Loading...
HomeMy WebLinkAboutSW6130401_APPROVED PLANS_20130418STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW JL��I DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 11 n FOREST HILLS SUBDIVISION P8 22, PG 81 CONNECT TO EXISTING STORM SYSTEM CS-23 RIM: 184.90 INV OUT: 181.55 LJ �N k zQH YN� Ufw01 18750 w h 1" G ZI I I ~� N2788'30'W 17299' EXISTING CEMETERY - LINE TABLE - LINE I BEARING LENGTH L1 S282734-E 20.99 - STOC11RM INVERTS - # TOP 189.42' TOP= 188.00 INV IN(SE)= 185.12' INV IN(SE)= 184.40' INV OUT(NW)= 184.92' INV OUT(NW)= 184.30' CB#2 - SEWER INVERTS - TOP= 188.58 SSMH111 INV IN(SE)= 184.18' RIM= 184.97' INV IN(NE)- 184.18' INV IN(SW)= 178.67' INV OUT(NW)= 184.08' INV OUT(NE)= 177.97' CB#3 - SIGN LEGEND - TOP= 185.71' S1 STREET NAME INV OUT(NW)= 180.21' S2 STOP S3 TOWN DISTRICT CB#4 S4 SPEED LIMIT TOP= 185.20' S5 HIGHWAY 55 WEST INV IN(SE)= 179.40' S6 DO NOT ENTER INV OUT(NW)= 179.20' S7 DIVIDED HIGHWAY S8 ONE WAY CB#5 S9 LANDFILL LEFT TOP= 184.64' S10 HIGHWAY SIGNS(5) INV IN(SE)= 177.44' S11 WRONG WAY INV OUT(NE)= 177.24' S12 HIGHWAY 421 NORTH S13 NO THRU TRAFFIC CB#6 S14 DMV RIGHT TO = 185.69' S15 DOWNTOWN INV IN(SE)= 179.39 S16 NO TRUCKS INV OUT(NE)= 179.29' S17 NO TRUCK PARKING & TOP= 187.31 ' INV OUT(SW)= 183.21' D§ TOP= 187.05' INV OUT(NW)= 183.45' YI IP TOP= 189.13' INV OUT(NW)= 186.03' R/W 1 n8 F ICKSON, TRUSTEE 4SSOCIATES PG 627 1 I W N ;1 ZI N/F LEE-MOORE OIL COMPANY 08 922, PG 645 / ON / / - - - - 30' UTILITY EASEMENT (PB 22, PG 81 & PB 20" PG 811 (SEE TC/4,10) - - _ - - - L - - - - o � FES-01 INV: 181.55 OWNER 1NFORMADON - ,1•.^,�',: BUFFALOE 004LING PARTNER: PB 2003, PG 811 - TRACT LF OF DOGHOUSE MH-02 (SEE DETAIL SHEET C-9) DB 2543 PG 619 -15" RCP RIM: 188.14 - AREA SUMMARY - 0 0.50X INV IN: 181.74 6.795 ACRES INV OUT: 181.74 (TO INFILTRATION BASIN) 295.000 SO. FEET INV OUT: 181.744 (SEE TC16) 0112 /-167.91 LIMITS OF DISTURBANCE (TYP.) LIMITS OF DISTURBANCE (TYP.) Bar OVER 6' NGE' ELE1-19JXV _ y C802 Q EXISTING CULVERT ��- 1Be97 1Bees EXISTING-CA-TCH - - - - 1 - __ BASt (TYP) - - - - - - - - - - - - - -- -- - -- -lap US HIGHWA W. �JAYKSON BLVD 00 VPD) 5 MPH) GRAPHIC SCALE IN FEET SCALE 1" = 40 FT REFER TO SHEET C-38 FOR DETAILED GRADING PLAN FOR \ \'q OFFSITE ROADWAY IMPROVEMENTS \ �4`\\ LIMITS OF DISTURBANCE (TYP.) A. ice\ IG \ RATED PVC \ UN PIPE ,T 0.1OX (TYP.) 'G lb b U ' �y \\ ' a �. •SW G13o�FoI �/u/�c� \ ORETE BA CS- RIM: 2 \\ TSP NV IN: s1D(C NO T) \ Tsp INV IN: C N T \ INV OUT. 4.26 . { % -- 192------� 8'[M rSSMH 191.31' INV IN(NW).s 183.81' INV OUT(SE)a 183.71' pharmacy SOUTHERN 11,W-LEFT CHAFFER DM-THRU STOREIME11' / WV W. JACKSON BLVD AND N. 13TH STREET ERWIN, NC PROJECT TYPE NEW DEAL TYPE FEE -FOR -SERVICE CS PROJECT MOM: 76M ENGINEER: O 1 21113 Kimley-Horn j and Associates, Inc. CONSULTANT- KIMLEY-HORN AND ASSOC. 