Loading...
HomeMy WebLinkAboutCape Fear Steam Station (19)6��. Progress Energy File No.: 12520-R Ms. Bethany A. Georgoulias Stormwater Permitting Unit Wetlands and Stormwater Branch North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 L W' JUN 15 2011 DENRWATE_R QUALITY POINT SOURCE BPPINCH N S000,S S o June 13, 2011 Subject: Carolina Power & Light Company d/b/a Progress Energy Carolinas, Inc. (Progress Energy) Cape Fear Steam Electric Plant NPDES Stormwater Permit Application Dear Ms. Georgoulias: Progress Energy received your letter dated May 17, 2011, indicating that storm water discharges specified in the submitted NPDES Permit Renewal Application (submitted to the Division of Water Quality on December 7, 2010, not on May 4, 2011, as indicated in your letter) will be permitted separately under an individual NPDES Stormwater Permit. Progress Energy will endeavor to correct any misunderstanding about the storm water outfalls located at the Cape Fear Plant based on the additional information requested. Storm water from various drains and sumps in the power block area contributes flow to several wastewater streams within the Cape Fear Plant system. These contributions are described in Form 2C and in the attachments to Form 2C. All wastewater streams combine and discharge to a tributary of the Cape Fear River via Outfall 007. These storm water flows are included in the wastewater permit and are not subject to the individual storm water permit. The four storm water outfalls described in Form 2F are the outfalls where storm water from industrial activity areas discharge to a surface water without combining with wastewater. As requested, revised Site Drainage Maps (Attachment 5 of the original submittal) with more detail are enclosed. As described in Form 2F, following an exceptional rainfall event, Outfalls SW -001 and SW -008 could potentially release storm water to surface water from inactive ash ponds which store coal ash. No coal ash has been sluiced to these ponds for more than 35 years. These are perched ponds meaning that the drainage areas contain only the precipitation that falls directly on the ash pond surface area. Since these ponds have been inactive, there have been no releases from these two storm water outfalls. In Form 2F IV B, the descriptions of the other two storm water outfalls are provided. Along the western perimeter of the drainage area for Outfall SW -2, there is a railroad spur that is used to deliver coal to the plant. The small contribution of runoff (< 1 acre) from along the railroad track (the industrial activity) flows through a pipe under the access road, then sheet flows over an employee parking lot and across a field to Shaddox Creek. The runoff is collected in a low area in the fKg pgjgq ,�%peath a berm to a discharge pipe to the creek. There have never been storage Cape Fear Steam Plant 500 CP&L Road Moncure, NC 27559 Ms. Bethany A. Georgoulias 2 June 13, 2011 areas or disposal areas, no loading or access areas, and,no pesticides, fertilizers, etc. applied within this drainage. Impervious areas located within this drainage area include an access road that parallels the railroad, a ,gravel parking lot, and a small employee picnic shelter. The small drainage area for Outfall SW -3 (— 2. acres) is along the swale between the plant access road and the north-west dike of the 1985 ash pond. Except for heavy rainfall events, storm water rarely flows from this outfall to drainages that eventually go to Shaddox Creek. Apart from an ash sluice pipeline, this area is away from industrial activities at the power plant area. There have never been,storage areas or disposal areas, no loading or access, areas, and no pesticides, fertilizers, etc. applied within this drainage. Also enclosed is a check ($860.00) for the NPDES Storm Water Permit fee. Please contact Ms. Robin Bryson, Environmental Specialist in our corporate office, at (919) 546-3962 or email to robin.bryson@pgnmail.com, if there are any questions with this submittal. 1 cert, under penalty of law, that this document and all attachment's were prepared under my,direction or supervision in accordance with,a,system,designed to assure that qualifieapersonnel,properly gather and evaluate the mformation,submitted Basedon my�inquiry of the person or persons who manage the,system, or those persons directly responsible for gathering the information, the information submitted is, to the,best°of my knowledge and belief, true, accurate, and complete I am aware that there are sign f cant,penalties for submitting false information, including the possibility offines and imprisonment for knowing violations Sincerely, 14 i� Randy Cox, P1ant,Manager Cape Fear Steam Electric Plant RC/rb Enclosures cc: Robin Bryson NPDES Wastewater Permitting/Sergei Chernikov Raleigh Regional Office, Water Quality Section 7." <--outfall SWOl <--outfall -002 q, fi -OUtfMW-003 tl Outfall SW -008 Property boundary Progress Energy Carolinas, Inc. Cape Fear Steam Electric Plant Attachment 5 (Revision 1) Form 2F - Item III Site Drainage Map NPDES Permit NC0003433 Permit Renewal Application 2011 A5-2