Loading...
HomeMy WebLinkAboutSW6140504_APPROVED PLANS_20140616STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWW��/% jD�f DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 1 2 WOMACK ARMY HARNETT COUNTY, D US Army Corps of EnginEers Wilmington District PLATE NO. I SHEET NO. MODE FILE SHEET FILE TILE C 1-1 0 STORM SEWER PROFILES 1 STORM SEWER PROFILES 2 MEDICAL � ENTER NORTH CAROLINA INDEX; OF DRAWNGS PLATE NO. I SHEET NO. I MODEL FILE I SHEET FILE TITLE SY,y�,o �1p�4 �Rp�Ati�, CU-102 10 SANITARY SEWER PROFILE CE-001 11 EROSION CONTROL NO -ES CE-002 12 STORMWATER POLLUTON PREVENTION PLAN NOTES CE-003 13 EROSION SEDIMENT & FOLLUTION PREVENTION PLAN NOTES CE-100 14 EROSION CONTROL NO -ES & LEGEND CE-101 15 EROSION, SEDIMENT, &POLLUTION CONTROL PLAN INITIAL PHASE CE-102 16 EROSION, SEDIMENT, &POLLUTION CONTROL PLAN FINAL PHASE C-501 17 SITE DETAILS C-502 18 MISCELLANEOUS DETAI_S _ C-503 19 DUMPSTER ENCLOSURE DETAILS 2-504 20 STORM DRAINAGE DETAILS C-507 1 23 1 1 1 HARNETT COUNTY PUBLIC UTILITIES WATER VAULT DETAILS I I I I 1 ' ; C-508 1 24 1 1 1 HARNETT COUNTY PUBLIC UTILITIES SANITARY SEWER DETAILS 1 C-510 26 1 ER SION SEDIMENT &POLLUTION CONTROL DETAILS 1 C-511 27 1 EROSION SEDIMENT &POLLUTION CONTROL DETAILS 2 C-512 28 INFILTRATION POND DE -AILS A A.C. AIR CONDITIONED A.D. AREA DRAIN A.H.U. AIR HANDLING UNIT ALT, ALTERNATE ALUM. ALUMINUM AMP., A. AMPERES A.O. ACCESS OPENING APPROX. APPROXIMATELY ARCH. ARCHITECTURAL A.T. ASPHALT TILE A.T.C. ACOUSTIC TILE CEILING B BAL. BALANCE BD. BOARD BLDG. BUILDING BLK. BLANK BM. BEAM BOT. BOTTOM BRIG. BEARING B.T.U.H. BRITISH THERMO UNIT/HOUR C CAB. CABINET CAP. CAPACITY C/B CIRCUIT BREAKER C.D. CEILING DIFFUSER CEM. CEMENT CER. CERAMIC C.F.M. CUBIC FEET/MINUTE CKT. CIRCUIT E CENTER LINE CELL. CEILING CL CLOSET C.M.U. CONCRETE MASONRY UNIT C.O. CLEAN OUT COL. COLUMN CONC. CONCRETE COND. CONDENSATE CONN. CONNECTION CONST. CONSTRUCTION CONT. CONTINUOUS CONTR. JT. CONTRACTION JOINT C.S.C. COLOR SYMBOL CODE C.T. CERAMIC TILE C.T.B. CERAMIC TILE BASE C. TO C. CENTER TO CENTER D DET. DETAIL DIA. DIAMETER DIFF. DIFFUSER DIM. DIMENSION DISC. DISCONNECT D.J. DUMMY JOINT DN. DOWN DR. DRAIN D.S. DOWN SPOUT DWG.(S) DRAWING(S) E EA. EACH STANDARD ABBREVIATIONS ELEC. ELECTRIC H OL OVERLOAD REG. REGISTER TEL TELEPHONE EQUIP. EQUIPMET H. HIGH B.'# POUND OPNG. OPENING REINF. REINFORCING TEMP. TEMPERATURE E.W.C. EXH. ELECTRIC WATER COOLER EXHAUST H.B. H.C. HOSE BIBB HOLLOW CORE _G. -P. LONG LIGHTING PANEL OPP. O.S.D. OPPOSITE OPEN SIGHT DFAIN REQ. RET. REQUIRED RETURN THK. THD. THICKNESS THRESHOLD �� �y EXP. JT. EXPANSION JOINT HT. HEIGHT TG. LIGHTING R.G. RETURN GRILLE TOIL. TOILET EXT. EXTERIOR H.M. HOLLOW METAL RM. ROOM TYP. TYPICAL EXIST. EXISTING H.P. HORSE POWER P R.P.M. REVOLUTION/MINUTE HR. HOUR A P. PAPER HTG. HEATING A. MOTOR PART. PARTITION V F HTR. HEATER AAINT. MAINTENANCE PER. PERIMETER S V. VOLT F.A. FIRE AL.AZM H.&V. HEATING AND VENTILATING AAX. MAXIMUM E. PL PLATE S. SUPPLY V.A.T. VINYL ASBESTOS TILE F.C. FLEXIBLE CONNECTION HW. HARDWARE A.D.P. MAIN NSTRIBUTION PANEL PM. RJUMBING S.A. SUPPLY AIR VENT. NENTIMATION F.D. FLOOR DIAIN HYD. HYDRANT AECH. MECHANICAL PLYW'D PLYWOOD SCH. SCHEDULE VERT. VERTICAL g�ocum F.E.C. FIRE EXTNGUISHER CABINET ATL METAL PNL. PANEL SECT. SECTION VTR VENT THRU ROOF Ap�rvuea�u.k;ya?Qrpdh,h nt' in accordant®with these document' Is FIN. FINISH AIN. MINIMUM PRESS. PRESSURE SERV. SERVICE Gonstruction required byy the stonnwater permit- North CSTithe system designer FL. FLOOR I AISC. MISCELLANEOUS PSF POUNDS/SQUAIE FOOT SHT. SHEET rules require that the Stormwater during construction; ceniry conformity w th ft FT. FOOT, FET I.D. INSIDE DIAMETER A.O. MASONRY OPENING PSI POUNDS/SQUARE INCH S.J. SLIP JOINT W inspect h and Specs; and cenlry compliance with the FT. FOOTING I.E. INVERT ELEVATION A. T. METAL THRESHOLD PSIG POUNDS/SQUARE INCH GAGE SPEC. SPECIFICATIONS W WATT plans stormwsterrules. (I5ANCAC2HA00801 ±' ' IN. INCHES ATD. MOUNTED PT. POINT SQ. FT. SQUARE FEET W/ WTH 5-0 Date (t P SW / Division of INCAND. INCANDESCENT ATG. MOUNTING PTD. PAINTED ST. STEEL WC WAINSCOA7ING ... ` Dato G INSUL. INSULATION A.V. MECHANICAL VENTILATION STOR. STORAGE WD. WOOD Revision sneer GA. GAGE INT. INTERIOR A.G.T. MATT GLAZE TILE STRUC. STRUCTURAL W.D. WINDOW DIMENSION GAL GALLON Q SUSP. SUSPENDED WF WIDE FLANGE GALV. GALVANIED Q QUARTER SW. SWITCH W.G. WATER GAGE G.F.E. GOVERNMENT FURNISHED J � QUAN. QUANTITY WP. WEATHERPROOF EQUIPMENT J.B. JUNCTION BOX J.A. NOT APPUCABLE WTR. WATER GL GLASS JCT. JUNCTION J.I.C. NOT IN CONTRACT T W.W.F. WELDED WIRE FABRIC GND. GROUND JT. JOINT J0. NUMBER R T. TOILET j 4 GOUT GOVERNMENT G.P.H. GALLONS?IOUR R. RISER G.P.M. GALLONSVINUTE R.A. RETURN AIR GR. GRILLE K ) RAD. RADIUS G.W.B. GYPSUM MALL BOARD KVA KILOVOLT AMPERE ).A. OUTDOOR AIR RD. ROUND ISSUED STAMP SS 110 EAL y' �,'. NGI NEB. •'���� s N (O n w uj Q N ~O O J W •- 7> a Na i w J ❑ V w > � m 0 cl m O O m O N WFL ^ Q w w m z ati V M 0 c�� 3� ui g0 zx W x W QQ K � � W m Niv U a 30 b � I'ma 3 ��®I u SHEET NUMBER 1 G-101 1 1 2 1 3 1 4 1 5 BUFFERING REQUIREMENTS A BUFFERING/STREETSCAPE REGULATIONS (PER HARNETT COUNTY ZONING ORDINANCE): BUFFERS WILL BE INSTALLED ALONG THE SIDES OF THE LOT ABUTTING THE CENTENNIAL PARKWAY .IND NC 24/87 RIGHTS —OF —WAY PER HARNETT COUNTY ZON/AG ORDINANCE. BUFFERS VILL BE "TYPE C" BASED ON GROUP 3 LAND USE CLASSIFICATON OF SUBJECT PROPERTY. IN EACH 10' BUFFER AREA: LARGE, MATURING TRESS WILL B-_ PLANTED (STAGGERED) NO MORE THAN 30 FEET APART 5 LOW —GROWING SHRUBS W-L BE PLANTED FOR EVER- LARGE, MATURING TREE PLANTED; AND GROUND COVER (EVERGREEN OR MULCM WILL COVER THE BALANCE OF THE BUFFER AREAS. MAINTENANCE OF BUFFR: MAINTENANCE OF THE (TYPE C) BUFFERS ALONG CENTENNIAL PARKWAY AND NORTH CAROLINA HIGHVAY 87 WILL BE THE RESPONSIBILITY OF THE PROPERTY OWNE?. EXISTING CURB & GUTTER CONTACT INFORNA77ON xx p r $ Q[ 1141 4 o I i I I 9.00.( Ti -9�,- n RITURE _ E OWNER: EDT DEVELOPMENT ,I�IL EDT, INC 7705 ENTERPRISE WAY, SUITE 200 ENGINEER: 4245 BALMORAL DRIVE, STE 303 MARIETTA, GA 30067 HUNTSOLLE, AL 35801 CONTACT HASSAN ANVARI, PE CONTACT MATTHEW GILLESPIE, PE 770-988-0400 256-883-8496 ARCHITECT: EDT—THA, INC SURVEYOR: JOYNER KEEN 4245 BALMORAL DRIV, STE 303 104 GILLESPIE STREET HUNTSVILLE, AL 35801 FAYETTEVILLE, NC 28301 CONTACT: JENNIFER THORINGTON, A/A CONTACT REX OWEN, PLS 256-883-8496 910-322-6569 MILITARY OVERLAY ZONE NOTE: THIS DEVELOPMENT IS WITHIN THE FIVL MILE MILITARY CORRIDOR OVERLAY ZONE, AND MAY BE SUBJECT TO MILIARY TRAINING ACTIVITIES. L 118.00' I)^woi D j I I... o gyp: o w z I l 1 ) 41.00' — L _ —_. _r— 22.01 'p 'so Ip ! m \g I I� 23.00' 4 7T II I SITEDATA PID 019594 0029 0 PIN 9594-17-0517.)00 TOWNSHIP ANDERSON CREW COUNTY HARNETT STATE NORTH CAROLIN7 ZONING CLASSIFICATION COMMERCIAL LAND USE CLASSIFICAT70N COMPACT, MIXE7—USE WATERSHED DISTRICT N/A THOROUGHFARE PLAN NOTA77ON NC 87 IS ON MRNETT COUNTY THOROUGHFAREPLAN GROSS ACREAGE J.45 MORE OR_ESS DISTRUBED ACREAGE 3.45 MORE OR_ESS IMPERVIOUS ACREAGE (POST CONSTRUCT70N) 2.17 MORE OR.£SS IMPERVOUS AREA X OF GROSS ACREAGE 62.9 i HOURS OF OPERAT70N MOB: MON—SA? 8AM-5PM RETAIL: SUN —SIT 8AM-10PM PARKING LOT MATERIAL AND SPACE TYPICAL STANDARD DUT' ASPHALT TYP 9'Xi8' PARKING REQUIRED PHARMACY.' 65(PER DoD REQUIREMENTS) ftETML: 44 (1 PER 300 SO FT) PARKING PROVIDED PHARMACY.• 73(INCLUDES 3 ACCESSIBLE) RETAIL: 54 (INCLUDES 2 ACCESSIBLE) SITEPLANLEGEND -� O HANDICAP RAMP TYPE 'A' REQ'D (SEE DETAL 8/C-502) HANDICAP RAMP TYPE'B' REQ'D (SEE DETAL 9/C-502) O3 HANDICAP RAMP TYPE 'C' REQ'D (SEE DETAL 10/C-502) ® WHITE PAINTED ARROW REQ'D (SEE DETAILI I/C502) O 24' CURB & GUTTER REQU (SEE DETAIL 1/0502) CURBED FLUME REGD (SEE DETAIL 14/C-501 -- O7 DETENTION DISCHARGE FLUME REQ'D (SEE)ETAIL 1/C-504) ® HANDICAP PARKING ACCESS AISLE STRIPIN; REQ'D (SEE DETAIL 4/C-502) O9 HANDICAP PARKING PAINT SYMBOL REQ'D (:EE DETAIL 4/G502) Imo. HANDICAP PARKING SIGN REQ'D (SEE DETAL 12/C-501) HANDICAP PARKING SIGN WITH VAN ACCESIBLE SIGN REQ'D , l `», ,z (SEE DETAIL 12/C-501) PRE -CAST CONCRETE WHEEL STOPS (SEE ETAIL 6IC-502) v Vv - 13 CONCRETE EDGE SEE DETAIL 15/C-501 FM-ORF 74VOE PAHBT'c9 ARRV44 R i)9 SEM TAW _ 1%, 62) PROPOSED NUMBER OF PARKING STALLS J Y - FEMA MAP = N. T- S. r "> C NOTE. • BASED ON GRAPHIC DETERMINATON, NO POR77ON OF THIS PROPERTY LIES IN A F.EM.A./F.LR.W. SPECIAL FLOOD I `^ HAZARD AREA PER COMMUNITY PANEL JUMBER 9584 OF MAP ` ' NUMBER 3710958400J DATED OCTOBER 3, 2006. NIL fs i _ - - -i CONCRETE DUMPSTER /N�A,/df MA s PAD WITH WOOD- E SCREENED FENCE N,T$. } (SEE DETAILS 11/C501 & ASTERISK DENOTES LOCA770N OF PROJECT - 1/C503 FOR REQ'TS) In •IMrmimp. ... MersaCrzeY . mAr302014 �w,a� °ouaLl�y s N a w via o Q N w O a 'm ¢ w m; aw w Y p ro N 0 O U o 0 Z w w m 0 m` a< y 0° 2 y 00 O w 2 O z15 z tii �u' Q>L v c7 ni Z x w� LU Q3 R W m O O (� LL In t9 iy Z_ r3 °z 5 w8 LL z� i�r^g� fi U.< Z uB;z r % zg, �Zg� E- I� g LOCAL *" AREA MAP w Z N. r. s. 4" PROJECT SITE (APPROXIMATE) z LLl M MW9 MAIN 5wmnan ( V Z M p i BOMI.UYM N1 ''d {^ ^� < IJ LLj `q Fayetteville Lu .. - 4a'W5`4� LL t' UbmmW ._ 54er Cq Nuwb bmn Ns � OWNER'S CONSENT O „., AS THE OWNER OF RECORD, I HEREBY FORMALL' CONSENT TO THE >O PROPOSED DEVELOPMENT SHOWN ON THIS SITE ?LAN AND ALL > U. b REGULATIONS AND REQUIREMENTS OF THE HARNETT COUNTY ORDINANCES. 0 SHEET NUMBER W OWNER SIGNATURE DA7E CS-101 SHEET 4 OF 85 V/ E 2 3 0 6. N C n i 333.50 < l�1 FG J A m ' 334.00 { i :� m rn 334.35 - BOC LP ' 333.50 ,.' BOC I 9t, �� - E I i m Cl) m M co .. 334.35 5 NEW MEDICALFG FUTURE RETAIL BLDG }^1 m m :. BOG - 333.50 334.20 I a p I . 0-333.65� :I OFFICE / PHARMACY w ._,. 333.50 I II, m D < m y' _.._.�_' Cl) _ _ BUILDING eoc °N 110?X 120') i �� m M )V t ,., 334 25 mo F ��� ' ^�. - o I�I 12,500 SF �, l I, ; I; N BOG FG m m: E. = 334.85 J , N co N -- 33 33350 BOC Jm I F.F.E. 4 50 133 66„ -0 00S ,. ` I Cl) I m - r a 334.4 ,. BOC _ - __' -. 0 ' _ :' {.,_ .,�.i, FG HP FG HP ' BOC'- - .. - 334.65 FG ,r .'- BOC _ 334.15 € r, i . - 333.850 M I I I t ri - _ .. .,,,.,._. _..,:.:,...._ A..�..,....; 333 75 a 333.50 f FG - - ;� BOG ( I m --- ,,fy ys• 0 334.35 334.35 OD y ` - ,LL ` m .,.. i BOG HP m ^.. FG } I n tD c�. BOC LPG+ s 1 I m CO ' ws� S 334.50 h ` o m ti I 334.80 FG r : BOC BOC I I +1'�� m t I F } BOC I I -- _ 33350 r 333.50 : t. .... - -., _ U 1 S _ , . , ~' m 334 85 J334.70 334 70� 33B BOO __ _____ { MI ! P i 3 ,r 333. FG 334.50BOC =�� _,/ �� 334.50. I I I �� . , I BOC s ; u'j 332 333.30 FG OC / 334.70 334 t 4 ami I € - �r \' : _ 333.00 33B4.65 �FG BOC ��jh 11i i i * 3 33.85i - BOC BOC 334.25 e i 332 •.'`3 BOG HP BOC 334.00 333 75 334 25 BOLO r BOC `- BOC 333.85 / i 5 336.00 �J 33 .0 333 333.85�{ BOCXI t j I I BOG t 334 00 IF 3 V I i 3 N I, eC I Boc ..._ 3 00 - 1: I �� i f 1 - 333.80 3 3 oa I I � �I N 35 6 334.05 I � 5 I 334.0 F {, BOC-� .! FG ` BOG n�3 333 BOC ; ( } I I• } %' I ` Mm m c F G ' F 333.52 { 333.35 i 333.75 FG 333.80 I I ,' ,> / �' m m m r 333.50 ,..,.i ' _ P: = ti ;' '+; o ` e G y 4 2 d ,. _. 333.10 i 334 ! FG i t BOC � I I {�'3` •• ,y'S3; BOG BO1. BOG .,:,......_ 334.25 - - "`, 80C 1 336.00 I Cl)mCl) 333.50 BOG 0 I BOC w ;- BOG.' 333.50 �7 0 335.00 o ' _ a 8 •.: 3co n 33.75 I �/ - . 334.00 BOC ;. ' BOC 333.65 t.,-333.75 ' BOC BOC 3 �„h u+ BOG BOG HP BOC 333.65 334.00 33445" / I _ v3 m • ,% BOC BC LP BOC HP j } . ! _ 334.50 BOC LP 3 r q 336.25 - - -. 334.00 333 333.45 30C 333.50 ��^� 3y 33.50 - 334.65' 3p BOC ` 174 333.85 334.00 "g�' rf �A I / 334.75 - �I335.8j5��I I7I �•.. 2• r 41 W ado `�O. I-a�n on :L JM[. BOG J,3 Is .+th F1 . I 30' 0 30' 60' SCALE 1" = 30' Approved Stormwatar P6 'it"It wOui li Construction in accoruance with .neaa doeurrlanis is required by the stonnwater permit North Ca rollrs rules require that the stormwater system designer Inspect during construction; certify conformity with the plans and specs{ end certify compliance with the stormwatar rules. (15A NCAC 2H 10050)) Panlt # 5 PTO {� Date {AC Diwsion of Revision Dat P_6AW Zf- STORM WATER INFILTRATION BASING SHALL BE INSPECTED AND MAINTAINED BY THE PROPERTY OWNER AT LEAST TWICE A YEAR. LISTED BELOW ARE OWNER'S MAINTENANCE RESPONSIBILITIES: MONTHLY • CLEAN AND REMOVE DEBRIS FROM INLET AND OUTLET STRUCTURES • MOW EMBANKMENTS AND SIDE SLOPES. ANNUALLY • INSPECT FOR DAMAGE, PAYING PARTICULAR ATTENTION TO THE CONTROL STRUCTURES. • CHECK FOR SIGNS OF POOR INFILTRATION CONDITIONS. • NOTE SIGNS OF HYDROCARBON BULD-UP, AND REMOVE APPROPRIATELY. • MONITOR FOR SEDIMENT ACCUMLLATION IN THE FACILITY AND ANY UPSREAM CATCH BASINS. • EXAMINE TO ENSURE THAT INLEC AND OUTLET DEVICES ARE FREE OF DEBRIS AND OPERATIONAL. • CHECK ALL INFILTRATION BASIN PRAINAGE STRUCTURES. AS NEEDED • REPAIR UNDERCUT OR ERODED AREAS. • MONITOR SEDIMENT ACCUMULATONS, AND REMOVE SEDIMENT WHEN THE BASIN VOLUME HAS BECOME REDUCED SIGNIFICANTLY. 30 2014 ISSUED STAMP is is ��!/ T Q S AL WES\/Jt v 0 N b N iu iti � o Q N w O 0 N W rc m J❑ x O m N 0 a 0 Y w 0 y as m J Y rW W r 2U' 2f�%1 r� Qu W K 7 in N N O O m LL U rA N rG�J O U Wpp � F+ y 6Z� ?u }n�`E C< fu�z tLI µ =II O C i) O W Z Z W J U 2 IL (DU Q Z_ 1200 O� 06 LL Q Z Y Q � Q �O O w w N SHEET NUMBER CG-101 SHEET 5 DP 85 N n ci O U w 0 LL 0 W D 1 E 9 rd '61 U C 3 0 I I - it t BOOT ROOF DOWNSPOUTS (21 LF 6" HOPE TYP)TO NEW STR 18 HEADWALL - - - STR 14 HEADWALL INFILTRATION POND. N: 547561.14 _ I ,_ N: 547433.1 PROVIDE CONCRETE SPLASH /E. 1990903.57 E: 199083a61 BLOCKS @ END OF BOOTS. TOP: 330.94 I.E. OUT (g): 329.00 I.E. IN (NE): 329.00 332 332 _ Y 333 _ 333 333 ---'----'333--------------------------------- --- _---__------------ -- _�T �.. ( 333 332 333 - - zoo _. 3: 333 . -331 __.._. 3 �33g 4 STR 12AI , : 331 330 330 - ------ ---- - - - - i N: 547365.58 E: 1990836.60 3 �� ��, 329 33D ��F �... ....-ate.........., ) � �t ... _ .� � ^^ TOP: 332.50 - I m 331 - -� ) �� t ( ) 334 333.. .. . -...'1 333 89 cA STR1787.Ba ` �I ' \\ I.E. IN SE 328.97 ,- a \ _. 