Loading...
HomeMy WebLinkAboutSW6130105_CURRENT PERMIT_20130208STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT. NO. DOC TYPE V) CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ���U210g YYYYMMDD MCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P.E. Governor Director February 8, 2013 Antonio G. Burgess, Corporate Secretary Spring Lake Congregation of Jehova's Witnesses 1015 Karen Circle Spring Lake, North Carolina 28390 Subject: Stormwater Permit No. SW6130105 Spring Lake Kingdom Hall Dear Mr. Burgess: John E. Skvarla, III Secretary RECEIVED MAR 1 1 2013 DENR-FAVETTEV"LEREGIONAL OFFlCE The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for Spring Lake Kingdom Hall on January 22, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 02H.1000. We are forwarding Permit No. SW6130105, dated February 8, 2013, for the construction, operation and maintenance of the subject project and the stormwater BMPs. This permit shall be effective from the date of issuance until February 7, 2021, and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to follow the procedures for transfer of the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes. Per NCGS 143- 215(e) the petition must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Raleigh Regional Office. If you have any questions, or need additional information concerning this matter, please contact Mike Randall at (919) 807-6374; or mike.randall@ncdenr.gov. Sincerely, ��.� .—� J2 u/,moo cc: for Charles Wakild, PE, Director Wetlands and Stc,nnater Sra,H) 1617 Mz,l Seiaice Cencei, R,:eigh, Iiodh C'amohna 27699 1617 '_oca!ion: 512 N. Sahshury S:. kale;;A Nash :"anhna 21604 Phcnec 91900i 63301FA7 P17307Lk.l 1nti;n6L;MV, 1cwa1erq--:11lyo;_ ,. , , N ' ,,. ...,,::.rr. ura.:ct, SW6130105 Verne L. Thoren, Project Manager Fayetteville Regional Office NorthCarolina Stpte Stormwater Permit Permit No. SW6130105 i STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Antonio G. Burgess, Corporate Secretary Spring Lake Kingdom Hall Spring Lake, North Carolina Harnett County FOR THE construction, operation and maintenance of one wetland in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 7, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in the application documents and as shown on the approved plans. 3. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 5. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. II. SCHEDULE OF COMPLIANCE 1. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 1 of 4 State Stormwater Permit Permit No. SW6130105 2. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans. f. Debris removal and unclogging of all drainage structures, level spreader, filter media, planting media, underdrains, catch basins and piping. g. Access to the cell and outlet structure must be available at all times. 3. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 4. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 5. The stormwater treatment system shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. Page 2 of 4 State Stormwater Permit Permit No. SW6130105 9. The permittee shall submit final site layout and grading plans for any permitted future areas shown' on the approved plans, prior to construction. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 21-1.1000, and NCGS 143-215.1 et.al. Page 3 of 4 State Stormwater Permit Permit No. SW6130105 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 8th day of February, 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION By Authority of the Environmental Management Commission Page 4 of 4 State Stormwater Permit Permit No: SW6130105 Spring Lake Kingdom Hall Spring Lake, North Carolina Harnett County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL cc: NCDENR-DWQ Regional Office Page 1 of 1 DWQ USE ONLY Date Received Fee Paid Permit Number v 0 1St vCv I O 10 Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (selectall that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: RECEIVED State of North Carolina MAR 1 1 2013 Department of Environment and Natural Resources Division of Water Quality DENR-FAYETTEMLLE RECU®F9WATER MANAGEMENT PERMTT APPLICATION FORM This fOrm may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Spring Lake Kingdom Hall 2. Location of Project (street address): City: Spring Lake County: Harnett -v 1 Zip: 28390 3. Directions to project (from nearest major intersection): rl� From Intersection of Front (US421) and Main St(US 401/210) South on NC 21013 miles to Raynor Rd (SR 2052)- Left (West) on Raynor 600 Feet - Property on Left 4. Latitude:35° 14' 22" N. Longitude:-78° 55' 47" W of the main entrance to the project. 11. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.lf this application is being submitted as the result of a modification to an existing permit, list the existing permit number N/A , its issue date (if known)NZA and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* 'provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, N/A and the previous name of the project, if different than currently proposed, N/A 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 16 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, issue date and the type of each permitIn Process ForinSWU-101 VersionW.ftm2010 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Spring Lake Congregation Of Jehova's Witnesses, Spring Lake, North Carolina, Inc Signing Official & Title:Antonio G. Burgess, Corporate Secretary b.Contact information for person listed in item la above: Street Address: 1015 Karen Circle City: Spring Lake State: NC Zip: 28390 Mailing Address (if applicable): 1015 Karen Circle City: Spring Lake State: NC Zip: 28390 Phone: (910 ) 885-2571 Fax: (910 ) 496-1896 Email:abiirgessODI@nc.rr.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/1 Signing Official & b. Contact information for person listed in item 2a above: Street Address: Mailing Address (if City: Phone: ( ) Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: NC Regional Building Committee #2 Signing Official & Title: Verne L. Thoren, Project Manager b.Contact information for person listed in item 3a above: Mailing Address: 1201 Green Branch Lane Phone: (919 ) 661-8151 Email:vernetl)oren@nc.rr.com 4. Local jurisdiction for building permits: Harnett Couny State: NC Zip: 27603 Fax: (919 ) 803-1944 Point of Contact: Jay Sikes Phone #: (910 ) 893-7525 Ext 4 FormSWU-101 Version 07Jun2010 Page 2of6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Runoff collected by combination of inlet and swales directed to Stormwater Wetlands with Forebay sized to mitigate 1 2 10 and 100 Yr peak increases. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUDApproval Date: ❑ Valid Building Permit Issued Date: ❑ Other: N/A Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the River basin. 4. Total Property Area: 2.11 Ac acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 2.11 acres Total pro/'ectarea shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks ofstreams and rivers, the area below the Nonnal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant protect area is used to caladate overall percent built upon area (BUA). Non -coastal wetlands Ian d ward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 31.0 U/l 9. How many drainage areas does the project have? 1 (For high density, count I for each proposed engineered storm water BMF. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area Drainage Area Receiving Stream Name U/T-Little River Stream Class * C Stream Index Number * 18-23-(24) Total Drainage Area (sf) 100,611 On -site Drainage Area (sf) 49794 Off -site Drainage Area (sf) 50,817 Proposed Impervious Area** (sf) 27,147 % Im ervious Area** (total) 1 27.0 Impervious" Surface Area Drainage Area _ Drainage Area _ Drainage Area _ Drainage Area On -site Buildings/Lots (sf) 4,610 _ On -site Streets (sf) 0 On -site Parking (sf) 21,197 On -site Sidewalks (sf) 1340 Other on -site (sf) 0 Future (sf) 0 Off -site (sf) 0 Existing BUA*** (sf) 0 Total (sf): 27,147 " Stream Class and Index Number can be determined at: http://portalncdeur. orv/web/wg/t7s/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, grovel areas, etc. Form SWU-101 Version 07.1un2010 Page 3 of 6 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be rephced bync w BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Cad Areas From Autocad Drawing - Back-up Attached Projects in Union County: Contact DWQ Central OJJice staffm check ifthe project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormmater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BM specified for this project. The latest versions of the forms can be downloaded from http://portil.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.nctienr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncLienr.org/web/wq/ws/su/statesw/forms does. ti Is 1. Original and one copy of the Stormwater Management Permit Application Form. �''. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'h mile of the site boundary, include the mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. Form SWU-101 Version 07Jun2010 Page 4 of 6 o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SH WT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NlZCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7375) 2�" A copy of the most current property deed. Deed book: 964 Page No: 124 For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. htt2://www.secretary.state.iic.