Loading...
HomeMy WebLinkAboutSW8000104_COMPLIANCE_20100126STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 000101-i DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE 2605 W 21y YYYYMMDD Permit: SW8000104 County: Onslow Region: Wilmington Compliance Inspection Report Effective: 04/12/00 Expiration: 04/12/10 Owner: Leo Weston Concret Contractor Inc - Project: Leo Weston Apartments Contact Person: Leo Weston Directions to Project: Title: Owner Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Northeast Creek) (03-05-02) ( SC;NSW) On -Site Representative(s): Related -Permits: Inspection Date: 0112612010 Entry Time: 02.00 PM Primary Inspector: Vincent Lewis Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ® Compliant ❑ Not Compliant Question Areas: ® State Stormwater (See attachment summary) Exit Time: 02 20 PM Phone: Phone: Inspection Type: Stormwater Page:1 Permit: SW8000104 Owner - Project: Leo Weston Concrel Contractor Inc Inspection Data: 01/26/2010 Inspection Type: Stormwater Reason for Visit: Routine Inspection Summary: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? g ❑ Cl ❑ Are the inlets located per the approved plans? a ❑ ❑ ❑ Are the outlet structures located per the approved plans? g ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? g ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ❑ g upon request? Comment: Page