333 FAYETTEVILLE STREET SUITE 600 RALEIGH, NC 27601 TEL (919) 835-1494 FAX (919) 653-5847 DEVELOPER REDDLANDS, INC. 116-103 WILSON PIKE CIR BRENTWOOD, TN 37027 PH (615) 591-5525 FAX (615) 352-9790 SEAL: J��� CAR SEAL 9r; 032582 •'�����ER " REVISIONS: DRAWING BY: JGM DATE: 05-APRIL-2013 JOB NUMBER: 012426063 TITLE: GRADING AND DRAINAGE SHEET NUMBER: C-4 COMMENTS: NOT RELEASED FOR CONSTRUCTION MR L EXIS77NC G RADE ANY FILL MATERIAL USED TO CONSTRUCT INFILTRATION BASINS MUST BE CLEAN SAND WITH LESS THAN 7% PASSING 200 SIEVE. 15" -- 0 0. TOP OF BASIN 186.00' CONCRETE CONTROL STRUCTURE (TOP OF RISER = 184.90) UTILIZE NEENAH GRATE TYPE 4884—A OR APPROVED EQUAL 1 10—YEAR WSEL= 184.89' s� F. � 1—YEAR WSEL= 183.51' �—GEOTEXTILE FILTER FABRIC INLET PIPE 4" LAYER CLEAN SAND THICK NCRETE ELLS ATE SEDIMENT CLEANOUT ELEV: 181.70 SHWT >57" BELOW EXISTING GRADE INFILTRATION BASIN BMP #1 N.T.S. SLU I IUN A -A RCP OUTLET J.50% INV=181.55 1 w _—ANY FILL MATERIAL �oQ USED TO CONSTRUCT INFILTRATION BASINS ti MUST BE CLEAN SAND WITH LESS THAN 7% PASSING 200 SIEVE. RCP OUTFALL (REFER TO GRADING PLAN FOR PROPOSED ELEVATIONS) INFILTRATION BASIN CONTROL STRUCTURE CS-23 NOT TO SCALE TOP OF RISER El EV.=184.90 SECTION B-B TE 15" RCP OUTLET 0 0.50% INV=181.55 CONSTRUCTION NOTES CARE SHOULD BE USED DURING INSTALLATION TO MINIMIZE COMPACTION OF SOIL ON THE BOTTOM AND WALLS OF INFILTRATION DEVICES SINCE THIS WILL REDUCE THE PERMEABILITY AT THE SOIL INTERFACE. TOAVOID COMPACTING THE DRAINAGE MEDIA, LIGHT EQUIPMENT AND CONSTRUCTION TECHNIQUES THAT MINIMIZE COMPACTION SHOULD BE USED. RUNOFF SHALL NOT BE DIRECTED INTO AN INFILTRATION DEVICE UNTIL THE DRAINAGE AREA IS STABILIZED.. A CONSTRUCTION SEQUENCE MUST BE FOLLOWED THAT REFLECTS THE NEED TO STABILIZE THE INFILTRATION DEVICE. THE LONGEVITY OF INFILTRATION DEVICES IS STRONGLY INFLUENCED BY THE CARE TAKEN DURING CONSTRUCTION. A MINIMUM OF ONE OBSERVATION WELL SHALL BE INCLUDED IN THE DESIGN OF AN INFILTRATION SYSTEM TO PERIODICALLY VERIFY THAT THE DRAINAGE MEDIA IS FULLY DRAINING. THE MONITORING WELL SHALL CONSIST OF A 4—INCH TO 6—INCH DIAMETER, PERFORATED POLYVINYL CHLORIDE (PVC) PIPE WITH A LOCKING CAP. THE WELL SHOULD BE PLACED NEAR THE CENTER OF THE FACILITY OR IN THE GENERAL LOCATION OF THE LOWEST POINT WITHIN THE FACILITY. WITH THE INVERT AT THE EXCAVATED BOTTOM OF THE FACILITY. MAINTENANCE NOTES PLEASE REFER TO SECTION 7.0 OF THE NCDENR STORMWATER BMP MANUAL, GENERAL BMP MAINTENANCE, FOR INFORMATION ON TYPES OF MAINTENANCE, TYPICAL FREQUENCY, AND SPECIFIC MAINTENANCE TASKS THAT ARE COMMON TO ALL BMPS. THE FOLLOWING INFORMATION IS MAINTENANCE THAT IS SPECIFIC TO INFILTRATION DEVICES. FOR THE FIRST YEAR OF OPERATION, INSTALLATIONS SHOULD BE INSPECTED MONTHLY AND AFTER EACH MAJOR STORM. AFTER THE FIRST YEAR, QUARTERLY INSPECTIONS, PREFERABLY CONDUCTED AFTER A STORM, ARE RECOMMENDED. MAINTENANCE IS VERY IMPORTANT FOR INFILTRATION DEVICES. PROPERTY OWNERS SHOULD BE EDUCATED IN THE FUNCTION AND MAINTENANCE REQUIREMENTS OF INFILTRATION DEVICES. ESPECIALLY IMPORTANT IS THE MAINTENANCE OF VEGETATED AREAS THAT DRAIN TO THE INFILTRATION SYSTEM. AREAS