332 332 O R STR 17 HEADWA I.E.�rj le, OUT (NE): 328.87 - 0 LL 03 _.. s . a _. 1 ' E: 1990953.55�,. F. .k; `DETENTION p F' I �� CD TOP: 331.44 '` I f° _ '•`-�i� I N�" (' \ DISCHARGE FLUME p A STR 5 HEADWALL S :332 I I.E.OUT SW : 329.50 "�- ? _ m N i7 f ' = 49 LF 18" RCP N: 54'416.72 f _-- -� ._. , - I ( ) N(SEE DETAIL) Z _ E 1910 Cl) �) �- ) -�. � 7 Cl) <� d r ,,, INV' 331.20 €;, m =' ` m rn + Zi; TOP:333.30 I E It (NW) 328.50 , I I, m N C n �.. NEW MEDICAL I i( i4 j �m (n m m FUTURE DETAIL BLDG �- h� I �7 ami amj►► ; STR 3HEADWALL Z E &9Ub6;79 OFFICE /PHARMACY o I i2oo SF = -$ q M t li �N: 547773.40 ICI STR13 HEADWALL .. } I 1 3, y m o E 1991122.97 ,_ 54 M ri m BUILDING - N I I 7 I.E. IN c> 28.50 W m I.E.I! (SW). 328.50 y„.., N STR 7 HEADWALL o w, : 10� .. m N: 547537.84 1 _ ( ,,40 X 120) I l N s: 3 { ___ 1I�M 12,500 SF ; ° E ,99,034.96 F'E. = 334.85 N rn IOC om _ m I I.E. IN IS): 329.00te F :moo �` M NCI m M STRIB WEIR BOX-N �" ' F.F.E. 334.50 tt LL m m rn c� STR 2 At J �% -0 W _.. .<.'' rl N: 5,7372.71 N m �, - .. m ;. N: 547634.55 0 -4 ,- 1 ._ I" - I I .- E: 190928.35 .._._ s „^. -1991134.70I _ -+ 8. - '. < G STR 6 AI ' N E: - - f TOP 332.75 _._..,. m r �� ( •�' --- TOP: 333.00 m N m }>-6"x8"ORIFICE: 330.75 N: 547479.99 '-- o CO t - A co l I m - a t.e. ui (swy. a2s.2s r - - p ; s r `� <` 1'U�,I m ETOP�332.25 ", 60 LF,2"0.83% o m LE. OUT (N): 329.19 ( i l 6" X30" ORIFICE: 331.75 - Lo m m I.E. OUT(S). 327.00 ( @ I.E. OUT IN): 329.50 STR 11 Ali t ( i r� t �I � � .. I - � _- � . . . . . . . . .� t N: 547327.59 - s _ r E: 1990903.00 ;,� - Cl) U ; i 333 I TOP: 332.50t ` `�- M( 33^---- �---------�GQ - ) -• I.E. OUT (NW)' 329.40 ~ 332 I STR 5 HEADWALL i F 3 �I M t \1' ,. r",' _ N: 547538.53 ; �� STF,O HEADWALL - """ E: 1991037.93 861 15" RCP - N:57374.05 .�384' I.E. IN (SE): 329.00 �':� @0.82°k I 332E: 490939.35 _ ^ r _ T01: 330.44 .,..,. V1 t 333-LE. N� (E) 3�8.50 SS 3�� -->t,$ y� I i I, k f f cCN ,. m a*t 1 f ! I �qI m Jt N 5 5 � i m f I ,� 333 + � I ! � I � � �,� Cl)m ti 33� �Sg 334 / n 3 I \ i f � ... /' co Cl)CONNECT NEW @ 0 40 . 18" RCP INTO EXISTING - STR 1 AI n�'�'/ a co ) ? - a \ V: 547557.98 17 I.E. IN: 325.00 TOP 33325t Mh i _333 - - - - - n'3� `73p - I.E. OUT (NE) 330_00 - - I I _- r _ ,' tv k. �_ L T 3g 2 Y 1334 - 333 icy r I _ A•7 .,_., _,"a -- _ At ,. NT547347.75 STR 8 At_. - _ rc - - = r - t_^ E: 1991005.1', N: 547418.49 STR 4 AI TOP: 332.55 E: 1991045.63 - - N: 547493.79 i ' i1 _ I.E. OUT (W): 329.40 TOP: 332.50 ' E: 1991086.75 I.E. OUT (NE): 329.59 TOP: 332.50 CENTENNIAL PARKWAY I.E.OUT(NIN : ):329. }-` - � I.E. OUT (NW): 329.26 _ (100' R/W_-_PUBLIC)_- ® (MAP 2011, PG 548) 3 HORIZONTAL & VERTICAL CONTROL IRON PIPE W/JK CAP #3 N: 547, 207.3616 5 E.- 1, 991, 026.2002 ELEVATION: 332.41 ' (GROUND) STORMSEWER PIPE SUMMARY TABLE (10-YEAR, 24HR STORM EVENT) From (Inlet) Node To (Outlet) Node Length (fit) Average Slope (%) Pipe Shape Pipe Diameter or Height (inches) Manning's Roughness Peak Flow (cfs) Max Flow Velocity (ft/sec) 1 AI 2AI 86.00 0.8300 CIRCULAR 15.000 0.0130 0.60 1.71 11AI 12AI 73.00 0.7500 CIRCULAR 15.000 0.0130 1.26 1.21 12 AI BASIN- 49.00 0.7600 CIRCULAR 18.000 0.0130 2.08 2.54 16 WEIR BOX OUTFALLS 142.56 1.4000 CIRCULAR 18.000 0.0130 3.64 5.77 2AI BASIN-: 138.00 0.5000 CIRCULAR 18.000 0.0130 2.39 2.37 4AI BASIN-3(STt-17) 65.00 0.4000 CIRCULAR 15.000 0.0130 2.57 2.10 6-AI BASIN-3(STI-17) 60.00 0.8300 CIRCULAR 12.000 0.0130 0.37 0.47 SAI 4AI 83.00 0.4000 CIRCULAR 15.000 0.0130 0.82 0.67 9AI BASIN-, 70.00 1.2900 CIRCULAR 15.000 0.0130 1.12 2.34 BASIN-2(STR-14) BASIN- 1 32.00 1.5600 CIRCULAR 13.000 0.0130 2.81 1.59 BASIN-3(STR-17) BASIN-2(STt-14)1 56.00 0.8900 1 CIRCULAR 18.000 0.0130 3.24 1.83 30' 0 ,J' 60, SCALE.' I" = 30 NOTE: ALL STORM SEWER AREA INLETS (STR'S 1, 2, 4, 8, 9, 11, 8 12) LOCATED WITHIN THE NEW PARKNG AREAS ARE TO HAVE A 2-0" DEEP SUMP FOR DEBRIS COLLECTION. (SEE INLET DETAILS IN EACK OF PLANS) Approved Stvrrnveler Pv mit Ugcufh@hiz t;onseucuon In at.Eoreansd with these 0100401111016 Is required by the stormNater permit. North Carolkle rules require that the stormwater system designer inspect during construction; certify conformity with the plans and specs; and certify compliance with the swrmwater rules. 0 5A NCAC 2H .1008 (1) ) r SW / d5o _Date/A 2 • :• C Division of WataP@selHy Sheet # Revision Date29&_L_A DRAINAGE B.XSIN PEAK RUNOFF (10-YEAR, 24HR STORM EVENT) Element Area Drainage Weighted Rain Gage Total Total )eak Time of ID Capture ID Curve ID Precipitation Runoff Ibnoff Concentration (acres) Number (inches) (inches) ;ds) (days hh:mm:ss) DEV-01 0.08 IN 93.2D 'Harnett -County 5.80 5.00 3.61 0 DD:05:D0 DEV-02 0.29 2AI 92.10 Harnett _County 5.80 4.88 2.08 0 00:05:00 DEV-03 0.65 BASIN-1 70.25 Harnett County 5.80 2.67 2.44 0 00:08:58 DEV-04 0.09 OUTFALL-N 53.70 Harnett _County 5.80 1.31 3.15 0 00:05:00 DEV-05 0.01 NORTHEAST 39.00 Harnett -County 5.80 0.03 3.00 0 00:05:00 DEV-06 0.51 BASIN-3(STR-17) 91.76 Harnett _County 5.80 4.85 3.68 0 00:05:00 DEV-07 0.47 BASIN-2(STR-14) 91.04 Harnett _County 5.80 4.77 3.37 0 00:05:00 DEV-08 0.25 4AI 94.40 Harnett County 5.80 5.14 1.85 0 00:05:00 DEV-09 0.08 6-AI 77.60 Harnett _County 5.80 3.36 3.41 0 00:05:00 DEV-10 0.12 8 AI 96.80 Harnett _County 5.80 5.42 3.87 0 00:05:00 DEV-11 0.15 9AI 97.04 Harnett _County 5.80 5.45 1.16 0 00:05:00 DEV-12 0.17 11AI 96.32 Harnett _County 5.80 5.36 1.30 0 00:05:00 DEV-13 0.12 12 At 97.76 Harnett -County 5.80 5.53 3.88 0 00:05:00 DEV-14 0.20 BASIN-4 75.44 Harnett _County 5.80 3.15 3.99 0 00:05:00 DEV-15 0.42 OUTFALL-5 74.48 Harnett _County 5.80 3.06 1.40 0 00:20:38 DEV-16 0.10 OUTFALL-5 72.70 Harnett _County 5.80 2.89 1 3.47 0 00:05:00 MAY 30 Z014 SPO% A ER QUAL11 NG ISSUED STAMP t.CARp��i OQ;.FEggiOi. li'y; :a S AL �` ' • . 1 NEB. •'�"�� WESZFP�I G W a 0 e N m N lii � QN o 0 � t0 w� J a �a J In m 'm a Y o 0 T m NLU O 0 n m q N as m W W W r 2< 0 z cs (9 z 6 3 13 g q m2 Z = W 2. `a Wx Id W 0 Qq� K 0 0 //1 J m LL V NN fn N z i3 z w8 LL z 2�u8� x<a; m F z 0 G U Z W O z U Zi- (D �NN I.f. Co 2 } Cl) / O W Z IL Q O V U SQ L J O 0 U. 0 SHEET NUMBER W CG-201 �M/� SHEET 6 of 85 j� 1 1 2 1 3 El 19 c 11 m STORM PRDFILE A 350 350 345 345 340 ------- 340 STIR 2 Al STRIA N: 547634.6 N: 54757.98 E: 199113470 --- ------- E: 1991138.87 TOP: 333.0 TOP: 33.25 I.E. IN (SW 329.29 335 I.E. OUT(NE): 330.00 I.E. OUT (N: 329.19 335 77177�� - -- ------ --- 10-YR HGL - - - - - - - - - - - - - - - - - 10-YR HGL 10-YR HGL - - - - - - - - - - - - - - 330 86 LF 15- RCP @ 0.82% 330 - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - 138 LF 18- RCP @ 0.509/6 - - ---- STR 3 HEADWALL 325 N: 547773.40 325 E: 1991122.97 I.E. IN IS): 328.50 320 f 0) " co 0) U� �q 0 q m CO m co 4 cn m co m co W U- WLL wU- w U- W LL w U- -0+25 0+00 0+50 I - CD N . a) co vi cn co C6 LO m CO m co m m CO CO') co C co U- w U- W LL w U- 1+00 1+50 0 U.1 2+00 STORM PROFILE C STORM PROFILE D 320 2+50 350 345 340 335 325 32C U. STORM PROFILE B ----------------- ---- ------- -- ---- ----- -- -------- --------------- ------ - --- 4-- STIR 8 Al -ffR4AI K 547493.79 ------- -- --------- - N: 547418.49 E 1991086.75 -E:1991045.63 T)P: 332.50 --------------------- TOP- 332.50 1.:. IN (SW): 329.26 I.E. OUT (NE): 329.59 I.:. OUT (NW): 329.26- ----------- I 10-YR HGL I BASIN-3 =ZZIN *R !GL--- ELEV' 331.94 - - - - - - - - - - - - 83 LF 15- RCP @ 0.40% . ......... 65 LF 15' RCP @ 0.40% N: 547538.53-1-l. E: 1991037.93 1 ----------- - - - -I.E. IN (SQ: 329.00-4-- T- r,- 00) 0 "t (0 10 LO Cl) 0 "t cn Ci cn Ci ClJ Ci 04 Ci CR "i N q m of I ce) m m m c) Cl) C) m M V) C) ce) co cn m m C) C') cl) co co co C) cn Cl) LL C) d (9 d (D 0 UJI W LL Lu L, LU LL w L, w U- w U- w LL .-i -0+25 0+00 350 250 350 350 350 -- ------- - 345 �45 345 345 345 340 ------ 340 340 340 STR 9 Al 60LF12"HDPE 547347.75 N: E: 1991005.15 335 0 @ 0-836X 235 335 TOP: 332.55 I.E. OUT 329.40 335 335 (W): 10-YR HGL BASIN-4 -.-.-10-YR HGL 10-YR HGL ELEV: 331.94 . . . . . . . . . . . . . . . -ELEr(.-331.83 . . . . . . . . . . 330 .... ....... z 330 j 70 LF 15" RCP @I !9% 330 330 STR 6 Al STR 7 HEADWALL STIR 10 iEAE)WALL 325 N: 547479.99 N: 547537.84 225 325 f: 547374.05 325 325 E: 1991014.75 E: 1991034.98 E 1990939.35 TOP: 332.25 I.E. IN (S): 329.00 I.E. 11 (E): 328.50 I.E. OUT (N): 329.50 320 220 320 320 320 00 co cl w C:, CO cl .(D Lo 0 . CO C) LO . 0) m do m m co Ci m m Cq M CO M CO CO b m co C9 Ci m co m m c 0 m co cn co c I 'i cn m N m c 1) co m 0 (D W LL m co Cl) W LL W LL U.1 U- . (000 . . UU U- U. W LL w LL w LL W LL w LL W LL W U- 0+50 1+00 STORM PROFILE E 350 345 340 335 330 325 320 0 U- 1+50 1+75 - -------------- --------- - - -------- STIR 1'HEADWALL 547409.54 - STR11AI E 1990861.70 N: 547327.59 I.E. [N*sw): 328.50 E: 1990903.00 -7 TOP: 332.50 -7-I.E. OUT (NW): 329.40---- 10-YR HGL N BASIN-4 --ID--YR HGt----- E-a3 ------------------- -------------- - - - - - - - - - - - - - - - 73 LF 15- RCP @ 0.59% ----------- - - - - - - - 49LF 18"RCP .......... -�;-7' - - m- -------- STIR 12 Al N: 547365.58 ­4---- - ---------- 1990836.60 TOP: 332.50 ------ ---- I.E. IN (SE): 32837 I.E. OUT (NE): 31.8.87 0 0 LO 00 - m 0 OD OD 0 04 u') C) 0) OD co r- CID Cl) . r-_ 00 m m m Cf) m C0 m m m Cl) c 0 Cl) CY) c 0 Cl) C) 6 CY) c e) m LL cr) Cl) m . Cl) . Cl) O . . m (9 d (D 6 (D d ob (go q d W LL w U- W LL w LL W LL w LL Lu LL -0+25 0+00 0+50 1+0) -0+25 0+00 0+50 1+00 -0+25 0+00 0+50 1+00 350 345 340 335 330 325 320 ( . D . U- 1+50 1+75 KOFILE SCALES: HA" = 20' VY' = 5' 302014 4D QUALITy R PE"17iING ISSUED STAMP C A X' SE L GINS WFSt Lli Uj C, 0 0 O z Ulas 0 z U? T< ;�RUR ; z zII0 0 w z W C) Z > (-) L- (D< < Ei .2 3: U) ww- c w w (1) =J C 2 LL 0 0 0 z u- Of Ll 0- 0 < U) < 0 0 LL SHEET NUMBER w CG-301 SHEET 7 OF 85 cn z O V H z O U w O U. 0 w M U) CO 1 1 2 3 9 5 C M 0 I - I PROPOSED ELECTRIC CONDUIT (SEE ELECTRICALPLANS FOR MORE DETAILS) VERIFY REQ'D SPARATION BETWEEN WATER & ELECTRIC PRIORFO CONSTRUCTION. IROPOSED ELECTRIC - • I - "RANSFORMER PROPOSED '� �' ' .. - - SEE ELECTRICAL PLANS TELEPHONE IOR MORE DETAILS) (RETAIL BLDG) PROPOSED TELEPHONE ImAiW INU MANNULC ' INV IN: 321.00 L O° ._ -_-.. v F 251 LF 8" SCH 40 PVC / K �� " PI: 0+69.41 @ 1.00 y , _ - -7 - - - - - - - - - - - - - - - - - - - - - ------------------� lur_3" PROPOSED ELECTRIC CONDUIT I r I I a 4 (SEE ELECTRICAL PLANS FOR MORE DETAILS VERIFY REQ'D SEPARATION BETWEEN WATE, & ELECTRIC PRIOR TO CONSTRUCTION. FUTURE RETAIL BLDG 13,200 SF I j r MH A2 (110' X 120') I I N: 547537.44 E: 1991064.71 F.F.E. = 334.85 TOP: 333.09 INV IN: 327.20 I ) `1 s v - INV OUT(SW): 326.26 _ CLEANOUT INV: 328.66 C.O. jS15D PN. Y _o"STR.) r , ! -� 1 p J FUTURE 2" PVC DOMESTIC 8" GATE + �€ FUTURE 6" D.1. VALVE (END""`�V FIRE LINE i _ I� , -I ) tl CONSTRj i I 1 X• W FUTURE DOMESIC 8 1.66 FIRE BACKFLOW 4 , MH At PREVENTER VALTS (SEE HARNETT COUNTY DETAIL: ON p E 1 /f ! FUTURE 2" WATER / 3MK3= U WATER / N: 547312.62 """`" a MAIN .y SHEETS C506 &}507 METER PER E: 1990943.86 iv FOR MORE INFO HARNETT COUNTY i I - TOP: 333.15 I i I i ( REQTS INV IN(NE): 323.75 - _ _ _-__-_ _ _[-__-�. INV OUT(SW): 323.65- ',. ! u NEW FIRE L---- HYDRANT- --- --REQ'D�------- • - I, II L ¢i u C} EXISTING POWER POLES TO REMAIN IN -PLACE. NO DISTURBANCES ALLOWED. COORDINATE ALL WORK IN UTILITY R.O.W. WITH CENTRAL ELECTRIC DEPARTMENT. UTIUTYPLANNOTES 1) ALL UTILITIES ARE TO BE INSTALLED RR LOCAL REQUIREMENTS 2) THE CONTRACTOR IS RESPONSIBLE F)R VERIFYING AND FOLLOWING ALL LOCAL UTILITY INSTALLTION REQUIREMENTS. IF A CONFLICT SHOULD ARISE BETWEEN THEDETAILS SHOWN ON THESE PLANS AND THE LOCAL UTILITY SIECIFICATIONS, THE LOCAL UTILITY SPECIFICATIONS SHALL GOVERP. 31 ONLY A LICENSED CONTRACTOR IS ALOWED TO INSTALL ANY PUBLIC UTILITY SHOWN WITHIN THESE PANS. 4) THERE MUST BE A MINIMUM 24" SEPAIATION BETWEEN WATER AND SANITARY SEWER LINES ACCORDIN3 TO HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES (HCIPU). 30, 0 34, 60, SCALE. 1" = JO' ,Appravea tie -nl# 04PH iffif? Construction in acouruhhce With .nose documents it. required by the stormwater permit. North CarokA rules th"jilre that the stprmwater system designer Ins ect on, Certify �S"1 -_ nsandspecca IrttfyGop1iance 008(ity with ft ��hthe :.r ... r , . ;...,' ,. �.. - r - <- " stormwater t01es. (15A N C ) --' _ r- NEW 2" WATER - - ' - - - - _ . . -. ._ � -_.. � Date a - 05Q �% r ICI HARNETT METER R _ i • -� I I COUNTY REQTS FUTURE /� p p I I 8" GATE 2" PVC CONNECT TO CENTENNIAL PARKWAY 131 VALVE DOMESTIC EXISTING WATER ' PROPOSED DOM:STIC I I SERVICE LINE & FIRE BACKFLOV (1.00'_[l/.vv '_P.UBLIC) - .. ___. ____. _ _-_._ _. -__ PREVENTER VAILTS ® (MAP 2011, PG 548) COUNTY DETAIL; ON I - __.. SHEETS C-506 &3507 31 _. I I 115 LF 16" STEEL __ _ -- FOR MORE INFO Y ( I ENCASEMENT PIPE REQ'D FOR NEW 8" D.I. HORIZONTAL & VERTICAL CONTROL 13l (JACK & BORE REQATER MAIN. 'D) IRON PIPE W/JK CAP #3 N: 547,207.3516 I I CONNECT TO EXISTING 12" E: 1, 991, 026.2002 III WATER MAIN. PROVIDE STAINLESS STEEL TAPPING ELEVATION: 332.41 ' i i SLEEVE & 8" GATE VALVE (GROUND) 131 PER UTILITY REQ'TS II # P rmit8$V✓ /�f' - --' r` Water ,-1 Sheet ARevision DataD1EML.e Jr MEDICAL OFFICE &DG WA TER USAGE CALCULA IONS MEDICAL OFFICE &DG SEWER USAGE CALCULATIONS Fixture Type Quantity Dfu Sub -total Shower 0 2.0 0.0 Sink - 3 2.0 6.0 Elea Water Cooler 0.5 1.0 Mop sink 1 : ;,-: 2.0 2.0 Lavatory 2$ - 1.0 28.0 Urinal 2, 2.0 4.0 Water Closet .9 '' 4.0 36.0 Fixtures Fixture Type Quantity SFU Sub -total Cw Sub -total Hv Sub -total Hose Bibb 4 2.25 9.00 2.25 9.00 Shower 4.00 3.00 3.0) Sink 3 „' 2.00 6.00 1.50 4.50 1.9 4:5 Elec. Water:ooler 1 " 0.25 0.25 0.25 0.25 Mop sink 1 3.00 3.00 2.25 2.25 2.9 2.5 Lavatory 28 0.07 1.96 1.50 42.00 1.5) 42.0 Urinal 2 5.00 10.00 5.00 10.00 Water Close 9 . , 10.00 90.00 10.00 90.00 Total SFU's 120.21 158.00 49.00 gpm -Lt. 48.00 56.55 28.82 m - Lv. 73.00 80.60 Pipe Setectbn Predominan y flush tank system, Lt. 5aected Pipe 'O.D. 'LD. Press. Loss/100 ft: **VelocityfUsei. Flow - qpm Gw •- Hw 1'.2 _ .1.375 1.265 8.87 7.36 28.82 Predominanly flush valve system, f.v. Cw 2 2.125 1.985 6.64 8.36 80.60 Service wate pipe Cw Lt. CwLv. 2 '. 2.125 1.985 5.53 7.57 73.00 Notes Pipe material is based on type L copper with a C value of 130 " \elocity should be kept between 3 and 8 feet per second 302014 MD QUALITY R PER611Tift ISSUED STAMP IC A RO t//% S AL r• 1p F . G1NE`�• �ik WIES�%1\8�/l a N m h iu ui 0 r N 0, p� w "- a �a i u K w m 3 O Y m v O O > O0 z a as m J Y w w= 0 zU` z y am' Q > O 32 g w z x O w m 2 7 w 2 J m w x N V O O 4 G. U m ry 5Z� O z v UN °2 �sR�E Z. w 3E �zPF i c u w H Z w U (D Q (DU Z � LU 0- m LLJ LL Q U SQ J >L w N SHEET NUMBER CU-101 SHEET 9 Or 85 O H VNN r U) Z O U N W O U. 0 LIJ C0 1 E t�' L7 5 0 10 A 0 FF.E.=334.50 M N I C7 N f. �/ Cl) / G) ,..'.wlI I M � + I _._ ® 111 SANITARY SEWER PROFILE �251 LF 8" SCH 40 PVC ! @ 1.00% i f 1 i INV IN: 3Z/.ZU INV OUT(SW): 326.26 �,. •" / r I N i CLEANOUT INV -328.6 C.O.,,'r' � (END PH. ICONSTR.) 411 -- A PROFILE SCALES: H:1"=20' V:1"=5' �_------_---die`---- ---- --- —131 I II �3,30. 02' 131 II r t 20' 0 :0' 40' — 1-- — SCALE. 1 = 2C UTIL/TYPLAN NOTES 1) ALL UTILITIES ARE TO BE INSTALLED FR LOCAL REQUIREMENTS. l i 2) THE CONTRACTOR IS RESPONSIBLE F)R VERIFYING AND FOLLOWING ALL LOCAL UTILITY INSTALLTION REQUIREMENTS. IF A 3 CONFLICT SHOULD ARISE BETWEEN THEDETAILS SHOWN ON THESE PLANS AND THE LOCAL UTILITY S'ECIFICATIONS, THE LOCAL `"' ipi I UTILITY SPECIFICATIONS SHALL GOVERP. 11 I 3 i 1 PUBLIC A LICENSED I' SHOWN WITRAC TOR IS ALOWPANSED TO INSTALL ANY ( 4) THERE MUST BE A MINIMUM 24" SEPAIATION BETWEEN WATER AND SANITARY SEWER LINES ACCORDIN3 TO HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES (HCD'U). 334 u, /.II 45 35 30 25 20 18 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 (approved SWr'j,0"taa P e.+i11t w0owmefft Construction accordance with these docurnsn{s is required by the stormwater permit. North Carolina rules requin, that the stormwater system designer Inspect during construction; certify conformity with the plans and specs; and certify compliance with the siormwater rules. (i 5A NCAC 2H .1008 ( ) ) Permit bj'6Date / ' {� &• &C Division of Sheet # Revision Date p MLR 302014 ND qUALiTY :R PERMITTING ISSUED STAMP ���yaafiffly�� �.. 4.. 4ESSy�•,/� T :a S AL ��FGINS k 1WES\ N N W H W < p Q N F w� a w a0w Na m3 d � y Y m y O N O m N T J Y W W 0 as � `v w m Zz_ _Q J 0 s w� c Zy O ism �E Z-'U$ N �WW JZ^ F z " D U W W Z J W U Z LL J � Q d U � W m� � U) oQ Q Y � Q Z �U) O F � w N SHEET NUMBER CU-102 SHEET 10 of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lrBEEN COMPLETED. EROSION WILL BE CONTROLLED AT THE STORM VATER OUtETS BY INSTALLATION OF STORM DRAIN OUTLET PROTECTION. ALL OTHER STCRM STRUCTURES WILL HAVE INLET PROTECTION INSTALLED ALSO AT -HIS TIML 12. tOADWAY PAVING. 13. IOUNDATION AND BUILDING CONSTRUCTION. 14. IINAL GRADING, LANDSCAPING, AND PERMANENT VEGETATIVE STA31LIZATION AND PARKING LOT PAVEMENT. 15. CLEANING OF STORM DRAINS 16.:INAL STABILIZATION AND SEEDING. 17. EEMOVE TEMPORARY EROSION CONTROLS. SEDIMENT TRAPS WILL BE DE -MUCKED AND CONVERTED TO INFILTRATION BASINS. INSTALLATION OF FINAL LAMSCAPE PLANT MATERIALS. 18. TILE NOTICE OF TERMINATION WITH EPD. T014L SITE ACREAGE OF THE CONTRACT PROJECT SITE: 3.45 ACRES TOl4L SITE AREA TO BE DISTURBED: 3.45 ACRES RECEIVING WATERS: THIS SITE DRAINS TO AN UNNAMD TRIBUTARY OF TWO DIFFERENT STREAMS: LITTLE BRIDGE BRANCH (REEDY'S SWAMP) STREAM INDEX #: 18-23-29-2 CLASSIFICATION: C RICE PATCH BRANCH STREAM INDEX #: 18-23-29-3 CLASSIFICATION: C WETLAND ACREAGE ONSITE: 0.00 ACRES MAXIMUM WETLAND DISTURBED AREA: 0.00 ACRES PROPOSED WETLAND DISTURBED AREA: 0.00 ACRES THE EROSION AND SEDIMENTATION CONTROLS FOR THS PROJECT SHALL BE CONSISTENT WITH AND NO LESS SYRINGENT THAN THE BEST MANAGEMENT PRACTICES CONTAINED N THE "EROSION AND SEDIMENT CONTROL PLANNING AND DEIGN MANUAL" PUBLISHED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LATEST VERSION. TEMPORARY SEDIMENT TRAPS ARE ONLY REQUIRED TC REMAIN IN PLACE DURING ACTIVE EARTHMOVING OPERATIONS ON THE SITE. ONCE THE SITE EARTHWORK IS COMPLETED ANDTHE SOIL SURFACE IS PROPERLY STABILIZED WITH MULCHING ANXOR TEMPORARY/PERMANMENT GRASSING/SOD, THE SEDIMENT TRAPS MAY BE REMOVED WHILE ALL OTHER MEASURE; SUCH AS SILT FENCING AND INLET PROTECTION REMAIN FOR THI DURATION OF THE CONSTRUCTION SCHEDULE SHOWN )N THE EROSION CONTROL DETAIL SHEETS. CONSTRUCTION PHASED EROSION CONTROL NOTES PHASE PHASE II PHASE II CONTINUED A. PRIOR TO THE LAND DISTURBING CONSTRUCTION, A. THE FOLLOWING EROSION CONTROL MEASURES 12. GRASS ALL AREAS WITH SEEDING SPECIFIED ON THE CONTRACTOR SHALL SCHEDULE A SHALL BE IMPLEMENTED DURING THE PRELIMINAFY THE EROSION CONTROL DETAILS SHEET. PRE -CONSTRUCTION MEETING WITH THE AREA SITE GRADING PHASE OF CONSTRUCTION: DEVELOPMENT INSPECTOR. 13. FINISH FINAL GRADING FOR PAVEMENT. 1. DURING CONSTRUCTION, THE CONTRACTOR B- THE CONTRACTOR SHALL OBSERVE THE PROJECT SHALL MAINTAIN CAREFUL SCHEDULING ANC 14, CONTINUE INSPECTIONS AS REQUIRED - SEQUENCE SHOWN ON THE PLANS. THE CONTRACTOR PERFORMANCE TO ENSURE THAT LAND STRPPED SHALL MAINTAIN CAREFUL SCHEDULING AND OF ITS NATURAL COVER IS EXPOSED ONLY II 15. SEDIMENT SHALL NOT BE WASHED INTO INLETS.IT PERFORMANCE TO INSURE THAT LAND STRIPPE) OF ITS SMALL QUANTITIES AND THEREFORE LIMITED SHALL BE REMOVED FROM THE SEDIMENT TRAPS NATURAL COVER IS EXPOSED ONLY IN SMALL QIANTITIES. DURATIONS, BEFORE PERMANENT EROSION AND DISPOSED OF SO THAT IT WILL NOT ENTER PROTECTION IS ESTABLISHED. THE INLETS AGAIN DURING GRADING. ALL C. THE OWNER AGREES TO PROVIDE AND MANTAIN EROSION CONTROL MATTING SHOULD BE OFF-STREET PARKING ON THE SUBJECT PROPEtTY DURING 2. EARTHWORK OPERATIONS IN THE VICINITY OF INSTALLED AS SHOWN ON THE PLANS. THE ENTIRE CONSTRUCTION PERIOD. STREAM BUFFERS SHALL BE CAREFULLY CONTROLLED TO AVOID DUMPING OR SLOUCHING 16. THE CONTRACTOR SHALL MAINTAIN THE D. NO STAGING AREAS, MATERIAL STORAGE, DONCRETE INTO THE BUFFER AREAS. TEMPORARY SEDIMENT TRAPS UNTIL THE WASH OUT AREAS, OR DEBRIS BURN AND BURIA. HOLES DISTURBED AREA IS STABILIZED. THEN THE SHALL BE LOCATED WITHIN 500 FEET OF DESIGMTED TREE 3. EROSION CONTROL DEVICES SHALL BE INSTALLED TEMPORARY RIP -RAP SPILLWAY CAN BE REMOVED PROTECTION AREAS. IMMEDIATELY PRIOR TO THE GROUND FROM THE SEDIMENT TRAP AND TRAP DISTURBANCE. THE LOCATION OF SOME OF -HE CONVERTED TO FINAL GRADING. GRASS ALL E. A COPY OF THE APPROVED LAND DISTURBANCE PLAN EROSION CONTROL DEVICES MAY HAVE TO EE AREAS WITH SEEDING SPECIFIED ON C-506. AND PERMIT SHALL BE PRESENT ON THE SITE A- ALL TIMES F. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSIONAND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND DISTURBING ACTVITIES. G. PRIOR TO COMMENCING LAND DISTURBING ACTIVITY, THE LIMITS OF LAND DISTURBANCE AND ALL STEEEAM BUFFERS SHALL BE CLEARLY AND ACCURATELY DEMARCATED WITH STAKES, RIBBONS, OR OTHER APPROPRIATE MEANS. THE LOCATION AND EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY SHA-L BE DEMARCATED FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL OCCUE OUTSIDE THE APPROVED LIMITS INDICATED ON THE APPFOVED PLANS. H. PRIOR TO ANY OTHER CONSTRUCTION, A STABILIZED CONSTRUCTION ENTRANCE/EXIT SHALL BE CONSTRUCTED AT EACH POINT OF ENTRY TO OR EXIT FROM THE SITE OR ONTO ANY PUBLIC ROADWAY. I. THE FOLLOWING INITIAL EROSION CONTRCL MEASURES SHALL BE IMPLEMENTED PRIOR TO /NY OTHER CONSTRUCTION ACTIVITY IN THE SEQUENCE BLOW: 1. THE CONSTRUCTION EXIT, CONSISTING OFA MINIMUM PAD SIZE OF 20 FEET BY 50 FEET WITH A MNIMUM OF 6" THICK STONE, SHALL BE PLACED AS SHOWN ON THE PLAN. THE STONE SIZE SHOULD CONSST OF COURSE AGGREGATE BETWEEN 1� & 34" II• DIAMETER AND OVERLAID ON A GEOTEXTILE UNDERLNER. THE GEOTEXTILE UNDERLINER SHALL MEET THE REQUIREMENTS OF AASHTO M288-96, SEC -ION 7.3 SEPARATION REQUIREMENTS. 2. INSTALL SILT FENCE AT THE TOE OF ALL FLL SLOPES 10 FEET OR GREATER IN HEIGHT. THE SILTFENCE SHALL BE PLACED IN ACCORDANCE WITH ALL APPLICABLE STATE REQUIREMENTS. THE SILT FENCE SHOULD BE KEPT ERECT AT ALL TIMES AND REPAIRED WHEN REQUESTED BY THE SITE INSPECTCR OR THE PROJECT DESIGN PROFESSIONAL OF RECORD. SILT SHOULD BE REMOVED WHEN ACCUMULATDN REACHES I HEIGHT OF THE BARRIER. THE FERIMETER SILT FENCE SHOULD BE INSPECTED DAILYFOR ANY FAILURES. ANY FAILURES OF SAID FENCING SHOULD BE REPAIRED IMMEDIATELY. 3. INLET SEDIMENT PROTECTION MEASURES3HALL BE INSTALLED ON ALL EXISTING STORM STRUCTURES AS SHOWN ON THE PLAN. SEE SEPARATE DE-RILS FOR SPECIFICS ON TYPE OF INLET PROTECTIOI SPECIFIED. 4. RELOCATE ANY EXISTING UTILITIES NEEDED TO CONSTRUCTION SEDIMENT BASIN. 5. CONSTRUCT ANY SPECIFIED SEDIMENT BASINS AS SHOWN ON THE PLANS INCLUDING OUTLE- CONTROL STRUCTURE, PIPE, AND SKIMMER. 6. CONSTRUCT DIVERSION DITCHES AND CHICK DAMS AS INDICATED ON PLANS. 7, CLEAR AND GRUBBING CAN COMMENCE. 8. DEMOLITION OF EXISTING STRUCTURES AND PAVING CAN START ALONG WITH ROUGH GRADING 9, TEMPORARILY SEED DISTURBED AREAS A: NEEDED. 10. COMPLETE REQUIRED INSPECTION REPOFTS. ALTERED FROM THAT SHOWN ON THE APPROVED PLANS. 4. IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE PROPOSED DRANAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS, CREATED AT VARIOUS STAGES DURING CONSTRUCTION. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL BE REPORTED TO THE DESIGN PROFESSIONAL IMMEDIATELY. 5. THE CONTRACTOR SHALL FURNISH AND MANTAIN ALL NECESSARY BARRICADES WHILE ROADWAY FRONTAGE IMPROVEMENTS ARE BEING MADE. 6. INSTALL ADDITIONAL SILT FENCE AT THE TO[ OF ALL FILL SLOPES 10 FEET OR GREATER IN HEIGHT OR WHERE NECESSARY. THE SILT FENCE SHALL BE PLACED IN ACCORDANCE WITH ALL APPLICABLE STATE REQUIREMENTS AND MAINTAINED UNTIL PERMANENT GROUND CCVER IS ESTABLISHED ON THE SLOPE. SILT SHALL3E REMOVED WHEN ACCUMULATION REACHES HEIGHT OF THE BARRIER. ADDITIONALLY, DIVERSION DITCHES SHALL BE CONSTRUCTED ALONG THE TOP OF ALL FILL SLOPES WITH TIE USE OF TEMPORARY DOWN DRAINS TO CON-ROL STORM WATER RUN OFF TO LOCATIONS AS SHOWN ON THE PLANS. SEE SEPARATE DETAILS FOR ADDITIONAL INFORMATION. 7. THE CONTRACTOR SHALL BE RESPONSIBLE:OR ESTABLISHING BARRIERS AT THE TOE OF SLOPES UNDER CONSTRUCTION. THESE BARRIERS STALL BE AS SHOWN IN THE PLANS. THESE BARRIERS MAY BE RELOCATED AND REUSED AFTER PERMANENT SLOPE STABILIZATION BECOMES FULLY ESTABLISHED. AS THEY ARE RELOCA-ED, ANY DEFECTIVE MATERIALS IN THE BARRIER SHALL BE REPLACED. IN ADDITION, ALL DEBFIS AND SILT AT THE PREVIOUS LOCATION SHAL BE REMOVED. 8. COORDINATE UTILITY RELOCATION AND INSTALLATION. 9. CONSTRUCT STORM DRAINAGE STRUCTURE AND PIPES ALONG WITH PROPER INLET PROTECTON AND OUTLET STABILIZATION STRUCTURES. REMOVE EXISTING CHECK DAMS AS REQUIRED TO ACCOMMODATE PHASE II DRAINAGE PATTEFNS. 10. IMMEDIATELY FOLLOWING INSTALLATION OF CATCH BASINS ON SITE, CONTRACTOR SHAL EXCAVATE INLET -SEDIMENT TRAPS IN LOCA-IONS NOTED ON THE EROSION CONTROL PLAN. 11. DURING GRADING, ALL EROSION CONTROL MATTING SHOULD BE INSTALLED AS SHOWNDN THE PLANS (AT ALL SLOPES OF 3:1). 17. CONSTRUCT SIDEWALKS, PAVE SITE, INSTALL LANDSCAPING AND PERMANENT GRASS AND SEEDING. 18. REMOVE SEDIMENT AND EXCAVATE THE TRAP TO THE ELEVATIONS SHOWN FOR THE PONDS. THI: INCLUDES GRADING OUT THE FOREBAYS (IF SPECIFIED) AS SHOWN ON THE PLANS. 19. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND CONTINUE INSPECTIONS UNTIL THE SITE IS STABILIZED. PERMANENT GROUNDCOVER SHALL BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR LAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION. ISSUED STAMP \N FC'ArRO''A. _�\2'OFESS�o`�� D S AL v" _ %'P�: • I NE � v �� N w w� o a N 0 ma J d m � Y O m N 0 U y m m N a¢ > J > W W t Q ti `a w Z x W ¢Q� K 0 W m LU N N zz_ 0 0 "c z Un �y KS< nun 0 m G U fII It W F- Cn z W W I- U z O (DQ z U Of W Q LL < O o L J Lu O F w SHEET NUMBER C E-001 ,SHEET 11 of 85 Z O U w V, tO V O LL 0 Lu 1 2 3 4 1 5 w C I1 0 STORM WATER PJLLUTION PREVENTION PLAN NOTES 1. STORM WATER POLLUT104 PREVENTION PLAN (SWPPP) CONSTITUENTS INCLUDE: A. APPROVED DRAWING£ B. (NOI) NOTICE OF INTENT C. (CGP) NORTH CAROLIM NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES D. CGP COVERAGE LETTER FROM NCDENR E. NCDENR OR LOCAL APPROVAL OF SEDIMENT AND EROSION PLANS F. GRADING PLANS OR STORM WATER MANAGEMENT PLANS 2. OPERATOR OF DAY TO D/Y SITE ACTIVITIES (ODSA) A. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ODSA RESPONSIBILITIES IDENTIFIED HEREIN AND AS IDENTIFIED IN THE CGF. 3. MAINTAIN SWPPP ON SITE A. THE CONTRACTOR SHALL MAINTAIN THE SWPPP ON SITE AND ALL CONSTITUENTS AT ALL TINES FOR USE OF ALL THOSE IDENTIFIED AS HAVINGRESPONSIBILITY UNDER THE SWPPP WHENEVER THEY ARE ON THE CONSTRUCTION SITE AND FOR USE BY INSPECTING OIFICIALS. 4. SWPPP DURATION A. THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN THE SWPPP AS WRITTEN FROM THE COAMENCEMENT OF THE CONSTRUCTION ACTIVTY UNTIL FINAL STABILIZATION IS COMPLETE. 5. SWPPP AREA OF COVERAGE A. TOTAL PROJECT (LEEELIMITS) AREA 33.55 ACRES B. TOTAL DISTURBED AREA 33.30 ACRES C. THIS SWPPP APPLIES AND IS LIMITED TO AREAS OF CONSTRUCTION IDENTIFIED IN THE APPROVED DRAWINGS. 6. PRE CONSTRUCTION COWERENCE A. PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL SCHEDULE & ORGANIZE AN ON -SITE PRE -CONSTRUCTION CONFERENCE. THE CONTRACTOR SHALL ENSURE THAT ALL PERSONS -HAT WILL BE CONDUCTING LAND DISTURBING ACTVITY ARE IN ATTENDANCE. B. THE CONTRACTOR SHALL SUBMIT INSPECTION REPORTS AS REQUIRED BY NCDENR. C. THE CONTRACTOR WILL PREPARE MINUTES OF THE SWPPP PRE -CONSTRUCTION CONFERENCE AND WILL PROVIDE THOSE TO THE CONTRACTING OFFICER WITHIN 7 DAYS OF THE SWPPP PRE -CONSTRUCTION ;ONFERENCE. 