Loading...
HomeMy WebLinkAboutNCC222628_Site Plan or Location Map_20220809M a co ,n +.. in CD N cc N a W m 4 Y p o 04 r < 4 < J C Q J Q Q � a 0 0 W � z Z O � qa a o 0 Q Temporary Diversion Ditch TDD - Q10 Side Bottom Diversion Drainage Q10 Length Velocity Liner Slope (%} Slope Width Depth (ft) Provided Liner Type Ditch Area (ac) (cfs) (ft) (fps) Required? (Z:1) (ft) TDD#1 0.21 0.30 142.0 4.1% 3 1.0 0-5 4.11 LINER REQ'D Straw with Net PDD#1 1 0.26 0.24 180.0 2.4% 3 1.0 0.5 3.15 LINER REQ'D Straw with Net EROSION & SEDIMENT CONTROL NOTES l . THE INDICATED STAGING AND PARKING AREA IS INTENDED FOR VEHICLES AND NON -ERODIBLE MATERIALS ONLY. NO SOIL, SAND OR OTHER ERODIBLE, FINE GRAINED MATERIAL SHALL BE STORED OUTSIDE OF THE LIMITS OF THE SITE PROTECTED BY EROSION & SEDIMENT CONTROL DEVICES OR MEASURES. 2. SOIL AND OTHER MATERIALS SHALL BE ONLY TEMPORARILY STOCKPILES WITHIN THE CONSTRUCTION LIMITS AND PROTECTED BY EROSION AND SEDIMENT CONTROL DEVICES AND MEASURES. STOCKPILES SHALL BE STABILIZED AS NECESSARY, SEE SLOPE & SURFACE STABILIZATION NOTES ON SHEET CE500. 3. TEMPORARY CONSTRUCTION FENCE SHALL BE USED AS SHOWN ON THE PLANS TO INDICATE THE LIMITS OF DISTURBANCE AND/OR TO SECURE THE CONSTRUCTION SITE AS NECESSARY. 4. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY AND MAY BE RELOCATED AS NECESSARY TO COMPLETE CONSTRUCTION ACTIVITIES. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED, AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. 5. IN ADDITION TO THE MEASURES SHOWN ON THE PLANS, THE CONTRACTOR SHALL USE INTERIM SILT FENCES, DIVERSION DITCHES, BERMS, OR OTHER METHODS AS REQUIRED TO DIRECT DRAINAGE AS SHOWN ON THE PLANS AND TO PREVENT SILT AND CONSTRUCTION DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE STAND AND LOCAL EROSION, CONSERVATION, AND SILTATION ORDINANCES. THE CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ONLY AFTER FINAL INSPECTION AND APPROVAL FROM A REPRESENTATIVE OF THE PRESIDING JURISDICTION. 6. ALL EROSION & SEDIMENT CONTROL FENCING, FINAL INLET PROTECTIONS, PIPE INLET/OUTLET PROTECTIONS SHALL REMAIN IN PLACE UNTIL AFTER FINAL STORMWATER/SITF STABILIZATION INSPECTION AND REMOVAL IS APPROVED. 7. CONTRACTOR SHALL PERFORM SELF -INSPECTIONS AFTER EACH PHASE OF THE PROJECT UNTIL AFTER FINAL STORMWATER/SITE STABILIZATION INSPECTION AND THE SITE IS APPROVED AS STABILIZED. 8. REFER TO DETAIL SHEETS CE500-CE501 FOR CONSTRUCTION SEQUENCE AND DETAILS. 9. REFER TO SHEET CE130 FOR SEEDING SCHEDULE. 