June 10, 2021
New Hanover County Aftport Authority
Attu. Granseur Dick, Facilities Director
1740 Airport Boulevard
Wilmington, NC 28405
NORTH CARi3lINA
subied'. Approved Minor Modification
Stormwater Permit No. SW8 050547
Wigton Iatereati4nal Airport
New Haver Canty
On April 20, 2021, the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources
received and accepted a complete minor modification application for changes to the moved plans for
Stormwater Mmagement Permit Number SW8 050547. It has been determined that the nature of the Wised
change meets the definition of a min modification in. that it does not result in an increase in the size of the
permitted stormwater control measure (SCM) and does not increase the amount of built -upon xm& Please refer to
Athwhinent C €or a detailed description o€the current proposed min modification and a list of all the past
mks moved during the effbative period of the permit. We are forwarding you an approved copy of the
modified plans for your files. Please add the attached plans to the previously approved plan set. Please reps the
previously issued permit with the revised: permit; dated June 10, 2021, attached:.
Please be aware that all berms and conditions of the permit issued on April 20, 2021 and modified: as attached,
remain in full force and of fi ct Please also understand that the approval of this minor lion to the sutoct
State Stormwater Permit is done on a roe -byre basis. Any other changes to this proNd miml be approved
through. this Office prior to constriction. The approval of this minor modification does not preclude the permittee
from complying with all other amble statifts, rules, regulations or ordmanccs, which may have j
over the proposed activity, and obtaining a permit or approval prior to construction.
If you have any questions concerning this matter, please contact Garrett Zorda in the Wilmington Regional Office
at (910) 745-7215 or garrett zorda�ncdenr.gov.
Sincerely,
u�- 1444
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures. Airaehrnent A — Designer's Certification Form
Attachmea C — Permitting History
Application Documents
DES\gdz \\\St0rMwatrr\Permtts & Prc jects\2005\050547 HD\2021 06 permit mi or 050547
cc: Jason NC Smith, PE, J M Smith F � , LLC
Neer Hanover Comity Mlding Safety Dqxwtment.
Wtimmgton Repocal Office Stormwater File
MarthCwvUmDeparUmevofEnvbrmmentatQaaUty I DtvisbaofEmgy,Mf waland Land. rmces
Mmkigmn RegiarwtO fce 1 127 Carkai Drive€xtenwn I Vftm nycott Nods+ Carojrna28405
State Stormwater Management Systems
Permit No. SW8 050547
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
New Hanover County Airport Authority
Wilmington International Airport Extended Dry Detention Basins (EDDB)
1740 Airport Boulevard, Wilmington, New Hanover County
I11C9]9IMIl'.I 0
construction, operation and maintenance of three (3) extended dry detention basin "stormwater control
measures" or "SCM") in compliance with the provisions of 15A NCAC 2H .1000 (1995 Rules) as
amended on January 1, 2017 (p2017 Rules) (collectively, the "stormwater rules') and the approved
stormwater management plans and specifications and other supporting data as attached and on file with
and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR")
and considered an enforceable part of this permit.
This permit shall be effective from the date of issuance until June 15, 2027, and shall be subject to the
following specified conditions and limitations:
I. DESIGN STANDARDS
1. The drainage area identified as Phase All is subject to the 1995 Rules and as clarified in the
1995 specific conditions listed herein. The drainage areas identified as Phase IIIA, Phase IIIB
and Phase IIIC are subject to the 1995 Rules and the 2017 Rules and as clarified in the 2017
Rules specific conditions listed herein.
2. This project and SCMs have been approved based on the "Wilmington International Airport
Stormwater Master Plan" document approved on November 24, 2004 as a variation to the
stormwater rules and in accordance with G.S. 143-214.7(c3). All future major modifications to
this permit must either meet the 2004 "Wilmington International Airport Stormwater Master
Plan" in its entirety, meet the most current set of stormwater rules, or provide technical
justification that the proposed modification is providing equal or better control and equal or
better protection of waters of the State as a variation under the current set of stormwater rules.
