Loading...
HomeMy WebLinkAboutNCC222496_ESC Approval Submitted_20220712ROY COOPER Governor ELIZABETH S. BISER Secretary BR1AN WRENN Director NORTH CAROLINA Environmental Quality July 14, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Blue Ridge Healthcare Hospitals, Inc. ATTN: Ms. Kathy C. Bailey 2201 S. Sterling S Morganton, NC 28655 RE: Project Name: Blue Ridge Healthcare Morganton Campus Improvements Acres Approved: 9.2 Project ID: BURKE-2021-034 County: Burke City: Morganton Address: S Sterling St/NC Hwy 18 River Basin: Catawba Stream Classification: WSAV Submitted By: Mr. Todd J. Poteet, P.E. Date Received by LQS: June 15, 2021 Plan Type: Commercial Dear Ms. Bailey, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications is attached. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources NOR7H CAROLINA � jj Asheville Regional Office 12090 U.S. Highway 70 I Swannanoa, North Carolina 28778 uav�emarr,vimo me�wiaw� /''� 828.296.400 Letter of Approval with Modifications Blue Ridge Healthcare Hospitals, Inc. ATTN: Ms. Kathy C. Bailey June 14, 2021 Page 2 of 4 deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul. clark@ ncdenr. gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. i cer chael Smith Assistant Regional Engineer Division of Energy, Mineral, and Land Resources Letter of Approval with Modifications Blue Ridge Healthcare Hospitals, Inc. ATTN: Ms. Kathy C. Bailey June 14, 2021 Page 3 of 4 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications ec: Mr. Todd J. Poteet, P.E. tpoteet@west-consultants.com cc: Regional Office file MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Blue Ridge Healthcare Morganton Campus Improvements Project ID: BURKE-2021-034 County: Burke For final plan approval, please provide to this office the requested documents or additional information listed below. 1. Please provide an original, signed and notarized Financial Responsibility/Ownership Form (FRO) listing on Part B line 2 (b) the name of the Registered Agent for this company. The legally registered agent for this company can be found listed on the North Carolina Secretary of State's Business `Nebsite. The web address of the Secretary of State's Business Registration website is copied below. {G.S. 113A-541. httl2s:,4/www.sosnc.coov1onIine servicesfsearchAbv titlel Business Registration 2. If this is a new installation, please include the section of 15" HDPE (SD-303) within the limits of disturbance shown on plan sheet C14 (Pavilion Grading) . {G.S.113A-57 (3)}. 3. Please include topographical elevations for the construction of the temporary sediment basins and traps. Please include the elevations of the bottom of the basins and top of the embankments and the construction dimensions of the outlet weirs in accordance with the Erosion Control Report and Calculations. {G.S.113A-57 (3)1. 4. Please consider addressing the method of equipment accessing the pond site on plan sheet C7. Are construction entrances necessary to prevent sediment deposition onto the Hospital entrances? Please address the access routes for maintain and removing the erosion control measures below the wet detention pond after this area is permanently stabilized. (G.S. 113A-57 (3)1. Letter of Approval with Modifications Blue Ridge Healthcare Hospitals, Inc. ATTN: Ms. Kathy C. Bailey June 14, 2021 Page 4 of 4 S. Please show the location of the outlet weir for sediment trap 1. Please provide the construction dimensions for this section of the trap in accordance with the Erosion Control Report and Calculations. {G.S. 113A-57 (3)). 6. For closing out the sediment basins and traps please add to the details section of the plans and the erosion control construction sequence for the sediment basins and traps; that after the drainage areas to the basins and traps have been permanently stabilized, dewater the basins. Fill the basins using stockpiled soil and bring to finish grade in compacted lifts. Smooth the basin sites to blend with the surrounding area, ensuring the basin sites will not pond water, and immediately permanently stabilize. {G.S. 113A-57 (3)1. 7. Please consider adding a note to the plans that sediment basin and trap embankments shall be provided with adequate groundcover immediately upon construction. {G.S. 113A-57 (3)1. 8. In addition to using the excess soil in the construction of the earth dam for the wet pond, please add a note to plans or the construction sequence, that if borrow or waste material is required or generated during grading operations, an approved erosion and sediment control permit must be secured for the borrow or waste material site prior to initiation of any land disturbing activity. {15A NCAC 04B .01101. Ref: G.S.113A-54.1 through G.S.113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities