Loading...
HomeMy WebLinkAboutNCC222126_ESC Approval Submitted_20220706ROY COOPER Governor ELIZABETH S. MISER secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality May 24, 2022 LETTER OF APPROVAL WITH MODIFICATIONS United States Golf Association Michael Lee, Managing Director 77 Liberty Corner Road Liberty Corner, NJ 0793 8 RE: Project Name: USGA— Golf House Pinehurst Acres Approved: 5.78 Project ID: MOORE-2022-065 County: Moore City: Pinehurst Address: NC Hwy 2 & NC Hwy 5 River Basin: Lumber Stream Classification: Other Submitted by: Jackson Maples Date Received by LQS: May 23, 2021 Plan Type: Commercial Dear Mr. Lee: The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be deemed approved.. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.ne.aov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette. lucas cr,ncdenr.gov or Paul Clark at Paul.clarkgncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR W North Carolina De artment ofEnvironmental ualit Division of Cher Mineral and Laud Resourres � C2 Y 4Y.faytttevilie Regi€aneal C3ffm- 1 225 Cmerk Strect, Suite714 I 1 ayettevilly, North Carolina 28301 >raffi_ 910.4.3%.3300 Stormwater Central Office staff in Raleigh. Title 15A NCAC 413 .011 S(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS I I 3A-54. I (b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: Jackson Maples, P. E., LKC — email copy Debra Ensminger, Moore County Inspection Office — email copy Fayetteville Regional Office Letter of Approval with Modifications Date: May 24, 2022 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: USGA— Golf House Pinehurst Project ID: MOORS-2022-065 Counties: Moore The modifications required for the project approval are as follows: 1. Add note to the waterline installation and storm sewer in the SW corner of the erosion control plan that reads "Trench will be backfilled, seeded and stabilized at the end of each working day". 2. Show silt fence along the entire length of limits of disturbance on the east side of the project. 3. Place a check dam at the downstream end of the ditch widening for the additional storm sewer. 4. Provide check dam detail. These modifications must be received at the Fayetteville Regional office no later than June 14, 2022 otherwise the permit will be rescinded.