THAT ARE ALLOWED TO BECOME BARE AND UNVEGETATED WILL CONTRIBUTE EXCESS SEDIMENT TO THE INFILTRATION SYSTEM AND HASTEN ITS FAILURE. ANY SEDIMENT DEPOSITS IN PRETREATMENT DEVICES SHOULD BE REMOVED AT LEAST ANNUALLY. THE SURFACE OF INFILTRATION SYSTEMS MUST BE KEPT IN GOOD CONDITION. COLONIZATION BY GRASS OR OTHER PLANTS SHOULD BE DISCOURAGED, SINCE THIS CAN LEAD TO REDUCED SURFACE INFILTRATION RATES. IN MANY INSTANCES, IT IS CONVENIENT TO COVER INFILTRATION TRENCHES WITH CONCRETE GRID PAVERS OR SIMILAR PERMEABLE PAVING SYSTEMS THAT CAN BE REMOVED EASILY AND REPLACED AS NECESSARY TO SERVICE THE TRENCH. IN ORDER TO MONITOR PERFORMANCE OF THE INFILTRATION DEVICE, OBSERVATIONS SHOULD BE CONDUCTED TO DETERMINE HOW LONG IT TAKES RETAINED WATER TO INFILTRATE INTO THE SOIL AFTER A STORM EVENT. THE DETERMINATION CAN BE MADE IN TWO WAYS. THE MOST INFORMATIVE WAY IS TO READ THE WATER LEVEL SEVERAL TIMES OVER A PERIOD OF DAYS AFTER A LARGE STORM. THE ALTERNATIVE IS A -ONE—STOP-METHOD, WHERE A SINGLE READING IS TAKEN AND COMPARED WITH THE LOCAL RAINFALL RECORD. ALTHOUGH LESS ACCURATE THAN THE MULTIPLE READING METHOD, THE ONE —STOP METHOD WILL STILL ALLOW SIGNIFICANT DETERIORATION IN PERFORMANCE TO BE RECOGNIZED. THE TOP SEVERAL INCHES OF DRAINAGE MEDIA AND THE FILTER CLOTH ALONG THE TOP OF THE DRAINAGE MEDIA SHOULE BE REPLACED ANNUALLY OR AT LEAST WHEN THE DEWATERING TIME IS LONGER THAN 5 DAYS. IF AFTER REPLACING THE TOP MEDIA THE INFILTRATION RATE IS STILL NOT IN THE ACCEPTABLE RANGE, THE ENTIRE FACILITY MUST BE DISMANTLED AND RECONSTRUCTED. PROPER DISPOSAL OF THE MATERIALS REMOVED IS NECESSARY; THE AGGREGATE AND CLOTH SHOULD BE APPROPRIATELY PACKAGED AND DELIVERED TO THE LOCAL LANDFILL, IF THE OPERATING AUTHORITY APPROVES THE DISPOSAL. INFILTRATION SODDED SIDE SLOPES AND BOTTOM CLASS "C" GEOTEXTILE FABRIC ALONG SIDE OF RAIN GARDEN ALONG COMPACTED SUBGRADE NOTES: PONDING DEPTH: 12" UNDERDRAIN TO BE 3/8" PERE 0 6" O.C., 4 HOLES PER ROW, SLOPED AT 0.10%; MINIMUM OF 3" OF GRAVEL OVER AND ON EITHER SIDE OF PIPES; GRAVEL NOT NECESSARY UNDER PIPES. UNDERDRAIN PIPES AND CLEANOUTS SHOULD BE LOCATED IN THE QUANTITY AND ELEVATION FOUND ON THE GRADING AND DRAINAGE PLAN. SANDY LOAM/LOAMY SAND; FINES SHOULD BE LIMITED TO TWENTY PERCENT OR LESS PASSING THROUGH A #200 SIEVE. MINIMUM INFILTRATION RATE = 2"/HR NATIVE SOIL, NO SECTION B'-B': UNDERDRAIN NOT TO SCALE CAPPED CLEAN OUT, TYP. TOP 6" ABOVE GRADE. (VARIES) BIORETENTION SOIL MIXTURE PER SPECIFICATION L— 4" SCHEDULE 40 PVC, SDR-35, OR SMOOTH WAL" CORRUGATED PLASTIC PIPE SLOPED AT 0.10% WITH 3/8" PERFERATIONS 0 6" ON CENTER (4 HOLES PER ROW) SECTION A' -A': UNDERDRAIN NOT TO SCALE BIORETENTION SOIL MIXTURE 6" DIA. PVC UNDERDRAIN PIF ELEV.