7. CONTRACTOR CERTIFICA IONS (ALL PROJECTS) A. ON BEHALF OF THE OVNER AND BEFORE ANY LAND DISTURBANCE ACTIVITIES CAN BEGIN, TIE CONTRACTOR SHALL ENSURE THAT ALL CONTRACTORS, SUBCONTRACTORS AND OTHER PERSONS THAT WILL BE ENGAGED IN LAND DISTURBANCE ACTIVITES SIGN A CO-PERMITTEE AND ATTEND A SWPPP PRE-CONSTRUCTIOP CONFERENCE. B. THE CONTRACTOR SHALL INSURE THAT COPIES OF ALL CERTIFICATIONS ARE MAINTAINED OI-SITE WITH THE SWPPP C. CONTRACTORS AND SIBCONTRACTORS ELECTING OR CONTRACTED TO BE CO-PERMITTEESSHALL SIGN A CERTIFICATION STATEMENT AS FOLLOWS: 91 a. C.O-PERSvt4TTEE CE434F4CATlOSt. "I CERTIFY BY MY SGNATURE BELOW THAT I PARTICIPATED IN A PRE -CONSTRUCTION COIFERENCE ONSITE OR, WHEN ALLOWED, C-FSITE WITH THE INDIVIDUAL WHO IS RESPONSIBLE FOR THE OPERATONAL CONTROL OF THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP); AND I ACCEPT THE TERMS AND CONDITIONS OF SWPPP AS REQUIRED BY THE 33ENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES PERMIT NUMBER NCR 010000) ISSUED TOTHE OWNER/OPERATOR OF THE CONSTRUCTION ACTIVITY FOR WHICF I HAVE BEEN CONTRACTED TO PERFORM CON:TRUCTION RELATED PROFESSIONAL SERVICES. FURTHER, BY MY SIGIATURE BELOW, 1 CERTIFY UNDER PENALTY 0- LAW THAT I UNDERSTAND, AND SHALL COMPLY WITH, THE TERMS AN7 CONDITIONS OF THE STATE OF NORTH CAROLINA GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES AND THIS STORMWATER POLLUTION PREVENTION PLAN PREIARED THEREUNDER." COMPANY NAME PRINTED NAME OF IERSON: TITLE: SIGNATURE: DATE: STREET ADDRESS: CITY, STATE, ZIP: PHONE: (DAY) 13. HAZARDOUS MATERIAL MANAGEMENT AND SPILL REPORTING PLAN A. ANY HAZARDOUS OR POTENTIALLY HAZARDOUS MATERIAL THAT IS BROUGHT ONTO THE CONSTRUCTIOV SITE WILL BE HANDLED PROPERLY IN ORDER TO REDUCE THE POTENTIAL FOR STORM WATER POLLUTION. ALL MATERIALS USED ON THIS CONSTRUCTION SITE WILL BE PROPERLY STORED, HANDLED, DISPENSED AND DISPOSED OF FOLLOWING ALL APPLICABLE LABEL DIRECTIONS. MATERIAL SAFETY DATA SHEETS (MSDS) INFORMATION WILL BE KEPTDN SITE FOR ANY AND ALL APPLICABLE MATERIALS B. IN THE EVENT OF AN ACCIDENTAL SPILL, IMMEDIATE ACTION WILL BE UNDERTAKEN BY THE GENERAL CONTRACTOR TO CONTAIN AND REMOVE THE SPILL=D MATERIAL. ALL HAZARDOUS MATERIALS WILL BE DISPOSED OF BYTHE CONTRACTOR IN THE MANNER SPECIFIED BY FEDERAL, STATE AND LOCAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS. AS SOON AS POSSIBLE, THE SPILL WILL BE REPORTED TO THE APPROPRIATE AGENCIES. AS REQUIRED UNDER THE PROVISIOIS OF THE CLEAN WATER ACT, ANY SPILL OR DISCHARGE ENTERING WATERS OF THE UNITED STATES WILL BE PROPER.Y REPORTED. THE GENERAL CONTRACTOR WILL PREPARE A WRITTEJ RECORD OF ANY SPILL OF PETROLEUM PRODICTS OR HAZARDOUS MATERIALS IN OWNER WITHIN 24-HOURS OF THE OCCURRENCE OF THE SPILL. A SPILL REPORT FORM IS LOCATED IN APPENDIX F. C. ANY SPILLS OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OF REPORTABLE QUANTITIES AS DEFINED BY EPA OR THE STATE CR LOCAL AGENCY REGULATIONS, SHALL BE IMMEDIATELY REPORTED -O THE EPA NATIONAL RESPONSE CENTER (1-300-424-8802). THE REPORTABLE QUANTITY FOR HAZARDOUS MATERIALS CAN BE FOUND IN 40 CFR 302. a. IN ORDER TO MINIMIZE THE POTENTIAL FOR A SPILL OF PETROLEUM PRODUCT OR HAZARDOUS MATERIALS TO COME IN CONTACT WITH STORM WAT_R, THE FOLLOWING STEPS WILL BE IMPLEMENTED. b. ALL MATERIALS WITH HAZARDOUS PROPERTIES WILL BE STORED IN A SECURE LOCATION, UNDER COVER, WHEN NOT IN USE. c. THE MINIMUM PRACTICAL QUAITITY OF ALL SUCH MATERIALS WILL BE KEPT ON THE JOB SITE AND SCHEDULED FOR DELIVERY AS CLOSE TO TIME (F USE AS PRACTICAL. d. A SPILL CONTROL AND CONTANMENT KIT WILL BE PROVIDED AT THE STORAGE SITE. e. ALL OF THE PRODUCT IN A CODTAINER WILL BE USED BEFORE THE CONTAINER IS DISPOSED OF. ALLSUCH CONTAINERS WILL BE TRIPLE FINSED, WITH WATER PRIOR TO DISPOSAL. THE RINSE WATER USED INTHESE CONTAINERS WILL BE DISPOSED OF IN A MANNER IN COMPLIANCE WITH STATE AND FEDERAL REGULATIONS AND WILL NOT BE ALLOWED TO MIX WITF STORM WATER DISCHARGES. f. ALL PRODUCTS WILL BE STORED IN AND USED FROM THE ORIGINAL CONTAINER WITH THE ORIGINAL 3RODUCT LABEL. g. ALL PRODUCTS WILL BE USED N STRICT COMPLIANCE WITH INSTRUCTIONS ON THE PRODUCT LABEL h. THE DISPOSAL OF EXCESS ORJSE 3D PRODUCTS WILL BE IN STRICT COMPLIANCE WITH INSTRUCTIONS ON THE PRODUCTS LABEL. ALLOWABLE NON STORMNATER DISCHARGES A. THE CONTRACTOR IS /UTHORIZED FOR THE FOLLOWING NON -STORM WATER DISCHARGES,'ROVIDED THE NON -STORM WATER COMPONENT CF THE DISCHARGE IS IN COMPLIANCE WITH THE CGP. a. DISCHARGES FROMFIRE FIGHTING ACTIVITIES. b. FIRE HYDRANT FLU;HINGS. c. WATER USED TO W/SH VEHICLES WHERE DETERGENTS ARE NOT USED. d. WATER USED TO CCNITROL DUST IN ACCORDANCE WITH THE CGP. e. POTABLE WATER IN'LUDING UNCONTAMINATED WATER LINE FLUSHINGS. f. ROUTINE EXTERNAL BUILDING WASH DOWN THAT DOES NOT USE DETERGENTS. g. PAVEMENT WASH WATERS WHERE SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE NOT OCCURRED AND WHERE DETERGEN-S ARE NOT USED. h. UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE. i. UNCONTAMINATED3ROUND WATER OR SPRING WATER j. FOUNDATION OR F(DTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS SUCH AS SOLVENTS. k. UNCONTAMINATED EXCAVATION DEWATERING. 9. CONSTRUCTION WASTE MATERIALS A. THE CONTRACTOR SHALL PREVENT THE DISCHARGE OF ALL BUILDING/CONSTRUCTION MATERIALS OR OTHER SIMILAR MATERIALS TO SURFACE WATERS OF THE STATE THROUGH THE USE OR ROLL -OFF CONTAINERS INTENDED FOR THE COLLECTION OF SUCHMATERIALS. ANY OTHER MEANS SHALL BE SUBMITTED BY THE OPERATOR AS AN AMENDMENT TO THE SWPPP AND APPROVED BY LOCAL GOVERNMENT PRIOR TO INITIATION. 10. SANITARY FACILITIES A. ALL PERSONNEL INVOIVED WITH CONSTRUCTION ACTIVITIES MUST COMPLY WITH STATE AN) LOCAL SANITARY OR SEPTIC SYSTEM REGUATIONS. TEMPORARY SANITARY FACILITIES WILL BE PROVIDED AT TF= SITE THROUGHOUT THE CONSTRUCTION PHASE. THEY MUST BE UTILIZED BY ALL CONSTRUCTION PERSONNEL AND VILL BE SERVICED BY A COMMERCIAL OPERAT)R. 14. BEST MANAGEMENT PRACTICE (BMR MAINTENANCE A. IF SITE INSPECTIONS IDENTIFY BMP'S THAT ARE NOT OPERATING EFFECTIVELY, THE CONTRACTOR SHA.L CONDUCT MAINTENANCE AS SOON AS PRACTICAL AND BEFORE THE NEXT STORM EVENT. B. IF SITE INSPECTIONS IDENTIFY A DEED, THE CONTRACTOR SHALL MODIFY BMP'S OR PROVIDE ADDITIONAL BMP'S AS NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR FDEP'S STANDARDS. IMPLMENTATION SHALL BE BEFORE THE NEXT STORM EVENT WHERE PRACTICAL. IF IMPLEMENTATION BEFORE THE NE)T STORM EVENT IS IMPRACTICAL, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMP'S MUSTBE IMPLEMENTED AS SOON AS PRACTICAL. 15. INSPECTIONS A. RESPONSIBILITY - THE CONTRAC-OR IS RESPONSIBLE FOR ALL INSPECTIONS. B. CONTRACTOR SHALL INSTALL A FAIN GAUGE ONSITE AND SHALL RECORD DAILY RAINFALL AMOUNTS. C. INSPECTION INTERVALS a. RAIN EVENT - THE CONTRACTCR SHALL INSPECT THE SIZE AND ALL BMP'S AFTER EVERY RAIN EVENTEXCEEDING 0.5 INCHES. b. WEEKLY - AFTER CONSTRUCTION BEGINS, THE CONTRACTOR SHALL INSPECT THE SITE AND ALL BMPS AT LEAST ONCE EVERY 7 DAYS. c. MONTHLY - AFTER TEMPORAW STABILIZATION IS COMPLETE, THE CONTRACTOR SHALL INSPECT THE SITE AND ALL BMP'S AT LEAST ONCE PER MCNTH. C. INSPECTION AREAS - INSPECTIONS SHALL INCLUDE: a. ALL AREAS OF THE SITE DISTURBED BY CONSTRUCTION ACTIVITY b. ALL AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION. D. INSPECTOR QUALIFICATION - INSPECTORS SHALL BE: a. A QUALIFIED INSPECTOR CERTFIED THROUGH A CONSTRUCTION SITE INSPECTOR COURSE APPROVED BY NCDENR. b. AN INDIVIDUAL WITH REGISTRATION EQUIVALENT TO THE SWPPP PREPARER. E. INSPECTORS SHALL INSPECT FOF: a. EVIDENCE/POTENTIAL OF POLLUTANTS ENTERING THE STORM WATER SYSTEM. b. PROPER OPERATION OF SEDIMENTATION AND EROSION CONTROL MEASURES BEST MANAGEMENT PRACTICES (BMP'S) c. DISCHARGE LOCATIONS TO MEASURE EFFECTIVENESS OF EROSION CONTROL MEASURES d. CONSTRUCTION ENTRANCES FOR EVIDENCE OF OFF -SITE SEDIMENT TRACKING 11. CONCRETE WASTE FROMCONCRETE READY -MIX TRUCKS A. DISCHARGE OF EXCES OR WASTE CONCRETE AND/OR WASH WATER FROM CONCRETE TRLCKS WILL TYPICALLY NOT BE ALLOWED ON THE COISTRUCTION SITE UNLESS PROPER MEASURES ARE TAKEN TO ENSURE A SPECIFIED AREA IS PERIODICALLY CLEANED AND ALL WASTE MATERIAL IS COMPLETELY REMOVED AT THE END OF CONSTRUCTION. PRIOR APPROVAL MAY BE REQUIRED. 12. FUEL TANKS A. TEMPORARY ON -SITE IUEL TANKS FOR CONSTRUCTION VEHICLES SHALL MEET ALL STATE AJD FEDERAL REGULATIONS. TANKS SHALL HAVE APROVED SPILL CONTAINMENT WITH THE CAPACITY REQUIRED BY THEAPPLICABLE REGULATIONS. THE TANKS SHALL BE IN SOUND CONDITION FREE OF RUST OR OTHER DAMAGE WHICH MIGH- COMPROMISE CONTAINMENT. FUEL !TORAGE AREAS WILL MEET ALL EPA, OSHA AND OTHER REGULATORYREQUIREMENTS FOR SIGNAGE, FIRE EXTINGASHER, ETC. HOSES, VALVES, FITTINGS, CAPS, FILLER NOZZLES, ANEASSOCIATED HARDWARE SHALL BE MAINTAINEDIN PROPER WORKING CONDITION AT ALL TIMES. B. A SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN MUST BE DEVELOPEDIF ABOVE GROUND OIL STORAGE CAPACITY A- THE CONSTRUCTION SIE EXCEEDS 1,320-GALLONS. CONTAINERS WI-H A STORAGE CAPACITY OF 55-GALLONS OR LESS ARE NOT INCLUDED WHEN CALCULATING SITE STORAGE CAPACITY. TFE GENERAL CONTRACTOR SHALL WORK WITH THE ENGINEER TO DEVELOP AND IMPLEMENT A SPCC PLAN IN ACCORDANCE WITH THE OIL POLLUTION PREVENTION REGULATION AT TITLE 40 OF THE CODE OF FEDERAL REGULATIONS, PART 112, 40 CFR 112). 17. ACTIVITY LOG A. THE CONTRACTOR SHALL RECORD AND MAINTAIN WITH THE SWPPP AN ACTIVITY LOG OF THE FOLLOWING: a. START DATES OF MAJOR GRADING ACTIVITIES b. TEMPORARY CEASE DATES OF PORTIONS OF THE SITE WHERE CONSTRUCTION HAS STOPPED FOR MORE TH/N 14 DAYS. c. START DATES WHEN STABILIZATION MEASURES ARE INITIATED. 18. RECORDS A. AFTER RECEIVING FINAL APPROVAL AND AFTER FINAL STABILIZATION IS COMPLETE, THE CONTRACTOR SHALL SJPPLY THE OWNER/OPERATOR WITH ALL SWPPP DOCUMENTATION. B. THE OWNER/OPERATOR SHALL MAINTAIN ALL SWPPP DOCUMENTATION FOR A PERIOD OF 3 YEARS FOLLOWING IINAL STABILIZATION. 19. SWPPP AMENDMENTS A. THE CONTRACTOR SHALL AMEND THE SWPPP IN ACCORDANCE WITH THE REQUIREMENTS OF THE CGP WHEN: a. THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE AT THE CONSTRUCTION SITE THAT WILL CAUSE OR HAVE THE POTENTIAL -O CAUSE OR CONTRIBUTE TO VIOLATIONS TO FDEP'S WATER QUALITA STANDARDS. b. INSPECTIONS BY SITE OR REGULATORY STAFF DETERMINE THAT THE SWPPP IS INEFFECTIVE. c. INSPECTIONS REQUIRED MODIFIED OR ADDITIONAL BMP'S. d. ALL SWPPP AMENDMENTS MUST BE IAVI THE CGP AND COMPLETE WITH 7 CALENDAR DAYS OF INSPECTION. B. ALL AMENDMENTS TO THE SWPPP MUST EE ACKNOWLEDGED BY CONTRACTORS AND SUBCONTRACTORS. 20. ADDITIONAL SWPPPS A. FOR ANY STORM DRAINAGE OR OTHER DISCHARGE NOT SPECIFICALLY INCLUDED IN THIS SWPPP, THE CONTRACTOR SHALL PREPARE, SUBMIT AND OBTAIN APPROVAL FOR A SEPARATE SWPPP TO COVER THE PROPOSED ACTIVITYPRIOR TO ENGAGING IN THE PROPOSED ACTIVIT'. THESE ACTIVITIES MAY INCLUDE BUT ARE NOT LIMITED TO DEDICATED ASPHALT PLANTS, DEDICATED CONCRETE PLANTS, ETC. B. THE CONTRACTOR SHALL ENSURE THAT ANY ADDITIONAL SWPPP'S DO NOT COMPROMISE OTHER RELATED SWFPP'S FOR THE PROJECT. 21. INDUSTRIAL DISCHARGES A. THIS SWPPP DOES NOT IN ANY WAY AUTHORIZE STORMWATER DISCHARGES FROM INDUSTRIAL ACTIVITY. 22. NOTICE OF TERMINATION (NOT) A. WITHIN 30 DAYS OF ACHIEVING FINAL STABILIZATION OF THE ENTIRE SITE, THE CONTRACTOR SHALL SUBMIT A PDTICE OF TERMINATION LAW THE CGP REQUIREMENTS. FINAL STABILIZATION IS DEFINED AS A MINIMUM OF 70% PERMANEPT COVER ON 100% OF THE SITE. 16. INSPECTION REPORTS A. WEEKLY INSPECTION REPORTS - THE CONTRACTOR SHALL DOCUMENT ALL INSPECTIONS WITH A REPORT. a. WEEKLY INSPECTION REPORT:ONTENTS - INSPECTION DATE INSPECTOR NAME INSPECTOR TITLE INSPECTOR QUALIFICATION WEATHER INFORMATION SLICE LAST INSPECTION OR SINCE CONSTRUCTION ACTIVITY STARTED: o ESTIMATED START TIME (F EACH STORM EVENT o ESTIMATED DURATION OF EACH STORM EVENT o ESTIMATED RAINFALL AM)UNT IN INCHES OF EACH STORM EVENT o DESCRIPTION OF DISCHARGES KNOWN TO OCCUR DESCRIPTION OF DISCHARGES OCCURRING AT TIME OF INSPECTION LOCATION(S) OF DISCHARGES OF SEDIMENT OR OTHER POLLUTANTS FROM THE SITE LOCATION(S) OF BMP'S THAF NEED MAINTENANCE LOCATION(S) OF BMP'S THAT FAILED TO OPERATE AS DESIGNED OR PROVED INADEQUATE FOR A'ARTICULAR LOCATION. LOCATION(S) WHERE ADDITIONAL BMP'S ARE NEEDED THAT DID NOT EXIST AT THE TIME OF INSPETION. CORRECTIVE ACTION REQUIRED INCLUDING ANY CHANGES TO THE SWPPP NECESSARY AND IMPLEMENTATION DATES. B. MONTHLY SITE INSPECTION REPCRT a. MONTHLY SITE INSPECTION REPORT CONTENTS - SUMMARY OF WEEKLY INSF_CTION REPORTS FOR THE MONTH. LISTING ALL DEFICIENCIES VITH: o DATE OF DISCOVERY o NAME, ADDRESS, TELEPFDNE NUMBER OF PARTY RESPONSIBLE FOR CORRECTIVE ACTION o STATEMENT WHETHER TFIS DEFICIENCY WAS PREVIOUSLY LISTED IN A MONTHLY REPORT o LISTING OF CORRECTIVE ACTIONS TAKEN WITH DATE. o STATEMENT ON WHETHEt SWPPP WAS UPDATED TO DEAL WITH DEFICIENCIES o COPY OF EACH INSPECTION REPORT CONDUCTED THAT MONTH AS AN APPENDIX. o CO-PERMITTEE AND NON CO-PERMITTEE CERTIFICATIONS AS APPENDICES (ONE ORIGINAL ANDONE COPY) THE CONTRACTOR SHALL PREPARE AND SUBMIT MONTHLY REPORTS (ORIGINAL & ONE COPY) TO:DEP AND, IF APPLICABLE, THE APPROPRATE MS4 ON OR BEFORE THE 28TH DAY OF THE MONTH FOLLOWING TiE REPORTING PERIOD. THE CONTRACTOR SHALL SJBMIT THE FIRST MONTHLY REPORT TO DHEC AFTER CONSTRUCTION BEGINS ON THE FACILITY AND SHALL INCLUIE THE ORIGINAL AND ONE COPY OF ALL CO-PERMITTEE AND NON-CO�ERMITTEE CERTIFICATIONS. THE CONTRACTOR SHALL RCLUDE IN SUBSEQUENT MONTHLY REPORTS ADDED CO-PERMITTEE CERTIFICATIONS SINCE THE FIRST MONTHLYREPORT. THE CONTRACTOR MAY ES-ABLISH ELECTRONIC METHODS OF MONTHLY REPORTING WITH FDEP AS APPROVED BY FDEP ON A CASE BY CASE EASIS. UNTIL CONSTRUCTION STATTS, THE CONTRACTOR SHALL REPORT THAT CONSTRUCTION ACTIVIT' HAS NOT STARTED. THE CONTRACTOR SHALL SIBMIT MONTHLY REPORTS UNTIL THE NOTICE OF TERMINATION IS SUEMITTED TO FDEP. C. INSPECTION REPORT RECORDS a. ALL INSPECTION REPORTS SH/LL BE ADDED TO THE SWPPP AND MAINTAINED IN ACCORDANCE WITHRECORD REQUIREMENTS. b. ONCE A DEFINABLE AREA HAS SEEN FINALLY STABILIZED, THE CONTRACTOR SHALL MARK THIS ON THE SWPPP AND NO FURTHER SWPPP OR INSPECTDN REQUIREMENTS APPLY TO THAT PART OF THE SITE. ISSUED STAMP tN I CAR��//� 0�'F ..... obi 2: O O •2� S AL -7 — 0 = • G/NE����\�� WEStti���'y/�?l 0 0 N w w? o Q N F } m m rc w J ❑ ❑ m m O FL U i m O z a¢ m J } co W W zl9 z y'� « `a g m Z= x W Q R W m ul N N ❑ ❑ N LL U f� ry cz V zg i U 0' W Z w OW U Z F- O J JZ (D U J Z 2C� W- LLI d J z m W W Z 0 >>O > Z LL Q U 0 L>LI Q O Of U >O w w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` POSSIBLE AND BEFORE THE NEXT STORM EVENT WHENEVER PRACTCABLE. 3. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL ERO:ION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED AND STABILIZED WITH GR/SSING IMMEDIATELY AFTER THE UTILITY IISTALLATION. FILL, COVER AND TEMPORARY SEEDING AT THE END OFEACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO FEMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 4. ALL EROSION CONTROL DEVICES 8"IALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUC-ION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. AEDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE3EDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 5. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE C=NERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/:OIL FROM PAVEMENT, AS MAY BE REQUIRED. I 6. TEMPORARY DIVERSION BERMS ADD/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT C WORK AREAS FROM UPSLOPE RUNDFF AND/OR TO DIVERT SEDIMENT LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 7. ALL WATERS OF THE STATE, INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MAR[ED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TCBE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MANTAINED BETWEEN THE DISTURBED AREA AND ALL WATERS OF THE STATE. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WATERS OF THE STATE. 8. LITTER, CONSTRUCTION DEBRIS, CLS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FDR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. PERMANENT STORMW.NTER MANAGEMENT MAINTENANCE PLAID 1. PRIOR TO FINAL ACCEPTANCE, MANTENANCE OF ALL PERMANENT STORMWATER MANAGEMENT STRUCTJRES IS THE RESPONSIBILITY OF THE CONTRAQOR. 2. EXCEPT AS OTHERWISE CONTRAC-ED OR AS SPECIFIED FOR WARRANTY, MAINTENANCE OF ALL PERMAPENT STORMWATER MANAGEMENT STRUCTURES AFTER FINAL ACCEPTANCE IS THE RESPONSIBILITY OF THE OWNER. 3. IN ADDITION TO MAINTENANCE REQUIRED DURING CONSTRUCTION AS INDICATED AND SPECIFIED ELSEWiERE, PERMANENT STORMWATER MANAGEMENT STRLCTURE MAINTENANCE SHALL MEET THE FOLLOWING MINIMUM REQUIFEMENTS SO AS TO PREVENT EROSION BY WIND OR PFECIPITATION: A. VEGETATED AREAS (TURF/PLNNTING BEDS/PLANTS/TREES/SHRUBBERY) a. ALL VEGETATED AREAS SEALL BE PROPERLY MAINTAINED BY MOWING, PRUNING, WATERING, FERTILIZING AND AS OTHERWISE REQUIRED TC MAINTAIN FULL AND HEALTHY VEGETATION. b. ALL PLANTING BEDS WITH MULCH SHALL BE PROPERLY MAINTAINED BY THE REPLACEMENT OF KULCH AS OTHERWISE REQUIRED TC MAINTAIN COMPLETE COVERAGE OF THE BED(S). c. AREAS OF PLANTS THAT DE OR SUBSIDE SHALL BE REPLACED AS NEEDED. d. VEGETATED AREAS SHALLEF REGULARLY CLEkNEU OF LITTER, DEBRIS AND OTHER REFUSE THAT MAY POLLUTE SURROUNDING PONDS, INRASTRUCTURE OR NATURAL AREAS. B e. INSPECTION AND CLEANIN3 INTERVALS SHALL MATCH MOWING INTERVALS BUT SHALL NOT EXCEED ONCE PER MONTH. B. PAVEMENTS/IMPERVIOUS SURFACES a. ALL PAVEMENT DISTRESSES SUCH AS POTHOLES, CRACKING OR OTHER FAILURE SHALL BE PATCHED TO PREVENT EROSION OF UNDERLYINGSOILS. b. EXCESSIVE PETROLEUM PRODUCE BUILDUP OR OTHER CHEMICAL BUILDUP OR SPILL SHALL BE GLEANED TO PREVENT MIGRATION TO 9.)RROUNDING WATER BODIES OR STORM DRAINAGE SYSTEMS. c. PAVED AREAS SHALL BE IGULARLY CLEANED OF LITTER, DEBRIS AND OTHER REFUSE THAT MAY POLLUTE SURROUND PONDS, INFRP3TRUCTURE OR NATURAL AREAS. d. INSPECTION AND CLEANING INTERVALS SHALL MATCH MOWING INTERVALS BUT SHALL NOT EXCEED ONCE PER MONTH. C. STORM DRAINAGE STRUCTURES & PIPING a. ALL STORM DRAINAGE STFUCTURES (CATCH BASINS, CURB INLETS, MANHOLES, FLUMES, JUNCTON BOXES, ETC..) AND PIPING SHALL BE VISIALLY INSPECTED REGULARLY CLEANED OF LITTER, DEBRIS, SEDIMENT AND OTHER REFUSE THAT MAY POLLU"E SURROUND PONDS, INFRASTRUCTURE OR NATURAL AREAS. INSPETION SHALL INCLUDE BASIN OUTFALL ;TRUCTURE PIPING TO ENSURE IT IS CLEAR OF DEBRIS OR SEDIMENT AND FUNCTIONING PROPERLY. b. EXCESSIVE BUILDUP OF SEDIMENT OR NOTICEABLE DECREASE IN FLOW MAY INDICATE A BLOCKAGE OR PIPE FAILURE. IN THIS CASE, INSPECT FULL LENGTHS OF PIPE RUNS FOR FAILURE OR BLOCKAGE ANDCLEAN OR REPAIR ACCORDINGLY. G. INSPECTION AND CLEANIN3 INTERVALS SHALL NOT EXCEED ONCE PER YEAR. D. SLOPES a. SLOPES OR BANKS SHALL3E INSPECTED, MAINTAINED AND REPAIRED AS NOTED FOR THE SURFACE TYPE NOTED ABOVE. E. INFILTRATION BASINS a. OUTLET STRUCTURES AN[ PIES SHALL BE KEPT CLEAN, FREE FROM OBSTRUCTIONS AND IN GOOD WORKING ORDER AT ALL TIMES. b. REMOVE ALL LITTER AND DEBRIS AND OTHER REFUSE THAT MAY POLLUTE SURROUNDING PONDS, INFRASTRUCTURE, OR NA-URAL AREAS OR THAT MAY PREVENT OUTLET STRUCTURES FROM FUNCTIONING PROPERLY. c. MAINTAIN INFILTRATION BASIN PERIMETERS, INCLUDING SIDE SLOPES, BERMS AND SURROUNDIG AREAS AS A SPECIFIED ABOVE FOR VEGETATED AREAS AND PAVEMENTS. d. MAINTAIN BOTTOMS IN KEEPING WITH THE SAND MATERIAL SPECIFIED FOR THE INFILTRATION B/SIN BOTTOMS. e. REMOVE SEDIMENT BUILDIPS FORM INFILTRATION BASIN BOTTOMS AS NECESSARY. f. INSPECTION AND CLEANING INTERVALS SHALL NOT EXCEED ONCE PER MONTH. F. DISCHARGE POINTS & ENERGY DISSIPATERS a. VEGETATED DISCHARGE LDCATIONS SHALL BE MAINTAINED WITH HEALTHY VEGETATION AS NOTED ABOVE FOR TURF. b. ENERGY DISSIPATERS SHALL BE REPAIRED WHEN NEEDED. c. DISCHARGE POINTS AND ENERGY DISSIPATERS SHALL BE REGULARLY CLEANED OF LITTER, DEBRIS AND OTHER REFUSE THAT MAY POLLU"E SURROUND PONDS, INFRASTRUCTURE OR NATURAL AREAS. d. INSPECTION, CLEANING, AND REPAIR INTERVALS SHALL NOT EXCEED ONCE PER YEAR. NCDNER LAND QUALITY SELF -INSPECTION REQUIREMENTS 1. EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTION LAND -DISTURBING ACTIVITIES LARGER THAN 1 ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING. 2. ALL OF THE EROSION AND SEDIMENTATION CONTROL MEASURES, INCLUDING SEDIMENTATION CONTROL BASINS, SEDIMENTATION TRAPS, SEDIMENTATION POADS, ROCK DAMS, TEMPORARY DIVERSIONS, TEMPORARY SLOPE DRANS, ROCK CHECK DAMS, SEDIMENT FENCE OR BARRIERS, ALL FORMS OF INLET PROTECTION, STORM DRAINAGE FACILITIES, ENERGY DISSIPATERS, AND STABLIZATION METHODS OF OPEN CHANNELS MUST BE INSPECTED. 3. TEMPORARY OR PERMANENT GROUND COVER MUST BE PROVIDED ON EXPOSED GRADED SLOPES AND FILLS WITHN 7 CALENDAR DAYS OF THE COMPLETION OF A PHASE OF GRADING. PERMANENT GROUND COVER MUST BE PROVIDED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (60 DAYS IN HQW ZONES), WHICHEVER TERM IS SHORTER, UPON THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 4. ACTUAL DIMENSIONS OF THE SEDIMENTATICNI CONTROL BASINS HAVE TO BE CHECKED, USUALLY WITH A TAPE MEASURE, AND COMPARED TO THE DIMENSICNS OF THE APPROVED PLAN. S. IF T4iE APPROVED EROSION AND SEDIMENTff`lQ d PLAN CAS S480T BE FOLLOWED, A REVISED PLA48 SBOULO SE SUBMITTED FOR REVIEW. A SIGNIFICANT DEVIATION MEANS AN OMISSION, ALTERATION OR RELOCATION OF AN EROSION OR SEDIMENTATION CONTROL MEASURE THAT PREVENTS THE MEASURE FROM PERFORMING AS INTENDED. 6. SELF INSPECTION REPORTS A. A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1" IS AVAILABLE FOR USE AT: hftp://www.d lr.enr.state. nc.us/pages/Sedimeit%20-°/u2OSelf-Inspection°/n2020100910/New%2OSelf%2Olnspection°/u20FAQ.)df. IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL SPREADSHEET. B. AN ALTERNATE IS TO MAKE NOTATIONSON THE COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE FROJECT SITE. RULE 15A NCAC 04B.0131 STATES THAT "... DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWI ON A COPY OF THE APPROVED EROSIOJ AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING MD SIGNING AN INSPECTION REPORT THATLISTS EACH MEASURE, PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATON CONTROL PLAN." C. REPORTS ARE TO BE COMPLETED AFTER EACH PHASE OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS COMPLETE AS FOLLOWS: a. INSTALLATION OF PERIMETER EROSDN AND SEDIMENT CONTROL MEASURES; b. CLEARING AND GRUBBING OF EXISTIJG GROUND COVER; c. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS; d. INSTALLATION OF STORM DRAINAGEFACILITIES; e. COMPLETION OF CONSTRUCTION OR DEVELOPMENT; f. ESTABLISHMENT OF PERMANENT GFRJUND COVER SUFFICIENT TO RESTRAIN EROSION. D. THE RECORDS MUST BE MADE AVAILAB_ TO THE EROSION CONTROL INSPECTOR AT THE SITE. ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE CN THE SITE. ANY tt LSPECTLON REPORTS EKAL.L ALSO BE MADE AVA4LABLE ON TKE StTE. ANTICIPATED CONSTRUCTION SCHEDULE 2014 12015 CONSTRUCTION ACTIVITY NCDENR LAND QUALITY SECTION EROSION AND SEDIMENTATION CONTROL PLAN APPLICATION CHECKLIST EROSION &SEDIMENTATION CONTROL PLAN APPLICAION CHECKLIST THE FOLLOWING ITEMS SHALL BE INCORPORATED WIl-I RESPECT TO SPECIFIC SITE CONDITIONS, IN AN EROSION & SEDIMEPT CONTROL PLAN: "X" DENOTES TASK HAS BEEN COMPLETED AS SHOWI ON DRAWINGS. LOCATION INFORMATION X PROJECT LOCATION (ROADS, STREETS, LANLVIARKS) X NORTH ARROW AND SCALE GENERAL SITE FEATURES (PLAN ELEMENTS) X LEGEND: NORTH ARROW, SCALE, ETC. X PROPERTY LINES X EXISTING CONTOURS (TOPOGRAPHIC LINES) X PROPOSED CONTOURS X LIMITS OF DISTURBED AREA (PROVIDE ACRE\GE TOTAL, DELINEATE LIMITS, AND LABEL) X PLANNED AND EXISTING BUILDING LOCATIONS AND ELEVATIONS X PLANNED &EXISTING ROAD LOCATIONS &ELEVATIONS X LOT AND/OR BUILDING NUMBERS X GEOLOGIC FEATURES: ROCK OUTCROPS, SUPS, SPRINGS, WETLAND AND THEIR LIMITS, STREAMS, LAKES, PONDS DAMS, ETC. N A EASEMENTS AND DRAINAGEWAYS N A PROFILES OF STREETS, UTILITIES, DITCHLIN6, ETC. X STOCKPILED TOPSOIL OR SUBSOIL LOCATIONS IF THE SAME PERSON CONDUCTS THE LAND -DISTURBING ACTIVITY &ANY RELATED BORROW OR WASTE ACTIVITY, "HE RELATED BORROW OR WASTE ACTIVITY SHALL CONSTI-UTE PART OF THE LAND -DISTURBING ACTIVITY UNLESS THE BORROWOR WASTE ACTIVITY ISREGULATED UNDER THE MINING ACT OF 191, OR IS A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE N4NAGEMENT. IF THE LAND -DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY ARE NOT CONDUCTED BY THESAME PERSON,THEY SHALL BE CONSIDERED SEPARATE LAND-DIS"URGING ACTIVITIES AND MUST BE PERMITTED EITHER THRU THE SEDMENTATION POLLUTION CONTROL ACT AS A ONE -USE BORROW SITE OR THROUGH THE MINING ACT. STREAM DISTURBANCE OVER 150 LINEAR FEET MAY REQUIRE 401 WATER QUALITY CERTIFICATION VIA THE DIVISIOD OF WATER QUALITY EROSION CONTROL MEASURES (ON PLAN) X LEGEND X LOCATION OF TEMPORARY MEASURES X LOCATION OF PERMANENT MEASURES x_ CONSTRUCTION DRAWINGS AND DETAILS FOR TEMPORARY AND PERMANENT MEASURES X MAINTENANCE REQUIREMENTS OF MEASURES CONTACT PERSON RESPONSIBLE FOR MAINT=NANCE X EXISTING AND PLANNED DRAINAGE PATTERNS (INCLUDE OFF -SITE AREAS THAT DRAIN THROUGH PROJECT) X METHOD OF DETERMINATION OF AND CALCULATIONS FOR ACREAGE OF LAND BEING DISTURBED X SIZE AND LOCATION OF CULVERTS AND SEWERS X SOIL INFORMATION: TYPE, SPECIAL CHARAC"ERISTICS X SOIL INFORMATION BELOW CULVERT STORMDUTLETS X NAME AND CLASSIFICATION OF RECEIVING WATER COURSE OR NAME OF MUNICIPAL OPERATOR (ONLY WHERE STORMWATER DISCHARGES ARE TO OCCUR) STORMWATER CALCULATIONS X PRE -CONSTRUCTION RUNOFF CALCULATION: FOR EACH OUTLET FROM THE SITE (AT PEAK DISCHARGE POINTS) X DESIGN CALCULATIONS FOR PEAK DISCHAR(ES OF RUNOFF (INCLUDING THE CONSTRUCTION PHASE &THE FINAL EUNOFF COEFFICIENTS OF THE SITE) X DESIGN CALCS OF CULVERTS AND STORM S5NERS x_ DISCHARGE AND VELOCITY CALCULATIONS F)R OPEN CHANNEL AND DITCH FLOWS (EASEMENT &RIGHT-OF-WAYS) X DESIGN CALCS OF CROSS SECTIONS AND METHOD OF STABILIZATION OF EXISTING AND PLANNED CHANNELS (INCLUDE TEMPORARY LININGS) X DESIGN CALCS AND CONSTRUCTION DETAILEOF ENERGY DISSIPATERS BELOW CULVERT AND STORM SEWER OUTLETS (DIAMETERS & APRON DIMENSIONS) X DESIGN CALCS AND DIMENSION OF SEDIMEN" BASINS X SURFACE AREA AND SETTLING EFFICIENCY IPFORMATION FOR PROPOSED SEDIMENT TRAPS AND/OR BASINS VEGETATIVE STABILIZATION X AREA &ACREAGE TO BE VEGETATIVELY STAEILIZED X METHOD OF SOIL PREPARATION X SEED TYPE &RATES (TEMPORARY &PERMANENT) X FERTILIZER TYPE AND RASES X MULCH TYPE AND RATES NOTE: PLAN SHOULD INCLUDE PROVISIONS FOR GRDUNDCOVER ON EXPOSED SLOPES WITHIN 15 WORKING DAYS OR 30 CALENDAR DAYS (WHICHEVER IS SHORTER), FOLLOWING COMPLETION OF ANY PHASE OF GRADING; PERMANENT GROUNDCOVER FCR ALL CONSTRUCTION OR DEVELOPMENT. FINANCIAL RESPONSIBILITY/OWNERSHIP FORM X _ COMPLETED, SIGNED &NOTARIZED FR/O FORM X ACCURATE APPLICATION FEE ($50.00 PER ACRE ROUNDED UP THE NEXT ACRE WITH NO CEILING AMOUNT) X CERTIFICATE OF ASSUMED NAME, IF THE OWJER IS A PARTNERSHIP X NAME OF REGISTERED AGENT (IF APPLICABLE) N/A COPY OF THE MOST CURRENT DEED FOR THE SITE NOTE: FOR THE EXPRESS PERMITTING OPTION, INQJIRE AT THE LOCAL REGIONAL OFFICE FOR AVAILABILITY. NARRATIVE AND CONSTRUCTION SEQUENCE CAR X NARRATIVE DESCRIBING THE NATURE &PURPOSE OF THE CONSTRUCTION ACTIVITY X CONSTRUCTION SEQUENCE RELATED TO EROSION AND SEDIMENT CONTROL (INCLUDING INSTALLATION OF CRITICAL MEASURES PRIOR TO THE INITIATION OF THE LAND-DISTURBINC ACTIVITY &REMOVAL OF MEASURES AFTER AREAS THEY SERVE ARE:IERMANENTLY STABILIZED BID SPECIFICATIONS RELATED ONLY TO EROSION CONTROL ISSUED STAMP Ssjo.��ti i :a SAL — 0 i 'i��: •C'. I NE�. •a��'�� ///ili1A\ a 0 N N w lii � o a N O w •- a w m � m N U W O oN m as r W > w w z t9 z Q� A 0� 3� �N z= 05 W QQ K U� J m wx NiV O � N LL U NN z oJ s w� z Qi�Mrz x�1 i ❑3 u � i' W H U °6 O J Q Z Z � Q � W H 0 O 2 O o Q a_ LLQ (nz) QJ wo d � w � 0j W w SHEET NUMBER CE-003 LL SHEET 13 of 85MINIM 0 2 3 5 I�. N.T.S. � /o" Dona ,c 1vn JOINT SEALANT SEE ENLARGED DETAIL -A c JONT DE?, JUNCTION BETWEEN NEW CONCRETE AND EXISTING GRCUND DETAIL SCALE: N.T.S C CONCRETE PAVEMENT (4000 PSI) SEE ENLARGED JOINT SEALANT DETAIL-B DOWEL -ONE END PAINTED AND OILED-3l4"DIA. STEEL BAR 16" LONG SPACED @ IT O.C. e a a tl A • E CONSTRUCTION JOINT DETAIL SCALE: N.T.S NEW CONCRETE PAVEMENT NEW BITUMINOUS SURFACE COURSE (HOT PLANT MIX) e'< TACK COAT JUNCTION BETWEEN NEW CONCRETE AND NEW ASPHALT PAVEMENT DETAIL SCALE: N.T.S. BASE COURSE, SUBGRADE COMPACTED TO MIN. 95% MOD. PROCTOR TYPICAL CONCRETE PAVING SECTION 11 SCALE N.T.S. FOR PAVEMENT MARKINGS SEE NOTE 1/CS100 N 'MAT W► TYPE SF-9.5B _ SURF. COURSE COMPACT TO 909 AGGREGATE BASE COURSE, NCDOT COMPACT PER AASHTO T 180 PAVEMENT AND COMPACTION REQUIREMENTS (STANDARD DUTY) RPE SF45C FOR PAVEMENT MARKINGS 1 SURF. OUR SEE NOTE 1/CS100 COMPACT ETO 90% N SUBGRADE COMPACTD TO MIN. 95% MOD. ROCTOR AGGREGATE BASE COURSE NCDOT 520. COMPACT PER AASHTO T 180 R_EXIBLE PAVEMENT AND rT�COMPACTION REOUIREMENTS (HEAVY DUTY) JOINT SEALAIT NEW CONCRE PAVEMENT /2" SAW CUT /4" BLOCKING MEDIUM A rPICAL ENLARGED DETAIL —A C501 SCAL: N.T.S. ROUNDEE 6" DIA. CONC. FILED SCH 80 GALVANIZE) STEEL PIPE PAINTD YELLOW 30# ROOFING FELT — WRAPPED AROUND TOF6' TOP OF CONCRETE Im PIPE (ALT. ®9"J) JOINT SEALANT NEW CONCRETE PAVEMENT GENERA_ NOTES FOR CONCRETE PAVING: 2" 1. MAY BEPLACED AS "PLAIN CONCRETE PAVEMENT" WITH NO REINFORCING 4" STEEL ORREINFORCING STEEL USED AT JOINTS. BACKER MATERIAL 2• CONSTRUCTION JOINTS AND OTHER DETAILS SHOWN THIS SHEET SHOULD BE 3/4"" MIN. NON IN ACCORDANCE WITH GUIDELINES PROVIDED BY THE PORTLAND CEMEIIT EXTRUDING JOINT ASSOCIATON AND THE AMERICAN CONCRETE INSTITUTE AND THEY SHCJLD BE FILLER UTILIZED ;HOULD ANY DISCREPANCY ARISE DURING CONSTRUCTION. j BUILDING TYPICAL ENLARGED DETAIL—B C 501 SCALE: N.T.S. SEE ENLARGED JOINT SEALANT DETAIL -El DOWEL -ONE END RINTED AND OILED-314" DIP STEEL BAR 16" LONG SPACED @ 12" O.C. a 314" NON EXTRUDING DANSION JOINT DETAIL, (EJ) AS NEEDED DURING CONSTRUCTION I_ r" 24. BOLLARD DETAIL C�01 SCALE N.T.S. K�9 Fl11/1"RADIUS, TYP. F6"X6"-W2.9XW2.9WWF IL: 71 12" COLORS: - BLUE ®BACKGROUND LETTERING - WHITE BORDER - WHITE RESERVED PARKING REQUIRED o . FOR VAN I VAN IACCESSIBLEJJ ACCESSIBLE SPACES ONLY io GALVANIZED METAL POST (TYP.) FINISHED GROUND LEVEL (SEE LEGEND BLOW) LEGEND: 0 CONCRETE PAVEMENT SLB, 4,000 PSI COMP./ ® COMPACTED AGGREGATE IASE - CABC STONE, 95% MIN. DENSITY (MOD. PROCT.) ® COMPACTED SUBGRADE -95% MIN. DENSITY (MOD. PROCT.) COMPACTED EARTH FILL- 90% MIN. DENSITY (MOD. PROCT.) 1 DUMPFER PAD AREA C501 SCALE: N.T.S. D 1 HANDICAP SIGN (R7-8) C501 CALF: N.T.S. IEW ASPHALT PARKING AREA TACK COAT- 12" WIDE (MIN.) 5 0 z_ m m SEE ENLARGED DETAIL-B d I CONCRETE PAVEMEN (4000 PSI) 3/4" NON EXTRUDING JOINT FILLER NEW BUILDING NEW CONCRETE SIDEWALK (THICKENED TO 6" AT BUILDING) 'ANSION JOINT DETAIL (ADJACENT TO BUILDING) N.T.S. BACK OF CURB (W) TYP. CONCRETE (4000 PS4) 1/2 EXPANSION JOINT 1/2" EXPANSION JOINT--j (NF) CONTRACTION JOINTS (TYP.) (TYP.) 3 \STANDARD JOINT LAYOUT FOR CONCRETE SIDEWALK (SCALE: N.T.S. GENERAL NOTES FOR CONCRETE SIDEWALKS: 1. NON -VEHICULAR SIDEWALKS SHALL HAVE A MINIMUM THICKNESS OF 4" THICK. 2. CONTRACTION JOINTS SHALL BE FORMED (OR SAWCUT) TCA DEPTH EQUAL TO 1/4 OF THE THICKNESS OF THE SIDEWALK AND EDGED WITH "/8" RADIUS. 3. 1/2" EXPANSION JOINT MATERIAL SHALL BE PROVIDED AT INTERVALS NOT TO EXCEED 120 FEET AND WHERE WALKS ABUT OTHER CONCRE E STRUCTURES, EXCLUDING WALKS LAID PARALLEL AND ABUTTING THE CURB AND GUTTER. 4. TRANSVERSE SLOPES ON SIDEWALKS SHALL BE 1/4 " PER Fr. WHERE POSSIBLE. 5. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI. ISHED TRADE c�! COMPACTED SUB-GRADE- 12"x6" CONCRETE EDGE (4000 PSI) Z4" GRADED AGREGATE BASE DOTE: 1SE 8" WIDE CONCRETE FOR ENTIRE EDGE OF ASPHALT AREA EXCEPT THE NEW DAWN DRIVE EDGE AS NOTED. CONCRETE EDGE DETAIL C501 SCALE: N.T.S. ISSUED STAMP CA /o :a S L $fs � e o N W N lil � O O ❑� w� a �a } m 3 rc w J Y O m N 0 FL v Y m O Zn w °w a¢ S w m c� ci z 0 zz x u� E V„ ZNU�3 C�1 �ZB�� z m u -' W W U QU w m2 13� U' O Q In Y SQ L J N SHEET NUMBER C-501 ,SHEET 17 OF 85 , r^. 3 0 C I� 0 PLAN �- A" -j- a qo tO 14'-6" 41-05' 0" `� " WWF 6"x6" - W4xW4 11 (4 GAGE) TYP II o SLOPE N AS II 0.50% MIN. REQ'D - - -+_- - - _ _ _ OUTFALL 1 x x x x .o DETENTION POND / + INVERT ELEVATION 6" SEE EROSION CONTROL PLAN FOR OUTLET 331.20 STABILIZATION REQ7S P PROFILE POND BOTTOM EDGE OF "V-NOTCH" TO BE BEVELED AT 45' 3'-6" 2'-6" EDGE OF "V-NOTCH" 333.30 TO BE BEVELED AT 45" WWF 4"x4"-W4xW4 (4 GAGE) TYP 112" THICK STEEL PLATE I. II iiu FLOW (PAINTED WHITE) _ I II 6" fl 3000 PSI L 4 I CONCRETE PLATE TO BE EMBEDED 2" 1T6T0 CONCRETE (T`(P) INVERT ELEVATION #5's @ 6" O.C.- EACH WAY uNa o� V #5's @ 6" O.C.- EACH WAY 18" RCP BEYOND 331.20 SEC'nON A -A I.E. O' BOX: (SEE 1 DISCHARGE FLUME DETAIL C504 SCALE: N.T.S. 6" 1 2'-6" 1 6" STEPS1 x (TYF l � / v (TYP) 0 - L DRLL 2" DIAM. 15" LAP 0 HOES IN BOTTOM (TYP) io `- ORNLET BASIN SECTION "A" -"A" AREA INLET (AD C504 SCALE: N.T.S. X-6" USE NFENAH FOUNDRY DUCTIG IRON, HEAVY DUTY (PATE & FRAME I I OR EQIIVALENT. 0 0 O O N cJ II II �i I NOTES: 1. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIV= STRENGTH OF 3000 PSI AT 28 DAYS (CLASS "A'). 2. ALL REINFORCING SHALL BE GRADE 60 DEFORMED BARS, AND SHALL CONFORM TO THE REQ'TS OF THE STANDAR) SPECIFICATIONS FOR BILLET STEEL (ASTM A-15), WITH DEFORMATIONS CONFORMING TO ASTM A-305. 1" DIAM.IOLE DRILLEETHRU BOTTONOF BASIN O FOR INFILTRATION (9-TOTA.) 0 0 9„ 11BOXYy HOLE PATERN TO BE ADJUSTEI AS NEEDED 2, 6„ TO AVOID30X REINFORIFMENT STEEL BOTTOM PROVIDE LIGHT DUTY CAST IRON FRAME AND SOLID LID NEENAH CAT. NO. R-1458-BD (OR EQUAL) ORIFICE'S THRU B FRONT OF BOX B I(SEE SECTION'B-B') I TOP VIEW -TOP OF LID 1 ELEV: 332.75 ORIFICE THFU BOX ORIFICE THRU BOX --�- (SEE SECTION -B-B-) #5's @ 12" O.C.- EACH WAY #5's@8"0 EACH WAY NOTES #5's @ 12" O.C. (VERTICAL) 1 -#5 IN BETWEEN OPENINGS (HORIZONTAL) STEPS " 145 %I(TYP) 00, " STEPS TO BE LOCATED ON SOLID WALL SIDE OF BOX. NOT ON SAME WALL AS ORIFICE OR PIPE EXIT. PROVIDE 24"DIAM. 6 SOLID LID -#4 BARS @ 4" O.C. EACH WAY `ild L SLOPE BOTTOII W1 15" LAP U GROUT AS NEE)ED (TYP) Cn " TO DRAIN 4'-6- SECTION "A" -"A" 6" TALL X 30'WIDE INV: 331.75 1. ALL CONCRETE SHALL BE CLASS "A" AND SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH TRASH SCREEN RACK REQ'D OF 3000 PSI IN 28 DAYS. (1" NG:MAX. IN EACH DIRECTION) 2. REINFORCING SHALL BE INTERMEDIATE GRADE (GRA)E 60) DEFORMED BARS AND SHALL CONFORM TO THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS ORIFICE THRI BOX FOR BILLET STEEL CONCRETE REINFORCEMENT 6" TALL X 15"NIDE WRS, ASTM A 45 AAIO DEFORMATIONS CQNFOROAING INV: 330.75 TO ASTM A-305 FRONT VIEW (SECTION 'B-B') 3. STEPS ARE REQUIRED ON ALL INLET BOXES WHEN DIMENSION FROM BOTTOM SLAB FLOW LINE TO TOP OF TOP SLAB IS GREATER THAN 4'-0". 4. WHEN BRICK CONSTRUCTION IS USED, WALLS SHALLBE 8" BRICK WHEN H < 5', USE 12' BRICK WHEN H > 5% WITI 112" THICK MORTAR ON BOTH SIDES. WEIR BOX DETAIL C504 SCALE: N.T.S. FOR CO: 1' 0" SECTION OF PIPE MAY BE CAST IN HEADWALL 3 C I �I I I UPK� I \G POINTS H - - - - - - - - - - - - - - - - F PLAN VARIABLE DIMENSIONS (CON(RETE PIPE) CU. YDS. CONC. INSIDE DIA PIPE AREA PIPE OPENING 4 B C D E F G H WT gA AREA 0.43 15" 1.23 S4, 2'-4" 3'-4 1/2" 1'-3 5 16" 1'-5" 4'-10" 2'-0" 1'-0 1 4" 1753 8.3C 0.43 18" 1.76 3'-5" 2'-4" 3'-4 1/2" 2'-0" 1'-5" 4'-10" 2'-0" 1'-0 1 4" 1753 8.3C 0.50 21 2.40 3'-b 1/2" 2'-6" 3-8 2'-3 2'-3 1/2" 1'-6" 5'-3 1/2" 2'-1 1/2" 1'-0 7 8" 2020 9.4C 0.51 24" 3.14 4'-0" 2'-9" 3'-11" 2'-7" 1'-8" 6'-11" 2'-4 112 1'-1 3 4" 2383 11.E0 0.79 30" 4.91 4'-6 1 2" 3'-1" 4'-5 1/2" 3'-1 1/2" 2'-0" 7'-1 1/2" 2'-10" 1'-3 7 8" 3182 15.10 1.00 36" 7.07 1 5'- " S-5" 5'-0" S-8" 2'-4" 8'-4" 3'-3 1/2" 1'-6" 4089 19.m BAR J BAR L 1. ALL CONCRETE SHALL BE 4000 PSI REINF. STEEL SHALL BE 112"0 OF INTERMEDIATI GRADE - PLACE REINF. 2 MIN. CL. CHAMFER ALL EXPOSED EDGES 3/4" 2. REINF. CONCRETE PIPE SHALL BE GROUTED IN PLACE C fi 1A SECTION C-C C SJ E L D TRASH SCREEN RACY OVER( ORIFICE THRU BOX I.E.: 331.75 ORIFICE THRU BOX I.E.: 330.75 BAR C SECTION A -A FRONT ELEVATION �i Ir 3" CL SECTION "B-B" BAR D BAR A BAR B AT PIPE BAR B 45°�\ TYPE 1 TYPE 2 BARS C,D,E,G,J,L 3ARS A,B u TYPE 4 TYPE 5 BAR F BAR K u TYPE BAR H BAR REINF DETAILS REINF STEEL TO BE 1/2" 0 BARS ---- COMPACTED SUBGRADE D C MINIMUM 95% STD. PROCTOR D SIDE ELEVATION BAR D BAR E BAR I BAR D BARS H BAR F 2-1/2" CL X. J BAR G SECTION B-B CAST IN -PLACE CONCRETE FEADWALL DETAILS N.T.S. SECTION D-D ISSUED STAMP a L = 3 94 G) kWE S, 111 0 N vi w r O �a w m ; >m � ° ❑ 0 > m" N o N a w J m w m W m 0 a a Y m z � z co 3 N c Z = W QQ K m wx N N ❑ ❑ f/1 LL 0 0 N z u� O z z. 1_ z�a zaWIr�p zLa�t mw l z w U 5)p Z w: ~ O Z LLJ U w U_ Q Q w 0 m� Z Z LL oQ O Y 2 (� U w wO O 3 U. M SHEET NUMBER W C-504 SHEET 20 of 85 v, 1 2 3 0 5 C BRASS MARKER PLATE MARKED PLATE WITH ANCHOR 3/4" CHAMFER AT V EA. CORNER 1 CAST THE LETTERS "MV" IN ONE FACE OF THE CONCRETE MARKER AND ORIENT TOWARD o I THE ROADWAY c ROTATE MARKER TO OTHER END FOR BLOW -OFF VALVENO. B 121 4� 4" SO. PRECAST CONC. --w AFT. POST (4000 P.S.I.) PLATE WITH VALVE NUMBER, DIRECTIONAL ARROW -POINTED TO MARKED VALVE & DISTANCE TO THE NEAREST FOOT. TYPICAL VALVE MARKER DETAIL%W� NO SCALE NITES, PJNT MARKER BLUE AFTER INSTALLATION VALE TYPICAL VALVE BOX DETAIL(W� NO SCALE NOTE: AT PIPE ITERSECTIONS, MULTIPLE VALVES, UN WIRE UP AT ONLY ONE VALV. SINGLE 2 AWG SOUD CORE WIR spm ,IPAP THRUST BLOCKING Y EXISTING WATER MAIN PE PLASTIC TO PROTECT 13 BARS TAPPING SLEEVE FIR IN w MODEL SSTTAPPING EEVE SHALL MANUFACTUURREDEWITTHA316 RAND O STAINLESS STEEL. TAPPING VALVE WITH VALVE BOX NEW WATER MAIN TO EDGE PLACE EMPTY VALVE BOX AT INIEVALS WERE VALVES DO NOT Coo R k PIACERACER MAE IN BC" CONCRETE PROTECTI i FINISHED GRAI 9:V.C. 1'IPEL1Yft TRACE, WIRE TO BE LAID GATE VALVE UNDENEATH WATER LINE TYPICAL TRACER WIRE INSTALL-ATION DETAIL rw NO SCALE 11.. DLL H IN VKVE BOX TO INSERT TRACER WIRE.BPoNG UP TO INSIDE AND R0,L UP AT LEAST 6•-B' EXCESS 2. FACE TRACER WRE N VAUVE BOX AT I,000' INTERVALS OR AS NOTED ON THE PLAYS. TYPICA,. 3. D NOT SPLICE WRE WHET! BEGINNING A NEW SPOOL. INSTEAD INSTALL A VALVE BOX AND ATTACH EACH MRE PITH A PASS SCREW TO THE VALVE BOX, AI { iIT t PIPE BRICK SU ON EACH SIDE T OP PIPE 2 f'\ MIN 6* I=1 i TAMPED BACKFIL, MIN 18' .�T; PIPE NIPPLE 2' DIA MIN. 1/3 C.Y. AT 3000 P.S.L. TYPICAL PERMANENT BI OW —OFF ASSEMBLY DET.�IL NO SCALE NOTE. SEE TYPICAL VALVE BD DETAIL FOR BRICK INSTALLATION TYPICAL TAPPING SLEEVE ANC VALVE ASSEMBLY DETAIL NO SCALE AS SHOWN PRECAST CONCRETE STEAMER _ EDGE pNi PLANS l PROTECTION RING CONNECTION OF ROAD \ 2 1/2" HOSE CONNECTION - 6" G.V. k BACKFILL 6" WATER C. I�. B�OX ,i i LINE 'tiI STONE - ( (7 C.F. MIN.) 6" HYDRANT TEE 4-3/4" TIE R06 WITH BRACKETS (SEE DETAIL) NOTE: _ TIE HYDRANT TO MAIN LINE W/TIE RODS IN LIEW OF CONC. BLOCKING IN SANDY SOIL TYPICAL FIRE HYDRANT NSTALLATION DETAIIl"'W NO SCALE 6 NOTES: 1. CONCRETE SHALL BE 3,000 PSI MIN. 2. CONCRETE FOR THRUST BLOCKING SHALL BE KEI FAIRLY DRY, THUS MAKING THE CONCRETE TEDC SHAPE MORE EASILY FORMED WITH THE WICIST PART (BLOCKING AREA) AGAINST UNDISTURBD ' 3. NO CONCRETE SHALL COVER ANY BOLTS ORGLA 4, ALL PIPING AND ACCESSORIES TO BE WRAPFD WITH 10 MIL. POLYETHYLENE PRIOR TO POLRINC BLOCKING. 5. VOLUME OF THRUST BLOCKING SHALL BE AS SHI ON SHE THRUST BLQCK(NG SCHEDULE. X t�"6M v MIN.1/3 C.Y. AT 3000 '.S.L PLAN BENDS Go M 18" MIN. - 10" 0 OR LESS 24" MIN. - 12" 0 OR LESS u U CL N m m I CDNC. N BLOCKING It (SEE NOTE) '- WEEP HOLE TO REMAIN OPEN .' X HYDRANT TE= PLAN TEES 8" MIN 11 ' PIPE 90' BEND i_ 45' B_END 221/2TBE_D 11/4' BEND TEE I PLUG _ I SIZE A A I ^B A B _ A B C D -(-8 4' a" 12 6 8' _A ..�1 6' _�- I F I 6` I 6" 8" 9" 1 10" 16' 6' 1 10" 12 8" I 10- 8- f 8" 8" 10" 1 10" 12' 18" 8" 15" 13 10" 10" I i 8" 8" 10" 12-1 12' 24" ____0- 10' 16 14A .10` _..'-._. 12" ___ 6" ti 6' I 10' _ 71" .- 14' 14' 25" 12" t 20" 16' 12 14" 8" 1:' 8' 12' 14' 16 i6 30" 14" 22" I 18" 1 1, 4" I 16" 10' 1' 10" 14" ib" 18" 1 18' 34' 16^ I zs= 20" 1 16" 18" 12" I' 1Y 16' 18" 20' 1 20' 36" TYPICAL THRUST 3LOCK DETAIL W NO SCALE T A s�SPpDi'SIPPORT CARRIER PIPE IN chS ME CARRIER PIPE � _1 STEED fA51PIPE �,�_� -SLOEKC TO GRAN —i 2• WEEP NOTE ELEVATION BOLTS C~ Pin (SPIDER WE DETER, SZE OF STEEL CAS? INNER PIPE.) SECTION "A" PAAVEWDW (ONE OR Two i I OR AS TRANSITION MIND AS REQUIRED SFL CASING EXIST, G STORM ENCASEMENT AREA TO INILUOE DUCTIL\/E- (ROAN PIPE ONLY 7 WAER DUTY SKIDS (4) MIN. f FrYPICAL STORM SEWER CROSSING DETAIL NO SCALE a f4 a Y iP' 1Y AS NOTED ON PLANS ��dt�EXIS_ ANPT. CUT EXIST. EHt RANG ROAD SHOULDER -0 APO a°:°r°Do�paPa°Aaao°Voeopa° O" MNE MEETING N.C.DO.T. SPECWTCATIDW j °a9°oo Do6°°°D°oC° utr°aa ¢ FOR AB.C. STONE. TYPE B OR C. TO BE �p trot od°so48oa°octl° o°°° _� //iDO4PK'IED TO IOD F YAXNW DRY OENSIIY z BACKnLL AS INDICATED ,t Ns n'4i NOTES: n 1. PAVEMENT SWYL BE CUT TO TRUE LINE AND REWOVFD BEFORE TRENCH IS CUT. 2. STONE AND PAVEMENT TO SE PULED PITH LEAST a5' BEND NTERFERENCE To TRAFFIC. CORPORATION WATER LINE SERVICE UIE TO NEW CONPACIED � L CORPORATION METER COPNECTION PIPE 3. STA84UZED ALGRECATE TO BE SECURED FROM AN COCK-A.Y. MCDONALD OR EGALL APPROVED QUARRY. 4. ALL PAIR ENT REPAIRS TO BE IN ACCORDANCE SERICE SADDLE - AY. MCDONALD OR EQUAL WITH N.000.T. SPEOIDCARONS. STYL HINGED 3891 FOR 3/4' SERICE SADDLE - A.Y. MCDONALD OR EQUAL TRENCH WIDTH PIPE OD. PwS IB• FOR PIPES UNDER 33, O.D. PIPE O.D. + 18' FOR PIPES UNER 33" O.D. PPE O.O. PLUS 2e FOR PIPES OVER 33. Do. PIPE O.D. + 24' FOR PIPES OVR 33" O.D. MITE: 1 "SERVICE CONNECTION" IN PROPOSAL TO INCLUDE SERVICE SADDLE. 45' BEND. CORPORATION COCK AND ALL LABOR INVOLVED IN MAKING A COMPLETE SERVICE CONNECTION. SERVICE PIPING TO BE 3/4' ALL BRASS PNTINGS SHALL BE COMPRESSION TYPE TYPICAL WATER SERVICE CONNECTION TYPICAL TRENCF IN BITUMINOUS SURFACE AREAS DETAILUSING TAPPING SADDLE DETAIL �w NO SCALE Q NO SCALE 13 LAYI NG CONDITIONS DESCRIPTION LiFLAT BOTTOM UNDISTURBED EARTH TRENCH, LOOSE BACKFILL T'PE 1 FLAT BOTTOMED UNDISTURBED EARTH TRENCH. BACKFILL LIGHTLY CONSOLIDATED TO CENTERLINE \ OF PIPE. T'PE 2 PIPE BEDDED IN 4" MININUM JOB EXCAVATED MATERIAL. BACKFILL LIGHTLY CONSOLIDATED TO TOP OF PIPE. T!PE 3 PIPE BEDDED IN SAND, GRANULAR MATERIAL OR GRADED GRAVEL TO THE DEPTH OF 1/8 PIPE DIAMETER, 4" MIN. JOB EXCAVATED MATERIAL COMPACTED TO 4" ABOVE TOP OF PIPE. (APPROX. 