Approval of such variations that do not meet all of the requirements is done on a case -by -case
basis.
3. FAA requirements prohibit standing water (i.e., permanent pools) and stipulate that the design
storm must be fully drained within 48 hours. This is supported by G.S. 143-214.7(c3) where
the Division does not require the use of an SCM with standing water. The approved SCM
design for the 3 extended dry detention basins includes a low flow device but does not include
a permanent pool at the low flow outlet or sediment storage.
4. The approved "Wilmington International Airport Stormwater Master Plan" document is not
intended to limit or restrict the airport or its current or prospective tenants from pursuing
alternative or modified stormwater management solutions in various locations than those listed
in the document itself. Since the approval of the "Wilmington International Airport Stormwater
Master Plan" document, other stormwater control measure (SCM) options that do not contain
areas of standing water have been developed and should be evaluated for future projects.
Page 1 of 5
State Stormwater Management Systems
Permit No. SW8 050547
5. This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data. The maximum amount of built -upon area (BUA)
allowed for the entire project is 9,304,059 square feet.
6. The three (3) SCMs identified as "Phase I and II" Extended Dry Detention Basin, Phase IIIA
Extended Dry Detention Basin and Phase IIIB Extended Dry Detention Basin have been
designed to handle the runoff from 8,520,835 square feet, 116,598 square feet, and 367,596
square feet of BUA, respectively, within the delineated drainage areas. The BUA for future
development within the drainage areas to the SCMs identifies as "Phase I and 11" Extended
Dry Detention Basin, Phase IIIA Extended Dry Detention Basin and Phase IIIB Extended Dry
Detention Basin is limited to 2,175,154 square feet, 48,788 square feet, and 264,031 square
feet, respectively.
7. Where an individual project within the drainage area is being leased or sold, the stormwater
collection system for that project must be located in either dedicated common areas or
easements and the final plats will be recorded showing all such required easements.
8. The drainage areas for the on -site stormwater systems will be limited to the amounts of built -
upon area indicated in this permit and the approved plans and specifications. The runoff from
all built -upon area within the permitted drainage areas of this project must be directed into the
permitted stormwater control measures.
9. (2017 Rules) The peak flow from the 10-year storm event shall not cause erosion downslope
of the discharge point.
10. (2017 Rules) A 50-foot wide vegetative setback must be provided and maintained in grass or
other vegetation adjacent to all surface waters as shown on the approved plans. The setback
is measured horizontally from the normal pool elevation of impounded structures, from the top
of bank of each side of streams or rivers, and from the mean high waterline of tidal waters,
perpendicular to the shoreline.
11. The portion of the existing airport previously included in the drainage area of the permitted dry
detention basin that is being removed, must be submitted in a future permit application as a
modification or under G.S. 143-214.7(c4).
12. (1995 Rules) The following design criteria have been provided and must be maintained in the
"Phase I and 11" Extended Dry Detention Basin.
Phase I & II
a. Drainage Area, acres: 287.63
Onsite, ft2: 12,529,107
Offsite, ft2: 0
b. Total Impervious Surfaces, ft2: 8,520,835
C. Design Storm, inches: 4,552,087 1"
3,968,748 @a 1.5"
d. Basin Bottom Elevation, feet: 7.0
e. TSS removal efficiency: 50%
f. Storage Elevation, FMSL: 13.0
gg Storage Surface Area, ft2 506,082
h. Permitted Detention Volume, ft3: 1,058,112
i. Seasonal High Water Table, FMSL: 6.0
Controlling Orifice: 12.0" O
Drawdown Time for 12.0" 0 orifice, hours: 57
1. Receiving Stream/River Basin: Smith Creek / Cape Fear
M. Stream Index Number: 18-74-63
n. Classification of Water Body: C;Sw
13. (2017 Rules) The SCMs identified as Phase IIIA Extended Dry Detention Basin and Phase IIIB
Extended Dry Detention are permitted based on the design criteria presented in the sealed,
signed and dated supplements, the sealed and signed "Technical Justification" document
dated April 13, 2021 justifying the variations from the Wilmington International Airport
Stormwater Master Plans well as the 2017 minimum design criteria, and as shown in the
approved plans and specifications. These SCMs must be provided and maintained at the
design condition. The approved supplements are incorporated by reference into this permit.
Page 2 of 5
State Stormwater Management Systems
Permit No. SW8 050547
14. (2017 Rules) If the SCMs identified as Phase IIIA Extended Dry Detention Basin and Phase
IIIB Extended Dry Detention are found to not meet the approved design criteria, a modification
must be submitted to either meet the requirements or propose another variation from the rules.
This is based on a case -by -case decision and should not be used as a precedent for future
permitting actions.
15. Tributary projects outside of the drainage area of the previously approved "for -credit" grassed
swales, but inside the drainage area of the approved SCIVIs, must provide an additional BMP
with a sufficient TSS removal efficiency such that the total TSS removal, including the
extended dry detention basin, is at least 85%.
H. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately. If the stormwater system was used as an Erosion Control device,
it must be restored to design condition prior to operation as a stormwater treatment device, and
prior to occupancy of the facility.
3. The facilities shall be constructed, operated, and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached to
this permit and on file with the Division.
4. The permittee is responsible for verifying that the proposed built -upon area for the entire
project does not exceed the maximum allowed by this permit.
5. Upon completion of the project, the permittee shall determine if the project is in compliance
with the approved plans anj take the necessary following actions:
a. If the permittee determines that the project is in compliance with the approved plans, then
within 45 days of completion, the permittee shall submit to the Division one hard copy
and one electronic copy of the following:
i. The completed and signed Designer's Certification provided in Attachment A
noting any deviations from the approved plans and specifications. Deviations
may require approval from the Division;
ii. A copy of the recorded operation and maintenance agreement;
iii. Unless already provided, a copy of the recorded deed restrictions and protective
covenants; and
iv. A copy of the recorded plat delineating the public rights -of -way, dedicated
common areas and/or permanent recorded easements, when applicable.
b. If the permittee determines that the project is not in compliance with the approved plans,
the permittee shall submit an application to modify the permit within 30 days of
completion of the project or provide a plan of action, with a timeline, to bring the site into
compliance.
6. The permittee shall at all times provide the operation and maintenance necessary to assure the
permitted stormwater system functions at the design condition. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled
intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch
basins and piping.
g. Access to the outlet structure must be available at all times.
7. Records of maintenance activities must be kept and made available upon request to authorized
personnel of DEMLR. The records will indicate the date, activity, name of person performing
the work and what actions were taken.
Page 3 of 5
State Stormwater Management Systems
Permit No. SW8 050547
8. (2017 Rules) The operation and maintenance agreement must be recorded with the Office of
the Register of Deeds.
9. (2017 Rules) The final plats for the project must be recorded with the Office of the Register of
eedl.Te recorded plat must reference the Operation and Maintenance Agreement and must
also show all public rights -of -way, dedicated common areas, and/or permanent drainage
easements, in accordance with the approved plans.
10. Access to the permitted stormwater facilities shall be maintained via appropriate easements (as
required) at all times.
11. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or vegetative
conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in the
approved plans and specifications.
g. Other modifications as determined by the Director.
12. The Director may notify the permittee when the permitted site does not meet one or more of the
minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
ni mimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
13. Prior to transfer of the permit, a file review and site inspection will be conducted by Division
personnel to ensure the permit conditions have been met and that the project and the on -site
stormwater system complies with the permit conditions. Any items not in compliance must be
repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities
performed to date may be requested.