=187.50 ITEM PERCENT BY WEIGHT MATERIAL SAND 85-88% CONSTRUCTION SAND FINES -8-12X SILT AND CLAY ORGANIC MATTER 3-5X PEAT MOSS Bioretention Soil Mixture (BSM): shall be placed and graded using low ground —contact pressure equipment or by excavators 6" DIA. PVC - and/or backhoes operating on the ground adjacent to the bioretention facility. No heavy equipment shall be used within the UNDERDRAIN PIPE perimeter of the bioretention facility before, during, or after the placement of the 8SM. The BSM shall be placed in horizontal layers not to exceed 12 inches for the entire area of the bioretention facility. The BSM shall be compacted by saturating the entire area of the bioretention facility after each lift of BSM is placed until water flows from the underdrain. Water for saturation shall be applied by spraying or sprinkling. An appropriate sediment control device shall be used to treat any sediment —laden water discharged from the underdrain. If the BSM becomes contaminated during the construction of the facility, the contaminated material shall be removed and replaced with uncontaminated material at no additional cost to the Owner. Final grading of the BSM shall be performed after a 24—hour settling period. Final elevations shall be within 2 inches of elevations shown on the Contract Plans. The Bioretention Soil Mixture (BSM) shall be a uniform mix, free of stones, stumps, roots or other similar objects larger than 6" DIA. PVC two inches excluding mulch. No other materials or substances shall be mixed or dumped within the bioretention area that may UNDERDRAIN PIPE be harmful to plant growth, or prove a hindrance to the planting or maintenance operations. ELEV.=187.50 Prior to placing the underdrain and the BSM, the bottom of the excavation shall be roto—tilled to a minimum depth of 6 inches to alleviate any compaction of the facility bottom. Any substitute method for roto—tilling must be approved by the Engineer prior to use. Any ponded water shall be removed from the bottom of the facility and the soil shall be friable before roto—tilling. Grass sod shall be used in bioretention area. Grassed sod must not be grown in soil with an impermeable (clay) layer. BSM must have a P—index of 10 to 30. BIORETENTION ;S [ON CLASS "C" GEOTExTILE FABRIC ALONG SIDE OF RAIN GARDEN ALONG COMPACTED SUBGRADE CLASS "Co GEOTEXTILE FABRIC AROUND WASHED STONE #57 STONE (WASHED) OUTLET GRATE — US FOUNDRY 4156 TOP OF RISER FRAME AND 6241 GRATE OR ELEV.=190.92 APPROVED EQUAL �15" RCP OUTLET 0 0.50% INV=184.26 SECTION A -A GRATE TOP OF RISER ELEV.=190.92 4' I� ,a �15" RCP OUTLET SECTION B-B NV=184.26 BIORETENTION CONTROL STRUCTURE CS-04 NOT TO SCALE IP M. 1 •1 .w■ S OFE NLWBE 75W W. JACKSON BLVD AND N. 13TH STREET ERWIN, NC PM EM7YPE- NEW DEAL TYPE FEE -FOR -SERVICE CS Pf OJECT NLUER: 76M ENGINEER: =F1 02013 Kimley-Horn and Associates, Inc. CONSULTANT KIMLEY-HORN AND ASSOC. 333 FAYETTEVILLE STREET SUITE 600 RALEIGH, NC 27601 TEL (919) 835-1494 FAX (919) 653-5847 DEVELOPER: REDDLANDS, INC. 116-103 WILSON PIKE CIR BRENTWOOD, TN 37027 PH (615) 591-5525 FAX (615) 352-9790 SEAL" y 9 SEAL 032582 = REVISIONS: DRAWING BY: DATE: JOB NUMBER: TITLE: STORMWATER DETAILS SHEET NUMBER: C-14- COMMENTS: