Loading...
HomeMy WebLinkAboutSW6220401_Design Calculations_20220621 (2)Cmeron Commercial Pond 1 Drawdown Time Temporary storage volume = Orifice #Idiameter= Area of orifice = Orifice #2 diameter = Area of orifice = Orifice Coefficient (Cd) _ Orifice elevation -- Water elevation --- Driving head (H) _ Discharge (Q) _ Drawdown time = 6,701 cf 1.5 in 1 0.0123 sf 0 in 0 0.0000 sf 0.60 321.00 ft 322.06 ft 0.35 ft 0.0351 cfs 190760 s 53.0 hr 2_2 days 1766-Drawdown time.xlsx Printed 6/21/2022