HomeMy WebLinkAboutNCC222482_ESC Approval Submitted_20220711ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality Apri122, 2022 LETTER OF APPROVAL Hamlet MHP, LLC Attn: David H. Reynolds, Member/Manager P.O. Box 457 Cedaredge, CO 81413 RE: Project Name: Hamlet Manufactured Home Community Acres Approved: 6.8 Project ID: RICHM-2022-008 County: Richmond, City: Hamlet, Address: Hwy 74 River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: 4D Site Solutions, Inc Date Received by LQS: February 17, 2022 Plan Type: New Dear Mr. Reynolds: The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 NORTH CAROLINA - oewnmwtoiEnviro�memalaual� /`� 910.433.3300 Letter of Approval with Modifications Hamlet MHP,LLC April 22, 2022 Page 2 of 2 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 413 .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely Jodi Pace, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: Scott Brown, 4D Site Solutions, Inc. (electronic copy) Gary Williams, Building Inspector (electronic copy) DEMLR - Fayetteville Regional Office File