7 Temporary Erosion and Sediment Control Structure Summary Surface Side Volume Weir Depth Spillway Disturbed Q10 Area Width Length Slope Depth Skimmer Orfice Size Dewatering Facility Required Width of Flow Capacity Area (ac) (cfs) Required (ft) (ft) Ratio (ft) Size (in) (in) Time (Days) (ft3) (ft) (ft) (cfs) (fe) (Z:1) TSSB#1 2.78 3.93 1 4999 1711 1 35 75 2 3 5 1 15.0 1.5 1.5 2.7 EROSION CONTROL SPECIFICATIONS EROSION CONTROL DEVICES TO BE INSTALLED AS PER THE SPECIFICATIONS SHOWN ON THE CONSTRUCTION DRAWINGS, WAKE COUNTY SPECIFICATIONS AND AS PER NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL AND NATURAL RESOURCES - EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, LATEST EDITION. WHERE CONFLICTS IN SPECIFICATIONS EXIST BETWEEN THE MANUAL AND THE CONSTRUCTION DRAWINGS, THE MORE STRINGENT SPECIFICATION SHALL APPLY. r g 141 LF 15" RCP @ 2.17% SLOPE UPSTREAM INV. ELEV. 306.50' DOWNSTREAM INV. ELEV. 303.44' SILT FENCE OUTLET, TYP. RIP RAP DISSIPATOR 1 SEE CE510 FOR DISSIPATOR CALCS STOCKPILING NOTES BASIN DESIGN CRITERIA 1. A 25-FOOT TEMPORARY MAINTENANCE AND ACCESS EASEMENT SHALL BE ESTABLISHED AROUND ALL PROPOSED FEDERAL GUIDELINES REQUIRE ALL SEDIMENT BASINS OVER 1 ACRE TO DRAIN FROM THE TOP OF THE WATER STOCKPILES. COLUMN, THE FOLLOWING ARE NCDFQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN 2. STOCKPILE FOOTPRINTS SHALL BE SETBACK A MINIMUM OF 25' FROM ADJACENT PROPERTY LINES. MANUAL MINIMUM REQUIREMENTS FOR SIZING THE SEDIMENT BASIN AND THE ASSOCIATED WEIR; 3. STOCKPILE HEIGHT SHALL NOT EXCEED 35 FEET. 1. SIZING THE STORAGE AREA 4. STOCKPILE SLOPES SHALL BE 2:1 OR FLATTER. SURFACE AREA REQUIREMENTS MUST BE MET FOR ALL SEDIMENT BASINS. 435 X Q1W = SURFACE AREA REQUIRED FOR ALL TYPES OF SEDIMENT BASINS. 5. APPROVED SCMs SHALL BE SHOWN ON A PLAN TO CONTROL ANY POTENTIAL SEDIMENT LOSS FROM A STOCKPILE. *USE MINIMUM C=0.5 FOR AREAS DRAINING TO BASIN. 6. STOCKPILING MATERIALS ADJACENT TO A DITCH, DRAINAGE WAY, WATERCOURSE, WETLAND, STREAM BUFFER, OR OTHER SEDIMENT BASIN VOLUME IS DETERMINED BY 1,800 CU/FT PER DRAINAGE ACRE, BODY OF WATER SHALL BE AVOIDED UNLESS AN ALTERNATIVE LOCATION IS DEMONSTRATED TO BE UNAVAILABLE. WAKE COUNTY CUSTOM BASIN VOLUME I DETERMINED Y A COU CU5 O SIS DE ED B 3,600 CU/FT PER DRAINAGE ACRE. THE MAXIMUM DEPTH ALLOWED IS 4 FEET. (FROM BOTTOM OF BASIN TO WEIR) 7. ANY CONCENTRATED FLOW LIKELY TO AFFECT THE STOCKPILE SHALL BE DIVERTED TO AN APPROVED SCM. THE MINIMUM DEPTH REQUIRED IS 2 FEET. (FROM BOTTOM OF BASIN TO WEIR) 8. OFF -SITE SPOIL OR BORROW AREAS MUST