III. GENERAL CONDITIONS
1. The issuance of this permit does not preclude the Permittee from complying with any and all
statutes, rules, regulations, or ordinances, which may be imposed by other government agencies
(local, state, and federal) having jurisdiction
2. This permit is not transferable to any person or entity except after notice to and approval by the
Director. The permittee shall submit a completed and signed "Permit Transfer Application
Form" (available on the Division website) accompanied by the required fee and supporting
documentation as listed on the form, to the Division at least 60 days prior to any one or more of
the following events:
a. The sale or conveyance of the project area in whole or in part, except in the case of an
individual lot sale that is made subject to the recorded deed restrictions and protective
covenants;
b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or
NCGS 57D-6-07 and 08;
c. Bankruptcy;
d. Foreclosure, subject to the requirements of Session Law 2013-121;
Page 4 of 5
State Stormwater Management Systems
Permit No. SW8 050547
3. Any individual or entity found to be in noncompliance with the provisions of this stormwater
management permit or the requirements of the Stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21.
4. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate
corrective action, including those as may be required by this Division, such as the construction
of additional or replacement stormwater management systems.
5. The permittee grants DEQ Staff permission to enter the property during normal business hours
for the purpose of inspecting all components of the permitted stormwater management facility.
6. The permit issued shall continue in force and effect until the.permittee files a request with the
Division for a permit modification, transfer, renewal, or rescission; however, these actions do
not stay any permit conditions.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must
follow the guidelines established in the North Carolina Erosion and Sediment Control Planning
and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of the permit. A copy of the approved plans and specifications shall be
maintained on file by the Permittee at all times.
9. The permittee is responsible for compliance with all permit conditions until such time as the
Division approves the transfer request. Neither the sale of the project, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the
stormwater permit.
10. The permittee shall submit a completed "Permit Information Update Application Form"
(available on the Division website) to the Division within 30 days to making any one or more
of the following changes:
a. A name change of the current permittee;
b. A name change of the project;
c. A mailing address change of the permittee;
11. The issuance of this permit does not prohibit the Director from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the
laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this
permit. The renewal request must include the appropriate application, documentation and the
processing fee as outlined in Title 15A NCAC 02H.1045(3).
Permit modified, updated and reissued this the 10t' day of June 2021.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Brian Wrenn, Dir for
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit No. SW8 050547
Page 5 of 5
State Stormwater Management Systems
Permit No. SW8 050547
Wilmington International Airport
Stormwater Permit No. SW8 050547
New Hanover County
Attachment A
Designer's Certification
I, , as a duly registered in the State of North
Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the
project,
(Project)
for (Project Owner) hereby state that, to the best of my
abilities, due care and diligence was used in the observation of the project construction such that the
construction was observed to be built within substantial compliance and intent of the approved plans
and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 1 of 2
f
State Stormwater Management Systems
Permit No. SW8 050547
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -
upon area.
3. All the built -upon area associated with the project is graded such that the runoff drains
to the system.
4. All drainage within the permitted contributing drainage area is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. A trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-circuiting of the
system.
11. The permitted amounts of surface area and/or volume have been provided.
12. Required drawdown device is correctly located and sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as pretreatment devices, outlet
structure and/or forebay.
15. The required system dimensions are provided per the approved plans.
16. The maximum drainage area and/or built -upon area have not been exceeded for the
"Phase 1 & I1" condition.
CC' NCDEQ-DEMLR Regional Office
New Hanover County Building Inspections
Page 2 of 2
4
State Stormwater Management Systems
Permit No. SW8
Attachment C - Permitting History
Wilmington International Airport EDDB
Permit No. SW8 050547
Approval
Tate
I Pernnit Act+L,n
�
AIMS
Version
Description of the C1=ges
This original issuance approved the 150 acre area
pocket of high density Phase I, in accordance with
6/15/2005
Original
1.0
SW8 040836, to be treated in an extended dry
Approval
detention basin (EDDB) #1 designed to handle the
runoff from 4,247,100 square feet of impervious
area.
Approved the modification of the permit to include
Phase II, which brought the total project area to 264
10/28/2009
Modification
1.1
acres and increased the size of the EDDB # 1 to
handle a total of 8,468,064 square feet of impervious
area.
Approved the modification to include Phase III,
which brought the total project area to 321.35 acres
and increased the size of the EDDB #1 to handle a
10/26/2011
Modification
1.2
total of 8,468,064 square feet of impervious area.
