Loading...
HomeMy WebLinkAboutSW6110501_CURRENT PERMIT_20110518STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWA/Z7� DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD !:7 ,w r NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue -Goleen H. Sullins Dee Freeman Governor Director Secretary May 18, 2011 Mr. Craig Lantz, Water Management Branch Directorate of Public Works U�` 2175 Reilly Road, Stop A Fa® Fort Bragg, NC 28310 JUN 2 12011 Subject: Stormwater Permit No. SW6110501 ®wo Scott Street Parking Lot High Density Commercial Wet, Pond Project -Handers" I1County--- Dear Mr. Lantz: The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for Scott Street Parking Lot on May 10, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 and Session Law 2006-246. We are forwarding Permit No. SW6110501, dated May 17, 2011, for the construction, operation and maintenance of the,subject project and the stormwater BMPs. This permit shall be effective from the date of issuance until May 10, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Fayetteville:Regional Office. If you have any questions, or need additional information concerning this matter; please contact Brian Lowther at (919) 807-6368; or brian.lowther@ncdenr.gov. Sincerely, for Coleen H. Sullins :. i. cc: Fayetteville Regional Office SW6110501 File ec: David Arnold, PE, Timmons Group Wetlands and Stormwater Branch One 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 NOi't-hCarOtlna Location: 5N. Salisbury St. Raleigh, North Carolina 27694 r% atum��J,� Phone: 919.8�BOP6300 \FAR: 919�607-6494 \ Customer Service: 1-677-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity V Affirmative Action Employer State Stormwater Permit Permit No.SW6110501 STATE`OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT J1 J0N 2 1 In accordance with the provisions bf Article 21''of Chapter 143, General Statute 1Afr North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Directorate of Public Works Scott Street Parking Lot Northwest intersection of Knox Street -and, Scott Street, Fort Bragg, Cumberland County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and S.L. 2006-246 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 17, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 223,050 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 6 ry r. State Stormwater Permit Permit No.SW6110501 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, arres: 6.7 Onsite, ft : 290,651 Offsite, ft2: .0 Total Impervious Surfaces, ftz:` 050 Buildings ft : `'; ° '.: 0 Roads/Parking, ft2: 202,869 Other, ft2: 7,290 (sidewalks and future) Offsite, ft2: 0 C. Pond Depth, feet: d. TSS removal efficiency: e. Design Storm: f. Permanent Pool Elevation, FMS g. Permitted Surface Area @PP ft In. Permitted Storage Volume, ft�: i. Storage Elevation, FMSL: j. Controlling Orifice: k. Permanent Pool Volume, ft3: I. Forebay Volume, ft3: m. Receiving Stream/River Basin: n. Stream Index Number: o. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 3.5 85% 1.0 inch 285.5 9,850 18,065 at temporary pool 287 2.0" 0 pipe 25,089 e. 5,502 Beavers Creek / Cape Fear 18-31-24-5 „C„ The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended:use':prior to the construction of any built -upon surface. ai v.,�ip During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes.andithe vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Records of maintenance activities must be, kept and made available upon request to authorized personnel of DWQ:' :The'records will indicate the date, activity, name of person performing thewark and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 2 of 6 State Stormwater Permit Permit No.SW6110501 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement;action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater.management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this `project are incorporated by reference and are enforceable parts of the permit. 10.The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11.The permittee shall notify the Division of.any name, ownership or mailing address changes at least 30 days prior,to`making such changes. 12.The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 18`h day of May, 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit ; Permit No.SW6110501 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to;'the Director and shall have received approval for revised plans, specifications, .and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation.and Erosion Control Plan approval or a CAMA Major permit was sought. i ,r)"- s. f. Filling in, altering, or;piping`of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements'of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership.Change form, to the Division of Water Quality, signed by both parties,: and -accompanied by supporting documentation as listed on page 2 of the form'. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Page 3 of 6 r =� State Stormwater Permit Permit No.SW6110501 Scott Street Parking Lot Stormwater Permit No. SW6110501 Cumberland County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project; r`� Scott Street Parking Lot (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL 'Page 5 of 6 State Stormwater Permit Permit No.SW6110501 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ` 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved' plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system 'are"provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Fayetteville Regional Office Surface Water Protection 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301 Page 6 of 6 i, I d/ lop9= ®Hensel Phelps Construction Co. Combined FORSCOM/USARC Headquarters Transmittal Cover Sheet Detailed, by Each Transmittal Project # 2008056 Jobsite Info. Hensel Phelps Construction Company Building 8-2422 Scott Street Tel: 910.401.0719 Fort Bragg, NC 28310-5000 Fax: 910,401.0740 1211412011 Reference Number: 0886 • Transmitted To Transmitted By - Arthur Cannady Dan Blalock U.S. Army Corps of Engineers Hensel Phelps Construction Company Attn: CD -BF (James Gehle) Building 8 BLDG 8-2425 Scott St 2422 Scott Street Fort Bragg, NC 28310 Fort Bragg, NC 28310 Tel: 910.396,1211 ext. 234 Tel: 910-401-0719 Fax: 910.396.8585 Fax: 910-401-0740 Acknowledgement Required i Package Transmitted for Delivered Via T Tracking Number As Requested Hand - �ltem # Cty .Item Description Notes 001 1.00 Document Designer's Certification of Stormwater System for The project owner portion has been left blank Scott Street Parking for completion by USACE or DPW. Cc: Company Name Contact Name Copies Notes i Remarks Designer's Certification for construction of stormwater collection system. DEC 2 2 2011 J)VY0 Signature Performance! Printed on: 12/14/2011 P HPCC B3038 PM 2008056 DEC 14 2011 J L7u t-1 L_;L -- --- ------------------- lye zo// Signed Date Page 1 Scott Street Parking Lot Stormwater Permit No. SW6110501 Cumberland County Designer's Certification State Stormwater Permit Permit No.SW6110501 DEC 2 2 2011 DWO I, Sr.... >�b¢rnaTlrre as a duly registered rblL%;d�ngI er�{nae� in the State of North Carolina, having been authorized too served (periodically/ weekly/ full time) the construction of the project, Scott Street Parking Lot for Al,,6161`ale mY(Project Owner) hereby state that, to the best of my abilities, a care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of,this,form is included in the Certification. Noted deviations from approved plans and specification: <Wvt, Signature 4 i/ Registration N ber O;5-tq3 Date (;ZN11 Page 5 of 6 i2 1 State Stormwater PerrYiit Permit No.SW6110501 ®ENR-FRO DEC 2 2 2011 Certification Requirements: DWO �1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ct, 13. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. t/ 7. Trash rack is provided on the`'d0tletlbypass structure. _jl 8. All slopes are grassed with permanent vegetation. ___k/_9. Vegetated slopes are no steeper than 3:1. _1/ _10. The inlets are located per the approved plans and do not cause short- circuiting of the system. J"11. The permitted amounts of surface area and/or volume have been / provided. r✓ 12. Required drawdown devices are,correctly sized per the approved plans. L_13. All required design depths are provided. �14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. / 15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification:'to:.r Fayetteville Regional Office P Surface Water Protection 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301 Page 6:of,6, DWQ USE ONLY Date Received Fee Paid Permit Number L' Vti CD 0.'tt 0_6 LY &0 to I I o I Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M *mt Plan: State of North Carolina p, Department of Environment and Natural Resources 'r V� I, Division of Water Quality R® JUN STORMWATER MANAGEMENT PERMIT APPLICATION FORM®�A?20» This form stay be photocopied for use as an original DWQ I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Scott Street Pa rki it g Lot 2. Location of Project (street address): Northeast intersection of Knox Street and Scott Street City:Fort Bragg County:Cumberland Zip:28310 3. Directions to project (from nearest major intersection): From Randolph Gate at Fort Bragg, travel west along Randolph Road. Take a right onto Knox Street and then a right onto Scott Street. The parking lot is bounded by Knox Street, Macomb Street, and Scott Street. 4. Latitude:35° 09' 09" N Longitude:78° 58' 57" W of the main entrance to the project. if. PERMIT INFORMATION 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System []Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the Stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 9.5 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Erosion Control Permit: Scott Street Parking Lot; CUMBE-2011-153; Form SWU-101 Version 07Jun2010 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the nroiect): Applicant/ Organ ization:Directorate of Public Works (DPW) Signing Official & Title:Mr. Craig Lantz, Water Management Branch (WMB) b.Contact information for person listed in item 1a above: Street Address:2175 Reilly Road, Stop A City:FortBragg State:NC Zip:28310-5000 Mailing Address (if applicahle):2175 Reilly Road, Stop A City:FortBragg State:NC Zip:28310-5000 Phone: (910 ) 396-2301 Email:6ennings.c.lantz@us.army.mil Fax: (910 ) 907-2420 