BE IN COMPLIANCE WITH WAKE COUNTY LIDO AND STATE REGULATIONS, ALL THE FLOOR OF ALL BASINS SHOULD BE ROUGHLY LEVEL. SPOIL AREAS OVER AN ACRE ARE REQUIRED TO HAVE AN APPROVED SEDIMENT CONTROL PLAN. BASIN SHOULD DEWATER 1N 3 TO 5 DAYS. DEVELOPER/CONTRACTOR SHALL NOTIFY WAKE COUNTY OF ANY OFFSITE DISPOSAL OF SOIL, PRIOR TO DISPOSAL, FILL OF USE REQUIRED SEDIMENT BASIN VOLUME (1,800 FT3 PER DRAINAGE ACRE) TO SIZE FEMA FLOODWAYS AND NOWENCROACHMENT AREAS ARE PROHIBITED EXCEPT AS OTHERWISE PROVIDED BY SUBSECTION 14-19-2 OF THE WAKE COUNTY UNIFIED DEVELOPMENT ORDINANCE {CERTIFICATIONS AND PERMITS REQUIREDI. SKIMMER AND ORIFICE DIAMETER. 9. SEEDING OR COVERING STOCKPILES WITH TARPS OR MULCH IS REQUIRED AND WILL REDUCE EROSION PROBLEMS. TARPS 2, SIZING THE WEIR SHOULD BE KEYED IN AT THE TOP OF THE SLOPE TO KEEP WATER FROM RUNNING UNDERNEATH THE PLASTIC. WEIR EQUATION: (MINIMUM WEIR LENGTH OF 10') 10. IF A STOCKPILE IS TO REMAIN FOR FUTURE USE AFTER THE PROJECT IS COMPLETE (BUILDERS, ETC.}, THE FINANCIAL Q= CLH3/2. C=3.0 (MAX). H FOR Q IS NOT TO EXCEED 0.5'. RESPONSIBLE PARTY MUST NOTIFY WAKE COUNTY OF A NEW RESPONSIBLE PARTY FOR THAT STOCKPILE. AN ADDITIONAL 1.0' OF WEIR CAPACITY IS REQUIRED FOR THE CONVEYANCE OF LARGER STORM 11. THE APPROVED PLAN SHALL PROVIDE FOR THE USE OF STAGED SEEDING AND MULCHING ON A CONTINUAL BASIS WHILE THE EVENTS; THEREFORE, THE TOTAL WEIR DEPTH WILL BE 1.5'. STOCKPILE IS IN USE. A MINIMUM WEIR LENGTH OF 10' IS REQUIRED. SHOW CALCULATIONS FOR SKIMMER SIZING AND DRAWDOWN. 12. ESTABLISH AND MAINTAIN A VEGETATIVE BUFFER AT THE TOE OF THE SLOPE (WHERE PRACTICAL). SHOW CALCULATIONS FOR THE SIZING OF THE ANTI -FLOTATION BLOCK. 3, SEE EROSION AND SEDIMENT CONTROL REPORT FOR FINAL CALCULATIONS. r CONCRETE ij� !),1{ WASHOUT, TYP. 1 f �; RAIN GAUGE 8, J PERMIT/RECORD BOX ji _1 3 / / 7 ! l , REQUIRED BASIN REMOVAL SEQUENCE I. SCHEDULE A SITE MEETING WITH THE ENVIRONMENTAL CONSULTANT IVANA BARHAM (919) 791-4215 TO DETERMINE IF A BASIN CAN BE REMOVED. INSTALL SILT FENCING OR OTHER TEMPORARY EROSION CONTROL MEASURES AS NEEDED PRIOR TO REMOVAL OF THE BASIN. 2. CONTACT NCDEQ - RALEIGH REGIONAL OFFICE (9191 791-4200 TO DETERMINE THE DIVISION OF ENERGY, MINERAL AND LAND RESOURCES CONTACT PERSON TO RECEIVE DEWATERING NOTIFICATIONS. AT LEAST 10 DAYS PRIOR TO BEGINNING DEWATERING ACTIVITY, SEND EMAIL TO NCDEQ-DEMLR CONTACT PERSON AND COPY ENVIRONMENTAL CONSULTANT THAT MET YOU ONSITE. THE EMAIL SHOULD INCLUDE: 2.1.E&SC JURISDICTION: NCDFQ 2.2. WAKE COUNTY PROJECT: NAME NUMBER 2.3.L CATION ITY TOWN ENVIRONMENTAL CONSULTANT NAME O C O, 1 [ 1. 