This permit also took into account the impervious
area for SW8 060326 and SW8 060515, which both
drain to EDDB #1 and were permitted as Offsite
permits to SW8 050547.
Approved the modification to the overall drainage
area to 3 22.3 8 acres and the increased size of EDDB
#1 to handle atotal of 9,751,185 square feet of
11/29/2012
Modification
1.3
impervious area. This modification included the
addition of two grassed pre-treatment swales. This
issuance left 3,177,214 square feet of Future
allocation for the Phase I & II area.
Approved the reallocation of 205,202 square feet of
Future allocation for the development of the Rental
2/8/2013
Plan Revision
1.4
Car Facility within the Phase I & II drainage area.
This issuance left 2,972,012 square feet of Future
allocation.
Approved the reallocation of 32,453 square feet of
Future allocation for the expansion of the North
8/4/2015
Plan Revision
1.5
General Aviation Apron draining to EDDB #1. This
issuance left 2,939,559 square feet of Future
allocation for the Phase I & II area.
Approved the reallocation of a total of 129,082
square feet of future allocation, 62,570 square feet
9/9/2015
Plan Revision
1.6
for the Business Park access road and 66,512 square
feet for Lot 9 of the Business Park, both draining to
EDDB #1. This issuance left 2,810,477 square feet
of Future allocation for the Phase I & II area.
Page 1 of 2
State Stormwater Management Systems
Permit No. SW8
Approved the reallocation of 122,922 square feet of
future allocation for the North General Aviation
Hanger Taxiline and Corporate Hanger Complex.
6/29/2016
Plan Revision
1.7
This also took into account the 24,190 square feet of
impervious area allocated to SW8 150723, which
drains to EDDB # 1 and is permitted as an Offsite
permit to SW8 050547. This issuance left 2,663,295
square feet of Future allocation.
Approved the reallocation of 75,596 square feet of
8/22/2017
Plan Revision
1.8
future allocation for the Avis Car Rental Facility
draining to EDDB #1. This issuance left 2,587,699
square feet of Future allocation.
Approved the reallocation of 29,337 square feet of
4/18/2018
Minor
1.9
future allocation for the Social Bark Kennel draining
Modification
to EDDB #1. This issuance left 2,558,362 square
feet of Future allocation.
Approved the reallocation of 110,358 square feet of
10/5/2018
Minor
2.0
future allocation for the FBO #2 project draining to
Modification
EDDB #1. This issuance left 2,448,004 square feet
of Future allocation.
10/3/2019
Renewal
3.0
This issuance renewed Permit No. SW8 050547 until
June 15, 2027.
Approved the reallocation of 224,194 square feet of
future allocation for the Air Carrier Apron
Expansion draining to EDDB # 1. This modification
Major
also adds Pre-treatment Swale #3 as pretreatment for
10/6/2020
Modification
3.1
EDDB #1. The submittal also included 9,268 square
feet of impervious area that meets NCGS 143-
214.7(c4) that does not drain to EDDB # 1. This
issuance left 2,223,812 square feet of Future
allocation for the Phase I & II area.
This issuance replaces the originally approved Phase
III expansion (and "Overall" condition) of Extended
Dry Detention Basin (EDDB) #1 with two new
EDDB's. EDDB #1 remains unmodified at the Phase
I&II condition. The two new EDDB's, identified as
Phase IIIA and Phase IIIB on the plans, are
permitted as a variation to the rules based on the
4/20/2021
Major
3.2
2004 "Wilmington International Airport Stormwater
Modification
Master Plan" document, signed and sealed
"Technical Justification " document dated April 13,
2021, and supplements as shown in the approved
plans and specifications. The Phase IIIA EDDB has
been designed to handle the runoff from 116,598
square feet of BUA and he Phase IIIB EDDB has
been designed to handle the runoff from 367,596
square feet of BUA.
This issuance approved the reallocation of 48,658
Minor
square feet of future BUA within the EDDB #1
6/10/2021
Modification
3.3
drainage area for the construction of the Aero Center
Wilmington project. This issuance left a total of
2,175,154 square feet of future allocation.