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State Mailing Address (if applicable): City: State Phone: ( ) Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Mr. Lee Ward Signing Official & Title: DPW / Water Management Branch b. Contact information for person listed in item 3a above: Mailing Address:Bldg 0-9125, McKellers Road City:Fort Bragg State:NC Zip:28310 Phone: (910 ) 396-2301 Email:lee.p.wardOus.army.mil 4. Local jurisdiction for building permits: Point of Contact: Fax: (910 ) 907-2420 Phone #: FormSWU-101 Version 07Jun20 10 Page 2of6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will be treated by a wet detention basin located on the eastern side of the proposed parking lot. Runoff will be conveyed via sheet flow off the parking lot into vegetated swales. A storm pipe network will capture this runoff and route it to the proposed wet detention basin. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 11.62 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:11.62 acres Total project area shall be calculated to exclude the followingg the noruml t7ool of impounded structures, the area between the banks of stremns and rivers, the area below the Nornal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landeoard from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal ¢oetlmids landward of the NHW (or MHW) line any be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 60.1 % 9. How many drainage areas does the project have?3 (For high density, count 1 for each proposed engineered stornuoater BMP. For late density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. V ° • n-ja A? AAA Ay Basin Information Draina e Area A Drainage Area A Drainage Area B Drainage Area _ Receiving Stream Name Beaver Creek Beaver Creek Young Lake Stream Class * C C C Stream Index Number * 18-31-24-5 18-31-24-5 18-23-27-1 Total Drainage Area (so 290,651 118,335 96,950 On -site Drainage Area (so 290,651 118,335 96,950 Off -site Drainage Area (so 0 0 0 Proposed Impervious Area**(so 223,050 36,241 44,979 % Impervious Area** total 76.7 130.6 46.4 Impervious- Surface Area Drainage Area A Drainage -Area A Drainage Area B Drainage Area _ On -site Buildings/Lots (so 0 0 0 On -site Streets (so . 0 0 0 On -site Parkin (so 202,869 7,815 4,942 On -site Sidewalks (so 3,425 2,146 918 Other on -site (so 0 0 0 Future (so 3,865. 0 . 3,571 Off -site (so 0 0 0 Existing BUA*** (so 12,891 26,280. 35,548 Total (so: 223,050, 36,241 44,979 * Stream Class and Inde.r Number can be determined at: httlr.//portaLncdeur.or hwebAwq/ps/csn/classifications Form SWU-101 Version 07Jun2010 Page 3 of Intt7ervions area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, siiiervalks, gravel areas, etc. ** Report only that mnmuit of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and rohfch will be replacer) by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DWQ Central Office stafflo check ifthe project is located inithin a Threatened & Endangered Species watershed that may he sabjecl to more stringent stornnwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htto://vortal.nc(lenr.ore/web/wo/ws/su/bmD-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available fromhttp://porta1.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. DA 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envlielp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/ management 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MI-IW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MI -I W (or NHW) of tidal waters. i. Dimensioned property/project Boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. NCR ➢A DQ for I a �q DP 'DA Form SWU-101 Version 07Jun2010 Page 4 of 6 o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SI-IWT elevations (Please identify �(t elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"zll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) NA NJF A copy of the most current property deed. Deed book: Page No: For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. littp://www.secretary.state.nc.tis/Corporatioiis/CSearch.asl)x 1VI1 W93ifiro wM 1I fiVC01\ri7[KIDWInk :1►VIF9 For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:David Arnold, PE Consulting Firm: Timmons Group Mailing Address:5410 Trinity Road, Suite 112 Phone: (919 ) 866-4938 Email:david.arnold©timmons.com State:NC Zip:27607 Fax: (919 ) 859-5663 IX. PROPERTY OWNER AUTHORIZATION (if Con tact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type none of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. FormSWU-101 VersiOn07JUn2010 Page 5of6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 pen day, pursuant to NCGS 143-215.6. a Notary Public for the State of . County of do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL. My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) Mr. Craig Lantz certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-1.1000, SL 2006-246 (Ph. If - Post Construction) or SL 2008-211. a Notary Public for the State of do hereby certify that Date: / / A%9 i ( 2y) County of personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission Form SWU-101 Version 07Jun2010 Page 6 of 6 Permit Number: (io be provided by DWQ) Drainage Area Number: 1 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided., This system (check one): RO ❑ does ® does not incorporate a vegetated filter at the outlet. JUN1�/��201, This system (check one): ®�/j" /Q ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. ' Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is Present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW40I-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (m be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessar . Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove . 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. . on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4._5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3!5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Sediment Removal , . 282 Pe manen Pool Elevatio Form SW401-Wet Detention Basin O&M-Rev.4 ------------ - ---- Volume Bott om Permanent Pool Elevation 285.5 Sediment Removal Elevation 281 Volume 281 -ft Min. ------ Sediment Bottom Elevation 280 I-ft n Storage Sedimer Storage FOREBAY MAIN POND Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Scott Street Parking Lot BMP drainage urea number: Print name:Mr. Craig Lantz Title: Directorate ol'Public Works (DPW) / Water Manaeement Branch (WMB) Address:2175 Reilly Road Stop A, Port Bragg, NC 28310-5000 Signature: �Ai�� 4� Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of , do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW40I-Wet Detention Basin O&M-Rev.4 Page 4 of 4. Permit No. (to be vovdel by DWO) ®4 '�_ t-11 W JUN 2 1 2u11 Y ®'i= NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Protect name Contact person Phone number Date Drainage area number 1l. DESIGN INFORMATION Site Characteristics Drainage area Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5• runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the tyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at (he perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp, pool? Elevation of the top of the additional volume Fenn SW401-Wet Detenlion Basin-Rev.8-9117109 290,651 ft2 223,050 ft2 76.74 % 1.0 in 17,938 ft3 18,065 ft3 ft3 ft3 ft3 ft3 ft3 Y (Y or N) 3.2 in 70 (CN) (unilless) 84 (CN) (unitless) iNhr 7.00 ft3/sec 3.56 ft3/sec -3.44 ft3lsec 18 Scott Street Insufficient required volume. 40 y 6— "__(k OK, volume provided is equal to or in excess of volume required. 287.00 fmsl 285.50 fmsl 280.00 fmsl ✓ 20,( 286.00 fmsl 285.00 fmsl 281.00 first 280.00 tmsl 1.00 It Y (Y or N) 287.0 fmsl OK Parts 1. 8 II. Oesign Summary, Page 1 of 2 'Z_ Permit No. no be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Ape,-pw Area, bottom of 1 Oft vegetated shelf, Aho, chap Area, sediment cleanout, top elevation (bottom of pond), Appr m„a Volumes Volume, temporary pool Volume, permanent pool, Vp._.i Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpa, ,. Area provided, permanent pool, Ape,m_pool Average depth calculated Average depth used in SAIDA, it,,, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ace,m_pa Area, bottom of 1Oft vegetated shelf, At melt 13,283 f? 9,307 N' 3.20 (unitless) 9,850 ft' OK 7,909 ft` 3,312 ftz 18,065 ft' OK 25,089 ft' 5,502 ft' 21,9% % OK 85 % N (Y or N) Y (Y or N) 3.20 (unitless) N (Y or N) 25,089 ft' 9,850 ft` it It Y (Y or N) 9,850 ft` 7,909 fr Area, sediment cleanout, top elevation (bottom of pond), Aror_,,d 3,312 ft' "Depth" (distance b/w bottom of 10ft shelf and top of sediment) 4.00 ft Average depth calculated 3.60 It Average depth used in SAIDA, day, (Round to nearest 0.511) 3.5 It Drawdown Calculations Drawdown through onfice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C„.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak Tow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of Towpath to width ratio Length to width ratio Trash rack for overflow 8 orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 2.00 in in' 0.60 (unitless) 1.50 If N (Y or N) (unitless) (unitless) it it 7.00 ft/sec 3.56 fte/sec 0.11 ft/sec 2.76 days Need 3 it min. OK OK OK, draws down in 2-5 days. 3:1 OK 10 :1 OK 10.0 If OK 3 :1 Insufficient Tow path to width ratio. Must not short-circuit pond. 1.5 :1 OK Y (Y or N) OK 3.0 ft OK N (Y or N) Insufficient. Vegetated filler required. N (Y or N) Insufficient. Recorded drainage easement required. Y (Y or N) OK Emergency Drain in Riser Structure Form SW401-Wet Detention Basin-Rev.8-9117109 Paris I. a 11. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. (p3.ol 3.°2 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High Flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overnow device, and - Boundaries of drainage easement. JF 3 0¢ 2. Partial plan (1" = 30' or larger) and details for the wet detention basin shoving: - Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. DA ir't-c-5 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. lA C-EL5 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. T)A 7. The supporting calculations. �A 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. N A 9. A copy of the deed restrictions (if required). 7P 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 j, &S tJ,-G. Z077Z