11M L159 Llm 35U 2]10 082 L263 LSBJ 1.90 121) LW L 104D f266 L53a L529 It DO 14N L651 6349 L])4 2641 LB9] 2751 L1019 L1020 2112 IS]E L1142 LItU RSB3 IBM LIMS LIX6 1. .1 IJ JO LI61 II.. L3N L38s 2160 1p J0 14. L. 2259 IJ ]] L331 LS}I 12Bp LDSR L853 604) 59 ]B IJJS L 8 1100 15 R. µ Lem L099 112] 1186 Ltp31 LIOR1 IBM 1i )] 1i 1 L11H L1145 25 f] 3160 L116J L1268 1210 ION F~4 L. V]C" SO.3 .13 L1BJ P6] LZM 3]01 L499 1]34 L531 ROM ISM IA54 LB35 MH 0122 L7J) L]]0 TI)] 18U N L90 L901 19]] 9I1 L1013 I3 LIIU 3544 LIMB 12M �4I Wa4 LI04IDS LIDS M]J N91 L2BJ l2M IJP IlM L410 L.11 I50] I)e] LSl3 1.M L6M b24J L)J9 1463 L.2 2527 LIOR4 L1025 IS•9 20 ]S L114) LIIU R411 In LIFO LIS)1 1R 80 to DO LIM 20 IS L1B9 L39p 19N 11 M 41 L41] ReU 1913 W4 LM! ITM 1189 L61) LDM 6]le 5]]9 L)0p l]61 1505 11m L901 L9N 2)31 t84t LIORa LIOP ISSt 431M -VI1. LIIM 25)5 21JI LIPS LIP] Ii 01 5]] W n1 L187 Rl M LI68 LIBR 1913 20{) L2M LNz 2449 12U L41I LIm 22M R220 LSM .7 1) W pal L630 L860 0910 5910 LJ62 L)e] 2 86 lam L905 IppB 10 N 1811 11 L1038 Lm19 I] 75 2150 Lila! 4902 L1374 ".I W z r�{ LI)0 LI11 1]]] I480 LM] L2N 21M ]J 4J L11) 1983 LSM 1539 34.1 SB Oil 1881 LBBZ 83 BB 4B11 051151 ) 4 Um LJ05 1102 IBP ] 5 9 �] LOW to RIU LI030 1183I 3290 2480 L115] L11N 4.15 ])J9 L1P8 L11P Via I529 ry (n 0 LI)2 LI]] 410] P2B L295 U" IIM ISN u18 15 R. LVO Wl 3366 4538 L66] LM{ ]S D6 6918 L]BB L>D] 28 J0 ]030 L9M 1910 14N ZB 41 11M3 IIMJ 3R 8J 2352 11135 LIIM 321] bSl LIPp LIDB 105I IS]] 19-4-�1 y 0 L174 LI)5 11m 1752 LZ91 LXB ]IH 1186 U19 u30 1121 Ill ix IS Ja 2pM LN2 LN3 141 45.N L685 L.D6 6496 850R 1 LJM LJ09 IS 55 2868 D L911 L912 10 fi1 M4R U. 11.15 36]0 2]JO LIt S] LN50 MOJ 516] LmaO Llm1 1587 1]OS 0y w whnj LIDO L1J) b99 4099 L300 l]Cp IS25 I5M L13 LI2 2a p3 1387 1544 LN5 2501 3325 LBB) LIN 6B B9 )fib 190 LIN I]B] M39 NB OJM 3 LBII .14 ]195 2495 14 DJ LIOb Lm3) PM 231E LIIM L1160 41P BSM LIZBT ..L3 152J I]6] a C 0 Ll]B L1J0 SJ 20 ]550 LMI l]OR 20 ) 2]b L424 L13! 21.3 LNB L54] 1543 8119 p]3al]e 1869 L6]0 80 q1 ]0 J] L]92 LJ93 J111 2]R2 { 840" L915 MOP 2J ]3 3420 LI038 LID19 17]5 1J 06 I LIIBI LII01 M28 wl] L1254 LOSS 1475 ]B8 SEE SHEET 1 Lim L181 )1 1190 L30J LIN 235] 2255 L426 L4P IBN 2510 2401 1340 LN0 12P J011 LD]1 L6]2 18M B]21 L]94 LJ05 2149 RI 89 Lail LB1B a05 2141 LIMD L1041 1 991 IB 00 LI1B] LIIO{ 5510 5399 L1RN L120] 1130 1]R9 SEE DUET I LIBE ]2N -MS LSDtl 194J B. LIm 419 194J 15M LMI 5159 2072 LB]3 Lm1 M08 N93 L]96 LIP RI 15 13W L819 L92o $213 Zo 99 s 9 M L1042 IIOU 1]42 1♦41 L1185 Lllee SIBS wn WaS u$e9 1898 Ie aJ SEE $NEEII WET LIm Si LI01 1B JS ]B 6J ]B Lb) L.MO IR 9] 1925 L1]0 3431 2168 L551 um M39 M30 L6]5 m)B 5489 4I18 L)B8 L]09 IB i5 119] A'M}] III,.. L921 L923 RJM 2T 90 LI011 LINS I515 1557 LI10) LIIBB 99 SI )9 LINO Lm91 R431 IB iJ w^ ENW LIM LIBJ M]1 M]4 LJO9 L]Ip 1402 20H LUI LU2 1900 141] 1554 LSM 2563 J)3J 1.11 m)B 291D J518 LBM LDM Re 2910 L92] L924 2]98 PIB LI048 LI04] IZ RB I4 tlJ -El LII]0 5126 ]9 D] LI08 2118 L]11 2010 L433 UJI R191 1011 LSM L55] 9m ]I44 L679 L6W.01 5453 MB] Lm2 Mp3 2001 2SM L935 L9R6 3112 UO] L10I8 L1NB 1s50 1429 LIIBI L11P 2.10 Mb CJJ /1 6 / 052 LI89 333. LI90 NM LJ13 19P uJ5 1014 LSM 1510 ID01 I2W LM4 804 L92) 2I 25 L1050 RI 48 LII]] .B Be _n LIM 1.33 1559 mM L802 52)J tE05 194fi L938 5BM LI051 14H Ltt)1 .])9 / p or_J� SEE IS A I I BSA OF B THIS SURVEY " HICATED 1 [TES THAT IS UNREGULATED AS TO A 6DN EXCSPTIM APPLICABLE LOCAL A THAT THE SURVEY IS A CONTROL SURVEY 89g 84 �� z� I HI �1 i1 �1 uumr" L Lmi1r11.NIIVIN This certifies that this copy of this plat accurately depicts the boundary of the jurisdiction of Section 404 of the Clean Water Act pursuant to the 1987 Corps of Engineers Wetlands DeOneotion Manual as determined by the undersigned on this dote Unless there is a change in the low of our published regu- lations this determination of Section 404 jurisdiction may be relied upon for a period of five years from lhrs dote - US -Army Corps of Engineers Official ODA LfS,oc,F 1.4 N/F GLENN WLILALISON ETAL TMS 229MO1202 DB 1095 PC 335 S IE3504 C 105316 (TOTAL) w x si: ml.xeq 6.6 1/2 Res STATE OF NORTH CAROLINA — BRUNSWICK COUNTY I ROBERT A. WARNER CERTIFY THAT THIS YAP WAS DRAWN UNDER IIY SUPERVISION FROM AN ACTUAL SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION FROM DEED DESCRIPTIONS RECORDED IN DEAD BOORS AND PAGES AS FOLLOWS THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY INDICATED AS DRAWN FROM DEND DESCRIPTIONS RECORDED /N DEED BOOKS A PACES AS FOLLOWS 1 N/F MAD HALES TMS 22800003 DB 1195 PG 270 44 zFo INS \ -I 51W290fi21" 5152]! J25 63 we ssw Wcv I THAT THE RATIO OF PRECISION AS CALCULATED IS 1. 