Page 2 of 2
DEMLR USE ONLY
Da a 4eceixed
Fee Paid
Permit Number
STORMWATER PERMITTING FORM 7:
MINOR MODIFICATION
Standard Permitting Program — No Fee for Minor Modification
Express Permitting Program — See Express Fee Schedule
Only complete applications packages will be accepted and reviewed. This form and the required items (with
original signatures) must be sent to the appropriate DEMLR Regional Office, which can be determined by locating
the project on the interactive online map at: http://dea.nc.gov/contact/reaional-offices.
This form is to only to be used by the current permittee to notify the Division of a minor
modification. Pursuant to Rule 15A NCAC 02H .1002, a minor modification is a change to the project that:
1) does not increase the net built -upon area; and/or
2) does not change the size or design of the SCM(s).
A. GENERAL INFORMATION
1. State Stormwater Permit Number: SW8 050547
2. Current Permit Holder's Company Name/Organization: New Hanover County Airport Authori
3. Signing Official's Name: Granseur Dick, PE
4. Signing Official's Title: Airport Director
5. Mailing Address: 1740 Airport Boulevard, Suite 12
City: Wilmington State: NC ZIP: 28405
6. Street Address (if different):
City: State: ZIP:
7. Phone: (910) 341-4333 Email: GDick(a)_flyilm.com
8. Describe the minor modifications that you are requesting, including any revised BUA allocations (attach
additional pages or supporting tables similar to Section IV.10 of the original application, if needed):
The proposed project will be revising the drainage area and utilizing 48,658 square feet of the permitted
built -upon area allocated for the Airport's master storm water management system covered under permit
SW8-050587.
See additional pages.
B. SUBMITTAL REQUIREMENTS
Please mark "Y" to confirm the items are included with this form. Please mark `X" if previously provided. If not
applicable or not available, please mark N/A.:
Y 1. Two hard copies (with original signatures) and one electronic copy of this completed form.
Y 2. Two hard copies and one electronic copy of the revised plan sheets (must be a revision of the
originally approved plan sheets).
X 3. If there is reallocation of lot BUA, a copy of the revised recorded deed restrictions and protective
covenants OR the proposed recorded deed restrictions and protective covenants documenting
the changes and a signed agreement to provide the final recorded document.
NA 4. If applicable, the appropriate Express review fee.
RE�E�vE
ANzo202,p
BY:
Stormwater Permit Form 7: Minor Modification Page 1 of 2
July 14, 2017
C. CONTACT INFORMATION
1. The Design Professional who is authorized to provide information on the Applicant's behalf:
Design Professional's Name:Jason M. Smith, PE
Consulting Firm: J M Smith Engineering, LLC
Mailing Address:P O Box 331
City:Cornelia State:GA Zip:30531
Phone: (706) 894-2331 Fax: (678) 267-3731
Email::imsmith(a-'Imsmithengineering.com
[OPTIONAL] If you would like to designate another person to answer questions about the project:
Name & Title:
Organization:
Mailing Address:
City:_
Phone:
Email: :
D. CERTIFICATION OF PERMITTEE
State: Zip:
Fax: ( )
I, Granseur Dick, PE , the current permittee, certify that I have authorized the minor modifications listed
in Section A and shown in the attached revised plan sheets. I further attest that this information is accurate and
complete to the best of my knowledge.
Signature:
Date:
I,3-rS%OH'i\) ' — �rb I"J , a Notary Public fof the State of � JV--Tt� �J9'12�U1f1 Nji',
County of , do hereby certify that U
personally appeared before me this the 1 S day of P 1 l�~ 20 „21 , and
acknowledge the due execution of the forgoing instrument. Witness my hand and official seal,
(Notary Seal)
Notary Sig
My commis
co - V
z
a
O
&OVER G
�ECEIVE
APR 2 0 2021
er•_
Stormwater Permit Form 7: Minor Modification Page 2 of 2 Oct 6, 2017
T-1
`
all
M
s
n
n
m
N
cs
W
C"
CDO
Q
U��
f7't
Gi
p
Q
R
y
aL.