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://port,il.nc(ienr.orgZweb/wq/ws/su/statesw/forms_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VUL CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: David L. Smith, P.E. Consulting Firm: Rivers And Associates Inc. Mailing Address:6131 Falls Of Neuse Road, Suite 300 City: Raleigh State:NC Zip:27609 Phone: (919 ) 848-3347 EXT 6257 Email:dsmith@riversandassociates.com Fax: (919 ) 484-0319 IX. PROPERTY OWNER AUTHORIZATION (if Contacthnfornnation, item 2has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) Owner/Applicant , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item 1 a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of,4p to $25,000 per day, pursuant to NCGS 143-215.6. Signature: X/ Date: I� d/{ 4 /✓ G✓ Jn S a Nota_Cy Public for the State of ��f�%t�+4rG�� / ^9 .County of �n do he by certify that 0 personally appeared before me thiZAd day of / 14 d , and ocknowl�c the due exe ition of the application for a stormwater permit. Witness my hand and official s SEAL My commission expires l/C44✓ // 20/3 X. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in Contact Information, item M) Antonio G Burgess certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under J,5A NCAC 2H .1000, SL 2006-246 (Ph. 11- Post Construction) or SL 2008-211. Signature: /'Date:/Z/ZO/3 I,1,6 13�4'/ a sp a Notasv Pu lfor e Stateoff 40A/% C/✓0%aat , County of do he by certify that P$S personally appeared before me thi L day of 70and acknowledge the due execution of the application for a stormwater permit. Witness my hand and of ' is sea , SEAL My commission expires Form SWU-101 Version 07Jun2010 Page 6 of 6 I'r C J •r ll 1�/ V him )ice l` ! i O • k (((If(i �_ / Llfl plU,: (;,� /J/�! •�ll�llUlli; _ 4A .JehovaWs M'itnesses Inc. 2415 Itoselrill I[oad I'Seyelleville, NC 211:301 January 3, 2013 CORPORATION RESOLUTION We the members of the Spring Lake Congregation of Jehovah's Witnesses, Spring Lake, North Carolina, Inc., give due authority to Antonio G. Burgess and Verne L. Thoren to represent the Corporation in signing project agreements for the upcoming building project. resident, James Bethea Jr. Date Secretary, Antonio G. Burgess Date Treasurer, Clarence M. Ferguson Date pfi,57V4-J 4V �206FFf oal /-Y)tL%- Application Completeness Review d First Submittal ❑ Re -submittal Date Received Development/Project Name: w I Receiving stream name u/-r-- River Basin: CA - Date Reviewed: _ By Bill Diuguid For post-constructidn requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek of Six Mile Creek Water Sheds): A r Latitude and Longitude: 35 /4- 2z A/ -7R 5S 4-9y; Jurisdiction 5 a. - Project Address: 1 X V Rg�„ra A Ron d Engineer name and firm: JMv'jis i.. SP;7T"- P.=. iP,✓c,<S and H-Vse ,�a-cr KA/c,a.L Arc Z9Goy Phone: 4i9- 94 9 _ -4 w4xn r / z So Finai d c,r; J- ii K,✓<A Is the project confirmed to be in the State MSI Stormwater Permit jurisdiction? 2'Yes or ❑ No ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets (D4iigh Density ❑ Other �/� �--401/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) / /BIJA 3/ °7 �,t Check for $505.00 included V Original signature (not photocopy) on application t:f Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). v HU.44An Cl2 faf c OKp_ Scr__ Check spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. ❑ For subdivided projects, a signed and notarized deed restriction statement ealed, signed & dated calculations correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) ❑ Bioretention ❑ Rooftop Runoff Management ❑ Dry Detention Basin ❑ S33��d Filter RECEIVED Filter Strip Cr3'Stormwater Wetland ❑ Grass Swale ❑ Wet Detention Basin MAR 1 1 2013 ❑ Infiltration Basin ❑ Low Density ❑ Infiltration Trench ❑ Curb Outlet ❑ Level Spreader ❑ Off -Site DENR-FAYETTEVII.LE REGIONAL OFFICE ❑ Permeable Pavement ❑ NCDOT Linear Road ❑ Restored Riparian Buffer t�Xarrative wo sets of sealed, signed & dated layout & finish grading plans with appropriate details Description of stormwater management provided ry /Soils report, geotech information provided GY Wetlands delineated or a note on the plans or in the accompanying documents that none exist on site and/or lacent property V/Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter, / Dimensions & slopes provided o/ Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density d/BMP operation and maintenance agreements provided o' Application complete ❑ Application Incomplete Returned: (Date) Comments Lpob r A -- Oct 29 2012 Revision, Bill Diuguid. t _ 01c, W A TfgO NCDENR C STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all the required information. h,PROJECT,INFORMATION!` Project name Spring Lake Congregation Kingdom Hall Contact name Verne L Thoren Phone number 919-661-8161 Date January 17, 2013 Drainage area number 1 II.':DESIGNIINFORMATION� Site Characteristics Drainage area 100,611.00 ff' Impervious area 27,147.00 ft'iRA gd Percent impervious 27 0% % Design rainfall depth 1.00 inch Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Pre/Post 1-yr, 24-hr peak control Storage Volume: Non -SA Waters Minimum required volume Volume provided (temporary pool volume) Storage Volume: SA Waters Parameters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Outlet Design Depth of temporary pool/ponding depth (Dpi ,J Drawdown time Diameter of orifice 3.06 in 0.13 inlhr 3.46 ff3/sec 6.62 ff3/sec 3.16 ff3/sec ►3 2,516.00 ff3 4,101.00 ff3 OK NIA ff3 ff3 It ff3 ff3 12.00 in OK 3.00 days OK 1.00 in OK Coefficient of discharge (Co) used in orifice diameter 0.60 (unitless) calculation Driving head (Ho) used in the orifice diameter calculation 0.33 it RECEIVED MAR 1 1 1013 DENR—FAYETTEVILLE REGIONAL OFFICE Provide calculations to support this driving head. Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 1 of 3 Surface Areas of Wetland Zones Surface Area of Entire Wetland 4,756.00 ft' OK Shallow Land 1,310.00 ft' Insufficient shallow land area. The shallow land percentage is: 28% % Shallow Water 1,787.00 ft Insufficient shallow water area. The shallow water percentage is: 38% % Deep Pool Forebay portion of deep pool (pretreatment) 476.00 f? OK The forebay surface area percentage is: 10% % Non-forebay portion of deep pool 455.00 ft' OK The non-forebay deep pool surface area percentage is: 10% % Total of wetland zone areas 4,028.00 ft2 Enter data into the shaded cells in this section. Add or subtract the following area from the zones -728.00 ftZ Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top) 215.00 It amsl Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top) 214.00 It amsl Shallow Water bottom 213.50 ft amsl Most shallow point of deep pool's bottom 212.00 It amsl Deepest point of deep pool's bottom 211.50 ft amsl Design must meet one of the following two options: This design meets Option #1, Top of PPE is within 6" of SHWT, If yes: N (Y or N) SHWT (Seasonally High Water Table) 213.00 ft amsl OK This design meets Option #2, Y (Y or N) Wetland has liner with permeability < 0.01 in/hr, If yes: Depth of topsoil above impermeable liner 4.00 in OK Topographic Zone Depths Temporary Pool Shallow Land 12.00 in OK Permanent Pool Shallow Water 6.00 in OK Deep Pool (shallowest) 24.00 in OK Deep Pool (deepest) 30.00 in OK Planting Plan Are cattails included in the planting plan? N (Y or N) OK Number of Plants recommended in Shallow Water Area: Herbaceous (4'cubic-inch container) 450 Number of Plants recommended in Shallow Land Area: Herbaceous (4'cubic-inch container), OR 350 Shrubs (1 gallon or larger), OR 56 Trees (3 gallon or larger) and Herbaceous (4+cubic-inch) 7 and 280 Number of Plants provided in Shallow Water Area: Herbaceous (4'cubic-inch container) 450 OK Number of Plants provided in Shallow Land Area: Herbaceous (4'cubic-inch container) 350 OK Shrubs (1 gallon or larger) 83 OK Trees (3 gallon or larger) and Grass -like Herbaceous (4+cubic-inch) Form SW401-Wetland-Rev.6-11116/09 Parts I and II. Project Design Summary, Page 2 of 3 ._ Additional Information Can the design volume be contained? Y (Y or N) OK Does project drain to SA waters? If yes, N (Y or N) Excess volume must pass through filter. What is the length of the vegetated filter? N/A ft Are calculations for supporting the design volume provided in the Y (Y or N) OK application? Is BMP sized to handle all runoff from ultimate build -out? Y (Y or N) OK Is the BMP located in a recorded drainage easement with a Y (Y or N) OK recorded access easement to a public Right of Way (ROW)? The length to width ratio is: 7.20 :1 OK Approximate wetland length 180.00 ft Approximate wetland width 25.00 ft Approximate surface area using length and width provided 4,500.00 ft, This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK Form SW401-Welland-Rev.6-11/16/09 Parts I and 11. Project Design Summary, Page 3 of 3 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. Z,¢ 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Wetland dimensions (and length to width ratio), - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. J� CL 2. Plan details (1" = 50' or larger) for the wetland showing: - Wetland dimensions (and length to width ratio) - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), - Overflow device, and - Boundaries of drainage easement. ny ,f 3. Section view of the wetland (1" = 20' or larger) showing: - Side slopes, 3:1 or lower - Wetland layers All wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no clay liner: SLWT depth ✓Option 2, clay liner: Depth of topsoil on top of liner, liner specifications 4. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: - A variety of several suitable species (not including cattails), - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, - The source nursery for the plants, and - Fertilizer and watering requirements to establish vegetation. Z) 4 5. A construction sequence that shows how the wetland will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations (including drawdown calculations). 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. A1 \ 8. A copy of the deed restrictions (if required). 9. A soils report that is based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. SW401-Wetland-Rev.6-11/16/09 Part III, page 1 of 1 Permit Number: (to be p ouded by DIYQ) Drainage Area Number: Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks). - No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. - Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, I will inspect it monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: Entire BMP Trash/debris is present. Remove the trash/debris. Perimeter of wetland Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height, Inlet device: pipe or The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment swale offsite. The pipe is cracked or otherwise Replace the pipe. damaged if applicable). Erosion is occurring in the swale (if Regrade the swale if necessary to smooth applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. RECEIVED MAR 1 1 2013 Form SW401-Wetland O&M-Rev.4 DENR-FAYETTDALLEREGIONALOFFICE Page Iof3 J Permit Number: (io be provided by DWQ) BMP element: Potentialproblem: How I will remediate theproblem: Forebay Sediment has accumulated in the Search for the source of the sediment and forebay to a depth that inhibits the remedy the problem if possible. Remove forebay from functioning well. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Deep pool, shallow water Algal growth covers over 50% of the Consult a professional to remove and and shallow land areas deep pool and shallow water areas. control the algal growth. Cattails, phragmites or other invasive Remove invasives by physical removal or plants cover 50% of the deep pool and by wiping them with pesticide (do not shallow water areas. spray) - consult a professional. Shallow land remains Flooded more Unclog the outlet device immediately. than 5 days after a storm event. Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Best professional practices show that Prune according to best professional pruning is needed to maintain optimal practices. plant health. Sediment has accumulated and, Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth of the deep the sediment and dispose of it in a location pools. where it will not cause impacts to streams or the BMP. Embankment A tree has started to grow on the Consult a dam safety specialist to remove embankment. the tree. An annual inspection by appropriate Make all needed repairs. professional shows that the embankment needs repair. Evidence of muskrat or beaver activity Consult a professional to remove muskrats is present. or beavers. Micropool Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Re air or re lace the outlet device. Receiving water Erosion or other signs of damage have Contact the NC Division of Water Quality occurred at the outlet. 401 Oversi ht Unit at 919-733-1756. Form SW40 I -Wetland O&M-Rev.4 Page 2 of 3 If Permit Number: provided by Dn'Q) p.a 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Spring Lake Kingdom Hall BMP drainage area number: Print name:Antonio G Burgess Title: Registered Agent - Spring Lake Congr. OfJehovah's Witnesses Spring Lake NC Inc Address:1015 Karen Circle Spring Lake, NC 28390 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1-+k a,Notary Public for the State of of t!P/ :t7j , do hereby certify that appeared before me this 2Ad day of �013 , and acknowledge the due execution of the forgoing stormwater wetland requirements. Witness my hand and official seal, SEAL My commission expires d "T� // U/ 3 Form SW401-Wetland O&M-Rev.4 Page 3 of 3 Ll v. is y N