95% STANDARD PROCTOR, AASHTO T-99) T'PE 4 PROJECT USE N(T USED. NCT USED. ALL DUCTILE IR01 GRAVITY SEVER LINE. ALL 'VC WATER LINEAND PVC FORCE MAIN. ALL 'VC GRAVITY PIPE BEDDED TO ITS CENTERLINE SEWR LINE. NCOMPACTED GRANULAR MATERIAL 4" MIN. UNDER PIPE. COMPACTED Ll GRANULAR OR SAND MATERIAL TO 4"ABOVE TOP OF PIPE_(APPROX. 95% STANDARD PROCTOR,, AASHTO T-99) T'PE 5 TYPICAL LAYING CONDITIONS DETAIL(W NO SCALE 11 NOTES, 1. INSTALL METER AT R/W 2. 'TWO (2)-3/4' SERVICE LINES MUST BE INSTALLED INSIDE A 2" SLEEVE.' 3. 'TWO LINES MUST BE INSTALLED 3' SERVICE ISIDw A w 4, SLEEVES SHOULD BE SCHEDULE 40 PVC PIPE.. z 5. SEE DETAIL FOR SERVICE MATERIAL AND METER SETTING Of 6. SERVICE LINE SHALL BE 3' BELOW IINISHED GRADE OF DITCHES. 7 CONDUIT MUST EXTEND PAST 'D SIDEWALK. 1' R/W II /.2' PVC SLEEVE W/ 3/4' CARRIER ® WATERMAIN 12' MIN LINE SINGLE 3/4' SERVICES ISSUED STAMP \\A\1\\\Illll l� a 0 N m N iJ f- iJ � Q N p� o F O w m¢ 0_ W J Q c¢i w m m K „ a U > m w O O DO °w LU c D. ¢ i zZ (7� z y QQ �(D <$ z = W m W x W O K C7 N ILL U N ry O N L) z V }�Pc z��a3 ZrZw I__E_ FU I� JZg Z 10 Z W 0_ Z U H J } f- W J U r EY Q (DU Z 7�Q Q O�I- m Z) 0 O W JW Z Z �Y EO =�� U Q w O 0 LL SHEET NUMBER W C-505 D SHEET 21 of 85 Z O U H Z O U w O LL a w 1 r 3 0 61 0 m u NO SCALE PLAN VIEW NOTE: METER TO BE ABB OR AMCO METER. BACKFLOW PREVENTER TO BE FROM APROVED LIST USE CONCRETE SUPPORTS ALSO FOR BY-PASS ALL PIPE SHALL BE DUCTILE IRON ALL BACKFLOW AND METER VAULT EQUIPMENT; ETC^. c HCDPU STANDARD VAULTS TO BE AS PER NARNETT COUNTY DEFT. OF ICAL 4" METER NO SCALE JBLE CHECK ASS LY LAYOUT DETAIL( w 20 DIM FDI RED I PROFILE NOTE: METER TO BE INSTALLED WITH EQUAL AMOLNTS OF SPACE ON METER SIDE AND BYPASS SUE. TYPICAL 6" METER 8c VAULT DETAIL / W NO SCALE 21 ISSUED STAMP �� O.•tTES3/''•�/ i 0y, y :a S AL 3 99 ._ WEL a 0 N h W W� F O Q N 0 w� a N m3 N K a W aw Y ci m u O a U > 0 N m W m as > W 111 m 2 U` Z f/f Q ft �In Z m W QQ K �� Im x CI CI 41 LL U fn N U Z_ r� O z T U V� �c z"U�3 2w y t?~6�.s ow a.. .Ili 0 Lu Z Z 0 LU J -- ~LLJ� V Q 0 0 :3 co U?� WV> � OQILL Z ILL QDW O Y = Q (� J 0 S N LL I� SHEET NUMBER W C-507 SHEET 23 OF 85 z O H U H U) z O U O LIL W cn cn 1 e 3 0 0 c 1:3 0 IN NOMFTRAFFIC AREAS.TOP OF FRAME AND COVER SHALL BE INSTALLED AT LEW 2 FT ABOVE FINISH GRADE OR STANDARD MAINCLE AT LEAST I FT ABOVE FLOOD STAGE RING AND COVER LAW 4 EA. %m ANCHOR BOLTS TO BOLT FRAME TO SPACER r USE ROPE MASTIC SEAL rip BETWEEN FRAME AND SPACER r MAX FOR SPACER _ ._ r-W. 94r MANHOLE STEPS OR 4W it 0.C. ECCENTFW SEE DETAIL 8-M TAPER UNIT JOINTS SHALL BE SEALED WITH A RUBBER DAM GABIETOR ROPE MASTIC SEAL .• - CEMENT RCM PLLJOINTS INSIDE AND OUT RISER LIMIT W DA MIL -�^ f t •A %-.12'SLOPE ON ALL INVERTS - BABE UNIT EXTED BASE BRICK 8 MORTAR INVERT �� OVER 1� a OV . .. �.� _ TYPICAL STANDARD PRECAST CONCRETE v1ANHOLE DETAIL NO SCALE NOTES: 1. SEE DETAIL &2E FOR TYPICAL INVERT NOTE 1. PIFE SIZE FOR DROP TO EQUAL INFLOW SEWER PIPE SIZE. 2. FITINGS FOR DROPS SHALL BE C-900 ORSCHE➢ULE 40 PVC. 3, SAJ-CUT OR DRILL ALL HOLES FOR PIFE AND BOLTS. 4. DRIP -MANHOLE MANDATORY WHEN DIFFERENTIAL BETWEEN INVERTS IS GRATER THAN 24'. 5. SE DETAIL S-28 FOR TYPICAL INVERT MANHOLE STEPS -•' SEE DETAIL 9-0 -`-PLUG FOR CAP y'x 2' S.S. PIPE - SUPPORTS - � STANLIRD MANHOLE RING , COVER STANDARD PRECAST MANHOLE ---' _5'-0" MIN, DIA, TEE RUBBER BOOT p RUBBER BOOT GROUT $- - TYPE 316 S.S. TO SLOPE ,a EXPANSION ANCHORS r 90' BEND TYPICAL INSIDE DROP MANE OLE DETAIL%S� NO SCALE 2 5 / NTTE: I.MPE SIZE FOR DROP TO EQUAL. INFLOW SEWER PIPE KM 2FITIIXiS FOR DROPS SHALL BE CYSIOR SCHEDULE 40 PVC. SBAW DUT OR DRILL ALL HOLES FOR PIPE AND BOLTS. 4DRORMANHME MANDATORY WHEN STANDARD MANHOE DIFFERENTIAL BETWEEN INVERTS IS r RING IL COVER GREATER THAN W. / AIEE DETAIL 5 2E FOR TYPICAL INVERT. TYPICAL POL NO SCALE 9 -. ir 1M� o COPQ.YI.ERPOLYPROPYETE FLA=MA I DUSTFOES MOD I Ps4P 0RARPROVFD EQUAL. L �RIAOOLDX Rnwm MANHOLE STNCRIRE z TYPICAL MANHOLE INVERT D=TAIL S N SCALE 2 CASTNON VALVE BDR YW CARLOIEM HUB BLC A8DLIT 0.LIM AND CAP V PVC VERTICAL > I ..f SCI40 PVCVERNCAL MMx 4' SWEEP WVE STOP AT" ///� SCH 40 PVC PLUG PO NOT OLUE) TEE BRANCH SLOPE MIL,% tljr i ANCHOR 8(LTT OETAJL 4W VIILAICHORBOLTYWF-1 0.D. r PRIJECRON J1 NUT PIPE r ENDED INTO CONC. : S EA.AR BARS VERT. EQUALLY SPACED ,e-- #3 SNffi O a' NOTE: AT THE OONTIAC'TOR$ OPTION N SECTION A -A LIEU OF FORW42 THE tHr COMM SAOOUE, AgWNLESE STEEL PIPE SADDLE MAY E PROVIDED.. �Ys xrLS.8IRAPW/2Y+ LEG 1 DI PIPE !11 MN. BEARING Ir I ir iinaw A cr ra r �- -_ __ 3. MN "i r� 3 r 1r tT END VIEW SIDE VEW ILi S TYPICAL AERIAL PIPE SUPPORTS DETEIL u ANETARYTE E IMUME WYE WE MATERIAL FITTING FOR NEIY B MAN) CONBTRUCFWNDR ROMAGC! SADDLE FOR TAP ON EMSTI G SANITARY IIEWER MAST TYPIC' _ SEWER SERVICE CONNECTIONDETAIL NO SCALE SANTARYSEWER MAIN mum I FA JOINT OF DUCTILE IRCR PIPE SHALL BE CENTERED UN09i STgBJ PPE FLR }ILL 1DPoDB1BH0E. TYPICAL STORM SEWER CROSSING FOR SANITARY SEWER DETAIL S NO SCARE 31 ��M�� V.�fV.Y1. V.Mi N. HUM, 1 EA. JOINT OFDUCTILE PONPIPE SHALL BECENTERED UNDER WATER LINE FOR ALL CROSSBNGM TYPICAL WATER LINE CROSSING FOR SANITARY SEWER DETAIL S NO SCALE 3 2 A S ISSUED STAMP �0 2.�0 o . 2 a $ L WESIFP N k a N 19 N H wa o QN F Na a K w t < ❑ m x ❑ m O N U m m to a¢ } W > W L o Z= x W C ❑ W m N N ❑ ❑ (/l LL U .A N G a 0 O Z V'm Z U_y w=a r�?3 i UO J _ q 1 z w UOf Lu Z z U O Q zWW U (D Dt� Q0_j m2 �jw F— �� wUcwn oQ Li. z Qaa 0 w Q ILL O " co p W > WILL N SHEET NUMBER C-509 SHEET 25 of 85 Li W Y/ m 1 2 3 0 11 IN C Al W CLASS B RIP RAP \� C F :::FLOW I FILTER IERM NC DOT 15 OR #57WASHED STONE MAINTENANCE REDARENENTS: INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AD AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE—HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL REA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIP —RAP DISPLAED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATLY. AFTER ALL THE SEDIMENT —PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALI THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WIT THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND CNER FILTER BERM NC DOT OR #57 WASHED ST( �o f '0 0 0 00 0 ,o R7HEOAWDWALL PLAN USE FILTER FABRIC UNDER ALL STONE" (TYP.) RIPRAP HEADWALL, 1' MIN. HEIGHT FROM ROAD SHOULDER CLASS B 0QIP RAP (— UNDISTURBED I- -VARIES, SEE PLNS—I CROSS SECTION TEMP SEDIMENT TRAP WITH ROCK PIPE INLET PROTECTION TST 10 SCALE N.T.S 1/4" WIRE MESH Q. A a 0 G i✓ .. 1TIA CD O C O O p O MAXIMUM POST SnPACING 4 FT.� 12" 2' IINI n—_—. IL2'� IIFIldISEDIMENT ) f 611I1/CONTROL STONE WIRE MESH \ / AVERAGE BOX DIMENSION VARIABLE FILTERED WATER SECTION A -A MAINTENANCE REQUIREMENTS: INSPECT INLETS AT LEAST MEEKLY AND AFTER EACH SIGNIFICANT (%INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVID: ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMEfT REMOVAL. REPLACE STONE AS NEEDED. F HARD WARE CLOTH & GRAVEL INLET PROTECTION C 1 SCALE: N.T.S. GROUND NATURAL GROUND F•6 7r W z J } SEED/SOD ACCORDING TO EXISTING GRADE PLANS (TYP) IW a 0 a SIDE SLOPES SHALL CONFORM TO GRADING PLAN AS APPLICABLE 1 (TYP) z ` 4 3 � 1 (TYP) PROPOSID GRADE � MAINTENANCE REQUIREMENTS: 1. INSPECT PERMANENT DIVERSION AFTER EVERY RAINFALL DURING THE CONSTRUCTON OPERATION. IMMEDIATELY REMOVE ANY OBSTRUCTIONS FFOM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CHECK OUTLETS, AND i,AKE TIMELY REPAIRS AS NEEDED. MAINTAIN THE VEGETATION IN A VIGOROUS, HEALTHY CONDITION \T ALL TIMES. 2. ALL DIT(HES/RIDGES ARE TO BE DESIGNATED TO RECEIVE 7-DAY GR)UND STABLIZATI(N. D' DIVERSION DITCH C 510 SCALE. N.T.S. Pipe Outlet to Flat Area - No Well -define) Channel DISTURBED AREA SUMMARY TOTAL SITE AREA = 3.45 ACRES SITE AREA TO BE DISTURBED = 3.45 AC POST -DEVELOPED HARD SURFACE AREA = 217 AC POST -DEVELOPED PERVIOUS AREA TO BE PIRM. STABILIZED = 1.28 AC SOILS TYPES BIIB BLANEY LOAMY SAND, 2 TO 8 PERCENT SLOPES WfB WALKULLA SAND, 0 TO 8 PERCENT SLOPES Notes jV j./•.•11I�WAj I 1. La is the length of the rprap apron. -0 diameter but not lessthan 6'. 3. In a well-defined chanilel extend the Plzn •�apron up the channel banks to an elevationLa of • abovethe maximum tailwater depth of to tie top of the '1•. '•�� �.������ atebank, whichever is le;s. Filter 4. A filter blanket or filterfabric should Secti • AA blanket • 'installed between • . •and soil foundation. INSPECT RIP —RAP MAINTENANCE REQUIREMENTS: BELOWGREATER) RAINFALL EVE4TS TO SEE IF ANY EROSION AROUND OR RIP —RAP HAS TAKEN PL!IiCE, OR IF STONES••• . IMMEDIATELY MAKE ALL • • REPAIRS TO PREVENT FURTHER DAMAGE. 0 s OUI LET STABILIZATION STRUCTURE 1 O SGILE:N.T.S. GRAVEL PAD IS REQUIRED TO PROVIDE BUFFER AREA MERE VEHICLES CAN DROP THEIR MUD AND SEDIMENT TO AVOID TRANSPORTING IT ONTO PAVED STREETS, TO CONTROL EROSION FROM SURFACE RUNOFF, AND TO HELP CONTROL DUST. MAINTENANCE REQUIREMENTS: MAINTAIN THE GRAVEL PAIL IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE.THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. C E TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/ EXIT (�' 1 SCALE: N.T.S. Figure 6.17e Channel Installation aW Slope Installation; Washington State Eoleo Department Langifudinal.1hor Terminal slope and t.h charnel anchor t.h Stalie imat 3' L• F Initial clonal Icl,eckslot anchor herah - heck slotSMI NOTE: 1. Check slats to be constructed per marufactarers a,weifimtions. 2. Staking or staling layout per nonfat iae s specificafio,a. Slope surfaee shall b<srmth before If there isaerm of iM tap of placement for proper soil onta&. slape,,nente "ape of the berm. Stirnirgponern as Man, 2• ,lw _ nr in b'+eb'mn Trench per nmrufachrera ti ail staple at 12' imer recwmre,data,a. Min, 6'a,iarfap, _.': .. .,.... — Staple overl. mix. 5'anx,. Do not sfrcicF NwkeK/mam,g Rightallow ering,mnial dawn to a level arm, turn the muMer 4' anal atrrple at 12' the rolls to conformto orry irregularities. inMrmis For slopes less Hon 3H:1V. rolls Lim, fertilize, and seed before imilatan. Planting may be pMred w ha,rmntal Mips. of shrubs, irem, etc slmuM accuafter installation. Maintenance I. Inspect Rolled Erosion Control Products at lest weekly and after each significant (1/2 inch or greater) rain fall event repai immediately. 2. Good contact with the ground must be maintained, and erosion most not occur beneath the RECP. 3. Any areas of the RECP that me damaged or nc in close contact with the ground shall be repaired and stapled 4. If erosion occurs due to poorly controlled dminge, the problem shall be fixed and the eroded area protected. 5. Monitor and repair the RECP as necessar until ground cover is established. Construction Construction Specifications Even if properly designed, if not properly installedRECP's will probably not function as desired. Proper installation is impertrve. Even if properly installed, it not properly Limed and nourished, vegeation will probably not grow as desired. Proper seed/vegetation selection is dso imperative. Grade the surface of installation areas so that the grond is smooth and loose. When seeding prior to installation, follow the steps Sr seed bed preparation, soil amendments, and seeding in Surface Stabilizatiot, 6.1. All gullies, rills, and any other disturbed areas must be fine graded pric to installation. Spread seed before RECP installation. (Important: Remove El large rocks, dirt clods, stumps, roots, grass clumps, trash, and other obstructions from the soil surface to allow for direct contact between the soil surface art the RECP) Terminal anchor trenches are required at RECP ends ad intermittent trenches most be constructed across channels at 25-foot intrvals. Terminal anchor trenches should be a minimum of 12 inches in deptl and 6 inches in width, while intermittent trenches need be only 6 inches dee.I and 6 inches wide. Installation for Slopes— Place the RECP 2-3 feet ver the top of the slope and into an excavated end trench measuring approximately 12 inches deep by 6 inches wide. Pin the RECP at 1 foot intervals llong the bottom of the trench, backfill, and compact Unroll the RECP down (or along) the slope maintaining direct contact between the soil and the IECP. Overlap adjacent rolls a minimum of 3 inches. Pin the RECP to the Tound using staples or pins in a 3 foot center -to -center pattern. Less freglent stapling/pinning is acceptable on moderate slopes. M MATTING BLANKETS B C51 O SCNE N.T.S. L = THE DISTANCE SUCi THAT POINTS A AND B ARE OF -QUAL ELEVATION A L SPACING BETWEEN CHECK 5' 12" OF NCDCT #5 OR #57 WASHED ST04E 11 < 1.5 AUM CLASS BRIP-RAP FILTER CLOTH o 0 0 0 2:7 2' MAX. AT ENTER FLOW MAINTENANCE REQUIREMENTS: INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (-/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS OF. OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DISPOSITION ABOVE THE CHECK DAM AND EROSION FROM iIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSDN OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS , INSTALLING A PROTECTIVE RP -RAP LINER IN THAT PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT LARGE FLOWS FRJM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTI(N. C D CHECK DAM C510 SCALE: N.T.S. ISSUED STAMP I•C•ARo��% o.'F> sS/'•.�� :a S AL = r = 994 i WEsj%il)v 0 N m lit � UJI O Q N w ° r a �a w J } v � a Y u m ca N O O w > w lit m 2 0 0 as > z c9 U-' z y Q3Q t? to Z = x N W O K � n N —t m ILL U N y N z u� O 5 U� vN � z EI r sZ 2�=` �zi3E" -. LU =iil Z W O Z U �p H J ZX V OU 2Z� F->- �OI¢— Cl) X� °a zoo °J Z LL O � O C� 0 W a/ cQ G J O 0 LL w SHEET NUMBER C-510 SHEET 26 OF 85 W 1 N 3 4 I 5 0 C TOP AND BOTTOM STRAND - SHALL BE 10 GAUGE MIN. WIRE �8' MAX. WITH WIRE — 6' MAX. WITHOUT WIRE) MIDDLE AND VERTICAL WIRES SHALL BE 121/2 GAUGE MIN. FILTER FABRIC i- I� M INt tun Is w[ ryr NOTES USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. USE FILTER FABRIC A MINIMUM OF 36" IN WIDTH MD FASTEN ADEQUATELY TO THE WIRE AS DIRECTED BY THE EVGINEER. PROVIDE 5'-0" S-EEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. ANGLE STEEL TYPE. FILTER FABRIC COMPACTED t B C SEDIMENT SILT FENCE S1 C 51 1 SCALE. N.T.S. IT A„ STEEL POST - 21-0" DEPTH EXTENSION OF FABRIC AND WIRE INT) TRENCH MAINTENANCE REQUIREMENTS: INSPECT SEDIMENT FENCES AT LAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REP -ACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TA(E CARE TO AVOID UNDERMINNG THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRNG THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STA3ILIZED. PS T S Fort Braes Seedine Specification (Rv. Oclober 1013) Apply fertilizer/Lim- at rates as determined by laboratory soil analysis of sods at the job site. In the absence of the soil analysis, apply soil amendments at be rates indicated in steps 2 and 3. 1. Area will be tiller to 4" depth 2. Apply lime at 70 xounds per 1000 square feet, or 1.5 tons per acre 3. Apply 10-20-20 firtilizer at a rate of 850 pounds per acre or 20 pounds per 1000 square feet. The fertilzer should be either slow time release or appled in two applications, half at time of planting and the second half after permanent sed germinates. 4. The lime and fertlizer will be worked into the top 2 to 4 inches of soil prior to seeding. 5. Seed Mix and Rae. Permanent Seeding "Cool Season": placed between 1 September and February 28 50 pounds per acre lenmcky 31 Tall Fescue (Festuca antndinacea ) 25 pounds per acre ommon Bermuda (Cynodon dactylon), hulled 25 pounds per acre ommon Bermuda (Cynodon dactylon?, unhulled "Warm Season": planed between 1 March and 31 August 50 pounds per acre lentucky 31 Tall Fescue (Festuca anin&nacea ) 50 pounds per acre ommon Bermuda (Cynodon dactylon), hulled Temporary Seedinl "Cool Season": planed between 1 September and February 28 120 pounds per acre Winter Wheat (Triticwn spelta) "Warn Season": plated between 1 March and 31 August 65 pounds per acre Berman (Setaria italica), Brown Top (Setana italics), or Fox Tail Millet (Brachiariaramosum) For nroiects in the vicinity of Pope Army Airrneld. Mackall Army Airfield, or Simmons Army Air•fidd Permanent Seeding "Cool Season": planed between 1 September and February 28 50 pounds per acre ientuckv 31 Tall Fescue (Festuca arond nacea ) 25 pounds per acre ommon Bermuda (Cynodon dactylon), hulled 25 pounds per acre ommon Bermuda (Cynodon dac4lon'), unhulled "Warn Season": platted between 1 March and 31 August 50 pounds per acre bentucky 31 Tall Fescue (Festuca anlnchnacea ) 50 pounds per acre ommon Bermuda (Cynodon dactylon), hulled Temporary Seedinl "Cool Season": planed between 1 September and February 28 50 pounds per acre Ientucky 31 Tall Fescue (Festuca anlnchnacea ) "Warm Season": phnted between 1 March and 31 August 50 pounds per acre lentucky 31 Tall Fescue (Festuca anlnLinacea ) Straw Mulch: Appi at 4,000 pounds per acre; leaving no bare spot larger than a quarter. Straw must bestabilized by either use of emulsified asphalt otby crimping the straw into the ground EmulsifiedAsohalt: Emulsified asphalt shall be applied at a rate heavy enough that the entire ara appears black in color; with partict)ar attention paid to the edges of area,. crests of ridges, and banks to prevent wind danage.. Crimnine: itraw may be crimped with a mulch anchoring tool or a wheel disk with dull blades st nearly straight may be used as a mdch anchoring tool. Crimping is not permitted on slopes steeper than 3:1. Hydrastte": BWfroseeiftne hats only be aftooable on slopes streyer than J hartrantalto I veracmL Steps 1 ftMgn 4 mlinbe conletedphortohydmseedirl. Hydroseedingsboo Idbeapplied inIwo applicatiom- The&Stapphc2tionwiliconsisofi3ofrm nWlcharul 2t3 of It= seed and to sectaul applialil.at will txuois l ul'23 of ttte nu1uh and 113 of the seed. The inukItw`I i1wlude a lackifier and willbe applied al ;tale of 2000 Pounds per aure or Ilse iriauuLLoutti's recuumrmlaliurt, wIdLIwvr1 is high. 6.EYEMPTIONS: Special Ise Areas, such 3s wetimids, rip3rbriare2s, floodplain, Generd Officer quarter; art dithistoric district. Contact the Fort BsIgFWater Managemes Branch (WMB ) at 910-3915-2301P823 wit nseedirg these areas. 7. Uponcompletionofthe pmjct, prior to leaving the site, the Water Managemell13 chshallbe notified 10 inspect he project Pnr Mi. Jack Wllsonat 910-302301f2823. Note: G.S. 113A-57 No landistuibing activity subject to this Article skull be uridertalmrt except in mcodance Witt the followirg mandatory requise me rm (1) 1'crmancrd gmundcora for all dotub ad am as shallbc providedwithm 1>working days of 90 calerdar days (chlchcvcr is shorter) tbllowrrig t1t: complebnof construction at development (final grade). (2) The angle flit glided sopes and fills shallbe no greaterthtn the angle that can be retained byvegatative coverer other adequate erosion -control. device or smsctures. Inanyevtent, slopes left exposed will, within 14 calerdar days ofcoraliltion of any phase ofgrading,be planted orrtherwise provided withtempoary or pernarmnt gmurd cover, devices, ar structures mYxientto restrain erosion All perimeter dil ms, ditches, swdes, perimeter slopes or slopes steeperthan 3 hariaonell to 1 vertical (3:1) slalibe provded temporary or permanent =biliartion wittlyound cover as soonas praeticatle but in any eves witltir17 calendard ays_ ><) Groamd stabidi noon- Site Area Stabilization Stabilization [low Lkseri tion Time Frame Frame F:x tiomt Perimeter dike.:. itraic!c ditches 7 days None: and -dopeA • High Quality Water (HC)W) 7 clays Notre Lo1R"1 It slopes are I U or • Slopes stocper 7 .lay. less in lasq.Kh and we than 3:1 not steeper than 2: 1. 11 da.-s arealimmd. • Sbyes 3A of 7-days for slopes ilallCr 14 days greater than 50 feet ngth in leNo • All cniteranea<sne femcier far with alopcs flatter 14 days perimeters and than 4• 1 H[)W Zones) •'1tdeasionaoftimemod'beapprovW11%thepaimttinrrauthority tstwl en wcathar or other rnlospecif to Qonddions that m tke compliance tmpmAcablc." t5cction 11.13(2 X b i ) Maintrmrrr. iAtrive Fsinhlinnowd Pr ind Maintrnaarr. nftbr srrdctt arcs shall inrtltdr pmtrrtingr.nfi�ankmrnts ant Aitrirs front mrfarr. trmicui; maintainillrmsirsn coutml materials and awldWLotectintg ha Jailed areas flout traffic; awting;watering; and post -fertilization. Mcninz a. Turf Areas: Turf acm31unbealowcdtoam4trainn3-intchluigIttwhall die turf isaniminmm4indieslgh. Clippings sltallba anlovetwhen tls amount cut prevents sunlight fan reaching the ground surface. b. Erosion Control Aeas: Erosion control areas shall be mowed to a minimum 4 inch height when the plantsrre a maximum 8 incaes high. Clippings shall be removed when the amount cut prevents sunlight from reacting the ground surface. Post -Fertilization After the permanent grass hs been accepted, and between the dates of April 15 and October 15, apply 425 pounds c fertilizer per acre. Repair or Reinstall Unsatisfactory stand of gas plants and mulch shall be repaired or reinstalled, and eroded areas shall be repaired unil a satisfactory stand of grass results. ISSUED STAMP IAR(1111 ` O.•'FESSjO•�i2� :c SE L_ WESSF�/ `/ (III\\\ i0 l. 0 m N m� o Q N 0 w1O a N} w } ra m rc w J ❑ > ❑ m w O O OJ m m @ N a¢ m J } W W 2t9 Zy Qu u 3 Zvi z= m Wi ❑ ❑ w LL U fa N 4 °z zA N= FV��I✓ JL- � m c W Z Z O L) �p J > (DV2 Z Of 2_ZN��/ C) < E CO U)ZQ r fY� °Q Z�W °J Z O O C) Wa 0 0 w Vi U. SHEET NUMBER W C-511 D SHEET 27 of 85 U) 0 2 3 C! 0 Ee POND BASIN-1 r FOR DETE _I VISCHARG € 325 .. . W. _ ..___.Iv..,_._.,..-._,,...-..,.,,m.-.-....__.._,_.,....,.._.__yv.,..».,..-......m,.».._.,._._�JI__,..,.....,-_.-..,..._.__..,,_�.:..._.....-... RIP -RAP OUTFALL _4"-.SANQ80TU`OM:._.___r»._,..,w......................_...............�._,. r.>.,..� .,�.._.._.,._.�F.LUME._..;. ---- -----FOR STR3 SHWT 3t9.00 r P ) i ) F 4 1 LU W O M i.D Cl) LL WLL Co U, M Gi MI 07 WL 0 00 MO n (`7 M WLL to M Co WLL 00 O M O MO M M WLL O V1' COCR cc (nM �00 M CO M Cl)N WLL WLL -0+25 0+00 0+50 1+00 1+50 BASIN-1 WQv CALCULATIONS: DRAINAGE B/.SIN AREA = 44,363 SF IMPERVIOUS%REA = 28,158 SF IA (%) = 63.40/ RD = 1.0" WQv REQUIRRD = 2296 CF WQv PROVIDED @ ELEV (331.20) = 5827 CF POND BASIN-3 34( 33; 331 B 32 321 0 YR HGL 331.94 _ T--- 1-YR HGL: 330.95 - a TOP OF SAND FG 329.00 t STIR 5 HEADWALL -4"-SAND BOTTOM N: 547538.53 8 STR 17 HEADWALL - E: 1991037.93 _,,. ....._.__ _, IN (SE)' 329.00 ..-.._... ...-......_..,... �._».. _..,.. ..>.,..... .__. _.._.,..,..._ N: 54758788 RIP -RAP OUTFALL __..- E: 199095355 FOR STR 5 `. I.E. OUT (SW) 32950 SHWT 319.60 M O O 0 0 n 0 �C co co U 10 rn of o d f`M70 Mn ('� M MM M� MK LL Q LL C70 Up (7 C90 % W LL W L W LL W U_W U_ WLL O MM WLL O O p Cl) 03 M h W U_ Q 0 (`N') LL M04 U Cl)M W LL 2+00 2+50 BASIN-1 WQv DRAW -DOWN -IME: DRAINAGE BASIN BOTTOM AREA =633 SF (ELEV: 328.00) INFILTRATION RATE = 4" PER HOUR WQv = 5827 CF TOTAL DRAW -DOWN TIME = 1.15 FDURS -- 1340 340 N O CN CO N co M 7 LU LL U_ W -0+25 0+00 0+50 1+00 1+50 BASIN-3 WQv CALCULATIONS: TiIS BASIN IS CONNECTED TO BASIN-4 VIA A 15" CONCRETE PPE. A PORTION OF THIS INFILTRATION BASIN IS BEING U-ILIZED FOR STORMWATER TREATMENT. (SEE CALCULATIONS FOR BASIN-4 FOR CALCULATIONS) 335 < - 330 325 325 20 320 1+90 -0+25 O r` C7 O co n M M LUU_ LL Ni l 350 345 340 340 335 335 330 330 325 325 320 320 WU. WLL W INFILTRAION BASIN HYDRAULIC GRADE LINE BASIN NO. 1 YR 2 YR 5 YR 10 YR 25 YR 50 YR 100 YR 1 329.73 330.07 330.78 331.25 331.64 331.81 332.07 2 330.95 331.15 331.59 331.89 332.17 332.31 332.49 3 330.95 331.16 331.61 331.94 332.26 332.42 332.62 4 330.95 331.14 331.55 331.83 332.05 332.15 332.28 POND BASIN-2 1 t STR 18 HEADWALL ------ 6 } . i i N: 547561 14 1 E: 1990903 57 - --- ----- ---- c 32 LF 18" RCP @ 1.57°'" I ._ _._. .._.. I.E. IN(NE): 329.00 _. I ..m...-.. TOP OF POND: 334.00 ..-.-.,,,.._�,,....,�• 1 ) ...-.....-...� TOP OF PO4D:I334.00 - ( • - - �- e f -,ae�rltH�L-s�r4r� - -. ' t mYROiGL 33'r89- z e 1-YR HGL: 330 95 ! __� _ - ..- - • r-..-- - 56 LF18"FRCP @ 0.89% _�ly - (TOP OF SAND FG 59.00 i TOP OF SAND FG: 329.00 I _ �. - _ I _ q 4 SAND �OTTOM g¢ I 4^SANDBOTTOM- - y ___..RIP..RAESILT - _ -'- -3-1-6- Al 1 . STR 14 HEADWALL �` �- ) SHWT = 318 00 $ FOR FLUPE ' N: 547433.11 ------ E: 1990834.61,_�._..- OUT '-----------._ i"""�."-"'=----«._----- -- -__-_ - �-- -._..__ . ---------- i I.E. (SE): 329.00 IN CD �0 OD D0 OD OD C0 �N cli 04 M M ULL M M Cl) M M M n M M M M Cl) M M W WLL WLL WLL ULL WLL WLL WLL WLL 3+00 -W5 0+00 0+50 1+00 1+50 BASIN-2WQv CALCULATIONS: THIS BASIN IS CONNECTED TO BASIN-4 VIA A 15" CONCRETE PIPE. A P(RTION OF THIS INFILTRATION BASIN IS BEING UTILIZED :OR STORMWATER TREATMENT. (SEE CALCULATIONS FOR BASIN4 FOR CALCULATIONS) POND BASIN-4 _-_ .. _ - --- ----------- ---- -- - - _- �- _�- - ... - 70 LF y �� 15' RCP ! @ 1>9^/0.- STIR 10 HEADWALL---- - __..__._ N: 547374.05 E: 1990939.35 I.E. IN (E): 328.50 RI SHW = 320. i s i 00 In co Lq M N M Cl)' M 0 th M W LL W LL W LL 0+50 i = P-RAF 20� `STR 16 WEIR BOX 547372.71 - OUTFALL E: 1990928.35 TOP: 332.75 ORIFICE -----I.E.: 330.75 6" X 30" ORIFICE d I.E.: 331.75 I.E. OUT e 1 V 1 CD 00 Go M M M � LL UL W LL W LL 1+00 INFILTRATION BASIN VOLUME TABLE BASIN-1 ELEVATION DEPTH (FT) AREA (SF) INCR. VOLUME (CF) TOTALdOLUME (CF) 328 0.0 633 0 0 329 1.0 1218 926 926 330 2.0 1940 1579 2505 331 3.0 3136 1 2538 5043 332 4.0 4705 3921 8963 332.5 4.5 7272 2994 11957 BASIN-2 ELEVATION DEPTH (FT) AREA (SF) INCR. VOLUME (CF) TOTALVOLUME (CF) 329 0.0 481 0 0 330 1.0 1445 963 963 331 2.0 2490 1968 2931 332 3.0 3582 3036 5967 333 4.0 4811 4197 10163 334 4.5 6530 5671 15834 i 15qu BASIN-4 WQv CALCULA-IONS: ;V THIS BASIN TREATS RUNOFFINTO BASIN-2, 3, & 4. TOTAL BASIN CALULATIONS: DRAINAGE BASIN AREA = 89,165 SF OP OF POND IMPERVIOUS AREA = 64,456 F 335 IA (%) = 71 7% RD = 1 0" ME 335 330 325 320 LL 2+00 _ 32 LF 18" RCP @ 1.57%_ WQv REQUIRED = 5,242 CF WQv PROVIDED -_--- ' - - ^T ---_ - - BASIN-2 @ ELEV (330.75) = 2,c39 CF � 330 BASIN-3 ELEV 330,75 = t,43 CF BASIN-4 @ ELEV (330.75) = 2,:69 CF TOTAL VgQv PROVIDED @ ELW (336.75) =15,121 CF _ - - _ - - i STR 7BBOTTO�M _ __.__ 15 HEADWALL _N:547416.72 -- BASIN 4 WQv DRAW-DONN TIME: _ E: 1990862.48 '32CJLE. _. _ IN (Nwp 326.SoDRAINAGE _ BASIN BOTTOM AtEA �.__.. BASIN-2 = 481 SF (ELEV: 329.(0) RIKRAP OUTFALL� -� BASIN-3 = 230 SF (ELEV: 329.(0) sTR ts�: BASIN-4 = 349 SF (ELEV: 328.10) 320 TOTALL BOTTOM AREA = 1,00 SF j O D O') co d M INFILTRATION RATE = 4" PERHOUR o MrNi `°M LULL WQv =6,121CF W LL W LL TOTAL DRAW -DOWN TIME =1.7 HOURS 1+50 2+00 2+25 BAIIN-3 ELEVATION DEPTH (FT) AREA (SF) INCR. VOLUME (CF) TOTAL VOLUME (CF) 329 0.0 2D 0 0 330 1.0 8S 535 535 331 2.0 1514 1172 1706 332 3.0 235 1915 3621 333 4.0 445 3375 6996 BA!IN-4 ELEVATION DEPTH (FT) AREP (SF) INCR. VOLUME (CF) TOTAL VOLUME (CF) 328.5 0.0 3,9 0 0 329 0.5 63 241 241 330 1.5 11B 898 1139 331 2.5 182 1508 2646 332 3.5 3M 2559 5205 333 4.5 592 4639 1 9844 333.5 5 70.7 3252 13096 ISSUED STAMP N I ICIA SS/o.i2 :a AL i 9 •. K WES��P�\\ '//711 I I tt\`f�51/l� 0 N N tit e o Q N f- w'° a Na 1 m3 d rc w J � Y O m U N 0 d U f O N as 0 ti W K In O 2 J m N v O O 0 LL U 55 N z uu� O x w� WWzN° Nll zzN i w -'I I' O ^ aii u Z LU Z O LLI U Z o I,-1 Aµprove,1'-"•t..,r:�y+aw�r vs'tn# E7r-+odRP1t1Y Construction ;n aczordance with these dosUrniI 16 J C7 Q Z 0 v required by the stormwater permit. North Caroller rules roWiru that the stormwater system designer the UT U Q o LL z U) Inspect during construction; certify conformity with plans and specs: and certify compliance with the Of LLI m 0 Q sicrmwaterrules (I5ANCAC2H.10080)) r # 7 SO Date G 76 }, U.I `n Permit Vision of < z Sheet #___ Revision Date 0 W Ll J O Y LL z C� U - SQ L J 0 W.O M U. 0 W 'M v+ rA