_
V
pq
IV
lfl
N
l/1
N
m
10
N
N
N
C
y.y
.--1
.•-1
�
I
UI
m
10
L
Q
CD
op
L
U
iq
Ln
9)i
m
��pp
d�
Ln
lO
N
kl
O
C
e-I
N
y
U
4
c
E
Ln
Ln
N
En
❑
ml
m
m
Y
Q
OPU
U
N
m
M
0)
LO
st
O
O
O
V1
ri
ip
000
aL-.
U
tD'
n
l0'
Ln
an
00
a
cc
E
F
❑
m�
Q
U
rn
m
m
00
c3
4
N
N
p��
m
e-1
1-1
to
a--1
Ln
C
E
N
N
e-4
f0
N
❑
Iv
�r
M
Lo
tL
Ln
N
m
o
p
Ln
o
o
Ln
o
C
r,
Ol
o f
pp
rp
n
pf
N
Rt%
�{
M
N
u"I
�
O
re
cD
co
UIm
`
O
O
Q
0
0
0
0
0
0
0
O
o
y
to
m
N
C
N
tlI
ml
m
N
N
-1
to
lD
Q`
�
o
0
0
0
0C:�
o
m
m
o
co
C
N
a4
M
n`
MI
lO
m
co
o
m
Q
00
rn
w
O
O
O
o
O
n
O
oc
N
m
o
.I
C
�
m
❑
* c
m
N
E m m Q* �' y
m N °� j• Q D v �.
z s v Q Q O m u
m o0 00 00
* z tv m to w Q t c n tm
CL m `• °y' m m E o y m Q E
Co
lu
L L
j0 no
O N
'u m v to to M E n vi to to to t t^ '„ m
CIS at M Vf H 0 a 3e � 0 0 0 0 0 2 O w H
c
cu
n C
� co-CU 7
f° > 3
> E N
tw Iv o
a
� O
lu
y
L 3
m Q N
G1 7 ++
C
f6 m N
0o E
Y = m
L L
� a
Q
a m v
O t N
TO
,; a 3
0o a �
C ++ C
O O N
C
O
-0 C v
v m a
E
Ea c'
o
.� m
c0 m
-0 w o `^
b5 ° C
v c m
m
u E m to
c m c
M -_ +. E
cu aL
lV y y Q
a s ❑ ai
+�
a? � c
m -0 IU
0,
� c Q v, �
L H m N C
a
++
m NCD
W 7
C C Y
N O N E -0
v E U v a;
m
O_ M U
m d r O
n E x u
03 — N N
° 3
i! t t L E
at °
CU a
M
' * O
* m •>
c L
a
v` v
s
0
� o
cc0 Q
A m
w o
L H
00
Ln
3 `0
u �
N �p
a o
H m
Burd, Tina J
From: Burd, Tina J
Sent: Friday, April 23, 2021 3:48 PM
To: gdick@flyilm.com; jmsmith@jmsmithengineering.com
Subject: SW8 050547 - Wilmington International Airport
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Minor Modification Application for the subject project on April 20, 2021. The project has been
assigned to Garrett Zorda and you will be notified if additional information is needed. Please be advised that the
construction of built -upon area may not commence until the Stormwater Permit is issued.
Best Regards,
Tina Burd
Administrative Associate it
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
E_r?tail corres!jOncle'?G0 to aim.f1orn this a(ilife SS is stjbject 10 th
NortF Carolina PiJbric deco ds L.avv and may be di.3t iose(! to ( ir(1 Verities.
Website: httg://deg nc gov/aboutidivisionslener_gy-mineral-land-resources/stormwater
Based on the current guidance to minimize the spread of COVID-ig, the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered
shifts. To accommodate these staffing changes, all DEQQoffice locations are limiting public access to appointments only. Please
check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We
appreciate your patience as we continue to serve the public during this challenging time.