2.4. ADDRESS THE FOLLOWING: 2A.1. REASON FOR CONVERSION 2.4.2. BASIN # 2.4.3. DEWATERING METHOD 2.4.4. ALL OTHER NECESSARY INFO FROM PART II, SECTION G, ITEM 4 OF THE NCG01. (KEEP EMAIL FOR YOUR NPDES MONITORING DOCUMENTATION) 3. AFTER RECEIVING POSITIVE CONFIRMATION FROM NCDEQ-DEMLR THAT YOU MAY REMOVE THE BASIN OR ON > DAY 11, WHICHEVER IS SOONER. REMOVE BASIN(S) AND ASSOCIATED TEMPORARY DIVERSION DITCHES. IF PIPES NEED TO BE EXTENDED, PERFORM THIS OPERATION AT THIS TIME. FINE GRADE AREA IN PREPARATION FOR SEEDING. 4. PERFORM SEEDBED PREPARATION, SEED, MULCH AND ANCHOR ANY RESULTING BARE AREAS IMMEDIATELY. 5. INSTALL VELOCITY DISSIPATERS AND/OR LEVEL SPREADERS AS REQUIRED ON THE EROSION CONTROL PLAN. 6. WHEN SITE 15 FULLY STABILIZED, CALL ENVIRONMENTAL CONSULTANT FOR APPROVAL OF REMOVING REMAINING TEMPORARY EROSION CONTROL MEASURES AND ADVICE ON WHEN SITE CAN BE ISSUED A CERTIFICATE OF COMPLETION_ NOTE: A MEETING SHOULD ALSO BE SCHEDULED WITH THE ENVIRONMENTAL CONSULTANT TO DETERMINE WHEN A BASIN MAY BE CONVERTED FOR STORMWATER USE. SOME MUNICIPALITIES MAY ALSO REQUIRE THIS. ash 40' 20' 0 40' SCALF: 1" = 40' BSA LifeStructures 510 Glenwood Ave, Suite 321 Raleigh, NC 27603-1262 ph 919.334.7301 fx 317.819.7288 WAUKEYC COMM SurfarA Surface 678, PA SEPI, Inc. C-2197 The Imperial Building 1 Glenwood Ave, Ste 600 215 Morris Street, Suite 150 Raleigh, NC 27603 Durham, NC 27701 Office 919.803.8798 Office 919.419.1199 Web sepiinc, com Web surface678.com Daniel Mi11er,PE THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S 0 3 WORKING DAYS FAILURE TO EXACTLY LOCATE AND BEFORE YOU DIG PRESERVE ANY AND ALL UNDERGROUND UTILITIES. FOR THE LOCATION OF UNDERGROUND FACILITIES NOTICE: Know what's below. CONSTRUCTION SITE SAFETY IS THE SOLE COII before dig. RESPONSIBILITY OF THE CONTRACTOR you NEITHER THE OWNER NORTH F ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. GENERAL EDUCATION BUILDING #1 AND STUDENT SERVICES CLIENT PROJECT NO. - NCCCS #2302 CONSTRUCTION PLAN SUBMITTAL _KEYPLAN PLAN NORTH = BOLD TRUE NORTH = DASHED MARWDA-TE ESCRi T IOC J q ,541t141�1j', lll li£ ` - ° SEAL �� - ~ Sri SEAL C-2197 028948 a ° 1f (� NOTE: These drawings are the property of SEPI Engineering & Construction, Inc. Copyright 2022 All rights reserved- They may not be used for any purpose without written permission. SHEET PH. 2 EROSION AND SEDIMENT CONTROL DATE MAY 19, 2022 BSALS PROJECT NO. 20180006.01 E110 © BSA LifeS£ructures Inc.