10.002 AND THAT THIS MAP WAS PREPARED IN ACCORDANCE WITH 0 S 47-30 AS- MENDED 300 0 300 600 900 WITNESS MY HAND AND OFFICIAL SEAL DATE 09/27/I005 _ i. - GRAPHIC SCALE - FEET E r e N C REGISTRATION NUMBER L-4M1 1+ A I C-1 THIS SURVEY IS OF AN EXISTIAO PARCEL OR PARCELS OF LAND AND DOES NOT CREATE A NEW STREET OR CHANCE AN EXISTING STREET Ag TAE AEWYBINIiIOM E WITH TEE OGGRYATION AVMWU se YE I AY UNABLE TO MAU A h OR OTAUA PYCUPTION DETERMIAHMM TO THE BUST Of MY PROPISSIONAG ABRWY AS TO THE PRIYISION9 WNTHNEO IN STITEYEMS IAA tHB%eA(OA - e COURSE BEARING OISTANCE I L-1 S 73 36 27V 15058 L-2 S 3T540O`W 16780 L-3 S IT231 PE 43102 L-4 5 4S57161Y 16665 L-5 S 3E4243V 4332 L-6 N 389631 E 27890 L-7 N 43 20 42 E 129 eo N L-6 S 361631'w 11972 P 'a I (LOCATION NOTES I I f REFERENCE PLAT ENTITLED HAP OF DIVISION OF REBECCA ✓ CAUSE ESTATE SURVEYED BY JAN R DALE DATED TO/Y2/1884 AND RECORDED IN PLAT CABINET P PAGE IZ6 2 REFERENCE PUT ENTITLED FINAL PLAT OF ROURKE SEASIDE G JC SNIDER TRACTS PREPARED FOR SUSTAINABLE FORESTS LLC BY THIS OFFICE DATED 10/01/2001 AND RECORDED IN PUT BOOK 26 PACE 44 H THIS PROPERTY IS LOCATED IN ZONE C WHICH IS NOT IN A PLOOD PLANE 4 NO BURIAL GROUNDS HAVE BEEN OBSERVED ON THIS PROPERTY I Robert A Warner certify that this plat was drawn under my supervision that the ratio of precision as calculated is 1 10000 that this plat was prepored in accordance with CS 47-30 as amended Witness my original signature registration number and seal this 27h day of SEPTEMBER AD 2005 3042 Registration Number L-4201 N/F BARRIE MCMURTRIE TMS 229MOD709 sN DS 2109 PG 1009 \ N/F OOHN GORE TMS 24400007 DS 955 PG 255 L-3 SM1 S 171749 ry JS 162326-E 53835 !S 1/21PF 1 IPF Tai rs 1/2 RBF N/F ODELL WILLUMSON TMS 229MOD102 UPLAND WETUwD U-1 764 ACRES W-1 1 07 ACRES U-2 165 ACRES W-2 010 ACRES U-3 031 ACRES W-3 007 ACRES U-4 545 ACRES W-4 2" ACRES U-5 207 ACRES W-5 036 ACRES U-8 3586 ACRES W-6 191 ACRES W-7 299 ACRES TOTAL - 5298 TOTAL - 598 i14 124531 N/F l9PoNL GUSE TYS M ixY47 1 ve es. Pc n 7- V MAP - - STATE OF NORM CARWNA - Cti OF BRUNSWICK I CERRFY THAT THE MAP OR PLAT TO WHICH THIS CERTIFICA11011 IS AFFDZD MEETS ALL STATUTORY REQUIREMENTS FOR RECORDING THIS _ DAY OF 2005 RENEW OFRCER